HomeMy WebLinkAboutA732 Third Floor Finish Plan Sector 2DN
UP
SECTOR 1 SECTOR 2
CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
CG1
CG1
WC
CT
E
C
E2
PL5
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1SECTOR 1SECTOR 2SECTOR 2SECTOR 1CENTRAL
SOILED
WORK
B1
P1/WP1
RT2
311
PATIENT
VITALS
ALCOVE
B1
P1
RT2
310
NURSE
WORK AREA
B1
P1/WP2
RT2
317B
PROVIDER
OFFICE
B1
P1
CPT3
317A
EXAM/CONSULT
B1
P1/WP2
RT2
308
EXAM/CONSULT
B1
P1/WP2
RT2
307
EXAM/CONSULT
B1
P1/WP2
RT2
306
EXAM/CONSULT
B1
P1/WP2
RT2
309
CIRCULATION
B1
P1/WP2
RT1/2
304
STAFF
BREAK
AREA
B1
P1
RT1
305
STAFF
TOILET
CT1
P1
CT1
305ASPECIALTY
EXAM/TREATMENT
RS1
P1/WP1
RS1
303
PATIENT
TOILET
CT1
P1
CT1
302
OFFICE
MANAGER
B1
P1
CPT3
301A
REGISTRATION
B1
P1
CPT3
301
PUBLIC
TOILET
CT1
P1
CT1
300B
PUBLIC
TOILET
CT1
P1
CT1
300A
WC
CT
E
C
E1
SS1
STAIR 1
TT1
P1
TT1
ST1-3
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
E2
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
E2
PL5
GUEST
WAITING/
CIRCULATION
B1
P1
300
P9
P9
P9
P9
P9
P9WP1
CT2
WC8
WC4
WC4
MP1
MP1
MP1
CT2
CT2
CT2
CT3
P10
P9P9
CT3
CT3
CT2
CT3
P9
CT2
CT3 P2P2P9
P9P9
P9
SEE TYPICAL EXAM ACCENT WALL 1
P9
WP1
WP1 P10
P9
WS1 WS1 WS1
WS1
WS1
WS1
WS1
WS1WS1WS1
WS1WS1WS1
CG2
CG2
CG1
CG1 CG1
CG1
CG1
CG2
CG1CG1
CG2
CG1CG1
CG1
CG1
CG1
CG1
CG1
CG1 CG1
CG2
CG2 CG2
CG2
CG1
CG2
CG2
CG1
CG1
CG2
WC
CT
E
C
E1
SS2
WC
CT
E
C
E1
SS1
WC
CT
E
C
E1
SS2
WC
CT
E
C
E1
PL1
SS1
RT1
RT2
1' - 0"RT1RT21' - 0"21°
A10
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
C10
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
A7
A550
________________________________________________
A7
A550
________________________________________________
A1
A550
________________________________________________
WP1
WP1
WP1
WP111' - 2 1/2"15' - 0"WP1
WP1
P10
P10P10WP1
WP1
WP1
WP1WP1WP1WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2WP2
WP2
WP2
WP2
WP2
CG1
WP2
WP2
WP2
WP2P17
P2 AT EXPOSED STRUCTURAL
BRACING, COORDINATE WITH
MANUFACTURER REQUIREMENTS TO
COVER INTUMESCENT FIREPROOFING
WP2
P19 AT LOW WALL
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1
P2 AT EXPOSED STAIR STRUCTURE
P9CG2
CPT3/4 & RT3
CPT3
RT3
CPT3
RT3
CPT4RT3CPT4RT3CPT4RT3CPT4
RT3
CPT4
RT3
CPT4
RT3
RT3
RT1
ELEV A
TT1TT1
300EA
ELEV B
TT1TT1
300EB
STAINLESS STEEL HANDRAILS &
CRASH RAILS, RAISED LAMINATE
WALL PANELS, PL1
RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/5/2021 4:57:48 PMA732
THIRD FLOOR
FINISH PLAN -
SECTOR 2
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
KEYED FINISH NOTES
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
0'1'2'4'8'1/4" = 1'-0"A1 THIRD FLOOR FINISH PLAN - SECTOR 2
#
REVISION SCHEDULE
NAME DATE
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021