Loading...
HomeMy WebLinkAboutCompliance with TC Energy Recommendations238 Dryden Rd Conformance with Tompkins County Energy Recommendations for New Construction (2018) 1. Energy Star.  The project will include water fixtures that meet EPA’s Water Sense requirements.  All permanent appliances will be Energy Star rated. 2. Heat Pumps.  Air sourced heat pumps will be used throughout the building.  Electric water heaters will be used 3. Renewables.  Roof surfaces are solar receptive to the extent possible, however, we are not providing solar panels as part of this project due to cost constraints. 4. Energy-efficient building design.  The building has been designed with a window-to-wall ratio of less than 25%.  The overall building shape is simple.  The final R-value of the insulation has not been determined at this time, but it is our intent to achieve an increase in R-value over code.  Best practices will be used for air sealing to minimize infiltration and stack effects. For buildings over 20 units: (Though only 8 units are proposed there are some items we intend to meet.) 5. Lighting controls and high-efficient lighting technology  LED lighting will be used throughout the project  Occupancy sensors will be used in common areas and photo sensors will be used for exterior lighting. 6. High-efficiency heating and cooling systems  Heating and cooling systems will be located in conditioned space.  Energy recovery ventilation will be used where required.  If ductwork is used for the heating/cooling system, it will be leak-tested and sealed as necessary. 7. Whole building energy modeling  Whole building modeling will not be completed. However, ComCheck will be performed to show code compliance with code energy requirements.