Loading...
HomeMy WebLinkAboutE101 First Floor Power & Systems PlanREF.FACPATSATSFFF F FFFFFFFFFFFFFFFT V T V TVTVFFF F FFFFFFF FFFFFFFFFFFFFFFFFT V SSSSSSSSSSSSSSSSSF FFFSSSSSSSSSSSSSSSF R A P FFFFFFJJJMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMTVMMMMMMMMMMMSHSHF MMJDHDHDHDHCRCRJCRJDHFFE NENM MJMMMWASTEHOLDING136PUBLICTOILET100AEVS109EXAM121EXAM120EXAM115EXAM114PoSPATIENTTOILET105CCLEANLINENHOLDING137TRIAGE/INTERVIEW106STAFFTOILET103EXAM116STORAGE144WATERSERVICE146SUPPLYCHAINAREA138EVSSUPPLY&EQUIPMENT139MAINELECTRICAL142EMERGENCYEQUIPMENTROOM141MAINSERVER140VESTIBULE100V2VESTIBULE100V1EXAM112SOILEDWORK111EXAM118CLEANSUPPLY134STAFFBREAK133SOILED132REGISTRATION124INCOMING FEEDERMETERING SECTIONDISTRIBUTION SECTIONMAIN BREAKERPP1BPP1ADP1GDPSBDPEMDPATS-SBATS-EMEP-1ASBP-1ACORRIDOR122151515151515WPWP15151515151515151515151515303030301515151515151515151515151515151515SPECIMENTOILET127HOLDING/MAIL100CVITALSALCOVE105ACIRCULATION105CIRCULATION105CIRCULATION105SUB-WAITING105BSTAIR2ST2-1BLOODDRAW130BLOODDRAW129BLOODDRAW(PoS)128WAITING/CIRCULATION123CORRIDOR135LABORATORY126STAFFTOILET131MAINLOBBY100EVS125RADIOLOGY(X-RAY)119CORRIDOR143TREATMENT117EXAM113STATLAB/MED110CLEANHOLDING107SHAREDPROVIDEROFFICE104STAFFBREAK102BUILDINGMAINTENANCETOILET/SHOWER138A60"ACACAC172"AC60"1ACAC AC15AC48"48"48"ACACACAC60"ACACACACACACACACAC ACACACIN PITIN PIT2ACAC ACAC148"48"AC15AC48"48"48"3060"172"1ACAC AC21530222151515151515 ACACUSBUSBUSBUSBUSBUSBUSBUSBUSBUSB USBAC3USBUSBWPWPWPWPWPWP444RECEPTION101BLOBBY/WAITING101VISITORTOILET101APUBLICTOILET100BHWH-1AHWRP-1ADFC-07BDFC-15BDFC-09BDFC-07ADFC-15ADFC-05IDFC-18ADFC-09SDFC-05GDFC-05HDFC-15EDFC-07DDFC-05CDFC-12RDFC-05BDFC-05FDFC-05DDFC-15DDFC-12BDFC-05ADFC-09RDFC-12ADFC-24BDFC-24ADFC-30ASBP-1A/48SBP-1A/55PP1A/19SBP-1A/41PP1A/25SBP-1A/3SBP-1A/14SBP-1A/12SBP-1A/51SBP-1A/17SBP-1A/18PP1A/9SBP-1A/22PP1A/22SBP-1A/4SBP-1A/8SBP-1A/13PP1A/16PP1A/14PP1A/15PP1A/13PP1A/12PP1A/27EP-1A/3PP1A/4PP1A/3PP1A/6PP1A/5PP1B/15PP1A/2PP1A/23EP-1A/3PP1A/28EP-1A/4PP1A/7PP1A/24PP1A/20SBP-1A/43SBP-1A/44ACPP1A/16PP1A/16PP1A/15PP1A/15PP1A/1PP1A/1PP1A/7PP1B/6PP1A/1PP1A/8PP1A/8PP1A/10PP1A/18SBP-1A/4SBP-1A/46SBP-1A/47SBP-1A/47SBP-1A/49PP1B/4PP1A/30EP-1A/6BS-13DBP-1CUH-1ASBP-1A/20SBP-1A/21SBP-1A/23BS-1PP1B/3PP1B/1PP1B/2PP1B/23PP1B/24 PP1B/25PP1B/8BS-454"54"54"48"SBP-1A/2BS-2BS-3PP1A/2948"30PP1A/9SBP-1A/16SBP-1A/42ACSBP-1A/24SBP-1A/52SBP-1A/53 