Loading...
HomeMy WebLinkAboutP101 First Floor Plan Sanitary Waste and StormREF.12345ABCE3.8F3.9WASTEHOLDING136STAFFBREAK133SOILED132CLEANSUPPLY134REGISTRATION124PUBLICTOILET100AEVS109EXAM121EXAM120SOILEDWORK111EXAM112EXAM115EXAM114PoSPATIENTTOILET105CCLEANLINENHOLDING137TRIAGE/INTERVIEW106STAFFTOILET103EXAM116STORAGE144WATERSERVICE146SUPPLYCHAINAREA138EVSSUPPLY&EQUIPMENT139EXAM118MAINELECTRICAL142EMERGENCYEQUIPMENTROOM141MAINSERVER140VESTIBULE100V2VESTIBULE100V1HOLDING/MAIL100CCIRCULATION105CIRCULATION105VITALSALCOVE105ASUB-WAITING105BSTAIR2ST2-1CIRCULATION105CORRIDOR122SPECIMENTOILET127BLOODDRAW130BLOODDRAW129BLOODDRAW(PoS)128WAITING/CIRCULATION123CORRIDOR135LABORATORY126STAFFTOILET131MAINLOBBY100EVS125CORRIDOR143TREATMENT117EXAM113STATLAB/MED110CLEANHOLDING107SHAREDPROVIDEROFFICE104STAFFBREAK102BUILDINGMAINTENANCETOILET/SHOWER138A2DPCO4" FD-A4" FD-A4" FD-A 4" FD-A1212112DPCODPCODPCODPCODPCOW651 1/2"W44WWWW4441 1/2"2"1 1/2"2"1 1/2"1 1/2"2"1 1/2"4442"441 1/2"4101041 1/2"61 1/2"1 1/2"2"410441144W3"WW73"34"4"431043104" FD-ADPCODPCOW1 1/2"2"1 1/2"2"1 1/2"2"2"W1 1/2"444448833223104"1 1/2"34"4"4"4"4"S T 1418121314181913204"4"4"ST6"6"916181715318176"6"STST1621224" FD-ADPCODPCODPCODPCODPCO4"2"4"4"4"2"1 1/2"31 1/2"24"4" FD-A4"4"803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:06:08 PMP101FIRST FLOORPLAN -SANITARY/WASTE ANDSTORM02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGN3/16" = 1'-0"1FIRST FLOOR PLAN - SANITARY/WASTE AND STORMDRAWING NOTES:124" SANITARY/WASTE DOWN.34" SANITARY/WASTE UP. GENERAL NOTES:1. PROVIDE WALL PLATE CLEANOUTS OR CLEANOUT TEES AT THE BASE OF ALL SANITARY/WASTE AND STORM STACKS.2. COORDINATE SANITARY/WASTE OR VENT PIPING LOCATIONS WITH HEAT PUMPS. NO PIPING SHALL BE RUN BELOW A HEAT PUMP TO ALLOW FOR DROPPING OF THE UNIT FOR SERVICE IF REQUIRED.41 1/2" WASTE UP TO SINK/LAVATORY. 51 1/2" WASTE UP TO ELECTRIC WATER COOLER. 61 1/2" WASTE UP TO BOTTLE FILLER.73" WASTE (WITH TRAP) UP TO MOP SERVICE SINK.82" WASTE (WITH TRAP) UP TO SHOWER.9104" SANITARY UP TO WATER CLOSET.2" VENT UP.111 1/2" WASTE UP TO BACK-TO-BACK SINKS/LAVATORIES. CONNECT 1 1/2" WASTE TO EACH SINK/LAVATORY.124" STORM STACK (PRIMARY SYSTEM) UP AND DOWN.134" STORM (SECONDARY SYSTEM) UP.14TERMINATE 4" STORM (SECONDARY SYSTEM) AT BUILDING'S EXTERIOR WITH ZURN ZARB199 DOWNSPOUT NOZZLE ON FACE OF BUILDING.15166" STORM (SECONDARY SYSTEM) UP.17TERMINATE 6" STORM (SECONDARY SYSTEM) AT BUILDING'S EXTERIOR WITH ZURN ZARB199 DOWNSPOUT NOZZLE ON FACE OF BUILDING.18SLEEVE AND SEAL.194" STORM (PRIMARY SYSTEM) UP.204" STORM (PRIMARY SYSTEM) DOWN.6" STORM (PRIMARY SYSTEM) UP.6" STORM (PRIMARY SYSTEM) DOWN.214" SANITARY/WASTE STACK UP AND DOWN.224" SANITARY UP WITHIN CHASE ON SECOND FLOOR.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021