HomeMy WebLinkAboutA711 First Floor Finish Plan Sector 1UP
FD
CORNER GUARD 7'-0"H U.O.N.
(TOP @ 7'-4" AFF).
TYPICAL AT ALL OUTSIDE
CORNERS. COORDINATE
WITH MILLWORK
3101
P1
CP1 RB1
ROOM NUMBER
WALL TREATMENT
FLOOR
TREATMENT
BASE TREATMENT
WINDOW SHADES
HANDRAIL. SEE
ELEVATIONS FOR
ADDITIONAL INFORMATION
P2 ACCENT WALL
PAINT COLOR
SS1
PL2
WC
CT
E
C
MILLWORK FINISH KEY:
PL1
WD1
WALL CABINET
FINISH
COUNTERTO
P FINISH
COUNTERTOP
EDGE
TALL OR BASE
CABINET FINISH
ROOM FINISH KEY:
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
SAW1 TACKABLE
ACOUSTIC
SURFACE
WS1
HR1
RESILIENT WALL BASE,
MATCH EXISTING (SHOWN
GRAPHICALLY ONLY
WHEN IN PATCHING
APPLICATIONS)
RB1
CG1 EG2
WALL COVERINGWC1
RIGID VINYL WALL
PROTECTION
WP1
MINARAL PROFILE
FEATURE PANEL
MP1
BACK-PAINTED
GLASS PANEL
PS1
PULL SIDE
* REFER TO ELEVATIONS
MATERIAL FINISH KEY: NOT ALL MAY APPLY
CERAMIC TILE ACCENT CT1
SECTOR 1 SECTOR 2
SECTOR 3
WC1
WP1
CG1
CG1
CG1
CG1
CG1
CG1
CG1 CG1
CG1CG1
CG1CG1
CG1
CG1
CG1 CG1
CG1CG1
CG1
CG1 CG1
CG1
WC
CT
E
C
PL2
E2
PL1
PL5
WC
CT
E
C
PL2
E2
PL5
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
SECTOR 2SECTOR 1SECTOR 3SECTOR 1WASTE
HOLDING
B1
P1
SC1
136
CLEAN
LINEN
HOLDING
B1
P1
SC1
137
CORRIDOR
B1
P1/WP2
RT1
135
STAFF
BREAK
B1
P1
RT3
133
CLEAN
SUPPLY
B1
P1
RT3
134
SPECIMEN
TOILET
CT1
P1
CT1
127
STAFF
TOILET
CT1
P1
CT1
131
SOILED
B1
P1
RT3
132 LABORATORY
B1
P1
RT3
126
BLOOD
DRAW
B1
P1
RT1
130
BLOOD
DRAW
B1
P1
RT1
129
BLOOD
DRAW (PoS)
B1
P18
RT1
128
CORRIDOR
B1
P1/WP2
RT1
122
EVS SUPPLY
&
EQUIPMENT
B1
P1
SC1
139
SUPPLY
CHAIN AREA
B1
P1
SC1
138
MAIN
ELECTRICAL
B1
P1
SC1
142
EMERGENCY
EQUIPMENT
ROOM
B1
P1
SC1
141
BUILDING
MAINTENANCE
TOILET/SHOWER
CT1
CT2/CT3
CT1
138A
MAIN
SERVER
B1
P1
SC1
140
CORRIDOR
B1
P1/WP2
RT1
143
WATER
SERVICE
B1
P1
SC1
146
MECHANICAL
B1
P1
SC1
145
STORAGE
B1
P1
SC1
144
STAIR 2
B1
P1
ST1
ST2-1
CT2
CT3
WC
CT
E
C
PL2
E1
PL1
SS1
WC
CT
E
C
PL2
E1
PL1
SS1
CG1
CT2
CT3
WP1
WP1
CT2
CT3
WP1
WP1
WS1
WS1
P9P9C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________
C4
A550
________________________________________________2' - 3 5/8"RT3
RT1
A4
A550
________________________________________________
A4
A550
________________________________________________
1
2
WP1
WP1
C7
A550
________________________________________________
P17 (WALL)
WP2
TYPICAL AT CORRIDORWP2
TYPICAL AT CORRIDOR
WP2
TYPICAL AT CORRIDOR
WP2
TYPICAL AT
CORRIDOR
WP2
TYPICAL AT CORRIDOR
WP2 WP2
WP2
WP2
WP2
FD
FD
WP2
CT2
P2 (BOTTOM OF STAIR
RUNS & LANDINGS &
EXPOSED STRUCTURE)
RT1 -RESILIENT TILE FLOORING
NOTE: REFER TO FINISH PLANS AND FINISH SCHEDULE FOR SPECIFIC PRODUCT TYPES
RT2 -RESILIENT TILE FLOORING
RT3 -RESILIENT TILE FLOORING
CT1 -CERAMIC TILE
CPT2 -WALKOFF CARPET TILE
CPT3 -CARPET TILE
CPT4 -CARPET TILE
CPT1 -WALKOFF CARPET TILE
RS1 -RESILIENT SHEET FLOORING
TT1 -TERRAZZO TILE
DATE:
PROJECT:
OTHER:
DRAWN BY:
