HomeMy WebLinkAbout20210426 - Permit Set (2)
20210426 - Permit Set.pdf
101 ROOM NAME A101 1 1 A101 1 DETAIL ENLARGEMENT WALL SECTION BUILDING SECTION DETAIL SECTION INTERIOR ELEVATION DOOR TAG WALL TAG ROOM IDENTIFICATION EXISTING DOOR DOOR FULL HEIGHT
PARTITION PARTIAL HEIGHT PARTITION KEYED NOTE FLOOR ELEVATION 1001 1 REVISION CLOUD & TAG A101 SIM A1 A2 A3 A4 DIMENSION TO THE FACE OF FRAMING AT NEW CONSTRUCTION, TYP. DIMENSION
TO THE FACE OF FINISH AT EXISTING CONSTRUCTION DIMENSION TO THE FACE OF FINISH 1 EXISTING PARTITION 1 A101 1 A101 NAME ELEVATION AAP AREA ALARM PANEL ACP ACOUSTICAL CEILING PANEL AFF
ABOVE FINISH FLOOR CL CENTERLINE CLL CONTRACT LIMIT LINE CLR CLEAR ETR EXISTING TO REMAIN FEC FIRE EXTINGUISHER CABINET HR HOUR MAX MAXIMUM MIN MINIMUM MO MASONRY OPENING NIC NOT IN
CONTRACT NPS NOMINAL PIPE SIZE NR NOT REQUIRED OC ON CENTER OD OUTSIDE DIAMETER OFCI OWNER FURNISHED CONTRACTOR INSTALLED OFOI OWNER FURNISHED OWNER INSTALLED OPP OPPOSITE RD ROOF
DRAIN SF SQUARE FOOT SIM SIMILAR SQ IN SQUARE INCHES TYP TYPICAL UON UNLESS OTHERWISE NOTED ZVB ZONE VALVE BOX CONTRACT LIMIT LINE AREA NOT IN CONTRACT (NIC) HOLT Architects, P.C. Architects,
Planners, and Interior Designers 619 West State Street, Ithaca, New York 14850 132 E. Jefferson Street, Syracuse, New York 13202 Tel 607.273.7600 www.holt.com PROJECT INFORMATION
DATE: JOB NUMBER: CONSTRUCTION CLASSIFICATION: SPRINKLER PROTECTION: BUILDING USE CLASSIFICATION: TOTAL EXISTING BUILDING AREA (SF): TOTAL AREA OF PROJECT (SF): AREA OF RENOVATION (SF):
AREA OF ADDITION (SF): ITHACA BEER COMPANY AT SAI 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 04.23.2021 20108 1A NFPA 13 A-2 59,311 3,935
3,935 G001 DRAWING LIST GENERAL G001 COVER SHEET G131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT STRUCTURAL S100 TYPICAL STRUCTURAL DETAILS ARCHITECTURAL A001 GENERAL NOTES, KEY
PLANS AND WALL TYPES A101 FIRST FLOOR PLAN A152 FIRST FLOOR REFLECTED CEILING PLAN A162 FIRST FLOOR FINISH PLAN A250 TYPICAL MOUNTING HEIGHTS AND ELEVATIONS FIRE PROTECTION GENERAL
FP001 GEN NOTES, SYMBOLS LIST AND DETAILS - FIRE PROTECTION FIRE PROTECTION DEMOLITION FP101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS - FIRE PROTECTION FIRE PROTECTION FP101 BASEMENT
AND FIRST FLOOR PLANS - FIRE PROTECTION PLUMBING GENERAL P001 GEN NOTES, SYMBOLS LIST, DETAILS AND SCHEDULE - PLUMBING PLUMBING DEMOLITION P101D BASEMENT AND FIRST FLOOR DEMOLITION
PLANS - PLUMBING PLUMBING P101 BASEMENT AND FIRST FLOOR PLANS - PLUMBING P201 KITCHEN EQUIPMENT SCHEDULE AND DETAILS - PLUMBING MECHANICAL GENERAL M000 GENERAL NOTES AND SYMBOLS LIST
- HVAC MECHANICAL DEMOLITION MD-101 FIRST AND SECOND FLOOR PLAN - HVAC DEMOLITION MECHANICAL M101 FIRST FLOOR PLAN - HVAC M102 ROOF PLAN - HVAC M400 DETAILS - HVAC M401 DETAILS - HVAC
M402 DETAILS - HVAC M403 DETAILS - HVAC M404 DETAILS - HVAC M405 DETAILS - HVAC M500 RISER DIAGRAMS - HVAC M600 SCHEDULES AND CONTROLS - HVAC ELECTRICAL GENERAL E000 GENERAL NOTES &
SYMBOL LIST - ELECTRICAL ELECTRICAL DEMOLITION ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION ELECTRICAL E100 BASEMENT FLOOR PLAN - POWER AND SYSTEMS/LIGHTING E101 FIRST FLOOR PLANS
- POWER AND SYSTEMS/LIGHTING E102 ROOF PLAN - POWER AND SYSTEMS E400 DETAILS - ELECTRICAL E600 SCHEDULES - ELECTRICAL E602 SCHEDULES - ELECTRICAL DRYDEN RD COLLEGE AVE OAK AVE E BUFFALO
ST EDDY ST DRYDEN RD WILLIAMS ST HOLLISTER DR LINDEN AVE BRYANT AVE ELMWOOD AVE SUMMIT AVE OAK AVE PROJECT LOCATION PLAN LEGEND AND ABBREVIATIONS Elwyn & Palmer Consulting Engineers
Structural Engineers 213 East Seneca Street, Ithaca, New York 14850 Tel 607.272.5060 M/E Engineering, P.C. Mechanical, Electrical, Plumbing and Fire Protection Engineers 300 Trolley
Boulevard, Rochester, New York 14606 Tel 585.288.5590 Fax 585.288.0233 THIS SET OF DRAWINGS WAS DEVELOPED FOR THE PURPOSES OF DEFINING THE DESIGN INTENT OF THE PROJECT, AND DEFINING
THE SCOPE OF THE PROJECT FOR THE BUILDING CODE OFFICAL FOR THE PURPOSES OF ISSUING A BUILDING PERMIT. WE HAVE PROVIDED SOME CONSIDERATIONS FOR BASIS OF DESIGN PRODUCTS; THESE PRODUCTS
ARE NOT REQUIRED TO BE USED AND SHOULD BE THOUGHTFULLY CONSIDERED BETWEEN THE OWNER AND BUILDER. 500 601 LOADING ZONE WATER METER DINING LEASING OFFICE ELEV ELEV CORRIDOR TRASH/ RECYCLE
FB-3HR-E FB-3HR-E SE-2HR-E FB-3HR-E SE-2HR-E FB-3HR-E FB-3HR-E FB-3HR-E FW-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E SE-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR FB-2HR-E ED
EA EA ED ED ED E STAIR NAME STAIR # STAIR WIDTH STAIR CAPACITY STAIR RATING DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING STAIR 3 ST3 44" CLR 146 2 HOUR ST2 34" CLR 170 1-1/2 HOUR STAIR
