HomeMy WebLinkAbout12 FurnishingsPark Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
ROLLER WINDOW SHADES 122413 - 1
SECTION 122413 - ROLLER WINDOW SHADES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Manually operated roller shades with single rollers.
B. Related Requirements:
1. Section 061053 "Miscellaneous Rough Carpentry" for wood blocking and grounds for
mounting roller shades and accessories.
2. Section 079200 "Joint Sealants" for sealing the perimeters of installation accessories for
light-blocking shades with a sealant.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components
and profiles, features, finishes, and operating instructions for roller shades.
B. Shop Drawings: Show fabrication and installation details for roller shades, including shadeband
materials, their orientation to rollers, and their seam and batten locations.
C. Samples for Verification: For each type of roller shade.
1. Shadeband Material: Not less than 10 inches square. Mark interior face of material if
applicable.
D. Product Schedule: For roller shades.
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For roller shades to include in maintenance manuals.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
ROLLER WINDOW SHADES 122413 - 2
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver roller shades in factory packages, marked with manufacturer, product name, and
location of installation using same designations indicated on Drawings.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Do not install roller shades until construction and finish work in
spaces, including painting, is complete and dry and ambient temperature and humidity
conditions are maintained at the levels indicated for Project when occupied for its intended use.
B. Field Measurements: Where roller shades are indicated to fit to other construction, verify
dimensions of other construction by field measurements before fabrication and indicate
measurements on Shop Drawings. Allow clearances for operating hardware of operable glazed
units through entire operating range. Notify Architect of installation conditions that vary from
Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the
Work.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain roller shades from single source from single manufacturer.
2.2 MANUALLY OPERATED SHADES WITH SINGLE ROLLERS
A. Basis-of-Design Product: Subject to compliance with requirements, provide the following:
1. MechoShade Systems, Inc.; Mecho/5 SlimLine.
B. Chain-and-Clutch Operating Mechanisms: With continuous-loop bead chain and clutch that
stops shade movement when bead chain is released; permanently adjusted and lubricated.
1. Bead Chains: Manufacturer's standard.
a. Loop Length: Full length of roller shade.
b. Limit Stops: Provide upper and lower ball stops.
c. Chain-Retainer Type: Chain tensioner, jamb or sill mounted, as required.
2. Spring Lift-Assist Mechanisms: Manufacturer's standard for balancing roller shade
weight and for lifting heavy roller shades.
a. Provide for shadebands that weigh more than 10 lb or for shades as recommended
by manufacturer, whichever criterion is more stringent.
C. Rollers: Corrosion-resistant steel or extruded-aluminum tubes of diameters and wall thicknesses
required to accommodate operating mechanisms and weights and widths of shadebands
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
ROLLER WINDOW SHADES 122413 - 3
indicated without deflection. Provide with permanently lubricated drive-end assemblies and
idle-end assemblies designed to facilitate removal of shadebands for service.
1. Roller Drive-End Location: As indicated on Drawings.
2. Direction of Shadeband Roll: Regular, from back (exterior face) of roller .
3. Shadeband-to-Roller Attachment: Manufacturer's standard method.
D. Mounting Hardware: Brackets or endcaps, corrosion resistant and compatible with roller assembly,
operating mechanism, installation accessories, and mounting location and conditions indicated.
E. Roller-Coupling Assemblies: Coordinated with operating mechanism and designed to join up to
three inline rollers into a multiband shade that is operated by one roller drive-end assembly.
F. Shadebands:
1. Shadeband Material: Light-filtering fabric or Light-blocking fabric, as scheduled on
Drawings.
2. Shadeband Bottom (Hem) Bar: Steel or extruded aluminum.
a. Type: Enclosed in sealed pocket of shadeband material or, for light-blocking shades,
exposed with endcaps and integral light seal at bottom where it meets the sill.
