Loading...
HomeMy WebLinkAboutC106 Layout Plan101010COMPACTCOMPACTS 35°56'24" W MAPS 33°47'35" W MAP453.73'S 23°34'32" W MAP279.30'225.43'228.30'NORTH MEADOW STREET (NYS ROUTE 13)CARPENTER PARKMATCH LINEMATCH LINE MATCH LINE S 35°56'24" W MAPMATCH LINE 0+001+002+002+96BIO RETENTION G.I. #3BIO RETENTION G.I. #3BIO RETENTION G.I. #3COMMUNITY GARDENS4551019496341051FIRE APPARATUS DRIVE15181695'R5'R 1245'R5'R4'R4'R4'R54/2 STORIES MIXED USE23,678 SF FOOTPRINT8.1'8.1'13.5' 11'8.5'8.5'26'25.4'18'20'18'18'20'26'8'8'22'12.2'8'22'5'24'5'17'18'8'22'20'37.1'8.5'2 7 '18'18'24'24'60'27'8. 5 '242.5'66.5'5'24'64.4'120'130'278'288'FIRE APPARATUS DRIVE4'R8'RCARPENTER DRIVEFIRE APPARATUS DRIVEXXXXXXXXXXXXXX X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX5+006+007+008+009+0010+00620'R5'R 1 0 ' R 10'R3'R10'R25'R43'R3'R5'R4'R4'R4'R4'R5'R5'R5'R5'R20'R20'R5'R5'R25'R 25'R5'R5'R5'R5'R5'R5'R38'R 59'R 5'R5'R43'R10'R4'R8'R20'R 20'R5' R 5'R5'R7'R10'R 5'R 43'R 2 0 ' R 5'R5'R10'R5'R10'R1 0 ' R5'RPROPOSED PROPERTYLINEPROPOSED PROPERTYLINE25'RPROPOSEDCROSSWALK. SEEDETAIL. (TYP.)PROPOSED 6' WIDESIDEWALKPROPOSEDPROPERTYLINE6" CURB ISLAND6.5' TRANSITIONCURB (TYP.)FLUSH HEADERCURB (TYP.)3' TRANSITIONCURB (TYP.)3' TRANSITION TOGRADE (TYP.)PROPOSED 6"REVEAL CURBPROPOSED CONCRETEPLAZA AREAPROPOSED PUBLICSIDEWALK (TYP.)PROPOSEDSIDEWALK (TYP.)ACCESS RAMP WITH DETECTIBLEWARNING. SEE DETAIL. (TYP.)PROPOSEDHANDICAPPARKINGSIGNAGE (TYP.)PROPOSED ACCESSRAMP WITH DETECTABLEWARNING (TYP.)PROPOSED ACCESSRAMP WITH DETECTABLEWARNING (TYP.)STRIPED HATCH ARE PAVEMENT AREASTO BE MILLED AND RESURFACEDPROPOSED FENCINGON PROPERTY LINEPROPOSED EDGE OFCONCRETE AND FENCINGON PROPERTY LINEPROPOSED EDGE OFCONCRETE AND FENCINGON PROPERTY LINEPROPOSEDFENCING ONPROPERTY LINEPROPOSED FENCINGON PROPERTY LINEPROPOSED BIKE RACK28.5'117BIO RETENTION G.I. #1BIO RETENTIONG.I. #2BUILDING B4/2 STORIES MIXED USE102 UNITS37,459 SF FOOTPRINTELEVATEDBOARDWALKCOMMUNITY GARDENSPROPOSED SPLITRAIL FENCEEND PROPOSEDSPLIT RAILFENCEPROPOSED ELEVATEDCROSS WALK SEEDETAIL (TYP.)HEAVY DUTY PAVEMENTSECTION SEE DETAIL (TYP.)LIGHT DUTY PAVEMENTSECTION SEE DETAIL (TYP.)HEAVY DUTY PAVEMENTSECTION SEE DETAIL (TYP.)PROPOSED ELEVATEDCROSS WALK SEEDETAIL (TYP.)HEAVY DUTYPAVEMENT SECTIONSEE DETAIL (TYP.)PLANTER BOXES (TYP.)6'37.1'20.4'110.6'27.7'4.3'GREEN SPACEGREEN SPACEGREEN SPACEFDC (TYP.)BIKE RACK(TYP.)BIKE RACK(TYP.)GREEN SPACE(TYP.)PROPOSED STOP SIGNAND 18" WIDE WHITEREFLECTIVE EPOXYPAINT STOP BARNO LEFTTURN SIGNDO NOTENTER SIGNAND SIGNPOSTDO NOTENTER SIGNAND SIGNPOST45.1'GREEN SPACE(TYP.)BIKE RACK(TYP.)BIKE RACK(TYP.)5'RXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X XXXXNo.RevisionsARTICLE 147 SECTION 7307. THESE PLANS ARE COPYRIGHT PROTECTEDVIOLATION OF STATE EDUCATION LAW ARTICLE 145 SECTION 7209 ANDUNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS INcDateByDescriptionSheet No.Project No.DateDrawing No.Scale:Designed byProject ManagerPrincipal-in-ChargePASSERO ASSOCIATESClient:StampPASSERO ASSOCIATESEngineeringwww.passero.comArchitecture224 West Main Street, Suite 100(585) 325-1000Rochester, New York 14614Fax: (585) 325-1691PARK GROVE REALTY, LLC46 PRINCE STREETROCHESTER, NY 14607Jess Sudol, PEMatthew NewcombTrevor Haut, EITCAYUGA PARKCITY OF ITHACATOMPKINS COUNTYSTATE OF NEW YORK20172440.0001AUGUST 2020CITY OF ITHACASITECAYU G A I N L E T N M E A D O W S TCASCADILLA ST3R D S T E X N 3RD STADAMS STADAMS S T4TH ST5TH STHANCOCK S T MADISON S T MORR I SAVEN F U L T O N S T OLD TAUGHANNOCK BLVDDRAWING INDEXC101 COVERC102 - 104 EX. CONDITIONS & DEMO PLANC105 - 107 LAYOUT PLANC108 - 110 UTILITY PLANC111 - 113 GRADING PLANC114 PROFILESC115 - 117 LIGHTING PLANC201 - 203 DETAILSNOT FOR CONSTRUCTIONLAYOUT PLANC 10661" = 20'LEGEND:PROPOSED PARKING COUNTPROPOSED BUILDINGPROPOSED CONCRETEPROPOSED CURBEXISTING CENTER LINE ROADPROPERTY BOUNDARYSETBACKPROPOSED EASEMENT LINEPROPOSED SIGNPROPOSED LIGHT POLERIGHT OF WAYEXISTING EASEMENT LINEEXISTING SIGN14PROPOSED FENCEPROPOSED ACCESS RAMPPROPOSED PAVEMENT STRIPINGPROPOSED BUILDING MOUNTED LIGHT00201040SCALE: 1"=20'HORIZONTAL SCALE20APPROVALSCOMMISSIONER OF PUBLIC WORKSTOWN ASSESSORFIRE MARSHALHIGHWAY SUPERINTENDENTPLANNING BOARD CHAIRMANAPPROVED BY DATEAPPROVED BY DATEAPPROVED BY DATEAPPROVED BY DATEAPPROVED BY DATEPROPOSED HEAVY DUTY PAVEMENTPROPOSED LIGHT DUTY PAVEMENT