Loading...
HomeMy WebLinkAbout08 OpeningsPark Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes: 1. Interior standard steel doors and frames. 2. Exterior energy efficient steel doors and frames. 1.3 DEFINITIONS A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or ANSI/SDI A250.8. 1.4 COORDINATION A. Coordinate anchorage installation for hollow-metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation. B. Coordinate requirements for installation of door hardware, electrified door hardware, and access control and security systems. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver hollow-metal doors and frames palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic. 1. Provide additional protection to prevent damage to factory-finished units. B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions. C. Store hollow-metal doors and frames vertically under cover at Project site with head up. Place on minimum 4-inch- high wood blocking. Provide minimum 1/4-inch space between each Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 2 stacked door to permit air circulation. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Ceco Door; ASSA ABLOY. 2. Curries Company; ASSA ABLOY. 3. Republic Doors and Frames. 4. Steelcraft; an Allegion brand. 2.2 PERFORMANCE REQUIREMENTS A. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings and temperature-rise limits indicated on Drawings, based on testing at positive pressure according to NFPA 252 or UL 10C. 1. Smoke- and Draft-Control Door Assemblies: Listed and labeled for smoke and draft control by a qualified testing agency acceptable to authorities having jurisdiction, based on testing according to UL 1784 and installed in compliance with NFPA 105. 2. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a qualified testing agency that doors comply with standard construction requirements for tested and labeled fire-rated door assemblies except for size. B. Thermally Rated Door Assemblies: Provide door assemblies with U-factor of not more than 0.37 deg Btu/F x h x sq. ft. when tested according to ASTM C518. 2.3 INTERIOR STANDARD STEEL DOORS AND FRAMES A. Construct hollow-metal doors and frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified. B. Heavy-Duty Doors and Frames: ANSI/SDI A250.8, Level 2; ANSI/SDI A250.4, Level B. At locations indicated in the Door and Frame Schedule Insert locations. 1. Doors: a. Type: As indicated in the Door and Frame Schedule. b. Thickness: 1-3/4 inches. c. Face: Uncoated steel sheet, minimum thickness of 0.042 inch (18-gauge Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 3 equivalent). d. Edge Construction: Model 1, Full Flush Model 2, Seamless. e. Edge Bevel: Provide manufacturer's standard beveled or square edges. f. Core: Vertical steel stiffener. g. Fire-Rated Core: Manufacturer's standard laminated mineral board core for fire-rated doors. 2. Frames: a. Materials: Uncoated steel sheet, minimum thickness of 0.053 inch (16-gauge equivalent). b. Sidelite Frames: Fabricated from same thickness material as adjacent door frame. c. Construction: Full profile welded. 3. Exposed Finish: Prime. 2.4 EXTERIOR ENERGY EFFICIENT STEEL DOORS AND FRAMES A. Construct hollow-metal doors and frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified. B. Exterior Doors (Energy Efficient): Face sheets fabricated of commercial quality hot-dipped zinc coated steel that complies with ASTM A924 A60. Provide doors complying with requirements indicated below by referencing ANSI/SDI A250.8 for level and model, and ANSI/SDI A250.4 for physical performance level. 1. Basis-of-Design Product: Subject to compliance with requirements, provide CECO Doors Products; (C) Energy Efficient - Mercury Series, or acceptable equal. 2. Design: Flush panel. 3. Core Construction: Foamed in place polyurethane and steel reinforced core with no stiffener face welds. a. Provide 18 gauge steel vertical reinforcements 6 inches apart and welded in place. Foamed in place polyurethane core is chemically bonded to all interior surfaces. No face welding is permitted. b. Thermal properties to rate at a fully operable minimum U-Factor 0.37 and R-Value 2.6, including insulated door, Mercury thermal-break frame and threshold. Thickness: 1-3/4 inches (44.5 mm). c. Face: Metallic-coated steel sheet, minimum thickness of 0.053 inch (1.3 mm) (16-gauge equivalent), with minimum A60 (ZF180) coating. d. Edge Construction: Model 2, Seamless or Model 3, Stile and Rail, as indicated on Drawings. e. Edge Bevel: Provide manufacturer's standard beveled or square edges. f. Top Edge Closures: Close top edges of doors with flush closures of same material as face sheets. Seal joints against water penetration. g. Bottom Edges: Close bottom edges of doors where required for attachment of weather stripping with end closures or channels of same material as face sheets. Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 4 h. Core: Polyisocyanurate. C. Exterior Frames (Energy Efficient): 1. Basis-of-Design Products: Subject to compliance with requirements, provide CECO Door Products; (C) - Thermal Break Mercury Series. 2. Frames: a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch (1.3 mm) (16-gauge equivalent), with minimum A60 (ZF180) coating. b. Thermal Break Frames: Subject to the same compliance standards and requirements as standard hollow metal frames. Tested for thermal performance in accordance with NFRC 102, and resistance to air infiltration in accordance with NFRC 400. c. Construction: Full profile welded 3. Exposed Finish: Prime. 2.5 FRAME ANCHORS A. Jamb Anchors: 1. Type: Anchors of minimum size and type required by applicable door and frame standard, and suitable for performance level indicated. 2. Quantity: Minimum of three anchors per jamb, with one additional anchor for frames with no floor anchor. Provide one additional anchor for each 24 inches of frame height above 7 feet. 3. Postinstalled Expansion Anchor: Minimum 3/8-inch- diameter bolts with expansion shields or inserts, with manufacturer's standard pipe spacer. B. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor. C. Material: ASTM A879/A879M, Commercial Steel (CS), 04Z coating designation; mill phosphatized. 1. For anchors built into exterior walls, steel sheet complying with ASTM A1008/A1008M or ASTM A1011/A1011M; hot-dip galvanized according to ASTM A153/A153M, Class B. 2.6 MATERIALS A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content. B. Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel (CS), Type B; suitable for exposed applications. C. Hot-Rolled Steel Sheet: ASTM A1011/A1011M, Commercial Steel (CS), Type B; free of scale, Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 5 pitting, or surface defects; pickled and oiled. D. Metallic-Coated Steel Sheet: ASTM A653/A653M, Commercial Steel (CS), Type B. E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A153/A153M. F. Power-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow-metal frames of type indicated. G. Mineral-Fiber Insulation: ASTM C665, Type I (blankets without membrane facing); consisting of fibers manufactured from slag or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E136 for combustion characteristics. H. Glazing: Comply with requirements in Section 088000 "Glazing." 2.7 FABRICATION A. Door Astragals: Provide overlapping astragal on one leaf of pairs of doors where required by NFPA 80 for fire-performance rating or where indicated. Extend minimum 3/4 inch beyond edge of door on which astragal is mounted or as required to comply with published listing of qualified testing agency. B. Hollow-Metal Frames: Fabricate in one piece except where handling and shipping limitations require multiple sections. Where frames are fabricated in sections, provide alignment plates or angles at each joint, fabricated of metal of same or greater thickness as frames. 1. Sidelite Frames: Provide closed tubular members with no visible face seams or joints, fabricated from same material as door frame. Fasten members at crossings and to jambs by welding, or by rigid mechanical anchors. 2. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners unless otherwise indicated. 3. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers as follows. Keep holes clear during construction. a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers. b. Double-Door Frames: Drill stop in head jamb to receive two door silencers. C. Hardware Preparation: Factory prepare hollow-metal doors and frames to receive templated mortised hardware, and electrical wiring; include cutouts, reinforcement, mortising, drilling, and tapping according to ANSI/SDI A250.6, the Door Hardware Schedule, and templates. 1. Reinforce doors and frames to receive nontemplated, mortised, and surface-mounted door hardware. 2. Comply with BHMA A156.115 for preparing hollow-metal doors and frames for hardware. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 6 D. Glazed Lites: Provide stops and moldings around glazed lites where indicated. Form corners of stops and moldings with butted or mitered hairline joints. 1. Provide stops and moldings flush with face of door, and with square stops unless otherwise indicated. 2. Provide fixed frame moldings on outside of exterior and on secure side of interior doors and frames. Provide loose stops and moldings on inside of hollow-metal doors and frames. 3. Coordinate rabbet width between fixed and removable stops with glazing and installation types indicated. 4. Provide stops for installation with countersunk flat- or oval-head machine screws spaced uniformly not more than 9 inches o.c. and not more than 2 inches o.c. from each corner. 2.8 STEEL FINISHES A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer. 1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with ANSI/SDI A250.10; recommended by primer manufacturer for substrate; compatible with substrate and field-applied coatings despite prolonged exposure. PART 3 - EXECUTION 3.1 PREPARATION A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces. Touch up factory-applied finishes where spreaders are removed. B. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware. 3.2 INSTALLATION A. Install hollow-metal doors and frames plumb, rigid, properly aligned, and securely fastened in place. Comply with approved Shop Drawings and with manufacturer's written instructions. B. Hollow-Metal Frames: Comply with ANSI/SDI A250.11. 1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces without damage to completed Work. a. Where frames are fabricated in sections, field splice at approved locations by welding face joint continuously; grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces. Touch-up finishes. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 HOLLOW METAL DOORS AND FRAMES 081113 - 7 b. Install frames with removable stops located on secure side of opening. 2. Fire-Rated Openings: Install frames according to NFPA 80. 3. Floor Anchors: Secure with postinstalled expansion anchors. a. Floor anchors may be set with power-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings. 4. Installation Tolerances: Adjust hollow-metal frames to the following tolerances: a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head. b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall. c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall. d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor. C. Hollow-Metal Doors: Fit and adjust hollow-metal doors accurately in frames, within clearances specified below. 1. Non-Fire-Rated Steel Doors: Comply with ANSI/SDI A250.8. 2. Fire-Rated Doors: Install doors with clearances according to NFPA 80. 3. Smoke-Control Doors: Install doors according to NFPA 105. D. Glazing: Comply with installation requirements in Section 088000 "Glazing" and with hollow-metal manufacturer's written instructions. 3.3 REPAIR A. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer. B. Metallic-Coated Surface Touchup: Clean abraded areas and repair with galvanizing repair paint according to manufacturer's written instructions. C. Touchup Painting: Cleaning and touchup painting of abraded areas of paint are specified in painting Sections. END OF SECTION 081113 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 1 SECTION 081416 - FLUSH WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Five-ply flush wood veneer-faced doors for transparent finish. 2. Factory finishing flush wood doors. 3. Factory fitting flush wood doors to frames and factory machining for hardware. B. Related Requirements: 1. Section 088000 "Glazing" for glass view panels in flush wood doors. 2. Section 134900 "Radiation Protection" for lead-lined flush wood doors. 1.3 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product, including the following: 1. Door core materials and construction. 2. Door edge construction 3. Door face type and characteristics. 4. Door trim for openings. 5. Door frame construction. 6. Factory-machining criteria. 7. Factory-finishing specifications. B. Sustainable Design Submittals: 1. Environmental Product Declaration (EPD): For each product. 2. Chain-of-Custody Qualification Data: For manufacturer and vendor. 3. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 2 4. Laboratory Test Reports: For composite wood products, indicating compliance with requirements for low-emitting materials. C. Shop Drawings: Indicate location, size, and hand of each door; elevation of each type of door; construction details not covered in Product Data; and the following: 1. Door schedule indicating door location, type, size, fire protection rating, and swing. 2. Door elevations, dimension and locations of hardware, lite and louver cutouts, and glazing thicknesses. 3. Details of frame for each frame type, including dimensions and profile. 4. Details of electrical raceway and preparation for electrified hardware, access control systems, and security systems. 5. Dimensions and locations of blocking for hardware attachment. 6. Dimensions and locations of mortises and holes for hardware. 7. Clearances and undercuts. 8. Requirements for veneer matching. 9. Doors to be factory finished and application requirements. 10. Apply AWI Quality Certification Program label to Shop Drawings. D. Samples for Initial Selection: For factory-finished doors. E. Samples for Verification: 1. Factory finishes applied to actual door face materials, approximately 8 by 10 inches, for each material and finish. 2. Polymer edging, in manufacturer's standard colors. 3. Frames for light openings, 6 inches long, for each material, type, and finish required. 1.5 CLOSEOUT SUBMITTALS A. Quality Standard Compliance Certificates: AWI Quality Certification Program certificates. 1.6 QUALITY ASSURANCE A. Certified Wood: Provide an invoice including vendor's chain-of-custody number, product cost, and entity being invoiced. B. Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body. C. Manufacturer's Certification: Licensed participant in AWI's Quality Certification Program. 1.7 DELIVERY, STORAGE, AND HANDLING A. Comply with requirements of referenced standard and manufacturer's written instructions. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 3 B. Package doors individually in plastic bags or cardboard cartons. C. Mark each door on bottom rail with opening number used on Shop Drawings. 1.8 FIELD CONDITIONS A. Environmental Limitations: Do not deliver or install doors until building is enclosed and weathertight, wet work is complete, and HVAC system is operating and maintaining temperature between 60 and 90 deg F and relative humidity between 25 and 55 percent during remainder of construction period. 1.9 WARRANTY A. Special Warranty: Manufacturer agrees to repair or replace doors that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Delamination of veneer. b. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section. c. Telegraphing of core construction in face veneers exceeding 0.01 inch in a 3-inch span. 2. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors. 3. Warranty Period for Solid-Core Interior Doors: Life of installation. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Fire-Rated Wood Door and Frame Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction, for fire-protection ratings and temperature-rise limits indicated on Drawings, based on testing at positive pressure in accordance with UL 10C or NFPA 252. 1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a qualified testing agency that doors comply with standard construction requirements for tested and labeled fire-rated door assemblies except for size. 2. Temperature-Rise Limit: At vertical exit enclosures and exit passageways, provide doors that have a maximum transmitted temperature end point of not more than 450 deg F above ambient after 30 minutes of standard fire-test exposure. B. Smoke- and Draft-Control Door Assemblies: Listed and labeled for smoke and draft control by a qualified testing agency acceptable to authorities having jurisdiction, based on testing in Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 4 accordance with UL 1784 and installed in compliance with NFPA 105. 2.2 FLUSH WOOD DOORS, GENERAL A. Quality Standard: In addition to requirements specified, comply with AWI/AWMAC/WI's "Architectural Woodwork Standards." 1. Provide certificates from AWI certification program indicating that doors and frames comply with requirements of grades specified. 2. The Contract Documents contain requirements that are more stringent than the referenced quality standard. Comply with the Contract Documents in addition to those of the referenced quality standard. B. Regional Materials: Wood doors shall be manufactured within 100 miles of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles of Project site. C. Certified Wood: Wood doors shall be certified as "FSC Pure" or "FSC Mixed Credit" according to FSC STD-01-001 and FSC STD-40-004. D. Adhesives: Use adhesives that meet the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers." E. Composite Wood Products: Products shall be made using ultra-low-emitting formaldehyde resins as defined in the California Air Resources Board's "Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products" or shall be made with no added formaldehyde. 2.3 SOLID-CORE FIVE-PLY FLUSH WOOD VENEER-FACED DOORS FOR TRANSPARENT FINISH A. Interior Doors : 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. Lambton Doors; ENVIRODESIGN 5-PLY Series. 2. Architectural Woodwork Standards Grade: Premium. 3. Faces: Single-ply wood veneer not less than 1/50 inch thick. a. Species: Select white maple. b. Cut: Plain sliced (flat sliced). c. Match between Veneer Leaves: Book match. d. Assembly of Veneer Leaves on Door Faces: Center-balance match. e. Pair and Set Match: Provide for doors hung in same opening or separated only by mullions. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 5 f. Room Match: Provide door faces of compatible color and grain within each separate room or area of building. 4. Exposed Vertical Edges: a. Fire-Rated Single Doors: Provide edge construction with intumescent seals concealed by outer stile. Comply with specified requirements for exposed vertical edges. b. Fire-Rated Pairs of Doors: Provide fire-retardant stiles that are listed and labeled for applications indicated without formed-steel edges and astragals. Provide stiles with concealed intumescent seals. Comply with specified requirements for exposed edges. c. Mineral-Core Doors: At hinge stiles, provide laminated-edge construction with improved screw-holding capability and split resistance. Comply with specified requirements for exposed edges. 1) Screw-Holding Capability: 475 lbf in accordance with WDMA T.M. 10. 5. Core for Non-Fire-Rated Doors: a. WDMA I.S. 10 structural composite lumber. 1) Screw Withdrawal, Door Face: 475 lbf. 2) Screw Withdrawal, Vertical Door Edge: 475 lbf. 6. Core for Fire-Rated Doors: As required to achieve fire-protection rating indicated on Drawings. a. Blocking for Mineral-Core Doors: Provide composite blocking with improved screw-holding capability approved for use in doors of fire-protection ratings indicated on Drawings as needed to eliminate through-bolting hardware. 7. Construction: Five plies, hot-pressed bonded (vertical and horizontal edging is bonded to core), with entire unit abrasive planed before veneering. 2.4 LIGHT FRAMES AND LOUVERS A. Wood Beads for Light Openings in Wood Doors: Provide manufacturer's standard wood beads unless otherwise indicated. 1. Wood Species: Same species as door faces . 2. Profile: Manufacturer's standard shape. 3. At wood-core doors with 20-minute fire-protection ratings, provide wood beads and metal glazing clips approved for such use. B. Wood-Veneered Beads for Light Openings in Fire-Rated Doors: Manufacturer's standard wood-veneered noncombustible beads matching veneer species of door faces and approved for use in doors of fire-protection rating indicated on Drawings. Include concealed metal glazing clips where required for opening size and fire-protection rating indicated. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 6 2.5 FABRICATION A. Factory fit doors to suit frame-opening sizes indicated. 1. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated. 2. Comply with NFPA 80 requirements for fire-rated doors. B. Factory machine doors for hardware that is not surface applied. 1. Comply with final hardware schedules, door frame Shop Drawings, ANSI/BHMA-156.115-W, and hardware templates. 2. Coordinate with hardware mortises in metal frames, to verify dimensions and alignment before factory machining. 3. For doors scheduled to receive electrified locksets, provide factory-installed raceway and wiring to accommodate specified hardware. C. Transom and Side Panels: 1. Fabricate matching panels with same construction, exposed surfaces, and finish as specified for associated doors. 2. Finish bottom edges of transoms and top edges of rabbeted doors same as door stiles. 3. Fabricate door and transom panels with full-width, solid-lumber, rabbeted, meeting rails. 4. Provide factory-installed spring bolts for concealed attachment into jambs of metal door frames. D. Openings: Factory cut and trim openings through doors. 1. Light Openings: Trim openings with moldings of material and profile indicated. 2. Glazing: Factory install glazing in doors indicated to be factory finished. Comply with applicable requirements in Section 088000 "Glazing." 2.6 FACTORY FINISHING A. Comply with referenced quality standard for factory finishing. 1. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing. 2. Finish faces, all four edges, edges of cutouts, and mortises. 3. Stains and fillers may be omitted on bottom edges, edges of cutouts, and mortises. B. Factory finish doors. C. Transparent Finish: 1. Finish: Architectural Woodwork Standards System-9, UV Curable, Acrylated Epoxy, Polyester or Urethane. 2. Finish: Architectural Woodwork Standards System-10, UV Curable, Water Based. 3. Staining: As selected by Architect from manufacturer's full range. 4. Effect: Open-grain finish. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 7 5. Sheen: Satin. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine doors and installed door frames, with Installer present, before hanging doors. 1. Verify that installed frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs. 2. Reject doors with defects. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Hardware: For installation, see Section 087100 "Door Hardware." B. Install doors to comply with manufacturer's written instructions and referenced quality standard, and as indicated. C. Install frames level, plumb, true, and straight. 1. Shim as required with concealed shims. Install level and plumb to a tolerance of 1/8 inch in 96 inches. 2. Anchor frames to anchors or blocking built in or directly attached to substrates. a. Secure with countersunk, concealed fasteners and blind nailing. b. Use fine finishing nails for exposed fastening, countersunk and filled flush with woodwork. 1) For factory-finished items, use filler matching finish of items being installed. 3. Install fire-rated doors and frames in accordance with NFPA 80. 4. Install smoke- and draft-control doors in accordance with NFPA 105. D. Job-Fitted Doors: 1. Align and fit doors in frames with uniform clearances and bevels as indicated below. a. Do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors. 2. Machine doors for hardware. 3. Seal edges of doors, edges of cutouts, and mortises after fitting and machining. 4. Clearances: a. Provide 1/8 inch at heads, jambs, and between pairs of doors. b. Provide 1/8 inch from bottom of door to top of decorative floor finish or covering Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FLUSH WOOD DOORS 081416 - 8 unless otherwise indicated on Drawings. c. Where threshold is shown or scheduled, provide1/4 inch from bottom of door to top of threshold unless otherwise indicated. d. Comply with NFPA 80 for fire-rated doors. 5. Bevel non-fire-rated doors 1/8 inch in 2 inches at lock and hinge edges. 6. Bevel fire-rated doors 1/8 inch in 2 inches at lock edge; trim stiles and rails only to extent permitted by labeling agency. E. Factory-Fitted Doors: Align in frames for uniform clearance at each edge. F. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site. 3.3 ADJUSTING A. Operation: Rehang or replace doors that do not swing or operate freely. B. Finished Doors: Replace doors that are damaged or that do not comply with requirements. Doors may be repaired or refinished if Work complies with requirements and shows no evidence of repair or refinishing. END OF SECTION 081416 Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 1 SECTION 081473.20 - WOOD SLIDING DOOR ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Interior Aluminum-Framed, Top-Hung Sliding Wood Door Assemblies and Related Hardware. B. Related Sections: 1. Division 01 Section "General Conditions". 2. Division 08 Section "Door Hardware Schedule". 3. Division 08 Section "Flush Wood Doors". C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction. 1. ICC/ANSI A117.1 - Accessible and Usable Buildings and Facilities. 2. ICC/IBC - International Building Code. 3. NFPA 80 - Fire Doors and Windows. 4. NFPA 101 - Life Safety Code. 5. NFPA 105 - Installation of Smoke Door Assemblies. 6. Window and Door Manufacturers Association - WDMA I.S.1-A Architectural Wood Flush Doors. 7. State Building Codes, Local Amendments. D. Standards: Comply with the following industry standards: 1. UL 1784 Standard for Air Leakage Tests of Door Assemblies and Other Opening Protectives. 1.3 PRE-INSTALLATION MEETINGS A. Pre-installation Conference: Refer to Division 01 Section "Project Requirements". Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 2 1.4 SUBMITTALS A. Comply with Division 01 Section "Submittal Procedures". B. