HomeMy WebLinkAboutSubmittal20_Downspout AdaptersSUBMITTAL TRANSMITTAL
Project Name: Ithaca Arthaus
Project Number : 18260
A
To: Vecino Construction, LLC Date Submitted
Attn:Submittal No. (per Procore)
X
From:
X
Item
No.
Spec
Paragraph /
No.Submittal Type Lead Time
1 PD
2
3
4
5
6
7
8
9
10
11
Comments:
4/8/2020
Date
22 14 13
Transmittal (from SUBCONTRACTOR)
22 14 13
Jordyn Confer
Core and Main
Manufacturer
4/8/2020
Edger Enterprises of Elmira, Inc.
Dwg. And/or Specification
Section
Downspout Adaptors
Title / Description
ReSubmitted for Review & Approval REV (1)
Submitted for Review & Approval REV (0)
This is a FULL SUBMITTAL
This is a PARTIAL Submittal
Corey Olmstead
corey@vecinogroup.com
Phone: (315) 854-0979
Signature/Stamp of Transmitter
Vecino Construction Stamp BW A&E Stamp
Submittal Transmittal
-3.0
Vecino Construction, LLC
(Contractor Review)
Recommend Approval
Recommend Approval as Noted
Revise and Resubmit
Reviewed for general conformance with the Contract
Documents. Subcontractor or material supplier is
responsible for: confirming and correlating all quantities
and dimensions; selecting fabrication processes and
techniques of construction; coordinating his work with
that of all other trades; and performing his work in a
safe and satisfactory manner.
Project:
Reviewed by:
Date:
Corey Olmstead
18260 Ithaca Arthaus
4/10/2020
Jordyn Confer Digitally signed by Jordyn ConferDN: C=US, E=jconfer@edgerinc.com, O="Edger Enterprises ", CN="Jordyn Confer "Date: 2020.04.08 08:22:21-04'00'
REVIEW
DATE PRODUCT DESCRIPTION
ACCEPTED ACCEPTED AS CORRECTED
REVISE AND RESUBMIT REJECTED – SEE REMARKS
REMARKS:
1. This approval is given subject to any corrections noted on the drawing, and subject to the condition that
proper connection or requisite fitting of parts either to adjacent work or to parts of the same work, or
for fully complying with the requirements of the contract drawings and specifications.
2. Acceptance is only for conformance with the design concept of the Project and compliance with the
information given in the Project Manual. Contractor is responsible for dimensions to be confirmed and
correlated at the job site for information that pertains solely to the fabrication processes or to techniques
of construction, for coordination of the work of all trades, and performing his work in a safe and satisfactory
manner.
3. All measurements and conditions shall be checked and verified by the Contractor at the site.
4. Corrections shown on this drawing shall not be deemed an order for extra work.
5. No change shall be made on any approved drawing without written authorization.
SIGNED:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Shop Drawing 5HYLHZ
Fagan Engineers & Land Surveyors, P.C.
113 East Chemung Place, Elmira, New York 14904 | P 607.734.2165 | F 607.734.2169 | FaganEngineers.com
352-(&7BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
2:1(5BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
(1*,1((5BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&2175$&725BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
)(352-(&712BBBBBBBBBBB
orization.
Ithaca Arthaus 2018-089
Vecino Group
Fagan Engineers & Land Surveyors, P.C.
Edger Enterprises
04-13-20 Downspout Adapters
Brian M. Grose, EIT
Staff Engineer