HomeMy WebLinkAbout!Binder_CD Landscape Set_stampedPATHWAY TO BE GR
ASS OR MUL
CH - EXACT LOC
ATION TO BE
DESIGNE
D BY
PROJ
ECT GROWING HOP
E M
E
MBER
SHIP
PATH
W
A
Y
T
O
B
E
G
R
A
S
S
O
R
M
U
L
C
H
-
E
X
A
C
T
L
O
C
A
T
I
O
N
T
O
B
E
DESI
G
N
E
D
B
Y
P
R
O
J
E
C
T
G
R
O
W
I
N
G
H
O
P
E
M
E
M
B
E
R
S
H
I
P
Chives
PLA
Y
G
R
O
U
N
D
LAWN
THIRD STREETPAV
0
1
PAV
0
1
E
E
W
W
W THIRD STREETNORTH MEADOW STREET (NYS RO
U
T
E
1
3
)
CARPENTER PARK
NEW Y
O
R
K
S
T
A
T
E
R
O
U
T
E
1
3
SOUTH ENLARGEMENT, 1"=20'M SEE SHEET L 103
CENTRAL ENLARGEMENT, 1"=20', SEE SHEET L 102 NORTH ENLARGEMENT, 1"=20', SEE SHEET L 101
DWG NO:
PLANTING
PLAN - FULL
SITE
DATE:
L 100
SCALE:
3/5/2021
1"=40'-0"
NOTES:
1. PLEASE REFER TO COMMUNITY GARDENS SITE PLAN DRAWINGS AND
DETAILS FOR ANY QUESTIONS REGARDING THE COMMUNITY GARDENS
Cayuga ParkREVISION - DATE
N
GATE
PATHWAY TO BE GRASS OR MULCH - EXACT LOCATION TO BEDESIGNED BY PROJECT GROWING HOPE MEMBERSHIPPAT
H
W
A
Y
T
O
B
E
G
R
A
S
S
O
R
M
U
L
C
H
-
E
X
A
C
T
L
O
C
A
T
I
O
N
T
O
B
E
DE
S
I
G
N
E
D
B
Y
P
R
O
J
E
C
T
G
R
O
W
I
N
G
H
O
P
E
M
E
M
B
E
R
S
H
I
P
PLA
Y
G
R
O
U
N
D
LAWN
THIRD STREETPLANT BED
PLANT BED PLANT BED
CHV(3)
PR(8)
PS(2)
PP(1)
AC(5)
PA(2)PS(1)
CC(3)
CM(2)
MD(1)
MA(1)
AC(2)
PIO(2)
MS(2)PP(2)
PP(3)
PAB(3)PAB(2)
PIO(1)
CM(3)
MD(1)
MD(1)
CM(3)
CC(3)
PIO(3)
MD(1)
MV(1)
PCB(1)
PCM(1)
HV(3)
PR(2)
PIO(3)
MS(5)
MU(1)
PCM(1)
MU(1)
PCS(1)
PCB(1)
CM(3)
MS(3)
CC(3)
CHV(1)
AA(3)
AA(1)
MU(1)
PR(1)
PAV
0
1
PAV
0
1
THIRD STREETCARPENTER PARK
BUI
L
D
I
N
G
A
P
L
A
N
T
I
N
G
EN
L
A
R
G
E
M
E
N
T
,
1
"
=
1
0
'
,
SE
E
S
H
E
E
T
L
1
0
1
.
1
BUI
L
D
I
N
G
A
P
L
A
N
T
I
N
G
EN
L
A
R
G
E
M
E
N
T
,
1
"
=
1
0
'
,
SE
E
S
H
E
E
T
L
1
0
1
.