G. Installation Accessories:
1. Exposed Headbox: Rectangular, extruded-aluminum enclosure including front fascia, top
and back covers, endcaps, and removable bottom closure.
2.3 SHADEBAND MATERIALS
A. Shadeband Material Flame-Resistance Rating: Comply with NFPA 701. Testing by a qualified
testing agency. Identify products with appropriate markings of applicable testing agency.
B. Light-Filtering Fabric: Woven fabric, stain and fade resistant.
1. Orientation on Shadeband: Up the bolt.
2. Color: As scheduled on Drawings.
2.4 ROLLER SHADE FABRICATION
A. Product Safety Standard: Fabricate roller shades to comply with WCMA A 100.1, including
requirements for flexible, chain-loop devices; lead content of components; and warning labels.
B. Unit Sizes: Fabricate units in sizes to fill window and other openings as follows, measured at
74 deg F:
1. Between (Inside) Jamb Installation: Width equal to jamb-to-jamb dimension of opening
in which shade is installed less 1/4 inch per side or 1/2-inch total, plus or minus 1/8 inch.
Length equal to head-to-sill or -floor dimension of opening in which shade is installed
less 1/4 inch, plus or minus 1/8 inch.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
ROLLER WINDOW SHADES 122413 - 4
C. Shadeband Fabrication: Fabricate shadebands without battens or seams to extent possible,
except as follows:
1. Vertical Shades: Where width-to-length ratio of shadeband is equal to or greater than 1:4,
provide battens and seams at uniform spacings along shadeband length to ensure
shadeband tracking and alignment through its full range of movement without distortion
of the material.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with
requirements for installation tolerances, operational clearances, and other conditions affecting
performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 ROLLER SHADE INSTALLATION
A. Install roller shades level, plumb, and aligned with adjacent units according to manufacturer's
written instructions.
B. Roller Shade Locations: As indicated on Drawings.
3.3 ADJUSTING
A. Adjust and balance roller shades to operate smoothly, easily, safely, and free from binding or
malfunction throughout entire operational range.
3.4 CLEANING AND PROTECTION
A. Clean roller shade surfaces, after installation, according to manufacturer's written instructions.
B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and
Installer, that ensure that roller shades are without damage or deterioration at time of
Substantial Completion.
C. Replace damaged roller shades that cannot be repaired, in a manner approved by Architect,
before time of Substantial Completion.
END OF SECTION 122413
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 1
SECTION 123623.13 - PLASTIC-LAMINATE-CLAD COUNTERTOPS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Plastic-laminate-clad countertops.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include data for fire-retardant treatment from chemical-treatment manufacturer and
certification by treating plant that treated materials comply with requirements.
B. Sustainable Design Submittals:
1. Environmental Product Declaration (EPD): For each product.
2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for
low-emitting materials.
3. Product Data: For installation adhesives, indicating VOC content.
4. Laboratory Test Reports: For installation adhesives, indicating compliance with
requirements for low-emitting materials.
5. Laboratory Test Reports: For composite wood products, indicating compliance with
requirements for low-emitting materials.
C. Shop Drawings: For plastic-laminate-clad countertops.
1. Include plans, sections, details, and attachments to other work. Detail fabrication and
installation, including field joints.
2. Show locations and sizes of cutouts and holes for items installed in plastic-laminate-clad
countertops.
3. Apply AWI Quality Certification Program label to Shop Drawings.
D. Samples: Plastic laminates in each type, color, pattern, and surface finish required in
manufacturer's standard size.
1.3 QUALITY ASSURANCE
A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate products
similar to those required for this Project and whose products have a record of successful
in-service performance.
1. Shop Certification: AWI's Quality Certification Program accredited participant.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 2
B. Installer Qualifications: AWI's Quality Certification Program accredited participant.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver countertops only after casework and supports on which they will be installed have been
completed in installation areas.
B. Store countertops in areas where environmental conditions comply with requirements specified
in "Field Conditions" Article.