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
Architecture
Planning
Interior Design
11 12
H
I
11 12
H
I
619 West State Street
Ithaca, New York 14850
132 E. Jefferson Street
Syracuse, New York 13202
p 607 273 7600 www.holt.com
WARNING: It is a violation of New
York State Law for any person,
unless acting under the direction of
a licensed Architect, to alter this
document in any way. If a document
bearing the seal of an Architect is
altered, the altering Architect shall
affix to such document his seal and
the notation "altered by" followed by
his signature, the date of such
alteration, and a specific description
of the alteration.2/5/2021 4:56:45 PMA711
FIRST FLOOR
FINISH PLAN -
SECTOR 1
02/05/2021
2018089
KAS/HRT Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDINGGENERAL FINISH NOTES
FINISH LEGEND
KEY PLAN
1 ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED.
2 ALL HOLLOW METAL FRAMES TO BE PAINTED P17 UNLESS OTHERWISE NOTED.
3 REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION AND
CLARIFICATION ON EXTENT OF FINISH MATERIALS.
4 ALIGN FLOOR TILE GROUT LINES WITH WALL TILE GROUT LINES.
5 TILE AND PLANK FLOORING UNITS SHALL NOT BE CUT LESS THAN 6” ON ANY EDGE.
6 PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR &
FINISH FOR ARCHITECT'S APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION.
ONSITE APPLICATION WILL BE REQUIRED ONE WEEK PRIOR TO FINAL APPROVAL.
ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL
TEST HAS BEEN COMPLETE.
7 PATTERN NAME, COLOR AND NUMBER FOR EACH MATERIAL ARE GIVEN WHEREVER
POSSIBLE ON THE FINISH PLAN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
8 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN
THE CLOSED POSITION UNLESS OTHERWISE NOTED.
9 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND
LAVATORIES.
10 ALL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL
COLOR.
11 CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEAD TIMES FOR
ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE.
ALL DELIVERY TIMES MUST BE CONFIRMED, AND ANY EXCESSIVE LEAD TIME MUST BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR
RESPECIFICATION IF NECESSARY.
12 ALL COVER PLATES, SWITCHES, OUTLETS, RECEPTACLES AND DEVICES TO BE WHITE
UON.
13 OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.).
14 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH
TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR.
15 REFER TO REFLECTED CEILING PLANS FOR SOFFIT AND CEILING MATERIALS AND
COLORS.
KEYED FINISH NOTES
1/4" = 1'-0"A2 FIRST FLOOR FINISH PLAN - SECTOR 1
0'1'2'4'8'
#
1 COORDINATE WITH OWNER FOR SPECIALTY BLACKLIGHT PAINT FINISHES TO BE
INSTALLED IN THIS ROOM BY SEPARATE VENDOR.
2 COUNTERTOP TO BE FLUSH WITH WINDOW STOOL. PROVIDE CLEAR FLUSH SEALANT
JOINT AT INTERSECTION
REVISION SCHEDULE
NAME DATE
FLOOR FINISH LEGEND
Received by DiMarco 2/15/2021