HomeMy WebLinkAboutA721 Second Floor Finish Plan Sector 1DN UP
CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
SECTOR 1 SECTOR 2
SECTOR 3
CG1
CG1 CG1
CG1
CG1
CG1 CG1
CG1
CG1
CG1
CG1
SHELL SPACE TO RECEIVE SEALED CONCRETE
FLOOR FINISH, PRIME 1ST COAT ON WALLS
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
E1
PL1
SS1
WC
CT
E
C
E1
PL1
SS1
WC
CT
E
C
E1
PL1
SS1WC9
WC10WC11WC12 SECTOR 3SECTOR 1SECTOR 2SECTOR 1IT/ELEC
B1
P1
SC1
243
STAFF
BREAK
B1
P1
RT1
242
MULTIPURPOSE/
ACTIVITY
B1
P1/WP1
CPT3
235
EDUCATION/
CONFERENCE
B1
P1/WP1
CPT3
234
STORAGE
B1
P1
CPT3
235A
RESPITE/
MEDITATION
B1
P1
CPT3
241
OFFICE
B1
P1
CPT3
238
STAFF
TOILET
CT1
CT2/CT3
CT1
237
STAFF
TOILET
CT1
CT2/CT3
CT1
236
RESPITE/
LACTATION
B1
P1
CPT3
240
RESPITE/
LACTATION
B1
P1
CPT3
239
CORRIDOR
B1
P1
RT3
232
P7WS1WS1WS1WS1WS1WS1WS1WS1WS1CG1
STAIR
B1
P1
ST1
ST2-2
CT2
CT3
P17P17
P17P17P16P16 P2P17 AT LOW WALL
P9
P9
CG2
A1
A550
________________________________________________
A1
A550
________________________________________________
A1
A550
________________________________________________A1
A550
________________________________________________
A4
A550
________________________________________________
A4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
E10
A550
________________________________________________
E10
A550
________________________________________________
A10
A565
________________________________________________
WC
CT
E
C
PL2
E1
PL1
SS1
P17 (WALL)
WP2
WP2
WP2
WP2
WP2
WP2
WP2
P2 AT EXPOSED STRUCTURAL
BRACING, COORDINATE WITH
MANUFACTURER REQUIREMENTS TO
COVER INTUMESCENT FIREPROOFING
P 9
WP2
TYPICAL
WP1
TYPICAL
WP1
TYPICAL
CT2
CT3
WC
CT
E
C
E1
SS1 REFEER ALSO TO
ALTERNATE #8.
P2 (BOTTOM OF STAIR
RUNS & LANDINGS &
EXPOSED STRUCTURE)
RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/5/2021 4:57:11 PMA721
SECOND
FLOOR FINISH
PLAN - SECTOR
1
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
KEYED FINISH NOTES
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
0'1'2'4'8'1/4" = 1'-0"A2 SECOND FLOOR FINISH PLAN - SECTOR 1
#
REVISION SCHEDULE
NAME DATE
DD
Addendum
1
4/9/2020
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021