1
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.2
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.3
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.2
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.3
PLANTING
PLAN - NORTHCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 101
SCALE:
3/8/2021
1"=20'-0"
AC(5)
PLAYGROUND
LAWN
PR(1)
PR(8)
PS(2)
PP(1)
PA(2)
PS(1)
CC(3)
IM(2)
AC(2)
PIO(2)
MS(2)
CSC(3)
PP(3)
PIO(1)
CM(3)
MD(1)
CM(3)
PIO(3)
MD(1)
MV(1)
PCB(1)
HV(3)
PIO(3)
MS(5)
IM(2)
RM(3)
SK(3)
FC(4)
RO(3)
PCM(1
)
MU(1)
PCS(1)
RR(4)
RM(2)
SK(3)
VC(3)
PCB(1)
CM(3)
MS(3)
HQ(5)
IV(3)
PH(5)
PH(3)
PH(5)
IN(2)
IN(2)
AA(3)
AA(1)
PP(2)
ASC(30)
AM(10)
NR(5)
IRS(5)
HQ(3)THIRD STREETCAK(12)
CAK(8)
TRASHCAN
TRASHCAN
PAV 01
PAV 01
THIRD STREETPLANTING PLAN -
ENLARGEMENT
BUILDING ACayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 101.1
SCALE:
3/8/2021
1"=10'-0"
10 10 10
COMPACT COMPACT
10 10 10
COMPACT COMPACT
10 10 10
COMPACT COMPACT
10 10 10
COMPACT COMPACT
GATE
PATHWAY TO BE GRASS OR MULCH - EXACT LOCATION TO BEDESIGNED BY PROJECT GROWING HOPE MEMBERSHIPPAT
H
W
A
Y
T
O
B
E
G
R
A
S
S
O
R
M
U
L
C
H
-
E
X
A
C
T
L
O
C
A
T
I
O
N
T
O
B
E
DE
S
I
G
N
E
D
B
Y
P
R
O
J
E
C
T
G
R
O
W
I
N
G
H
O
P
E
M
E
M
B
E
R
S
H
I
P
TT(6)
QP(8)
QA(2)
CC(3)
PP(7)
CC(3)
CC(1)CC(2)
CC(3)
CM(2)
CHV(5)
CC(3)
BP(7)
AS(1)
PPB(3)BP(3)
BP(3)
PAB(1)
PAB(1)
AA(3)
AA(3)
CHV(1)
CHV(1)
QP(1)
W
W
W
NORTH MEADOW STREET (NYS R
O
U
T
E
1
3
)
CARPENTER PARK
STORMWATER PLAZA
ENLARGEMENT, 1"=10',
SEE SHEET L 102.1
BUILDING B NORTH SIDE
PLANTING ENLARGEMENT,
1"=10', SEE SHEET L 102.1
WEST SIDE BIO RETENTION
PLANTING ENLARGEMENT,
1"=10', SEE SHEET L 102.1
BUILDING B WEST SIDE
PLANTING, 1"=10', SEE
SHEET L 102.3
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.2
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 102.2
PLANTING
PLAN - CENTERCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 102
SCALE:
3/8/2021
1"=20'-0"
COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
CHV(5)
HV(2)
PAB(1)
AA(3)CHV(1)
CHV(1)
QP(1)
PCH(80)
IV(12)
AAB(11)
RH(80)
CAK(19)
CAK(31)
AM(127)
EP(10)
MO(11)
BM(3)
SK(3)
TT(6)
QA(2)
PAB(1)
CO(3)
LS(41)
CO(3)
AAB(5)
IRS(3)
AAB(2)
PDB(25)
LS(26)
PDB(16)
LS(27)
PCH(61)
AAB(6)
AAB(3)
IRS(9)
IRS(6)
PDB(33)
IRS(7)
CO(2)
IRS(7)
AAB(8)
CSC(7)NR(23)CV(47)
SK(3)
LM(25)
LM(20)
LM(20)
LM(20)
LM(20)
PDB(190)
NR(21)
NR(30)
PDB(80)
LM(30)BIKE RACK
10 10 10101010101010101010
PPB(3)
AA(3)
CO(3)
AAB(6)
IRS(12)
IRS(2)
LS (9)
