Loading...
HomeMy WebLinkAboutA712 First Floor Finish Plan Sector 2CORNER GUARD 7'-0"H U.O.N. (TOP @ 7'-4" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT WINDOW SHADES HANDRAIL. SEE ELEVATIONS FOR ADDITIONAL INFORMATION P2 ACCENT WALL PAINT COLOR SS1 PL2 WC CT E C MILLWORK FINISH KEY: PL1 WD1 WALL CABINET FINISH COUNTERTO P FINISH COUNTERTOP EDGE TALL OR BASE CABINET FINISH ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. SAW1 TACKABLE ACOUSTIC SURFACE WS1 HR1 RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS) RB1 CG1 EG2 WALL COVERINGWC1 RIGID VINYL WALL PROTECTION WP1 MINARAL PROFILE FEATURE PANEL MP1 BACK-PAINTED GLASS PANEL PS1 PULL SIDE * REFER TO ELEVATIONS MATERIAL FINISH KEY: NOT ALL MAY APPLY CERAMIC TILE ACCENT CT1 SECTOR 1 SECTOR 2 SECTOR 3 WC1 WC1 WC2 WC2 WP1 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG2 CG2 CG2 CG2 CG2 CG1 CG2 CG2 CG2 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG2 CG2 CG1 CG1 CG1 CG2 PS1 MP1 WC CT E C E1 SS2 WC CT E C E1 SS1 WC CT E C E2 PL5 WC CT E C E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL5 WC CT E C E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E2 PL5 WC CT E C E2 PL5 WC CT E C E1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C E2 PL1 PL5 WP1 SECTOR 2SECTOR 1S E C T O R 2SECTOR 3 WAITING / CIRCULATION B1 P1 CPT3 123 RADIOLOGY (X-RAY) B1 P1 RT3 119 EXAM B1 P1 RT3 118 EXAM B1 P1 RT1 113 EXAM B1 P1 RT1 112 SOILED WORK B1 P1 RT1 111 EXAM B1 P1 RT3 120 EXAM B1 P1 RT3 121 STAT LAB/ MED B1 P1 RT3 110 TREATMENT RS1 P1 RS1 117 EXAM B1 P1 RT3 116 EXAM B1 P1 RT3 115 EXAM B1 P1 RT3 114 SUB-WAITING B1 P1 RT3 105B PoS PATIENT TOILET CT1 P1 CT1 105C SHARED PROVIDER OFFICE B1 P1 CPT3 104 STAFF TOILET CT1 P1 CT1 103 STAFF BREAK B1 P1 RT3 102 PUBLIC TOILET CT1 P1 CT1 100A PUBLIC TOILET CT1 P1 CT1 100B HOLDING/MAIL B1 P1 RT3 100C EVS B1 P1 RT3 109 VISITOR TOILET CT1 P1 CT1 101A RECEPTION B1 P1 RT3 101B CLEAN HOLDING B1 P1 RT3 107 TRIAGE/ INTERVIEW B1 P1 RT3 106 MP1 MP1 MP1 CT2 CT2 CT3 WP1 CT2 CT3 WP1 VESTIBULE B1 P1 CPT1 100V2 P3 P3 CORRIDOR B1 P1/WP2 RT1 122 WC CT E C E2 PL5 P6P6 WC CT E C PL2 E1 PL1 SS1 P4P6SEE TYPICAL EXAM ACCENT WALL 1WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 P6SEE TYPICAL EXAM ACCENT WALL 1P6SEE TYPICAL EXAM ACCENT WALL 1P6SEE TYPICAL EXAM ACCENT WALL 1P6SEE TYPICAL EXAM ACCENT WALL 1P6SEE TYPICAL EXAM ACCENT WALL 1 MIRROREDP6P6WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1P6P6 P6 P 6 P6 P4 P4 P4P4WC CT E C E2 PL1 PL5 CIRCULATION B1 P1 RT1/3 105 WC CT E C PL2 E1 PL1 SS1P4P4 P5 P5P 6 P 6 WC CT E C PL2 E2 PL5 WC CT E C PL2 E2 PL5 P 6 P 6 P 5 P4 P4 P6P6WC CT E C PL1 C T 2 C T 3 W P 1 W P 1 C T 2 C T 3WP1 LOBBY/WAITING B1 P1 RT2/3 101 C T 2 C T 3 W P 1 W P 1 P6SEE TYPI CAL EXAM ACCENT WALL 1 MI RROREDP 4 P4P 5 P5WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 WS1 P L 1 PL1 PL1 PL1 A1 A550 ________________________________________________ A10 A550 ________________________________________________ E1 A550 ________________________________________________ E1 A550 ________________________________________________ A10 A550 ________________________________________________ A4 A550 ________________________________________________ A1 A550 ________________________________________________ A7 A550 ________________________________________________ A4 A550 ________________________________________________ A4 A550 ________________________________________________ A1 A550 ________________________________________________ 1' - 0"RT1RT3RT1 RT3 RT3 RT1 1' - 0"RT3RT11' - 0"1' - 0"RT1 RT3 1' - 0 " R T 1 R T 3 R T 3 R T 1 1 ' - 0 " R T 2 R T 3 RT3RT2WC CT E C PL2 E2 PL5 A1 A550 ________________________________________________ A10 A501 ________________________________________________ WP2 WP2 WP2 WP2 WC CT E C E1 PL1 SS1 WP1 UNDER DESK WP2 WP2 WP2 WP2 WP2 WP2 TYPICAL AT CORRIDOR WP2 WP2 WP2 WP2WP2WP2 WP2 WP2 WP2 WP2 WP2WP2 WP2 WP2 WP2 SS1 ELEV A TT1TT1 100EA ELEV B TT1TT1 100EB STAINLESS STEEL HANDRAILS & CRASH RAILS, RAISED LAMINATE WALL PANELS, PL1 SEE TYPICAL EXAM ACCENT WALL 1 MIRROREDSEE TYPICAL EXAM ACCENT WALL 1 MIRROREDMAIN LOBBY P1 100 CPT2/TT1 P5 CIRCULATION B1 P1 RT1/3 105 CIRCULATION B1 P1 RT1/3 105 NURSE CORE B1 P1 RT3 108 CIRCULATION B1 P1 RT1/3 105 CIRCULATION B1 P1 RT1/3 105 RT1RT3LK1 RT1 -RESILIENT TILE FLOORING NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES RT2 -RESILIENT TILE FLOORING RT3 -RESILIENT TILE FLOORING CT1 -CERAMIC TILE CPT2 -WALKOFF CARPET TILE CPT3 -CARPET TILE CPT4 -CARPET TILE CPT1 -WALKOFF CARPET TILE RS1 -RESILIENT SHEET FLOORING TT1 -TERRAZZO TILE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/5/2021 4:56:56 PMA712 FIRST FLOOR FINISH PLAN - SECTOR 2 02/05/2021 2018089 KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES FINISH LEGEND KEY PLAN 1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED. 2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED. 3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND CLARIFICATION ON EXTENT OF FINISH MATERIALS. 4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES. 5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE. 6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR & FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN COMPLETE. 7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL COLOR. 11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. 12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE UON. 13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). 14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. 15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND COLORS. KEYED FINISH NOTES 0'1'2'4'8' 1/4" = 1'-0"A1 FIRST FLOOR FINISH PLAN - SECTOR 2 # REVISION SCHEDULE NAME DATE FLOOR FINISH LEGEND Received by DiMarco 2/15/2021