Loading...
HomeMy WebLinkAboutA742 Fourth Floor Finish Plan Sector 2DN UP UP SECTOR 1 SECTOR 2 CORNER GUARD 7'-0"H U.O.N. (TOP @ 7'-4" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT WINDOW SHADES HANDRAIL. SEE ELEVATIONS FOR ADDITIONAL INFORMATION P2 ACCENT WALL PAINT COLOR SS1 PL2 WC CT E C MILLWORK FINISH KEY: PL1 WD1 WALL CABINET FINISH COUNTERTO P FINISH COUNTERTOP EDGE TALL OR BASE CABINET FINISH ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. SAW1 TACKABLE ACOUSTIC SURFACE WS1 HR1 RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS) RB1 CG1 EG2 WALL COVERINGWC1 RIGID VINYL WALL PROTECTION WP1 MINARAL PROFILE FEATURE PANEL MP1 BACK-PAINTED GLASS PANEL PS1 PULL SIDE * REFER TO ELEVATIONS MATERIAL FINISH KEY: NOT ALL MAY APPLY CERAMIC TILE ACCENT CT1 WC6 WC6 WC6 WP1 CG2 CG2 CG1 CG1 CG1 CG2 CG2 CG1 CG1 CG1 CG1 CG1 CG1 CG2 CG2 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG1CG1 WC CT E C E1 SS1 WC CT E C E2 PL1 PL5 WC CT E C E1 PL1 SS1 WC CT E C E2 PL5 WC CT E C E1 SS1 WC CT E C PL2 E2 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1SECTOR 1SECTOR 2SECTOR 2SECTOR 1GOWNING B1 P1 CPT3 418A ULTRASOUND (GUIDED BIOPSY) B1 P1 RT1 415 MEN'S SUB-WAIT B1 P1 CPT3 418 EVS B1 P1 RT1 417 PATIENT TOILET CT1 P1 CT1 418B WC CT E C E2 PL5 WC CT E C E2 PL5 DIAGNOSTIC RADIOGRAPHY B1 P1 RT1 416 PATIENT TOILET CT1 P1 CT1 413 PATIENT TOILET CT1 P1 CT1 415A STAFF TOILET CT1 P1 CT1 414 CIRCULATION B1 P1 RT2 412 NURSE/TECH STATION B1 P1 RT2 411 GOWNING 2 B1 P1 CPT3 407C GOWNING 3 B1 P1 CPT3 407D WOMEN'S CIRCULATION B1 P1 CPT3 407 GOWNING 1 B1 P1 CPT3 407A PATIENT TOILET CT1 P1 CT1 407B CIRCULATION B1 P1 RT1 406 MULTIPURPOSE/ CONSULT B1 P1 CPT3 405 PUBLIC TOILET CT1 P1 CT1 400B STORAGE B1 P1 RT1 404 PRACTICE MANAGER B1 P1 CPT3 403 PUBLIC TOILET CT1 P1 CT1 400A REGISTRATION B1 P1 CPT3 402 ELEVATOR LOBBY & PUBLIC CORRIDOR B1 P1 RT1 400 MP1 MP1 MP1 CT2 CT2 CT2 CT3 CT3 STAIR 1 TT1 P1 TT1 ST1-4 CT2 CT3 HOLDING BAY 1 B1 P1 RT2 412A HOLDING BAY 2 B1 P1 RT2 412B CT2 CT3 CT2 CT3 RESULTS ALCOVE TT1 P1 TT1 410 STAIR 3 TT1 P1 TT1 ST3-4 WC CT E C E2 PL5 WC CT E C E2 PL5 WC CT E C E2 PL5 IMAGING GUEST LOUNGE/WAITING B1 P1 401 CPT3/4 & RT1 P11 P13P13P13P11P13P13P11 P12 P12 P11 P12 P12P11P11P11P11P11P11P11P11P13P13P13P11 P11 P11 P13P13P13P11 P12 P12 P11P11 WC CT E C E1 SS1 MEN'S CIRCULATION B1 P1/WP2 RT1 422 CG1 CG2 CG2 CG1 CG2CG2 CG1 CG1 CG1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1WS1WS1 WS1WS1 WOMEN'S CIRCULATION B1 P1/WP2 RT1 425 WC CT E C E1 SS2 WC CT E C E1 PL1 SS1 P11 PL1 PL1 A1 A550 ________________________________________________ A10 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ E4 A550 ________________________________________________ A1 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ R T 2 R T 1 E4 A550 ________________________________________________ WP1 WP1 WP1 WP1 WP1 WP1 CT2 CT3 WP1 A1 A550 ________________________________________________ A10 A550 ________________________________________________ E10 A550 ________________________________________________ A1 A550 ________________________________________________ WP1 WP1 WP1 WP1 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 CG1 P11P13 AT COLUMNS, P19 AT LOW WALL P2 AT EXPOSED STRUCTURAL BRACING, COORDINATE WITH MANUFACTURER REQUIREMENTS TO COVER INTUMESCENT FIREPROOFING P2 AT EXPOSED STAIR STRUCTURE P17RT1 CPT3 CPT4RT1CPT4RT1CPT4RT1CPT4RT1CT2 CT3 ELEV A TT1TT1 400EA ELEV B TT1TT1 400EB STAINLESS STEEL HANDRAILS & CRASH RAILS, RAISED LAMINATE WALL PANELS, PL1 RT1 -RESILIENT TILE FLOORING NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES RT2 -RESILIENT TILE FLOORING RT3 -RESILIENT TILE FLOORING CT1 -CERAMIC TILE CPT2 -WALKOFF CARPET TILE CPT3 -CARPET TILE CPT4 -CARPET TILE CPT1 -WALKOFF CARPET TILE RS1 -RESILIENT SHEET FLOORING TT1 -TERRAZZO TILE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/5/2021 4:58:06 PMA742 FOURTH FLOOR FINISH PLAN - SECTOR 2 02/05/2021 2018089 KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES FINISH LEGEND KEY PLAN KEYED FINISH NOTES 1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED. 2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED. 3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND CLARIFICATION ON EXTENT OF FINISH MATERIALS. 4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES. 5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE. 6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR & FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN COMPLETE. 7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL COLOR. 11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. 12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE UON. 13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). 14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. 15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND COLORS. 0'1'2'4'8'1/4" = 1'-0"A1 FOURTH FLOOR FINISH PLAN - SECTOR 2 # REVISION SCHEDULE NAME DATE FLOOR FINISH LEGEND Received by DiMarco 2/15/2021