Loading...
HomeMy WebLinkAboutL104 Landcape Details 13"-4" DOUBLEGROUND HARDWOOD MULCH (NATURAL AND UNDYED) MAINTAINED WEED-FREE FOR DURATION OF THE CONTRACT PERIOD. SEE PLANTING PLAN TOPSOIL COMPOST 50/50 BOUND DEPTH AS SPECIFIED IN MATERIALS SCHEDULE UN-COMPACTED SUBGRADE ADJACENT PAVING SEE CIVIL DRAWINGS NOTES: 1.LOOSEN OR SCARIFY ROOTS IF ROOT BOUND 2.FINISHED SURFACE OF THE MULCH SHOULD BE 1" BELOW GRADE OF PAVING UN-COMPACTED SUBGRADE ADJACENT PAVING SEE CIVIL DRAWINGS 3"-4" DOUBLEGROUND HARDWOOD MULCH COVERED AND WEED-FREE (NATURAL UNDYED), DO NOT PLACE MULCH IN CONTACT WITH TRUNK. SEE PLANTING PLAN TOPSOIL COMPOST 50/50 BOUND DEPTH AS SPECIFIED IN MATERIALS SCHEDULE BOTTOM OF ROOT BALL RESTS ON MOUNDED SUBGRADE 2 TIMES THE ROOTBALL DIAMETER NOTES: 1.REMOVE ALL TWINE AND ROPE, WIRE OR BURLAP FOR TOP HALF OF ROOT BALL IF BALLED AND BURLAPPED 2.LOOSEN OR SCARIFY ROOTS IF ROOT BOUND 3.ROOT CROWN AT FINISHED GRADE TO 1" ABOVE FINISHED GRADE ADJACENT PAVING, SEE CIVIL DRAWINGS UN-COMPACTED SUBGRADE MIN. 8" SOIL BETWEEN CURB FOUNDATION AND ROOT BALL TYP. CURB -SEE CIVIL DRAWINGS SEE PLANTING PLAN 2 TIMES THE ROOTBALL DIAMETER NOTES: 1.REMOVE ALL CONSTRUCTION DEBRIS AND FOREIGN OBJECTS PRIOR TO PLANTING 2.ENSURE THAT PLANTING SOIL FILLS WIDTH OF BED, SHORE UP SIDES AS NECESSARY TO PREVENT GRAVEL INTRUSION. 3.EACH TREE TO HAVE MINIMUM PLANTING SOIL VOLUME 760 CU FT PER CITY SITE ORDINANCE 276-7 REVIEW CRITERIA B.3.C. LARGE TO MEDIUM CANOPY TREES PRIOR TO START OF WORK 4.SEE DETAIL #1 FOR TREE STAKING REQUIREMENTS 5.SEE DETAIL #4 FOR TREE PLANTING REQUIREMENTS STREET TREES AS SHOWN IN LANDSCAPE PLAN E.Q.E.Q. 1:1 SLOPE ON SIDES OF PLANTING HOLE NOTES: 1.AT TIME OF PLANTING, PRUNE ONLY CROSSOVER LIMBS, CO-DOMINANT LEADERS, AND BROKEN OR DEAD BRANCHES. SOME INTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED; HOWEVER, DO NOT REMOVE THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE EDGE OF THE CROWN. NO MORE THAN 25% OF CROWN TO BE PRUNED. 2.EACH TREE TO HAVE MINIMUM PLANTING SOIL VOLUME 760 CU FT PER CITY SITE ORDINANCE 276-7 PROJECT REVIEW CRITERIA B.3.C. LARGE TO MEDIUM CANOPY TREES PRIOR TO START OF WORK 3.TREES TO BE STAKED AS REQUESTED BY LANDSCAPE ARCHITECT 4.REMOVE ALL TWINE, ROPE, WIRE AND BURLAP FROM TOP HALF OF ROOT BALL 5.IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND FOLD DOWN 8" INTO PLANTING HOLE 6.TOP OF ROOT BALL TO BE 1"-2" ABOVE FINISHED GRADE BOTTOM OF ROOT BALL RESTS ON MOUNDED SUBGRADE2 TIMES THE ROOTBALL DIAMETER 3"-4" DOUBLEGROUND HARDWOOD MULCH COVERED AND WEED-FREE (NATURAL UNDYED) DO