Loading...
HomeMy WebLinkAboutM401 Schedules803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:05:22 PMM401SCHEDULES02/05/20212018089JCC, CTLCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGVRF SYSTEM SCHEDULE - INDOOR UNITSTAG LOCATION SERVICETYPECFME.S.P. (in.WG)TMBH SMBH HEATING MBHELECTRICAL DATADESIGN EQUIPMENTVOLTS PH MCA MOCPDDFC-05_ MULTIPLE MULTIPLE DUCTED CONCEALED 280 0.60 5.04.76.8 208 1 0.80 A 15DAIKIN FXSQ05TAVJUDFC-07_ MULTIPLE MULTIPLE DUCTED CONCEALED 280 0.60 7.05.88.9 208 1 0.80 A 15DAIKIN FXSQ07TAVJUDFC-09_ MULTIPLE MULTIPLE DUCTED CONCEALED 320 0.60 9.07.010.9 208 1 0.80 A 15DAIKIN FXSQ09TAVJUDFC-12_ MULTIPLE MULTIPLE DUCTED CONCEALED 335 0.60 12.0 9.713.9 208 1 0.80 A 15DAIKIN FXSQ12TAVJUDFC-15_ MULTIPLE MULTIPLE DUCTED CONCEALED 530 0.60 15.0 11.317.7 208 1 1.40 A 15DAIKIN FXSQ15TAVJUDFC-18_ MULTIPLE MULTIPLE DUCTED CONCEALED 600 0.60 18.0 13.620.8 208 1 1.60 A 15DAIKIN FXSQ18TAVJUDFC-24_ MULTIPLE MULTIPLE DUCTED CONCEALED 740 0.60 24.0 17.130.0 208 1 1.80 A 15DAIKIN FXSQ24TAVJUDFC-30_ MULTIPLE MULTIPLE DUCTED CONCEALED 810 0.60 30.0 22.635.1 208 1 1.80 A 15DAIKIN FXSQ30TAVJUDFC-36_ MULTIPLE MULTIPLE DUCTED CONCEALED 1130 0.60 36.0 25.741.3 208 12.50 A 15DAIKIN FXSQ36TAVJUVRF SYSTEM SCHEDULE - OUTDOOR UNITSTAGLOCATIONSERVICECOOLINGAMBIENT TEMP.COOLINGMBHHEATINGAMBIENT TEMPHEATING MBHELECTRICAL DATAMCA MOCPDDESIGN EQUIPMENTVOLTAGE PHACCU-1EROOF1ST FLOOR EAST89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-1NROOF1ST FLOOR NORTH89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-1SROOF1ST FLOOR SOUTH89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-1WROOF1ST FLOOR WEST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-2EROOF2ND FLOOR EAST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-2NROOF2ND FLOOR NORTH89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-2SROOF2ND FLOOR SOUTH89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-2WROOF2ND FLOOR WEST89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-3EROOF3RD FLOOR EAST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-3NROOF3RD FLOOR NORTH89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-3SROOF3RD FLOOR SOUTH89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-3WROOF3RD FLOOR WEST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-4EROOF4TH FLOOR EAST89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-4NROOF4TH FLOOR NORTH89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-4SROOF4TH FLOOR SOUTH89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-4WROOF4TH