Loading...
HomeMy WebLinkAboutA301 Exterior ElevationsSD FIRST FLOOR 100' -0" SECOND FLOOR 114' -0" THIRD FLOOR 128' -6" FOURTH FLOOR 144' -0" FIFTH FLOOR 158' -0" E7 A401 ________________________________________________ PENTHOUSE 183' -4" B/O LOW ROOF DECK 124' -6"14'-0"14'-6"15'-6"14'-0"17'-10"7'-6"76' - 4" ± BUILDING HEIGHTT/O LOW ROOF PARAPET 125' -11" METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) CURTAIN WALL SYSTEM BRICK (BRK-1) SLOPED ROOF -HIGH POINT 175' -9 21/32" SLOPE OF ROOF BEYOND T/O CURTAIN WALL 176' -4" PARAPET -LOW POINT 179' -4" CW5CW3 CW4 6"1' - 0" WALL HYDRANT, REFER TO PLUMBING DRAWINGS CARD READER, REFER TO ELECTRICAL DRAWINGS RECESSED AUTOMATIC DOOR OPERATOR PUSH PLATE, REFER TO ELECTRICAL DRAWINGS LIGHT FIXTURE, REFER TO ELECTRICAL DRAWINGS 6' - 0"6' - 0" TOTAL WALL AREA: 9876 SF TOTAL WINDOW AREA: 2029 SF WINDOW TO WALL AREA: 20% W32 W33 W36 W27 W32W25 3' - 9 3/8"2' - 10 3/4" ±5 3/8"2' - 2 3/4" ±2' - 5 3/8"2' - 10 3/4" ±JOINTS TO ALIGN WITH HORIZONTAL JOINTS IN SOUTH ELEVATION PREFINISHED FASCIA (RF-2) ALUMINUM-FRAMED STOREFRONT WINDOW PRECAST SILL (PS-1).BELT COURSE ALIGN ALIGN ALIGN ALIGN PREFINISHED FASCIA (RF-1) 7 EQUAL PANELS @ 5' - 0"13 EQUAL PANELS @ 5' - 0" STAIR 3 LANDING 146' -3" ALIGN 1' - 2" CONTROL JOINT ALIGN ALIGNTOOTH MASONRY E 13 EQUAL PANELS @ 5' - 0" 3' - 10" ± VIF 12 EQUAL PANELS @ 5' - 0"5' - 0" ALIGN FIRST FLOOR 100' -0" SECOND FLOOR 114' -0" THIRD FLOOR 128' -6" FOURTH FLOOR 144' -0" FIFTH FLOOR 158' -0" PENTHOUSE 183' -4" B/O LOW ROOF DECK 124' -6" T/O LOW ROOF PARAPET 125' -11" METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) CURTAIN WALL SYSTEM SLOPED ROOF -HIGH POINT 175' -9 21/32" ILLUMINATED SIGNAGE A5 A452 ________________________________________________ T/O CURTAIN WALL 176' -4" SEE A303 FOR NON-OBLIQUE ELEVATION SEE A303 FOR NON-OBLIQUE ELEVATION CW2 TOTAL WALL AREA: 7825.5 SF TOTAL WINDOW AREA: 1577.5 SF WINDOW TO WALL AREA: 20% A652 F1 METAL COMPOSITE MATERIAL WALL PANELS (MCP-2) JOINTS TO ALIGN WITH HORIZONTAL JOINTS IN EAST AND SOUTH ELEVATIONS METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) CURTAIN WALL SYSTEM PREFINISHED FASCIA (RF-2) METAL COMPOSITE MATERIAL WALL PANELS (MCP-2) 4' - 2"18 EQUAL PANELS @ 5' - 0" JOINTS TO ALIGN WITH HORIZONTAL JOINTS IN EAST AND WEST AND SOUTH ELEVATIONS METAL COMPOSITE MATERIAL WALL PANELS (MCP-1), BEYOND ALIGN ALIGN ALIGN PREFINISHED FASCIA (RF-1) 5' - 0"7 1/2"9 EQUAL PANELS @ 5' - 0"EQ EQ 9 EQUAL PANELS @ 5' - 0"7 1/2"5' - 0" JOINTS TO ALIGN WITH HORIZONTAL JOINTS ABOVE SEE A303 FOR MOCKUP AREA #2 SEE A455 FOR MOCKUP AREA #3 A301 E1 A301A3 A301A1 A301A1 FIRST FLOOR 100' -0" SECOND FLOOR 114' -0" THIRD FLOOR 128' -6" FOURTH FLOOR 144' -0" FIFTH FLOOR 158' -0" T/O CURTAIN WALL 176' -4" JOINTS TO ALIGN WITH HORIZONTAL JOINTS IN EAST AND SOUTH ELEVATIONS METAL COMPOSITE MATERIAL WALL PANELS (MCP-1) 6" DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.2/10/2021 2:36:14 PMA301 EXTERIOR ELEVATIONS 02/05/2021 2018089 CRB, KAS Cayuga Park, Ithaca, New York 14850Park Grove - Cayuga Medical CenterMEDICAL OFFICE BUILDING1/8" = 1'-0"E1 WEST ELEVATION 1/8" = 1'-0"A3 NORTH ELEVATION KEY PLAN0'2'4'8'16' REVISION SCHEDULE NAME DATE 1/8" = 1'-0"A1 NORTH ELEVATION - METAL PANELS (PRINT IN COLOR) Received by DiMarco 2/15/2021