HomeMy WebLinkAboutP301 First Floor Plan Indirect WasteREF.12345ABCE3.8F3.9WASTEHOLDING136STAFFBREAK133SOILED132CLEANSUPPLY134REGISTRATION124PUBLICTOILET100AEVS109EXAM121EXAM120SOILEDWORK111EXAM112EXAM115EXAM114PoSPATIENTTOILET105CCLEANLINENHOLDING137TRIAGE/INTERVIEW106STAFFTOILET103EXAM116STORAGE144WATERSERVICE146SUPPLYCHAINAREA138EVSSUPPLY&EQUIPMENT139EXAM118MAINELECTRICAL142EMERGENCYEQUIPMENTROOM141MAINSERVER140VESTIBULE100V2VESTIBULE100V1HOLDING/MAIL100CCIRCULATION105CIRCULATION105VITALSALCOVE105ASUB-WAITING105BSTAIR2ST2-1CIRCULATION105CORRIDOR12222IW31111111111111111SPECIMENTOILET127BLOODDRAW130BLOODDRAW129BLOODDRAW(PoS)128WAITING/CIRCULATION123CORRIDOR135LABORATORY126STAFFTOILET131MAINLOBBY100EVS125RADIOLOGY(X-RAY)119CORRIDOR143TREATMENT117EXAM113STATLAB/MED110CLEANHOLDING107SHAREDPROVIDEROFFICE104STAFFBREAK102BUILDINGMAINTENANCETOILET/SHOWER138A1VISITORTOILET101ARECEPTION101BLOBBY/WAITING1011112"2"2"1111IWIWIW3/4"3/4"3/4"3/4"IW3/4"3/4"44IW3/4"3/4"443/4"3/4"4IW3/4"IW3/4"3/4"3/4"5IWIW3/4"3/4"3/4"4IW43/4"IW3/4"3/4"4IW3/4"IW 3/4"3/4"41IWIWIW3/4"3/4"3/4"443/4"4IW3/4"3/4"5PUBLICTOILET100BMECHANICAL145CORRIDOR1433/4"13/4"42"803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:09:24 PMP301FIRST FLOORPLAN -INDIRECTWASTE02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING3/16" = 1'-0"1FIRST FLOOR PLAN - INDIRECT WASTENDRAWING NOTES:1CONNECT 3/4" INDIRECT WASTE TO HEAT PUMP (BY MECHANICAL CONTRACTOR). REFER TO DETAIL DRAWING(S).2SUMP PUMP IN ELEVATOR SHAFT. REFER TO DETAIL DRAWING(S). PROVIDE 2" INDIRECT WASTE AS SHOWN.3TERMINATE 2" INDIRECT WASTE 6" ABOVE FLOOD RIM OF MOP SERVICE SINK.DROP 3/4" INDIRECT WASTE IN WALL AND CONNECT TO SINK/LAVATORY TAILPIECE UPSTREAM OF TRAP. REFER TO DETAIL DRAWING(S).45TERMINATE 3/4" INDIRECT WASTE 6" ABOVE FLOOD RIM OF MOP SERVICE SINK.GENERAL NOTES:1. COORDINATE CONDENSATE PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021