HomeMy WebLinkAboutAddendum No. 2_3-11-2021CORNELL UNIVERSITY STATLER HOTEL GUESTROOM FACILITIES CONTRACTS SUITES RENOVATION 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 2 March 11, 2021 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. ADD Photos Reference Room: 9th Floor Suite, dated March 5, 2021, for reference, attached. Item 2. RFI Questions and Clarifications See Attached RFI Log (Items 1 - 2) Attachments: Photos Reference Room: 9th Floor Suite RFI Log (Items 1 - 2) ****END OF ADDENDUM****
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointCornell University- Statler Hotel Guest Suites Renovation Phase IIPhotos Reference Room:9thFloor SuiteMarch 5, 2021These photos are the completed work from Phase I of the project provided for reference and represent the materials and work to be performed in Phase II.
McElhiney Architects LLC Studio HME Engineering, PCTrophy Point9thFloor Plan – Photo Locations121345678910111312
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos12
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos34
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos56
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos78
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos910
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos11 12
McElhiney Architects LLC Studio HME Engineering, PCTrophy PointPhotos13 13
PROJECT: Statler Hotel Guestroom Suites Renovation March 11, 2021
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1
What is the height of the deck above on each floor?Height is approximately 8'-3". Floor to floor height
for the 3rd, 4th, and 5th floors is 9'-0". The concrete
slab is 9".
2
Is there, or will there be a link to the walk thru photos and video?See Addendum 1, Item 1.