3 DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING ST3 38" CLR 190 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104A 69" CLR 345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104
69" CLR 345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104B 69" CLR 345 N/A EXIT DISCHARGE THROUGH LOBBY D1 = 117'-4" D2 = 73' REMOTENESS OF EXITS 71'/107' = .663 X 100 = 66.3%
PER 2020BCNYS SECTION 1007.1.1 EXCEPTION 2 - NO LESS THAN 33% OF DIAGONAL ALLOWED EATD = 47'-6" ASSEMBLY UNCONCENTRATED (TABLES AND CHAIRS) 1,978 SF FB-3HR-ESE -2HR-E SE-2HR-E SE-2HR-E
SE-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E FB-3HR-E FB-1HR-EFB -1HR-E FB-1HR-E FB-1HR-E FE ED DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING EXISTING 69" CLR 345 N/A FB-2HR-E FB-2HR-E FB-2HR-E
FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FW-2HR-E FW-2HR-E FW-2HR-E FEC FB-3HR-E FB-3HR-E SE-1HR-E SE-1HR-E SE-1HR-E KITCHEN RETAIL WAIT BAR 1,978 sf KITCHENS - COMMERCIAL 1,497SF ASSEMBLY
UNCONCENTRATED (TABLES AND CHAIRS) 1716 SF EATD = 81' EATD = 79'-6" EXIT ACCESS TRAVEL DISTANCE (EATD) = 131' (SHOW THE LONGER OF THE TWO DISTANCES) PER 2020 BCNYS TABLE 1017.2, 250'
ALLOWED IN SPRINKLERED BUILDING CPET = 57' CPET= 73' 6" EXISTING EXISTING GENERAL CODE NOTES 1. EXISTING WALL RATINGS SHOWN ON CODE DRAWINGS REFLECT THE RATINGS AS SHOWN ON EXISTING
DOCUMENTS PROVIDED BY THE OWNER. NOT VERIFIED BY ARCHITECT. COORDINATE EXISTING AND NEW PARTITIONS WITH DEMOLITION AND CONSTRUCTION PLANS. 2. FLOOR IN THE AREA TO BE 2 HOUR RATED AS
PART OF EXIT LOBBY. NOTE: NOT ALL MAY APPLY LOCATION OF EXITS EXIT ACCESS TRAVEL DISTANCE (EATD): DISTANCE TO EXITS FROM THE MOST REMOTE POINT IN THE MOST REMOTE ROOM ON THE FLOOR
COMMON PATH OF EGRESS TRAVEL (CPET) CONTRACT LIMIT LINE E ENCLOSED EXIT/ EXIT TO EXTERIOR HE HORIZONTAL EXIT EA EXIT ACCESS REMOTENESS OF EXITS D2 = xxx FEET D1 = xxx FEET DEAD END
CORRIDOR (DE) ED EXIT DISCHARGE EXIT TO EXIT (D2) BUILDING DIAGONAL (D1) EATD = xxx FEET CPET = xxx FEET DE = xxx FEET FIRE EXTINGUISHER FEC FEBRACKET CABINET 1 HOUR FIRE BARRIER -
EXISTING 1/2 HOUR FIRE PARTITION - EXISTING 0 HOUR SMOKE PARTITION - EXISTING FB-1HR-E SP-0HR 1 HOUR FIRE BARRIER FB-1HR 1/2 HOUR FIRE PARTITION FP-1/2HR-E SP-0HR-E 0 HOUR SMOKE PARTITION
1 HOUR SHAFT/STAIR ENCLOSURE - EXISTING 1 HOUR SHAFT/STAIR ENCLOSURE SE-1HR-E SE-1HR 2 HOUR FIRE WALL - EXISTING FW-2HR-E 2 HOUR FIRE WALL FW-2HR 1 HOUR FIRE PARTITION - EXISTING 1
HOUR FIRE PARTITION FP-1HR-E FP-1HR 2 HOUR FIRE BARRIER - EXISTING FB-2HR-E 2 HOUR FIRE BARRIER FB-2HR 1 HOUR SMOKE BARRIER - EXISTING 1 HOUR SMOKE BARRIER SB-1HR-E SB-1HR FP-1/2HR
3 HOUR FIRE WALL - EXISTING 3 HOUR FIRE WALL FW-3HR-E FW-3HR SE-2HR-E SE-2HR 2 HOUR SHAFT/STAIR ENCLOSURE - EXISTING 2 HOUR SHAFT/STAIR ENCLOSURE HORIZONTAL ASSEMBLY (HA) (SHOWN IN
PLAN) 3 HOUR FIRE BARRIER FB-3HR OCCUPANCY DIFFERENCE FEC FEC FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E EATD = 52 FT E SE-1HR-E SE-1HR-E E FB-1HR-E FB-1HR-E
ITHACA BEER TENANT SPACE, ONLY BEING PROVIDED WITH LIFE SAFETY REQUIREMENTS AT THIS TIME FUTURE STORAGE FUTURE ASSEMBLY UNCONCENTRATED 308 2020 BCNYS 2020 BC 8 239 </=67%
=2 URINALS 3 WC REQUIRED=66% 6 3 3 3 3 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design
11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York
State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the
altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
4/26/2021 2:15:53 PM G131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR 1/8" = 1'-0" D5 ITHACA BEER SAI - FIRST FLOOR CODE CONFORMANCE PLAN 1/8" = 1'-0" D1 ITHACA BEER SAI - BASEMENT FLOOR CODE PLAN KEY PLAN 0' 2' 4' 8' 16'0' 2' 4' 8' 16' REVISION SCHEDULE
NAME DATE L1 1/2" x1 1/2" x 1/4" (TYP) 1/2"⌀HOT-DIPPED GALVANIZED BOLTS 4 PLACES. BOLT TO ENGAGE CFS STUD FLANGE. (TYP) L2"x2"x1/4" CLIP WITH BOLTS AND HEX NUTS STANDARD RISER SUPPORT
WITH BOLTS AND HEX NUTS STANDARD RISER SUPPORT WITH BOLTS AND HEX NUTS STEEL PLATE WASHER AND NUT (TYP 4) 10" 2" 1' - 0" 2" STUDS EXTERIOR CFS ASSEMBLY SEE ARCH EXTERIOR WALL L1 1/2"
x1 1/2" x 1/4" (TYP) TYP L1 1/2" x1 1/2" x 1/4" HORIZ TYPICAL TOP AND BOTTOM PROVIDE SUPPORT @ 1'-0" BELOW EACH FLOOR LEVEL (5 LOCN'S) FLOOR ELEV SEE PLAN SAW CUT SQUARE OPENING DO
NOT OVERCUT CORNERS EXG 4 1/2" SLAB ON DECK 1" 14" @ SINK DRAIN 9" @ FLR DRAIN 1" CAST DRAIN INTO NON-SHRINK GROUT PROVIDE CIRCULAR CUT IN STEEL DECK AS REQUIRED FOR NEW DRAIN 1/2"
COLLAR DIA. FLR/SINK DRAIN 1/2" PROVIDE ANGLE FRAME FOR PENETRATIONS > 6"⌀ SEE 5/S100 DUCT DIMENSION COORD WITH DUCT SUPPORT POST ADJUSTABLE LOWER BRACE BALLAST SUPPORT PAD. DO NOT
PENETRATE EXISTING ROOF MEMBRANE. FIELD ADJUST UP TO 12" 12 1/4" TO 24" 24 1/4" TO 36" 36 1/4" TO 48" 48 1/4" TO 60" 60 1/4" TO 72" 72 1/4" TO 84" 2'-0" 3'-0" 4'-0" 5'-0" 6'-0" 7'-0"
