Loading...
HomeMy WebLinkAboutA732 Third Floor Finish Plan Sector 2DN UP SECTOR 1 SECTOR 2 CORNER GUARD 7'-0"H U.O.N. (TOP @ 7'-4" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT WINDOW SHADES HANDRAIL. SEE ELEVATIONS FOR ADDITIONAL INFORMATION P2 ACCENT WALL PAINT COLOR SS1 PL2 WC CT E C MILLWORK FINISH KEY: PL1 WD1 WALL CABINET FINISH COUNTERTO P FINISH COUNTERTOP EDGE TALL OR BASE CABINET FINISH ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. SAW1 TACKABLE ACOUSTIC SURFACE WS1 HR1 RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS) RB1 CG1 EG2 WALL COVERINGWC1 RIGID VINYL WALL PROTECTION WP1 MINARAL PROFILE FEATURE PANEL MP1 BACK-PAINTED GLASS PANEL PS1 PULL SIDE * REFER TO ELEVATIONS MATERIAL FINISH KEY: NOT ALL MAY APPLY CERAMIC TILE ACCENT CT1 CG1 CG1 WC CT E C E2 PL5 WC CT E C PL2 E2 PL1 PL5 WC CT E C PL2 E2 PL1 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1SECTOR 1SECTOR 2SECTOR 2SECTOR 1CENTRAL SOILED WORK B1 P1/WP1 RT2 311 PATIENT VITALS ALCOVE B1 P1 RT2 310 NURSE WORK AREA B1 P1/WP2 RT2 317B PROVIDER OFFICE B1 P1 CPT3 317A EXAM/CONSULT B1 P1/WP2 RT2 308 EXAM/CONSULT B1 P1/WP2 RT2 307 EXAM/CONSULT B1 P1/WP2 RT2 306 EXAM/CONSULT B1 P1/WP2 RT2 309 CIRCULATION B1 P1/WP2 RT1/2 304 STAFF BREAK AREA B1 P1 RT1 305 STAFF TOILET CT1 P1 CT1 305ASPECIALTY EXAM/TREATMENT RS1 P1/WP1 RS1 303 PATIENT TOILET CT1 P1 CT1 302 OFFICE MANAGER B1 P1 CPT3 301A REGISTRATION B1 P1 CPT3 301 PUBLIC TOILET CT1 P1 CT1 300B PUBLIC TOILET CT1 P1 CT1 300A WC CT E C E1 SS1 STAIR 1 TT1 P1 TT1 ST1-3 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL5 WC CT E C E2 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL1 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C E2 PL5 GUEST WAITING/ CIRCULATION B1 P1 300 P9 P9 P9 P9 P9 P9WP1 CT2 WC8 WC4 WC4 MP1 MP1 MP1 CT2 CT2 CT2 CT3 P10 P9P9 CT3 CT3 CT2 CT3 P9 CT2 CT3 P2P2P9 P9P9 P9 SEE TYPICAL EXAM ACCENT WALL 1 P9 WP1 WP1 P10 P9 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1WS1WS1 WS1WS1WS1 CG2 CG2 CG1 CG1 CG1 CG1 CG1 CG2 CG1CG1 CG2 CG1CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG2 CG2 CG2 CG2 CG1 CG2 CG2 CG1 CG1 CG2 WC CT E C E1 SS2 WC CT E C E1 SS1 WC CT E C E1 SS2 WC CT E C E1 PL1 SS1 RT1 RT2 1' - 0"RT1RT21' - 0"21° A10 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ C10 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A1 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ A7 A550 ________________________________________________ A7 A550 ________________________________________________ A1 A550 ________________________________________________ WP1 WP1 WP1 WP111' - 2 1/2"15' - 0"WP1 WP1 P10 P10P10WP1 WP1 WP1 WP1WP1WP1WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2WP2 WP2 WP2 WP2 WP2 CG1 WP2 WP2 WP2 WP2P17 P2 AT EXPOSED STRUCTURAL BRACING, COORDINATE WITH MANUFACTURER REQUIREMENTS TO COVER INTUMESCENT FIREPROOFING WP2 P19 AT LOW WALL SEE TYPICAL EXAM ACCENT WALL 1 SEE TYPICAL EXAM ACCENT WALL 1 SEE TYPICAL EXAM ACCENT WALL 1 P2 AT EXPOSED STAIR STRUCTURE P9CG2 CPT3/4 & RT3 CPT3 RT3 CPT3 RT3 CPT4RT3CPT4RT3CPT4RT3CPT4 RT3 CPT4 RT3 CPT4 RT3 RT3 RT1 ELEV A TT1TT1 300EA ELEV B TT1TT1 300EB STAINLESS STEEL HANDRAILS & CRASH RAILS, RAISED LAMINATE WALL PANELS, PL1 RT1 -RESILIENT TILE FLOORING NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES RT2 -RESILIENT TILE FLOORING RT3 -RESILIENT TILE FLOORING CT1 -CERAMIC TILE CPT2 -WALKOFF CARPET TILE CPT3 -CARPET TILE CPT4 -CARPET TILE CPT1 -WALKOFF CARPET TILE RS1 -RESILIENT SHEET FLOORING TT1 -TERRAZZO TILE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/5/2021 4:57:48 PMA732 THIRD FLOOR FINISH PLAN - SECTOR 2 02/05/2021 2018089 KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES FINISH LEGEND KEY PLAN KEYED FINISH NOTES 1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED. 2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED. 3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND CLARIFICATION ON EXTENT OF FINISH MATERIALS. 4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES. 5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE. 6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR & FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN COMPLETE. 7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL COLOR. 11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. 12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE UON. 13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). 14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. 15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND COLORS. 0'1'2'4'8'1/4" = 1'-0"A1 THIRD FLOOR FINISH PLAN - SECTOR 2 # REVISION SCHEDULE NAME DATE FLOOR FINISH LEGEND Received by DiMarco 2/15/2021