HomeMy WebLinkAboutA713 First Floor Finish Plan Sector 3RAPUP
SECTOR 1 SECTOR 2
SECTOR 3
CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
CG1
CG1
CG1
CG1
CG1
PS1 MP1
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
E1
SS1
WC
CT
E
C
E1
SS2SECTOR 3SECTOR 1S E C T O R 2SECTOR 3
MP1
WC
CT
E
C
E1
SS1
WC
CT
E
C
E1
SS4
P 4
REGISTRATION
B1
P1
RT3
124
CG1
EVS
B1
P1
RT1
125
WP1 STAIR 1
TT1
P1
TT1
ST1-1
MAIN
LOBBY
P1
100
CPT2/TT1 TT1
WC
CT
E
C
E1
SS1
WS1
WS1
CG1
WS1
A10
A550
________________________________________________
E10
A550
________________________________________________
E10
A550
________________________________________________
A1
A550
________________________________________________
RT1
RT3
SS1
A10
A550
________________________________________________
A1
A550
________________________________________________
A10
A501
________________________________________________
F11
A501
________________________________________________
WP1 WP1
CT3
CG1
VESTIBULE
TT1
P1
CPT1
100V1
MAIN
LOBBY
P1
100
CPT2/TT1 TT1
TT1CPT2CPT2TT1RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/5/2021 4:57:04 PMA713
FIRST FLOOR
FINISH PLAN -
SECTOR 3
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
KEYED FINISH NOTES
0'1'2'4'8'
1/4" = 1'-0"B3 FIRST FLOOR FINISH PLAN - SECTOR 3
#
REVISION SCHEDULE
NAME DATE
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021