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, door hardware and accessories, and finishes. C. Shop Drawings: Show details of fabrication and installation, including the following: 1. Assembly elevations and sections indicating dimensions, tolerances, materials, components, hardware, finishes, options, and accessories. 2. Door hardware locations, mounting heights, quantities, and installation requirements. 3. Frame anchorages and wall reinforcement requirements. D. Samples for Verification: For each type of exposed finish indicated, provide samples below as requested by Architect. 1. Frame finish sample. 2. Door veneer sample. E. Maintenance Data: For top-hung, sliding door assemblies include in maintenance manuals. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer. B. Notify manufacturer immediately of any shipping damage. C. Storage and Handling Requirements: 1. Store and handle materials in accordance with manufacturer’s instructions. 2. Keep materials in manufacturer’s original, unopened containers and packaging until installation. 3. Store materials in clean, dry area indoors. 4. Protect materials and finish during storage, handling, and installation to prevent damage. 1.6 WARRANTY A. General Warranty: The special warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. B. Special Warranty: Manufacturer's written warranty agreeing to repair or replace components of the top-hung, sliding door assemblies that fail in materials or workmanship within the specified warranty period. Failures include, but are not limited to, the following: Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 3 1. Structural failures. 2. Deterioration of metals, metal finishes, and other materials beyond normal weathering. 3. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section. 4. Telegraphing of core construction in wood face veneers exceeding 0.01 inch in a 3-inch span. 5. Failure of operating components to function normally. C. Warranty includes installation and finishing that may be required due to repair or replacement of defective doors. D. General Warranty Period: One year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Aluminum Frames: Aluminum cased opening perimeter frames manufactured with integral C- channel door cavity and acoustic seals. B. Closing Mechanism: Soft self-closing mechanism integrated with top track. C. Door Guide: Concealed type door guide. D. Accessibility Standards: Comply with applicable provisions in Accessibility Guidelines for Buildings and Facilities ICC (ANSI) A117.1 and requirements of authorities having jurisdiction. 2.2 MANUFACTURERS A. Subject to compliance with requirements, provide the named product, or the comparable product by one of the alternate specified manufacturers. Comparable products are subject to review and approval through the submittal process specified. B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. ASSA ABLOY 2. AD Systems. 2.3 INTERIOR TOP-HUNG, SLIDING DOOR ASSEMBLIES A. Basis-of-Design Manufacturer: 1. ASSA ABLOY RITE SLIDE Sliding Door System. B. Frame and Door Assembly Components: Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 4 1. Single Piece Box Top Track: Extruded aluminum track system with mounting brackets. 2. Fascia: Extruded aluminum with matching integral end caps. 3. Integral Soft-Closer: Soft and self-closing damper mechanism. 4. Concealed Door Bottom Floor Guide. 5. Seal Sets: Integral to frame. 6. Acoustically tested to STC34 7. Operating Hardware. Specified under section 087100 Finish Hardware. C. Specified Wall Thickness: 1. As indicated on Architectural Drawings. D. Frame Profiles: Extruded aluminum cased frame and trim with integral vertical jamb receiver channel. 1. 1-1/2" Faces. E. Fascia Profile: 1. Standard: Square. F. Frame Finish: 1. Custom Kynar Finish: To match Sherwin Williams SW7674 Peppercorn. G. Framing Anchors and Fastenings: Manufacturer's standard concealed anchors and fastenings. H. Flush Wood Door Construction: 1. Standard: WDMA I.S.1-A Performance Grade: Extra Heavy Duty; Aesthetic Grade: A Premium. 2. Minimum Thickness: 1-3/4". 3. Core Construction: Engineered Core (EC). 4. Face Veneer: Plain Sliced White Birch 5. Finish: Comply with referenced standard for factory finishing. 6. Door Glazing: As indicated on Architectural Elevations and Drawings. a. Minimum 6" vertical stiles and 10" bottom rail required. I. Door Preparation. Doors are to be factory machined for hardware including pilot and function holes. J. Door Hardware Components: 1. General: Heavy-duty, operating door hardware units in sizes, quantities, and types recommended by manufacturer for sliding door assemblies indicated. 2. Hardware is specified under section 087100 Finish Hardware Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 5 2.4 FABRICATION A. General: Fabricate top-hung, sliding door assemblies in sizes, profiles, and configurations indicated on Architectural Schedules and Drawings. B. Factory prepare door assemblies for field installation of door hardware and accessories to greatest extent possible. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify dimensions of wall openings. B. Examine wall openings and conditions, with Installer present, for plumb, level, and square, and compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Sliding door operation will be adversely affected by out-of-tolerance framing. C. Examine surfaces to receive door bottom guide. Floor shall have no height variance throughout the complete sliding operation. D. Notify Architect of conditions that would adversely affect installation or subsequent use of sliding doors. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 DOOR, FRAME AND HARDWARE ASSEMBLY INSTALLATION A.General: Comply with manufacturer's written installation instructions and approved shop drawings. B. Install frame components and sliding doors plumb, level, square, and in proper alignment. C. Anchor sliding door assemblies securely in place to supports according to manufacturer's written installation instructions. 3.3 ADJUSTING AND CLEANING A. Adjust sliding doors and hardware for smooth operation in accordance with manufacturer's written instructions without binding and with tight fit at contact points and seals. Sliding doors to close against walls without gaps. B. Repair minor damages to finish in accordance with manufacturer’s written instructions and as approved by Architect. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 6 3.4 PROTECTION A. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer that ensure sliding door assemblies are without damage or deterioration at the time of Substantial Completion. 3.5 DOOR HARDWARE SETS 1. Refer to Section 087100 Finish Hardware, for hardware sets. END OF SECTION 081473.20 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ACCESS DOORS AND FRAMES 083113 - 1 SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Access doors and frames. B. Related Requirements: 1. Section 077200 "Roof Accessories" for roof hatches. 1.2 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include construction details material descriptions, dimensions of individual components and profiles, and finishes. B. Samples: For each type of access door and frame and for each finish specified, complete assembly minimum 6 by 6 inches in size. C. Product Schedule: For access doors and frames. PART 2 - PRODUCTS 2.1 ACCESS DOORS AND FRAMES A. Flush Access Doors with Concealed Flanges: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. ACUDOR Products, Inc. b. Babcock-Davis. c. Larsens Manufacturing Company. d. Milcor; a division of Hart & Cooley, Inc. e. Nystrom. f. Williams Bros. Corporation of America (The). 2. Description: Face of door flush with frame; with concealed flange for gypsum board installation and concealed hinge. 3. Locations: Wall and ceiling. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ACCESS DOORS AND FRAMES 083113 - 2 4. Door Size: Confirm all door sizes and locations with Architect. 5. Uncoated Steel Sheet for Door: Nominal 0.060 inch, 16 gage, factory primed. 6. Frame Material: Same material and thickness as door. 7. Latch and Lock: Cam latch, screwdriver operated. B. Exterior Flush Access Doors: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Activar Construction Products Group, Inc. - JL Industries. b. Babcock-Davis. c. Nystrom. d. Williams Bros. Corporation of America (The). 2. Description: Weatherproof assembly, with face of door fit flush with frame and with exposed frame. Include extruded door gaskets and minimum 2-inch- thick fiberglass insulation. 3. Locations: Wall. 4. Door Size: As indicated on Drawings. 5. Aluminum Sheet for Door: Nominal 0.045 inch, with manufacturer's standard baked-enamel or powder-coat finish. 6. Frame Material: Same material, thickness, and finish as door. 7. Latch and Lock: Cam latch operated by handle, without lock. 2.2 MATERIALS A. Steel Sheet: Uncoated or electrolytic zinc coated, ASTM A879/A879M, with cold-rolled steel sheet substrate complying with ASTM A1008/A1008M, Commercial Steel (CS), exposed. B. Aluminum Sheet: ASTM B209, alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated. C. Frame Anchors: Same material as door face. D. Inserts, Bolts, and Anchor Fasteners: Hot-dip galvanized steel according to ASTM A153/A153M or ASTM F2329. 2.3 FABRICATION A. General: Provide access door and frame assemblies manufactured as integral units ready for installation. B. Metal Surfaces: For metal surfaces exposed to view in the completed Work, provide materials with smooth, flat surfaces without blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, or roughness. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ACCESS DOORS AND FRAMES 083113 - 3 C. Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces. Furnish mounting holes, attachment devices and fasteners of type required to secure access doors to types of supports indicated. 1. For concealed flanges with drywall bead, provide edge trim for gypsum panels securely attached to perimeter of frames. D. Latch and Lock Hardware: 1. Quantity: Furnish number of latches and locks required to hold doors tightly closed. 2. Keys: Furnish two keys per lock and key all locks alike. 2.4 FINISHES A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. D. Painted Finishes: Comply with coating manufacturer's written instructions for cleaning, conversion coating, and applying and baking finish. 1. Factory Primed: Apply manufacturer's standard, lead- and chromate-free, universal primer immediately after surface preparation and pretreatment. 2. Factory Finished: Apply manufacturer's standard baked-enamel or powder-coat finish immediately after cleaning and pretreating, with minimum dry-film thickness of 1 mil for topcoat. a. Color: As selected by Architect from full range of industry colors. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ACCESS DOORS AND FRAMES 083113 - 4 3.2 INSTALLATION A. Comply with manufacturer's written instructions for installing access doors and frames. 3.3 ADJUSTING A. Adjust doors and hardware, after installation, for proper operation. END OF SECTION 083113 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 1 SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum-framed storefront systems. 2. Aluminum-framed entrance door systems. B. Related Requirements: 1. Comply with requirements of Section 019119 "Building Enclosure Commissioning Requirements" for commissioning procedures and testing requirements. 1.2 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes. B. Sustainable Design Submittals: 1. Product Data: For sealants, indicating VOC content. 2. Laboratory Test Reports: For sealants, indicating compliance with requirements for low-emitting materials. 3. Environmental Product Declaration: For each product. 4. Health Product Declaration: For each product. 5. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer. C. Shop Drawings: For aluminum-framed entrances and storefronts. Include plans, elevations, sections, full-size details, and attachments to other work. 1. Include details of provisions for assembly expansion and contraction and for draining moisture occurring within the assembly to the exterior. 2. Include full-size isometric details of each type of vertical-to-horizontal intersection of aluminum-framed entrances and storefronts, showing the following: a. Joinery, including concealed welds. b. Anchorage. c. Expansion provisions. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 2 d. Glazing. e. Flashing and drainage. 3. Show connection to and continuity with adjacent thermal, weather, air, and vapor barriers. 4. Include point-to-point wiring diagrams showing the following: a. Power requirements for each electrically operated door hardware. b. Location and types of switches, signal device, conduit sizes, and number and size of wires. D. Samples for Initial Selection: For units with factory-applied color finishes. E. Samples for Verification: For each type of exposed finish required, in manufacturer's standard sizes. 1.4 CLOSEOUT SUBMITTALS A. Maintenance Data: For aluminum-framed entrances and storefronts to include in maintenance manuals. 1.5 QUALITY ASSURANCE A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer and that employs a qualified glazing contractor for this Project who is certified under the North American Contractor Certification Program (NACC) for Architectural Glass & Metal (AG&M) contractors. B. Product Options: Information on Drawings and in Specifications establishes requirements for aesthetic effects and performance characteristics of assemblies. Aesthetic effects are indicated by dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining construction. 1. Do not change intended aesthetic effects, as judged solely by Architect, except with Architect's approval. If changes are proposed, submit comprehensive explanatory data to Architect for review. 1.6 MOCKUPS A. Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for fabrication and installation. 1. Build mockup of typical wall area as shown on Drawings. 2. Testing shall be performed on mockups in accordance with requirements in "Field Quality Control" Article. 3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 3 4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. 1.7 WARRANTY A. Special Warranty: Manufacturer agrees to repair or replace components of aluminum-framed entrances and storefronts that do not comply with requirements or that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures, including, but not limited to, excessive deflection. b. Noise or vibration created by wind and thermal and structural movements. c. Deterioration of metals, metal finishes, and other materials beyond normal weathering. d. Water penetration through fixed glazing and framing areas. e. Failure of operating components. 2. Warranty Period: Five years from date of Substantial Completion. B. Special Finish Warranty, Anodized Finishes: Standard form in which manufacturer agrees to repair finishes or replace aluminum that shows evidence of deterioration of anodized finishes within specified warranty period. 1. Deterioration includes, but is not limited to, the following: a. Color fading more than 5 Delta E units when tested in accordance with ASTM D 2244. b. Chalking in excess of a No. 8 rating when tested in accordance with ASTM D 4214. c. Cracking, peeling, or chipping. 2. Warranty Period: 10 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. General Performance: Comply with performance requirements specified, as determined by testing of aluminum-framed entrances and storefronts representing those indicated for this Project without failure due to defective manufacture, fabrication, installation, or other defects in construction. 1. Aluminum-framed entrances and storefronts shall withstand movements of supporting structure, including, but not limited to, twist, column shortening, long-term creep, and deflection from uniformly distributed and concentrated live loads. 2. Failure also includes the following: a. Thermal stresses transferring to building structure. b. Glass breakage. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 4 c. Noise or vibration created by wind and thermal and structural movements. d. Loosening or weakening of fasteners, attachments, and other components. e. Failure of operating units. B. Structural Loads: 1. Wind Loads: As indicated on Drawings. 2. Other Design Loads: As indicated on Drawings. C. Deflection of Framing Members Supporting Glass: At design wind load, as follows: 1. Deflection Normal to Wall Plane: Limited to 1/175 of clear span for spans of up to 13 feet 6 inches and to 1/240 of clear span plus 1/4 inch for spans greater than 13 feet 6 inches. 2. Deflection Parallel to Glazing Plane: Limited to amount not exceeding that which reduces glazing bite to less than 75 percent of design dimension and that which reduces edge clearance between framing members and glazing or other fixed components to less than 1/8 inch. D. Structural: Test in accordance with ASTM E330/E330M as follows: 1. When tested at positive and negative wind-load design pressures, storefront assemblies, including entrance doors, do not evidence deflection exceeding specified limits. 2. When tested at 150 percent of positive and negative wind-load design pressures, storefront assemblies, including entrance doors and anchorage, do not evidence material failures, structural distress, or permanent deformation of main framing members exceeding 0.2 percent of span. 3. Test Durations: As required by design wind velocity, but not less than 10 seconds. E. Energy Performance: Certified and labeled by manufacturer for energy performance as follows: 1. Thermal Transmittance (U-factor): a. Fixed Glazing and Framing Areas: U-factor for the system of not more than 0.34 Btu/sq. ft. x h x deg F as determined in accordance with NFRC 100. b. Entrance Doors: U-factor of not more than 0.77 Btu/sq. ft. x h x deg F as determined in accordance with NFRC 100. 2. Solar Heat-Gain Coefficient (SHGC): a. Fixed Glazing and Framing Areas: SHGC for the system of not more than 0.40 as determined in accordance with NFRC 200. b. Entrance Doors: SHGC of not more than 0.40 as determined in accordance with NFRC 200. 3. Condensation Resistance Factor (CRF): a. Fixed Glazing and Framing Areas: CRF for the system of not less than 45 as determined in accordance with AAMA 1503. b. Entrance Doors: CRF of not less than 63 as determined in accordance with AAMA 1503. F. Thermal Movements: Allow for thermal movements resulting from ambient and surface Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 5 temperature changes. 1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. 2. Thermal Cycling: No buckling; stress on glass; sealant failure; excess stress on framing, anchors, and fasteners; or reduction of performance when tested in accordance with AAMA 501.5. a. High Exterior Ambient-Air Temperature: That which produces an exterior metal-surface temperature of 180 deg F. b. Low Exterior Ambient-Air Temperature: 0 deg F. c. Interior Ambient-Air Temperature: 75 deg F. 2.2 STOREFRONT SYSTEMS A. Manufacturers: Subject to compliance with requirements, provide Basis-of-Design products as scheduled on Drawings by EFCO Corporation or comparable products by one of the following: 1. Kawneer North America, an Arconic company. 2. Oldcastle BuildingEnvelope (OBE); CRH Americas. B. Framing Members: Manufacturer's extruded- or formed-aluminum framing members of thickness required and reinforced as required to support imposed loads. 1. Exterior Framing Construction: Thermally broken. 2. Glazing System: Retained mechanically with gaskets on four sides. 3. Glazing Plane: Center. 4. Finish: Clear anodic finish. 5. Fabrication Method: Screw-spline system. 6. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated. 7. Steel Reinforcement: As required by manufacturer. C. Backer Plates: Manufacturer's standard, continuous backer plates for framing members, if not integral, where framing abuts adjacent construction. D. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with nonstaining, nonferrous shims for aligning system components. 2.3 ENTRANCE DOOR SYSTEMS A. Entrance Doors: Manufacturer's standard glazed entrance doors for manual-swing or automatic operation. 1. Door Construction: 2-inch overall thickness, with minimum 0.188-inch- thick, extruded-aluminum tubular rail and stile members. Mechanically fasten corners with reinforcing brackets that are deeply penetrated and fillet welded or that incorporate concealed tie rods. a. Thermal Construction: High-performance plastic connectors separate aluminum members exposed to the exterior from members exposed to the interior. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 6 2. Basis-of-Design Product: Provide EFCO Corporation; D502 Thermastile Doors or acceptable equal. 3. Finish: Match adjacent storefront framing finish. 2.4 ENTRANCE DOOR HARDWARE A. Entrance Door Hardware: Hardware not specified in this Section is specified in Section 087100 "Door Hardware." B. General: Provide entrance door hardware and entrance door hardware sets indicated in door schedule for each entrance door, to comply with requirements in this Section. 1. Entrance Door Hardware Sets: Provide quantity, item, size, finish or color indicated, and products complying with BHMA standard referenced. 2. Opening-Force Requirements: a. Egress Doors: Not more than 15 lbf to release the latch and not more than 30 lbf to set the door in motion and not more than 15 lbf to open the door to its minimum required width. C. Designations: Requirements for design, grade, function, finish, quantity, size, and other distinctive qualities of each type of entrance door hardware are indicated in "Entrance Door Hardware Sets" Article. Products are identified by using entrance door hardware designations as follows: 1. References to BHMA Standards: Provide products complying with these standards and requirements for description, quality, and function. D. Weather Stripping: Manufacturer's standard replaceable components. 1. Compression Type: Made of ASTM D2000 molded neoprene or ASTM D2287 molded PVC. E. Weather Sweeps: Manufacturer's standard exterior-door bottom sweep with concealed fasteners on mounting strip. 2.5 GLAZING A. Glazing: Comply with Section 088000 "Glazing." 2.6 MATERIALS A. Sheet and Plate: ASTM B209. B. Extruded Bars, Rods, Profiles, and Tubes: ASTM B221. C. Structural Profiles: ASTM B308/B308M. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 7 D. Steel Reinforcement: 1. Structural Shapes, Plates, and Bars: ASTM A36/A36M. 2. Cold-Rolled Sheet and Strip: ASTM A1008/A1008M. 3. Hot-Rolled Sheet and Strip: ASTM A1011/A1011M. E. Steel Reinforcement Primer: Manufacturer's standard zinc-rich, corrosion-resistant primer complying with SSPC-PS Guide No. 12.00; applied immediately after surface preparation and pretreatment. Select surface preparation methods in accordance with recommendations in SSPC-SP COM, and prepare surfaces in accordance with applicable SSPC standard. F. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content. G. Recycled Content of Aluminum Components: Postconsumer recycled content plus one-half of preconsumer recycled content. H. Regional Materials: Products shall be manufactured within 100 miles of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles of Project site. 2.7 ACCESSORIES A. Automatic Door Operators: Section 087113 "Automatic Door Operators." Fasteners and Accessories: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding fasteners and accessories compatible with adjacent materials. 1. Use self-locking devices where fasteners are subject to loosening or turning out from thermal and structural movements, wind loads, or vibration. 2. Reinforce members as required to receive fastener threads. 3. Use exposed fasteners with countersunk Phillips screw heads, finished to match framing system. B. Anchors: Three-way adjustable anchors with minimum adjustment of 1 inch that accommodate fabrication and installation tolerances in material and finish compatible with adjoining materials and recommended by manufacturer. C. Concealed Flashing: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding flashing compatible with adjacent materials . D. Bituminous Paint: Cold-applied asphalt-mastic paint containing no asbestos, formulated for 30-mil thickness per coat. E. Rigid PVC filler. 2.8 FABRICATION A. Form or extrude aluminum shapes before finishing. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 8 B. Weld in concealed locations to greatest extent possible to minimize distortion or discoloration of finish. Remove weld spatter and welding oxides from exposed surfaces by descaling or grinding. C. Fabricate components that, when assembled, have the following characteristics: 1. Profiles that are sharp, straight, and free of defects or deformations. 2. Accurately fitted joints with ends coped or mitered. 3. Physical and thermal isolation of glazing from framing members. 4. Accommodations for thermal and mechanical movements of glazing and framing to maintain required glazing edge clearances. 5. Provisions for field replacement of glazing from interior. 6. Fasteners, anchors, and connection devices that are concealed from view to greatest extent possible. D. Mechanically Glazed Framing Members: Fabricate for flush glazing without projecting stops. E. Storefront Framing: Fabricate components for assembly using screw-spline system. F. Entrance Door Frames: Reinforce as required to support loads imposed by door operation and for installing entrance door hardware. 1. At interior and exterior doors, provide compression weather stripping at fixed stops. G. Entrance Doors: Reinforce doors as required for installing entrance door hardware. 1. At pairs of exterior doors, provide sliding-type weather stripping retained in adjustable strip and mortised into door edge. 2. At exterior doors, provide weather sweeps applied to door bottoms. H. Entrance Door Hardware Installation: Factory install entrance door hardware to the greatest extent possible. Cut, drill, and tap for factory-installed entrance door hardware before applying finishes. I. After fabrication, clearly mark components to identify their locations in Project in accordance with Shop Drawings. 2.9 ALUMINUM FINISHES A. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 9 B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION, GENERAL A. Comply with manufacturer's written instructions. B. Do not install damaged components. C. Fit joints to produce hairline joints free of burrs and distortion. D. Rigidly secure nonmovement joints. E. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding movement of moving joints. F. Seal perimeter and other joints watertight unless otherwise indicated. G. Metal Protection: 1. Where aluminum is in contact with dissimilar metals, protect against galvanic action by painting contact surfaces with materials recommended by manufacturer for this purpose or by installing nonconductive spacers. 