HomeMy WebLinkAboutP305 Fifth Floor Plan Indirect Waste12345ABC3.8EXAM/CONSULT521EXAM/CONSULT507PROVIDEROFFICE539ANURSEWORK539EXAM/CONSULT528EXAM/CONSULT529PATIENTTOILET527CIRCULATION504SPECIALTYEXAM/TREATMENT526PATIENTTOILET526ASTAFFTOILET525TRIAGENURSE524IT/ELEC523PROVIDEROFFICE517FNURSEWORKAREA517EEXAM/CONSULT518EXAM/CONSULT519EXAM/CONSULT520EXAM/CONSULT522EXAM/CONSULT513CIRCULATION504BBEXAM/CONSULT514EXAM/CONSULT515EXAM/CONSULT516STAFFCIRCULATION517PROVIDEROFFICE517ANURSEWORKAREA517BEXAM/CONSULT509EXAM/CONSULT508SPECIALTYEXAM/TREATMENT506STAIRVESTIBULE504ASTAFFBREAKAREA505OFFICEMANAGER502APATIENTTOILET503PUBLICTOILET501APUBLICTOILET501BSPECIMENCOLLECTION533LABDRAW532LAB534PATIENTTOILET535ASPECIALTYEXAM/TREATMENT/TELEMED535ELEVATORCONTROLROOM500EXAM/CONSULT537PATIENTTOILET536TRIAGENURSE539BEXAM/CONSULT531REGISTRATION502STAIR1ST1-3PATIENTVITALSALCOVE510STAIRST2-2STAFFTOILET505AUnoccupiedUnoccupiedSTAFFCIRCULATION517CENTRALSOILEDWORK511EXAM/CONSULT5381111111111111111111111111111111IW23/4"3/4"3/4"IWIW2123/4"IW23/4"23/4"IW3/4"213/4"IW23/4"3/4"IW3/4"3/4"3/4"3/4"3/4"23/4"IW3/4"2IW3/4"2IW3/4"IW3/4"2IW3/4"3/4"3/4"23/4"223/4"2IW3/4"23/4"3/4"1213/4"3/4"3/4"3/4"IWIWIW3/4"IW3/4"3/4"223/4"IWIWIW3/4"3/4"3/4"GUESTWAITING/CIRCULATION501CENTRALCLEANWORK512CIRCULATION504ELEVA500EAELEVB500EBSTAIR1ST1-5IW3/4"IW13/4"3/4"803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:10:13 PMP305FIFTH FLOORPLAN -INDIRECTWASTE02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING3/16" = 1'-0"1FIFTH FLOOR PLAN - INDIRECT WASTENDRAWING NOTES:1CONNECT 3/4" INDIRECT WASTE TO HEAT PUMP (BY MECHANICAL CONTRACTOR). REFER TO DETAIL DRAWING(S).2DROP 3/4" INDIRECT WASTE IN WALL AND CONNECT TO SINK/LAVATORY TAILPIECE UPSTREAM OF TRAP. REFER TO DETAIL DRAWING(S).GENERAL NOTES:1. COORDINATE CONDENSATE PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021