Loading...
HomeMy WebLinkAboutA1.10LEVEL 1 - PHASE 1 DEMOUPUPUPUPUPUPUPUPMLKJIHGFEDCBAN22113346677885QPRSTO1013151516161717U18192021242523269111214S1R14AQ1225.120' - 0" +-20' - 0" +-20' - 0" +-20' - 3 1/2" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-15' - 2 1/2" +-9' - 5" +-16' - 9" +-9' - 5" +-12' - 2 1/2" +-20' - 0" +-20' - 3 1/2" +-10' - 10" +-15' - 5 1/2" +-20' - 0" +-15' - 0" +-20' - 0" +-20' - 0" +-12' - 0" +-12' - 0" +-12' - 0" +-12' - 0" +-12' - 0" +-20' - 0" +-20' - 0" +-10' - 10" +-15' - 5 1/2" +-25' - 0" +-10' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-20' - 0" +-4' - 0" +-19' - 0" +-20' - 0" +-20' - 0" +-19' - 0" +-1' - 0" +-23.126.115' - 3 1/2" +-20' - 0" +-25' - 3 1/2" +-5' - 0" +-1.221.09WORK AREA1.181.201.191.22REMOVE ALL WALL HUNG PICTURES & DEVICES. PATCH WALLS.1.231.231.231.241.251.091.091.26REMOVE ALL WALL HUNG PICTURES & DEVICES. PATCH WALLS.DEMOLITION GENERAL NOTESA. THE DEMOLITION PLANS ARE NOT COMPREHENSIVE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING CONSTRUCTION AS REQUIRED. IN GENERAL, THE INTENT OF DEMOLITION IS INDICATED WITH DASHED LINES ON THE DRAWINGS, BUT THE SCOPE IS DIAGRAMMATIC IN NATURE AND IS COMPLEMENTED BY THE COMPLETE SET OF CONTRACT DOCUMENTS.B. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THE CONSTRUCTION INDICATED OR REASONABLY IMPLIED IS TO BE REMOVED AND DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. IN ALL AREAS WHERE ARCHITECTURAL CONSTRUCTION IS TO BE REMOVED, STRUCTURAL ELEMENTS ARE TO BE PRESERVED.C. TAKE ALL PRECAUTIONS TO PREVENT DAMAGE TO EXISTING SURFACES TO REMAIN.D. WHEN REMOVING PORTIONS OF WALLS OR CEILINGS, TAKE ALL PRECAUTIONS TO PREVENT STRUCTURAL DAMAGE.E. ALL DEMOLITION WORK TO BE COORDINATED WITH ABATEMENT SCOPE.F. SEE MEP/FP DRAWINGS FOR BUILDING SYSTEM DEMOLITION. ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT DAMAGE. REMOVE, REPLACE, AND/OR CAP AS REQUIRED.G. ADDITIONAL CEILING & WALL REMOVAL AND REINSTALLATION MAY BE REQUIRED FOR THE INSTALLATION OF WORK SHOWN ON MEP DRAWINGS.DEMOLITION PLAN LEGENDCONCRETE SLAB TO BE REMOVED FOR NEW PENETRATIONRAISED FLOOR SYSTEM TO BE REMOVEDREMOVAL AND REINSTALLATION OF CEILING AS NOTEDWALL TO REMAINWALL TO BE DEMOLISHED. INTERIOR PARTITION WALLS TO BE REMOVED ARE CONCRETE MASONRY UNLESS OTHERWISE NOTED.DOOR AND FRAME TO BE DEMOLISHED.ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477As indicatedA1.1020758.0011/30/2018LEVEL 1 - PHASE 1 DEMO DEMOLITION KEYNOTES1.09 REMOVE DOOR AND DOOR FRAME. FILL AND PATCH WALL TO MATCH EXISTING1.18 EXISTING KITCHENETTE TO REMAIN1.19 EXISTING FIRE EXTINGUISHER TO REMAIN1.20 REMOVE EXISTING LETTERS. PATCH WALL1.22 REMOVE EXISTING MILLWORK PARTITION. PATCH FLOOR1.23 REMOVE COLUMN. PATCH CEILING1.24 REMOVE SHAFT WALL.1.25 REMOVE DOOR AND FRAME. EXPAND OPENING.1.26 REMOVE & REPLACE EXISTING DRINKING FOUNTAIN. PATCH WALL.# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION