HomeMy WebLinkAboutP001 Legend & General Notes1. THE PLUMBING SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALLCONFORM TO THE PLUMBING CODE AND AUTHORITIES HAVINGJURISDICTION. IN CASE OF CONFLICTS WITH CODES, DRAWINGS, ORSPECIFICATIONS, THE MOST STRINGENT SHALL PREVAIL.2. BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFYTHE EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF ALLUTILITIES AND PIPING, AND SHALL IMMEDIATELY NOTIFY THE ARCHITECTOF ANY DISCREPANCIES.3. THESE DRAWINGS DO NOT INCLUDE ALL NECESSARY SAFETYREQUIREMENTS. CONTRACTOR TO COMPLY TO THE SAFETYREQUIREMENTS SET FORTH BY THE LOCAL AUTHORITIES HAVINGJURISDICTION.4. THESE DRAWINGS ARE FOR BIDDING PURPOSES ONLY. THEY AREESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT MANY OFFSETS,BENDS, UNIONS, SPECIFIC FITTINGS AND EXACT LOCATIONS ARE NOTINDICATED.5. ALL PLUMBING WORK SHALL BE INSTALLED SO AS TO AVOIDINTERFERENCE WITH ELECTRICAL EQUIPMENT, MECHANICAL EQUIPMENTAND STRUCTURAL FRAMING, SKYLIGHTS, ETC.6. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILINGACCESS PANELS WITH THE ARCHITECTURAL REFLECTED CEILING PLANAND ELECTRICAL LIGHTING PLAN.7. COORDINATE ALL LOCATIONS, SIZES AND ELEVATIONS OF ALL SLEEVESTHROUGH WALLS, BEAMS, SLABS AND FOOTING WITH STRUCTURAL ANDARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH BEAMS ORFOOTINGS SHALL HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVERTHE PIPE PASSING THROUGH THE FOOTING OR PER STRUCTURALDRAWING. THE MOST STRINGENT SHALL PREVAIL.8. BEFORE FABRICATION OR INSTALLATION, THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS OF ALL MECHANICAL/PLUMBING EQUIPMENT AND EQUIPMENT PROVIDED UNDER ANOTHER SECTION OF SPECIFICATIONS. EXACT ROUGH-IN LOCATIONS AND REQUIREMENTS SHALL BE COORDINATED IN FIELD.9. PIPING SUPPORTS. ALL PIPING TO BE SUPPORTED WITH HANGERS ANDBRACKETS WHICH PROVIDE ISOLATION FROM FRAMING. CONTACTBETWEEN PIPE AND SUPPORT TO BE LINED WITH PLASTIC OR FELT.10. ALL FLOOR AND WALL PENETRATIONS MUST BE SEALED WATERTIGHT AND VERMIN PROOF.11. EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURESSHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS.12. SEE ARCHITECTURAL DRAWINGS FOR HANDICAP FIXTURE LOCATIONS AND MOUNTING HEIGHTS. INSULATE ALL EXPOSED HOT WATER AND DRAIN PIPING BELOW HANDICAP LAVATORIES AND SINKS WITH INSULATING WRAP AND OFFSET P-TRAP AGAINST WALL. ALL FLUSH VALVES FOR HANDICAP SHALL BE LOCATED ON HANDICAP WHEELCHAIR ACCESS SIDE OF STALL.13. ALL CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. THECONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS OFEQUIPMENT, CABINETS, ETC., WITH