FLOOR WEST89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-5EROOF5TH FLOOR EAST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-5NROOF5TH FLOOR NORTH89 °F96.0-10 °F108.0208 3 38.145DAIKIN REYQ96XATJAACCU-5SROOF5TH FLOOR SOUTH89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJAACCU-5WROOF5TH FLOOR WEST89 °F72.0-10 °F81.0208 3 38.145DAIKIN REYQ72XATJANOTES:1. PROVIDE ALL OUTDOOR UNITS ON EQUIPMENT SUPPORT RAILS, RAILS BY OTHERS.2. ELECTRICAL CONTRACTOR TO PROVIDE A SINGLE 120V POWER CONNECTION FOR ALL BRANCH SELECTOR BOXES SHOWN ON DRAWINGS.3. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWITCH FOR ALL OUTDOOR UNITS.4. PROVIDE DAIKIN VRF SYSTEM TOUCHSCREEN HEAD END CONTROLLER, I-TOUCH MANAGER AT LOCATION SHOWN ON M101. INTERLOCK ENTIRE VRF SYSTEM AND DOAS UNITS TO I-TOUCH CONTROLLER.NOTES:1. PROVIDE VARIABLE REFRIGERANT FLOW CONDENSING UNIT CONNECTED TO MULTIPLE INTERIOR UNITS PER MANUFACTURER'S REQUIREMENTS, INCLUDING ALL REQUIRED CONTROLS.2. PROVIDE 3-PIPE REFRIGERANT PIPING SYSTEM FOR SIMULTANEOUS HEATING AND COOLING AVAILABILITY FOR AIR HANDLING UNITS PER MANUFACTURER'S REFRIGERANT PIPING REQUIREMENTS.3. PROVIDE APPROPRIATE PIPING MANIFOLD OR KIT AS REQUIRED FOR EACH INDOOR UNIT.4. ALL INDOOR UNITS SHALL HAVE INTEGRAL CONDENSATE DRAIN PUMP WITH A SINGLE POINT ELECTRICAL CONTECTION.5. PROVIDE WIRED REMOTE CONTROLLERS AT ALL LOCATIONS. WIRELESS REMOTE CONTROLLERS SHALL NOT BE ACCEPTABLE.6. PROVIDE ALL DUCTED INDOOR UNITS WITH A SINGLE RETURN REGISTER SERVING A SINGLE INDOOR UNIT WITH A FILTERED RETURN REGISTER WITH A 2" MERV 8 FILTER.7. PROVIDE ALL DUCTED INDOOR UNITS WITH MULTIPLE RETURN REGISTERS SERVING A SINGLE INDOOR UNIT WITH ACCESSIBLE FILTER BOXES, CONTRACTOR TO FIELD FABRICATE AND INSTALL 2" MERV 8 FILTER RACK AT FAN COIL RETURN AIR INTAKE. FILTER BOX TO BE FABRICATED TO STANDARD FILTER DIMENSIONS. CONTRACTOR TO SHOW SIDE OR BOTTOM ACCESS PER UNIT ON COORDINATION DRAWING SUBMITTAL.8. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWITCH FOR ALL INDOOR UNITS.9. PROVIDE DAIKIN VRF SYSTEM TOUCHSCREEN HEAD END CONTROLLER, I-TOUCH MANAGER AT LOCATION SHOWN ON M101. INTERLOCK ENTIRE VRF SYSTEM AND DOAS UNITS TO I-TOUCH CONTROLLER.ROOFTOP HEAT RECOVERY UNIT SCHEDULE - DX HEATPUMP WITH ELECTRIC BACKUPTAG LOCATIONSERVICESUPPLY FANEXHAUST FANMIN OA EERCOOLING - HXSUMMERWINTERHEATING - ELECTRICELECTRICAL DATADESIGN EQUIPMENTCFM E.S.P. (in. wg) HP CFM E.S.P. (in. wg.) HPTMBH SMBH ROWS EAT db EAT wb LAT db LAT wb EAT db EAT wb