LS (93)
RH (63)
PCH(60)
CRT(1)
CRT(1)
SM(3)MO(9)
MO(21)
MO(8)
ASC(23)
MO(10)NR(3)
PLANTING PLAN -
BIORETENTION
ENLARGEMENTSCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 102.1
SCALE:
3/8/2021
1"=10'-0"
NORTH SIDE OF
BUILDING B ZOOM IN
BIORETENTION AREA
SOUTH OF COMMUNITY
GARDENS
BIORETENTION PLAZA
IN BETWEEN BUILDING
B AND BUILDING C
PAB(2)
CC(3)
CM(2)
CHV(5)
HV(2)
CC(3)
QP(1)
HQ(9)
HQ(3)
CSC(5)
PH(3)
PH(7)
RH(80)
IN(3)
IM(3)
HQ(9)
AO(29)RA(17)
AM(127)
AO(81)
FV(180)
QP(8)
AS(1)
FV(1013)
HT(153)EP(478)
AAB(13)
IV(5)
CO(7)
CSC(3)
IV(5)
IG(11)
NR(23)
CO(5)
LS(672)
CV(47)
CVF(180)
PVB(168)
NR(24)HF(230)
AM(127)
30% PVB (25) 70% LS (132)
PDB(190)
NORTH MEADOW STREET (NYS
R
O
U
T
E
1
3
)
PLANTING PLAN -
ENLARGEMENT
DOT BUFFERCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 102.2
SCALE:
3/8/2021
1"=10'-0"
10 10 10101010101010101010
CC(3)
PPB(3)
BP(3)
BP(3)
PAB(1)
AA(3)AA(3)CHV(1)
CHV(1)
LS (93)
RH (63)
CAK(19)
CRT(1)
CRT(1)
CRT(1)
CRT(1)
CRT(1)
CRT(1)
EP(17)EP(10)EP(13)
MO(11)
ASC(60)
MO(8)
EP(15)
MO(7)
SM(3)MO(9)
MO(21)
MO(8)
ASC(23)
MO(10)
ASC(32)
MO(20)
SK(3)
NR(6)NR(3)BM(3)BM(3)
BM(3)BM(3)
BM(3)
SK(3)
TRASHCAN
PAB(3)
PAB(2)
PH(7)
AO(29)HT(81)
PLANTING PLAN -
ENLARGEMENT
BUILDING BCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 102.3
SCALE:
3/8/2021
1"=10'-0"
UP
Chives
PLANT BED
PLANT BED
PLANT BED
TT(6)
CM(2)CM(2)
CC(1)
CC(1)
MS(5)
AR(2)
QA(2)
MS(3)
PAB(2)
PAB(5)
TT(8)
PAB(2)
AC(5)PP(5)AC(5)PS(5)
AC(5)
PP(5)
MS(3)
CC(3)
CM(2)CM(1)
CM(6)
AA(10)
QP(5)
AS(3)
AR(5)
CC(3)
PAB(1)
CC(2)
AA(3)MS(5)
CAO(3)
AR(3)
E
STORMWATER PLAZA
ENLARGEMENT, 1"=10',
SEE SHEET L 102.1
BUILDING D PLANTING
ENLARGEMENT, 1"=10', SEE
SHEET L 103.1
SOUTHERN BIO RETENTION
PLANTING ENLARGEMENT,
1"=10', SEE SHEET L 103.2
DOT BUFFER PLANTING
ENLARGEMENT, 1"=10',
SEE SHEET L 103.2
BUILDING C BIO RETENTION
PLANTING ENLARGEMENT,
1"=10', SEE SHEET L 103.3
PLANTING
PLAN - SOUTHCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 103
SCALE:
3/8/2021
1"=20'-0"
UP
GENERATOR
Chives
CM(6)
AA(10)
AR(5)
QP(1)
LS(165)
CL(35)
LC(100)
PCH(156)
AAB(8)
CSC(7)
CL(141)
EP(27)
LS(30)
RO(6)
IRS(9)
AAB(3)
CO(3)
IRS(10)
IG(5)
LS(315)
LS(615)
CV(85)
AAB(5)
IRS(8)
AAB(3)CL (238)
RC (55)
HQ(16)
IG(13)
HQ(16)
AO(70)
CST(784)
RM(7)
NR(24)
RC(61)
HT(82)
CST(150)
IRS(7)
NR(30)
CVF(50)
RH(80)
PCH(48)
IRS(3)
CO(5)
IRS(3)
LS(58)
LS(105)
CL(155)
ASC(54)
ASC(147)
RH(232)
CVF(45)
CVF(50)
NR(19)WASTE
RECEPTACLE
BENCH
IRS(7)
CO(3)
LS(90)
PCH(20)
CSC(7)
BENCH
