HomeMy WebLinkAboutL104 Landcape Details 13"-4" DOUBLEGROUND
HARDWOOD
MULCH (NATURAL AND UNDYED)
MAINTAINED WEED-FREE FOR
DURATION OF THE CONTRACT
PERIOD.
SEE PLANTING PLAN
TOPSOIL COMPOST 50/50 BOUND
DEPTH AS SPECIFIED IN
MATERIALS SCHEDULE
UN-COMPACTED SUBGRADE
ADJACENT PAVING
SEE CIVIL DRAWINGS
NOTES:
1.LOOSEN OR SCARIFY ROOTS IF ROOT
BOUND
2.FINISHED SURFACE OF THE MULCH SHOULD
BE 1" BELOW GRADE OF PAVING
UN-COMPACTED SUBGRADE
ADJACENT PAVING
SEE CIVIL DRAWINGS
3"-4" DOUBLEGROUND HARDWOOD
MULCH COVERED AND WEED-FREE
(NATURAL UNDYED), DO NOT PLACE
MULCH IN CONTACT WITH TRUNK.
SEE PLANTING PLAN
TOPSOIL COMPOST 50/50
BOUND DEPTH AS SPECIFIED
IN MATERIALS SCHEDULE
BOTTOM OF ROOT BALL RESTS
ON MOUNDED SUBGRADE
2 TIMES THE
ROOTBALL
DIAMETER
NOTES:
1.REMOVE ALL TWINE AND ROPE, WIRE OR
BURLAP FOR TOP HALF OF ROOT BALL IF
BALLED AND BURLAPPED
2.LOOSEN OR SCARIFY ROOTS IF ROOT
BOUND
3.ROOT CROWN AT FINISHED GRADE TO 1"
ABOVE FINISHED GRADE
ADJACENT
PAVING,
SEE CIVIL
DRAWINGS
UN-COMPACTED SUBGRADE
MIN. 8" SOIL BETWEEN CURB
FOUNDATION AND ROOT BALL
TYP. CURB
-SEE CIVIL DRAWINGS
SEE PLANTING PLAN
2 TIMES THE
ROOTBALL
DIAMETER
NOTES:
1.REMOVE ALL CONSTRUCTION DEBRIS
AND FOREIGN OBJECTS PRIOR TO
PLANTING
2.ENSURE THAT PLANTING SOIL FILLS
WIDTH OF BED, SHORE UP SIDES AS
NECESSARY TO PREVENT GRAVEL
INTRUSION.
3.EACH TREE TO HAVE MINIMUM
PLANTING SOIL VOLUME 760 CU FT
PER CITY SITE ORDINANCE 276-7
REVIEW CRITERIA B.3.C. LARGE TO
MEDIUM CANOPY TREES PRIOR TO
START OF WORK
4.SEE DETAIL #1 FOR TREE STAKING
REQUIREMENTS
5.SEE DETAIL #4 FOR TREE PLANTING
REQUIREMENTS
STREET TREES AS SHOWN IN
LANDSCAPE PLAN
E.Q.E.Q.
1:1 SLOPE ON SIDES
OF PLANTING HOLE
NOTES:
1.AT TIME OF PLANTING, PRUNE ONLY CROSSOVER LIMBS,
CO-DOMINANT LEADERS, AND BROKEN OR DEAD
BRANCHES. SOME INTERIOR TWIGS AND LATERAL
BRANCHES MAY BE PRUNED; HOWEVER, DO NOT REMOVE
THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE
EDGE OF THE CROWN. NO MORE THAN 25% OF CROWN TO
BE PRUNED.
2.EACH TREE TO HAVE MINIMUM PLANTING SOIL VOLUME 760
CU FT PER CITY SITE ORDINANCE 276-7 PROJECT REVIEW
CRITERIA B.3.C. LARGE TO MEDIUM CANOPY TREES PRIOR
TO START OF WORK
3.TREES TO BE STAKED AS REQUESTED BY LANDSCAPE
ARCHITECT
4.REMOVE ALL TWINE, ROPE, WIRE AND BURLAP FROM TOP
HALF OF ROOT BALL
5.IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE
ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND
FOLD DOWN 8" INTO PLANTING HOLE
6.TOP OF ROOT BALL TO BE 1"-2" ABOVE FINISHED GRADE
BOTTOM OF ROOT BALL RESTS
ON MOUNDED SUBGRADE2 TIMES THE
ROOTBALL
DIAMETER
3"-4" DOUBLEGROUND HARDWOOD
MULCH COVERED AND WEED-FREE
(NATURAL UNDYED)
DO NOT PLACE MULCH IN CONTACT
WITH TRUNK
TOPSOIL COMPOST 50/50 BOUND
DEPTH AS SPECIFIED IN MATERIALS
SCHEDULE
CONCRETE PAVING
SEE CIVIL DRAWINGS
UN-COMPACTED SUBGRADE DEPTH OFROOTBALLTREE PLANTING HOLE
DEPTH OF ROOTBALL
TREE TO BE PLANTED SO THE TRUNK
FLARE IS VISIBLE. SOIL NOT TO
COVER TOP OF ROOT BALL. WHERE
TRUNK FLARE IS NOT VISIBLE, TREE
WILL BE REJECTED.6'-0"1'-0"PLAN
VIEW
NOTES:
1.REMOVE ANY DAMAGED OR BROKEN
BRANCHES
2.REMOVE NURSERY STAKE. IF CENTRAL
LEADER NEEDS TO BE STRAIGHTENED
OR HELD ERECT, IT IS ACCEPTABLE TO
ATTACH A 1/2" X 8' BAMBOO POLE TO
THE CENTRAL LEADER AND TRUNK FOR
A MAXIMUM OF 12 MONTHS.
