Loading...
HomeMy WebLinkAboutP202 Second Floor Plans Domestic12345ABCE3.8F3.9PUBLICTOILET200APUBLICTOILET200BSTAFFTOILET205EXAM210EXAM211EXAM212EXAM215EXAM216EXAM217EXAM(GYN)218SHAREDCLEANWORK/MEDPREP219EXAM(GYN)PoS220PATIENTTOILET222VISITORTOILET(PoS)224DENTALTREATMENTROOM225DENTALEQUIPMENTSTERILIZATION227SHAREDSOILEDHOLDING229SHAREDEQUIPMENTSTORAGE231EVS226VITALSALCOVE223CORRIDOR232RESPITE/LACTATION240STAFFTOILET237STAIR2ST2-1MAINLOBBY100RESPITE/MEDITATION241OFFICE238UnoccupiedUnoccupiedCIRCULATION228DENTALOFFICE230WAITING201SHAREDMULTIPURPOSE/CONSULT/TELEMED206SHAREDRECEPTION/REGISTRATION202SHAREDCLERICALOFFICE203CIRCULATION207NURSE214PHYSICIANOFFICE/DICTATION213LAB221MANAGEROFFICE209SHAREDSTAFFBREAK208MULTIPURPOSE/CONSULT/TELEMED204EDUCATION/CONFERENCE234IT/ELEC24388872VMULTIPURPOSE/ACTIVITY235STAFFBREAK242RESPITE/LACTATION239STAFFTOILET236TELMED2339HHWRCHHWRCCHHWRH H W RC HHWRCVV10111LAV-B12WC-A12SHR-A131LAV-B1LAV-B12SHR-A1316WC-B1LAV-B1SINK-C1SINK-A1LAV-A1SINK-D1LAV-A12MSS-A1SINK-A1SINK-A1SINK-A1SINK-A1SINK-A1SINK-A1SINK-B6BF-A1SINK-AWC-A1LAV-B12125EWC-A3112WC-ALAV-A6BF-A1LAV-A3WC-A121231WC-ALAV-A4CHHWRVCH1SINK-A1SINK-A1SINK-A1SINK-AHHWRC1LAV-A32"1 1/2"HHWRCV3"HHWRCV3/4"2"1"1"1/2"1/2"2"1 1/2"33/4"3/4"3/4"1 1/2"VV2"1"3/4"3/4"1"2 1/2"1"1"3/4"2"1 1/2"3/4"3"2"2"2"1 1/2"3/4"3/4"2"3/4"1 1/2"2"2"1 1/2"3/4"2"2"3/4"3/4"3/4"2"2"3/4"3/4"1 1/2"1 1/2"3/4"3/4"1"3/4"2"2"2"3/4"3/4"2"14141414141415803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:08:19 PMP202SECONDFLOOR PLANS -DOMESTIC02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGN3/16" = 1'-0"1SECOND FLOOR PLAN - DOMESTICDRAWING NOTES:1DROP 1/2" HOT AND COLD AND 1 1/2" VENT TO SINK/LAVATORY. 1 1/2" WASTE DOWN.24" VENT UP.3DROP 1 1/2" COLD TO WATER CLOSET.4DROP 3/4" HOT AND COLD TO MOP SERVICE SINK. PROVIDE CHECK VALVES IN SUPPLY LINES.5DROP 1/2" COLD AND 1 1/2" VENT TO ELECTRIC WATER COOLER. 1 1/2" WASTE DOWN.6DROP 1/2" COLD AND 1 1/2" VENT TO BOTTLE FILLER. 1 1/2" WASTE DOWN.GENERAL NOTES:1. PROVIDE SHUT-OFF VALVES ON ALL COLD AND HOT BRANCH LINES, NOT ALL VALVES CAN BE SHOWN DUE TO SCALE OF DRAWINGS.2. PROVIDE A PRESSURE REDUCING VALVE (PRV) ON DOMESTIC RISERS WHEN PRESSURES EXCEED 65 PSI.3. COORDINATE DOMESTIC OR VENT PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.74" VENT DOWN.84" VENT STACK UP AND DOWN.94" COLD RISER UP AND DOWN.10PROVIDE DECK MOUNTED EYEWASH (EW-A) AT SINK AS SPECIFIED. REFER TO DETAIL DRAWING(S).11DOMESTIC WATER HEATER (HWH-1). COORDINATE WITH MECHANICAL CONTRACTOR (INLET/OUTLET DUCT CONNECTIONS) PRIOR TO START OF WORK. REFER TO DETAIL DRAWING(S).122" VENT DOWN.13DROP 1/2" HOT AND COLD TO SHOWER.14PROVIDE BALANCING VALVE ARRANGEMENT. REFER TO DETAIL DRAWING(S).15STANDARD WATER CLOSET WITH BARIATRIC SPACING (SEE ARCHITECTURAL DRAWINGS) AND BARIATRIC GRAB BAR SUPPORTS (BY GENERAL CONTRACTOR). BARIATRIC LAVATORY SUPPORTS, COORDINATE WITH GENERAL CONTRACTOR.16DROP 1 1/2" COLD AND 2" VENT TO WATER CLOSET.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021