THE ARCHITECT PRIOR TO ANYINSTALLATION.14. ALL VALVES, TRAP PRIMERS, WATER HAMMER ARRESTORS OR OTHEREQUIPMENT SHOWN IN WALLS OR ABOVE NON-ACCESSIBLE CEILINGSSHALL BE INSTALLED BEHIND AN ACCESS PANEL. COORDINATELOCATION AND SIZE WITH ARCHITECT.15. PLUMBING CONTRACTOR SHALL COORDINATE COMPLETE PLUMBINGINSTALLATION AND REQUIREMENTS PRIOR TO SUBMITTING BID WITH ALLLOCAL DISTRICTS AND GOVERNING AUTHORITIES. INCLUDE ALL FINDINGSWITHIN THE BASE BID.16. ALL DRY SYSTEM PIPING SHALL BE INSTALLED WITH PROPER PITCH FORDRAINING OF SYSTEM.17. DO NOT SHUT DOWN ANY SYSTEM WITHOUT BUILDING OWNER'S PRIOR WRITTEN APPROVAL. FOLLOW ALL OWNER REQUIREMENTS AND SHUT DOWN PROCEDURES AS WELL AS ALL REQUIREMENTS OF THIS PROJECT'S CONTRACT DOCUMENTS (PLANS AND SPECIFICATIONS).18. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ROOF WORKTHAT IS REQUIRED AS PART OF THIS CONTRACT. ALL ROOF WORKSHALL BE PERFORMED SUCH THAT ALL EXISTING ROOF WARRANTEESARE MAINTAINED.19. PROVIDE ALL WORK IN COMPLIANCE WITH ALL LOCAL, STATE ANDFEDERAL CODES. OBTAIN ALL REQUIRED PERMITS. COORDINATE ALLWORK WITH LOCAL FIRE MARSHAL.20. FIELD VERIFY EXACT LOCATION, COMPOSITION AND CONDITION OF ALLPIPING, VALVES AND SYSTEMS AS REQUIRED FOR WORK OF THECONTRACT.21. PROVIDE ALL REQUIRED EXCAVATION, BACKFILL AND COMPACTION FORALL UNDERGROUND WORK.22. REFER TO ARCHITECTURAL DRAWINGS AND THE PROJECT SPECIFICATIONS FOR PROJECT PHASING REQUIREMENTS.23. WHERE PIPING IS LOCATED OVER FOOTINGS AND/OR OTHERUNDERGROUND STRUCTURES, ROLL DOWN AS REQUIRED TO CONNECT TO SYSTEMS NOTED. PROVIDE ALL REQUIRED OFFSETS, FITTINGS ANDCONNECTIONS.24. PROVIDE BALANCING VALVE ARRANGEMENTS AT EACH LOCATION WHERE MULTIPLE RISERS OR HORIZONTAL LOOPS INTERSECT.25. PITCH ALL SANITARY/WASTE, INDIRECT WASTE AND STORM PIPING AS FOLLOWS: PIPING 2 1/2" AND SMALLER, PITCH AT 2 PERCENT (1/4" PER FOOT) MINIMUM,PIPING 4" AND LARGER, PITCH AT 1 PERCENT (1/8" PER FOOT) MINIMUM.26. SUBMITTALS AND SHOP DRAWINGS: AS SOON AS POSSIBLE AND WITHIN21 DAYS AFTER AWARD OF THE CONTRACT, AND BEFORE THEIRPURCHASE, THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT 6BOUND BOOKLETS FOR APPROVAL AND CONTAINING A COMPLETE LISTOF MATERIALS, SPECIALTIES AND EQUIPMENT HE IS TO FURNISH FORTHE INSTALLATION. ALL SUBMITTALS SHALL BE MADE AT ONE TIME. NODEVIATION OF PLUMBING FIXTURES WILL BE ACCEPTED. BASED ONAPPROVAL OF ALTERNATE PRIOR TO BID.27. COORDINATE PLUMBING SYSTEMS WITH WORK OF ALL OTHER TRADESPRIOR TO ANY FABRICATION OR INSTALLATION.28. COORDINATE LOCATIONS OF ALL ROOF OPENINGS WITH STRUCTURAL,MECHANICAL, AND ARCHITECTURAL PLANS PRIOR TO ANY