Loading...
HomeMy WebLinkAbout00 Unit PricePark Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 UNIT PRICE 00 43 22 - 1 SECTION 00 43 22 - UNIT PRICE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions of the Contract for Construction and other Division 00 & 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for unit prices. 1.3 DEFINITIONS A. Unit price is an amount proposed by bidders, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased. B. Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in this specification. Mobilization does not include the start of work at a specific area on the project site while the contractor is present at other areas immediately prior to, during or following the work. 1.4 PROCEDURES A. Unit prices include all necessary supervision, labor, materials, and cost for delivery, installation, insurance, overhead and profit. B. Measurement and Payment: The extent of work associated with unit prices, is to be determined in field by the General Contractor prior to the commencement of work. Any work not having the prior approval of the General Contractor will be considered base bid. Field verify all quantities prior to bid. C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured by the Owner’s Representative. Received by DiMarco 02/25/2021 Park Grove – Cayuga Medical Center MEDICAL OFFICE BUILDING Cayuga Park, Ithaca, NY 14850 HOLT Project No. 2018089 UNIT PRICE 00 43 22 - 2 D. List of Unit Prices: A list of unit prices shall include in the Bid and paragraph 3.1 below. Specification Sections referenced in the schedule contain requirements for materials described under each unit price. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF UNIT PRICES Unit Cost # ITEM NAME Value Unit 01 Excavate and remove unsuitable soil CY 02 Structural Fill – in place and compacted in 8 inch lifts using heavy compaction equipment CY 03 Structural Fill – in place and compacted in 4 inch lifts using hand operated tampers CY 04 Controlled Low-Strength Material – in place CY 05 Removal of exterior ACM window glazing compound LF 06 Removal of exterior ACM window frame caulk LF 07 Removal of non-ACM roofing materials down to ACM tar and fabric layer SF 08 Removal of ACM tar and fabric roofing above the deck SF 09 Removal of ACM vapor barrier from concrete deck SF 10 Removal of ACM tar from intact masonry parapet SF END OF SECTION 00 43 22 Received by DiMarco 02/25/2021