C. Keep surfaces of countertops covered with protective covering during handling and installation.
1.5 FIELD CONDITIONS
A. Environmental Limitations with Humidity Control: Do not deliver or install countertops until
building is enclosed, wet-work is complete, and HVAC system is operating and maintaining
temperature between 60 and 90 deg F and relative humidity between 25 and 55 percent during
the remainder of the construction period.
B. Established Dimensions: Where countertops are indicated to fit to other construction, establish
dimensions for areas where countertops are to fit. Provide allowance for trimming at site, and
coordinate construction to ensure that actual dimensions correspond to established dimensions.
PART 2 - PRODUCTS
2.1 PLASTIC-LAMINATE-CLAD COUNTERTOPS
A. Quality Standard: Unless otherwise indicated, comply with the "Architectural Woodwork
Standards" for grades of plastic-laminate-clad countertops indicated for construction, finishes,
installation, and other requirements.
1. The Contract Documents contain requirements that are more stringent than the referenced
quality standard. Comply with requirements of Contract Documents in addition to those
of the referenced quality standard.
B. Grade: Premium.
C. Regional Materials: Wood products shall be manufactured within 100 miles of Project site from
materials that have been extracted, harvested, or recovered, as well as manufactured, within 100
miles of Project site.
D. Certified Wood: Wood products shall be certified as "FSC Pure" or "FSC Mixed Credit"
according to FSC STD-01-001 and FSC STD-40-004.
E. High-Pressure Decorative Laminate: NEMA LD 3, Grade HGS.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 3
1. Manufacturers: Subject to compliance with requirements, provide products by the
following:
a. Wilsonart LLC.
F. Colors, Patterns, and Finishes: Provide materials and products that result in colors and textures
of exposed laminate surfaces complying with the following requirements:
1. As scheduled on Drawings.
G. Edge Treatment: 3.0-mm PVC edging.
H. Core Material: Particleboard or Exterior-grade plywood.
I. Core Material at Sinks: Particleboard made with exterior glue or exterior-grade plywood.
J. Core Thickness: 1-1/8 inch.
K. Backer Sheet: Provide plastic-laminate backer sheet, NEMA LD 3, Grade BKL, on underside
of countertop substrate.
2.2 WOOD MATERIALS
A. Wood Products: Provide materials that comply with requirements of referenced quality
standard unless otherwise indicated.
1. Wood Moisture Content: 5 to 10 percent.
B. Composite Wood Products: Provide materials that comply with requirements of referenced
quality standard for each type of countertop and quality grade specified unless otherwise
indicated.
1. Composite Wood Products: Products shall be made using ultra-low-emitting
formaldehyde resins as defined in the California Air Resources Board's "Airborne Toxic
Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products"
or shall be made with no added formaldehyde.
2. Particleboard: ANSI A208.1, Grade M-2 or Grade M-2-Exterior Glue.
3. Softwood Plywood: DOC PS 1.
2.3 ACCESSORIES
A. Wire-Management Grommets: Circular, molded-plastic grommets and matching plastic caps
with slot for wire passage.
1. Manufacturers: Subject to compliance with requirements, provide products by the
following:
a. Doug Mockett & Company, Inc.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 4
2. Outside Diameter: 2 inches.
3. Color: Black.
2.4 MISCELLANEOUS MATERIALS
A. Adhesives: Use adhesives that meet the testing and product requirements of the California
Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile
Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
B. Adhesive for Bonding Plastic Laminate: Contact cement .
1. Adhesive for Bonding Edges: Hot-melt adhesive or adhesive specified above for faces.
C. Installation Adhesive:
1. Adhesives shall have a VOC content of 70 g/L or less.
2. Adhesive shall comply with the testing and product requirements of the California
Department of Public Health's "Standard Method for the Testing and Evaluation of
Volatile Organic Chemical Emissions from Indoor Sources Using Environmental
Chambers."