2. Where aluminum is in contact with concrete or masonry, protect against corrosion by painting contact surfaces with bituminous paint. H. Set continuous sill members and flashing in full sealant bed, as specified in Section 079200 "Joint Sealants," to produce weathertight installation. I. Install joint filler behind sealant as recommended by sealant manufacturer. J. Install components plumb and true in alignment with established lines and grades. 3.3 INSTALLATION OF GLAZING A. Install glazing as specified in Section 088000 "Glazing." 3.4 INSTALLATION OF ALUMINUM-FRAMED ENTRANCE DOORS A. Install entrance doors to produce smooth operation and tight fit at contact points. 1. Exterior Doors: Install to produce weathertight enclosure and tight fit at weather stripping. 2. Field-Installed Entrance Door Hardware: Install surface-mounted entrance door hardware in accordance with entrance door hardware manufacturers' written instructions using concealed fasteners to greatest extent possible. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 10 3.5 ERECTION TOLERANCES A. Install aluminum-framed entrances and storefronts to comply with the following maximum tolerances: 1. Plumb: 1/8 inch in 10 feet; 1/4 inch in 40 feet. 2. Level: 1/8 inch in 20 feet; 1/4 inch in 40 feet. 3. Alignment: a. Where surfaces abut in line or are separated by reveal or protruding element up to 1/2 inch wide, limit offset from true alignment to 1/16 inch. b. Where surfaces are separated by reveal or protruding element from 1/2 to 1 inch wide, limit offset from true alignment to 1/8 inch. c. Where surfaces are separated by reveal or protruding element of 1 inch wide or more, limit offset from true alignment to 1/4 inch. 4. Location: Limit variation from plane to 1/8 inch in 12 feet; 1/2 inch over total length. 3.6 FIELD QUALITY CONTROL A. Comply with requirements of Section 019119 "Building Enclosure Commissioning Requirements" for commissioning procedures and testing requirements. 3.7 MAINTENANCE SERVICE A. Entrance Door Hardware Maintenance: 1. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of entrance door hardware. END OF SECTION 084113 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 1 SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Glazed aluminum curtain wall systems: a. Conventionally glazed. b. Two-sided, structural-sealant-glazed. B. Related Requirements: 1. Section 019119 "Building Enclosure Commissioning Requirements" for commissioning procedures and testing requirements. 2. Section 078443 "Joint Firestopping" perimeter fire-containment systems (safing insulation) field installed with glazed aluminum curtain walls. 3. Section 079200 "Joint Sealants" for installation of joint sealants installed with glazed aluminum curtain walls and for sealants to the extent not specified in this Section. 4. Section 088000 "Glazing" for curtain wall glazing. 1.3 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes. B. Sustainable Design Submittals: 1. Product Data: For sealants, indicating VOC content. 2. Laboratory Test Reports: For sealants, indicating compliance with requirements for low-emitting materials. 3. Environmental Product Declaration: For each product. 4. Health Product Declaration: For each product. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 2 5. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer. C. Shop Drawings: For glazed aluminum curtain walls. Include plans, elevations, sections, full-size details, and attachments to other work. 1. Include details of provisions for assembly expansion and contraction and for draining moisture occurring within the assembly to the exterior. 2. Include full-size isometric details of each type of vertical-to-horizontal intersection of glazed aluminum curtain walls, showing the following: a. Joinery, including concealed welds. b. Anchorage. c. Expansion provisions. d. Glazing. e. Flashing and drainage. 3. Show connection to and continuity with adjacent thermal, weather, air, and vapor barriers. D. Samples for Initial Selection: For units with factory-applied color finishes. E. Samples for Verification: For each type of exposed finish required, in manufacturer's standard sizes. F. Delegated-Design Submittal: For glazed aluminum curtain walls, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation. 1.5 INFORMATIONAL SUBMITTALS A. Energy Performance Certificates: For glazed aluminum curtain walls, accessories, and components from manufacturer. 1. Basis for Certification: NFRC-certified energy performance values for each glazed aluminum curtain wall. 1.6 CLOSEOUT SUBMITTALS A. Maintenance Data: For glazed aluminum curtain walls to include in maintenance manuals. B. Maintenance Data for Structural Sealant: For structural-sealant-glazed curtain walls to include in maintenance manuals. Include ASTM C1401 recommendations for post-installation-phase quality-control program. 1.7 QUALITY ASSURANCE A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer and that employs a qualified glazing contractor for this Project who is certified under the North American Contractor Certification Program (NACC) for Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 3 Architectural Glass & Metal (AGM) contractors and that employs glazing technicians certified under the Architectural Glass and Metal Technician (AGMT) certification program. B. Product Options: Information on Drawings and in Specifications establishes requirements for aesthetic effects and performance characteristics of assemblies. Aesthetic effects are indicated by dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining construction. 1. Do not change intended aesthetic effects, as judged solely by Architect, except with Architect's approval. If changes are proposed, submit comprehensive explanatory data to Architect for review. C. Structural-Sealant Glazing: Comply with ASTM C1401 for design and installation of structural-sealant-glazed curtain wall assemblies. 1.8 MOCKUPS A. Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for fabrication and installation. 1. Build mockup of typical wall area as shown on Drawings. 2. Testing shall be performed on mockups in accordance with requirements in "Field Quality Control" Article. 3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing. 4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. 1.9 WARRANTY A. Special Assembly Warranty: Manufacturer agrees to repair or replace components of glazed aluminum curtain wall that do not comply with requirements or that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures including, but not limited to, excessive deflection. b. Noise or vibration created by wind and thermal and structural movements. c. Deterioration of metals, metal finishes, and other materials beyond normal weathering. d. Water penetration through fixed glazing and framing areas. e. Failure of operating components. 2. Warranty Period: 10 years from date of Substantial Completion. B. Special Finish Warranty, Anodized Finishes: Standard form in which manufacturer agrees to repair finishes or replace aluminum that shows evidence of deterioration of anodized finishes within specified warranty period. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 4 1. Deterioration includes, but is not limited to, the following: a. Color fading more than 5 Delta E units when tested in accordance with ASTM D2244. b. Chalking in excess of a No. 8 rating when tested in accordance with ASTM D4214. c. Cracking, peeling, or chipping. 2. Warranty Period: 10 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design glazed aluminum curtain walls. B. General Performance: Comply with performance requirements specified, as determined by testing of glazed aluminum curtain walls representing those indicated for this Project without failure due to defective manufacture, fabrication, installation, or other defects in construction. 1. Glazed aluminum curtain walls shall withstand movements of supporting structure, including, but not limited to, story drift, twist, column shortening, long-term creep, and deflection from uniformly distributed and concentrated live loads. 2. Failure also includes the following: a. Thermal stresses transferring to building structure. b. Glass breakage. c. Noise or vibration created by wind and thermal and structural movements. d. Loosening or weakening of fasteners, attachments, and other components. e. Failure of operating units. C. Structural Loads: 1. Wind Loads: As indicated on Drawings. 2. Other Design Loads: As indicated on Drawings. D. Deflection of Framing Members Supporting Glass: At design wind load, as follows: 1. Deflection Normal to Wall Plane: Limited to 1/175 of clear span for spans of up to 13 feet 6 inches and to 1/240 of clear span plus 1/4 inch for spans of greater than 13 feet 6 inches. 2. Deflection Parallel to Glazing Plane: Limited to amount not exceeding that which reduces glazing bite to less than 75 percent of design dimension and that which reduces edge clearance between framing members and glazing or other fixed components to less than 1/8 inch. 3. Cantilever Deflection: Limited to 1/175 at unsupported cantilevers. E. Structural: Test in accordance with ASTM E330/E330M as follows: 1. When tested at positive and negative wind-load design pressures, assemblies do not Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 5 evidence deflection exceeding specified limits. 2. When tested at 150 percent of positive and negative wind-load design pressures, assemblies, including anchorage, do not evidence material failures, structural distress, or permanent deformation of main framing members exceeding 0.2 percent of span. 3. Test Durations: As required by design wind velocity, but not less than 10 seconds. F. Interstory Drift: Accommodate design displacement of adjacent stories indicated. 1. Test Performance: Complying with criteria for passing based on building occupancy type when tested in accordance with AAMA 501.4 at design displacement and 1.5 times the design displacement. G. Energy Performance: Certified and labelled by manufacturer for energy performance as follows: 1. Thermal Transmittance (U-factor): a. Fixed Glazing and Framing Areas: U-factor for the system of not more than 0.34 Btu/sq. ft. x h x deg F as determined in accordance with NFRC 100. 2. Solar Heat Gain Coefficient (SHGC): a. Fixed Glazing and Framing Areas: SHGC for the system of not more than 0.40 as determined in accordance with NFRC 200. 3. Condensation Resistance Factor (CRF): a. Fixed Glazing and Framing Areas: CRF for the system of not less than 55 as determined in accordance with AAMA 1503. H. Thermal Movements: Allow for thermal movements resulting from ambient and surface temperature changes: 1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. 2. Thermal Cycling: No buckling; stress on glass; sealant failure; excess stress on framing, anchors, and fasteners; or reduction of performance when tested in accordance with AAMA 501.5. a. High Exterior Ambient-Air Temperature: That which produces an exterior metal-surface temperature of 180 deg F. b. Low Exterior Ambient-Air Temperature: 0 deg F. I. Structural-Sealant Joints: 1. Designed to carry gravity loads of glazing. J. Structural Sealant: ASTM C1184. Capable of withstanding tensile and shear stresses imposed by structural-sealant-glazed curtain walls without failing adhesively or cohesively. When tested for preconstruction adhesion and compatibility, cohesive failure of sealant shall occur before adhesive failure. 1. Adhesive failure occurs when sealant pulls away from substrate cleanly, leaving no sealant material behind. 2. Cohesive failure occurs when sealant breaks or tears within itself but does not separate Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 6 from each substrate, because sealant-to-substrate bond strength exceeds sealant's internal strength. 2.2 SOURCE LIMITATIONS A. Obtain all components of curtain-wall system, including framing entrances and accessories, from single manufacturer. 2.3 GLAZED ALUMINUM CURTAIN WALL SYSTEMS A. Manufacturers: Subject to compliance with requirements, provide Basis-of-Design products by EFCO Corporation or comparable products by one of the following: 1. Kawneer North America, an Arconic company. 2. Oldcastle BuildingEnvelope. B. Framing Members: Manufacturer's extruded- or formed-aluminum framing members of thickness required and reinforced as required to support imposed loads. 1. Construction: Thermally broken. 2. Glazing System: Retained mechanically with gaskets on two sides and structural sealant on two sides. 3. Glazing Plane: Front. 4. Finish: Clear anodic finish. 5. System: Shear block system. 6. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated. 7. Steel Reinforcement: As required by manufacturer. C. Pressure Caps: Manufacturer's standard aluminum components with fiberglass pressure plates that mechanically retain glazing. 1. Include snap-on aluminum trim that conceals fasteners. D. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with nonstaining, nonferrous shims for aligning system components. E. Entrance Door Systems: Comply with Section 084113 "Aluminum-Framed Entrances and Storefronts". 2.4 GLAZING A. Glazing: Comply with Section 088000 "Glazing." B. Structural Glazing Sealants: ASTM C1184, chemically curing silicone formulation that is compatible with system components with which it comes into contact, specifically formulated and tested for use as structural sealant and approved by structural-sealant manufacturer for use Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 7 in curtain-wall assembly indicated. 1. Color: As selected by Architect from manufacturer's full range of colors. 2.5 MATERIALS A. Sheet and Plate: ASTM B209. B. Extruded Bars, Rods, Profiles, and Tubes: ASTM B221. C. Structural Profiles: ASTM B308/B308M. D. Steel Reinforcement: 1. Structural Shapes, Plates, and Bars: ASTM A36/A36M. 2. Cold-Rolled Sheet and Strip: ASTM A1008/A1008M. 3. Hot-Rolled Sheet and Strip: ASTM A1011/A1011M. E. Steel Reinforcement Primer: Manufacturer's standard zinc-rich, corrosion-resistant primer complying with SSPC-PS Guide No. 12.00; applied immediately after surface preparation and pretreatment. Select surface preparation methods in accordance with recommendations in SSPC-SP COM, and prepare surfaces in accordance with applicable SSPC standard. F. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content. G. Recycled Content of Aluminum Components: Postconsumer recycled content plus one-half of preconsumer recycled content. H. Regional Materials: Products shall be manufactured within 100 miles of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles of Project site. 2.6 ACCESSORIES A. Fasteners and Accessories: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding fasteners and accessories compatible with adjacent materials. 1. Use self-locking devices where fasteners are subject to loosening or turning out from thermal and structural movements, wind loads, or vibration. 2. Reinforce members as required to receive fastener threads. 3. Use exposed fasteners with countersunk Phillips screw heads, finished to match framing system. B. Anchors: Three-way adjustable anchors with minimum adjustment of 1 inch that accommodate fabrication and installation tolerances in material and finish compatible with adjoining materials and recommended by manufacturer. C. Concealed Flashing: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 8 flashing compatible with adjacent materials. D. Bituminous Paint: Cold-applied asphalt-mastic paint containing no asbestos, formulated for 30-mil thickness per coat. 2.7 FABRICATION A. Form or extrude aluminum shapes before finishing. B. Weld in concealed locations to greatest extent possible to minimize distortion or discoloration of finish. Remove weld spatter and welding oxides from exposed surfaces by descaling or grinding. C. Fabricate components that, when assembled, have the following characteristics: 1. Profiles that are sharp, straight, and free of defects or deformations. 2. Accurately fitted joints with ends coped or mitered. 3. Physical and thermal isolation of glazing from framing members. 4. Accommodations for thermal and mechanical movements of glazing and framing to maintain required glazing edge clearances. 5. Provisions for field replacement of glazing from exterior. 6. Fasteners, anchors, and connection devices that are concealed from view to greatest extent possible. D. Fabricate components to resist water penetration as follows: 1. Internal guttering system or other means to drain water passing joints, condensation occurring within framing members, and moisture migrating within glazed aluminum curtain wall to exterior. E. Curtain-Wall Framing: Fabricate components for assembly using shear block system. F. Factory-Assembled Frame Units: 1. Rigidly secure nonmovement joints. 2. Prepare surfaces that are in contact with structural sealant in accordance with sealant manufacturer's written instructions, to ensure compatibility and adhesion. Preparation includes, but is not limited to, cleaning and priming surfaces. 3. Seal joints watertight unless otherwise indicated. 4. Install glazing to comply with requirements in Section 088000 "Glazing." 5. Install structural glazing. a. Set glazing into framing in accordance with sealant manufacturer and framing manufacturer's written instructions and standard practice. Use a spacer or backer as recommended by manufacturer. b. Set glazing with proper orientation so that coatings face exterior or interior as specified. c. Apply structural silicone sealant to completely fill cavity, in accordance with sealant manufacturers written instructions with the framing and glazing in a fully supported position. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 9 d. Brace or stiffen framing and glazing in such a manner to prevent undue stresses on the glass edge seal and structural joints or movement of the glazing, until sealant is fully cured in accordance with manufacturer's recommendations. e. After structural sealant has completely cured, insert backer rod between lites of glass as recommended by sealant manufacturer. f. Install weatherseal sealant to completely fill cavity, in accordance with sealant manufacturer's written instructions, to produce weatherproof joints. g. Clean and protect glass as indicated in Section 088000 "Glazing." h. Retain bracing or stiffening until erected to prevent racking of units during transportation and erection. G. After fabrication, clearly mark components to identify their locations in Project in accordance with Shop Drawings. 2.8 ALUMINUM FINISHES A. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker. 2.9 SOURCE QUALITY CONTROL A. Structural Sealant: Perform quality-control procedures complying with ASTM C1401 recommendations, including, but not limited to, assembly material qualification procedures, sealant testing, and assembly fabrication reviews and checks. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION, GENERAL A. Comply with manufacturer's written instructions. B. Do not install damaged components. C. Fit joints to produce hairline joints free of burrs and distortion. D. Rigidly secure nonmovement joints. E. Install anchors with separators and isolators to prevent metal corrosion and electrolytic Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 10 deterioration and to prevent impeding movement of moving joints. F. Where welding is required, weld components in concealed locations to minimize distortion or discoloration of finish. Protect glazing surfaces from welding. G. Seal joints watertight unless otherwise indicated. H. Metal Protection: 1. Where aluminum is in contact with dissimilar metals, protect against galvanic action by painting contact surfaces with primer, applying sealant or tape, or installing nonconductive spacers as recommended by manufacturer for this purpose. 2. Where aluminum is in contact with concrete or masonry, protect against corrosion by painting contact surfaces with bituminous paint. I. Install components to drain water passing joints, condensation occurring within framing members, and moisture migrating within glazed aluminum curtain wall to exterior. J. Install components plumb and true in alignment with established lines and grades. 3.3 INSTALLATION OF GLAZING A. Install glazing as specified in Section 088000 "Glazing." 3.4 INSTALLATION OF STRUCTURAL GLAZING A. Prepare surfaces that will contact structural sealant in accordance with sealant manufacturer's written instructions, to ensure compatibility and adhesion. Preparation includes, but is not limited to, cleaning and priming surfaces. B. Set glazing into framing in accordance with sealant manufacturer's and framing manufacturer's written instructions and standard practice. Use a spacer or backer as recommended by manufacturer. C. Set glazing with proper orientation, so that coatings face exterior or interior as specified. D. Hold glazing in place using temporary retainers of type and spacing recommended by manufacturer, until structural sealant joint has cured. E. Apply structural sealant to completely fill cavity, in accordance with sealant manufacturer's and framing manufacturer's written instructions and in compliance with local codes. F. Apply structural sealant at temperatures indicated by sealant manufacturer for type of sealant. G. Allow structural sealant to cure in accordance with manufacturer's recommendations. H. Clean and protect glass as indicated in Section 088000 "Glazing." Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZED ALUMINUM CURTAIN WALLS 084413 - 11 3.5 INSTALLATION OF WEATHERSEAL SEALANT A. After structural sealant has completely cured, remove temporary retainers and insert backer rod between lites of glass, as recommended by sealant manufacturer. B. Install weatherseal sealant to completely fill cavity, in accordance with sealant manufacturer's written instructions, to produce weatherproof joints. 3.6 ERECTION TOLERANCES A. Install glazed aluminum curtain walls to comply with the following maximum tolerances: 1. Plumb: 1/8 inch in 10 feet; 1/4 inch in 40 feet. 2. Level: 1/8 inch in 20 feet; 1/4 inch in 40 feet. 3. Alignment: a. Where surfaces abut in line or are separated by reveal or protruding element up to 1/2 inch wide, limit offset from true alignment to 1/16 inch. b. Where surfaces are separated by reveal or protruding element from 1/2 to 1 inch wide, limit offset from true alignment to 1/8 inch. c. Where surfaces are separated by reveal or protruding element of 1 inch wide or more, limit offset from true alignment to 1/4 inch. 4. Location: Limit variation from plane to 1/8 inch in 12 feet; 1/2 inch over total length. 3.7 FIELD QUALITY CONTROL A. Comply with requirements of Section 019119 "Building Enclosure Commissioning Requirements" for commissioning procedures and testing requirements. B. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections. C. Test Area: Perform tests on representative areas of glazed aluminum curtain walls. END OF SECTION 084413 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM SLIDING SERVICE WINDOWS 085800 - 1 SECTION 085800 - ALUMINUM SLIDING SERVICE WINDOWS PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Frameless, interior sliding service windows. 1.2 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1.3 SUBMITTALS A. Product Data: For each type of product. B. Sustainable Design Submittals: 1. Product Data: For sealants, indicating VOC content. 2. Environmental Product Declaration: For each product. 3. Health Product Declaration: For each product. C. Shop Drawings: Submit for fabrication and installation of windows. Include plans, elevations and installation requirement of finish hardware and cleaning. D. Samples for Verification: For each type of exposed finish required, in manufacturer's standard sizes. 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver windows crated to provide protection during transit and job storage. B. Inspect windows upon delivery for damage. Unless minor defects can be made to meet the Architect’s specifications and satisfaction, damaged parts should be removed and replaced. C. Store windows at building site under cover in dry location. 1.5 CLOSEOUT SUBMITTALS A. Maintenance Data: For aluminum-framed entrances and storefronts to include in maintenance manuals. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM SLIDING SERVICE WINDOWS 085800 - 2 1.6 QUALITY ASSURANCE A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer. 1.7 PROJECT CONDITIONS A. Field measurements: Check opening by accurate field measurement before fabrication. Show recorded measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of work. 1.8 WARRANTY A. All material and workmanship shall be warranted against defects for a period of one year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 GENERAL A. Regional Materials: Products shall be manufactured within 100 miles (160 km) of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles (160 km) of Project site. 2.2 MANUFACTURERS A. Basis-of-Design: Provide the following. 1. C.R. Laurence Co. Inc.; CRL Sharyn Custom Size Frameless Pass-Thru (#SHCX0A) Assembly. 2.3 ALUMINUM SLIDING SERVICE WINDOW SYSTEMS A. Replacement and servicing of glass shall be from the clerk side of the window by means of an access panel in the top header and does not require the removal of the frame from the opening. B. Window glides on top-hung heavy-duty ball bearing slides. C. Self-latching handle. D. Push button lock. E. Configuration: Overall panel sizes are to be in accordance with the contract drawings. F. Finish: Black Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM SLIDING SERVICE WINDOWS 085800 - 3 G. Glazing: 1. Comply with Section 088000 "Glazing." 2. Configuration: As indicated on Drawings. 2.4 ACCESSORIES A. Provide all components required for complete and functioning operation of the sliding service window system, including top track, running gear, clamping shoes, track stopper set, guides and lock. 2.5 ALUMINUM FINISHES A. Baked-Enamel or Powder-Coat Finish: AAMA 2603 except with a minimum dry film thickness of 1.5 mils (0.04 mm). Comply with coating manufacturer's written instructions for cleaning, conversion coating, and applying and baking finish. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. General: 1. Comply with manufacturer's written instructions. 2. Do not install damaged components. 3. Fit joints to produce hairline joints free of burrs and distortion. 4. Rigidly secure nonmovement joints. 5. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding movement of moving joints. B. Metal Protection: 1. Where aluminum is in contact with dissimilar metals, protect against galvanic action by painting contact surfaces with materials recommended by manufacturer for this purpose or by installing nonconductive spacers. 2. Where aluminum is in contact with concrete or masonry, protect against corrosion by painting contact surfaces with bituminous paint. C. Install components plumb and true in alignment with established lines and grades. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 ALUMINUM SLIDING SERVICE WINDOWS 085800 - 4 D. Install operable units level and plumb, securely anchored, and without distortion. Adjust hardware movement to produce proper operation. E. Install glazing as specified in Section 088000 "Glazing." 3.3 CLEANING A. Clean frame and glazing surfaces after installation, complying with requirements contained in the manufacturer’s instructions. Remove excess glazing sealant compounds, dirt or other substances. 3.4 PROTECTION A. Institute protective measures required throughout the remainder of the construction period to ensure that all the windows do not incur any damage or deterioration, other than normal weathering, at the time of acceptance. END OF SECTION 085800 Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 1 SECTION 087100 – DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes commercial door hardware for the following: Swinging doors. Sliding doors. Other doors to the extent indicated. B. Door hardware includes, but is not necessarily limited to, the following: Mechanical door hardware. Electromechanical door hardware. C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction. ANSI A117.1 - Accessible and Usable Buildings and Facilities. ICC/IBC - International Building Code. NFPA 70 - National Electrical Code. NFPA 80 - Fire Doors and Windows. NFPA 101 - Life Safety Code. NFPA 105 - Installation of Smoke Door Assemblies. State Building Codes, Local Amendments. D. Standards: All hardware specified herein shall comply with the following industry standards as applicable. Any undated reference to a standard shall be interpreted as referring to the latest edition of that standard: ANSI/BHMA Certified Product Standards - A156 Series. UL10C – Positive Pressure Fire Tests of Door Assemblies. ANSI/UL 294 – Access Control System Units. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 2 1.3 SUBMITTALS A. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, operational descriptions and finishes. B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and Format for the Hardware Schedule." Organization: Organize the Door Hardware Schedule into door hardware sets indicating complete designations of every item required for each door or opening. Organize door hardware sets in same order as in the Door Hardware Sets at the end of Part 3. Submittals that do not follow the same format and order as the Door Hardware Sets will be rejected and subject to resubmission. Content: Include the following information: Type, style, function, size, label, hand, and finish of each door hardware item. Manufacturer of each item. Fastenings and other pertinent information. Location of door hardware set, cross-referenced to Drawings, both on floor plans and in door and frame schedule. Explanation of abbreviations, symbols, and codes contained in schedule. Mounting locations for door hardware. Door and frame sizes and materials. Warranty information for each product. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date, particularly where approval of the Door Hardware Schedule must precede fabrication of other work that is critical in the Project construction schedule. Include Product Data, Samples, Shop Drawings of other work affected by door hardware, and other information essential to the coordinated review of the Door Hardware Schedule. C. Shop Drawings: Details of electrified access control hardware indicating the following: Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field- installed wiring. Include the following: Elevation diagram of each unique access controlled opening showing location and interconnection of major system components with respect to their placement in the respective door openings. Complete (risers, point-to-point) access control system block wiring diagrams. Wiring instructions for each electronic component scheduled herein. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 3 Electrical Coordination: Coordinate with related sections the voltages and wiring details required at electrically controlled and operated hardware openings. D. Keying Schedule: After a keying meeting with the owner has taken place prepare a separate keying schedule detailing final instructions. Submit the keying schedule in electronic format. Include keying system explanation, door numbers, key set symbols, hardware set numbers and special instructions. Owner must approve submitted keying schedule prior to the ordering of permanent cylinders/cores. E. Informational Submittals: F. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation in quantity as required in Division 01, Closeout Procedures. 1.4 QUALITY ASSURANCE A. Manufacturers Qualifications: Engage qualified manufacturers with a minimum 5 years of documented experience in producing hardware and equipment similar to that indicated for this Project and that have a proven record of successful in-service performance. B. Installer Qualifications: A minimum 3 years documented experience installing both standard and electrified door hardware similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. C. Door Hardware Supplier Qualifications: Experienced commercial door hardware distributors with a minimum 5 years documented experience supplying both mechanical and electromechanical hardware installations comparable in material, design, and extent to that indicated for this Project. Supplier recognized as a factory direct distributor by the manufacturers of the primary materials with a warehousing facility in Project's vicinity. Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during the course of the Work to consult with Contractor, Architect, and Owner concerning both standard and electromechanical door hardware and keying. D. Source Limitations: Obtain each type and variety of door hardware specified in this section from a single source unless otherwise indicated. Electrified modifications or enhancements made to a source manufacturer's product line by a secondary or third party source will not be accepted. Provide electromechanical door hardware from the same manufacturer as mechanical door hardware, unless otherwise indicated. E. Each unit to bear third party permanent label demonstrating compliance with the referenced standards. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 4 F. Keying Conference: Conduct conference to comply with requirements in Division 01 Section "Project Meetings." Keying conference to incorporate the following criteria into the final keying schedule document: Function of building, purpose of each area and degree of security required. Plans for existing and future key system expansion. Requirements for key control storage and software. Installation of permanent keys, cylinder cores and software. Address and requirements for delivery of keys. G. Pre-Submittal Conference: Conduct coordination conference in compliance with requirements in Division 01 Section "Project Meetings" with attendance by representatives of Supplier(s), Installer(s), and Contractor(s) to review proper methods and the procedures for receiving, handling, and installing door hardware. Prior to installation of door hardware, conduct a project specific training meeting to instruct the installing contractors' personnel on the proper installation and adjustment of their respective products. Product training to be attended by installers of door hardware (including electromechanical hardware) for aluminum, hollow metal and wood doors. Training will include the use of installation manuals, hardware schedules, templates and physical product samples as required. Inspect and discuss electrical roughing-in, power supply connections, and other preparatory work performed by other trades. Review sequence of operation narratives for each unique access controlled opening. Review and finalize construction schedule and verify availability of materials. Review the required inspecting, testing, commissioning, and demonstration procedures H. At completion of installation, provide written documentation that components were applied to manufacturer's instructions and recommendations and according to approved schedule. 1.5 DELIVERY, STORAGE, AND HANDLING A. Inventory door hardware on receipt and provide secure lock-up and shelving for door hardware delivered to Project site. Do not store electronic access control hardware, software or accessories at Project site without prior authorization. B. Tag each item or package separately with identification related to the final Door Hardware Schedule, and include basic installation instructions with each item or package. C. Deliver, as applicable, permanent keys, cylinders, cores, access control credentials, software and related accessories directly to Owner via registered mail or overnight package service. Instructions for delivery to the Owner shall be established at the "Keying Conference". 1.6 COORDINATION A. Templates: Obtain and distribute to the parties involved templates for doors, frames, and other work specified to be factory prepared for installing standard and electrified hardware. Check Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 5 Shop Drawings of other work to confirm that adequate provisions are made for locating and installing hardware to comply with indicated requirements. B. Door and Frame Preparation: Doors and corresponding frames are to be prepared, reinforced and pre-wired (if applicable) to receive the installation of the specified electrified, monitoring, signaling and access control system hardware without additional in-field modifications. 1.7 WARRANTY A. General Warranty: Reference Division 01, General Requirements. Special warranties specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. B. Warranty Period: Written warranty, executed by manufacturer(s), agreeing to repair or replace components of standard and electrified door hardware that fails in materials or workmanship within specified warranty period after final acceptance by the Owner. Failures include, but are not limited to, the following: Structural failures including excessive deflection, cracking, or breakage. Faulty operation of the hardware. Deterioration of metals, metal finishes, and other materials beyond normal weathering. Electrical component defects and failures within the systems operation. C. Standard Warranty Period: One year from date of Substantial Completion, unless otherwise indicated. D. Special Warranty Periods: Ten years for mortise locks and latches. Seven years for heavy duty cylindrical locks and latches. Five years for exit hardware. Thirty years for manual overhead door closer bodies. Five years for motorized electric latch retraction exit devices. Two years for electromechanical door hardware. 1.8 MAINTENANCE SERVICE A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 6 PART 2 - PRODUCTS 2.1 SCHEDULED DOOR HARDWARE A. General: Provide door hardware for each door to comply with requirements in Door Hardware Sets and each referenced section that products are to be supplied under. B. Designations: Requirements for quantity, item, size, finish or color, grade, function, and other distinctive qualities of each type of door hardware are indicated in the Door Hardware Sets at the end of Part 3. Products are identified by using door hardware designations, as follows: Named Manufacturer's Products: Product designation and manufacturer are listed for each door hardware type required for the purpose of establishing requirements. Manufacturers' names are abbreviated in the Door Hardware Schedule. C. Substitutions: Requests for substitution and product approval for inclusive mechanical and electromechanical door hardware in compliance with the specifications must be submitted in writing and in accordance with the procedures and time frames outlined in Division 01, Substitution Procedures. Approval of requests is at the discretion of the architect, owner, and their designated consultants. 2.2 HANGING DEVICES A. Hinges: ANSI/BHMA A156.1 certified butt hinges. Hinge Options: Comply with the following: Non-removable Pins: Provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for the all out- swinging lockable doors. Manufacturers: Bommer Industries (BO). Hager Companies (HA). McKinney Products (MK). B. Continuous Geared Hinges: ANSI/BHMA A156.26 Grade 1 certified continuous geared hinge. Hinges are non-handed, reversible and fabricated to template screw locations. Factory trim hinges to suit door height and prepare for electrical cut-outs. Manufacturers: Bommer Industries (BO). Hager Companies (HA). Pemko Products; ASSA ABLOY Architectural Door Accessories (PE). Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 7 C. Continuous Double-acting Hinges. ANSI/BHMA A156.26 Grade 1 Certified continuous hinges. Hinges shall be non-handed and allow the door to swing up to 100 degrees in either direction. Manufacturers: Architectural Builders Hardware (AH). A507 Markar Products (MK) DSH Series. D. Sliding and Folding Door Hardware: Hardware is to be of type and design as specified and should comply with ANSI/BHMA A156.14. Sliding Bi-Passing Pocket Door Hardware: Provide complete sets consisting of track, hangers, stops, bumpers, floor channel, guides, and accessories indicated. Manufacturers: Hager Companies (HA). Johnson Hardware (JO). Pemko Products (PE). 2.3 POWER TRANSFER DEVICES A. Electrified Quick Connect Continuous Geared Transfer Hinges: Provide electrified transfer continuous geared hinges with a movable service panel cutout accessible without de-mounting door from the frame. Furnish with Molex™ standardized plug connectors with sufficient number of concealed wires (up to 12) to accommodate the electrified functions specified in the Door Hardware Sets. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Wire nut connections are not acceptable. Manufacturers: Architectural Builders Hardware (AH). EZ12&M B. Electric Door Wire Harnesses: Provide electric/data transfer wiring harnesses with standardized plug connectors to accommodate up to twelve (12) wires. Connectors plug directly to through- door wiring harnesses for connection to electric locking devices and power supplies. Provide sufficient number and type of concealed wires to accommodate electric function of specified hardware. Provide a connector for through-door electronic locking devices and from hinge to junction box above the opening. Wire nut connections are not acceptable. Determine the length required for each electrified hardware component for the door type, size and construction, minimum of two per electrified opening. Manufacturers: Architectural Builders Hardware (AH). McKinney Products (MK) Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 8 2.4 DOOR OPERATING TRIM A. Flush Bolts and Surface Bolts: ANSI/BHMA A156.3 and A156.16, Grade 1, certified. Flush bolts to be furnished with top rod of sufficient length to allow bolt retraction device location approximately six feet from the floor. Provide related accessories (mounting brackets, strikes, coordinators, etc.) as required for appropriate installation and operation. Manufacturers: Architectural Builders Hardware (AH). Rockwood Products (RO). Trimco (TC). B. Door Push Plates and Pulls: ANSI/BHMA A156.6 certified door pushes and pulls of type and design specified in the Hardware Sets. Coordinate and provide proper width and height as required where conflicting hardware dictates. Push/Pull Plates: Minimum .050 inch thick, size as indicated in hardware sets, with beveled edges, secured with exposed screws unless otherwise indicated. Door Pull and Push Bar Design: Size, shape, and material as indicated in the hardware sets. Minimum clearance of 2 1/2-inches from face of door unless otherwise indicated. Offset Pull Design: Size, shape, and material as indicated in the hardware sets. Minimum clearance of 2 1/2-inches from face of door and offset of 90 degrees unless otherwise indicated. Fasteners: Provide manufacturer's designated fastener type as indicated in Hardware Sets. Manufacturers: Architectural Builders Hardware (AH). Rockwood Products (RO). Trimco (TC). 2.5 CYLINDERS AND KEYING A. General: Cylinder manufacturer to have minimum (10) years experience designing secured master key systems and have on record a published security keying system policy. B. Cylinders: Original manufacturer cylinders complying with the following: Mortise Type: Threaded cylinders with rings and cams to suit hardware application. Rim Type: Cylinders with back plate, flat-type vertical or horizontal tailpiece, and raised trim ring. Bored-Lock Type: Cylinders with tailpieces to suit locks. Mortise and rim cylinder collars to be solid and recessed to allow the cylinder face to be flush and be free spinning with matching finishes. Keyway: Match Facility Standard. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 9 C. Patented Cylinders: ANSI/BHMA A156.5, Grade 1, certified patented cylinders employing a utility patented and restricted keyway requiring the use of a patented key. Cylinders are to be protected from unauthorized manufacture and distribution by manufacturer’s United States patents. Cylinders are to be factory keyed with owner having the ability for on-site original key cutting. Patented key systems shall not be established with products that have an expired patent. Expired systems shall only be specified and supplied to support existing systems. Manufacturers: Sargent (SA) – Degree DG1. No Substitution. D. Keying System: Each type of lock and cylinders to be factory keyed. Supplier shall conduct a "Keying Conference" to define and document keying system instructions and requirements. Furnish factory cut, nickel-silver large bow permanently inscribed with a visual key control number as directed by Owner. Existing System: Field verify and key cylinders to match Owner's existing system. E. Key Quantity: Provide the following minimum number of keys: Change Keys per Cylinder: Two (2) Master Keys (per Master Key Level/Group): Five (5). Construction Keys (where required): Ten (10). F. Construction Keying: Provide construction master keyed cylinders. G. Key Registration List (Bitting List): Provide transcript list in writing or electronic file as directed by the Owner. 2.6 MECHANICAL LOCKS AND LATCHING DEVICES A. Mortise Locksets: ANSI/BHMA A156.13, Series 1000, Operational Grade 1 Certified. Locksets are to be manufactured with a corrosion resistant steel case and be field-reversible for handing without disassembly of the lock body. Manufacturers: Sargent Manufacturing (SA) – 8200 Series. B. Cylindrical Locksets: ANSI/BHMA A156.2, Series 4000, Operational Grade 1 Certified. Furnish with solid cast levers, standard 2 3/4” backset, and 1/2" (3/4" at rated paired openings) throw brass or stainless steel latchbolt. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 10 Locks are to be non-handed and fully field reversible. Manufacturers: Sargent Manufacturing (SA) – 10 Line. 2.7 STAND ALONE ACCESS CONTROL LOCKING DEVICES A. Stand Alone Electronic Keypad Locksets: Internal, battery-powered, self-contained ANSI Grade 1 mortise or cylindrical lock consisting of electronically motor driven locking mechanism and integrated keypad without requirements for separate electronic programming devices. Locks to accept standard, interchangeable (removable) core, security and high security override cylinders. Provide keypad locks with a minimum 100 user codes furnished standard with 6 "AA" batteries and non-volatile memory. Energy Efficient Design: Provide lock bodies which have a holding current draw of 15mA maximum, and can operate on either 12 or 24 volts. Locks are to be field configurable for fail safe or fail secure operation. Manufacturers: Sargent Manufacturing (SA) - KP Series. 2.8 LOCK AND LATCH STRIKES A. Strikes: Provide manufacturer's standard strike with strike box for each latch or lock bolt, with curved lip extended to protect frame, finished to match door hardware set, unless otherwise indicated, and as follows: Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim. Aluminum-Frame Strike Box: Provide manufacturer's special strike box fabricated for aluminum framing. Double-lipped strikes: For locks at double acting doors. Furnish with retractable stop for rescue hardware applications. B. Standards: Comply with the following: Strikes for Mortise Locks and Latches: BHMA A156.13. Strikes for Bored Locks and Latches: BHMA A156.2. Strikes for Auxiliary Deadlocks: BHMA A156.36. Dustproof Strikes: BHMA A156.16. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 11 2.9 ELECTRIC STRIKES A. Standard Electric Strikes: Electric strikes tested to ANSI/BHMA A156.31, Grade 1, for use on non-rated or fire rated openings. Strikes shall be tested to a minimum of 1500 pounds of static strength and 70 foot-pounds of dynamic strength with a minimum endurance of 1 million operating cycles. Provide strikes with 24 VDC capability, fail-secure unless otherwise specified. Manufacturers: HES (HS) - 1006 Series. B. Surface Mounted Rim Electric Strikes: Surface mounted rim exit device electric strikes tested to ANSI/BHMA A156.31, Grade 1, and UL Listed for both Burglary Resistance and for use on fire rated door assemblies. Construction includes internally mounted solenoid with two heavy-duty, stainless steel locking mechanisms operating independently to provide tamper resistance. Strikes tested for a minimum of 500,000 operating cycles. Provide strikes in 24 VDC capability supplied standard as fail-secure unless otherwise specified. Manufacturers: HES (HS) - 9600 Series. 2.10 EXIT DEVICES A. General Requirements: All exit devices specified herein shall meet or exceed the following criteria: Exit Devices: ANSI/BHMA A156.3, Grade 1 Certified. Electromechanical Options: Subject to same compliance standards and requirements as mechanical exit devices, electrified devices to be of type and design as specified in hardware sets. Include any specific controllers when conventional power supplies are not sufficient to provide the proper inrush current. Lever Operating Trim: Where exit devices require lever trim, furnish manufacturer's heavy duty escutcheon trim with threaded studs for thru-bolts. Lock Trim Design: As indicated in Hardware Sets, provide finishes and designs to match that of the specified locksets. Vertical Rod Exit Devices: Where surface or concealed vertical rod exit devices are used at interior openings, provide as less bottom rod (LBR) unless otherwise indicated. Provide dust proof strikes where thermal pins are required to project into the floor. Rail Sizing: Provide exit device rails factory sized for proper door width application. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 12 Through Bolt Installation: For exit devices and trim as indicated in Door Hardware Sets. Exit device latch to be stainless steel, pullman type, with deadlock feature. Manufacturers: Sargent Manufacturing (SA) - 80 Series. B. Exit Devices, Aluminum Entrances: ANSI/BHMA A156.3, Grade 1 certified panic devices. Manufacturers: Adams Rite Manufacturing (AD) – 8000 Series. 2.11 DOOR CLOSERS A. All door closers specified herein shall meet or exceed the following criteria: Standards: Closers to comply with UL-10C for Positive Pressure Fire Test and be U.L. listed for use of fire rated doors. Door Closers: ANSI/BHMA A156.4, Grade 1 surface mounted, heavy duty door closers with complete spring power adjustment, sizes 1 thru 6; and fully operational adjustable according to door size, frequency of use, and opening force. Size of Units: Comply with manufacturer's written recommendations for sizing of door closers depending on size of door, exposure to weather, and anticipated frequency of use. Where closers are indicated for doors required to be accessible to the physically handicapped, provide units complying with ANSI ICC/A117.1. Closers shall not be installed on exterior or corridor side of doors; where possible install closers on door for optimum aesthetics. Closer Accessories: Provide door closer accessories including custom templates, special mounting brackets, spacers and drop plates as required for proper installation. Manufacturers: LCN Closers (LC) – 4010/4110 Series. 2.12 SURFACE MOUNTED CLOSER HOLDERS A. Electromagnetic Door Holders: Certified ANSI A156.15 electromagnetic door holder/releases with a minimum 20 to 40 pounds holding power and single coil construction able to accommodate.12VDC, 24VAC, 24VDC and 120VAC. Manufacturers: Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 13 Architectural Builders Hardware (AH). LCN Door Closers (LC). Rixson (RF). 2.13 ARCHITECTURAL TRIM A. Door Protective Trim General: Door protective trim units to be of type and design as specified below or in the Hardware Sets. Size: Fabricate protection plates (kick, armor, or mop) not more than 2" less than door width (LDW) on stop side of single doors and 1” LDW on stop side of pairs of doors, and not more than 1" less than door width on pull side. Coordinate and provide proper width and height as required where conflicting hardware dictates. Height to be as specified in the Hardware Sets. Where plates are applied to fire rated doors with the top of the plate more than 16” above the bottom of the door, provide plates complying with NFPA 80. Consult manufacturer’s catalog and template book for specific requirements for size and applications. Protection Plates: ANSI/BHMA A156.6 certified protection plates (kick, armor, or mop), fabricated from the following: Stainless Steel: 300 grade, 050-inch thick. Options and fasteners: Provide manufacturer's designated fastener type as specified in the Hardware Sets. Provide countersunk screw holes. Manufacturers: Burns Manufacturing (BU). Rockwood Products (RO). Trimco (TC). 2.14 DOOR STOPS AND HOLDERS A. General: Door stops and holders to be of type and design as specified below or in the Hardware Sets. B. Door Stops and Bumpers: ANSI/BHMA A156.16, Grade 1 certified door stops and wall bumpers. Where wall bumpers are not appropriate, provide overhead type stops. Manufacturers: Hiawatha, Inc. (HI). Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 14 Rockwood Products (RO). Trimco (TC). C. Overhead Door Stops and Holders: ANSI/BHMA A156.8, Grade 1 certified overhead stops and holders to be surface or concealed types as indicated in Hardware Sets. Track, slide, arm and jamb bracket to be constructed of extruded bronze and shock absorber spring of heavy tempered steel. Provide non-handed design with mounting brackets as required for proper operation and function. Manufacturers: Architectural Builders Hardware (AH). Rixson Door Controls (RF). Sargent Manufacturing (SA). 