HomeMy WebLinkAboutA731 Third Floor Finish Plan Sector 1CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
SECTOR 1 SECTOR 2
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E2
PL5 SECTOR 1SECTOR 2SECTOR 2SECTOR 1PROVIDER
OFFICE
B1
P1
CPT3
339A
WC
CT
E
C
E2
PL5
NURSE
WORK
B1
P1
RT2
339
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
PL2
E2
PL5
TRIAGE
NURSE
B1
P1
RT2
339B
EXAM/CONSULT
B1
P1/WP2
RT2
327
EXAM/CONSULT
B1
P1/WP2
RT2
328
EXAM/CONSULT
B1
P1/WP2
RT2
331
EXAM/CONSULT
B1
P1/WP2
RT2
329.1
EXAM/CONSULT
B1
P1/WP2
RT2
329
EVS
B1
P1
RT2
330
SPECIALTY
EXAM/TREATMENT/
TELEMED
RS1
P1/WP1
RS1
335
PATIENT
TOILET
CT1
P1
CT1
336
PATIENT
TOILET
CT1
P1
CT1
335A
LAB
B1
P1/WP1
RT2
334
LAB DRAW
B1
P1/WP1
BBT2
332
SPECIMEN
COLLECTION
CT1
P1
CT1
333
PATIENT
TOILET
CT1
P1
CT1
327
SPECIALTY
EXAM/
TREATMENT
RS1
P1/WP1
RS1
326
PATIENT
TOILET
CT1
P1
CT1
326A
STAFF
TOILET
CT1
P1
CT1
325
ELEC/ DATA
B1
P1
SC1
323
TRIAGE
NURSE
B1
P1
CPT3
324
PROVIDER
OFFICE
B1
P1
CPT3
317F
NURSE
WORK AREA
B1
P1/WP2
RT3
317E
EXAM/CONSULT
B1
P1/WP2
RT2
322
EXAM/CONSULT
B1
P1/WP2
RT2
321
EXAM/CONSULT
B1
P1/WP2
RT2
320
EXAM/CONSULT
B1
P1/WP2
RT2
319
EXAM/CONSULT
B1
P1/WP2
RT2
318
CENTRAL
CLEAN
WORK
B1
P1/WP1
RT2
312
EXAM/CONSULT
B1
P1/WP2
RT2
313
EXAM/CONSULT
B1
P1/WP2
RT2
314
EXAM/CONSULT
B1
P1/WP2
RT2
315
EXAM/CONSULT
B1
P1/WP2
RT2
316
STAFF
CIRCULATION
B1
P1
RT2
317
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
STORAGE
B1
P1
RT2
350
STORAGE
RS1
P1
RS1
335B
WC
CT
E
C
PL2
E1
PL1
SS1
CIRCULATION
B1
P1/WP2
RT1/2
304
STAIR 2
B1
P1
ST1
ST2-3
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
E2
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
P9
P9
P9
P9P9
P9
P9
P9
P9
CT2 CT2
WP1
WP1
P9P9
WP1
WP1
P9SEE TYPICAL EXAM ACCENT WALL 2P9SEE TYPICAL EXAM ACCENT WALL 2P9
SEE TYPICAL EXAM ACCENT WALL 2
P9
SEE TYPICAL EXAM ACCENT WALL 2
P9
SEE TYPICAL EXAM ACCENT WALL 2
CT2
CT2
CT3
CT3 CT3
P9P9
P10
P10
P9P9WP1
WP1
WS1
CG1
CG1 CG1
CG1CG1 CG2 CG2 CG2
CG1CG1
CG1
CG1CG1
CG1
CG2
CG1 CG1
CG2
CG2
CG1
CG1
CG1
CG1
CG1 CG1
CG1
CG1
CG1
CG1
WS1WS1WS1WS1
WS1WS1
WS1WS1WS1WS1
WP1
WP1
WP1
WP1
WP1
WP1 WP1
CT3
WP1
A1
A550
________________________________________________
A4
A550
________________________________________________
A7
A550
________________________________________________
E7
A550
________________________________________________RT2RT1RT2
RT1 A4
A550
________________________________________________
RT1
RT2
RT3RT2RT3RT2A4
A550
________________________________________________
A7
A550
________________________________________________
A7
A550
________________________________________________
E7
A550
________________________________________________
A4
A550
________________________________________________
C1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________ALIGNALIGN1' - 0"11 7/8"1' - 0"
WP1
WP1
WP1WP2
WP2
WP2 WP2
WP2
WP2
WP2
WP2 WP2
WP2 WP2
WP2 WP2
WP2 WP2
WP2 WP2 WP2
WP2
WP2
WP2 WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP2
WP1
WP2
WP2
WP2
WP2
P2 AT EXPOSED STRUCTURAL
BRACING, COORDINATE WITH
MANUFACTURER REQUIREMENTS TO
COVER INTUMESCENT FIREPROOFING
P2 AT EXPOSED STRUCTURAL
BRACING, COORDINATE WITH
MANUFACTURER REQUIREMENTS TO
COVER INTUMESCENT FIREPROOFING
WP1 P17P17 (WALL)
P19 P19 P19 AT LOW WALL
P19 AT LOW WALLP19
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1 MIRRORED
SEE TYPICAL EXAM ACCENT WALL 1
SEE TYPICAL EXAM ACCENT WALL 1 MIRRORED
SEE TYPICAL EXAM ACCENT WALL 1 MIRRORED
SEE TYPICAL EXAM ACCENT WALL 1 MIRRORED
ALUMINUM TRIM,
REFER TO
DETAIL A5/A502
CT3
CT2
CT3
CT2
P2 (EXPOSED STRUCTURE)
LK1
LK1
DN
SEAL GAP
PROVIDE EMSEAL
HORIZONTAL COLORSEAL;
COLOR TBD
SOLID SURFACE
SILL (SS4)
FINISHED SURFACE OF
SEALANT, FLORING
AND SOLID SUFRAC
SILL TO ALIGN
UP
RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/11/2021 3:32:36 PMA731
THIRD FLOOR
FINISH PLAN -
SECTOR 1
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
KEYED FINISH NOTES
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
0'1'2'4'8'
1/4" = 1'-0"A2 THIRD FLOOR FINISH PLAN - SECTOR 1
#
REVISION SCHEDULE
NAME DATE
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021