Loading...
HomeMy WebLinkAboutA302 Exterior ElevationsSD FIRST FLOOR 100' -0" SECOND FLOOR 114' -0" ROOF 174' -0" THIRD FLOOR 128' -6" FOURTH FLOOR 144' -0" FIFTH FLOOR 158' -0" PENTHOUSE 183' -4" A5 A401 ________________________________________________ B/O LOW ROOF DECK 124' -6" T/O LOW ROOF PARAPET 125' -11" METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) BELT COURSE ILLUMINATED SIGNAGE DOWNSPOUT NOZZLE, REFER TO PLUMBING DRAWINGS LIGHT FIXTURE, REFER TO ELECTRICAL DRAWINGS A1 A454 ________________________________________________ T/O CURTAIN WALL 176' -4" PARAPET -LOW POINT 179' -4" A7 A453 ________________________________________________A1 A453 ________________________________________________ CW6 WALL HYDRANT, REFER TO PLUMBING DRAWINGS RECESSED AUTOMATIC DOOR OPERATOR PUSH PLATE, REFER TO ELECTRICAL DRAWINGS A652 D1 EQ 20 EQUAL PANELS @ 5' - 0" (ALIGN VERTICAL JOINTS WITH SOFFIT JOINTS BELOW) TOTAL WALL AREA: 7,743 SF TOTAL WINDOW AREA: 683.50 SF WINDOW TO WALL AREA: 9%.BRICK (BRK-1)8' - 0" TYPICALPREFINISHED FASCIA (RF-1) ALIGN CARD READER, REFER TO ELECTRICAL DRAWINGS 20' - 0"20' - 0" CONTROL JOINT CONTROL JOINT ALIGN ALIGN 6" 6" E EQ EQ 16' - 0"16' - 0" EQ EQ 17' - 0"17' - 0" EQ EQ FIRST FLOOR 100' -0" SECOND FLOOR 114' -0" ROOF 174' -0" THIRD FLOOR 128' -6" FOURTH FLOOR 144' -0" FIFTH FLOOR 158' -0" PENTHOUSE 183' -4" B/O LOW ROOF DECK 124' -6" T/O LOW ROOF PARAPET 125' -11" METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) CURTAIN WALL SYSTEM BRICK (BRK-1) SLOPED ROOF -HIGH POINT 175' -9 21/32" ILLUMINATED SIGNAGE METAL COMPOSITE MATERIAL WALL PANELS (MCP-2) PARAPET -LOW POINT 179' -4" CW1 WALL HYDRANT, REFER TO PLUMBING DRAWINGS3' - 1 3/8" ±W24 3' - 9 3/8" ±W28 W26 2' - 10 3/4" ±W25 3' - 1 1/2" ±W22 2' - 10 3/4" ±W24 2' - 10 3/4" ±W21 2' - 10 3/4" ±W25 3' - 1 3/8" ±W24 4' - 2 3/4" ±W41 4' - 8" ±TOTAL WALL AREA: 10,809 SF TOTAL WINDOW AREA: 1,739 SF WINDOW TO WALL AREA: 16% W44 W45 W24 W27W25 3' - 4 1/8" ±2' - 8" ±4' - 5 3/8"25 EQUAL PANELS @ 5' - 0"76' - 4" ± BUILDING HEIGHTJOINTS TO ALIGN WITH HORIZONTAL JOINTS IN SOUTH AND NORTH ELEVATIONS METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) PRECAST SILL (PS-1).ALUMINUM-FRAMED STOREFRONT WINDOW BELT COURSE PREFINISHED FASCIA (RF-1)A652 H1 1' - 2" ALIGN 20' - 0"20' - 0"18' - 0" ALIGN ALIGN CONTROL JOINT CONTROL JOINTCONTROL JOINT ALIGN TOOTH MASONRY TOOTH MASONRY TOOTH MASONRY E DOWNSPOUT NOZZLE, REFER TO PLUMBING DRAWINGS 13 EQUAL PANELS @ 5' - 0" 3 ' - 10" ± VIF 12 EQUAL PANELS @ 5' - 0"5' - 0" ALIGN SLOPE OF ROOF, BEYOND MOCKUP AREA #1A MOCKUP AREA #1A - COMPOSITE METAL PANEL TRANSITION TO METAL FASCIA AT TOP OF BRICK, INCLUDING OVERHANG, SHOWING VERTICAL AND HORIZONTAL JOINTS AND VENTS AND WEEPS; - METAL FASCIA AT TOP OF BRICK TRANSITION TO FASCIA AT TOP OF ROOF PARAPET - COMPOSITE METAL PANEL TRANSITION TO ROOFING - BELT COURSING AND TRANSITIONS TO STOREFRONT HEAD AND PRECAST SILL - PRECAST SILL TRANSITION TO STOREFRONT - BRICK TOOTHING AT ANGLE CHANGE IN BRICK WALL - BRICK CONTROL JOINT THROUGH BRICK - BRICK CONTROL JOINT THROUGH BRICK/STONE BELT COURSE - BRICK CONTROL JOINT AT STOREFRONT INTENT OF MOCKUP IS TO CONDUCT INTERMITTENT VISUAL ENVELOPE COMMISSIONING INSPECTIONS AS WELL AS TO CONDUCT AIR LEAKAGE AND WATER PENETRATION TESTING AT THE STOREFRONT ASSEMBLY. - CONSTRUCT CFMF, SHEATHING, AIR/VAPOR BARRIER SYSTEM AND STOREFRONT, INCLUDING GLAZING - CONDUCT AIR LEAKAGE AND WATER PENETRATION TEST AT STOREFRONT - CONTINUE WITH REMAINDER OF MOCKUP AFTER AAMA AIR LEAKING TESTING IS COMPLETE AND ALL NOTED DEFICIENCIES HAVE BEEN ADDRESSED/CORRECTED. MOCKUP AREA #1B MOCKUP AREA #1B - RECOMMENDED LOCATION - CW WITH CAPTURED AND STRUCTURALLY GLAZED MULLION CONDITIONS; - CW TRANSITION TO COMPOSITE METAL PANEL (CMP); INTENT OF MOCKUP IS TO CONDUCT INTERMITTENT VISUAL ENVELOPE COMMISSIONING INSPECTIONS AS WELL AS TO CONDUCT AIR LEAKAGE AND WATER PENETRATION TESTING AT THE CURTAIN WALL ASSEMBLY. - CONSTRUCT CFMF, SHEATHING, AIR/VAPOR BARRIER SYSTEM AND CURTAIN WALL INCLUDING GLAZING - CONDUCT AIR LEAKAGE AND WATER PENETRATION TEST AT CURTAIN WALL - CONTINUE WITH REMAINDER OF MOCKUP AFTER AAMA AIR LEAKING TESTING IS COMPLETE AND ALL NOTED DEFICIENCIES HAVE BEEN ADDRESSED/CORRECTED. A302 A1 A302 E1 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/10/2021 2:36:37 PMA302 EXTERIOR ELEVATIONS 02/05/2021 2018089 CRB, KAS Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1/8" = 1'-0"E1 SOUTH ELEVATION 1/8" = 1'-0"A1 EAST ELEVATION KEY PLAN0'2'4'8'16' REVISION SCHEDULE NAME DATE (PRINT IN COLOR) Received by DiMarco 2/15/2021