HomeMy WebLinkAboutE511 DetailsLIGHTING CONTROLPANEL SCHEDULEPANEL NAME VOLTAGE LOCATIONLCP-1 120 ELECT 142RELAYLOAD NAMEWATTS LOAD TYPE CIRCUIT NOTES1 EXTERIOR BLDG LIGHTS200 LED EP-1A/142,62 EXTERIOR BLDG LIGHTS435 LED EP-1A/152,63 1ST FLR CORRIDOR EM LTS 320 LED EP-1A/22,3,441ST FLR QUICK CARE WAITING EMLTS140 LED EP-1A/102,3,4,551ST FLR QUICK CARE CORRIDOREM LTS280 LED EP-1A/102,3,4,56 1ST FLR LOBBY EM LTS338 LED EP-1A/112,3,4,57 1ST FLR BLOOD DRAW LTS 220 LED PP1B/72,4,58 1ST FLR CORRIDOR LTS440 LED PP1B/52,49 QUICK CARE EXAM RMS560 LED SBP-1A/572,510 QUICK CARE CORRIDOR627 LED SBP-1A/582,4,511QUICK CARE LOBBY388 LED SBP-1A/592,4,5121ST FLR LOBBY506 LED PP1B/92,4,5131415SITE LIGHTING1856 LED PP1A/31,332,616SITE LIGHTING1624 LED PP1A/32,342,6NOTES1. SUNSET ON/ SUNRISE OFF2. OWNER PROVIDED OPERATION SCHEDULE3. DIM TO 20% AFTER HOURS4. OCCUPANCY SENSOR CONTROL5. LOCAL DIMMER STATION CONTROL6. PHOTOCELL ON, PHOTOCELL OFFGENERAL NOTESA. MASTER DIMMING PANEL FOR PROGRAMMING AND TIMESCHEDULING THE ENTIRE SYSTEM.B. COORDINATE DIMMING SCENES AND TIME SCHEDULESWITH OWNER.C. CONSTRACTOR SHALL CONFIRM WIRE SIZES WITHVOLTAGE DROP CALCULATIONS BASED ON INSTALLEDCIRCUIT LENGTHS.D. PROVIDE 0-10V CONTROL CARDS AS REQUIRED.E. PROVIDE CONTROL PROCESSOR WITH BATTERY BACKUPLIGHTING CONTROLPANEL SCHEDULEPANEL NAMEVOLTAGE LOCATIONLCP-2 120 ELECT 243RELAYLOAD NAMEWATTS LOAD TYPE CIRCUIT NOTES1 2ND FLR CORRIDOR/LOBBY EM LTS 600 LED EP-2A/32,3,4,52 2ND FLR CORRIDOR EM LTS 260 LED EP-2A/22,3,4,53WAITING 201 EM LTS100 LED EP-2A/22,3,4,54 2ND FLR CORRIDOR LTS300 LED PP2B/372,4,55 CIRCULATION CORRIDOR 207 520 LED PP2B/302,4,56NURSE 214 LTS120 LED PP2B/302,4,57WAITING 201 LTS220 LED PP2B/312,4,58 QUICK CARE EXAM RMS570 LED PP2B/292,5910111213141516LIGHTING CONTROLPANEL SCHEDULEPANEL NAME VOLTAGE LOCATIONLCP-3 120 ELECT 323RELAYLOAD NAMEWATTS LOAD TYPE CIRCUIT NOTES1 3RD FLR CORR EM LTS320 LED EP-3A/32,3,4,52 3RD FLR CORRIDOR EM LTS 288 LED EP-3A/32,3,4,533RD FLR RECEPTION/CIRCULATIONEM LTS400 LED EP-3A/32,3,4,54 3RD FLR CORRIDOR LTS540 LED PP3B/342,4,55 3RD FLR CORRIDOR LTS338 LED PP3B/312,4,56NURSE 317E52LED PP3B/312,4,57NURSE 317B250 LED PP3B/312,4,58 3RD FLR EXAM ROOMS343 LED PP3B/352,59 3RD FLR EXAM ROOMS441 LED PP3B/352,510 3RD FLR EXAM ROOMS196 LED PP3B/322,511CIRCULATION 300570 LED PP3B/332,4,51213141516LIGHTING CONTROLPANEL SCHEDULEPANEL NAME VOLTAGE LOCATIONLCP-5 120 ELECT 523RELAYLOAD NAMEWATTS LOAD TYPE CIRCUIT NOTES1 5TH FLR CORR EM LTS320 LED EP-5A/22,3,4,52 5TH FLR CORRIDOR EM LTS 288 LED EP-5A/32,3,4,535TH FLR