HomeMy WebLinkAboutE100 Site PlansPOSTPOSTMB ON WALKRAILROAD TRACKRAILROAD TRACK2"GM 2"GM 2"GM DASHED WHITE LANE STRIPESOLID WHITENOTE:YELLOW CENTER MEDIAN STRIPE POINTS LOCATED INFIELD 02.06.19 DO NOT MATCH SITE PHOTOGRAPHSYELLOW CENTER MEDIAN STRIPEDASHED WHITELANE STRIPESONW INV. 8'PVC 384.92139 LF 8"PVC ST. @ 0.37%188 LF 36"RCP SAN. @ 0.01%310 LF 36"RCP SAN. @ 0.11%185 LF 36"RCP SAN. @ 0.30%207 LF 36"RCP SAN. SEWER6' CHAIN LINK FENCEEDGE OF ASPHALT PAVEMENTEGUY WIRES (TYPICAL)NYSE&G #8NYSE&G #9NYSE&G NO#NYSE&G #7ONE STORY MASONRY BLDG.PPPPBKPPPPâ„„ SEVENTH STREET(UNOPENED STREET)BIO R ETEN TIO N G .I.#3BIO RETENTION G.I.#3B IO RETEN TIO N G .I.#3BIO RETENTION G.I.#1BIORETENTIONG.I. #5BIORETENTIONG.I. #4BIORETENTIONG.I. #7B4/23BUILDING C4/2 STORIES MIXED USE64 UNITS23,678 SF FOOTPRINTWATERLINEEASEMENTINSTRUMENT#2016-02718 &573432-001250KW/312.5KVADIESEL GENERATOR6" CONCRETE PADPROTECTIVE BOLLARDSEV CAR CHARGINGPROVIDE (2) 1 1/2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 1 1/2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 1 1/2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIED(9)4" SCHEDULE 80 PVC CONDUITS, DIRECT BURIED, TO UTILITY TRANSFORMERPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIED1PROVIDE (3)4" SCHEDULE 80 PVC CONDUIT FOR GENERATOR FEEDERS AND (3)1 1/2" SCHEDULE 80 PVC CONDUIT FOR CONTROLS, BLOCK HEATER AND BATTERY CHARGER, DIRECT BURIED34EP-1A/8EP-1A/755555588884444REFER TO CIVIL DRAWINGS FOR FIXTURE TYPE, POLE, AND BASE. (TYPICAL)PP1A/31,33 PP1A/32,34GROUND GRID8PROVIDE 1 1/2" SCEDULE 80 PVC CONDUITS, DIRECT BURIEDPROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIED44PROVIDE 2" SCEDULE 80 PVC CONDUITS, DIRECT BURIED803573SNSEWYORKOFETAT SSOIANLEOFPRLI C E N S E DREENIGN ETRASS N EJ.CIRER EXCELSIOR°°°°°°°°DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design1112HI1112HI619 West State StreetIthaca, New York 14850132 E. Jefferson StreetSyracuse, New York 13202p 607 273 7600 www.holt.com2/10/2021 1:56:12 PME100SITE PLAN02/05/20212018089RSCayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1" = 30'-0"1SITE PLANDRAWING NOTES:1PROVIDE (2)40A, 208V, SINGLE PHASE CIRCUITS FOR CAR CHARGING STATION. FEED EACH CIRCUIT WITH 3-#3 & 1-#10EG IN 1" CONDUIT. PROVIDE 1" SCHEDULE 80 PVC CONDUIT WITH PULLSTRING FOR NETWORK CABLE.PROVIDE (3)4" SCHEDULE 80 PVC CONDUIT FOR GENERATOR FEEDERS AND (1)1 1/2" SCHEDULE 80 PVC CONDUIT FOR CONTROLS, DIRECT BURIED.PROVIDE 2-#12, 1-#12EG, 1" CONDUIT FROM 20A/1P CIRCUIT BREAKER IN PANEL SHOWN AND MAKE REQUIRED CONNECTIONS AT BLOCK HEATER.PROVIDE 2-#12, 1-#12EG, 1" CONDUIT FROM 20A/1P CIRCUIT BREAKER INPANEL SHOWN AND MAKE REQUIRED CONNECTIONS AT BATTERY CHARGER.PROVIDE 1" SCHEDULE 80 PVC CONDUIT TO LIGHT POLE FOR FROM BUILDING FOR LOW VOLTAGE SECURITY CABLING.234A. A.THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL ELECTRICAL CONDUIT, MANHOLES, CABLE, AND TERMINATIONS.B. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL COMMUNICATIONS CONDUIT AND HANDHOLES.C. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE PROPER UTILITIES INCLUDING ALL UTILITIES PRIVATELY OWNED AND STAKING OUT ALL UTILITIES PRIOR TO BEGINNING ANY WORK. VERIFY ALL UTILITY LOCATIONS PRIOR TO TRENCHING TO AVOID DAMAGE TO EXISTING UTILITIES. SPRAY PAINT LOCATION OF UTILITIES ON ASPHALT AND CONCRETE AND PROVIDE STAKES ON GRASS OR DIRT SURFACES. REMOVE SPRAY PAINT FROM ASPHAULT AND CONCRETE ONCE PROJECT IS COMPLETE.D. HAND EXCAVATE WHERE NECESSARY TO AVOID CAUSING DAMAGE TO EXISTING UTILITIES AND SERVICES. PROVIDE OWNER WITH 7 WORKING DAYS NOTICE OF ANY SHUTDOWNS.E. COORDINATE ALL CUTTING AND PATCHING OF SIDEWALKS AND DRIVEWAYS WITH GENERAL CONTRACTOR PRIOR TO BEGINNING CONSTRUCTION. E.C. IS TO REPAIR ALL EXISTING ASPHAULT AND CONCRETE AS REQUIRED FOR INSTALLATION OF CONDUITS.F. ALL EXCAVATION AND BACKFILL FOR THE ELECTRICAL SITE WORK IS BY THE ELECTRICAL CONTRACTOR. COORDINATE ALL WORK WITH THE SITE CONTRACTOR.G. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC MAINTENANCE AND SAFETY, ASPHALT CUTTING, EXCAVATION, BACKFILL, SEEDING AND CONCRETE WORK REQUIRED FOR THE INSTALLATION OF ELECTRICAL WORK. ALL REPAIR SHALL BE BY THE ELECTRICAL CONTRACTOR AFTER ALL ELECTRICAL WORK IS COMPLETE.H. ROUTE ALL CONDUIT PENETRATIONS SHOWN UNDER BUILDING FOUNDATIONS TO EACH BUILDINGS MECHANICAL SPACE.I. ALL WIRING SHALL CONFORM TO THE NATIONAL ELECTRIC CODE.J. PROVIDE 5/8" DIAMETER x 8' COPPERWELD GROUND ROD AT EACH POLE LOCATION.GENERAL NOTES:5REVISION SCHEDULENAME DATEReceived by DiMarco 2/15/2021