2.5 FABRICATION
A. Fabricate countertops to dimensions, profiles, and details indicated. Provide front and end
overhang of 1 inch over base cabinets. Ease edges to radius indicated for the following:
1. Solid-Wood (Lumber) Members: 1/16 inch unless otherwise indicated.
B. Complete fabrication, including assembly, to maximum extent possible before shipment to
Project site. Disassemble components only as necessary for shipment and installation. Where
necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.
1. Trial fit assemblies at fabrication shop that cannot be shipped completely assembled.
Install dowels, screws, bolted connectors, and other fastening devices that can be
removed after trial fitting. Verify that various parts fit as intended, and check
measurements of assemblies against field measurements before disassembling for
shipment.
C. Backsplashes: Provide backsplashes integral to countertops.
D. Shop cut openings to maximum extent possible to receive appliances, plumbing fixtures,
electrical work, and similar items. Locate openings accurately, and use templates or
roughing-in diagrams to produce accurately sized and shaped openings. Sand edges of cutouts
to remove splinters and burrs.
1. Seal edges of cutouts by saturating with varnish.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 5
PART 3 - EXECUTION
3.1 PREPARATION
A. Before installation, condition countertops to average prevailing humidity conditions in
installation areas.
B. Before installing countertops, examine shop-fabricated work for completion and complete work
as required, including removal of packing.
3.2 INSTALLATION
A. Grade: Install countertops to comply with same grade as item to be installed.
B. Assemble countertops and complete fabrication at Project site to the extent that it was not
completed in the shop.
1. Provide cutouts for appliances, plumbing fixtures, electrical work, and similar items.
Locate openings accurately, and use templates or roughing-in diagrams to produce
accurately sized and shaped openings. Sand edges of cutouts to remove splinters and
burrs.
2. Seal edges of cutouts by saturating with varnish.
C. Field Jointing: Where possible, make in the same manner as shop jointing, using dowels,
splines, adhesives, and fasteners recommended by manufacturer. Prepare edges to be joined in
shop so Project-site processing of top and edge surfaces is not required. Locate field joints
where shown on Shop Drawings.
1. Secure field joints in countertops with concealed clamping devices located within 6
inches of front and back edges and at intervals not exceeding 24 inches. Tighten in
accordance with manufacturer's written instructions to exert a constant, heavy-clamping
pressure at joints.
D. Scribe and cut countertops to fit adjoining work, refinish cut surfaces, and repair damaged
finish at cuts.
E. Countertop Installation: Anchor securely by screwing through corner blocks of base cabinets or
other supports into underside of countertop.
1. Install countertops level and true in line. Use concealed shims as required to maintain not
more than a 1/8-inch-in-96-inches variation from a straight, level plane.
2. Seal joints between countertop and backsplash, if any, and joints where countertop and
backsplash abut walls with mildew-resistant silicone sealant or another permanently
elastic sealing compound recommended by countertop material manufacturer.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
PLASTIC-LAMINATE-CLAD COUNTERTOPS 123623.13 - 6
3.3 ADJUSTING AND CLEANING
A. Repair damaged and defective countertops, where possible, to eliminate functional and visual
defects. Where not possible to repair, replace countertops. Adjust joinery for uniform
appearance.
B. Clean countertops on exposed and semiexposed surfaces.
C. Protection: Provide Kraft paper or other suitable covering over countertop surfaces, taped to
underside of countertop at a minimum of 48 inches o.c. Remove protection at Substantial
Completion.
END OF SECTION 123623.13
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
SOLID SURFACING COUNTERTOPS 123661.16 - 1
SECTION 123661.16 - SOLID SURFACING COUNTERTOPS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Solid surface material countertops.
2. Solid surface material backsplashes.
3. Solid surface material end splashes.
4. Solid surface material apron fronts.
5. Solid surface material sinks.
B. Related Requirements:
1. Section 224100 "Residential Plumbing Fixtures" for non-integral sinks and plumbing
fittings.