8'-0" DUCT SIZE EQUIPMENT RAIL LENGTH SIZE CHART ADJUSTABLE UPPER BRACE PROVIDE BALLASTED SUPPORT FRAME RATED FOR 115 MPH ULTIMATE WIND LOAD. SIMILAR TO "UNISTRUT HVAC DUCT SUPPORTS
WITH CONCRETE WEIGHTED BASES". EXISTING 6" CFS STUDS EXISTING GYPSUM SHEATHING TO REMAIN CUT AND REPLACE SHEATHING AS REQUIRED FOR LINTEL INSTALLATION. 400T125-43 + 400S200-43 (TYP)
FASTEN TO JAMB STUDS W/ 4x4x16 GA. CLIP ANGLE W/ (4) #10 SELF-DRILLING SCREWS INTO EACH LEG. EXISTING GLASS-MAT GYPSUM SHEATHING EXISTING EIFS TO REMAIN 2" DEEP X 4" WIDE NOTCH IN STUD
TO ACCOMODATE NEW CFS LINTEL (TYP) #10 SELF-DRILLING FASTENERS @ 12" O.C. (TYP) DUCT (TYP) 1/2" ROOF OR FLOOR OPENING 1/4 TYP FLOOR BEAM OR JOIST - TYP L6x4x3/8 (LLV) CLIP HORIZONTAL
LEG L4x4x1/4" - WELD FLUSH TO L6x4x3/8 - 2 REQUIRED COORDINATE FINAL SIZE AND LOCATION OF ROOF FRAMES WITH MECHANICAL AND PLUMBING CONTRACTORS. 8'-0" MAX SPACING DATE: PROJECT: OTHER:
DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850
132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com Elwyn Palmer & CONSULTING ENGINEERS, PLLC 213 East Seneca Street Ithaca, New York 14850 www.ElwynPalmer.com
607.272.5060 4/22/2021 5:34:49 PM S100 TYPICAL STRUCTURAL DETAILS 04.23.2021 20108 JEC/RAM 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR REVISION
SCHEDULE NAME DATE 1 1/2" = 1'-0" 1 VERTICAL PIPE/DUCT SUPPORT DETAIL 1 1/2" = 1'-0" 2 TYPICAL FLOOR/SINK DRAIN IN EXISTING SLAB ON DECK 1" = 1'-0" 3 BALLAST ROOF DUCT SUPPORT DETAIL
1" = 1'-0" 4 TYP DUCT PENETRATION @ EXTERIOR WALL 3/4" = 1'-0" 5 TYPICAL FLOOR FRAME OPENING 1_ 1A 1B 2_ 2A 2B 3_ 3A 3B • EXTEND TO UNDERSIDE OF DECK • RATED AS REQUIRED BY CODE CONFORMANCE
PLANS, REFER TO UL DESIGN U419 OR U425 • ACOUSTICAL PERFORMANCE - STC 49+ • PROVIDE TILE BACKER PANEL, IN LIEU OF GYPSUM BOARD AT LOCATIONS TO BE TILED 5/8" VARIES 5/8" CEILING PLANE,
SEE REFLECTED CEILING PLANS SEALANT, BOTH SIDES, ENTIRE PERIMETER UNDERSIDE OF DECK GYPSUM BOARD SOUND ATTENUATION BLANKET GYPSUM BOARD SEALANT, BOTH SIDES, ENTIRE PERIMETER METAL STUDS
@ 16" OC WALL BASE, SEE FINISH SCHEDULE 3-5/8" STUD 6" STUD 5/8" CEILING PLANE, SEE REFLECTED CEILING PLANS VARIES SEALANT, ENTIRE PERIMETER UNDERSIDE OF DECK METAL STUDS @ 16" OC GYPSUM
BOARD WALL BASE, SEE FINISH SCHEDULE SEALANT, ENTIRE PERIMETER • EXTEND TO UNDERSIDE OF DECK • PROVIDE TILE BACKER PANEL, IN LIEU OF GYPSUM BOARD AT LOCATIONS TO BE TILED 1-5/8" STUD
3-5/8" STUD • EXTEND TO UNDERSIDE OF DECK • RATED AS REQUIRED BY CODE CONFORMANCE PLANS, REFER TO UL DESIGN U419 OR U425 • ACOUSTICAL PERFORMANCE - STC 49+ • PROVIDE TILE BACKER PANEL,
IN LIEU OF GYPSUM BOARD AT LOCATIONS TO BE TILED 5/8" CEILING PLANE, SEE REFLECTED CEILING PLANS SEALANT, BOTH SIDES, ENTIRE PERIMETER UNDERSIDE OF DECK GYPSUM BOARD SOUND ATTENUATION
BLANKET SEALANT, BOTH SIDES, ENTIRE PERIMETER METAL STUDS @ 16" OC WALL BASE, SEE FINISH SCHEDULE 3-5/8" STUD 6" STUD CEMENT BOARD SHEATHING, PLACED ON KITCHEN SIDE, SEE FINISH PLAN
DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street
Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting
under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such
document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 4:06:33 PM A001 GENERAL
NOTES, KEY PLANS AND WALL TYPES 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1 1/2" = 1'-0" G1 IWS #1 - METAL STUD
W/ GYPSUM BOARD EACH SIDE 1 1/2" = 1'-0" G3 IWS #2 - METAL STUD W/ GYPSUM BOARD ONE SIDE 1 1/2" = 1'-0" G5 IWS #3 - METAL STUD W/ GYPSUM BOARD AND CEMENT BOARD REVISION SCHEDULE NAME
DATE FD FD FD FD FD FS FS FS FS 1A 2A 32 3.5 4 5 5.8 5.9 B C D E F G H J K L N O M 1.9 TABLE 18" x 30" SAUTEE 60" x 40"W/ SALIMANDER ABOVE GRILL TOP W/ LOWBOY UNDERNEATH, SALIMANDER
ABOVE 36" x 36" FLAT TOP 60" x 36" (3) FRYERS 48" x 30" TABLE 24" x 30" HW SINK 17" x 15" FRIDGE 24" x 30" COOLER 60" x 30" STAGING TABLE 60" x 30" SALAD STATION 60" x 30" TABLE 24"
x 44" ICE MAKER 30" x 30" PIZZA PREP TABLE 80"X 31" MUGNANI 74.5" x 74,5" DISH WASHER 31.8" x 24.6" (3) BAY SINK 108"x30" CLEAR 5' - 0" 24" DISH WASHER BEER AND MERCHANDISE 24" x 24"
HW SINK 25" DISH WASHER 4'-0" UC COOLER WATER SPIGGIT ABOVE COUNTER, NEED DRAIN 4'-0" (2) BAY SINK 104 WOMEN'S TOILET 103 MEN'S TOILET 105 KITCHEN CLEAR 3' - 8" COOLER 6' - 0" 16' -
5" 9' - 2" PREP TABLE 30" DEPTH CLEAR 5' - 0" CROWLER MACHINE ON TOP OF COUNTER 18" DUMP SINK 13' - 6" HOT FOOD TO GO/ OR DISPLAY 8' OF TAPS (15+/- LINES) COOLER 6' - 0" TWO-SIDED
COOLER DISPLAY WINDOW OPENING W/ HEAT LAMPS CLEAR 4'-7" 8' - 6" 3'-7" 8' - 6" CLEAR 5' - 0" 10' - 0" TABLE 24" x 60" 3' - 8 1/8" 5' - 3 3/8" TABLE 24" x 60" RACK 6'-3" BUILT-IN COUNTERS
25.25" x 29.8" " DISH WASHER 3' - 0" 8" 101 WAIT 106 BAR 102 DINING 107 RETAIL 100 VESTIBULE TAKEOUT SERVING STATION PIZZA OVEN JC COOLER 1 1 1A 1A 1A 1A 1A 1A 2B 1A 1A 1A 1A 1A 1A