3.SEE DETAIL #4 FOR TREE PLANTING
DETAIL
NONABRASIVE NYLON
WEBBING + GROMMET
THREE (2") TWO-INCH
LODGE POLE STAKES
DRIVE STAKE INTO
SUBGRADE 6"-12".
INSTALL APPX. 2" AWAY
FROM EDGE OF ROOT
BALL. STAKE LOCATION
SHALL NOT INTERFERE
WITH PERMANENT
BRANCHES. REMOVE 6
MONTHS AFTER
PLANTING UNLESS
OTHERWISE DIRECTED
BY LANDSCAPE
ARCHITECT.
NONABRASIVE NYLON
WEBBING + GROMMET
LODGE POLE STAKES
PREVAILING WIND
18" - 30"
PROVIDE GARDENHOSE,
OR GEOTEXTILE CUSION
BETWEEN CABLE AND
TRUNK
GARDEN SIDE PROJECT SIDE
2'1'NOTES:
1.SEE DETAIL #7 FOR PERENNIAL
PLANTING REQUIREMENTS
2.FINAL FENCE DETAIL TO BE
APPROVED BY ITHACA COMMUNITY
GARDENS
SEE PLANT
SCHEDULE
MESH TO CONTINUE TO 8'
BLACK COATED WIRE,
2 1/2" MESH TO PREVENT
GROUNDHOGS
1" MESH TO PREVENT
GROUNDHOGS AND RABBITS
- 3' TO BE BURIED
UNDERGROUND
MESH TO ONLY BE CONNECTED
AT 2' ABOVE GROUND,
1' TO REMAIN LOOSE
1" CRUSHER RUN STONE
UNDERGROUND BARRIER TO
BE BURIED STRAIGHT DOWN 1'
AND ANGLE SHARPLY AT 90° 2' AWAY
FROM THE GARDEN AREA
UN-COMPACTED SUBGRADE
2x6 DECKING
2x4 DECK "CURB"
1'Ø SONOTUBE
FOUNDATION, 3'
DEPTH MIN.
6x6 POST, TREATED FOR
GROUND CONTACT
6x6 POST
SLEEVE,
SUBMIT
HARDWARE
FRO APPROVAL
TOP VIEWFRAMING VIEW 2x12 ABUTMENT BOARD
TREATED FOR GROUND
CONTACT, TYP.
2x8 JOIST
2x6 JOIST
2x6 WOOD DECK PLANK
2x4 DECK "CURB"
SECTION VIEW7'-5"7'-5"2x6 JOIST
6x6 POST & 1'Ø
SONOTUBE FOOTING,
TYP.2'-7"4'-6" O.C. (POSTS)
6'
2x6 JOIST
2x8 JOIST2'-7"2x6 SPACER
1'-7" APPROX.3' MIN.2x4 DECK "CURB"PATHWAY SURFACING
2x6 DECKING
2x8 JOIST
2x12 ABUTMENT BOARD
TREATED FOR GROUND
CONTACT, TYP.
6x6 POST
OPEN
ELEVATION VIEW
PERENNIAL PLANTING DETAIL1SCALE: NTS
SHRUB PLANTING DETAIL2SCALE: NTS
TREE STAKING DETAIL3SCALE: NTS
STREET TREE PLANTING DETAIL5SCALE: NTS
TREE PLANTING DETAIL7SCALE: NTS
COMMUNITY GARDEN FENCE PLANTING DETAIL6SCALE: NTS
DWG NO:Cayuga ParkLANDSCAPE
DETAILS 1
DATE:
L 104
SCALE:
REVISION - DATE
N
3/5/2021
AS SHOWN
PEDESTRIAN FOOT BRIDGE DETAIL 4 SCALE: NTS