BENCH
PCH(80)
RH(18)
BIKE RACK
AR(3)
BENCH
BENCH
E
RM(5)
AAB(5)
IRS(5)
CO(3)
CO(3)
CL(15)
PLANTING PLAN -
BUILDING D
ENLARGEMENTCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 103.1
SCALE:
3/8/2021
1"=10'-0"
Chives
QP(5)
CC(3)
QP(1)
CO(5)
IV(5)
CO(5)
CSC(7)
AAB(11)
AAB(14)
CSC(7)
LS(615)
CV(85)
FV(486)
AAB(5)
IRS(8)
AAB(3)
AAB(3)IRS(3)
CG (23)
CL (238)
RC (55)
IG(13)
HQ(16)
CST(784)
PVB(398)
IV(5)
MPD(223)
HT(213)
CP(225)
MPD(851)
MPD(345)
CV(67)
NR(130)
PCH(48)
CV(13)
IRS(3)
CO(5)
IRS(3)
MPD(18)
LS(58)
LS(105)
CL(155)
ASC(54)
ASC(147)
CVF(45)
CSC(7)
BENCH
PCH(80)
AR(3)
AR(2)
PAB(5)
AS(3)
CL(150)
AAB(12)
IRS(11)
RH (40)
RH (220)
CL (160)CG(24)
PCH(34)
CG(60)
PLANTING PLAN -
BUILDING D DOT
ENLARGEMENTCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 103.2
SCALE:
3/8/2021
1"=10'-0"
BIORETENTION AREA
WEST OF MEDICAL
OFFICE BUILDING
DOT LANDSCAPE BUFFER
AREA NEAR MEDICAL
OFFICE BUILDING
TT(6)
MS(3)
PAB(2)
TT(8)
PAB(2)
MS(3)
CC(2)
LC(220)
LS(120)
CG(110)
CL(150)
CO(3)
IRS(12)
IRS(3)
LM(80)
LM(20)
LM(30)
PLANTING PLAN -
BIORETENTION
ENLARGEMENTCayuga ParkREVISION - DATE
N
DWG NO:
DATE:
L 103.3
SCALE:
3/8/2021
1"=10'-0"
BIORETENTION AREA
BEHIND BUILDING C
3"-4" DOUBLEGROUND
HARDWOOD
MULCH (NATURAL AND UNDYED)
MAINTAINED WEED-FREE FOR
DURATION OF THE CONTRACT
PERIOD.
SEE PLANTING PLAN
TOPSOIL COMPOST 50/50 BOUND
DEPTH AS SPECIFIED IN
MATERIALS SCHEDULE
UN-COMPACTED SUBGRADE
ADJACENT PAVING
SEE CIVIL DRAWINGS
NOTES:
1.LOOSEN OR SCARIFY ROOTS IF ROOT
BOUND
2.FINISHED SURFACE OF THE MULCH SHOULD
BE 1" BELOW GRADE OF PAVING
UN-COMPACTED SUBGRADE
ADJACENT PAVING
SEE CIVIL DRAWINGS
3"-4" DOUBLEGROUND HARDWOOD
MULCH COVERED AND WEED-FREE
(NATURAL UNDYED), DO NOT PLACE
MULCH IN CONTACT WITH TRUNK.
SEE PLANTING PLAN
TOPSOIL COMPOST 50/50
BOUND DEPTH AS SPECIFIED
IN MATERIALS SCHEDULE
BOTTOM OF ROOT BALL RESTS
ON MOUNDED SUBGRADE
2 TIMES THE
ROOTBALL
DIAMETER
NOTES:
1.REMOVE ALL TWINE AND ROPE, WIRE OR
BURLAP FOR TOP HALF OF ROOT BALL IF
BALLED AND BURLAPPED
2.LOOSEN OR SCARIFY ROOTS IF ROOT
BOUND
3.ROOT CROWN AT FINISHED GRADE TO 1"
ABOVE FINISHED GRADE
ADJACENT
PAVING,
SEE CIVIL
DRAWINGS
UN-COMPACTED SUBGRADE
MIN. 8" SOIL BETWEEN CURB
FOUNDATION AND ROOT BALL
TYP. CURB
-SEE CIVIL DRAWINGS
SEE PLANTING PLAN
2 TIMES THE
ROOTBALL
DIAMETER
NOTES:
1.REMOVE ALL CONSTRUCTION DEBRIS
AND FOREIGN OBJECTS PRIOR TO
PLANTING
2.ENSURE THAT PLANTING SOIL FILLS
WIDTH OF BED, SHORE UP SIDES AS
NECESSARY TO PREVENT GRAVEL
INTRUSION.
