Loading...
HomeMy WebLinkAboutA711 First Floor Finish Plan Sector 1UP FD CORNER GUARD 7'-0"H U.O.N. (TOP @ 7'-4" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT WINDOW SHADES HANDRAIL. SEE ELEVATIONS FOR ADDITIONAL INFORMATION P2 ACCENT WALL PAINT COLOR SS1 PL2 WC CT E C MILLWORK FINISH KEY: PL1 WD1 WALL CABINET FINISH COUNTERTO P FINISH COUNTERTOP EDGE TALL OR BASE CABINET FINISH ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. SAW1 TACKABLE ACOUSTIC SURFACE WS1 HR1 RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS) RB1 CG1 EG2 WALL COVERINGWC1 RIGID VINYL WALL PROTECTION WP1 MINARAL PROFILE FEATURE PANEL MP1 BACK-PAINTED GLASS PANEL PS1 PULL SIDE * REFER TO ELEVATIONS MATERIAL FINISH KEY: NOT ALL MAY APPLY CERAMIC TILE ACCENT CT1 SECTOR 1 SECTOR 2 SECTOR 3 WC1 WP1 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG1 CG1CG1 CG1CG1 CG1 CG1 CG1 CG1 CG1CG1 CG1 CG1 CG1 CG1 WC CT E C PL2 E2 PL1 PL5 WC CT E C PL2 E2 PL5 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 SECTOR 2SECTOR 1SECTOR 3SECTOR 1WASTE HOLDING B1 P1 SC1 136 CLEAN LINEN HOLDING B1 P1 SC1 137 CORRIDOR B1 P1/WP2 RT1 135 STAFF BREAK B1 P1 RT3 133 CLEAN SUPPLY B1 P1 RT3 134 SPECIMEN TOILET CT1 P1 CT1 127 STAFF TOILET CT1 P1 CT1 131 SOILED B1 P1 RT3 132 LABORATORY B1 P1 RT3 126 BLOOD DRAW B1 P1 RT1 130 BLOOD DRAW B1 P1 RT1 129 BLOOD DRAW (PoS) B1 P18 RT1 128 CORRIDOR B1 P1/WP2 RT1 122 EVS SUPPLY & EQUIPMENT B1 P1 SC1 139 SUPPLY CHAIN AREA B1 P1 SC1 138 MAIN ELECTRICAL B1 P1 SC1 142 EMERGENCY EQUIPMENT ROOM B1 P1 SC1 141 BUILDING MAINTENANCE TOILET/SHOWER CT1 CT2/CT3 CT1 138A MAIN SERVER B1 P1 SC1 140 CORRIDOR B1 P1/WP2 RT1 143 WATER SERVICE B1 P1 SC1 146 MECHANICAL B1 P1 SC1 145 STORAGE B1 P1 SC1 144 STAIR 2 B1 P1 ST1 ST2-1 CT2 CT3 WC CT E C PL2 E1 PL1 SS1 WC CT E C PL2 E1 PL1 SS1 CG1 CT2 CT3 WP1 WP1 CT2 CT3 WP1 WP1 WS1 WS1 P9P9C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________ C4 A550 ________________________________________________2' - 3 5/8"RT3 RT1 A4 A550 ________________________________________________ A4 A550 ________________________________________________ 1 2 WP1 WP1 C7 A550 ________________________________________________ P17 (WALL) WP2 TYPICAL AT CORRIDORWP2 TYPICAL AT CORRIDOR WP2 TYPICAL AT CORRIDOR WP2 TYPICAL AT CORRIDOR WP2 TYPICAL AT CORRIDOR WP2 WP2 WP2 WP2 WP2 FD FD WP2 CT2 P2 (BOTTOM OF STAIR RUNS & LANDINGS & EXPOSED STRUCTURE) RT1 -RESILIENT TILE FLOORING NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES RT2 -RESILIENT TILE FLOORING RT3 -RESILIENT TILE FLOORING CT1 -CERAMIC TILE CPT2 -WALKOFF CARPET TILE CPT3 -CARPET TILE CPT4 -CARPET TILE CPT1 -WALKOFF CARPET TILE RS1 -RESILIENT SHEET FLOORING TT1 -TERRAZZO TILE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/5/2021 4:56:45 PMA711 FIRST FLOOR FINISH PLAN - SECTOR 1 02/05/2021 2018089 KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES FINISH LEGEND KEY PLAN 1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED. 2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED. 3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND CLARIFICATION ON EXTENT OF FINISH MATERIALS. 4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES. 5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE. 6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR & FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN COMPLETE. 7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL COLOR. 11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. 12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE UON. 13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). 14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. 15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND COLORS. KEYED FINISH NOTES 1/4" = 1'-0"A2 FIRST FLOOR FINISH PLAN - SECTOR 1 0'1'2'4'8' # 1 COORDINATE WITH OWNER FOR SPECIALTY BLACKLIGHT PAINT FINISHES TO BE INSTALLED IN THIS ROOM BY SEPARATE VENDOR. 2 COUNTERTOP TO BE FLUSH WITH WINDOW STOOL. PROVIDE CLEAR FLUSH SEALANT JOINT AT INTERSECTION REVISION SCHEDULE NAME DATE FLOOR FINISH LEGEND Received by DiMarco 2/15/2021