HomeMy WebLinkAboutSubmittal20_Downspout AdaptersSUBMITTAL TRANSMITTAL Project Name: Ithaca Arthaus Project Number : 18260 A To: Vecino Construction, LLC Date Submitted Attn:Submittal No. (per Procore) X From: X Item No. Spec Paragraph / No.Submittal Type Lead Time 1 PD 2 3 4 5 6 7 8 9 10 11 Comments: 4/8/2020 Date 22 14 13 Transmittal (from SUBCONTRACTOR) 22 14 13 Jordyn Confer Core and Main Manufacturer 4/8/2020 Edger Enterprises of Elmira, Inc. Dwg. And/or Specification Section Downspout Adaptors Title / Description ReSubmitted for Review & Approval REV (1) Submitted for Review & Approval REV (0) This is a FULL SUBMITTAL This is a PARTIAL Submittal Corey Olmstead corey@vecinogroup.com Phone: (315) 854-0979 Signature/Stamp of Transmitter Vecino Construction Stamp BW A&E Stamp Submittal Transmittal -3.0 Vecino Construction, LLC (Contractor Review) Recommend Approval Recommend Approval as Noted Revise and Resubmit Reviewed for general conformance with the Contract Documents. Subcontractor or material supplier is responsible for: confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner. Project: Reviewed by: Date: Corey Olmstead 18260 Ithaca Arthaus 4/10/2020 Jordyn Confer Digitally signed by Jordyn ConferDN: C=US, E=jconfer@edgerinc.com, O="Edger Enterprises ", CN="Jordyn Confer "Date: 2020.04.08 08:22:21-04'00' REVIEW DATE PRODUCT DESCRIPTION ACCEPTED ACCEPTED AS CORRECTED REVISE AND RESUBMIT REJECTED – SEE REMARKS REMARKS: 1. This approval is given subject to any corrections noted on the drawing, and subject to the condition that proper connection or requisite fitting of parts either to adjacent work or to parts of the same work, or for fully complying with the requirements of the contract drawings and specifications. 2. Acceptance is only for conformance with the design concept of the Project and compliance with the information given in the Project Manual. Contractor is responsible for dimensions to be confirmed and correlated at the job site for information that pertains solely to the fabrication processes or to techniques of construction, for coordination of the work of all trades, and performing his work in a safe and satisfactory manner. 3. All measurements and conditions shall be checked and verified by the Contractor at the site. 4. Corrections shown on this drawing shall not be deemed an order for extra work. 5. No change shall be made on any approved drawing without written authorization. SIGNED:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Shop Drawing 5HYLHZ Fagan Engineers & Land Surveyors, P.C. 113 East Chemung Place, Elmira, New York 14904 | P 607.734.2165 | F 607.734.2169 | FaganEngineers.com 352-(&7BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 2:1(5BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (1*,1((5BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &2175$&725BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB )(352-(&712BBBBBBBBBBB orization. Ithaca Arthaus 2018-089 Vecino Group Fagan Engineers & Land Surveyors, P.C. Edger Enterprises 04-13-20 Downspout Adapters Brian M. Grose, EIT Staff Engineer