Loading...
HomeMy WebLinkAboutS100 Foundation PlanTOP OF FOOTING ELEV UNO (WHERE SHOWN) LEGEND = TOP OF FOOTING ELEVATION UNLESS NOTED OTHERWISE = STEP FOOTING (REFER TO TYPICAL DETAILS) = CONSTRUCTION JOINT = SAWCUT GROOVE JOINT (CONTROL JOINT) = NO PIER = NO FOOTING = MATCH EXISTING SF CJ SJ NP NF ME -5'-0" FOOTING MARK (SEE FOOTING SCHEDULE)FX -96'-0" PIER MARK (SEE PIER SCHEDULE) PX TOF ELEV NOTES 1. DATUM ELEVATION = FINISHED GROUND FLOOR = 0'-0" (100' -0"). 2. REFER TO S001 AND S002 FOR GENERAL NOTES. REFER TO S101 FOR COLUMN AND SLAB PLAN. REFER TO S502 FOR FOUNDATION WALL AND FOOTING SCHEDULE. 3. TOP OF PIER IS (-0'-8") UNLESS OTHERWISE NOTED. 4. (+/-) X'-XX" DENOTES TOP OF FOOTING ELEVATION WITH RESPECT TO DATUM ELEVATION. 5. COLUMN PIERS AND GRADEWALLS SHALL BE CAST INTEGRAL. WALL REINFORCING SHALL BE CONTINUOUS THROUGH PIERS. REFER TO TYPICAL DETAILS. 6. COORDINATE LOCATION OF PIPES PENETRATING FOUNDATION WALLS WITH MECH. DRAWINGS. PROVIDE PIPE SLEEVES AT PENETRATIONS, REFER TO TYPICAL DETAILS. A A B B C C D D 1 1 2 2 3 3 3.8 3.8 4 4 5 5 6 6 F 3.9 E 5'-1 3/4"33'-3"14'-11 1/4"10'-5 5/8"5'-1 1/8"12'-6 5/8"16'-6 5/8"31'-6"23'-8 1/2"6'-9 1/2"24'-6 1/4"6'-11 3/4"31'-10"10'-7 7/8"16'-6" 1 8 '-8 "33.00°96'-0" F12 96'-0" F15.1 96'-0" F20 96'-0" F15.1 96'-0" F6 96'-0" F12 96'-0" F15 96'-0" F14 96'-0" F10 96'-0" F5 96'-0" F8 96'-0" F14 96'-0" F14 96'-0" F14 96'-0" F10 96'-0" F5 96'-0" F4 96'-0" F4 96'-0" F10 96'-0" F15.1 96'-0" F8 96'-0" F6 96'-0" F8 96'-0" F6 96'-0" F15 95'-0" F15 95'-0" F14F12F12F12F12 F15 F15F15 F15 F15F15F 1 5 96'-0" SF1 96'-0" SF1 96'-0" SF1 96'-0" SF1 96'-0" SF1 96'-0" SF1 96'-0" SF1 SUMP. COORDINATE WITH ELEVATOR SUPPLIER. 95'-0"F15F 1 5 F 1 5 96'-0" SF1 5.5 5.513'-8 3/4"18'-8 3/4"15 7/8"9"5.6 5.6 33.00°0'-3" 2 '-1" 4 '-1 "1'-3"1'-3"8'-0"1'-3"6'-8 1/2" P6 P5 P3 P5 P3 P1 P1 P1 P5 P3P3P6P6 P3 P6 P3 P4 P3 P6P6 P6P7 A.5 A.5 B.3 B.3 2.7 2.7 D.3 99'-7" F6 LOCATE FOOTING AT LANDING OF PRECAST STAIR 8'-8"+/- STRIP FOOTING. COORDINATE WITH STAIR LANDING.78.00°5 S501 TYP. 3 6 S500 96'-0" SF1 2 '-1 "5 '-1 "1 S501 1 S501 1 S501 1 S501 1 S501 4 S501 3 S501 12.00°90.00° E.1 E.1 2 '-1 "18 '-9 5 /8"13'- 5 1/4" 8 '-0 1 /8"61 '-11 1 /4" 1 '-3" 7" BRICK LEDGE (TYP) 7" BRICK LEDGE (TYP) 7" BRICK LEDGE (TYP) 7" BRICK LEDGE (TYP) 7" BRICK LEDGE (TYP) 7" BRICK LEDGE (TYP)2'-4"2'-4" 1 '-10"1'-10" 1 '-1 0 "1 '-4"2'-4"2'-4" 1'-4" 1'-4" 96'-0" SF1 1'-4" 1'-0"1'-4"11 S501 1 '-1 0 "1'- 4 "1'-4"1'-0"1'-4"1'-0"1'-4"1'-0"1'-0"1'-0"P7 11 S501 