Loading...
HomeMy WebLinkAboutFP301 Riser DiagramTSTSTSTSTSTSTSTSTO FEED 5TH FLOORSPRINKLERSTO FEED 4TH FLOORSPRINKLERSTO FEED 3TH FLOORSPRINKLERSTO FEED 2ND FLOORSPRINKLERS6" REDUCED PRESSURE DETECTORASSEMBLY MAKE: WATTS 957 RPDARUN DRAIN TO BUILDING'SEXTERIOR AND TERMINATE24" ABOVE GRADE WITH 45°GALVANIZED ELBOW TURNEDDOWNRISER VALVE FORFIRST FLOORTO FIRE DEPARTMENTCONNECTION (FDC)6" COMBINEDSERVICE2 1/2" HOSE VALVE AT 4'-0" AFF ONINTERMEDIATE FLOORS. PROVIDEPRESSURE RESTRICTING HOSE VALVEON ALL FLOORS WHERE STATIC SYSTEMPRESSURE EXCEEDS 100 PSI (TYPICAL)2 1/2" HOSE VALVE AT 4'-0" AFF ONINTERMEDIATE FLOORS. PROVIDEPRESSURE RESTRICTING HOSE VALVEON ALL FLOORS WHERE STATIC SYSTEMPRESSURE EXCEEDS 100 PSI (TYPICAL)2 1/2" HOSE VALVE AT 4'-0" AFF ONINTERMEDIATE FLOORS. PROVIDEPRESSURE RESTRICTING HOSE VALVEON ALL FLOORS WHERE STATIC SYSTEMPRESSURE EXCEEDS 100 PSI (TYPICAL)FIRST FLOORSECOND FLOORTHIRD FLOORFOURTH FLOORROOFFIFTH FLOORFSFSFSTSFSTS803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 2:02:04 PMFP301RISERDIAGRAM02/05/20212018089AuthorCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1FIRE PROTECTION SCHEMATICGENERAL NOTES:A. COORDINATE ALL SPRINKLER MAINS, BRANCHES AND HEAD LOCATIONS WITH ALL OTHER TRADES.B. THE FIRE PROTECTION CONTRACTOR SHALL HYDRAULICALLY CALCULATE ALL SPRINKLER SYSTEMS AND SHALL SIZE THE PIPING ACCORDINGLY.C. PROVIDE FULL SPRINKLER COVERAGE FOR ALL CONCEALED SPACES PER NFPA 13.D. PROVIDE STANDPIPE HOSE VALVES AT 4'-0" AFF ON INTERMEDIATE FLOORS. PROVIDE PRESSURE RESTRICTING HOSE VALVE ON ALL FLOORS WHERE STATIC SYSTEM PRESSURE EXCEEDS 100 PSI.REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021