Loading...
HomeMy WebLinkAbout20210222-CayugaParkMOB_Permit-ECC Compliance Report Page 1 of 2 Taitem Engineering, PC │ 110 South Albany Street, Ithaca, NY 14850 │ v. 607-277-1118 │ www.taitem.com February 22, 2021 Code Inspector City of Ithaca Building Division 108 E Green St. Ithaca, NY 14850 Compliance Report for 2020 Energy Conservation Code of NYS Cayuga Park Medical Office Building Cayuga Park, Ithaca NY 14850 Per requirements of 2020 Energy Conservation Code of NYS, Section C402.1 Application and Section C407.3 Performance-Based Compliance, whole building energy models have been developed for the project following Section C407.5 Calculation Procedure. The energy models have been developed using the eQUEST version 3.64 software tool. Energy models of the standard reference design building and the proposed building were constructed, and the yearly energy cost of each building was then compared. The results from the energy models are shown in the table below. Utility rates used in the modeling are current NYSEG rates for non-residential service as published on NYSEG’s website, $0.061 per kwh for electricity. As shown in the table above, the proposed building energy cost is less than 85 percent of the standard reference design building, therefore the building is determined to be in compliance with 2020 Energy Conservation Code of NYS, Section C407.3, Performance-Based Compliance, as defined in Section C401.2, Application, Option 3. Additional documentation is available on request. In addition to compliance through whole building energy modeling, it is our understanding that the project must also comply with the following required sections of the 2020 Energy Conservation Code of Electricty Use (kwh/yr) Natural Gas Use (MMBtu/yr) Electricity Cost ($/yr) Natural Gas Cost ($/yr) Total Energy Cost ($/yr) Standard Reference Building 1,108,206 - 63,366$ -$ 63,366$ Cayuga Park Medical Office Building 651,927 - 40,052$ -$ 40,052$ 63%Proposed Design Energy Cost as Percent of Standard Reference Building Energy Cost 2020 Energy Conservation Code of NYS, Section C407.3, Performance-Based Compliance Page 2 of 2 Taitem Engineering, PC │ 110 South Albany Street, Ithaca, NY 14850 │ v. 607-277-1118 │ www.taitem.com NYS. The construction documents verify that these requirements have been met as noted on Sheet M001, dated 02/05/21. C402.5 – Air leakage – Thermal Envelope (Mandatory) C403.2 – System Design (Mandatory) C403.3.1 – C403.3.2 – Heating and Cooling Equipment Efficiencies (Mandatory) C403.4.1 – C403.4.2.3 – Heating and Cooling System Controls (Mandatory) C403.5.5 – Economizer Fault Detection and Diagnostics (Mandatory) C403.7 – Ventilation and Exhaust Systems (Mandatory) C403.8.1 – C403.8.4 – Fans and Fan Controls (Mandatory) C403.10.1 – C403.10.3 – Refrigeration Equipment Performance (Mandatory) C403.11 – Construction of HVAC System Elements (Mandatory) C403.12 – Mechanical Systems Located Outside of the Building Thermal Envelope (Mandatory) C404 – Service Water Heating (Mandatory) C405.1 – General (Mandatory) C405.2 – Lighting Controls (Mandatory) C405.4 – Exterior Lighting (Mandatory) C405.5 – Dwelling Electrical Meter (Mandatory) C405.6 – Electrical Transformers (Mandatory) C405.7 – Electric Motors (Mandatory) Sincerely, Rob Rosen Senior Energy Analyst Taitem Engineering, PC 607-277-1118 x110