Loading...
HomeMy WebLinkAboutP103 Third Floor Plan Sanitary Waste and Storm12345ABC3.8ELEC/DATA323STAIR2ST2-1STAIR1ST1-3W3211STAFFBREAKAREA305STAFFTOILET305ASPECIMENCOLLECTION333876746W4"1 1/2"4"1 1/2"4"4"4"96765491 1/2"4"41 1/2"10741 1/2"1 1/2"92"41 1/2"4"44WW4467WW4"4"4"1 1/2"4"467674446741 1/2"W413111412EXAM/CONSULT327TRIAGENURSE339BPATIENTTOILET336SPECIALTYEXAM/TREATMENT/TELEMED335PATIENTTOILET335ALAB334LABDRAW332GUESTWAITING/CIRCULATION300PUBLICTOILET300BPUBLICTOILET300AREGISTRATION301CENTRALSOILEDWORK311PATIENTVITALSALCOVE310EXAM/CONSULT309SPECIALTYEXAM/TREATMENT303OFFICEMANAGER301APATIENTTOILET302EXAM/CONSULT307EXAM/CONSULT306EXAM/CONSULT308NURSEWORKAREA317BPROVIDEROFFICE317AEXAM/CONSULT316EXAM/CONSULT315EXAM/CONSULT314EXAM/CONSULT313CIRCULATION304EXAM/CONSULT318EXAM/CONSULT319EXAM/CONSULT320EXAM/CONSULT321EXAM/CONSULT322CENTRALCLEANWORK312EXAM/CONSULT328EXAM/CONSULT331EXAM/CONSULT328PROVIDEROFFICE339AEXAM/CONSULT329EVS330NURSEWORK339PATIENTTOILET327SPECIALTYEXAM/TREATMENT326PATIENTTOILET326ATRIAGENURSE324PROVIDEROFFICE317FNURSEWORKAREA317BCIRCULATION304CIRCULATION304STST6"6"14131211W4"1 1/2"4"4764"W476104"4"4"441 1/2"2"2"44152"NURSEWORKAREA317ECIRCULATION3044"4"WW2"4"41 1/2"4"3"21 1/2"1 1/2"4"2"1 1/2"W2"631 1/2"STAFFTOILET325803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:06:33 PMP103THIRD FLOORPLAN -SANITARY/WASTE ANDSTORM02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGN3/16" = 1'-0"1THIRD FLOOR PLAN - SANITARY/WASTE AND STORMDRAWING NOTES:4GENERAL NOTES:1. PROVIDE WALL PLATE CLEANOUTS OR CLEANOUT TEES AT THE BASE OF ALL SANITARY/WASTE AND STORM STACKS.2. COORDINATE SANITARY/WASTE OR VENT PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.1 1/2" WASTE UP TO SINK/LAVATORY. 1 1/2" WASTE UP TO ELECTRIC WATER COOLER. 564" SANITARY UP TO WATER CLOSET.72" VENT UP.14" SANITARY/WASTE STACK UP AND DOWN.24" SANITARY/WASTE UP.34" SANITARY/WASTE DOWN.81 1/2" WASTE UP TO BACK-TO-BACK LAVATORY/BOTTLE FILLER. CONNECT 1 1/2" WASTE TO LAVATORY AND BOTTLE FILLER.91 1/2" WASTE UP TO BACK-TO-BACK SINKS/LAVATORIES. CONNECT 1 1/2" WASTE TO EACH SINK/LAVATORY.103" WASTE (WITH TRAP) UP TO MOP SERVICE SINK.116" STORM (PRIMARY SYSTEM) DOWN.126" STORM (SECONDARY SYSTEM) DOWN.136" STORM (PRIMARY SYSTEM) UP.146" STORM (SECONDARY SYSTEM) UP.152" WASTE UP TO DISINFECTION UNIT.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021