3.EACH TREE TO HAVE MINIMUM
PLANTING SOIL VOLUME 760 CU FT
PER CITY SITE ORDINANCE 276-7
REVIEW CRITERIA B.3.C. LARGE TO
MEDIUM CANOPY TREES PRIOR TO
START OF WORK
4.SEE DETAIL #1 FOR TREE STAKING
REQUIREMENTS
5.SEE DETAIL #4 FOR TREE PLANTING
REQUIREMENTS
STREET TREES AS SHOWN IN
LANDSCAPE PLAN
E.Q.E.Q.
1:1 SLOPE ON SIDES
OF PLANTING HOLE
NOTES:
1.AT TIME OF PLANTING, PRUNE ONLY CROSSOVER LIMBS,
CO-DOMINANT LEADERS, AND BROKEN OR DEAD
BRANCHES. SOME INTERIOR TWIGS AND LATERAL
BRANCHES MAY BE PRUNED; HOWEVER, DO NOT REMOVE
THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE
EDGE OF THE CROWN. NO MORE THAN 25% OF CROWN TO
BE PRUNED.
2.EACH TREE TO HAVE MINIMUM PLANTING SOIL VOLUME 760
CU FT PER CITY SITE ORDINANCE 276-7 PROJECT REVIEW
CRITERIA B.3.C. LARGE TO MEDIUM CANOPY TREES PRIOR
TO START OF WORK
3.TREES TO BE STAKED AS REQUESTED BY LANDSCAPE
ARCHITECT
4.REMOVE ALL TWINE, ROPE, WIRE AND BURLAP FROM TOP
HALF OF ROOT BALL
5.IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE
ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND
FOLD DOWN 8" INTO PLANTING HOLE
6.TOP OF ROOT BALL TO BE 1"-2" ABOVE FINISHED GRADE
BOTTOM OF ROOT BALL RESTS
ON MOUNDED SUBGRADE2 TIMES THE
ROOTBALL
DIAMETER
3"-4" DOUBLEGROUND HARDWOOD
MULCH COVERED AND WEED-FREE
(NATURAL UNDYED)
DO NOT PLACE MULCH IN CONTACT
WITH TRUNK
TOPSOIL COMPOST 50/50 BOUND
DEPTH AS SPECIFIED IN MATERIALS
SCHEDULE
CONCRETE PAVING
SEE CIVIL DRAWINGS
UN-COMPACTED SUBGRADE DEPTH OFROOTBALLTREE PLANTING HOLE
DEPTH OF ROOTBALL
TREE TO BE PLANTED SO THE TRUNK
FLARE IS VISIBLE. SOIL NOT TO
COVER TOP OF ROOT BALL. WHERE
TRUNK FLARE IS NOT VISIBLE, TREE
WILL BE REJECTED.6'-0"1'-0"PLAN
VIEW
NOTES:
1.REMOVE ANY DAMAGED OR BROKEN
BRANCHES
2.REMOVE NURSERY STAKE. IF CENTRAL
LEADER NEEDS TO BE STRAIGHTENED
OR HELD ERECT, IT IS ACCEPTABLE TO
ATTACH A 1/2" X 8' BAMBOO POLE TO
THE CENTRAL LEADER AND TRUNK FOR
A MAXIMUM OF 12 MONTHS.
3.SEE DETAIL #4 FOR TREE PLANTING
DETAIL
NONABRASIVE NYLON
WEBBING + GROMMET
THREE (2") TWO-INCH
LODGE POLE STAKES
DRIVE STAKE INTO
SUBGRADE 6"-12".
INSTALL APPX. 2" AWAY
FROM EDGE OF ROOT
BALL. STAKE LOCATION
SHALL NOT INTERFERE
WITH PERMANENT
BRANCHES. REMOVE 6
MONTHS AFTER
PLANTING UNLESS
OTHERWISE DIRECTED
BY LANDSCAPE
ARCHITECT.