INSTALLATION.29. COORDINATE ALL VENT TERMINATIONS ABOVE ROOF WITH HVACCONTRACTOR. ALL VENT TERMINATIONS ABOVE ROOF SHALL BE AMINIMUM 25'-0" (HEALTHCARE) AWAY FROM ANY HVAC OUTSIDE AIR INTAKE (ROOFTOP UNIT, LOUVER, ETC). OR AT LEAST 3 FEET ABOVE WINDOW, DOOR, OPENING, AIR INTAKE OR VENT SHAFT.30. PROVIDE HOSE BIBB (HB) UNDER LAVATORY IN ALL TOILET ROOMSWITH FLOOR DRAINS.31. PROVIDE SCHEDULE 40 BLACK STEEL PIPE SLEEVES FOR ALLUNDERGROUND PIPING PASSING THROUGH OR UNDER FOOTINGS, WALLS,FOUNDATION WALLS, SLABS FLOORS AND/OR UNDERGROUND STRUCTURES. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.32. PLATFORMS, CURBS, AND FLUSHINGS FOR PLUMBING EQUIPMENT SHALLBE AS INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS,UNLESS NOTED OTHERWISE, COORDINATE EXACT SIZES OF REQUIREDOPENINGS AND SUPPORTS FOR FURNISHED EQUIPMENT.33. MAINTENANCE LABEL SHALL BE AFFIXED TO ALL PLUMBING EQUIPMENTAND A MAINTENANCE MANUAL SHALL BE PROVIDED TO OWNER'SREPRESENTATIVE WITH A COPY PROVIDED TO BUILDING COMMISIONING AGENT AND INCLUDED IN PROJECT O&M MANUAL SUBMISSION AT COMPLETION OF PROJECT.34. ALL HOSE BIBBS, WALL HYDRANTS AND MOP SERVICE BASINS SHALLBE EQUIPPED WITH APPROVED, PROPERLY INSTALLED ATMOSPHERIC TYPEVACUUM BREAKERS.35. COORDINATE WITH ELECTRICAL TRADE PRIOR TO ORDERING ELECTRICALLY OPERATED EQUIPMENT FOR AVAILABLE VOLTAGES AT EQUIPMENTLOCATIONS.36. PIPE SIZE DISCREPANCIES BETWEEN FLOOR PLANS AND RISER DIAGRAMSLARGER PIPE SIZE INDICATED WILL TAKE PRECEDENCE.37. THESE PLANS INDICATE APPROXIMATE ROUGH-INS ONLY FOR EQUIPMENTNOT IN THIS SECTION (N.I.T.S.) EXACT ROUGH-IN DIMENSIONS MUST BEOBTAINED FROM THE EQUIPMENT MANUFACTURER.38. ALL VALVES, UNIONS, ETC. TO BE SAME SIZE AS PIPE UNLESSOTHERWISE INDICATED ON DRAWINGS.39. UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH SCREW-TYPEVALVE AND PRIOR TO EQUIPMENT CONNECTIONS.40. THE PLUMBING CONTRACTOR SHALL COORDINATE ALL REQUIREMENTSFOR ALL POINTS OF CONNECTION WITH THE GENERAL CONTRACTOR ANDOTHER TRADES PRIOR TO BID.41. CONTRACTOR SHALL PROVIDE ALL VALVES AND BACKFLOW PREVENTIONDEVICES AS REQUIRED BY STATE AND LOCAL CODES.42. DRAINS SHALL BE INSTALLED AT THE LOW POINT OF THE FLOORS,UNLESS OTHERWISE NOTED.43. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NOADDITIONAL COST TO THE OWNER.44. PROVIDE RPZ TYPE BACKFLOW PREVENTER AND ISOLATION VALVES ONALL MAKE-UP WATER LINES EQUAL TO WATTS LF909 (SAME SIZE AS LINE).COORDINATE WITH MECHANICAL DRAWINGS. PROVIDE CAP DOWNSTREAMOF RPZ FOR HVAC CONTRACTOR. MOUNT DEVICE AS HIGH ASPOSSIBLE. PROVIDE DRAIN FROM RPZ'S RELIEF VALVE ANDTERMINATE AT NEAREST FLOOR DRAIN.45. PROVIDE CLEAN-OUTS AT THE BASE OF ALL STORM, SANITARY, ANDWASTE STACKS.46. MINIMUM SIZE OF SANITARY/WASTE PIPING BELOW SLAB SHALL BE 3".47. PROVIDE FLOOR DRAIN TRAP SEALER ON ALL FLOOR DRAINS ASSPECIFIED.48. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OWNERAND OTHER TRADES PRIOR TO DEMOLITION.49. PLUMBING SYSTEMS AND ALL COMPONENTS THAT ARE DESIGNED AND/ORINTENDED TO DELIVER POTABLE WATER FOR HUMAN CONSUMPTION SHALL BE THIRD-PARTY TESTED AND CERTIFIED FOR NOT EXCEEDING THE MAXIMUM ALLOWABLE LEAD CONTENT PER THE NSF/ANSI 372 STANDARD.50. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THEEQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND APPLICABLECODES, PROVIDE ALL FITTINGS, VALVES, AND OTHER DEVICES REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.51. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS,FLANGES AND OTHER APPURTENANCES REQUIRING ACCESS AREACCESSIBLE.52. PROVIDE CUTTING, CORING AND PATCHING OF ALL WALLS, SLABS ANDDECKS AS REQUIRED FOR WORK SHOWN. COORDINATE ALL WORK WITHOWNER AND GENERAL CONTRACTOR.53. PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA "GUIDELINESFOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBINGPIPING SYSTEMS."GENERAL NOTES:GENERAL SITE/UTILITY NOTES:1. THE PLUMBING CONTRACTOR SHALL PROVIDE THE WATER, SEWER ANDSTORM DRAIN SYSTEMS TO A POINT OF CONNECTION 5'-0" OUTSIDE OFTHE BUILDING AND SHALL MEET THE INVERT ELEVATION SHOWN ON THECIVIL DRAWINGS. PIPING BEYOND THIS POINT IS SPECIFIED UNDERANOTHER SECTION OF THE SPECIFICATION AND SHALL BE AS SHOWNON THE CIVIL DRAWINGS.2. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITYCOMPANIES FOR SERVICE AND CONNECTION AND SHALL MAKEAPPLICATION FOR SERVICE AND PERMITS IN THE NAME OF THE OWNERAND SHALL PAY ALL FEES AND CHARGES INCLUDING THE COST OFVAULTS AND METERS. CONTRACTOR SHALL MAKE VARIATIONS PER UTILITYCOMPANY'S REQUIREMENTS WITHOUT CHARGING EXTRA TO THE BIDCONTRACT.3. ALL EXTERIOR GAS COCKS, WATER SHUTOFF VALVES AND/OR SEWERCLEAN OUTS BELOW GROUND SHALL BE INSTALLED IN YARD BOXESWITH THE COVERS CONSPICUOUSLY MARKED "GAS", "WATER", AND"SEWER" RESPECTIVELY.4. CONNECT TO SITE PIPING OUTSIDE BUILDING AS SHOWN. PROVIDE ALLREQUIRED OFFSETS, FITTINGS AND CONNECTIONS. FIELD VERIFY EXACTLOCATION, DEPTH AND COMPOSITION OF SITE SERVICES ANDCOORDINATE ALL WORK WITH SITE CONTRACTOR.5. FIELD VERIFY ALL UNDERGROUND VALVES AND PIPING AS REQUIRED FORWORK SHOWN.6. WATER OR WASTE PIPE BELOW GRADE OUTSIDE THE BUILDING SHALLHAVE MINIMUM COVER AS RECOMMENDED BY LOCAL AUTHORITIES.7. NO GAS PIPING SHALL BE INSTALLED IN OR ON THE GROUND UNDERANY BUILDING OR STRUCTURE