NOT PLACE MULCH IN CONTACT WITH TRUNK TOPSOIL COMPOST 50/50 BOUND DEPTH AS SPECIFIED IN MATERIALS SCHEDULE CONCRETE PAVING SEE CIVIL DRAWINGS UN-COMPACTED SUBGRADE DEPTH OFROOTBALLTREE PLANTING HOLE DEPTH OF ROOTBALL TREE TO BE PLANTED SO THE TRUNK FLARE IS VISIBLE. SOIL NOT TO COVER TOP OF ROOT BALL. WHERE TRUNK FLARE IS NOT VISIBLE, TREE WILL BE REJECTED.6'-0"1'-0"PLAN VIEW NOTES: 1.REMOVE ANY DAMAGED OR BROKEN BRANCHES 2.REMOVE NURSERY STAKE. IF CENTRAL LEADER NEEDS TO BE STRAIGHTENED OR HELD ERECT, IT IS ACCEPTABLE TO ATTACH A 1/2" X 8' BAMBOO POLE TO THE CENTRAL LEADER AND TRUNK FOR A MAXIMUM OF 12 MONTHS. 3.SEE DETAIL #4 FOR TREE PLANTING DETAIL NONABRASIVE NYLON WEBBING + GROMMET THREE (2") TWO-INCH LODGE POLE STAKES DRIVE STAKE INTO SUBGRADE 6"-12". INSTALL APPX. 2" AWAY FROM EDGE OF ROOT BALL. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES. REMOVE 6 MONTHS AFTER PLANTING UNLESS OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT. NONABRASIVE NYLON WEBBING + GROMMET LODGE POLE STAKES PREVAILING WIND 18" - 30" PROVIDE GARDENHOSE, OR GEOTEXTILE CUSION BETWEEN CABLE AND TRUNK GARDEN SIDE PROJECT SIDE 2'1'NOTES: 1.SEE DETAIL #7 FOR PERENNIAL PLANTING REQUIREMENTS 2.FINAL FENCE DETAIL TO BE APPROVED BY ITHACA COMMUNITY GARDENS SEE PLANT SCHEDULE MESH TO CONTINUE TO 8' BLACK COATED WIRE, 2 1/2" MESH TO PREVENT GROUNDHOGS 1" MESH TO PREVENT GROUNDHOGS AND RABBITS - 3' TO BE BURIED UNDERGROUND MESH TO ONLY BE CONNECTED AT 2' ABOVE GROUND, 1' TO REMAIN LOOSE 1" CRUSHER RUN STONE UNDERGROUND BARRIER TO BE BURIED STRAIGHT DOWN 1' AND ANGLE SHARPLY AT 90° 2' AWAY FROM THE GARDEN AREA UN-COMPACTED SUBGRADE 2x6 DECKING 2x4 DECK "CURB" 1'Ø SONOTUBE FOUNDATION, 3' DEPTH MIN. 6x6 POST, TREATED FOR GROUND CONTACT 6x6 POST SLEEVE, SUBMIT HARDWARE FRO APPROVAL TOP VIEWFRAMING VIEW 2x12 ABUTMENT BOARD TREATED FOR GROUND CONTACT, TYP. 2x8 JOIST 2x6 JOIST 2x6 WOOD DECK PLANK 2x4 DECK "CURB" SECTION VIEW7'-5"7'-5"2x6 JOIST 6x6 POST & 1'Ø SONOTUBE FOOTING, TYP.2'-7"4'-6" O.C. (POSTS) 6' 2x6 JOIST 2x8 JOIST2'-7"2x6 SPACER 1'-7" APPROX.3' MIN.2x4 DECK "CURB"PATHWAY SURFACING 2x6 DECKING 2x8 JOIST 2x12 ABUTMENT BOARD TREATED FOR GROUND CONTACT, TYP. 6x6 POST OPEN ELEVATION VIEW PERENNIAL PLANTING DETAIL1SCALE: NTS SHRUB PLANTING DETAIL2SCALE: NTS TREE STAKING DETAIL3SCALE: NTS STREET TREE PLANTING DETAIL5SCALE: NTS TREE PLANTING DETAIL7SCALE: NTS COMMUNITY GARDEN FENCE PLANTING DETAIL6SCALE: NTS DWG NO:Cayuga ParkLANDSCAPE DETAILS 1 DATE: L 104 SCALE: REVISION - DATE N 3/5/2021 AS SHOWN PEDESTRIAN FOOT BRIDGE DETAIL 4 SCALE: NTS