1A 2B 1A 1A 1A 1A 1B 2A 2A2A 2A2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 10'-0 5/8" 1'-4 7/8" 9'-0 5/8" 5'-7 1/4" 6'-8 5/8" 5'-0 1/4" 6'-5 1/4" 9'-0
5/8" 2B 18'-2" 6'-4 7/8"11'-2 7/8" 10'-4 7/8"5'-3 7/8"1'-4 1/8"11'-3 1/2" 6'-8 1/8" 5'-11 1/4" 9'-7 1/2" 21'-2 5/8" 4 2 3 2'-6" 2'-6" 5'-0" 3'-0" COOLER A101 H8 SINK UNDER BAR 6 3'-9"
6'-0" 5'-5 5/8" 8'-9 7/8" 9'-4 1/8" 5 6 2 2'-1 5/8" 8'-3 5/8" 5'-5" 3'-1 7/8"3'-1"5'-0" 7'-1 3/4" 6'-1 1/2" 4'-7 1/8" 4'-11" 3'-8 5/8" HOST 1'-3" 2'-11" 6'-5 3/4" 10'-5" 8'-10" 112°
143° 112° 112° 5'-9 3/4" 2'-6 3/4" 1'-11 7/8" 6'-3" 4'-10" 11'-2 7/8" 7'-6 5/8" 4'-11 1/2" 15'-6 1/8" PROVIDE A 6" WIDE BY 3/8" THICK PLATE UNDER THE OVEN LEGS, COORDINATE SIZE AND
LOCATION OF PLATE, CONNECTIONS WITH OVEN PROVIDED BY OWNER OVEN LEGS DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture
Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It
is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of
an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific
description of the alteration. 4/23/2021 4:09:07 PM A101 FIRST FLOOR PLAN 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR 1/4" = 1'-0" A1 FIRST FLOOR PLAN GENERAL ARCHITECTURAL NOTES KEY PLAN KEYED CONSTRUCTION NOTES GENERAL NOTES 1 ALL WORK IS NEW UNLESS NOTED AS EXISTING. 2 ANY DISCREPANCY CONTAINED
WITHIN ANY OF THE DOCUMENTS SHALL BE UNDERSTOOD TO MEAN THAT THE GREATER QUANTITY AND OR THE BETTER QUALITY SHALL BE PROVIDED IN THE FAVOR OF THE OWNER. 3 REFER TO CODE CONFORMANCE
DRAWINGS FOR REQUIRED FIRE RATED CONSTRUCTION. 4 PROTECT/MAINTAIN ALL EXISTING FIRE PROTECTION AND FIRE RESISTANCE RATED CONSTRUCTION. WHERE SCHEDULED WORK DISTURBS FIRE PROTECTION,
THE CONTRACTOR SHALL MAKE REPAIRS NECESSARY TO MAINTAIN REQUIRED RATING. WHERE ANY CONSTRUCTION ACTIVITY DISRUPTS ANY ACTIVE LIFE SAFETY SYSTEMS, THESE MUST BE COORDINATED AT A TIME
OF MINIMUM DISRUPTION TO THE OWNER AND WITH AT LEAST FOURTEEN (14) DAYS NOTICE. 5 CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD (EXISTING AND SCHEDULED CONSTRUCTION)
AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 6 DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. 7 NOTES ON ONE DETAIL OR DRAWING APPLY TO ALL SIMILAR DETAILS AND DRAWINGS. 8 DIMENSIONS
NOTED "EQ" ARE EQUAL TO EACH OTHER ONLY IF THEY ARE ON THE SAME DIMENSION STRING AND IN THE SAME ROW. 9 ROOM NUMBERING IS FOR CONSTRUCTION PURPOSES ONLY, ACTUAL ROOM NUMBERING TO BE
COORDINATED WITH THE OWNER PRIOR TO ANY SCHEDULING OR LABELING. ALL EQUIPMENT LABELING AND SCHEDULING SHALL BE FORMATTED AS DIRECTED BY OWNER. 10 ANY PORTION OF THE PROJECT WHICH IS
DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY SHALL BE REPAIRED. 11 MAINTAIN MEANS OF EGRESS, KEEPING IT FULLY SEPARATED FROM CONSTRUCTION AREA AT ALL TIMES WITH A 1-HOUR FIRE RESISTANT
RATED BARRIER (U L DESIGN 309) 12 PROVIDE A FRAMED, DUST PROOF BARRIER TO SEPARATE CONSTRUCTION AREA FROM THE REST OF THE FACILITY AT ALL TIMES. PROVIDE TEMPORARY FILTERS, AND/OR NEGATIVE
AIR, AS REQUIRED TO PREVENT THE SPREAD OF DUST, FUMES, AND ODORS THROUGHOUT THE BUILDING. UPON COMPLETION OF THE WORK, REMOVE AND REPAIR ANY DAMAGE CAUSED BY THE UNSTALLATION/PRESENCE
OF THE TEMPORARY BARRIER TO A NEW-LIKE CONDITION. # SWINGING DOORS, NO LATCH. WHERE SEATING OR STANDING SPACE AT FIXED OR BUILT-IN TABLES, COUNTERS OR WORKSURFACES IS PROVIDED IN ACCESSIBLE
SPACES, AT LEAST 5 PERCENT OF THE SEATING AND STANDING SPACES, BUT NOT LESS THAN ONE, SHALL BE ACCESSIBLE. NYS 2020 BUILDING CODE BC1109.11. POINT OF SALE AND SERVICE COUNTER: WHERE
COUNTERS ARE PROVIDED FOR SALES OR DISTRIBUTION OF GOODS OR SERVICES, AT LEAST ONE OF EACH TYPE PROVIDED SHALL BE ACCESSIBLE. NYS BUILDING CODE 2020 BC1109.12.3. PROVIDED PAINTED METAL
ENDCAP. GYPSUM BOARD SURROUND STEEL CROSSBRACING, AS TIGHT AS POSSIBLE TO STEEL, CREATE OPENINGS WHERE THEY EXIST IN CROSSBRACING. PARTIAL HEIGHT WALL AT 42" AFF. GLASS VESTIBULE, WITH
CAP AT 9'-6" AFF. LOW WALL AT BANQUETTE SIDE, HEIGHT TO BE COORDINATED WITH BANQUETTE DETAIL. 0' 1' 2' 4' 8' CONTRACTOR SHALL PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL FLOOR, WALL,
AND CEILING MOUNTED EQUIPMENT, MILLWORK, AND ACCESSORIES PROVIDED UNDER THIS CONTRACT AND EQUIPMENT TO BE PROVIDED BY THE OWNER. CONTRACTOR SHALL PROVIDE BRACING WHERE REQUIRED TO SUPPORT
OR STABILIZE ALL NON-STRUCTURAL FRAMING. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS AS REQUIRED TO OBTAIN CONVENIENT MAINTENANCE ACCESS TO ALL VALVES, DAMPERS, CONCEALED JUNCTION BOXES,
AND OTHER EQUIPMENT REQUIRING ADJUSTMENT, SERVICE, OR MAINTENANCE. PROVIDE PROPOSED LOCATION AND SIZE OF ALL ACCESS PANELS FOR REVIEW AND APPROVAL BY ARCHITECT PRIOR TO INSTALLATION.