1.3 ACTION SUBMITTALS
A. Product Data: For countertop materials and sinks.
B. Sustainable Design Submittals:
1. Chain-of-Custody Certificates: For certified wood products. Include statement of costs.
2. Product Data: For adhesives, indicating VOC content.
3. Laboratory Test Reports: For adhesives, indicating compliance with requirements for
low-emitting materials.
4. Laboratory Test Reports: For composite wood products, indicating compliance with
requirements for low-emitting materials.
C. Shop Drawings: For countertops. Show materials, finishes, edge and backsplash profiles,
methods of joining, and cutouts for plumbing fixtures.
1. Show locations and details of joints.
2. Show direction of directional pattern, if any.
D. Samples for Verification: For the following products:
1. Countertop material, 6 inches square.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
SOLID SURFACING COUNTERTOPS 123661.16 - 2
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For solid surface material countertops to include in maintenance manuals.
Include Product Data for care products used or recommended by Installer and names,
addresses, and telephone numbers of local sources for products.
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Shop that employs skilled workers who custom-fabricate countertops
similar to that required for this Project, and whose products have a record of successful
in-service performance.
B. Installer Qualifications: Fabricator of countertops.
1.6 FIELD CONDITIONS
A. Field Measurements: Verify dimensions of countertops by field measurements before
countertop fabrication is complete.
1.7 COORDINATION
A. Coordinate locations of utilities that will penetrate countertops or backsplashes.
PART 2 - PRODUCTS
2.1 SOLID SURFACE COUNTERTOP MATERIALS
A. Solid Surface Material: Homogeneous-filled plastic resin complying with ICPA SS-1.
1. Manufacturers: Subject to compliance with requirements, provide products by the
following:
a. Meganite Inc.
2. Integral Sink Bowls: Comply with CSA B45.5/IAPMO Z124.
3. Colors and Patterns: As indicated on Drawings.
B. Solid Surface Material Sinks:
1. Products: Subject to compliance with requirements, provide E. I. duPont de Nemours
and Company; CORIAN #820 and CORIAN ACCESSIBLE SINK #5610, unless
otherwise noted.
C. Composite Wood Products: Products shall be made using ultra-low-emitting formaldehyde
resins as defined in the California Air Resources Board's "Airborne Toxic Control Measure to
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
SOLID SURFACING COUNTERTOPS 123661.16 - 3
Reduce Formaldehyde Emissions from Composite Wood Products" or shall be made with no
added formaldehyde.
D. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue.
E. Plywood: Exterior softwood plywood complying with DOC PS 1, Grade C-C Plugged, touch
sanded.
2.2 COUNTERTOP FABRICATION
A. Fabricate countertops according to solid surface material manufacturer's written instructions
and to the AWI/AWMAC/WI's "Architectural Woodwork Standards."
1. Grade: Premium.
B. Configuration:
1. Front: Straight, slightly eased at top.
2. Backsplash: Straight, slightly eased at corner.
3. End Splash: Matching backsplash.
C. Countertops: 1/2-inch- thick, solid surface material with front edge built up with same
material.
D. Backsplashes: 3/4-inch- thick, solid surface material.
E. Fabricate tops with shop-applied edges and backsplashes unless otherwise indicated. Comply
with solid surface material manufacturer's written instructions for adhesives, sealers,
fabrication, and finishing.
1. Install integral sink bowls in countertops in the shop.
F. Joints: Fabricate countertops in sections for joining in field.
1. Joint Locations: Not within 18 inches of a sink or cooktop and not where a countertop
section less than 36 inches long would result, unless unavoidable.
2. Splined Joints: Accurately cut kerfs in edges at joints for insertion of metal splines to
maintain alignment of surfaces at joints . Make width of cuts slightly more than thickness
of splines to provide snug fit. Provide at least three splines in each joint.