2.15 ARCHITECTURAL SEALS A. General: Thresholds, weatherstripping, and gasket seals to be of type and design as specified below or in the Hardware Sets. Provide continuous weatherstrip gasketing on exterior doors and provide smoke, light, or sound gasketing on interior doors where indicated. At exterior applications provide non-corrosive fasteners and elsewhere where indicated. B. Smoke Labeled Gasketing: Assemblies complying with NFPA 105 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for smoke control ratings indicated, based on testing according to UL 1784. Provide smoke labeled perimeter gasketing at all smoke labeled openings. C. Fire Labeled Gasketing: Assemblies complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to UL-10C. Provide intumescent seals as indicated to meet UL10C Standard for Positive Pressure Fire Tests of Door Assemblies, and NPFA 252, Standard Methods of Fire Tests of Door Assemblies. D. Sound-Rated Gasketing: Assemblies that are listed and labeled by a testing and inspecting agency, for sound ratings indicated. E. Replaceable Seal Strips: Provide only those units where resilient or flexible seal strips are easily replaceable and readily available from stocks maintained by manufacturer. F. Manufacturers: National Guard Products (NG). Pemko Products (PE). Reese Enterprises, Inc. (RE). Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 15 2.16 ELECTRONIC ACCESSORIES A. Exit Delay Locking Systems: Exit delay locking systems are fully integrated units consisting of a minimum 1200 pound holding force magnetic lock, movement initiating device, reset bypass switch, and exit delay timer module. Unit to include an adjustable initiation gap allowing door travel of up to 1 inch before going into alarm condition. Operates on either 12VDC or 24VDC. Manufacturers: Securitron (SU) - iMXD Series. B. Digital Keypads: Digital keypad designed for high volume use controlling entry of electrified locking devices. Fully weather proof, vandal resistant with wall type gang box or mullion mounting applications. Digital keypad system circuit board is remote mounted in a metal enclosure and provides for multiple users and digit codes, and variable programmable release times. Operates on either 12 or 24 volts AC or DC. Manufacturers: Securitron (SU) - DK Series. C. Switching Power Supplies: Provide power supplies with either single or dual voltage configurations at 12 or 24VDC. Power supplies shall have battery backup function with an integrated battery charging circuit and shall provide capability for power distribution, direct lock control and Fire Alarm Interface (FAI) through add on modules. Power supplies shall be expandable up to 16 individually protected outputs. Output modules shall provide individually protected, continuous outputs and/or individually protected, relay controlled outputs. Manufacturers: Securitron (SU) - AQD Series. 2.17 FABRICATION A. Fasteners: Provide door hardware manufactured to comply with published templates generally prepared for machine, wood, and sheet metal screws. Provide screws according to manufacturers recognized installation standards for application intended. 2.18 FINISHES A. Standard: Designations used in the Hardware Sets and elsewhere indicate hardware finishes complying with ANSI/BHMA A156.18, including coordination with traditional U.S. finishes indicated by certain manufacturers for their products. B. Provide quality of finish, including thickness of plating or coating (if any), composition, hardness, and other qualities complying with manufacturer's standards, but in no case less than specified by referenced standards for the applicable units of hardware Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 16 C. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine scheduled openings, with Installer present, for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance. B. Notify architect of any discrepancies or conflicts between the door schedule, door types, drawings and scheduled hardware. Proceed only after such discrepancies or conflicts have been resolved in writing. 3.2 PREPARATION A. Hollow Metal Doors and Frames: Comply with ANSI/DHI A115 series. B. Wood Doors: Comply with ANSI/DHI A115-W series. 3.3 INSTALLATION A. Install each item of mechanical and electromechanical hardware and access control equipment to comply with manufacturer's written instructions and according to specifications. Installers are to be trained and certified by the manufacturer on the proper installation and adjustment of fire, life safety, and security products including: hanging devices; locking devices; closing devices; and seals. B. Mounting Heights: Mount door hardware units at heights indicated in following applicable publications, unless specifically indicated or required to comply with governing regulations: Standard Steel Doors and Frames: DHI's "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames." Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for Wood Flush Doors." Where indicated to comply with accessibility requirements, comply with ANSI A117.1 "Accessibility Guidelines for Buildings and Facilities." Provide blocking in drywall partitions where wall stops or other wall mounted hardware is located. C. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant complying with requirements specified in Division 7 Section "Joint Sealants." Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 17 D. Storage: Provide a secure lock up for hardware delivered to the project but not yet installed. Control the handling and installation of hardware items so that the completion of the work will not be delayed by hardware losses before and after installation. 3.4 FIELD QUALITY CONTROL A. Field Inspection (Punch Report): Reference Division 01 Sections “Closeout Procedures”. Produce project punch report for each installed door opening indicating compliance with approved submittals and verification hardware is properly installed, operating and adjusted. Include list of items to be completed and corrected, indicating the reasons or deficiencies causing the Work to be incomplete or rejected. Organization of List: Include separate Door Opening and Deficiencies and Corrective Action Lists organized by Mark, Opening Remarks and Comments, and related Opening Images and Video Recordings. Submit documentation of incomplete items in the following formats: PDF electronic file. 3.5 ADJUSTING A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements. 3.6 CLEANING AND PROTECTION A. Protect all hardware stored on construction site in a covered and dry place. Protect exposed hardware installed on doors during the construction phase. Install any and all hardware at the latest possible time frame. B. Clean adjacent surfaces soiled by door hardware installation. C. Clean operating items as necessary to restore proper finish. Provide final protection and maintain conditions that ensure door hardware is without damage or deterioration at time of owner occupancy. 3.7 DEMONSTRATION A. Instruct Owner's maintenance personnel to adjust, operate, and maintain mechanical and electromechanical door hardware. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 18 3.8 DOOR HARDWARE SETS A. The hardware sets represent the design intent and direction of the owner and architect. They are a guideline only and should not be considered a detailed hardware schedule. Discrepancies, conflicting hardware and missing items should be brought to the attention of the architect with corrections made prior to the bidding process. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application and functionality. Quantities listed are for each pair of doors, or for each single door. The supplier is responsible for handing and sizing all products. Where multiple options for a piece of hardware are given in a single line item, the supplier shall provide the appropriate application for the opening. B. Manufacturer’s Abbreviations: Hardware Sets Set: 1.0 1 Continuous Hinge A270HD 95"C AH 1 Rim Exit Device, Classroom DG1 12 31 8813 ETL US32D SA 1 Surface Closer 4111 EDA 2-1/2"AL LC 1 Electromagnetic Holder 2100 20100 THICK US32D AH 1 Perimeter Gasket By Frame Manufacturer OT Set: 2.0 1 Continuous Hinge A270HD 95"C AH 1 Rim Exit Device, Passage 12 31 8815 ETL US32D SA 1 Surface Closer 4011 REG 2-1/2"AL LC 1 Electromagnetic Holder 2600 THICK US28 AH 1 Perimeter Gasket By Frame Manufacturer OT Set: 3.0 1 Continuous Hinge A270HD 95"C AH 1 Rim Exit Device, Passage 12 31 8815 ETL US32D SA 1 Surface Closer 4011 REG 2-1/2"AL LC 1 Electromagnetic Holder 2100 20100 THICK US32D AH 1 Perimeter Gasket By Frame Manufacturer OT Set: 4.0 Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 19 1 Continuous Hinge A240HD 83" EA12-EZ-AA C AH 1 Fail Safe Exit Device DG1 12 8875-24v ETL US32D SA 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 1 Smoke Gasket PK33 BL PE 1 Wiring Harness (Door)QC-C length as required MK 1 Wiring Harness (Frame)QC-C3000P MK 1 Digital Keypad DK-12 SU 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Door to be constantly closed and latched at all times. Push side: Free egress at all times. Pull side: Door to be locked at all times. Entry allowed by keypad or mechanical key override. When keypad is used the exit device will unlock for 5 seconds allowing entry, then return to the locked state. In the event of a fire alarm or loss of power the exit device will unlock allowing free entry (fail safe). Set: 5.0 1 Continuous Hinge A240HD 83"C AH 1 Surface Closer 4111 SCUSH AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Threshold 253x3FG Pemkote MSES25SS-2 A PE 1 Gasket 2891S (Install prior to other hardware)A PE 1 Sweep 3452NB C PE 1 Door Contact By Security Company OT 1 Request to Exit By Security Company OT Set: 6.0 2 Continuous Hinge A160HD 95"C AH 2 Concealed Vert Rod Exit 8600T C 36 2" MEC-US32D US32D AD 1 Exit Device Trim 8650 US32D AD 4 Mortise Cylinder DG1 43 Cam and collar as required US32D SA 2 Door Pull BF157A Mtg-Type 12XHD US32D RO 2 Overhead Stop 102*SL THICK US32D AH 1 Surface Closer 4111 EDA AL LC Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 20 1 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 1 Threshold 253x3FG Pemkote MSES25SS-2 A PE 1 Perimeter Gasket By Frame Manufacturer OT 2 Sweep By Door Manufacturer OT 2 Astragal Gasket By Door Manufacturer OT 2 Door Contact By Security Company OT 1 Key Switch Supplied under section 087113 BM Notes: Theory of operation: During open hours: Exit devices to be mechanically dogged down to allow push pull operation. Key switch for the operator will be turned on and both actuators will be active. Free egress at all times. During closed hours: Door to be closed and locked at all times. Entry allowed by mechanical key. Key switch for the operator will be turned off and both actuators will be inactive. Free egress at all times Set: 7.0 1 Continuous Hinge A160HD 95"C AH 1 Rim Exit, Storeroom DG1 GL 16 8804 862 US32D SA 1 Mortise Cylinder DG1 43 Cam and collar as required US32D SA 1 Overhead Stop 102*SL THICK US32D AH 1 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 1 Threshold 252x3FG Pemkote MSES25SS-2 A PE 1 Perimeter Gasket By Frame Manufacturer OT 1 Sweep By Door Manufacturer OT 1 Door Contact By Security Company OT 1 Request to Exit By Security Company OT 1 Key Switch Supplied under section 087113 BM Notes: Theory of operation: During open hours: Exit devices to be mechanically dogged down to allow push pull operation. Key switch for the operator will be turned on and both actuators will be active. Free egress at all times. During closed hours: Door to be closed and locked at all times. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 21 Entry allowed by mechanical key. Key switch for the operator will be turned off and both actuators will be inactive. Free egress at all times Set: 8.0 1 Continuous Hinge A240HD 83"C AH 1 Rim Exit, Storeroom DG1 GL 16 8804 862 US32D SA 1 Electric Strike 9600 630 HS 1 Conc Overhead Stop 102*US32D AH 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Threshold 253x3FG Pemkote MSES25SS-2 A PE 1 Gasket 2891S (Install prior to other hardware)A PE 1 Sweep 3452NB C PE 1 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Request to Exit By Security Company OT 1 Wiring Harness (Frame)QC-C3000P MK 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Door to be closed and locked at all times entry allowed through access control system or mechanical key override. When valid credentials are presented the electric strike shall release for 5 seconds allowing entry. After 5 seconds the electric strike will return to the secure state. Free egress at all times. Fail secure Set: 9.0 2 Continuous Hinge A410HD 83" EA12-EZ-AA C AH 1 Surface Vert Rod Exit, Exit Only 56 NB8710 EO US32D SA 1 Surface Vert Rod Exit DG1 56 NB8706 ETL US32D SA 2 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 2 Armor Plate K1050 34" High (UL where required)32D RO 1 Threshold 252x3FG Pemkote MSES25SS-2 A PE 1 Gasket 2891S (Install prior to other hardware)A PE 2 Sweep 3452NB C PE 2 Astragal 18041NB C PE 2 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Request to Exit By Security Company OT 2 Wiring Harness (Door)QC-C length as required MK Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 22 2 Wiring Harness (Frame)QC-C3000P MK 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Door to be closed and locked at all times. Entry allowed through the access control system. Upon valid credentials the exit device shall retract the latch for 5 seconds and the actuator on the secure side will be turned on allowing use of the operator. After 5 seconds the exit shall return to the secure state and the actuator switch will be turned off.. Remote access is allowed through access control system. Actuator on the non-secure side will be active at all times Free egress at all times upon power failure the door shall remain secure. Fail Secure Set: 10.0 1 Continuous Hinge A240HD 83"C AH 1 Rim Exit Device, Storeroom DG1 GL 8804 ETL US32D SA 1 Conc Overhead Stop 102*US32D AH 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Threshold 253x3FG Pemkote MSES25SS-2 A PE 1 Gasket 2891S (Install prior to other hardware)A PE 1 Sweep 3452NB C PE 1 Door Contact By Security Company OT 1 Request to Exit By Security Company OT Set: 11.0 1 Continuous Hinge A240HD 83"C AH 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Surface Closer 4111 SCUSH AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Threshold 253x3FG Pemkote MSES25SS-2 A PE 1 Gasket 2891S (Install prior to other hardware)A PE 1 Sweep 3452NB C PE 1 Door Contact By Security Company OT 1 Request to Exit By Security Company OT Notes: KEY ON STAIRWELL SIDE Set: 12.0 1 Continuous Hinge (Double Swing)A507 83"Clear AH 1 Privacy Lock V21 8265 LNL Custom Lip Length Strike US26D SA Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 23 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 409 US32D RO 1 Rescue Stop A509-Silencers US32D AH Set: 13.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Privacy Lock V21 8265 LNL US26D SA 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 14.0 4 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 1 Smoke Gasket PK33 BL PE Set: 15.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 1 Smoke Gasket PK33 BL PE Set: 16.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 41 10G04 LL US26D SA 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 17.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 41 10G04 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Kick Plate K1050 10" High B4E 32D RO 3 Silencer 608-RKW RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 24 Set: 18.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 41 10G04 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Kick Plate K1050 10" High B4E 32D RO 3 Silencer 608-RKW RO Set: 19.0 1 Continuous Hinge A240HD 83"C AH 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Armor Plate K1050 34" High (UL where required)32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 20.0 1 Continuous Hinge A240HD 83"C AH 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Armor Plate K1050 34" High (UL where required)32D RO 3 Silencer 608-RKW RO Set: 21.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 41 10G04 LL US26D SA 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 22.0 2 Continuous Hinge A160HD 95"C AH 2 Push Bar & Pull BF15747 T1HD US32D RO 2 Overhead Stop 102*SL THICK US32D AH 1 Surface Closer 4111 EDA AL LC 1 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 1 Perimeter Gasket By Frame Manufacturer OT 2 Astragal Gasket By Door Manufacturer OT Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 25 Notes: Theory of operation: both actuators are active at all times Set: 23.0 1 Continuous Hinge A160HD 95"C AH 1 Push Bar & Pull BF15747 T1HD US32D RO 1 Overhead Stop 102*SL THICK US32D AH 1 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 1 Perimeter Gasket By Frame Manufacturer OT Notes: Theory of operation: both actuators are active at all times Set: 24.0 1 Continuous Hinge A270HD 95"C AH 1 Classroom Lock DG1 31 8237 LNL US26D SA 1 Mortise Cylinder DG1 43 Cam and collar as required US32D SA 1 Electric Strike 1500C 630 HS 1 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 1 Perimeter Gasket By Frame Manufacturer OT 1 Key Switch Supplied under section 087113 BM Notes: Operator to power electric strike. Theory of operation: During open hours: Door shall be unlock by key. Key switch for the operator will be turned on and both actuators will be be active and the electric strike shall be released. Free egress at all times. In the event of a fire alarm the electric strike shall return to the secure state (Fail secure). During closed hours: Door to be closed and locked at all times. Entry allowed by mechanical key. Key switch for the operator will be turned off and both actuators will be inactive and the electric strike will be secure. Free egress at all times Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 26 Set: 25.0 1 Continuous Hinge A240HD 83"C AH 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4111 DEL EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Notes: Theory of operation: Entry allowed by keypad or key Free egress at all times Set: 26.0 1 Continuous Hinge A240HD 83"C AH 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4011 DEL REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Notes: Theory of operation: Entry allowed by keypad or key Free egress at all times Set: 27.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 28.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 27 Set: 29.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 3 Silencer 608-RKW RO Set: 30.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4111 DEL EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Notes: Theory of operation: Entry allowed by keypad or key Free egress at all times Set: 31.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Keypad Cylindrical Lock DG1 28 KP10G77 LL US26D SA 1 Surface Closer 4111 SCUSH AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Notes: Theory of operation: Entry allowed by keypad or key Free egress at all times Set: 32.0 2 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Wall Stop 406 US32D RO Set: 33.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 28 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 34.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 74 10G37 LL US26D SA 1 Protection Plate Supplied under section 102600 OT 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 35.0 2 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 74 10G37 LL US26D SA 2 Surf Overhead Stop 902*A LL US32D AH 2 Protection Plate Supplied under section 102600 OT 3 Silencer 608-RKW RO Set: 36.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 37.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Kick Plate K1050 10" High B4E 32D RO 3 Silencer 608-RKW RO Set: 38.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 29 Set: 39.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 40.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 3 Silencer 608-RKW RO Set: 41.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 42.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surface Closer 4011 DEL REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 43.0 1 Continuous Hinge A240HD 83"C AH 1 Classroom Lock DG1 31 8237 LNL US26D SA 1 Mortise Cylinder DG1 43 Cam and collar as required US32D SA 1 Electric Strike 1500C 630 HS 1 Automatic Operator Supplied under section 087113 BM Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 30 1 Touchless Actuator Supplied under section 087113 BM 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 1 Smoke Gasket PK33 BL PE 1 Key Switch Supplied under section 087113 BM Notes: Operator to power electric strike. Theory of operation: During open hours: Door shall be unlock by key. Key switch for the operator will be turned on and both actuators will be be active and the electric strike shall be released. Free egress at all times. In the event of a fire alarm the electric strike shall return to the secure state (Fail secure). During closed hours: Door to be closed and locked at all times. Entry allowed by mechanical key. Key switch for the operator will be turned off and both actuators will be inactive and the electric strike will be secure. Free egress at all times Set: 44.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Classroom Lock DG1 28 10G37 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 3 Silencer 608-RKW RO Set: 45.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Entry/Office Lock DG1 28 10G05 LL US26D SA 1 Wall Stop 409 US32D RO 1 Smoke Gasket PK33 BL PE Set: 46.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Entry/Office Lock DG1 28 10G05 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Smoke Gasket PK33 BL PE Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 31 Set: 47.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Entry/Office Lock DG1 28 10G05 LL US26D SA 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 409 US32D RO 1 Smoke Gasket PK33 BL PE Set: 48.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Entry/Office Lock DG1 28 10G05 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 1 Surface Closer 4011 REG AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Smoke Gasket PK33 BL PE Set: 49.0 1 Continuous Hinge A240HD 83"C AH 1 Rim Exit Device, Storeroom DG1 GL 8804 ETL US32D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 50.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Store Lock DG1 10G26 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 51.0 2 Continuous Hinge A240HD 83" EA12-EZ-AA C AH 1 Magnetic Lock iMXDa SU 2 SVR Exit (Electric, Exit Only)12 TB 55 56 NB8710 EO US32D SA 2 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 2 Armor Plate K1050 34" High (UL where required)32D RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 32 1 Smoke Gasket PK33 BL PE 2 Astragal 18041NB C PE 2 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Signage on door shall read: “Push until alarm sounds. door can be opened in 15 seconds” Authorized ingress into corridor 122 from Lobby 100. Allowed through access control system. Upon use of valid credentials the delayed egress magnetic lock shall disarm, and the automatic operator actuator will turned on, allowing egress without alarm and use of the operator. After the door closes the delayed egress magnetic lock will automatically rearm in 3 seconds and the actuator will be turned off. Unauthorized egress: Upon attempted egress the alarm will sound, and remote signal sent to the security system. After 15 seconds the magnetic lock will release allowing for free egress. The alarm will remain on until it is reset remotely or by key switch on the magnetic lock. Exiting from Corridor 122 to Lobby 100 is allowed at all times, without alarm. Actuator on corridor side 122 will be active at all times. When the actuator is activated the delayed egress, magnetic lock will be shunt allowing the both doors to open without alarm. After the doors close the delayed egress magnetic lock will automatically rearm in 3 seconds Upon alarmed event or power failure the delayed egress will be deactivated allowing for free egress without alarm. Set: 52.0 1 Pull S3305-B-12-0.875 630 RS Notes: Balance of hardware included in system supplied by door manufacturer Set: 53.0 1 Privacy Lock S5340 S460PI 630 RS 1 Pull S3305-B-12-0.875 630 RS Set: 54.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Passage Latch 28 10U15 LL US26D SA 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 33 Set: 55.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Passage Latch 28 10U15 LL US26D SA 1 Surf Overhead Stop 902*A US32D AH 3 Silencer 608-RKW RO Set: 56.0 1 Continuous Hinge A240HD 83"C AH 1 Passage Latch 28 10U15 LL US26D SA 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 57.0 1 Continuous Hinge A240HD 83"C AH 1 Passage Latch 28 10U15 LL US26D SA 1 Surface Closer 4011 DEL REG AL LC 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 58.