PROVIDE FIRE RATED ACCESSORIES AT ALL FIRE RATED PARTITIONS. REFER TO CODE CONFORMANCE DRAWING FOR FIRE EXTINGUISHER CABINET LOCATIONS. COMPLY WITH BC1109.2 NYS BUILDING CODE FOR TOILET
FACILITIES ACCESSIBILITY REQUIREMENTS. REPAIR ANY FIRE RATED CONSTRUCTION DAMAGED DURING CONSTRUCTION; MAINTAIN EXISTING FIRE RATING AS PER BUILDING CODE REQUIREMENTS. PATCH EXISTING
WALLS AND PREPARE FOR SCHEDULED FINISH, TYPICAL ALL EXISTING WALLS WITHIN CONTRACT LIMIT LINES AND NOTED ELSEWHERE. CLEAN ALL WINDOW GLASS, INTERIOR AND EXTERIOR. ALL SLAB OPENINGS
FOR FLOOR SINKS, DRAINS, TROUGHS, TO BE FIRESTOPPED WITH REQUIRED RATING, AND FLASHED. PAINT ALL WALLS AND CEILINGS UON. 1 2 3 4 5 6 7 8 9 10 11 1/2" = 1'-0" H8 STRUCTURAL PLATE UNDER
PIZZA OVEN 1 2 3 4 5 6 7 COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE INSTALLED. 13 REVISION SCHEDULE
NAME DATE GC RESPONSIBILITY TO COORDINATE ARCHITECTURAL WORK SCOPE WITH ROOFTOP MECHANICAL WORK SHOWN ON DRAWINGS M102 & M400. CONFIRM THAT THIS WORK WILL NOT AFFECT EXISTING ROOFING
WARRANTY. 14 IT IS THE RESPONSIBILITY OF THE GC TO ENSURE THAT THE KITCHEN HOOD CLEARANCE FROM LIMITED-COMBUSTIBLE MATERIALS IS IN COMPLIANCE WITH LOCAL CODE REQUIREMENTS. 15 AN ADDITIONAL
LAYER OF ROOFING MEMBRANE TO BE APPLIED AT THE LOCATION OF THE KITCHEN AND PIZZA HOOD EXHAUST FANS. KITCHEN AND PIZZA HOOD EXHAUST DUCTS SHOULD BE PAINTED TO MATCH THE EXTERIOR OF THE
BUILDING. 16 17 S S S M M M M M OS OS ELEV ELEV 12'-2" 18'-0" BUILT IN BENCH 11' - 0" 9' - 6" 9' - 0" 9' - 0" E7 A152 9' - 0" 1 2 2 3 4 5 6 7 4 8' - 9" 6'-0"6'-0" 90° 7'-0" 7'-0" 8'-3"
9' - 0" 8' - 6" G7 A152 G7 A152 G7 A152 8' - 6" 8' - 6" 8 8 GYPSUM BOARD CEILINGS AND SOFFITS 2' X 2' ACOUSTICAL PANEL CEILING SYSTEM NOTE: REFER TO FINISH/MATERIAL LEGEND FOR CEILING
TYPES KEYED INTO CEILING HEIGHT/MATERIAL TAG. PENDANT LED EDISON BULB WITH CORDS OF VARYING LENGTH, BASIS OF DESIGN: https://www.contechlighting.com/en/products/rlm80 OR https://www.usa.lighting.phi
lips.com/api/assets/v1/file/PhilipsLighting/cont ent/comf7404039-pss-en_us/LP_CF_7404039_EU.en_US.PROF.CF.pdf SOCKET BAR ABOVE LAVS AND WET WALLS, BASIS OF DESIGN: https://www.tivolilighting.com/wpco
ntent/uploads/Tivoli_Assets/Product_SpecSheet_Files/3093Channel_WB_SS_07-23-2020.pdf RECESSED DOWNLIGHTS 4" DIAMETER MONOPOINT LED 4" DIAMETER ON STEM COPLANAR TO CEILING SLATS DECORATIVE
LED PENDANT FIXTURE, TBD 1'X4' SIGNIFY FLUXPANEL LED, BASIS OF DESIGN: https://www.signify.com/en-us/products/indoor-luminaires/recessed-andsurface/general-purpose-lensed/fluxpanel-led
ACP: (KITCHEN) WASHABLE, SOIL RESISTANT, MOLD AND MILDEW RESISTANT, RESISTANT TO SAGGING -BASIS OF DESIGN ARMSTRONG CERAMAGUARD UNPERFORATED TRACK LIGHTING, TBD CEILING HEIGHT TBD ANGLE
SOFFIT UP TO _AFF, COORDINATE WITH DIFFUSER RETURN WALL ALL SIDES OF SOFFIT CEILING HEIGHT TBD SUSPENDED UNISTRUT FOR LIGHTING 6" ALIGN COORDINATE CEILING HEIGHT WITH DUCTWORK UON 6"
IN FIELD VERIFY GYPSUM BOARD OR ACOUSTICAL PANEL CEILING, AS INDICATED, CUT PARTIAL PANEL TO MATCH TEGULAR EDGE, TYP. PAINT EDGES TO MATCH PANEL SUSPENSION WIRE CORNERBEAD WALL ANGLE
NON-STRUCTURAL METAL FRAMING EXISTING BEAM WITH SPRAYED FIRE-RESISTIVE MATERIAL GYPSUM BOARD CEILING HEIGHT 9'-0" CEILING HEIGHT 9'-0" DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G
A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street
Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect,
to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered
by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 4:09:35 PM A152 FIRST FLOOR REFLECTED CEILING PLAN 04.23.2021 20108
CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/4" = 1'-0" A1 ITHACA BEER SAI - FIRST FLOOR REFLECTED CEILING PLAN GENERAL RCP NOTES
CEILING MATERIALS KEY PLAN ACOUSTIC PANEL CEILINGS ARE APC1 UNLESS OTHERWISE NOTED BY CEILING HEIGHT/MATERIAL TAG. PAINT CEILING ACCESS PANELS WHERE THEY OCCUR TO MATCH ADJECENT CEILING.
CENTER ACOUSTIC CEILING PANELS WITHIN FIELD. PARTIAL PANELS AT ROOM PERIMETER SHALL NOT BE LESS THAN 6". MOUNT ALL FIXTURES AND DEVICES IN CENTER OF ACOUSTIC CEILING PANEL UNLESS OTHERWISE
NOTED. REFER TO MECHANICAL, ELECTRICAL, FIRE ALARM AND FIRE PROTECTION DRAWINGS FOR FIXTURES NOT SHOWN ON THIS SHEET. COORDINATE LOCATIONS OF FIXTURES NOT SHOWN WITH LAYOUT INDICATED
ON THIS SHEET. PROVIDE ACCESS PANELS IN ALL NON-ACCESSIBLE CEILINGS WHERE SERVICE OR ADJUSTMENT TO MECHANICAL, PLUMBING OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESS PANELS SHALL BE EQUAL
TO THE RATING OF THE WALL OR CEILING IN WHICH THEY OCCUR. PROVIDE COORDINATED SHOP DRAWING OF ALL REQUIRED ACCESS PANELS FOR REVIEW. PROVIDE COORDINATION DRAWINGS OF ALL EXPOSED MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION AND AUDIO/VIDEO SYSTEMS FOR REVIEW. EXPOSED FIREPROOFED DECK, BEAMS AND UTILITIES, UON, TO BE PAINTED WITH DRYFOG ACRYLIC LATEX PAINT WITH FLAME
SPREAD INDEX <200. PAINT ALL EXPOSED DUCTWORK; COORDINATE WITH OWNER IF DUCTWORK TO BE SAME COLOR AS DRYFOG OR DIFFERENT COLOR. IF DIFFERENT COLOR, PAINT PRIOR TO INSTALLATION. ALL
SUSPENDED SYSTEMS MUST PROVIDE FOR LATERAL FORCE RESISTANCE REQUIREMENTS OF ALL APPLICABLE CODES. 1 2 3 4 5 6 7 8 9 10 KEYED CONSTRUCTION NOTES # PROVIDE ACCESS PANELS AS REQUIRED FOR
TOILET ROOMS. UNISTRUT AT 9'-0" AFF TO PROVIDE PATHWAY FOR PENDANT LIGHTS. PENDANTS SHOULD BE FLEXIBLE IN TERMS OF LOCATION. CURVILINEAR DECORATIVE FASCIA, MATERIAL AND DETAIL TBD.
