Loading...
HomeMy WebLinkAbout23 05 12-9 Pipe Portal Submittal Rev. 1, CORRECTIONS NOTED, PROCEEDSUBMITTAL TRANSMITTAL Project Name: Ithaca Arthaus Project Number : 18260 A To: Vecino Construction, LLC Date Submitted Attn:Submittal No. (per Procore) X From: X Item No. Spec Paragraph / No.Submittal Type Lead Time 1 Product Information 2 3 4 5 6 7 8 9 10 11 Comments: The edges at the top of the portals will be sealed. The sides and back of the portal will be sealed with 24 gage stainless steel, the same material used in the rest of the portal. The front opening will be sealed with spray insulation. Pipe penetrations through the roof will also be sprayed with foam insualtion. GC to provide additional insulation to be laid on top. Date 23 05 12-9 Transmittal (from SUBCONTRACTOR) 23 05 12 mcahill@suretemp.com (607) 729-6800 - Manufacturer 11/9/2020 Maura Cahill Dwg. And/or Specification Section Pipe Portals Title / Description ReSubmitted for Review & Approval REV (1) Submitted for Review & Approval REV (0) This is a FULL SUBMITTAL This is a PARTIAL Submittal Corey Olmstead corey@vecinogroup.com Phone: (315) 854-0979 Signature/Stamp of Transmitter Vecino Construction Stamp BW A&E Stamp Submittal Transmittal Vecino Construction, LLC (Contractor Review) Recommend Approval Recommend Approval as Noted Revise and Resubmit Reviewed for general conformance with the Contract Documents. Subcontractor or material supplier is responsible for: confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner. Project: Reviewed by: Date: Corey Olmstead 18260 Ithaca Arthaus 11/10/2020 Taitem Engineering PC ENERGY STAR MFHR Submittal Review Approved Approved As Noted Revise and Resubmit Rejected No Review Required This review only covers the requirements related to the ENERGY STAR Multifamily High Rise Program and associated energy savings. By: Date: Evan Hallas 11/10/2020 Example portal, reviewed on site with Sure Temp andVecino Construction on 11/5/2020, and descriptionlisted here is acceptable. A minimum of R-35 insulation must be installedwithin the portal, two layers of R-19 fiberglass battwould be acceptable. The contractor and/or owner may want to consideran alternative to spray foam for sealing between therefrigerant lines and front opening of portal as sprayfoam will degrade overtime from UV exposure fromlight reflected off of TPO roofing. 1122334455667788AABBCCDDSHEET 1 OF 1 DRAWNCHECKEDQAMFGAPPROVEDMaura9/11/2020DWG NODrawingTITLESIZEDSCALEREV1 / 428.005.0325.2515.2520.5030.5015.0314.00ALL UNITS ARE IN INCHES EMMKCPIPE PORTALSpray insulation will be used to create the vapor barrior.GC to provide R-19 batt insulation.Three sides will be sealed off with sheet metal. The front of the pipe portal will besealed off with spray foam insulation. See the attached photo for more information. Pipes will come throughthe front of the pipeportal, to be sealedonsite with spray foaminsulation.