NONABRASIVE NYLON
WEBBING + GROMMET
LODGE POLE STAKES
PREVAILING WIND
18" - 30"
PROVIDE GARDENHOSE,
OR GEOTEXTILE CUSION
BETWEEN CABLE AND
TRUNK
GARDEN SIDE PROJECT SIDE
2'1'NOTES:
1.SEE DETAIL #7 FOR PERENNIAL
PLANTING REQUIREMENTS
2.FINAL FENCE DETAIL TO BE
APPROVED BY ITHACA COMMUNITY
GARDENS
SEE PLANT
SCHEDULE
MESH TO CONTINUE TO 8'
BLACK COATED WIRE,
2 1/2" MESH TO PREVENT
GROUNDHOGS
1" MESH TO PREVENT
GROUNDHOGS AND RABBITS
- 3' TO BE BURIED
UNDERGROUND
MESH TO ONLY BE CONNECTED
AT 2' ABOVE GROUND,
1' TO REMAIN LOOSE
1" CRUSHER RUN STONE
UNDERGROUND BARRIER TO
BE BURIED STRAIGHT DOWN 1'
AND ANGLE SHARPLY AT 90° 2' AWAY
FROM THE GARDEN AREA
UN-COMPACTED SUBGRADE
2x6 DECKING
2x4 DECK "CURB"
1'Ø SONOTUBE
FOUNDATION, 3'
DEPTH MIN.
6x6 POST, TREATED FOR
GROUND CONTACT
6x6 POST
SLEEVE,
SUBMIT
HARDWARE
FRO APPROVAL
TOP VIEWFRAMING VIEW 2x12 ABUTMENT BOARD
TREATED FOR GROUND
CONTACT, TYP.
2x8 JOIST
2x6 JOIST
2x6 WOOD DECK PLANK
2x4 DECK "CURB"
SECTION VIEW7'-5"7'-5"2x6 JOIST
6x6 POST & 1'Ø
SONOTUBE FOOTING,
TYP.2'-7"4'-6" O.C. (POSTS)
6'
2x6 JOIST
2x8 JOIST2'-7"2x6 SPACER
1'-7" APPROX.3' MIN.2x4 DECK "CURB"PATHWAY SURFACING
2x6 DECKING
2x8 JOIST
2x12 ABUTMENT BOARD
TREATED FOR GROUND
CONTACT, TYP.
6x6 POST
OPEN
ELEVATION VIEW
PERENNIAL PLANTING DETAIL1SCALE: NTS
SHRUB PLANTING DETAIL2SCALE: NTS
TREE STAKING DETAIL3SCALE: NTS
STREET TREE PLANTING DETAIL5SCALE: NTS
TREE PLANTING DETAIL7SCALE: NTS
COMMUNITY GARDEN FENCE PLANTING DETAIL6SCALE: NTS
DWG NO:Cayuga ParkLANDSCAPE
DETAILS 1
DATE:
L 104
SCALE:
REVISION - DATE
N
3/5/2021
AS SHOWN
PEDESTRIAN FOOT BRIDGE DETAIL 4 SCALE: NTS
1'-6"4"3"6'-7"8'-1"17'-4"
STONE VENEER
CONCRETE LEDGE
CAPSTONE
4X4 CORNER POST
1X4 TRIM BOARD
1X4 TRIM BOARD
1X6 TRIM BOARD CAP
1X4 TRIM BOARD
1X6 PANEL
BOARDS @ 45°
OPENCLASP
2X2 SLATS (ALIGNS WITH AIR INTAKE)
4X4 POST4X4 POST
OPEN BETWEEN SLATS
2'-3"1'-6"3"6'-7"8'-1"1'-7"1'-7"
6'-8"
STONE VENEER
CONCRETE LEDGE
CAPSTONE
4X4 CORNER POST
1X4 TRIM BOARD
1X4 TRIM BOARD
1X4 TRIM BOARD CAP
1X4 TRIM BOARD
1X6 PANEL BOARDS
VERTICAL
OPEN
CARRIAGE BOLT, TYP.
4X4
POST
REMOVABLE
PANEL
1'-2"1'-2"9'
CONCRETE SLAB,
SEE CIVIL
STONE VENEER
CONCRETE
LEDGE
CAPSTONE
1X4 TRIM BOARD
1X4 TRIM BOARD
1X6 TRIM BOARD
CAP
CONCRETE
SLAB, SEE
CIVIL
SEE CIVIL FOR
FOUNDATION
GENERATOR
GENERATOR
GENERATOR
ACCESS
DOOR
W/ AIR
VENTS
CARRIAGE BOLT, TYP.
