Loading...
HomeMy WebLinkAboutA741 Fourth Floor Finish Plan Sector 1UP CORNER GUARD 7'-0"H U.O.N. (TOP @ 7'-4" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT WINDOW SHADES HANDRAIL. SEE ELEVATIONS FOR ADDITIONAL INFORMATION P2 ACCENT WALL PAINT COLOR SS1 PL2 WC CT E C MILLWORK FINISH KEY: PL1 WD1 WALL CABINET FINISH COUNTERTO P FINISH COUNTERTOP EDGE TALL OR BASE CABINET FINISH ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. SAW1 TACKABLE ACOUSTIC SURFACE WS1 HR1 RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS) RB1 CG1 EG2 WALL COVERINGWC1 RIGID VINYL WALL PROTECTION WP1 MINARAL PROFILE FEATURE PANEL MP1 BACK-PAINTED GLASS PANEL PS1 PULL SIDE * REFER TO ELEVATIONS MATERIAL FINISH KEY: NOT ALL MAY APPLY CERAMIC TILE ACCENT CT1 SECTOR 1 SECTOR 2 WP1 WP1 WP1 WP1 WP1 WP1 WP1 CG1 CG1 CG1CG1 CG1 CG1 CG2 CG2 CG1 CG1 CG2 CG2 CG2 CG2 CG2 CG2 CG2 CG2 CG2 CG1 CG1 CG1 CG1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL5WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL1 PL5 WC CT E C PL2 E2 PL5 SECTOR 1SECTOR 2SECTOR 2SECTOR 1PROCEDURE ROOM RS1 P1/WP1 RS1 442 PROCEDURE ROOM RS1 P1/WP1 RS1 441 PROCEDURE ROOM RS1 P1/WP1 RS1 440 RECEPTION B1 P1 CPT3 436 PROVIDER OFFICE B1 P1 CPT3 436A WAITING B1 P1/WP2 CPT3 434 SHARED CONFERENCE B1 P1 CPT3 433 CLEAN WORKROOM& EQUIP.STORAGE B1 P1/WP1 RT1 437 SOILED WORKROOM B1 P1/WP1 RT1 438 EVS B1 P1/WP1 RT1 439 PATIENT TOILET CT1 P1 CT1 444 STAFF TOILET CT1 P1 CT1 445 STAFF BREAK B1 P1 RT1 443 CIRCULATION B1 P1/WP2 BBT3 435 DEXASCAN B1 P1 RT1 432 EQUIPMENT STORAGE & FLEX SPACE B1 P1 RT1 421 SOILED WORKROOM B1 P1/WP1 RT1 420 CLEAN WORKROOM B1 P1/WP1 RT1 419 MAMMOGRAPHY (STEREOTATIC BIOPSY) B1 P1 RT1 431 MAMMOGRAPHY B1 P1 RT1 427 EQUIPMENT STORAGE B1 P1 RT1 431A ELEC/DATA B1 P1 SC1 430 IMAGING IT/DATA B1 P1 RT1 429 OFFICE/ READING B1 P1 CPT3 428 READING ROOM B1 P1 CPT3 426 ULTRASOUND B1 P1 RT1 424 PATIENT TOILET CT1 P1 CT1 424A PATIENT TOILET (PoS) CT1 P1 CT1 423A ULTRASOUND (PoS) B1 P1 RT1 423 MEN'S CIRCULATION B1 P1/WP2 RT1 422 WOMEN'S CIRCULATION B1 P1/WP2 RT1 425 WC CT E C E2 PL5CT2CT3CT2CT3ELEVATOR LOBBY & PUBLIC CORRIDOR B1 P1 RT1 400 STAIR 2 B1 P1 ST1 ST2-4 WC CT E C E2 PL5 CT2CT3CT2 CT3 P11P11P11 P11P13P11 P11P11P11P11 P11 P11 P11P11P12 P11 P12 P12 P11 P11P11P11P11 P11P11P11 P11P11P11P11 P12P12P12 P11P11 P12CG1 CG2 CG1 WS1WS1 WS1WS1 WS1 WS1 WS1 WS1 WS1 WS1 A1 A550 ________________________________________________ WP1 WP1 WP1 WP1 A7 A550 ________________________________________________ A7 A550 ________________________________________________ A7 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ C4 A550 ________________________________________________ A1 A550 ________________________________________________ WP1 WP1 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP1 WP1 WP2 WP2 P11WC11 P17 (WALL) P2 (EXPOSED STRUCTURE) P13 AT COLUMNS, P19 AT LOW WALL WP2 P11 WC10 WP2 TYPICAL P2 AT EXPOSED STRUCTURAL BRACING, COORDINATE WITH MANUFACTURER REQUIREMENTS TO COVER INTUMESCENT FIREPROOFING P2 AT EXPOSED STRUCTURAL BRACING, COORDINATE WITH MANUFACTURER REQUIREMENTS TO COVER INTUMESCENT FIREPROOFING P17WP1 LK1 ALUMINUM TRIM, REFER TO DETAIL A5/A502 SEAL GAP PROVIDE EMSEAL HORIZONTAL COLORSEAL; COLOR TBD OPEN TO BELOW ALUMINUM TRIM FINISHED SURFACE OF SEALANT, FLORING AND SOLID SUFRAC SILL TO ALIGN DN RT1 -RESILIENT TILE FLOORING NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES RT2 -RESILIENT TILE FLOORING RT3 -RESILIENT TILE FLOORING CT1 -CERAMIC TILE CPT2 -WALKOFF CARPET TILE CPT3 -CARPET TILE CPT4 -CARPET TILE CPT1 -WALKOFF CARPET TILE RS1 -RESILIENT SHEET FLOORING TT1 -TERRAZZO TILE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/5/2021 4:57:56 PMA741 FOURTH FLOOR FINISH PLAN - SECTOR 1 02/05/2021 2018089 KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES FINISH LEGEND KEY PLAN KEYED FINISH NOTES 1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED. 2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED. 3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND CLARIFICATION ON EXTENT OF FINISH MATERIALS. 4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES. 5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE. 6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR & FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN COMPLETE. 7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL COLOR. 11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. 12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE UON. 13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). 14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. 15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND COLORS. 0'1'2'4'8' 1/4" = 1'-0"A2 FOURTH FLOOR FINISH PLAN - SECTOR 1 # REVISION SCHEDULE NAME DATE FLOOR FINISH LEGEND Received by DiMarco 2/15/2021