2 S501 2 S501 2 S501 2 S501 COORD. DIMS WITH FINAL ELEVATOR SELECTION 4'-5 3/4" 152'-5 7/8" B.5 B.5 12 S501 N 1 0 "SIM. SIM. 2 '-1 "0'-10"2'- 1 " 2 S501 SIM. 1 S501 SIM. 1'-0"1'-0" P6 P3 P3 P3 PROVIDE ENGINEERED SHORING FOR EXCAVATION TO ENSURE EXCAVATION WILL COMPLY WITH OSHA REQUIREMENTS AND TO ENSURE PROTECTION OF THE ADJACENT BUILDING. COORDINATE EXTENTS REQUIRED WITH FIELD CONDITIONS. SUBMIT PLANS SIGNED AND SEALED BY A REGISTERED NEW YORK STATE PROFESSIONAL ENGINEER. 7 5/8" ANTICIPATED CLOSEST POINT TO PROPERTY LINE. COORD. WITH SITE AND ARCH. APPROXIMATE LOCATION OF PROPERTY LINE. COORDINATE WITH SITE, ARCH. AND SURVEY INFORMATION.DO NOT LOCATE BUILDING BASED ON STRUCTURAL DRAWINGS. LINE IS PROVIDED HERE FOR INFORMATION ONLY. 20'-0" 8'-0" 1'-3" 10'-9"9'-3"10'-9"DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com phone: (585) 482-8130 www.jensenbrv.com ROCHESTER, NEW YORK 14609 1653 EAST MAIN STREET Structural Engineering Consultants2/10/2021 4:46:42 PMS100 FOUNDATION PLAN 02/05/2021 2018089 NH Carpenter Park, Ithaca, NY 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING3/16" = 1'-0"1 FOUNDATION PLAN PIER SCHEDULE PIER DESCRIPTION REINFORCING P1 18" DIAMETER (6)-#7 BARS WITH #3 TIES AT 12" o/c P3 24" X 24"(8)-#6 BARS WITH #3 TIES AT 12" o/c P4 24" X 30"(8)-#6 BARS WITH #3 TIES AT 12" o/c P5 30" X 30"(8)-#7 BARS WITH #3 TIES AT 12" o/c P6 24" X 36"(8)-#7 BARS WITH #3 TIES AT 12" o/c P7 36" X 36"FULL DEPTH ANCHOR RODS W/ #4 TIES AT 4" O/C STRIP FOOTING SCHEDULE MARK DESCRIPTION WIDTH DEPTH REINFORCING SF1 CONTINUOUS STRIP FOOTING 2'-0" 1'-0" (2)-#5 BARS, CONTINUOUS FOUNDATION WALL SCHEDULE MARK DESCRIPTION THICKNESS LAYERS VERTICAL DOWELS W/HOOK VERTICAL BARS HORIZONTAL BARS F12 12" C.I.P. FOUNDATION WALL 12" 2 #5 AT 12" O/C #5 AT 12" O/C #5 AT 12" O/C F15 15" C.I.P. FOUNDATION WALL 15" 2 #5 AT 12" O/C #5 AT 12" O/C #5 AT 12" O/C RECTANGULAR COLUMN FOOTING SCHEDULE MARK LENGTH WIDTH THICKNESS REINFORCING F4 4'-0"4'-0"16" (5)-#5 BARS EA. WAY F5 5'-0"5'-0"16" (6)-#5 BARS EA. WAY F6 6'-0"6'-0"16" (7)-#5 BARS EA. WAY F8 8'-0"8'-0"20" (9)-#7 BARS EA. WAY F10 10'-0"10'-0"24" (11)-#7 BARS EA. WAY F12 12'-0"12'-0"24" (13)-#7 BARS EA. WAY TOP AND BOTTOM F14 14'-0"14'-0"28" (19)-#7 BARS EA. WAY F15 15'-0"15'-0"30" (18)-#7 BARS EA. WAY TOP AND BOTTOM F15.1 15'-0"15'-0"54" (22)-#8 BARS EA. WAY TOP AND BOTTOM F20 20'-0"20'-0"72" (40)-#8 BARS EA. WAY TOP AND BOTTOM REVISION SCHEDULE NAME DATE 02/10/2021 Received by DiMarco 2/15/2021