RECEPTION/CIRCULATIONEM LTS400 LED EP-5A/42,3,4,54 5TH FLR CORRIDOR LTS540 LED PP5A/432,4,55 5TH FLR CORRIDOR LTS338 LED PP5A/452,4,56NURSE 517E52LED PP5A/452,4,57NURSE 517B250 LED PP5A/452,4,58 5TH FLR EXAM ROOMS343 LED PP5A/442,59 5TH FLR EXAM ROOMS441 LED PP5A/462,510 5TH FLR EXAM ROOMS196 LED PP5A/322,511CIRCULATION 500570 LED PP5A/472,4,512EXTERIOR SIGNAGELED PP5A/55213EXTERIOR SIGNAGELED PP5B/18214EXTERIOR SIGNAGELED PP5B/1921516LIGHTING CONTROLPANEL SCHEDULEPANEL NAMEVOLTAGE LOCATIONLCP-4 120 ELECT 430RELAYLOAD NAMEWATTS LOAD TYPE CIRCUIT NOTES1 4TH FLR ELEV LOBBY/CORR EM LTS 300 LED EP-4A/22,3,42 4TH FLR CORR EM LTS480 LED EP-4A/32,3,4,534TH FLR RECEPTION/CIRCULATIONEM LTS400 LED EP-4A/42,3,4,54 4TH FLR ELEV LOBBY/CORR LTS 400 LED SBP-4A/102,4,554TH FLR MULTI DISCPLINE CORRLTS140 LED SBP-4A/62,4,564TH FLR CORR LTS360 LED PP4B/232,4,57 4TH FLR EXAM RM LTS280 LED PP4B/232,58 4TH FLR EXAM RM LTS500 LED PP4B/222,59 4TH FLR PROCEDURE RM LTS 414 LED SBP-4A/462,510 REGISTRATION 402 LTS400 LED PP4B/212,4,511 IMAGING LOUNGE 401300 LED PP4B/212,4,51213141516TCTIMECLOCKASTRONOMIC, DIGITAL, 7 DAYLCP-1MASTER RELAY PANEL20A/1P120VLINE VOLTAGELIGHTING CIRCUITSCAT 6ALOADLOADDIMSDDIMMING MODULEDIGITAL SWITCHPCCPHOTOCELL MODULEPHOTOCELL PHOTOCELL(OPTIONAL) CAT 6ALCP-2SLAVE RELAY PANELLOADLOADLCP-3SLAVE RELAY PANELLOADLOADLCP-4SLAVE RELAY PANELLOADLOADCAT 6ALINE VOLTAGELIGHTING CIRCUITSLINE VOLTAGELIGHTING CIRCUITSLINE VOLTAGELIGHTING CIRCUITSSEQUENCE OF OPERATION:LIGHTS-ALL LIGHTS ARE DIMMABLE-EACH ZONE IS CAPABLE OF BEING CONTROLLED INDEPENDENTLY. ZONES TO BE FINALIZED BY OWNER.OCCUPANCY-LIGHTS AUTOMATICALLY TURN ON WHEN OCCUPANT ENTERS THE SPACE VIA LOCAL OCCUPANCY SENSOR OR INTEGRAL OCCUPANCY SENSOR. CONFIGURED TO 50% AUTO-ON-LIGHTS AUTOMATICALLY TURN OFF WHEN ROOM BECOMES VACANT VIA SET TIME ON LOCAL OCCUPANCY SENSOR OR INTEGRAL OCCUPANCY SENSOR. SHORT OFF TIME DELAY OF 1 MINUTE OR LESSMANUAL-MASTER ON/OFF & RAISE/LOWER CONTROL OF ENTIRE ROOM/ZONE-OPTIONAL ADDITIONAL CONTROL (ADD XCR 2PWH -DUAL ROCKER SWITCHES)CORRIDORS-DIM CORRIDORS TO 30% BRIGHTNESS DURING BUSINESS HOURS WHEN SPACE BECOMES VACANT VIA OCCUPANCY SENSOR.-CORRIDOR FIXTURES TO TURN OFF AFTER HOURS. SET BY OWNER.