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Passage Latch 28 10U15 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO Set: 59.0 3 Hinge, Full Mortise TA2714 4-1/2" x 4-1/2"US26D MK 1 Passage Latch 28 10U15 LL US26D SA 1 Surface Closer 4111 SCUSH AL LC 3 Silencer 608-RKW RO Set: 60.0 1 Continuous Hinge A240HD 83"C AH 1 Passage Latch 28 10U15 LL US26D SA 1 Surface Closer 4111 EDA AL LC 1 Wall Stop 406 US32D RO Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 34 3 Silencer 608-RKW RO Set: 61.0 2 Continuous Hinge A410HD 83"C AH 2 Push Pull 18111 32D AH 2 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 2 Armor Plate K1050 34" High (UL where required)32D RO 2 Wall Stop 406 US32D RO 2 Silencer 608-RKW RO Notes: Theory of operation: both actuator are active at all times Set: 62.0 2 Continuous Hinge A410HD 83" EA12-EZ-AA C AH 1 Surface Vert Rod Exit, Exit Only 56 NB8710 EO US32D SA 1 Surface Vert Rod Exit DG1 56 NB8706 ETL US32D SA 2 Automatic Operator Supplied under section 087113 BM 2 Touchless Actuator Supplied under section 087113 BM 2 Armor Plate K1050 34" High (UL where required)32D RO 2 Wall Stop 406 US32D RO 2 Silencer 608-RKW RO 2 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Request to Exit By Security Company OT 2 Wiring Harness (Door)QC-C length as required MK 2 Wiring Harness (Frame)QC-C3000P MK 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Door to be closed and locked at all times. Entry allowed through the access control system. Upon valid credentials the exit device shall retract the latch for 5 seconds and the actuator on the secure side will be turned on allowing use of the operator. After 5 seconds the exit shall return to the secure state and the actuator switch will be turned off.. Remote access is allowed through access control system. Actuator on the non-secure side will be active at all times Free egress at all times upon power failure the door shall remain secure. Fail Secure Set: 63.0 Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 35 2 Continuous Hinge A240HD 83"C AH 2 Surface Vert Rod Exit DG1 12 NB8706 ETL US32D SA 2 Surface Vert Rod Exit, Exit Only 12 TB NB8710 EO US32D SA 2 Surface Closer 4111 EDA AL LC 2 Kick Plate K1050 10" High B4E 32D RO 2 Wall Stop 406 US32D RO 1 Smoke Gasket PK33 BL PE 1 Astragal S771 BL PE Set: 64.0 6 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Flush Bolt 1855S US32D AH 1 Storeroom/Closet Lock DG1 28 41 10G04 LL US26D SA 2 Kick Plate K1050 10" High B4E 32D RO 2 Wall Stop 406 US32D RO 2 Silencer 608-RKW RO Notes: Overlapping metal edge and astragal required by door manufacturer Set: 65.0 2 Continuous Hinge A240HD 83"C AH 1 Magnetic Lock iMXDa SU 2 Surface Vert Rod Exit, Exit Only 12 TB NB8710 EO US32D SA 2 Surface Closer 4111 EDA AL LC 2 Kick Plate K1050 10" High B4E 32D RO 2 Electromagnetic Holder 2100 20100 US32D AH 1 Smoke Gasket PK33 BL PE 2 Astragal 18041NB C PE 2 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Request to Exit By Security Company OT 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Signage on door shall read: “Push until alarm sounds. door can be opened in 15 seconds” Authorized ingress into corridor 232 from Walking track 200. Allowed through access control system. Upon use of valid credentials the delayed egress magnetic lock shall disarm, allowing egress without alarm. After the door closes the delayed egress magnetic lock will automatically rearm in 3 seconds. Unauthorized egress: Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 36 Upon attempted egress the alarm will sound, and remote signal sent to the security system. After 15 seconds the magnetic lock will release allowing for free egress. The alarm will remain on until it is reset remotely or by key switch on the magnetic lock. Exiting from Corridor 232 to Walking Track 200 is allowed at all times, without alarm. Upon alarmed event or power failure the delayed egress will be deactivated allowing for free egress without alarm Set: 66.0 1 Sliding Door Hdwe HBP200A/8 PE 1 Fascia F134C 96"PE 2 Flush Pull 95B US26D RO Set: 67.0 3 Hinge TA2714 NRP 4-1/2" x 4-1/2"US26D MK 1 Storeroom/Closet Lock DG1 28 10G04 LL US26D SA 1 Electric Strike 1500C 630 HS 1 Surface Closer 4111 EDA AL LC 1 Kick Plate K1050 10" High B4E 32D RO 1 Wall Stop 406 US32D RO 3 Silencer 608-RKW RO 1 Door Contact By Security Company OT 1 Reader By Security Company OT 1 Request to Exit By Security Company OT 1 Wiring Harness (Frame)QC-C3000P MK 1 Power Supply Shared see hardware set 68.0 SU Notes: Theory of operation: Door to be closed and locked at all times entry allowed through access control system or mechanical key override. When valid credentials are presented the electric strike shall release for 5 seconds allowing entry. After 5 seconds the electric strike will return to the secure state. Free egress at all times. Fail secure Set: 68.0 2 Power Supply AQD6 (1st Floor)SU 4 Power Distribution Board PDB-8C8R2 (1st Floor)SU 1 Power Supply AQD2 (2nd Floor)SU 1 Power Distribution Board PDB-8C8R2 (2nd Floor)SU 1 Power Supply AQD1 (3rd Floor)SU Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DOOR HARDWARE 087100 - 37 1 Power Distribution Board PDB-8C8R2 (3rd Floor)SU 1 Power Supply AQD1 (4th Floor)SU 1 Power Distribution Board PDB-8C8R2 (4th Floor)SU 1 Power Supply AQD1 (5th Floor)SU 1 Power Distribution Board PDB-8C8R2 (5th Floor)SU 12 Battery B-24-5 SU Notes: Power supplies to be located IT/electric rooms on each floor END OF SECTION 087100 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 1 SECTION 087113 - POWER DOOR OPERATORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Low-energy door operators for swinging doors. B. Related Requirements: 1. Section 033000 "Cast-in-Place Concrete" for installing recessed metal frames for control mats in concrete. 1.2 DEFINITIONS A. AAADM: American Association of Automatic Door Manufacturers. B. Activation Device: A control that, when actuated, sends an electrical signal to the door operator to open the door. C. Double-Egress (Doors): A pair of doors that simultaneously swing, with the two doors moving in opposite directions with no mullion between them. D. Double-Swing (Doors): A pair of doors that swing, with the two doors moving in opposite directions with a mullion between them; each door functioning as a single-swing door. E. Safety Device: A control that, to avoid injury, prevents a door from opening or closing. F. For automatic door terminology, see BHMA A156.19 for definitions of terms. 1.3 COORDINATION A. Coordinate sizes and locations of recesses in concrete floors for recessed control mats that control power door operators. Concrete, reinforcement, and formwork requirements are specified elsewhere. B. Templates: Distribute for doors, frames, and other work specified to be factory prepared and reinforced for installing power door operators. C. Coordinate hardware for doors with operators to ensure proper size, thickness, hand, function, and finish. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 2 D. Electrical System Roughing-in: Coordinate layout and installation of power door operators with connections to the following: 1. Power supplies. 2. Access-control system. 3. Remote activation devices. 4. Remote monitoring systems. 1.4 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1.5 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for power door operators. 2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories. B. Shop Drawings: For power door operators. 1. Include plans, elevations, sections, hardware mounting heights, and attachment details. 2. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 3. Indicate locations of activation and safety devices. 4. Include diagrams for power, signal, and control wiring. 5. Include plans, elevations, sections, and attachment details for guide rails. C. Samples: For each exposed product and for each color and texture specified, manufacturer's standard size. 1.6 CLOSEOUT SUBMITTALS A. Maintenance Data: For power door operators, safety devices, and control systems, to include in maintenance manuals. 1.7 QUALITY ASSURANCE A. Installer Qualifications: An authorized representative who is trained and approved by manufacturer for installation and maintenance of units required for this Project. 1. Maintenance Proximity: Not more than two hours' normal travel time from Installer's place of business to Project site. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 3 1.8 WARRANTY A. Special Warranty: Manufacturer agrees to repair or replace components of power door operators that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Faulty or sporadic operation of power door operator, including controls. b. Deterioration of metals, metal finishes, and other materials beyond normal weathering or use. 2. Warranty Period: Two years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by the following: 1. Besam Entrance Solutions; an ASSA ABLOY Group Company; SW200i. B. Source Limitations: Obtain power door operators, including activation and safety devices, from single source from single manufacturer. 2.2 POWER DOOR OPERATORS, GENERAL A. General: Provide operators of size recommended by manufacturer for door size, weight, and movement; for condition of exposure; and for long-term, maintenance-free operation under normal traffic load for occupancy type indicated; and in accordance with UL 325. Coordinate operator mechanisms with door operation, hinges, and activation and safety devices. 1. Fire-Rated Doors: Provide door operators for fire-rated door assemblies that comply with NFPA 80 for fire-rated door components and are listed and labeled by a qualified testing agency. 2. Wind Load: Provide door operators on exterior doors that will open and close doors and maintain them in fully closed position when subjected to wind load as indicated on Drawings. B. Electromechanical Operating System: Self-contained unit powered by permanent-magnet dc motor; with closing speed controlled mechanically by gear train and dynamically by braking action of electric motor, connections for power and activation- and safety-device wiring, and manual operation, including spring closing when power is off. C. Hinges: See Section 087100 "Door Hardware" for hinge type for each door that door operator shall accommodate. D. Cover for Surface-Mounted Operators: Fabricated from 0.125-inch- thick, extruded or formed Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 4 aluminum; continuous over full width of operator-controlled door opening; with enclosed end caps, provision for maintenance access, and fasteners concealed when door is in closed position. E. Brackets and Reinforcements: Fabricated from aluminum with nonstaining, nonferrous shims for aligning system components. F. Fire-Door Package: Consisting of UL-listed latch mechanism, power-reset box, and caution signage for fire-rated doors. Latch mechanism shall allow door to swing free during automatic operation; when fire is detected, latch actuator shall cause exit hardware to latch when door closes. Provide latch actuators with fail-secure design. G. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 2.3 LOW-ENERGY DOOR OPERATORS FOR SWINGING DOORS A. Standard: BHMA A156.19. B. Performance Requirements: 1. Opening Force if Power Fails: Not more than 15 lbf required to release latch if provided, not more than 30 lbf required to manually set door in motion, and not more than 15 lbf required to fully open door. 2. Entrapment-Prevention Force: Not more than 15 lbf required to prevent stopped door from closing or opening. C. Configuration, Single: Operator to control single swinging door. 1. Traffic Pattern: Two way. 2. Operator Mounting: Surface. D. Configuration, Pair: Operator to control pair of swinging doors. 1. Traffic Pattern: Double egress and Double swing. 2. Operator Mounting: Surface. E. Operation: Power opening and power-assisted spring closing. Provide time delay for door to remain open before initiating closing cycle as required by BHMA A156.19. When not in automatic mode, door operator shall function as manual door closer, with or without electrical power. F. Operating System: Electromechanical. G. Microprocessor Control Unit: Solid-state controller. H. Features: 1. Adjustable openingandclosing speed. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 5 2. Adjustable openingandclosing force. 3. Adjustable backcheck. 4. Adjustable hold-open time from zero to 30 seconds. 5. Adjustable time delay. 6. Adjustable acceleration. 7. Obstruction recycle. 8. On-off/hold-open switch to control electric power to operator; key operated. I. Activation Device: Touchless switchto activate door operator. 1. Products: Subject to compliance with requirements, provide ASSA ABLOY; Touchless Wave Plates. J. Exposed Finish: Class I, clear anodic finish. 2.4 MATERIALS A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated. 1. Extrusions: ASTM B221. 2. Sheet: ASTM B209. B. Fasteners and Accessories: Corrosion-resistant, nonstaining, nonbleeding fasteners and accessories compatible with adjacent materials. 2.5 CONTROLS A. General: Provide controls, including activation and safety devices, in accordance with BHMA standards; for condition of exposure; and for long-term, maintenance-free operation under normal traffic load for occupancy type indicated. Coordinate activation and safety devices with door operation and door operator mechanisms. B. Presence Sensors: Self-contained, active-infrared scanner units; adjustable to provide detection field sizes and functions required by BHMA A156.10. Sensors shall remain active at all times. C. Photoelectric Beams: Pulsed infrared, sender-receiver assembly for recessed mounting. Beams shall not be active when doors are fully closed. D. Touchless Switch: Hands-free activation door-control switch with flat motion sensor face-plate with contrasting-colored, engraved message. 1. Products: Subject to compliance with requirements, provide ASSA ABLOY; Touchless Wave Plates. 2. Configuration: 1.68-by-4.56-inch jamb-style face plate. a. Mounting: Recess mounted in door jamb. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 6 3. Face-Plate Material: As selected by Architect from manufacturer's full range of options. 4. Message: "Wave to Open" and wave symbol. E. Electrical Interlocks: Unless units are equipped with self-protecting devices or circuits, provide electrical interlocks to prevent activation of operator when door is locked, latched, or bolted. 2.6 ACCESSORIES A. Signage: As required by cited BHMA standard for type of door and its operation. 1. Application Process: Operator manufacturer's standard process. 2. Provide sign materials with instructions for field application when operators are installed. 2.7 FABRICATION A. Factory fabricate power door operators to comply with indicated standards. B. Form aluminum shapes before finishing. C. Fabricate exterior components to drain condensation and water-passing joints within operator enclosure to the exterior. D. Use concealed fasteners to greatest extent possible. Where exposed fasteners are required, use countersunk Phillips flat-head machine screws, finished to match operator. 2.8 GENERAL FINISH REQUIREMENTS A. Protect mechanical finishes on exposed surfaces from damage by applying strippable, temporary, protective covering before shipping. B. Apply organic and anodic finishes to formed metal after fabrication unless otherwise indicated. C. Appearance of Finished Work: Noticeable variations in same piece are unacceptable. Variations in appearance of adjoining components are acceptable if they are within range of approved Samples and are assembled or installed to minimize contrast. 2.9 ALUMINUM FINISHES A. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 7 PART 3 - EXECUTION 3.1 EXAMINATION A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances, door and frame preparation and reinforcements, and other conditions affecting performance of power door operators. B. Examine roughing-in for electrical systems to verify actual locations of power connections before power door operator installation. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION, GENERAL A. Install power door operators in accordance with manufacturer's written instructions and cited BHMA standard for type of door operation and direction of pedestrian travel, including signage, controls, wiring, remote power units if any, and connection to building's power supply. 1. Do not install damaged components. Fit joints to produce hairline joints free of burrs and distortion. 2. Install operators true in alignment with established lines and door geometry without warp or rack. Anchor securely in place. B. Controls: Install activation and safety devices in accordance with manufacturer's written instructions and cited BHMA standard for operator type and direction of pedestrian travel. Connect control wiring in accordance with Section 260519 "Low-Voltage Electrical Power Conductors and Cables." C. Access-Control System: Connect operators to access-control system as specified in Section 281500 "Access Control Hardware Devices." D. Signage: Apply on both sides of each door as required by cited BHMA standard for type of door operator and direction of pedestrian travel. 3.3 FIELD QUALITY CONTROL A. Perform the following tests and inspections[ with the assistance of a factory-authorized service representative]: 1. Test and inspect each power door operator installation, using AAADM inspection forms, to determine compliance of installed systems with applicable BHMA standards. B. Power door operators will be considered defective if they do not pass tests and inspections. C. Prepare test and inspection reports. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 AUTOMATIC DOOR OPERATORS 087113 - 8 3.4 ADJUSTING A. Adjust power door operators to function smoothly, and lubricate as recommended by manufacturer; comply with requirements of applicable BHMA standards. 1. Adjust operators on exterior doors for tight closure. B. After completing installation of power door operators, inspect exposed finishes on doors and operators. Repair damaged finish to match original finish. C. Readjust power door operators and controls after repeated operation of completed installation equivalent to three days' use by normal traffic (100 to 300 cycles). D. Occupancy Adjustment: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to Project during other-than-normal occupancy hours for this purpose. 3.5 MAINTENANCE SERVICE A. Initial Maintenance Service: Beginning at Substantial Completion, maintenance service shall include 12 months' full maintenance by skilled employees of power door operator Installer. Include quarterly preventive maintenance, repair or replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper door operation. Parts and supplies shall be manufacturer's authorized replacement parts and supplies. 1. Engage a Certified Inspector to perform safety inspection after each adjustment or repair and at end of maintenance period. Furnish completed inspection reports to Owner. 2. Perform maintenance, including emergency callback service, during normal working hours. 3. Include 24-hour-per-day, seven-day-per-week, emergency callback service. 3.6 DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain power door operators. END OF SECTION 087113 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 1 SECTION 088000 - GLAZING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Glass products. 2. Laminated glass. 3. Insulating glass. 4. Glazing tapes. 5. Miscellaneous glazing materials. B. Related Requirements: 1. Section 084413 "Glazed Aluminum Curtain Walls" for glazing sealants used in structural-sealant-glazed curtain walls. 2. Section 088113 "Decorative Glass Glazing." 3. Section 088813 "Fire-Rated Glazing." 1.2 DEFINITIONS A. Glass Manufacturers: Firms that produce primary glass, fabricated glass, or both, as defined in referenced glazing publications. B. Glass Thicknesses: Indicated by thickness designations in millimeters in accordance with ASTM C1036. C. IBC: International Building Code. D. Interspace: Space between lites of an insulating-glass unit. 1.3 COORDINATION A. Coordinate glazing channel dimensions to provide necessary bite on glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable tolerances to achieve proper safety margins for glazing retention under each design load case, load case combination, and service condition. 1.4 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site. 1. Review and finalize construction schedule and verify availability of materials, Installer's Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 2 personnel, equipment, and facilities needed to make progress and avoid delays. 2. Review temporary protection requirements for glazing during and after installation. 1.5 QUALITY ASSURANCE A. Preferred Installer Qualifications: A qualified glazing contractor for this Project who is certified under the North American Contractor Certification Program (NACC) for Architectural Glass & Metal (AG&M) contractors and who employs glazing technicians certified under the Architectural Glass and Metal Technician (AGMT) certification program. B. Glass Testing Agency Qualifications: A qualified independent testing agency accredited according to the NFRC CAP Certification Agency Program. C. Sealant Testing Agency Qualifications: An independent testing agency qualified according to ASTM C1021 to conduct the testing indicated. D. Material Compatibility: Use only materials with reliable aesthetic and functional compatibility over design service life of application. E. Mockups: Build mockups to demonstrate aesthetic effects and to set quality standards for materials and execution. 1. Install glazing in mockups specified in Section 084113 "Aluminum-Framed Entrances and Storefronts" and Section 084413 "Glazed Aluminum Curtain Walls" to match glazing systems required for Project, including glazing methods. 2. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. 1.6 DELIVERY, STORAGE, AND HANDLING A. Protect glazing materials in accordance with manufacturer's written instructions. Prevent damage to glass and glazing materials from condensation, temperature changes, direct exposure to sun, or other causes. B. Comply with insulating-glass manufacturer's written instructions for venting and sealing units to avoid hermetic seal ruptures due to altitude change. 1.7 FIELD CONDITIONS A. Environmental Limitations: Do not proceed with glazing when ambient and substrate temperature conditions are outside limits permitted by glazing material manufacturers and when glazing channel substrates are wet from rain, frost, condensation, or other causes. 1. Do not install glazing sealants when ambient and substrate temperature conditions are outside limits permitted by sealant manufacturer or are below 40 deg F. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 3 1.8 WARRANTY A. Manufacturer's Special Warranty for Coated-Glass Products: Manufacturer agrees to replace coated-glass units that deteriorate within specified warranty period. Deterioration of coated glass is defined as defects developed from normal use that are not attributed to glass breakage or to maintaining and cleaning coated glass contrary to manufacturer's written instructions. Defects include peeling, cracking, and other indications of deterioration in coating. 1. Warranty Period: 10 years from date of Substantial Completion. B. Manufacturer's Special Warranty for Laminated Glass: Manufacturer agrees to replace laminated-glass units that deteriorate within specified warranty period. Deterioration of laminated glass is defined as defects developed from normal use that are not attributed to glass breakage or to maintaining and cleaning laminated glass contrary to manufacturer's written instructions. Defects include edge separation, delamination materially obstructing vision through glass, and blemishes exceeding those allowed by referenced laminated-glass standard. 1. Warranty Period: 10 years from date of Substantial Completion. C. Manufacturer's Special Warranty for Insulating Glass: Manufacturer agrees to replace insulating-glass units that deteriorate within specified warranty period. Deterioration of insulating glass is defined as failure of hermetic seal under normal use that is not attributed to glass breakage or to maintaining and cleaning insulating glass contrary to manufacturer's written instructions. Evidence of failure is obstruction of vision by dust, moisture, or film on interior surfaces of glass. 1. Warranty Period: 10 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Source Limitations for Glass: Obtain coated glass from single source from single manufacturer. B. Source Limitations for Glazing Accessories: For each product and installation method, obtain from single source from single manufacturer. 2.2 PERFORMANCE REQUIREMENTS A. General: Installed glazing systems shall withstand normal thermal movement and wind and impact loads (where applicable) without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; or other defects in construction. B. Structural Performance: Glazing shall withstand the following design loads within limits and under conditions indicated determined in accordance with the IBC and ASTM E1300: 1. Design Wind Pressures: As indicated on Drawings. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 4 a. Wind Design Data: As indicated on Drawings. b. Basic Wind Speed: 90 mph. c. Importance Factor: 1.0. 2. Maximum Lateral Deflection: For glass supported on all four edges, limit center-of-glass deflection at design wind pressure to not more than 1/50 times the short-side length or 1 inch, whichever is less, and keeps glazing retained in place with a suitable margin of safety under all design conditions. 3. Thermal Loads: Design glazing to resist thermal stress breakage induced by differential temperature conditions and limited air circulation. C. Safety Glazing: Where safety glazing is indicated, provide glazing that complies with 16 CFR 1201, Category II. D. Thermal and Optical Performance Properties: Provide glass with performance properties specified, as indicated in manufacturer's published test data, based on procedures indicated below: 1. For monolithic-glass lites, properties are based on units with lites 6 mm thick. 2. For laminated-glass lites, properties are based on products of construction indicated. 3. For insulating-glass units, properties are based on units of thickness indicated for overall unit and for each lite. 4. U-Factors: Center-of-glazing values, in accordance with NFRC 100 and based on most current non-beta version of LBL's WINDOW computer program, expressed as Btu/sq. ft. x h x deg F. 5. SHGC and Visible Transmittance: Center-of-glazing values, in accordance with NFRC 200 and based on most current non-beta version of LBL's WINDOW computer program. 6. Visible Reflectance: Center-of-glazing values, in accordance with NFRC 300. 2.3 GLASS PRODUCTS, GENERAL A. Glazing Publications: Comply with published recommendations of glass product manufacturers and organizations below unless more stringent requirements are indicated. See these publications for glazing terms not otherwise defined in this Section or in referenced standards. 1. NGA Publications: "Laminated Glazing Reference Manual" and "Glazing Manual." 2. FGIA Publication for Insulating Glass: IGMA TM-3000, "North American Glazing Guidelines for Sealed Insulating Glass Units for Commercial and Residential Use." B. Safety Glazing Labeling: Where safety glazing is indicated, permanently mark glazing with certification label of the SGCC or another certification agency acceptable to authorities having jurisdiction. Label shall indicate manufacturer's name, type of glass, thickness, and safety glazing standard with which glass complies. C. Insulating-Glass Certification Program: Permanently marked either on spacers or on at least one component lite of units with appropriate certification label of the IGCC. D. Thickness: Where glass thickness is indicated, it is a minimum. Provide glass that complies with performance requirements and is not less than thickness indicated. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 5 1. Minimum Glass Thickness for Exterior Lites: 5 mm. E. Strength: Do not substitute relative to designations of annealed, heat-strengthened, and fully tempered glass. 2.4 GLASS PRODUCTS A. Clear Annealed Float Glass: ASTM C1036, Type I, Class 1 (clear), Quality-Q3. 1. Manufacturers Basis-of-Design Glass Product: Subject to compliance with requirements, provide Guardian Glass products indicated in Glass Schedule or comparable products by one of the following: a. AGC Glass Company North America, Inc. b. Pilkington North America. c. Vitro Architectural Glass. B. Fully Tempered Float Glass: ASTM C1048, Kind FT (fully tempered), Condition A (uncoated) unless otherwise indicated, Type I, Class 1 (clear) or Class 2 (tinted) as indicated, Quality-Q3. 1. Fabrication Process: By horizontal (roller-hearth) process with roll-wave distortion horizontally oriented upon completion of installation. C. Heat-Strengthened Float Glass: ASTM C1048, Kind HS (heat strengthened), Type I, Condition A (uncoated) unless otherwise indicated, Type I, Class 1 (clear) or Class 2 (tinted) as indicated, Quality-Q3. 