SBP-1A/54SBP-1A/50ACPP1A/2172"1SBP-1A/45PP1B/12PP1B/14PP1B/13SBP-1A/448"SBP-1A/11SBP-1A/10SBP-1A/92E101PROVIDE (4) 4" HILTI FIRESTOP SPEED SLEEVES, CP 653 SERIESPROVIDE (4) 4" HILTI FIRESTOP SPEED SLEEVES, CP 653 SERIES, TO SECOND FLOORBS-14PP1A/17548"48"BS-6BS-7BS-8BS-11BS-12BS-10BS-548"5548"548"5548"548"48"48"55548"5BS-9PP1B/17AC-18AAC-18BAC-18CESP-1AESP-1BTWO-WAY COMMUNICATION HEADENDEP-1A/9FIRE BELLAC-2AC-14EP-1A/3SBP-1A/16SBP-1A/16EP-1A/3SBP-1A/156SBP-1A/3764EP-1A/34EP-1A/36SBP-1A/38SBP-1A/3966SBP-1A/40661515T-X1T-X24EP-1A/11E601PP1A/1148"48"SBP-1A/56BF-1ATSFTSTSTSTSTSLCP-178888888SD9SD9SD9SD9SD9SD9SD9SD9SD9SD9SD9SD9SD9SD98GROUND BARPROVIDE 3/4" FIRE TREATED PLYWOOD BACKBOARD FROM 2' AFF TO CEILING ON WALL SHOWN, PAINT GRAYL6-30R TWISTLOCK,(TYPICAL OF 6)SBP-1A/5PP1A/16SBP-1A/7SBP-1A/6PROPOSED RACKS BY OTHERSSBP-1A/25,27SBP-1A/26,28SBP-1A/29,31SBP-1A/30,32SBP-1A/33,35SBP-1A/34,36PROVIDE (4) 4" HILTI FIRESTOP SPEED SLEEVES, CP 653 SERIESPROVIDE (4) 4" HILTI FIRESTOP SPEED SLEEVES, CP 653 SERIES803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 1:56:24 PME101FIRST FLOORPOWER &SYSTEMS PLAN02/05/20212018089RSCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGDRAWING NOTES:1GENERAL NOTES:A. INSTALL CONDUIT PERPENDICULAR, PARALLEL, AND TIGHT TO STRUCTURE COLUMNS AND BEAMS. COORDINATE EXPOSED CONDUIT ROUTING WITH ARCHITECT AND ENGINEER.B. LABEL CONDUIT PER SPECIFICATION.C. PROVIDE TYPE WRITTEN PANELBOARD SCHEDULES FOR ALL PANELS. D. PROVIDE BLANK COVERPLATES ON ALL UNUSED OUTLET BOXES.E. PROVIDE 4 11/16" SQUARE OUTLET BOX WITH 2-GANG MUD RING FOR ALL VOICE/DATA OUTLETS SHOWN. PROVIDE 1" CONDUIT FROM OUTLET BOX TO ACCESSIBLE CORRIDOR CEILING SPACE. PROVIDE PLASTIC BUSHINGS ON BOTH ENDS OF CONDUIT. IN AREAS WHERE CABLE TRAY IS IN CORRIDORS, RUN CONDUIT TO CABLE TRAY. PROVIDE #6 BONDING WIRE BETWEEN CONDUIT AND CABLE TRAY. COORDINATE INSTALLATION WITH TELECOMMUNICATIONS DEPARTMENT. PROVIDE PULL STRINGS IN ALL VOICE/DATA OUTLETS.F. COORDINATE ALL CONDUIT RUNS WITH OTHER TRADES PRIOR TO ROUGH-IN. RELOCATE ANY CONDUITS AS NECESSARY TO PERMIT INSTALLATION OF DUCTWORK OR PIPING.G. REFER TO ARCHITECTURAL ELEVATIONS FOR DEVICE LOCATION AND MOUNTING HEIGHT PRIOR TO ROUGH-IN.H. FIRESTOP ALL PENETRATIONS THROUGH FIRE AND SMOKE WALLS.I. ALL WIRING SHALL BE PLENUM RATED.J. PROVIDE TAMPERPROOF RECEPTACLES FOR ALL RECEPTACLES SHOWN