-CORRIDOR EMERGENCY FIXTURES TO DIM TO 20% AFTER HOURS FOR SECURITY NIGHT LIGHTING.LOBBY AND WAITING-AUTOMATIC OFF VIA DIGITAL TIMECLOCK-DIM TO 50% BRIGHTNESS DURING BUSINESS HOURS WHEN SPACE BECOMES VACANT VIA OCCUPANCY SENSOR-PROVIDE MANUAL CONTROL STATIONS AS NOTED IN "MANUAL" DESCRIPTION, SWITCHING SHOWN ON PLANS AND LIGHTING SYSTEM CONTROL NOTES.OFFICE AND CONFERENCE-AUTOMATIC OFF WHEN ROOM BECOMES VACANT VIA VACANCY SENSOR TIME DELAY-PROVIDE MANUAL CONTROL STATIONS AS NOTED IN "MANUAL" DESCRIPTION, SWITCHING SHOWN ON PLANS AND LIGHTING SYSTEM CONTROL NOTES.EXAM AND TREATMENT ROOMS- ROOMS TO HAVE TIME SCHEDULE OFF VIA DIGITAL TIMECLOCK TO TURN OFF FIXTURES AFTER HOURS PER OWNER SCHEDULE-PROVIDE MANUAL CONTROL STATIONS AS NOTED IN "MANUAL" DESCRIPTION, SWITCHING SHOWN ON PLANS AND LIGHTING SYSTEM CONTROL NOTES.EXTERIOR-SITE LIGHTING AND BUILDING MOUNTED LIGHTING TO BE CONTROLLED VIA DIGITAL TIMECLOCK AND PHOTOCONTROL. MOTION SENSORS TO BE PROVIDED ON FIXTURES OR REMOTE.-ADDITIONAL CONTROLS TO BE PROVIDED AS NOTED.-EXTERIOR BUILDING SIGNAGE TO BE CONTROLLED VIA DIGITAL TIMECLOCK.ADDITIONAL OPTIONS:-FOR EMERGENCY LIGHTING CONTROL ADD A VOLTAGE BARRIER TO MASTER PANELLIGHTING CONTROL SYSTEM NOTES1. INCLUDE ALL CONTROL STATIONS, POWER BOOSTERS, NETWORKING EQUIPMENT AND ALL OTHER ACCESSORIESAND WIRING REQUIRED FOR A COMPLETE SYSTEM.2. COORDINATE EXACT LOCATION , QUANTITY AND CONFIGURATION OF CONTROL STATIONS WITH OWNER.3. COORDINATE ALL TIME SCHEDULING AND SCENE PROGRAMMING WITH OWNER.4. COORDINATE EXACT DECORATIVE FIXTURE LAMPS AND LOADS TO BE CONTROLLED WITH INTERIOR DESIGNER AND ARCHITECT. MOST OF THE DECORATIVE FIXTURES ARE INCANDESCENT WITH LED LAMPS. COORDINATE FIXTURE WIRING WITH SPECIFIC LAMPS AND FIXTURES AND PROVIDE ANY NECESSARY ACCESSORIES FOR PROPER DIMMING OPERATION.5. MUST BE LISTED FOR USE WITH 0-10V LED. PROVIDE 0-10V CONTROL WIRES AS REQUIRED.6. FOLLOW MANUFACTURERS RECOMMENDED WIRING INSTRUCTIONS FOR MAXIMUM CABLE LENGTHS.7. EMERGENCY LIGHTING ZONES SHALL HAVE AUTOMATIC LOAD CONTROL RELAYS THAT SENSE NORMAL POWER FAILURE FROM THE NON-EMERGENCY LIGHTING ZONE IN THE SAME SPACE. SEE EMERGENCY LIGHTING CONTROL DIAGRAMS.8. LIGHTING CONTROL SYSTEM SHALL INTERFACE WITH FIRE ALARM SYSTEM TO BRING ALL LIGHTING ZONES TO FULL BRIGHTNESS DURING GENERAL ALARM.9. LIGHTING CONTROL SYSTEM SHALL ACCEPT PHOTOCELL INPUT FOR CONTROL OF EXTERIOR FIXTURES.10. ALL OCCUPANCY AND VACANCY SENSORS SHALL HAVE AN OFF DELAY OF 1 MINUTE.11. LIGHTING CONTROL SYSTEM TO BE OF THE FOLLOWING MANUFACTURERS:A. ILC LightLEEDerB. GREENGATE CONTROLKEEPERC. ACUITY BRANDS BLUE BOXLCP-5SLAVE RELAY PANELLOADLOADLINE VOLTAGELIGHTING CIRCUITS803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 1:59:27 PME511DETAILS02/05/20212018089AuthorCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1LIGHTING CONTROL DIAGRAMREVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021