LAT db LAT wb KW MBH STAGES LAT VOLT PH MCA MOCPDDOAS-1 ROOF5TH FLOOR VENTILATION 1945 1.25 4 1250 1.00 2.3 1945 12.6 85.756.9 3 89 °F 74 °F 80 °F 67 °F 0 °F -1 °F 41 °F 33 °F 18.0 61.4 SCR 70 °F 2083 103.80 A 110.00 ADAIKIN DPS007ADOAS-2 ROOF 1ST - 4TH FLOOR VENTILATION 4150 1.25 8 3375 1.00 4 4150 10.7174.7 118.3 6 89 °F 74 °F 80 °F 67 °F 0 °F -1 °F 38 °F 30 °F 54.0 184.3 SCR 78.6 208 3 229.10 A 250.00 ADAIKIN DPS015ADOAS-3 ROOF 1ST - 4TH FLOOR VENTILATION 4565 1.25 8 3160 1.00 4 4565 10.7181.1 125.6 6 89 °F 74 °F 81 °F 69 °F 0 °F -1 °F 34 °F 27 °F 54.0 184.3 SCR 71 208 3 229.10 A 250.00 ADAIKIN DPS015ANOTES:1. PROVIDE ALL DOAS'S WITH MERV 8 PRE-FILTERS, MERV-13 FINAL FILTERS, ECM FAN MOTORS, HEAT RECOVERY SECTION, MODULATING COMPRESSORS, SCR CONTROLLED ELECTRIC HEAT, HOT GAS REHEAT WITH DEHUMIDIFICATION CONTROL, SINGLE POINT POWER CONNECTION, PACKAGED DISCONNECT AND STARTER, DIRTY FILTER SWITCH AND 14" WIND RATED ROOF CURB.2. FOR ALL DOAS'S WITH MORE THAN 2000 CFM, EC SHALL FURNISH SUPPLY SIDE DUCT SMOKE DETECTOR, MC SHALL INSTALL SUPPLY SIDE DUCT SMOKE DETECTOR.3. PROVIDE 1" CONDENSATE PIPING FROM ALL DOAS'S TO THE NEAREST ROOF DRAIN AND TERMINATE INDIRECTLY.4. PROVIDE DAIKIN VRF SYSTEM TOUCHSCREEN HEAD END CONTROLLER, I-TOUCH MANAGER AT LOCATION SHOWN ON M101. INTERLOCK ENTIRE VRF SYSTEM AND DOAS UNITS TO I-TOUCH CONTROLLER.5. PRIMARY HEATING IS TO BE THRU THE AIR SOURCE HEAT PUMP, ELECTRIC HEAT IS FOR TRIMMING TO 70°F LAT OFF UNIT ONLY. AIR SOURCE HEAT PUMP MODE IS EXPECTED TO BE THE PRIMARY HEATING SOURCE DOWN TO 10°F OAT WHICH IS WHEN THE LAT OF THE WHEEL IS EXPECTED TO DIP BELOW 43°F.FAN SCHEDULETAG LOCATION SERVICE CFME.S.P.(in. wg)BLADETYPEFANRPMDRIVE TYPE SONESELECTRICAL DATADESIGN EQUIPMENTHP VOLT PH FLA STARTERBF-1_ MULTIPLE HWH-1 300 0.40 BC 2466 DIRECT, ECM 0.1 208 1 0.50 A BY EC FANTECH FG8ECEF-1560 ROOF SOILED LINEN 1560 1.00 BI 1371 BELT 13.4 0.75 120 1 13.80 A BY EC GREENHECK CUBE-141NOTES: 1. EC SHALL PROVIDE STARTERS AND DISCONNECTS.2. PROVIDE ROOF MOUNTED EXHAUST FANS WITH HINGED, WIND RATED CURBS.3. PROVIDE BF-1 WITH ECM MOTOR AND INTERLOCK WITH OPERATION OF HWH-1 SERVED, INTERLOCK BY MC. REGISTER, GRILLE & DIFFUSER SCHEDULETAGTYPEMATERIAL FINISH/COLOR DAMPER DESIGN EQUIPMENT1SUPPLYSTEEL / ALUMINUM BY ARCH Yes TITUS OMNI / OMNI-AA2SUPPLYSTEEL / ALUMINUM BY ARCH Yes TITUS 272RL / 272FL3SUPPLYALUMINUMBY ARCH YesTITUS ML-39A RETURN / EXHAUST STEEL / ALUMINUM BY ARCH Yes TITUS 350RL / 350FLB RETURN / EXHAUST STEEL / ALUMINUM BY ARCH YesTITUS 350RLF1C RETURN / EXHAUSTALUMINUMBY ARCH YesTITUS MLR-39NOTES: 1. PROVIDE ALL TYPE 1, 2, A & B DIFFUSERS AND REGISTERS WITH OPPOSED BLADE DAMPERS.2. PROVIDE ALL DUCTED INDOOR UNITS WITH A SINGLE TYPE B RETURN REGISTER SERVING A SINGLE INDOOR UNIT WITH A FILTERED RETURN REGISTER WITH A 1" MERV 8 FILTER.MINI-SPLIT SYSTEM - OUTDOOR UNITTAG LOCATIONPAIRED INDOORUNITSSEER LOW AMBIENTELECTRICAL DATADESIGN EQUIPMENTVOLTS PH MCA MOCPDCU-18_ ROOF AC-18_ 17 Yes 208 1 16.50 A 20.00 A DAIKIN RZR18TAVJUACU-24A ROOF AC-24A 17 Yes 208 1 16.20 A 20.00 A DAIKIN RXB24AXVJUCU-48A ROOF AC-24B,24C 17 Yes 208 1 33.20 A 35.00 A DAIKIN 5MXS48TVJUMINI-SPLIT SYSTEM - INDOOR UNITTAG LOCATION CFMMBHSMBH HEATING MBHELECTRICAL DATADESIGN EQUIPMENTVOLTAGE PHASE MCA MOCPDAC-18_ MULTIPLE 50018.013.720810.50 A 15.00 A DAIKIN FAQ18TAVJUAC-24_ MULTIPLE 55523.516.525.320810.24 A 0.00 A DAIKIN FTXB24AXVJUCABINET UNIT HEATER SCHEDULE - ELECTRICTAG MOUNTING CFMHEATING ELECTRICAL DATADESIGN EQUIPMENTMBH KW EAT LAT AMPS VOLT PHCUH-1_ RECESSED 45 5.1 1.5 45 90 12.5 120 1 QMARK HT1502SSNOTES:1. MC SHALL PROVIDE DISCONNECT AND LINE VOLTAGE THERMOSTAT.2. REVIEW ARCHITECTURAL PLANS FOR WALL TYPES, PROVIDE SURFACE WALL MOUNT FRAME AS REQUIRED.NOTES:1. PROVIDE EACH INDOOR UNIT WITH CONDENSATE PUMP.2. PROVIDE SECONDARY CONDENSATE DETECTION TO SHUT DOWN UNIT UPON DETECTION AND PROVIDE ALARM IN DDC SYSTEM.3. EC TO PROVIDE DISCONNECTS AND STARTERS.NOTES:1. PROVIDE EACH OUTDOOR UNIT WITH LOW AMBIENT CAPACITY AND WIND BAFFLES. 2. PROVIDE OUTDOOR UNITS ON ROOF MOUNTED SUPPORT RACK, SUPPORT RACK BY OTHERS.3. EC TO PROVIDE DISCONNECTS AND STARTERS.NOTES:THE PROJECT IS DESIGNED UNDER THE 2020 NYS STRETCH CODES, 2020 NYS IECC, ASHRAE 90.1-2006, ITHACA GREEN BUILDING POLICY INITIATIVE,WELL BUILDING DESIGN CRITERIA VERSION 2, LEED VERSION 4.1, BASE TAX ABATEMENT AND ENHANCED ENERGY ABATEMENT AS WELL AS THE 2018 FGI REQUIREMENTS FOR OUTPATIENT FACILITIES.INCLUSIVE OF THE PROGRAMS LISTED ABOVE, LEED AND WELL BUILDING CREDITS ARE BEING PURSUED THAT SPECIFICALLY IMPACT THE MECHANICAL SCOPE. PIPING, SEALANT AND INSULATION MATERIAL, EQUIPMENT EFFICIENCIES, SPACE PRESSURIZATION REQUIREMENTS, INDOOR AIR QUAILITY REQUIREMENTS, ENERGY STAR EQUIPMENT, ETC. CONTRACTOR TO REVIEW ALL REQUIREMENTS PRIOR TO BID, ALL EQUIPMENT AND MATERIALS TO MEET OR EXCEED THE REQUIREMENTS OF THE PROGRAMS LISTED.THIS PROJECT WILL BE COMMISSIONED. REFERENCE SPECIFICATION SECTIONS 230800 AND 019113 FOR COMMISSIONING REQUIREMENTS.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021