HomeMy WebLinkAboutE502 DetailsDCS120VWEATHER CAPFURNISHED BY E.C.INSTALLED BY M.C.CRITICAL MUFFLERFURNISHED BY E.C.ENGINE STARTCONTACTTO LOAD (REFER TOPOWER ONE-LINEDIAGRAM FOR FEEDERAND CIRCUIT BREAKERSIZE).ATS-SBAUTOMATIC TRANSFERSWITCH WITH BATTERYCHARGER, EXERCISERCLOCK, AND LOADSEQUENCER BY E.C.TO NORMAL POWER SOURCE(REFER TO POWER ONE-LINEDIAGRAM FOR FEEDER ANDCIRCUIT BREAKER SIZE).EMERGENCY BREAK GLASSSTATION BY E.C. INTERLOCKGAS VALVE AND GENERATORSHUTDOWNEXHAUST PIPINGBY M.C.VIBRATION ISOLATORS BY E.C.GENERATOR MAINCIRCUIT BREAKER BY E.C.STARTING BATTERIES BY E.C.ENGINECRANKCASE HEATERGENERATORBACK DRAFT DAMPERWITH BIRD SCREENAIR DISCHARGE DUCTFLEXIBLE DUCTCONNECTION250KW/313KVA DIESEL EMERGENCY GENERATOR208Y/120V, 3PH, 4WGENERATORPAD BY E.C. TOMANUFACTURERS REC.BY-PASS DAMPERGENERATOR CONTROLPANEL BY E.C.GENERATOR DISTRIBUTION PANELGENDP BY E.C.REMOTE GENERATOR CONTROL PANEL BY E.C.REFER TO MECHANICALPLANS FOR CHANGES.CSENGINE STARTCONTACTTO LOAD (REFER TOPOWER ONE-LINEDIAGRAM FOR FEEDERAND CIRCUIT BREAKERSIZE).ATS-EMAUTOMATIC TRANSFERSWITCH WITH BATTERYCHARGER, EXERCISERCLOCK, AND LOADSEQUENCER BY E.C.TO NORMAL POWER SOURCE(REFER TO POWER ONE-LINEDIAGRAM FOR FEEDER ANDCIRCUIT BREAKER SIZE).32 HOUR SUB-BASE FUEL TANKSOUND ATTENUATED WEATHERPROOF ENCLOSUREEXHAUST SCOOPW/ BIRD GUARD ANDDUCT DRAINNOTE:PITCH MUFFLER SLIGHTLYTO ENCOURAGE CONDENSATIONTO RUN AWAY FROM ENGINE.ALL EXHAUST PIPING INCLUDINGINSULATION SHALL BE BY FACTORYMOUNTED AND INSTALLED.1.2.MIN.MIN.8"6"NOTE: PITCH SLAB @ 1/8"/FT. AWAY FROM BUILDING.OVERALL PAD DIMENSIONS SHALL BE 15'-7"x5'-6".2'-0" 1'-0" 1'-0" 2'-0"(2) LAYERS OF 1" RIGID INSULATION(STAGGER JOINTS) TYP. UNDERSLAB12" CRUSHED STONE STUB BASECOMPACTED IN TWO LIFT. MIN.95%1" FILLET(1) #4 BAR @ PERIMETER(PROVIDE & INSTALLCORNER BARS)6" THICK 4000 PSI CONCRETE SLABW/6x6 #6 MESH MIDPOINT OF SLABPAVEMENT ON FIN. GRADE REPAIRTO MATCH EXIST. AFTER PAD ISCONSTRUCTED.CAST IRON LIDWITH SECURITY BOLTSGRADEGROUND RING#2 AWG, SOLID TINNED BARE COPPER WIRECLEAN SAND FILLPVC PIPE TO BE SLOTTEDAT BOTTOM STRADDLING GROUND RING30" MINIMUMNOTES:1. READ THE SPECIFICATIONS2. REPAIR ALL SETTLEMENT3. MINIMUM TOP SOIL-6".PAVING OR TOPSOIL TOMATCH SITE CONDITIONS5/8 " x 8'-0" COPPERGROUND ROD803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 1:59:05 PME502DETAILS02/05/20212018089RSCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1EMERGENCY GENERATOR SCHEMATIC2EMERGENCY GENERATOR PAD DETAIL3INSPECTION WELL DETAILREVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021