AND ALL EXPOSED GAS PIPING SHALL BEKEPT AT LEAST 6" ABOVE GRADE.WHHBTSFSGIWAWAVSYMBOLACID WASTE PIPING (AW)ACID VENT PIPING (AV)NATURAL GAS PIPING (G)INDIRECT WASTE PIPING (IW)SANITARY/WASTE PIPING (SAN/W)VENT PIPING (V)DESCRIPTIONAGWO2N2VACVACUUM PIPING (VAC)NITROGEN PIPING (N2)OXYGEN PIPING (O2)GREASY WASTE PIPING (GW)COMPRESSED AIR PIPING (A)VALVE WITH TAMPER SWITCHFLOW SWITCHWALL HYDRANTHOSE BIBBTHERMOMETERCLEANOUT (CO)PLUMBING SYMBOLS LISTREMOVE TO THIS POINTNEW TO EXISTING CONNECTIONEXISTING PIPINGWORK TO BE REMOVEDHW RECIRCULATION PIPING (HWR)HOT WATER PIPING (H)COLD WATER PIPING (C)STORM PIPING (ST)P-TRAPDROP CONNECTIONELBOW UP, ELBOW DOWNUNIONCAP OR PLUGCHECK VALVESHUT OFF VALVEBALANCE VALVEPRESSURE GAGESTRAINERBACKFLOW PREVENTERFLOOR DRAIN (FD)SOLENOID VALVEREGULATING VALVEPIPE CONTINUATION (SINGLE LINE)PIPE CONTINUATION (DOUBLE LINE)BUTTERFLY VALVEMETERMROOF DRAIN (RD)PUMPPRESSURE REDUCING VALVEHCHWRVSTWVENT THROUGH ROOF (VTR)LIQUEFIED PETROLEUM GAS PIPING (LPG)LPGVTRDECKPLATE CLEANOUT (DPCO)NOTE: NOT ALL SYMBOLS ARE NECESSARILY USED SYMBOL DESCRIPTIONFILTERED COLD WATER PIPING (FC)FCNOTES:THE PROJECT IS DESIGNED UNDER THE 2020 NYS STRETCH CODES, 2020 NYS IECC, ASHRAE 90.1-2006, ITHACA GREEN BUILDING POLICY INITIATIVE,WELL BUILDING DESIGN CRITERIA VERSION 2, LEED VERSION 4.1, BASE TAX ABATEMENT AND ENHANCED ENERGY ABATEMENT AS WELL AS THE 2018 FGI REQUIREMENTS FOR OUTPATIENT FACILITIES.INCLUSIVE OF THE PROGRAMS LISTED ABOVE, LEED AND WELL BUILDING CREDITS ARE BEING PURSUED THAT SPECIFICALLY IMPACT THE PLUMBING SCOPE. PIPING MATERIAL, WATER QUALITY, HOT WATER HEATER EFFICIENCY, LEGIONELLA CONTROL, WATER SENSE FIXTURES, FIXTURE WATER CONSUMPTION, ENERGY STAR EQUIPMENT, ETC. CONTRACTOR TO REVIEW ALL REQUIREMENTS PRIOR TO BID, ALL EQUIPMENT AND MATERIALS TO MEET OR EXCEED THE REQUIREMENTS OF THE PROGRAMS LISTED.THIS PROJECT WILL BE COMMISSIONED. REFERENCE SPECIFICATION SECTIONS 220800 AND 019113 FOR COMMISSIONING REQUIREMENTS.REQUIRED 2020 IECC ENERGY CONSERVATION COMPLIANCECODE SECTIONCOMPLIANCEC303.3 OPERATION AND MAINTENANCE MANUAL SHALL BE PROVIDED TO OWNER BY CONTRACTOR FOR ALL EQUIPMENTC401.2 BUILDING COMPLIES WITH THE APPLICABLE SECTIONS OF CODE BASED ON METHOD 2C402.5 REFERENCE ARCHITECTURAL PLANS FOR AIR LEAKAGE CRITERIA C403.2.1HVAC LOAD SIZING HAS BEEN PERFORMED IN THE CARRIER HAP PROGRAM, USING RTS (HEAT BALANCE) METHODOLOGYC403.2.3 ALL HVAC EQUIPMENT MEETS OR EXCEEDS MINIMUM EFFICIENCIES, REFERENCE MECHANICAL DOCUMENTSC403.2.4 REQUIRED HVAC CONTROLS SHALL BE PROVIDED, REFERENCE MECHANICAL DOCUMENTSC403.2.4.3MOTORIZED DAMPERS PROVIDED FOR