PENDANT LIGHTING TO BE LOCATED IN FIELD. GYPSUM BOARD CEILING CLOUD, FRAME WITH METAL STUD AND EDGE WITH ALUMINUM TRIM, TBD. 2X2 METAL SLATS, MATERIAL TBD. TRACK LIGHTING ABOVE SLATS.
PROVIDE CEILING OVER COOLERS. LIGHT FIXTURES 1 2 3 4 5 6 7 8 3/4" = 1'-0" E7 SECTION @ SOFFIT 1 1/2" = 1'-0" G7 CEILING DETAIL - GYPSUM BOARD SOFFIT AT BEAMS - SAI ITHACA BEER REVISION
SCHEDULE NAME DATE DN FD FD FD FD FD FS FS FS FS FD FS ELEV ELEV DINING P SC 102 RETAIL P SC 107 WOMEN'S TOILET RB EP SC 104 MEN'S TOILET RB EP SC 103 EP SS KITCHEN RS FRP RS 105 BAR
COOLER COOLER 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT P2 ACCENT WALL PAINT COLOR ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. FLOOR
FINISHES SCOPE OF WORK AREA FLOOR DRAIN COORDINATE WITH PLUMBING DRAWINGS FLOOR SINK COORDINATE WITH PLUMBING DRAWINGS * REFER TO ELEVATIONS DATE: PROJECT: OTHER: DRAWN BY: A B C D
E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson
Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect,
to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered
by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 4:10:03 PM A162 FIRST FLOOR FINISH PLAN 04.23.2021 20108 CAK/HRT
411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/4" = 1'-0" A1 ITHACA BEER SAI - FIRST FLOOR FINISH PLAN 1 ALL WALLS TO BE PAINTED X UNLESS
OTHERWISE NOTED. 2 ALL GYPSUM BOARD CEILINGS TO BE PAINTED. 3 ALL DOORS / FRAMES AND PAINTED WINDOW TRIM / FRAMES SHALL BE PAINTED. 4 SEE REFLECTED CEILING PLAN FOR ADDITIONAL FINISH
INFORMATION, TYPICAL. 5 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 6 EXTEND ALL FINISHES UNDER CABINETS, BENCHES,
SHELVING, COUNTERTOPS AND LAVATORIES. 7 MISCELLANEOUS ELECTRICAL PANEL COVERS, GRILLES, ETC. TO BE PAINTED TO MATCH ADJACENT WALL SURFACES. 8 ALL GYPSUM BOARD AT TOILET ROOMS TO BE
MOISTURE RESISTANT GYSPUM BOARD UNLESS OTHERWISE NOTED. 9 ADHESIVES AND FINISHES TO BE LOW VOC. 10 IN KITCHEN, OUTSIDE CORNERS TO RECEIVE STAINLESS STEEL CORNER GUARDS (U.O.N.). 11
PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. GENERAL FINISH NOTES FINISH LEGEND KEYED FINISH
NOTES KEY PLAN FINISH SCHEDULE: FLOORS: SC: SEALED CONCRETE RS: RESILIENT SHEET FLOORING WITH SLIP RESISTANCE, WELDED SEAMS, 6" FLASH COVE BASE, 2.5mm THICKNESS -BASIS OF DESIGN: ALTRO
CLASSIC 25 WALLS: P: LATEX PAINT; EGGSHELL OR SATIN ON WALLS AND GYPSUM BOARD CEILINGS, SEMI- GLOSS AT DOOR FRAMES, TRIM EP: (TOILET ROOMS AND SELECT AREAS IN KITCHEN) WATER BASED EPOXY
PAINT FRP: (THROUGHOUT KITCHEN, UON) FIBERGLASS REINFORCED POLYESTER PANEL ON CEMENT BOARD SHEATHING, JOINTS, SEAMS, AND EDGES SHOULD HAVE MOULDING/JOINT STRIPS, AND ALSO BE SEALED.
SS: (COOKING AREA) FLASHED WITH 20 GAUGE (1MM) STAINLESS STEEL, WITH LOCK SEAMS, FROM FLOOR TO CEILING AND EXHAUST HOOD BOTTOM; APPLY TO CEMENT BOARD SHEATHING RB: RUBBER BASE AT 6"
HIGH IN TOILET ROOMS CEILINGS: DF: (GENERAL EXPOSED FIREPROOFED DECK AND BEAMS) DRYFOG ACRYLIC LATEX PAINT WITH FLAME SPREAD INDEX < 200 INCLUDE ALL EXPOSED UTILITIES UON ACP1: (KITCHEN)
WASHABLE, SOIL RESISTANT, MOLD AND MILDEW RESISTANT, RESISTANT TO SAGGING -BASIS OF DESIGN ARMSTRONG CERAMAGUARD UNPERFORATED NOTE: SLATS AND OTHER MATERIALS SHOWN ON RCP TO BE DETERMINED
BY OWNER. # 1 2 3 0' 2' 4' 8' 16' COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE INSTALLED. 12 REVISION
SCHEDULE NAME DATE FEC SD FP FA E TOSS H C EM PROTRUDING OBJECTS CLEAR FLOOR SPACE Unless otherwise specified may include knee and toe clearances CIRCULAR TURNING SPACE May include
knee and toe clearances 'T-TURN' TURNING SPACE May include knee and toe clearances only at the end of either the base or one arm. 4" MAX 80" 27" 3' -4" 2' -11" 3' -4" 4' -0" 4' -0"
EXCEPTIONS: (1) HANDRAILS MAY PROTRUDE 4-1/2" MAX. (2) DOOR CLOSERS & STOPS MAY BE 78" MIN. ABOVE THE FLOOR FIG. 307.2 FIG. 603.4 COAT HOOK & SHELF MOUNTING HEIGHTS FIG. 603.3
MIRROR MOUNTING HEIGHTS NOTE: SEE REACH RANGES FOR COAT HOOK MOUNTING HEIGHTS NOTE: HEIGHT TO EDGE OF REFLECTIVE SURFACE FIG. 604.5.2 REAR WALL GRAB BAR FOR WATER CLOSET 2' -10" TYPICAL
CLEARANCES AND REACH RANGES - ANSI 2009 1' - 6" 1' - 0" 2' - 0" TYPICAL MOUNTING HEIGHTS AND CLEARANCES FOR PLUMBING FIXTURES 6' - 9" MIN 6' - 2" MIN SHELF 36" MIN. 102800 - TOILET