SEE CIVIL FOR
FOUNDATION6"PLAN VIEW
A1 A2
B1 B2
D1 D2
C1 C2SECTION
SECTION
ELEVATION
ELEVATION
GENERATOR
ACCESS
DOOR
W/ AIR
VENTS
17'-10"9'-8" (FOOTPRINT)7'-8" (SLAB)6'-8" (REMOVABLE PANEL)6' (CLEARANCE)B1 B2GENERATOR4'-6"12'-11"
A2
A1
4'-2"4'-2"D1 D2
C1
C2
NOTES:
1.CONFIRM GENERATOR DIMENSIONS PRIOR
TO START OF WORK.
PLAN VIEW
1%1%1%1%1%1%1%1%1%1%1%1%1%1%
1%1%1%1%
LP
CURB CURB
ASPHALT
6'x7'
DUMPSTER
TYP.
26' (FOOTPRINT)
B1
B1 B2
D1 D2
A2
A1
C1
C2
D2D1ELEVATION
SECTION
E2 E1
E1 ELEVATION
A1 A2
C1 C2
SECTION
ELEVATION
12' (FOOTPRINT)6' (O.C.)E.Q. (O.C.)6' (O.C.)E.Q. (O.C.)6' (O.C.)4'-6" (O.C.)STONE VENEER
CONCRETE LEDGE
CAPSTONE
1X4 TRIM
BOARD
1X4 TRIM
BOARD
1X6 TRIM
BOARD CAP
SUBMIT FOUNDATION SHOP
DRAWING FOR APPROVAL, TYP.
9"1'-6"3"6'-7"8'-1"9'-6"
STONE VENEER
CONCRETE LEDGE
CAPSTONE
6X6 GATE POST
1X4 TRIM BOARD
1X4 TRIM BOARD
1X4 TRIM BOARD
CAP
1X4 TRIM BOARD
1X6 PANEL BOARDS
@ 45°
OPEN
4X4 CORNER POST
STONE VENEER
CONCRETE LEDGE
CAPSTONE
4X4 CORNER
POST
1X4 TRIM BOARD
1X4 TRIM BOARD
1X4 TRIM
BOARD CAP
1X4 TRIM BOARD
1X6 PANEL BOARDS @ 45°
OPEN
STONE VENEER
CONCRETE LEDGE
CAPSTONE
1X4 TRIM BOARD
1X4 TRIM BOARD
1X6 TRIM BOARD
CAP
6" Ø STEEL GATE
POST. SUBMIT GATE
HINGE HARDWARE
FOR APPROVAL
SUBMIT FOUNDATION SHOP
DRAWING FOR APPROVAL, TYP.
SUBMIT FOUNDATION SHOP
DRAWING FOR APPROVAL, TYP.
6" Ø STEEL
BOLLARD, FILL W/
CONCRETE, TYP.
OPEN
CHAINLINK SWING GATE
PANEL W/ FABRIC PRIVACY
SCREEN. SUBMIT SCREEN
FOR APPROVAL
SWING GATE WHEEL,
TYP. SUBMIT FOR
APPROVAL
DROP-LOCK DEAD BOLT,
TYP. SUBMIT HARDWARE
FOR APPROVAL
CHAINLINK SWING
GATE-TO-WOOD POST
HINGE, SUBMIT
HARDWARE FOR
APPROVAL. TYP.
6" Ø STEEL GATE POST.
SUBMIT GATE HINGE
HARDWARE FOR APPROVAL
B2
E2
6'x7'
DUMPSTER
TYP.
6'x7'
DUMPSTER
TYP.
6'x7'
DUMPSTER
TYP.
6'x7'
DUMPSTER
TYP.
6'x7'
DUMPSTER
TYP.
6'x7'
DUMPSTER
TYP.
1X4 TRIM
BOARD
NOTES:
1.CONFIRM DUMPSTER DIMENSIONS PRIOR
TO START OF WORK.
GENERATOR ENCLOSURE DETAIL9SCALE: NTS
DWG NO:Cayuga ParkLANDSCAPE
DETAILS 2
DATE:
L 104.1
SCALE:
REVISION - DATE
N
3/5/2021
AS SHOWN
DUMPSTER ENCLOSURE DETAIL8SCALE: NTS