G. Cutouts and Holes:
1. Undercounter Plumbing Fixtures: Make cutouts for fixtures in shop using template or
pattern furnished by fixture manufacturer. Form cutouts to smooth, even curves.
a. Provide vertical edges, slightly eased at juncture of cutout edges with top and
bottom surfaces of countertop and projecting 3/16 inch into fixture opening.
2. Counter-Mounted Plumbing Fixtures: Prepare countertops in shop for field cutting
openings for counter-mounted fixtures. Mark tops for cutouts and drill holes at corners of
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
SOLID SURFACING COUNTERTOPS 123661.16 - 4
cutout locations. Make corner holes of largest radius practical.
3. Fittings: Drill countertops in shop for plumbing fittings, undercounter soap dispensers,
and similar items.
2.3 INSTALLATION MATERIALS
A. Adhesive: Product recommended by solid surface material manufacturer.
1. Adhesives shall have a VOC content of 70 g/L or less.
2. Adhesive shall comply with the testing and product requirements of the California
Department of Public Health's "Standard Method for the Testing and Evaluation of
Volatile Organic Chemical Emissions from Indoor Sources Using Environmental
Chambers."
B. Sealant for Countertops: Comply with applicable requirements in Section 079200 "Joint
Sealants."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates to receive solid surface material countertops and conditions under which
countertops will be installed, with Installer present, for compliance with requirements for
installation tolerances and other conditions affecting performance of countertops.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Install countertops level to a tolerance of 1/8 inch in 8 feet, 1/4 inch maximum. Do not exceed
1/64-inch difference between planes of adjacent units.
B. Fasten countertops by screwing through corner blocks of base units into underside of countertop.
Predrill holes for screws as recommended by manufacturer. Align adjacent surfaces and, using
adhesive in color to match countertop, form seams to comply with manufacturer's written
instructions. Carefully dress joints smooth, remove surface scratches, and clean entire surface.
C. Fasten subtops to cabinets by screwing through subtops into cornerblocks of base cabinets.
Shim as needed to align subtops in a level plane.
D. Secure countertops to subtops with adhesive according to solid surface material manufacturer's
written instructions. Align adjacent surfaces and, using adhesive in color to match countertop,
form seams to comply with manufacturer's written instructions. Carefully dress joints smooth,
remove surface scratches, and clean entire surface.
Received by DiMarco 02/25/2021
Park Grove - Cayuga Medical Center
MEDICAL OFFICE BUILDING
Cayuga Park, Ithaca, NY 14850
HOLT Project No. 2018089
SOLID SURFACING COUNTERTOPS 123661.16 - 5
E. Bond joints with adhesive and draw tight as countertops are set. Mask areas of countertops
adjacent to joints to prevent adhesive smears.
1. Install metal splines in kerfs in countertop edges at joints . Fill kerfs with adhesive before
inserting splines and remove excess immediately after adjoining units are drawn into
position.
2. Clamp units to temporary bracing, supports, or each other to ensure that countertops are
properly aligned and joints are of specified width.
F. Install backsplashes and end splashes by adhering to wall and countertops with adhesive. Mask
areas of countertops and splashes adjacent to joints to prevent adhesive smears.
G. Install aprons to backing and countertops with adhesive. Mask areas of countertops and
splashes adjacent to joints to prevent adhesive smears. Fasten by screwing through backing.
Predrill holes for screws as recommended by manufacturer.
H. Complete cutouts not finished in shop. Mask areas of countertops adjacent to cutouts to prevent
damage while cutting. Make cutouts to accurately fit items to be installed, and at right angles to
finished surfaces unless beveling is required for clearance. Ease edges slightly to prevent snipping.
1. Seal edges of cutouts in particleboard subtops by saturating with varnish.
I. Apply sealant to gaps at walls; comply with Section 079200 "Joint Sealants."
END OF SECTION 123661.16
Received by DiMarco 02/25/2021