Loading...
HomeMy WebLinkAboutAddendum No. 3_3-17-2021CORNELL UNIVERSITY STATLER HOTEL GUEST FACILITIES CONTRACTS SUITES RENOVATION PHASE II 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 3 March 17, 2021 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Drawing A-111 DELETE in its entirety. REPLACE with revised Drawing A-111, attached. Item 2. Drawing A-112 DELETE in its entirety. REPLACE with revised Drawing A-112, attached. Item 3. Drawing A-121 DELETE in its entirety. REPLACE with revised Drawing A-121, attached. Item 4. Drawing A-122 DELETE in its entirety. REPLACE with revised Drawing A-122, attached. Item 5. Drawing A-124 DELETE in its entirety. REPLACE with revised Drawing A-124, attached. Item 6. Drawing A-125 DELETE in its entirety. REPLACE with revised Drawing A-125, attached. Statler Hotel Guest Suites Renovation Phase II Addendum No. 3 March 17, 2021 Page 2 Item 7. Drawing A-601 DELETE in its entirety. REPLACE with revised Drawing A-601, attached. Item 8. ADD Photos Existing Conditions: 3rd Floor and 5th Floor, dated March 17, 2021, for reference only, attached. Item 9. RFI Questions and Clarifications See attached RFI Log (Items 3 - 6) Attachments: Drawing A-111 Drawing A-112 Drawing A-121 Drawing A-122 Drawing A-124 Drawing A-125 Drawing A-601 Photos Existing Conditions: 3rd Floor and 5th Floor RFI Log (Items 1 - 6) ****END OF ADDENDUM**** Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy PointCornell University- Statler Hotel Guest Suites Renovation Phase IIPhotos Existing Conditions:3rdFloor and 5thFloorMarch 17, 2021These photos are some of the existing conditions on the suites 3rdand 5thfloor rooms (all floors similar). Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point3rd Floor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos Richard McElhiney Architects LLC Studio HME Engineering, PCTrophy Point5thFloor Photos PROJECT: Statler Hotel Guestroom Suites Renovation March 17, 2021 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 What is the height of the deck above on each floor?Height is approximately 8'-3". Floor to floor height for the 3rd, 4th, and 5th floors is 9'-0". The concrete slab is 9". 2 Is there, or will there be a link to the walk thru photos and video?See Addendum 1, Item 1. 3 A-111, A-112 What is the existing floor base material in living spaces and bathrooms? See Addendum No. 3, Items 1 and 2 for updated note. There is no base in carpeted areas, The bathrooms have a tile base as indicated by Note D24 on the construction plans. 4 A501, A121, A124 Details 11,12/A-501 are shown in the Powder Room on 1/A-121 and 1/A-124. Note F1(shown at dotted walls) on these drawings refers to existing rated walls. No demolition is shown for these walls. Are details 11,12/A-501 only required in reference to penetrations or are new walls to be constructed? Yes, just in reference to penetrations. The line does not indicate new walls. 5 A-121, A-124 Does the carpet replacement extend into the main entry hall and the hall between the bedroom and bathroom? Yes. See Addendum No. 3, Items 3 and 5 for clarification. 6 Can pictures of the existing suites be provided? Yes. See Addendum No. 3, Item 8.