EXHAUST AND OUTSIDE AIR INTAKES GREATER THAN 300 CFM OR IN BUILDINGS 3 STORIES OR LESSC403.2.9.1 DUCT IS REQUIRED TO BE INSULATED TO THE INDICATED MINIMUM LEVEL, REFERENCE MECHANICAL DOCUMENTSC403.2.9.3 INSTALLING CONTRACTOR SHALL ENSURE THAT ALL AIR DISTRIBUTION COMPONENTS ARE PROPERLY SEALEDC403.2.9.5 DUCT SIZING AND DUCT DESIGN HAS BEEN PERFORMED, REFERENCE MECHANICAL DOCUMENTSC403.2.10 ALL PIPING INSULATION CRITERIA HAS BEEN MET, REFERENCE MECHANICAL / PLUMBING DOCUMENTSC403.2.11 MECHANICAL SYSTEMS SHALL BE COMMISSIONED AS REQUIREDC404.2 ALL WATER HEATING EQUIPMENT MEETS OR EXCEEDS MINIMUM EFFICIENCIES, REFERENCE PLUMBING DOCUMENTSC404.4 ALL DOMESTIC HOT WATER PIPING INSULATION CRITERIA HAS BEEN MET, REFERENCE PLUMBING DOCUMENTSC405.2 LIGHTING CONTROL CRITERIA HAS BEEN MET, REFERENCE ELECTRICAL DOCUMENTSC405.5 EXTERIOR LIGHTING TOTAL POWER DOES NOT EXCEED THE ALLOWANCE, REFERENCE ELECTRICAL DOCUMENTSC405.6 ELECTRICAL POWER HAS BEEN PROVIDED PER THE CODE REQUIREMENTS, REFERENCE ELECTRICAL DOCUMENTSC408.2.2 INSTALLING CONTRACTOR SHALL TEST AND BALANCE ALL HVAC SYSTEMS AND PROVIDE REPORT TO ENGINEERMECHANICAL DESIGN CONFORMS TO 2020 IECC AND IMC CODE REQUIREMENTSC103.2.1REFERENCE ARCHITECTURAL PLANS FOR FENESTRATION U-FACTORS AND SOLAR HEAT GAIN COEFFICIENTSREFERENCE ARCHITECTURAL PLANS FOR AREA-WEIGHTED U-FACTORS AND SOLAR HEAT GAIN COEFFICIENTSC103.2.2C103.2.3C103.2.4C103.2.5C103.2.6C103.2.7C103.2.8C103.2.9C103.2.10C103.2.11C103.2.12REFERENCE MECHANICAL AND PLUMBING DOCUMENTS FOR DUCT AND PIPE INSULATION MATERIALS, ARCHITECTURAL DOCUMENTS FOR ALL OTHER INSULATION MATERIALSREFERENCE MECHANICAL AND PLUMBING DOCUMENTS FOR EQUIPMENT TYPES, SIZES AND EFFICIENCIESREFERENCE MECHANICAL DOCUMENTS FOR EQUIPMENT TYPES, SIZES AND EFFICIENCIESREFERENCE MECHANICAL DOCUMENTS FOR EQUIPMENTAMD SYSTEM CONTROLSREFERENCE MECHANICAL DOCUMENTS FOR EQUIPMENT HORSEPOWER AND CONTROLSREFERENCE MECHANICAL AND PLUMBING SPECIFICATIONS FOR SEALING AND INSULATION LOCATIONSREFERENCE ELECTRICAL DOCUMENTS FOR LIGHTING FIXTURE SCHEDULE AND CONTROLSREFERENCE ELECTRICAL DRAWINGS FOR DAYLIGHTING ZONESREFERENCE MECHANICAL SPECIFICATIONS FOR AIR SEALING DETAILS803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:05:43 PMP001LEGEND &GENERALNOTES02/05/20212018089WABCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGTO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT, THE PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH THE INTERNATIONAL ENERGY CODE, AS ADOPTED BY THE STATE.ENERGY CONSERVATION CODE COMPLIANCE STATEMENTREVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021