1. Fabrication Process: By horizontal (roller-hearth) process with roll-wave distortion horizontally oriented upon completion of installation. D. Low-E-Coated Vision Glass: ASTM C1376. 1. Manufacturers Basis-of-Design Product: Subject to compliance with requirements, provide Guardian Glass products indicated in Glass Schedule or comparable products by one of the following: a. Pilkington North America. b. Vitro Architectural Glass. E. Silicone-Coated Spandrel Glass: ASTM C1048, Type I, Condition B, Quality-Q3. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. ICD High Performance Coatings. 2.5 LAMINATED GLASS A. Laminated Glass: ASTM C1172. Use materials that have a proven record of no tendency to bubble, discolor, or lose physical and mechanical properties after fabrication and installation. 1. Construction: Laminate glass with polyvinyl butyral interlayer to comply with interlayer Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 6 manufacturer's written instructions. 2. Interlayer Thickness: Provide thickness not less than that indicated and as needed to comply with requirements. 3. Interlayer Color: As indicated on Drawings by Vanceva. 2.6 INSULATING GLASS A. Insulating-Glass Units: Factory-assembled units consisting of sealed lites of glass separated by a dehydrated interspace, qualified in accordance with ASTM E2190. 1. Sealing System: Dual seal, with manufacturer's standard primary and secondary sealants. 2. Perimeter Spacer: Manufacturer's standard spacer material and construction. 3. Desiccant: Molecular sieve or silica gel, or a blend of both. 2.7 GLAZING TAPES A. Back-Bedding Mastic Glazing Tapes: Preformed, butyl-based, 100 percent solids elastomeric tape; nonstaining and nonmigrating in contact with nonporous surfaces; with or without spacer rod as recommended in writing by tape and glass manufacturers for application indicated; and complying with ASTM C1281 and AAMA 800 for products indicated below: 1. AAMA 806.3 tape, for glazing applications in which tape is subject to continuous pressure. 2. AAMA 807.3 tape, for glazing applications in which tape is not subject to continuous pressure. 2.8 MISCELLANEOUS GLAZING MATERIALS A. General: Provide products of material, size, and shape complying with referenced glazing standard, recommended in writing by manufacturers of glass and other glazing materials for application indicated, and with a proven record of compatibility with surfaces contacted in installation. B. Cleaners, Primers, and Sealers: Types recommended by sealant or gasket manufacturer. C. Setting Blocks: 1. EPDM with Shore A durometer hardness of 85, plus or minus 5. 2. Type recommended in writing by sealant or glass manufacturer. D. Spacers: 1. Neoprene blocks or continuous extrusions of hardness required by glass manufacturer to maintain glass lites in place for installation indicated. 2. Type recommended in writing by sealant or glass manufacturer. E. Edge Blocks: 1. EPDM with Shore A durometer hardness per manufacturer's written instructions. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 7 2. Type recommended in writing by sealant or glass manufacturer. 2.9 FABRICATION OF GLAZING UNITS A. Fabricate glazing units in sizes required to fit openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with written instructions of product manufacturer and referenced glazing publications, to comply with system performance requirements. 1. Allow for thermal movements from ambient and surface temperature changes acting on glass framing members and glazing components. a. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. B. Clean-cut or flat-grind vertical edges of butt-glazed monolithic lites to produce square edges with slight chamfers at junctions of edges and faces. C. Grind smooth and polish exposed glass edges and corners. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine framing, glazing channels, and stops, with Installer present, for compliance with the following: 1. Manufacturing and installation tolerances, including those for size, squareness, and offsets at corners. 2. Presence and functioning of weep systems. 3. Minimum required face and edge clearances. 4. Effective sealing between joints of glass-framing members. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean glazing channels and other framing members receiving glass immediately before glazing. Remove coatings not firmly bonded to substrates. B. Examine glazing units to locate exterior and interior surfaces. Label or mark units as needed so that exterior and interior surfaces are readily identifiable. Do not use materials that leave visible marks in the completed Work. 3.3 GLAZING, GENERAL A. Comply with combined written instructions of manufacturers of glass, sealants, gaskets, and Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 8 other glazing materials, unless more stringent requirements are indicated, including those in referenced glazing publications. B. Protect glass edges from damage during handling and installation. Remove damaged glass from Project site and legally dispose of off Project site. Damaged glass includes glass with edge damage or other imperfections that, when installed, could weaken glass, impair performance, or impair appearance. C. Apply primers to joint surfaces where required for adhesion of sealants, as determined by preconstruction testing. D. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing publications, unless otherwise required by glass manufacturer. Set blocks in thin course of compatible sealant suitable for heel bead. E. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites. F. Provide spacers for glass lites where length plus width is larger than 50 inches. 1. Locate spacers directly opposite each other on both inside and outside faces of glass. Install correct size and spacing to preserve required face clearances, unless gaskets and glazing tapes are used that have demonstrated ability to maintain required face clearances and to comply with system performance requirements. 2. Provide 1/8-inch- minimum bite of spacers on glass and use thickness equal to sealant width. With glazing tape, use thickness slightly less than final compressed thickness of tape. G. Provide edge blocking where indicated or needed to prevent glass lites from moving sideways in glazing channel, as recommended in writing by glass manufacturer and in accordance with requirements in referenced glazing publications. H. Set glass lites in each series with uniform pattern, draw, bow, and similar characteristics. I. Set glass lites with proper orientation so that coatings face exterior or interior as specified. J. Where wedge-shaped gaskets are driven into one side of channel to pressurize sealant or gasket on opposite side, provide adequate anchorage so gasket cannot walk out when installation is subjected to movement. K. Square cut wedge-shaped gaskets at corners and install gaskets in a manner recommended by gasket manufacturer to prevent corners from pulling away; seal corner joints and butt joints with sealant recommended in writing by gasket manufacturer. 3.4 TAPE GLAZING A. Position tapes on fixed stops so that, when compressed by glass, their exposed edges are flush with or protrude slightly above sightline of stops. B. Install tapes continuously, but not necessarily in one continuous length. Do not stretch tapes to make them fit opening. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 9 C. Cover vertical framing joints by applying tapes to heads and sills first, then to jambs. Cover horizontal framing joints by applying tapes to jambs, then to heads and sills. D. Place joints in tapes at corners of opening with adjoining lengths butted together, not lapped. Seal joints in tapes with compatible sealant approved by tape manufacturer. E. Do not remove release paper from tape until right before each glazing unit is installed. F. Apply heel bead of elastomeric sealant. G. Center glass lites in openings on setting blocks, and press firmly against tape by inserting dense compression gaskets formed and installed to lock in place against faces of removable stops. Start gasket applications at corners and work toward centers of openings. H. Apply cap bead of elastomeric sealant over exposed edge of tape. 3.5 CLEANING AND PROTECTION A. Immediately after installation, remove nonpermanent labels and clean surfaces. B. Protect glass from contact with contaminating substances resulting from construction operations. Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at frequent intervals during construction, but not less than once a month, for buildup of dirt, scum, alkaline deposits, or stains. 1. If, despite such protection, contaminating substances do contact with glass, remove substances immediately as recommended in writing by glass manufacturer. Remove and replace glass that cannot be cleaned without damage to coatings. C. Remove and replace glass that is damaged during construction period. D. Wash glass on both exposed surfaces not more than four days before date scheduled for inspections that establish date of Substantial Completion. Wash glass as recommended in writing by glass manufacturer. 3.6 MONOLITHIC GLASS SCHEDULE A. Clear Glass Type: Heat-strengthened or Fully tempered float glass. 1. Minimum Thickness: 6 mm. 2. Safety glazing, as required. 3.7 INSULATING GLASS SCHEDULE A. Low-E-Coated, Clear Insulating Vision Glass [Type: D]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1 inch. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 10 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter-coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace Content: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Clear float glass. 9. Heat Treatment: Heat-strengthened or Fully tempered float glass. 10. Glass Unit Performance Values: 11. Winter Nighttime U-Factor: 0.25 maximum. 12. Visible Light Transmittance: 68 percent minimum. 13. SHGC: 0.37 maximum. 14. Safety glazing, as required. B. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: A - Light Green]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace Content: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Spandrel Color "#2 Gratifying Green". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. C. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: B - Dark Green]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Spandrel Color "#2 4014 Haven". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 11 D. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: C - Cool Grey]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#3-7541 Cool Gray 7C1". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. E. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: E - Light Teal]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#6-4231 Meander Blue". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. F. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: F - Dark Teal]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#6-4238 Blithe Blue". 10. Heat Treatment: Fully tempered. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 12 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. G. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: G - Bright White]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#0-1911 Nice Bright White 1". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. H. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: H - Dark Blue]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#6-4234 Resolute Blue". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. I. Low-E Coated, Silicone Coated, Insulating Spandrel Glass [Type: I - Light Blue]: 1. Basis-of-Design Product: Guardian Glass; SunGuard SN 68 on clear with ICD High Performance Coatings; OPACI-COAT 300. 2. Overall Unit Thickness: 1 inch. 3. Minimum Thickness of Each Glass Lite: 6 mm. 4. Outboard Lite: Sputter coated clear float glass. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 13 5. Coating on Surface No. 2: Guardian SunGuard SN 68. 6. Heat Treatment: Heat-strengthened or Fully tempered. 7. Interspace Content: Argon filled, 12mm (1/2 inch) wide, hermetically sealed. 8. Inboard Lite: Ceramic coated float glass. 9. Coating on Surface No. 4: ICD Color "#6 - 4233 Vast Sky". 10. Heat Treatment: Fully tempered. 11. Glass Unit Performance Values: 12. Visible Light Transmission: 0 percent. 13. Solar Heat Gain Coefficient: 0.29 maximum. 14. Winter Nighttime U-Factor: 0.25 maximum. 15. Safety glazing, as required. 3.8 INSULATING-LAMINATED-GLASS SCHEDULE A. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: J - Light Blue]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#1223). a. 0.015 inch) Vanceva® 0001 Coral Rose PVB b. 0.015 inch) Vanceva® 0002 Aquamarine PVB c. 0.015 inch ) Vanceva® 0002 Aquamarine PVB d. 0.015 inch) Vanceva® 0003 Smoke Grey PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 37 percent minimum. 12. Solar Heat Gain Coefficient: 0.30 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. B. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: K - Dark Blue]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#122H). a. 0.015 inch) Vanceva® 0001 Coral Rose PVB Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 14 b. 0.015 inch) Vanceva® 0002 Aquamarine PVB c. 0.015 inch ) Vanceva® 0002 Aquamarine PVB d. 0.015 inch) Vanceva® 000H Ocean Grey PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 30 percent minimum. 12. Solar Heat Gain Coefficient: 0.27 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. C. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: L - Light Green]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#0028). a. 0.015 inch) Saflex® R Clear PVB b. 0.015 inch) Saflex® R Clear PVB c. 0.015 inch ) Vanceva® 0002 Aquamarine PVB d. 0.015 inch) Vanceva® 0008 Golden Light PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 56 percent minimum. 12. Solar Heat Gain Coefficient: 0.35 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. D. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: M - Dark Green]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#028H). a. 0.015 inch) Saflex® R Clear PVB b. 0.015 inch ) Vanceva® 0002 Aquamarine PVB Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 15 c. 0.015 inch) Vanceva® 0008 Golden Light PVB d. 0.015 inch) Vanceva® 000H Ocean Grey PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 39 percent minimum. 12. Solar Heat Gain Coefficient: 0.28 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. E. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: N - Light Teal]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#0002). a. 0.015 inch) Saflex® R Clear PVB b. 0.015 inch) Saflex® R Clear PVB c. 0.015 inch) Saflex® R Clear PVB d. 0.015 inch ) Vanceva® 0002 Aquamarine PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 58 percent minimum. 12. Solar Heat Gain Coefficient: 0.39 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. F. Low-E-Coated, Colored Insulating Outboard Laminated Glass [Type: O - Dark Teal]: 1. Basis-of-Design Product: Vanceva; PVB Colored Interlayer and Guardian Glass; SunGuard SN 68 on Clear. 2. Overall Unit Thickness: 1-1/16 inch. 3. Outboard Lite: Laminated glass. a. Clear fully tempered or heat strengthened 3/16 inch glass. 4. Interlayer: 0.060 inch Vanceva Color Code (#0022). a. 0.015 inch) Saflex® R Clear PVB b. 0.015 inch) Saflex® R Clear PVB c. 0.015 inch ) Vanceva® 0002 Aquamarine PVB Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 GLAZING 088000 - 16 d. 0.015 inch ) Vanceva® 0002 Aquamarine PVB 5. Clear fully tempered or heat strengthened 3/16 inch glass. 6. Interspace: Argon filled, 3/8 inch wide, hermetically sealed. 7. Inboard Lite: 1/4 inch thick, sputter coated clear float glass. 8. Coating on Surface No. 5: Guardian SunGuard SN 68. 9. Heat Treatment: Heat-strengthened or Fully tempered. 10. Glass Unit Performance Values: 11. Visible Light Transmission: 51 percent minimum. 12. Solar Heat Gain Coefficient: 0.36 maximum. 13. Winter Nighttime U-Factor: 0.25 maximum. 14. Safety glazing, as required. END OF SECTION 088000 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DECORATIVE GLASS GLAZING 088113 - 1 SECTION 088113 - DECORATIVE GLASS GLAZING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Coated glass. 2. Glass with finished edges. 1.2 DEFINITION A. Glass Thickness: Indicated by thickness designations in millimeters in accordance with ASTM C1036. 1.3 COORDINATION A. Coordinate glazing channel dimensions to provide necessary bite on glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable tolerances. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product. B. Shop Drawings: For decorative glass. Show fabrication and installation details. Include the following: 1. Size and location of penetrations. 2. Glazing method. 3. Mounting method. 4. Attachments to other work. 5. Full-size details of edge-finished profiles. C. Glass Samples: For the following products, 12 inches square: 1. Each type of decorative glass. 2. Each edge treatment on type of decorative glass. 3. Each decorative film overlay on type of decorative glass. 4. Each applied coating on type of decorative glass. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DECORATIVE GLASS GLAZING 088113 - 2 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect decorative glass and glazing materials according to manufacturer's written instructions. Prevent damage to glass and glazing materials from condensation, temperature changes, direct exposure to sun, or other causes. B. Retain packaging and sequencing numbers for decorative glass units. 1.6 FIELD CONDITIONS A. Environmental Limitations: Do not deliver or install decorative glass until spaces are enclosed and weathertight, wet-work in spaces is complete and dry, and temporary HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period. B. Field Measurements: Verify actual dimensions of openings and construction contiguous with decorative glass by field measurements before fabrication. PART 2 - PRODUCTS 2.1 MANUFACTURERS OF DECORATIVE GLASS A. Manufacturers: Subject to compliance with requirements, provide products by the following: 1. Goldray Glass; Backpainted Glass. 2.2 PERFORMANCE REQUIREMENTS A. General Performance: Installed glazing systems shall withstand normal thermal movement and impact loads (where applicable) without failure, including loss or glass breakage attributable to the following: defective manufacture, fabrication, or installation; deterioration of glazing materials; or other defects in construction. B. Structural Performance: Decorative glass installed adjacent to walking surfaces shall withstand the following design loads within limits and under conditions indicated: 1. Differential deflection of adjacent unsupported edges shall not exceed glass thickness when subjected to 50 lbf/ft. applied horizontally to one panel at any point up to 42 inches above the adjacent walking surface. 2. Base design on thickness at thinnest part of the glass. 2.3 GLASS PRODUCTS, GENERAL A. Thickness: Where glass thickness is indicated, it is a minimum. Provide glass lites in Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DECORATIVE GLASS GLAZING 088113 - 3 thicknesses as needed to comply with requirements indicated. B. Strength: Where annealed float glass is indicated, provide annealed float glass, heat-strengthened float glass, or fully tempered float glass as needed to comply with requirements indicated. Where heat-strengthened glass is indicated, provide heat-strengthened float glass or fully tempered float glass as needed to comply with requirements indicated. Where fully tempered glass is indicated, provide fully tempered float glass. 2.4 GLASS PRODUCTS A. Heat-Strengthened Glass: ASTM C1048, Kind HS (heat strengthened), Type I, Condition A (uncoated) unless otherwise indicated, Type I, Class 1 (clear) or Class 2 (tinted) as indicated, Quality-Q3. 2.5 GLAZING MATERIALS A. Glazing Sealants, Tapes, and Miscellaneous Glazing Materials: As specified in Section 088000 "Glazing." 1. Colors: As selected by Architect from manufacturer's full range. 2.6 DECORATIVE GLASS FABRICATION A. Fabricate decorative glass and provide other glazing products in sizes required to glaze openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with product manufacturer's written instructions and with referenced glazing standard. B. Edge Finishing: Finish edges smooth and polished, without chips, scratches, or warps. 1. Finished Edge: Clean cut or flat grind vertical edges of butt-glazed lites in a manner that produces square edges with slight kerfs. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine decorative glass framing members, with Installer present, for compliance with the following: 1. Manufacturing and installation tolerances, including those for size, squareness, and offsets at corners. 2. Minimum required face or edge clearances. 3. Effective sealing between joints of decorative glass framing members. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 DECORATIVE GLASS GLAZING 088113 - 4 B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean glazing channels and other framing members receiving glass immediately before glazing. Remove coatings not firmly bonded to substrates. B. Examine glazing units to locate orientation of outer surfaces. Label or mark units as needed so that surface orientation is readily identifiable. Do not use materials that leave visible marks in the completed Work. 3.3 INSTALLATION A. Set decorative glass units in each series true in line with uniform orientation, pattern, draw, bow, and similar characteristics. B. Set decorative glass in locations indicated on Drawings. 3.4 CLEANING AND PROTECTION A. Immediately after installation, remove nonpermanent labels and clean surfaces. B. Protect glass from contact with contaminating substances resulting from construction operations. If, despite such protection, contaminating substances do come into contact with glass, remove substances immediately as recommended in writing by glass manufacturer. C. Remove and replace glass that is damaged during construction period. D. Wash glass on both exposed surfaces not more than four days before date scheduled for inspections that establish date of Substantial Completion. Wash glass as recommended in writing by glass manufacturer. 3.5 DECORATIVE GLASS SCHEDULE A. Coated Glass [Type: PS1]: Coated glass with decorative glass paint or ink applied to glass surface and cured. 1. Glass Type: Clear, heat-strengthened float glass. 2. Glass Thickness: 3/8 inch (3 mm). 3. Safety glazing required. 4. Coating Colors: As indicated. 5. Pattern: Solid color. END OF SECTION 088113 Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 1 SECTION 08 8810 - FIRE RATED GLASS AND FRAMING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Fire rated temperature rise door system. 1. Framing fire resistive, temperature rise, framing system for 120 minutes. 2. Temperature Rise 90-minute full vision temperature rise doors. 3. Fire Protective 20–45-minute fire protective doors and openings. 4. 20-minute fire protective full vision aluminum stile and rail glass doors 5. Applications of fire temperature rise door system includes: a. Vision lites in full vision temperature rise doors. B. Related Sections: 1. Section 08 7100: Finish Hardware. 2. Section 08 8000: Glazing. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. ASTM E119 Methods for Fire Tests of Building Construction and Materials. 2. ASTM E152 Methods of Fire Tests of Door Assemblies. 3. ASTM E163 Methods for Fire Tests of Window Assemblies. 4. ASTM E2074: Standard Test Method for Fire Tests of Door Assemblies, including Positive Pressure Testing of Side-hinged and Pivoted Swinging Door Assemblies. 5. ASTM E2110-1: Standard Test for Positive Pressure of Fire Tests of Window Assemblies. 6. ASTM E283-04: Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors. 7. ASTM 547-00: Test Method for Water Penetration of Exterior Windows, Curtain Walls, and Doors by Cyclic Static Air Pressure Difference. 8. ASTM E331-00: Standard Test Method for Metal Curtain Walls and Doors by Uniform Static Air Pressure Difference. 9. ASTM E330-02: Structural Performance of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference. 10. ASTM F 588-04: Test Method for Resistance of Window Assemblies to Forced Entry Excluding Glazing. B. National Fire Protection Association (NFPA): 1.NFPA 80: Fire Doors and Windows. 2. NFPA 251: Fire Tests of Building Construction and Materials. 3. NFPA 252: Fire Tests of Door Assemblies. 4. NFPA 257: Fire Tests of Window Assemblies. C. Underwriters Laboratories, Inc. (UL): 1. UL 9: Standard for Safety of Fire Tests of Window Assemblies. 2. UL 10B: Standard for Safety of Fire Tests of Door Assemblies. 3. UL 10C: Standard for Safety of Positive Pressure Fire Tests of Door Assemblies. 4. UL 263: Fire Tests of Building Construction and Materials. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 2 5. UL 752-2005: Standard for Safety for Bullet-Resisting Equipment. D. Consumer Product Safety Commission (CPSC): 1. CPSC 16 CFR 1201: Safety Standard for Architectural Glazing Materials. E. American National Standards Institute (ANSI): 1. ANSI Z97.1: Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test. F. National Fenestration Rating Council (NFRC) 1. NFRC 100: Procedure for Determining Fenestration Product U-Factors. 2. NFRC 200: Procedure for Determining Fenestration Product Solar Heat Gain Coefficient and Visible Transmittance at Normal Incidence. 1.3 SUBMITTALS A. Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedure Section. 1. Shop Drawings: Submit shop drawings showing layout, profiles, and product components. 2. Samples: Submit samples for finishes, colors, and textures. 3. Technical Information: Submit latest edition of manufacturer’s product data providing product descriptions, technical data, and installation instructions. 1.4 DELIVERY, STORAGE AND HANDLING A. General: Comply with Division1 Product Requirements Sections. B. Ordering: Comply with manufacturer’s ordering instructions and lead-time requirements to avoid construction delays. C. Delivery: Deliver materials to specified destinations in manufacturer’s or distributor’s packaging undamaged, complete with installation instructions. D. Storage and Protection: Store off ground, under cover, protected from weather and construction activities and at temperature conditions recommended by manufacturer. 1.5 FABRICATION DIMENSIONS A. Field Measurements: Verify actual measurements for openings by field measurements before fabrication. Show recorded measurements on shop drawings. Coordinate field measurements and fabrication schedule with construction progress to avoid construction delays. 1.6 WARRANTY A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. B. Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document. Manufacturer’s warranty is not intended to limit other rights that the Owner may have under the Contract Documents. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 3 1.Warranty Period: 5 years from date of shipping. PART 2 PRODUCTS 2.1 SYSTEM DESCRIPTION A. Performance Requirements: 1. Fire Rating: must meet 20, 45, 60, 90 or 120 minutes as specified. 2. Fire Resistive Wall Assembly Certifications: must meet 60-120 minute fire resistive wall assemblies tested in accordance with ASTM E119, NFPA 251, UL 263 and ULC-S101. 3. Fire Resistive, Temperature Rise Door Assembly Certifications: must meet 60-90 minute fire resistive temperature rise door assemblies tested in accordance with NFPA 252, UL 10B, UL 10C and CAN4 S104. Must meet 250 degrees F/450 degrees F temperature rise door requirements. 4. Fire Protective, Fire Rated Doors shall be tested in accordance with ASTM E2074-00, NFPA 80, NFPA 252, UL 10C, 10C. 5. Air Infiltration: must meet <0.01 cfm/ft2. 6. Water Resistance Test Pressure: up to 20.0 psf 7. Uniform Load Deflection Test Pressure: up to +/- 50.0 psf 8. Uniform Load Structural Test Pressure: up to +/- 75.0 psf 9. Testing Laboratory: Fire test must be conducted by a nationally recognized independent testing laboratory. 10. Glazing: Fire protective glazing in 20–45-minute fire protective doors and openings up to the maximum size tested. Fire resistive glazing that meets ASTM E-119/UL 263/ULC-S101 up to the max. size tested. All glazing used in doors, sidelites or any hazardous location must meet CPSC Cat. I or II impact safety. 11. Max. Door Opening Sizes: must meet up to 4’0” wide x 9’0” high for single doors and 8’0” wide by 9’0” high in pair doors. No intermediate rails required. B. Listings and Labels: 1. Fire resistive, temperature rise framing system shall be under current follow-up service by a nationally recognized independent laboratory approved by OSHA and maintain a current listing or certification. Assemblies shall be labeled in accordance with limits of listings. C. Appearance: 1. Fire rated wall/door assembly shall have a neat finished appearance with minimum joints at decorative cover intersections. 2.2 MANUFACTURERS A. Manufacturer of Framing System: GPX Architectural Series Framing as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. B. Manufacturer of Glazing Material: 1. 90 Minute Doors, 45,60-, and 120-Minute Frames: (SuperLite II-XL) as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. 2. 20 Minute Doors: (Superlite 1) as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. C. Manufacturer of Doors: Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 4 1. 90 Minute Fire Resistive: GPX Builders Series as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. 2. 20 Minute Fire Protective: GPX Architectural Series as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. D. Fire rated glass and framing must be provided by a single-source, US manufacturer. Distributors of fire rated glass and framing are not to be considered as manufacturers. Materials for the project should be shipped together in the same shipment on the same truck. E. Substitutions: No substitutions allowed. 2.3 MATERIALS – FRAMING A. Fire resistive, temperature rise framing system rated for 20 to 120 minutes. B. Properties: 1. Window/Wall Frame thickness: 2-1/2” Standard. 3”, 4-1/8” and 5” also available. 2. Fire resistive aluminum capable of accommodating concealed hardware. 3. Internal framing: Internal tube steel framing shall conform to ASTM A501. Formed steel retainers shall be galvanized conforming to ASTM A527. 4. Insulation: The framing system shall insulate against the effects of fire, smoke, and heat transfer from either side. The perimeter of the framing system to the rough opening shall be firmly packed with mineral wool fire stop insulation or appropriately rated intumescent sealant. 5. Fasteners: Type recommended by manufacturer. No exposed fasteners allowed. 6. Glazing accessories: The glazing material perimeter shall be separated from the perimeter framing system with approved flame-retardant glazing tape. The SuperLite glazing panel shall be caulked continuously around the edge to the tube steel frame utilizing neutral cure silicone. Silicone setting blocks recommended. 7. SAFTI FIRST listing allows for doors by others. 2.02 MATERIALS – DOOR A. Temperature rise: 90-minute doors. B. Properties: 1. Constructed in accordance with the individual manufacturer’s listings or in accordance with HMMA 861- 06 and HMMA 850. 2. Fire resistive aluminum cladded door capable of accommodating concealed hardware. 3. Standard door profile includes 6 in. rail and 2 in. frame. 4. 10 in. ADA compliant bottom rail. 5. Meets 250 degrees F/450 degrees F at 30 minutes. 6. 2-1/2 in. door thickness. C. Fire Protective: 20-minute full vision aluminum stile and rail door. B. Properties: 1. Aluminum: Meeting requirements of ASTM B221, 6063T5 alloy, and as otherwise required to assure compliance with dimensional tolerances and maintain color. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 5 uniformity. 2. Anchorage Devices, Clips and Fasteners: Manufacturer’s standard type, compatible with materials being secured. 3. Accessories: As necessary for complete system. 4. 5 in. profile width 5. 10 in. ADA compliant bottom rail. 6. 1-3/4 in. door thickness. 2.03 MATERIALS – GLASS A. Assemblies shall be glazed with SuperLite glazing products. 1. 90 Minute Doors, 45,60-, and 120-Minute Frames: (SuperLite II-XL) as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. 2. 20 Minute Doors: (Superlite 1) as manufactured and distributed by SAFTI FIRST Fire Rated Glazing Solutions. B. Properties: 1. Individual Lites shall be permanently identified with a listing mark. 2. Glazing material installed in “Hazardous Locations” (subject to human impact) shall be certified to meet the applicable requirements for fire rated assemblies referenced in ANSI Z97.1 Standard for Safety Glazing Materials Used in Buildings and/or CPSC 16 CFR 1201 Safety Standard for Architectural Glazing Materials. 3. Temperature rise on the unexposed side of glazing material shall be limited to 250 degrees Fahrenheit when required. C. Logo: Each piece of fire rated glazing shall be labeled with a permanent logo. 2.03 FABRICATION A. Assemblies shall be furnished knocked down for field assembly and will be glazed in the field. B. Door assemblies shall be factory prepared for field mounting of hardware. C. Fabrication Dimensions: Fabricate to approved dimensions. The general contractor shall guarantee dimensions within required tolerance. Obtain approved shop drawings prior to fabrication. 2.04 FINISHES A. Comply with NAAMM’s “Metal Finishes Manual for Architectural and Metal Products” for recommendations for applying and designing finishes. B. Covers shall be chemically cleaned and pretreated; then, finished with: 1. Aluminum Doors and Frames: Clear Anodized. 2. Metal Framing: Custom color to match Aluminum Doors and Frames, as selected by Architect. C. Protect finishes on exposed surfaces from damage by applying strippable, temporary protective covering before shipping. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE RATED GLASS AND FRAMING 088810 - 6 D. Variations in appearance of abutting or adjacent pieces are acceptable. Noticeable variations in the same piece are not acceptable. 2.05 DOOR HARDWARE FOR SINGLE AND PAIRED DOORS A. Perimeter smoke/fire gasket by SAFTI FIRST. Balance of hardware shall be supplied under section 087100 Finish Hardware. PART 3 EXECUTION 3.01 MANUFACTURER’S INSTRUCTIONS A. Compliance: Comply with manufacturer’s product data including product technical bulletins and installation instructions. 3.02 EXAMINATION A. Site Verification of Conditions: Verify substrate conditions, have been previously installed under other sections, and are acceptable for product installation in accordance with manufacturer’s instructions. Openings shall be plumb, square and within allowable tolerances. The Architect/Engineer shall be notified of any conditions that jeopardize the integrity of the proposed fire wall/door framing system. Do not proceed until such conditions are corrected. 3.03 INSTALLATION A. Fire wall/door installation shall be by a licensed contractor and in strict accordance with the approved shop drawings. 3.04 CLEANING AND PROTECTION A. Protect glass from contact with contaminating substances resulting from construction operations. Remove such substances by method approved by manufacturer. B. Wash glass on both faces not more than four days prior to date schedule for inspections intended to establish date of Substantial Completion. Wash glass by method recommended by glass manufacturer. C. Remove temporary coverings and protection of adjacent work areas. D. Remove construction debris from project site and legally dispose of debris. END OF SECTION 088810 Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 1 SECTION 088813 - FIRE-RATED GLAZING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fire-protection-rated glazing. 2. Fire-resistance-rated glazing. 1.2 DEFINITIONS A. Fire-Protection-Rated Glazing: Glazing in rated doors and openings up to 45 minutes, limited in size, and not capable of blocking radiant heat. B. Fire-Resistance-Rated Glazing: Glazing that prevents spread of fire and smoke and radiant heat; used in rated wall and door applications 60 minutes and above without size limitations. C. Glass Manufacturers: Firms that produce primary glass, fabricated glass, or both, as defined in referenced glazing publications. D. Glass Thicknesses: Indicated by thickness designations in millimeters in accordance with ASTM C1036. 1.3 COORDINATION A. Coordinate glazing channel dimensions to provide necessary bite on glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable tolerances. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product. B. Sustainable Design Submittals: 1. Product Data: For sealants, indicating VOC content. 2. Laboratory Test Reports: For sealants, indicating compliance with requirements for low-emitting materials. C. Glass Samples: For each type of glass product; 12 inches square. D. Glazing Schedule: List glass types and thicknesses for each size opening and location. Use Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 2 same designations indicated on Drawings. 1.5 INFORMATIONAL SUBMITTALS A. Product Certificates: For each type of glass and glazing product. 1.6 QUALITY ASSURANCE A. Installer Qualifications: A qualified installer who employs glass installers for this Project who are certified under the NGA's Certified Glass Installer Program. 1.7 DELIVERY, STORAGE, AND HANDLING A. Protect glazing materials in accordance with manufacturer's written instructions. Prevent damage to glass and glazing materials from condensation, temperature changes, direct exposure to sun, or other causes. 1.8 FIELD CONDITIONS A. Environmental Limitations: Do not deliver or install fire-resistant glazing until spaces are enclosed and weathertight and temporary HVAC system is operating and maintaining ambient temperature conditions at occupancy levels during remainder of construction period. 1.9 WARRANTY A. Manufacturer's Special Warranty for Laminated Glass: Manufacturer agrees to replace laminated-glass units that deteriorate within specified warranty period. Deterioration of laminated glass is defined as defects developed from normal use that are not attributed to glass breakage or to maintaining and cleaning laminated glass contrary to manufacturer's written instructions. Defects include edge separation, delamination materially obstructing vision through glass, and blemishes exceeding those allowed by referenced laminated-glass standard. 1. Warranty Period: Five years from date of Substantial Completion. B. Manufacturer's Special Warranty for Tempered Glazing Units with Clear Intumescent Interlayer: Manufacturer agrees to replace units that deteriorate within specified warranty period. Deterioration of tempered glazing units with clear intumenscent interlayer is defined as failure of hermetic seal under normal use that is not attributed to glass breakage or to maintaining and cleaning glass contrary to manufacturer's written instructions. Evidence of failure is air bubbles within units, or obstruction of vision by contamination or deterioration of intumescent interlayer. 1. Warranty Period: Lifetime from date of Substantial Completion. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 3 PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Source Limitations for Glass: For each glass type, obtain from single source from single manufacturer. B. Source Limitations for Glazing Accessories: For each product and installation method, obtain from single source from single manufacturer. 2.2 PERFORMANCE REQUIREMENTS A. General: Installed glazing systems shall withstand normal thermal movement and impact loads (where applicable) without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation; deterioration of glazing materials; or other defects in construction. 2.3 GLASS PRODUCTS, GENERAL A. Glazing Publications: Comply with published recommendations of glass product manufacturers and organization below unless more stringent requirements are indicated. See these publications for glazing terms not otherwise defined in this Section or in referenced standards. 1. NGA Publications: "Laminated Glazing Reference Manual" and "Glazing Manual." B. Safety Glazing Labeling: Where safety glazing is indicated, permanently mark glazing with certification label of the SGCC the SGCC or another certification agency acceptable to authorities having jurisdiction or manufacturer. Label shall indicate manufacturer's name, type of glass, glass thickness, and safety glazing standard with which glass complies. 2.4 GLASS PRODUCTS A. Float Glass: ASTM C1036, Type I, Quality-Q3, Class I (clear) unless otherwise indicated. B. Low-Iron Float Glass: ASTM C1036, Type I, Quality-Q3, Class I (clear), with visible light transmission not less than 91 percent. C. Tempered Float Glass: ASTM C1048, Kind FT (fully tempered), Condition A (uncoated) unless otherwise indicated, Type I, Class I (clear) unless otherwise indicated, Quality-Q3. 1. Fabrication Process: By horizontal (roller-hearth) process with roll-wave distortion parallel to bottom edge of glass as installed unless otherwise indicated. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 4 2.5 FIRE-PROTECTION-RATED GLAZING A. Fire-Protection-Rated Glazing: Listed and labeled by a testing agency acceptable to authorities having jurisdiction, for fire-protection ratings indicated, based on positive-pressure testing in accordance with NFPA 257 or UL 9, including hose-stream test, and shall comply with NFPA 80. 1. Fire-protection-rated glazing required to have a fire-protection rating of 20 minutes shall be exempt from hose-stream test. B. Fire-Protection-Rated Glazing Labeling: Permanently mark fire-protection-rated glazing with certification label of a testing agency acceptable to authorities having jurisdiction. Label shall indicate manufacturer's name; test standard; whether glazing is permitted to be used in doors or openings; if permitted in openings, whether glazing has passed hose-stream test; whether glazing meets 450 deg F temperature-rise limitation; and fire-resistance rating in minutes. C. Fire-Protection-Rated Tempered Glass: 6-mm thickness; fire-protection-rated tempered glass; complying with 16 CFR 1201, Category II. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. SAFTI FIRST Fire Rated Glazing Solutions; Super-Lite I XL. D. Fire-Protection-Rated Monolithic Glass for Doors and Protected Openings: 19-mm thickness; low-iron fire-protection-rated glass; complying with 16 CFR 1201, Category II. UL listed and tested in accordance with NFPA 252 for fire-rated doors and NFPA 257 for protected openings with hose-stream testing. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. SAFTI FIRST Fire Rated Glazing Solutions; SuperClear 45-HS-LI. E. Fire-Protection-Rated Monolithic Glass for Doors Only: 19-mm thickness; clear, fire-protection glass; complying with 16 CFR 1201, Category II. UL listed and tested in accordance with NFPA 252 for fire-rated doors with hose-stream testing. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. SAFTI FIRST Fire Rated Glazing Solutions; Super-Lite X90. 2.6 FIRE-RESISTANCE-RATED GLAZING A. Fire-Resistance-Rated Glazing: Listed and labeled by a testing agency acceptable to authorities having jurisdiction, for fire-resistance ratings indicated, based on testing in accordance with ASTM E119 or UL 263. B. Fire-Resistance-Rated Glazing Labeling: Permanently mark fire-resistance-rated glazing with Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 5 certification label of a testing agency acceptable to authorities having jurisdiction. Label shall indicate manufacturer's name, test standard, that glazing is approved for use in walls, and fire-resistance rating in minutes. C. Fire-Resistance-Rated Framing and Doors: Fire-resistance-rated glazing with 60-, 90-, and 120-minute ratings requires framing and doors from glass supplier, tested as an assembly complying with ASTM E119 or UL 263. D. Fire-Resistance-Rated Laminated Glass with Intumescent Interlayers: Laminated glass made from multiple plies of uncoated, clear float glass; with intumescent interlayers; complying with 16 CFR 1201, Category II. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. SAFTI FIRST Fire Rated Glazing Solutions; Super-Lite II XL-120. 2.7 GLAZING ACCESSORIES A. Provide glazing gaskets, glazing sealants, glazing tapes, setting blocks, spacers, edge blocks, and other glazing accessories that are compatible with glazing products and each other and are approved by testing agencies that listed and labeled fire-resistant glazing products with which products are used for applications and fire-protection ratings indicated. B. Glazing Sealants for Fire-Rated Glazing Products: Neutral-curing silicone glazing sealant complying with ASTM C920, Type S, Grade NS, Class 50, Use NT. Comply with sealant and glass manufacturers' written instructions for selecting glazing sealants suitable for applications indicated. 1. Sealant shall comply with the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers." 2. Colors of Exposed Glazing Sealants: As selected by Architect from manufacturer's full range of industry colors. C. Back-Bedding Mastic Glazing Tapes: Preformed, butyl-based, 100 percent solids elastomeric tape; nonstaining and nonmigrating in contact with nonporous surfaces; with or without spacer rod as recommended in writing by tape and glass manufacturers for application indicated; and complying with ASTM C1281 and AAMA 800 for products indicated below: 1. AAMA 806.3 tape, for glazing applications in which tape is subject to continuous pressure. 2. AAMA 807.3 tape, for glazing applications in which tape is not subject to continuous pressure. D. Expanded Cellular Glazing Tapes: Closed-cell, PVC foam tapes; factory coated with adhesive on both surfaces; and complying with AAMA 800 for the following types: Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 6 1. AAMA 810.1, Type 1, for glazing applications in which tape acts as primary sealant. 2. AAMA 810.1, Type 2, for glazing applications in which tape is used in combination with a full bead of liquid sealant. 2.8 MISCELLANEOUS GLAZING MATERIALS A. General: Provide products of material, size, and shape complying with referenced glazing standard, recommended in writing by manufacturers of glass and other glazing materials for application indicated, and with a proven record of compatibility with surfaces contacted in installation. B. Cylindrical Glazing Sealant Backing: ASTM C1330, Type O (open-cell material), of size and density to control glazing sealant depth and otherwise produce optimum glazing sealant performance. C. Perimeter Insulation for Fire-Resistance-Rated Glazing: Product that is approved by testing agency that listed and labeled fire-resistant glazing product with which it is used for application and fire-protection rating indicated. 2.9 FABRICATION OF GLAZING UNITS A. Fabricate glazing units in sizes required to fit openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with written instructions of product manufacturer and referenced glazing publications, to comply with system performance requirements. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine framing, glazing channels, and stops, with Installer present, for compliance with manufacturing and installation tolerances, including those for size, squareness, and offsets at corners, and for compliance with minimum required face and edge clearances. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean glazing channels and other framing members receiving glass immediately before glazing. Remove coatings not firmly bonded to substrates. B. Examine glazing units to locate fire side and protected side. Label or mark units as needed so that fire side and protected side are readily identifiable. Do not use materials that leave visible Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 7 marks in the completed Work. 3.3 GLAZING, GENERAL A. Use methods approved by testing agencies that listed and labeled fire-resistant glazing products. B. Comply with combined written instructions of manufacturers of glass, sealants, gaskets, and other glazing materials unless more stringent requirements are indicated, including those in referenced glazing publications. C. Protect glass edges from damage during handling and installation. Remove damaged glass from Project site and legally dispose of off Project site. Damaged glass is glass with edge damage or other imperfections that, when installed, could weaken glass and impair performance and appearance. D. Apply primers to joint surfaces where required for adhesion of sealants, as determined by preconstruction testing. E. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing publications unless otherwise required by glass manufacturer. Set blocks in thin course of compatible sealant suitable for heel bead. F. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites. G. Provide spacers for glass lites where length plus width is larger than 50 inches. 1. Locate spacers directly opposite each other on both inside and outside faces of glass. Install correct size and spacing to preserve required face clearances unless gaskets and glazing tapes are used that have demonstrated ability to maintain required face clearances and to comply with system performance requirements. 2. Provide 1/8-inch- minimum bite of spacers on glass and use thickness equal to sealant width. With glazing tape, use thickness slightly less than final compressed thickness of tape. H. Provide edge blocking where indicated or needed to prevent glass lites from moving sideways in glazing channel, as recommended in writing by glass manufacturer and in accordance with requirements in referenced glazing publications. I. Set glass lites with proper orientation so that coatings face fire side or protected side as specified. J. Where wedge-shaped gaskets are driven into one side of channel to pressurize sealant or gasket on opposite side, provide adequate anchorage so gasket cannot walk out when installation is subjected to movement. K. Square cut wedge-shaped gaskets at corners and install gaskets in a manner recommended by gasket manufacturer to prevent corners from pulling away; seal corner joints and butt joints with sealant recommended in writing by gasket manufacturer. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 8 3.4 TAPE GLAZING A. Position tapes on fixed stops so that, when compressed by glass, their exposed edges are flush with or protrude slightly above sightline of stops. B. Install tapes continuously, but not necessarily in one continuous length. Do not stretch tapes to make them fit opening. C. Cover vertical framing joints by applying tapes to heads and sills first and then to jambs. Cover horizontal framing joints by applying tapes to jambs and then to heads and sills. D. Place joints in tapes at corners of opening with adjoining lengths butted together, not lapped. Seal joints in tapes with compatible sealant approved by tape manufacturer. E. Do not remove release paper from tape until right before each glazing unit is installed. F. Apply heel bead of elastomeric sealant. G. Center glass lites in openings on setting blocks and press firmly against tape by inserting dense compression gaskets formed and installed to lock in place against faces of removable stops. Start gasket applications at corners and work toward centers of openings. H. Apply cap bead of elastomeric sealant over exposed edge of tape. 3.5 GASKET GLAZING (DRY) A. Cut compression gaskets to lengths recommended by gasket manufacturer to fit openings exactly, with allowance for stretch during installation. B. Insert soft compression gasket between glass and frame or fixed stop, so it is securely in place with joints miter cut and bonded together at corners. C. Installation with Drive-in Wedge Gaskets: Center glass lites in openings on setting blocks and press firmly against soft compression gasket by inserting dense compression gaskets formed and installed to lock in place against faces of removable stops. Start gasket applications at corners and work toward centers of openings. D. Install gaskets so they protrude past face of glazing stops. 3.6 SEALANT GLAZING (WET) A. Install continuous spacers, or spacers combined with cylindrical sealant backing, between glass lites and glazing stops to maintain glass face clearances. Secure spacers or spacers and backings in place and in position to control depth of installed sealant relative to edge clearance for optimum sealant performance. Received by DiMarco 02/25/2021 Park Grove - Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 FIRE-RESISTANT GLAZING 088813 - 9 B. Force sealants into glazing channels to eliminate voids and to ensure complete wetting or bond of sealant to glass and channel surfaces. C. Tool exposed surfaces of sealants to provide a substantial wash away from glass. 3.7 CLEANING AND PROTECTION A. Immediately after installation, remove nonpermanent labels and clean surfaces. B. Protect glass from contact with contaminating substances resulting from construction operations. Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at frequent intervals during construction, but not less than once a month, for buildup of dirt, scum, alkaline deposits, or stains. 1. If, despite such protection, contaminating substances do contact with glass, remove substances immediately as recommended in writing by glass manufacturer. C. Remove and replace glass that is damaged during construction period. D. Wash glass on both exposed surfaces not more than four days before date scheduled for inspections that establish date of Substantial Completion. Wash glass as recommended in writing by glass manufacturer. END OF SECTION 088813 Received by DiMarco 02/25/2021