Loading...
HomeMy WebLinkAboutP102 Second Floor Plan Sanitary Waste and Storm12345ABCE3.8F3.9PUBLICTOILET200APUBLICTOILET200BSTAFFTOILET205EXAM210EXAM211EXAM212EXAM215EXAM216EXAM217EXAM(GYN)218SHAREDCLEANWORK/MEDPREP219EXAM(GYN)PoS220PATIENTTOILET222VISITORTOILET(PoS)224DENTALTREATMENTROOM225DENTALEQUIPMENTSTERILIZATION227SHAREDSOILEDHOLDING229SHAREDEQUIPMENTSTORAGE231EVS226VITALSALCOVE223STAIRST2-2CORRIDOR232RESPITE/LACTATION240STAFFTOILET237STAIR2ST2-1MAINLOBBY100RESPITE/MEDITATION241OFFICE238UnoccupiedUnoccupiedCIRCULATION228DENTALOFFICE230WAITING201SHAREDMULTIPURPOSE/CONSULT/TELEMED206SHAREDRECEPTION/REGISTRATION202SHAREDCLERICALOFFICE203CIRCULATION207NURSE214PHYSICIANOFFICE/DICTATION213LAB221MANAGEROFFICE209SHAREDSTAFFBREAK208MULTIPURPOSE/CONSULT/TELEMED204EDUCATION/CONFERENCE234IT/ELEC2431121W3MULTIPURPOSE/ACTIVITY235RESPITE/LACTATION239STAFFTOILET236TELMED233WWW1 1/2"4"1 1/2"4"2"WW654666451 1/2"6661 1/2"1 1/2"2"66W2"2"W66W64"4"666544"4"5461 1/2"4"1 1/2"666W1 1/2"2"WW662"6645654W1 1/2"4"4"4"4566547131313STAFFBREAK242STAFFBREAK242CIRCULATION207CIRCULATION228WALKINGTRACK200ELEVA200EAELEVB200EBSTAIR1ST1-24"1415ST13STST4"4"1514STST1686"6"1110664559121 1/2"4"1 1/2"STST6"6"10111681 1/2"62"1 1/2"1 1/2"6WW66661 1/2"6W2"2"1 1/2"1 1/2"4"4"4"3"1 1/2"2"1 1/2"2"4"2"4"4"4"4"1 1/2"1 1/2"64"17803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:06:20 PMP102SECONDFLOOR PLAN -SANITARY/WASTE ANDSTORM02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGN3/16" = 1'-0"1SECOND FLOOR PLAN - SANITARY/WASTE AND STORMDRAWING NOTES:1114" SANITARY/WASTE STACK UP AND DOWN.24" SANITARY/WASTE UP.34" SANITARY/WASTE DOWN.GENERAL NOTES:1. PROVIDE WALL PLATE CLEANOUTS OR CLEANOUT TEES AT THE BASE OF ALL SANITARY/WASTE AND STORM STACKS.2. COORDINATE SANITARY/WASTE OR VENT PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.44" SANITARY UP TO WATER CLOSET.52" VENT UP.61 1/2" WASTE UP TO SINK/LAVATORY. 71 1/2" WASTE UP TO ELECTRIC WATER COOLER. 893" WASTE (WITH TRAP) UP TO MOP SERVICE SINK.10121 1/2" WASTE UP TO BACK-TO-BACK SINK/LAVATORY. CONNECT 1 1/2" WASTE TO EACH SINK/LAVATORY.134" STORM UP TO ROOF DRAIN (RD-A).144" STORM (PRIMARY SYSTEM) DOWN.154" STORM (SECONDARY SYSTEM) DOWN.166" STORM (PRIMARY SYSTEM) DOWN.6" STORM (SECONDARY SYSTEM) DOWN.6" STORM (PRIMARY SYSTEM) UP.6" STORM (SECONDARY SYSTEM) UP.17CONNECT 4" SANITARY/WASTE TO WALL MOUNTED WATER CLOSET. RUN 4" SANITARY/WASTE IN CHASE WALL (TO AVOID BEAM BELOW)AND DOWN TO FIRST FLOOR CEILING.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021