Loading...
HomeMy WebLinkAboutP100 Foundation PlanREF.12345ABCE3.8F3.914W3W5W67867W8113"1273"3"W888107123"3"8"867WV2"74"4"4"1313131313W1W3"98586764"4"4"5WW5W84"4"8764"WW3"3"888888884"4"4"7252228876884"8103"8567124"4"3"84"4"3"4"10104"8"8"V2"4"134"4"W74"154"1554168"6"STST6"STSTST4"ST4"14144"6"6"8"8"4186"17555VESTIBULE100V2LOBBY/WAITING101LOBBY/WAITING101RECEPTION101BTRIAGE/INTERVIEW106CLEANHOLDING107STAFFBREAK102STAFFTOILET103SHAREDPROVIDEROFFICE104PoSPATIENTTOILET105CSUB-WAITING105BEXAM114EXAM115EXAM116TREATMENT117STORAGE144MECHANICAL145WATERSERVICE146CIRCULATION105EXAM118RADIOLOGY(X-RAY)119EXAM113EXAM112EXAM121EXAM120SOILEDWORK111MAINSERVER140BUILDINGMAINTENANCETOILET/SHOWER138AEMERGENCYEQUIPMENTROOM141MAINELECTRICAL142SUPPLYCHAINAREA138EVSSUPPLY&EQUIPMENT139BLOODDRAW130BLOODDRAW129BLOODDRAW(PoS)128CORRIDOR122CLEANLINENHOLDING137WASTEHOLDING136STAFFBREAK133CLEANSUPPLY134STAFFTOILET131LABORATORY126REGISTRATION124WAITING/CIRCULATION123MAINLOBBY100EVS125PUBLICTOILET100APUBLICTOILET100BMAINLOBBY100CORRIDOR122CIRCULATION105STATLAB/MED110VITALSALCOVE105AVESTIBULE100V1CORRIDOR143CORRIDOR14358"8"4"4"24"W4"W3"3"4"2"4"134"3"803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:05:56 PMP100FOUNDATONPLAN02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING3/16" = 1'-0"1FOUNDATION PLANNDRAWING NOTES:1ELEVATOR SUMP PUMP (ESP-1). REFER TO DETAIL DRAWING(S).24" SANITARY/WASTE UP.3CONNECT 8" SANITARY SEWER TO 8" BY CIVIL CONTRACT AT INVERT -5.00'.4SLEEVE AND SEAL.5UP TO DECK PLATE CLEANOUT.64" SANITARY UP TO WATER CLOSET.72" VENT UP.81 1/2" WASTE UP TO SINK/LAVATORY. INCREASE TO 3" WASTE ON ALL UNDERGROUND HORIZONTAL RUNS.91 1/2" WASTE UP TO ELECTRIC WATER COOLER. INCREASE TO 3" WASTE ON ALL UNDERGROUND HORIZONTAL RUNS.101 1/2" WASTE UP TO BOTTLE FILLER. INCREASE TO 3" WASTE ON ALL UNDERGROUND HORIZONTAL RUNS.111 1/2" WASTE UP TO BACK-TO-BACK SINKS/LAVATORIES. CONNECT 1 1/2" WASTE TO EACK SINK/LAVATORY. INCREASE TO 3" WASTE ON ALL UNDERGROUND HORIZONTAL RUNS.123" WASTE (WITH TRAP) UP TO MOP SERVICE SINK.134" WASTE (WITH TRAP) UP TO FLOOR DRAIN.FEE = 0.00'144" STORM (PRIMARY SYSTEM) UP.156" STORM (PRIMARY SYSTEM) UP.16CONNECT 8" STORM TO 8" BY CIVIL CONTRACT AT INVERT -5.00'.176" COMBINED WATER SERVICE UP.18CONNECT 6" COMBINED WATER SERVICE TO 6" BY CIVIL CONTRACT.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021