Loading...
HomeMy WebLinkAbout23 05 12-1.1 Fan Submittal, CORRECTIONS NOTED, PROCEED Taitem Engineering PC ENERGY STAR MFHR Submittal Review Approved Approved As Noted Revise and Resubmit Rejected No Review Required This review only covers the requirements related to the ENERGY STAR Multifamily High Rise Program and associated energy savings. By: Date: Evan Hallas 10/13/2020 As requested in original submittal review, thefollowing wills till need to be provided. Seesubsequent submittal request by Vecino:-Provide wall mounted speed controller for EF-2-Provide motorized make-up air damper for EF-2 thatmeets IECC air leakage requirements, installed atexterior wall, and linked to EF-2 operation Installation notes:-Radiation damper to be air sealed to EF-1 exhaustfan. EF-1/radiation damper to be air sealed to drywall.