AND BATH ACCESSORIES 210000 - FIRE SUPRESSION 2'-0" B C D E F G H K L N O 4' - 0" 6' - 8" 4' - 6" FIRE EXTINGUISHER CABINET (FEC) FIRE ALARM PULL FIRE ALARM SMOKE DETECTOR 1 1/2" MIN
1' - 0" MIN M A B D E F G I J SANITARY NAPKIN DISPENSER PAPER TOWEL DISPENSER SOAP DISPENSER, NIC MIRROR (TOP) LAVATORY TOP OF WATER CLOSET SEAT GRAB BAR ITEM WASTE RECEPTACLE C K
LTOILET PAPER DISPENSER URINAL MOUNTING HEIGHT CODE REF. ICC/ANSI A117.1-2009 6' - 2" MIN M N O DRINKING FOUNTAIN SHOWER CURTAIN ROD FOLDING SHOWER SEAT SHOWER CONTROLS GRAB BAR AT
TUB SOAP DISH AT TUB TOILET SEAT COVER DISPENSER TOILET PARTITION PUSH PLATE 1' - 6" 2' - 10" 1' - 5" 2' - 10" 3' - 8" (1) 3' - 6" (2) 3' - 0" 3' - 6" 3' - 6" 3' - 6" 2' - 3" 9" 606.3
604.4 604.5 604.7 605.2 602.4 HOLT STANDARDS 610.3 608.5 HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS HOLT STANDARDS3' -
0" ITEM CODE REF. ICC/ANSI A117.1-2009 H MIRROR (BOTTOM) 3' - 4" MAX 603.3 1' - 6" to 4' - 0" 1' - 6" HAND DRYER 3' - 6" HOLT STANDARDS SOAP DISH/ CORNER BASKET AT SHOWER 3' - 6" HOLT
STANDARDS Q R T U V S3' - 4" 3' - 6" 6' - 10" MOUNTING HEIGHT HOLT STANDARDS 260000 - ELECTRICAL DEVICES 224000 - PLUMBING FIXTURES Q R S T(1) T(2) U V 1' - 6" POWER OUTLET OCCUPANCY
SENSOR LIGHT SWITCH THERMOSTAT HUMIDITY CONTROL 5' - 1" 2" HINGED SIDE OF DOOR ROOM SIGN, SEE SCHEDULE LATCH SIDE OF DOOR EDGE OF DOOR FRAME OR EDGE OF OPENINGSIGN MOUNTING ELEVATION
3' - 2" CODE BLUE EMERGENCY POWER 5' - 6" ZONE VALVE BOX AREA ALARM PANEL FIG. 308.2.1 UNOBSTRUCTED FORWARD REACH FIG. 308.2.2 OBSTRUCTED HIGH FORWARD REACH FIG. 308.3.1 UNOBSTRUCTED
SIDE REACH FIG. 308.3.2 OBSTRUCTED HIGH SIDE REACH 48" MAX 48" 15" MIN 20" MAX 48" MAX 25" MAX 44" MAX 48" MAX 15" MIN 46" MAX 24" MAX 34" MAX 48" MAX 10" 34" MAX 10" MAX 5' - 0" 2'
- 0"3' - 0" 1' - 0" 1' - 0" 3' - 0" 2' - 10 13/32" 4' - 0" 5' - 0" FIG. 604.4 & FIG. 604.5.1 & FIG. 604.7 WATER CLOSET HEIGHTS 9" 1' - 7" MAX 1' - 5" MIN 2' - 10" 1' - 6" 3' - 3" 3'
- 5" 1' - 0"3' - 6" 4' - 6" MIN 1' - 6" 2' - 0" MIN NOTE: REQUIRED CLEARANCE MAY INCLUDE GRAB BARS, PAPER DISPENSERS, SANITARY NAPKIN RECEPTACLES, COAT HOOKS, SHELVES, ACCESSIBLE ROUTES,
CLEAR FLOOR SPACE OF OTHER FIXTURES AND TURNING SPACE. NO OTHER FIXTURES OR OBSTRUCTIONS SHALL BE WITHIN THE REQUIRED WATER CLOSET CLEARANCE. FIG 604.3 CLEARANCE AT WATER CLOSETS 5'
-0" 4' -8" PLAN VIEW 18" 1 1/2" MIN DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12
H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State
Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering
Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021
4:10:37 PM A250 TYPICAL MOUNTING HEIGHTS AND ELEVATIONS 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR REVISION SCHEDULE
NAME DATE SEMI-RECESSED PENDENT SPRINKLER HEAD UPRIGHT SPRINKLER HEAD DESCRIPTIONSYMBOL FIRE PROTECTION SYMBOL LIST POINT OF CONNECTION NTS NOT TO SCALE SIDEWALL SPRINKLER HEAD (ETR)
EXISTING TO REMAIN GC GENERAL CONTRACTOR PC PLUMBING CONTRACTOR FC FLUSHING CONNECTION ELBOW DOWN DRAIN VALVE ELBOW UP CHECK VALVE TOP TEE CONNECTION PRESSURE REDUCING VALVE FLUSHING
CONNECTION RELIEF VALVE BACKFLOW PREVENTER (BFP) CONCEALED PENDENT SPRINKLER HEAD SHUT-OFF VALVE WITH TAMPER SWITCH (TS) AFF ABOVE FINISHED FLOOR MC MECHANICAL CONTRACTOR EC ELECTRICAL
CONTRACTOR (E) EXISTING PIPING FP FIRE PROTECTION PIPING (FP) D SPRINKLER DRAIN PIPING (D) 45°OFFSET BOTTOM/TEE CONNECTION PIPE CONTINUATION PENDENT SPRINKLER HEAD FIRE DEPT. VALVEFDV
POINT OF DISCONNECTION FS FLOW SWITCH (FS) PS PRESSURE SWITCH (PS) DRY PRE-ACTION ALARM VALVE ALARM CHECK VALVE WITH TRIM (ACV) FIRE DEPARTMENT VALVE (FDV) POST INDICATOR VALVE (PIV)
WATER MOTOR GONG FIRE DEPARTMENT CONNECTION (FDC) FIRE PUMP TEST HEADER INSPECTOR'S TEST CONNECTION (ITC) FIRE HYDRANT (FH) FIRE HOSE CABINETFHC FIRE VALVE CABINETFVC (E) EXISTING WORK
TO BE REMOVED FPC FIRE PROTECTION CONTRACTOR THESE NOTES ARE APPLICABLE TO ALL FIRE PROTECTION CONTRACT DRAWINGS. PROVIDE A COMPLETE WET PIPE FIRE PROTECTION SPRINKLER AND STANDPIPE
SYSTEM TO PROTECT ALL TENANT AND BUILDING SPACES IN COMPLIANCE WITH THE STATE CODE REFERENCED EDITION OF NFPA 13, NFPA 14, THE 2020 INTERNATIONAL FIRE CODE AND ALL CITY OF ITHACA REQUIREMENTS.
