HomeMy WebLinkAboutP104 Fourth Floor Plan Sanitary Waste and Storm12345ABC3.8PATIENTTOILET444SHAREDCONFERENCE433PATIENTTOILET418BELEC/DATA430NURSE/TECHSTATION411PATIENTTOILET413MAMMOGRAPHY427STAFFTOILET414EQUIPMENTSTORAGE431APATIENTTOILET424APATIENTTOILET(PoS)423APATIENTTOILET415AHOLDINGBAY1412ACIRCULATION406PATIENTTOILET407BPUBLICTOILET400BPUBLICTOILET400ASTAFFTOILET445EVS439STAIR1ST1-3STAIR2ST2-1PROCEDUREROOM442STAFFBREAK443PROCEDUREROOM441CIRCULATION435SOILEDWORKROOM438PROCEDUREROOM440RECEPTION436WAITING434PROVIDEROFFICE436ACLEANWORKROOM&EQUIP.STORAGE437ELEVATORLOBBY&PUBLICCORRIDOR400IMAGINGGUESTLOUNGE/WAITING401WHEELCHAIRSTORAGE400CREGISTRATION402WOMEN'SCIRCULATION407GOWNING2407CGOWNING3407DSTAIR3ST3-4GOWNING1407AWOMEN'SCIRCULATION425ULTRASOUND(GUIDEDBIOPSY)415ULTRASOUND424ULTRASOUND(PoS)423DIAGNOSTICRADIOGRAPHY416SOILEDWORKROOM420CLEANWORKROOM419MEN'SCIRCULATION422DEXASCAN432MAMMOGRAPHY(STEREOTATICBIOPSY)431READINGROOM426EQUIPMENTSTORAGE&FLEXSPACE421GOWNING418ACIRCULATION412HOLDINGBAY2412BMEN'SSUB-WAIT418MULTIPURPOSE/CONSULT405PRACTICEMANAGER403OFFICE/READING428IMAGINGIT/DATA429EVS41723W1311 1/2"4"4"1 1/2"4"2"1 1/2"1 1/2"4"681154664"66452"661 1/2"4"WWWWW6544144"6W54"61 1/2"6WW66666WW6W1 1/2"4"4"5466WW4"4569544"4"7W1 1/2"4"45W1 1/2"2"6451 1/2"1312105STST131210116"6"ELEVATORLOBBY&PUBLICCORRIDOR400661 1/2"4"662"2"1 1/2"1 1/2"4"664"4"62"4"6W6661 1/2"64"62"2"4"4"4"WOMEN'SCIRCULATION4251 1/2"1 1/2"1 1/2"1 1/2"1 1/2"21 1/2"2"1 1/2"1 1/2"2"1 1/2"W4"4"61 1/2"WOMEN'SSUB-WAIT409RESULTSALCOVE410803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:06:46 PMP104FOURTHFLOOR PLAN -SANITARY/WASTE ANDSTORM02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGN3/16" = 1'-0"1FOURTH FLOOR PLAN - SANITARY/WASTE AND STORMDRAWING NOTES:GENERAL NOTES:1. PROVIDE WALL PLATE CLEANOUTS OR CLEANOUT TEES AT THE BASE OF ALL SANITARY/WASTE AND STORM STACKS.2. COORDINATE SANITARY/WASTE OR VENT PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.44" SANITARY UP TO WATER CLOSET.52" VENT UP.61 1/2" WASTE UP TO SINK/LAVATORY. 71 1/2" WASTE UP TO ELECTRIC WATER COOLER. 83" WASTE (WITH TRAP) UP TO MOP SERVICE SINK.14" VENT UP, 4" SANITARY/WASTE DOWN.24" VENT UP.34" SANITARY/WASTE DOWN.91 1/2" WASTE UP TO BACK-TO-BACK LAVATORY/BOTTLE FILLER. CONNECT 1 1/2" WASTE TO LAVATORY AND BOTTLE FILLER.106" STORM (PRIMARY SYSTEM) DOWN.116" STORM (SECONDARY SYSTEM) DOWN.126" STORM (PRIMARY SYSTEM) UP.136" STORM (SECONDARY SYSTEM) UP.141 1/2" WASTE UP TO BACK-TO-BACK SINKS/LAVATORIES. CONNECT 1 1/2" WASTE TO EACH SINK/LAVATORY.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021