IN CORRIDORS, LOBBIES, AND STAIRWELLS.K. ALL RECEPTACLES IN PATIENT CARE AREAS SHALL BE HOSPITAL GRADE TAMPER-PROOF EQUAL TO HUBBELL HBL8300 SERIES. NORMAL RECEPTACLES SHALL BE COLOR BY ARCHITECT, RECEPTACLES CONNECTED TO EP PANELS SHALL BE RED.L. FOR BUILDING ACCESS CONTROL SYSTEM THE ELECTRICAL CONTRACTOR SHALL RUN ALL REQUIRED CABLING AS DIRECTED AND SHOWN IN DETAILS. ELECTRICAL CONTRACTOR SHALL INSTALL ALL FIELD HARDWARE PROVIDED BY THE DOOR HARDWARE SUPPLIER AND TERMINATE ALL CABLING AT DEVICES AS REQUIRED.COORDINATE TV OUTLET & RECEPTACLE HEIGHT WITH OWNER PRIOR TO ROUGH-IN.PROVIDE 120 VOLT CONNECTION FOR ELECTRIC WATER COOLER. COORDINATE ROUGH-IN WITH PLUMBING CONTRACTOR.PROVIDE 120V POWER CONNECTION TO ELECTRIC FIREPLACE. PROVIDE 2-GANG OUTLET BOX ABOVE DOOR ON SECURE SIDE FOR FUTURE CONNECTION OF SECURITY DEVICES. PROVIDE 3/4" CONDUIT TO DOOR FRAME AND ROUGH (1) 3/4" CONDUIT WITH SINGLE GANG BOX AT 46"AFF IN ACCESSIBLE WALL. PROVIDE BLANK PLATE. PROVIDE 120V CIRCUIT FROM NEAREST EMERGENCY PANEL. COORDINATE FINAL ROUGH-IN LOCATION WITH SECURITY SYSTEM VENDOR.PROVIDE 120V RECEPTACLE AT 48" AFF FOR INTEGRATED WALL SYSTEM. COORDINATE FINAL LOCATION WITH OWNER PRIOR TO ROUGH-IN.PROVIDE 120 VOLT CONNECTION TO POWERED DOOR OPERATOR. PROVIDE ALL REQUIRED CONNECTIONS TO CONTROLS, PUSHPLATES AND INTERLOCKS AS REQUIRED BY MANUFACTURER.PROVIDE RATH SMART RESCUE BASE STATION FOR TWO-WAY COMMUNICATION SYSTEM ADJACENT TO THE FIRE ALARM ANNUNCIATOR. COORDINATE FINAL LOCATION WITH AHJ. EC TO PROVIDE ALL CODE REQUIRED SIGNAGE.ALL TOILET ROOM WATER CLOSETS SHALL HAVE SENSOR OPERATED FLUSH VALVES. ENTIRE SENSOR ASSEMBLY SHALL BE FURNISHED BY THE PLUMBING CONTRACTOR. ELECTRICAL CONTRACTOR SHALL INSTALL ALL DEVICES PER MANUFACTURER'S RECOMMENDATIONS. COORDINATE INSTALLATION WITH PLUMBING CONTRACTOR AND TILE CUTTERS. PROVIDE 120 VOLT CONNECTION AS SHOWN. PROVIDE ALL ADDITIONAL CONDUIT AND WIRING AS REQUIRED TO CONNECT EACH WATER CLOSET. CIRCUIT TO NEAREST RECEPTACLE CIRCUIT.FURNISH DUCT SMOKE DETECTOR FOR INSTALLATION BY MECHANICAL CONTRACTOR. PROVIDE ALL NECESSARY CONNECTIONS AT FIRE ALARM SYSTEM. MAKE CONNECTION AS REQUIRED SUCH THAT DAMPER WILL CLOSE UPON ACTIVATION OF DUCT SMOKE DETECTORN3/16" = 1'-0"1FIRST FLOOR POWER & SYSTEMS PLAN2341/4" = 1'-0"2ENLARGED MAIN SERVER ROOM56789REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021