HomeMy WebLinkAboutA742 Fourth Floor Finish Plan Sector 2DN
UP
UP
SECTOR 1 SECTOR 2
CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
WC6
WC6
WC6
WP1
CG2
CG2 CG1
CG1
CG1
CG2
CG2
CG1
CG1
CG1
CG1
CG1
CG1
CG2
CG2
CG1
CG1
CG1
CG1
CG1
CG1
CG1
CG1CG1
WC
CT
E
C
E1
SS1
WC
CT
E
C
E2
PL1
PL5
WC
CT
E
C
E1
PL1
SS1
WC
CT
E
C
E2
PL5
WC
CT
E
C
E1
SS1
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1SECTOR 1SECTOR 2SECTOR 2SECTOR 1GOWNING
B1
P1
CPT3
418A
ULTRASOUND
(GUIDED
BIOPSY)
B1
P1
RT1
415
MEN'S
SUB-WAIT
B1
P1
CPT3
418
EVS
B1
P1
RT1
417
PATIENT
TOILET
CT1
P1
CT1
418B
WC
CT
E
C
E2
PL5
WC
CT
E
C
E2
PL5
DIAGNOSTIC
RADIOGRAPHY
B1
P1
RT1
416
PATIENT
TOILET
CT1
P1
CT1
413
PATIENT
TOILET
CT1
P1
CT1
415A
STAFF
TOILET
CT1
P1
CT1
414
CIRCULATION
B1
P1
RT2
412
NURSE/TECH
STATION
B1
P1
RT2
411
GOWNING 2
B1
P1
CPT3
407C
GOWNING 3
B1
P1
CPT3
407D
WOMEN'S
CIRCULATION
B1
P1
CPT3
407
GOWNING 1
B1
P1
CPT3
407A
PATIENT
TOILET
CT1
P1
CT1
407B
CIRCULATION
B1
P1
RT1
406
MULTIPURPOSE/
CONSULT
B1
P1
CPT3
405
PUBLIC
TOILET
CT1
P1
CT1
400B
STORAGE
B1
P1
RT1
404
PRACTICE
MANAGER
B1
P1
CPT3
403
PUBLIC
TOILET
CT1
P1
CT1
400A
REGISTRATION
B1
P1
CPT3
402
ELEVATOR
LOBBY &
PUBLIC
CORRIDOR
B1
P1
RT1
400
MP1
MP1
MP1
CT2
CT2
CT2
CT3
CT3
STAIR 1
TT1
P1
TT1
ST1-4
CT2
CT3
HOLDING
BAY 1
B1
P1
RT2
412A
HOLDING
BAY 2
B1
P1
RT2
412B
CT2
CT3
CT2
CT3
RESULTS
ALCOVE
TT1
P1
TT1
410
STAIR 3
TT1
P1
TT1
ST3-4
WC
CT
E
C
E2
PL5
WC
CT
E
C
E2
PL5
WC
CT
E
C
E2
PL5
IMAGING
GUEST
LOUNGE/WAITING
B1
P1
401
CPT3/4 & RT1
P11
P13P13P13P11P13P13P11
P12
P12
P11
P12 P12P11P11P11P11P11P11P11P11P13P13P13P11
P11
P11
P13P13P13P11
P12
P12 P11P11
WC
CT
E
C
E1
SS1
MEN'S
CIRCULATION
B1
P1/WP2
RT1
422
CG1
CG2
CG2
CG1
CG2CG2
CG1
CG1
CG1
WS1 WS1 WS1
WS1
WS1
WS1
WS1
WS1WS1WS1
WS1WS1
WOMEN'S
CIRCULATION
B1
P1/WP2
RT1
425
WC
CT
E
C
E1
SS2
WC
CT
E
C
E1
PL1
SS1
P11
PL1
PL1
A1
A550
________________________________________________
A10
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
E4
A550
________________________________________________
A1
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
R T 2
R T 1
E4
A550
________________________________________________
WP1
WP1
WP1
WP1
WP1
WP1
CT2
CT3
WP1
A1
A550
________________________________________________
A10
A550
________________________________________________
E10
A550
________________________________________________
A1
A550
________________________________________________
WP1
WP1
WP1
WP1
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
CG1
P11P13 AT COLUMNS, P19 AT LOW WALL
P2 AT EXPOSED STRUCTURAL BRACING,
COORDINATE WITH MANUFACTURER
REQUIREMENTS TO COVER
INTUMESCENT FIREPROOFING
P2 AT EXPOSED STAIR STRUCTURE
P17RT1
CPT3
CPT4RT1CPT4RT1CPT4RT1CPT4RT1CT2
CT3
ELEV A
TT1TT1
400EA
ELEV B
TT1TT1
400EB
STAINLESS STEEL HANDRAILS &
CRASH RAILS, RAISED LAMINATE
WALL PANELS, PL1
RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/5/2021 4:58:06 PMA742
FOURTH
FLOOR FINISH
PLAN - SECTOR
2
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
KEYED FINISH NOTES
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
0'1'2'4'8'1/4" = 1'-0"A1 FOURTH FLOOR FINISH PLAN - SECTOR 2
#
REVISION SCHEDULE
NAME DATE
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021