THE STANDPIPE SYSTEM IS A WET MANUAL TYPE, CLASS 1 WITH 2 1/2" FIRE DEPARTMENT VALVES INSTALLED AT ALL INTERMEDIATE LANDINGS. MODIFY SPRINKLER SYSTEM AS REQUIRED TO PROTECT ALL SPACES
OF THIS PROJECT. THE SPRINKLER AND STANDPIPE SYSTEM SHALL BE HYDRAULICALLY CALCULATED AND DESIGNED BY THE FIRE PROTECTION CONTRACTOR. REFER TO SPECIFICATIONS AND DRAWING NOTES. PROVIDE
SPRINKLER DRAWINGS, WORKING DRAWINGS AND HYDRAULIC CALCULATIONS IN ACCORDANCE WITH ALL REQUIREMENTS OF NFPA-13. SPRINKLER PIPE SIZES AND LOCATIONS SHOWN ON THESE DRAWINGS ARE FOR REFERENCE
AND INTENT. THE CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS TO DETERMINE ALL FINAL PIPE SIZES AND LOCATIONS AND SHALL ADJUST ALL PIPE SIZES AND LOCATIONS AS REQUIRED TO PROVIDE
A FUNCTIONAL, COMPLIANT SYSTEM. THE CONTRACTOR SHALL PROVIDE ADDITIONAL PIPING AND SPRINKLER HEADS REQUIRED TO PROVIDE A SPRINKLER SYSTEM THAT PROTECTS ALL BUILDING SPACES. THE PLANS
ARE DIAGRAMMATIC AND INDICATE ONLY THE GENERAL ARRANGEMENT OF PIPING, SPRINKLER HEADS AND EQUIPMENT. ALL REQUIRED MAINS, BRANCH LINES, SPRINKLER HEADS, EQUIPMENT AND SYSTEM COMPONENTS
SHALL BE PROVIDED BY THE CONTRACTOR. THE PLANS ARE NOT INTENDED TO SHOW EVERY ITEM OF WORK OR EQUIPMENT. THE CONTRACTOR SHALL FURNISH AND INSTALL ANY COMPONENT NECESSARY TO COMPLETE
THE SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE, NFPA AND THE CITY OF ITHACA WITHOUT ADDITIONAL COST. ITEMS OF WORK OR EQUIPMENT SHOWN ON THE DRAWINGS ONLY, OR CALLED
FOR IN THE SPECIFICATIONS ONLY, SHALL BE FURNISHED AND INSTALLED IN THE SAME MANNER AS IF THEY APPEARED ON BOTH THE DRAWINGS AND THE SPECIFICATIONS. DRAWINGS DO NOT INDICATE ALL OFFSETS,
CHANGES IN ELEVATION, DRAINS ETC. WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL MAKE SUCH CHANGES AND ADDITIONS IN PIPING AND LOCATION OF EQUIPMENT, ETC. TO ACCOMMODATE WORK, OBSTACLES,
AND WORK OF OTHER CONTRACTORS. INSTALL EQUIPMENT AND PIPING TO AVOID INTERFERENCE WITH THE OPERATION, SERVICE, AND MAINTENANCE OF EQUIPMENT. ALL PENETRATIONS THROUGH WALLS, FLOORS AND
ROOFS SHALL BE PROVIDED BY THIS CONTRACTOR FOR INSTALLATION OF FP SYSTEMS INCLUDING, BUT NOT LIMITED TO, EQUIPMENT, PIPING,ETC., UNLESS OTHERWISE SHOWN ON THE ARCHITECTURAL DRAWINGS.
THIS CONTRACTOR SHALL PROVIDE SLEEVES AND FIRESTOPPING FOR ALL PIPING PENETRATING THROUGH ALL RATED WALLS AND FLOORS. ALL PENETRATIONS THROUGH NON RATED WALLS SHALL BE SLEEVED AND SEALED
WITH A NON-HARDENING SEALANT ON BOTH SIDES OF THE WALL. ALL WORK BY THIS CONTRACTOR. THE PLANS DO NOT INDICATE ALL LOCATIONS OF HIGH TEMPERATURE HEADS. THE CONTRACTOR SHALL PROVIDE
HIGH TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA-13 AND THE PROJECT SPECIFICATIONS. PROVIDE TAMPER SWITCHES, CHAINS AND BREAKABLE LOCKS FOR ALL FIRE PROTECTION VALVES. ALL
SHUTOFF VALVES SHALL BE CHAINED AND LOCKED IN THE OPEN POSITION. DISPOSE OF ALL WASTE MATERIALS CAUSED BY WORK OF THIS CONTRACTOR. LEGALLY DISPOSE ALL MATERIALS TO A LOCATION OFF SITE.
COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OWNER AND OTHER TRADES PRIOR TO CONSTRUCTION. COORDINATE WATER SERVICE INSTALLATION WITH SITE/CIVIL CONTRACTOR. MAINTAIN SERVICE
CLEARANCES FOR ALL EQUIPMENT. ADVISE OTHER TRADES OF THE REQUIRED SERVICE CLEARANCES FOR FIRE PROTECTION EQUIPMENT. LABEL ALL PIPING, SHUT OFF VALVES, DRAINS, TEST CONNECTIONS, RISERS
TEST HEADERS AND FIRE DEPT. CONNECTIONS. PIPING SHALL BE INSTALLED AND CONCEALED ABOVE FINISHED CEILINGS WITH SPRINKLER HEADS LOCATED IN CENTER OF CEILING TILES WHERE TILED CEILINGS
ARE TO BE INSTALLED. ARRANGE WET PIPE SPRINKLER SYSTEMS TO DRAIN BACK TO A LOW POINT DRAIN VALVES. WHERE NOT POSSIBLE PROVIDE AUXILIARY DRAINS ON ALL SPRINKLER MAINS. ALL COSTS FOR
CUTTING, PATCHING, AND PAINTING OF WALLS, CEILINGS AND FLOORS TO ACCOMMODATE THE INSTALLATION OF WORK SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR UNLESS INDICATED OTHERWISE. MATERIALS
FOR RESTORATION OF EXISTING SURFACES SHALL MATCH THE EXISTING SURFACES. THIS CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF EXISTING OR NEW FIRE PROOFING WHICH IS DISTURBED OR REMOVED
DURING THE COURSE OF ANY DEMOLITION OR INSTALLATION OF NEW WORK THAT IS PART OF THIS CONTRACT. ALL PENETRATIONS THROUGH WALLS AND FLOORS SHALL BE COORDINATED WITH THE PROJECT'S STRUCTURAL
ENGINEER PRIOR TO MAKING PENETRATION. ALL PENETRATIONS SHALL BE PROVIDED IN STRICT ACCORDANCE OF THE PROJECT STRUCTURAL ENGINEER'S RECOMMENDATIONS. DO NOT DRILL, CORE OR CUT ANY PORTION
OF COLUMNS, BEAMS, JOISTS OR BRIDGING RIBS WITHOUT PRIOR APPROVAL.PRIOR TO CUTTING, DETERMINE THE LOCATION OF PROPOSED OPENINGS SUCH THAT NO PORTION OF EXISTING BEAMS OR JOISTS WILL
BE ALTERED IN ANY WAY. THERE ARE NO SEISMIC RESTRAINT/SUPPORT REQUIREMENTS FOR THIS PROJECT. REFER TO ARCHITECTURAL PLANS FOR CEILING GRID LAYOUTS, DECORATIVE CEILINGS FEATURES, SOFFITS,
ETC. PROTECT ALL CEILINGS AND FEATURES, PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED. WHEREVER THE TERM "THIS CONTRACTOR" OR "CONTRACTOR" IS USED ON FP DRAWINGS, IT SHALL MEAN THE PROJECT'S
FIRE PROTECTION SPRINKLER CONTRACTOR CONTRACT. PROVIDE COMPLETE SPRINKLER DRAWINGS AND HYDRAULIC CALCULATIONS FOR ALL PROJECT AREAS. PROVIDE ALL INFORMATION REQUIRED BY NFPA-13 ON THE
DRAWINGS. SUBMIT DRAWINGS AND CALCULATIONS FOR PROJECT ENGINEER AND CITY OF ITHACA APPROVAL. DO NOT ORDER ANY EQUIPMENT, MATERIAL AND/OR COMPONENTS UNTIL SPRINKLER DRAWINGS AND HYDRAULIC
CALCULATIONS ARE APPROVED BY PROJECT ENGINEER AND CITY OF ITHACA. OBTAIN SPRINKLER DRAWINGS AND HYDRAULIC CALCULATIONS FROM ORIGINAL BUILDING'S CONSTRUCTION TO UTILIZE IN PREPARING
DOCUMENTS FOR THIS PROJECT. A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Z. SPRINKLER BRANCH LINE IF OFFSET LENGTH EXCEEDS 2'-0", PROVIDE PIPE HANGER DROP
NIPPLE (1" SIZE) CLOSE NIPPLE REDUCER SUSPENDED CEILING PENDENT OR CONCEALED PENDENT SPRINKLER BRANCH LINE SPRINKLER IF OFFSET LENGTH EXCEEDS 2'-0", PROVIDE PIPE HANGER CLOSE NIPPLE
DROP NIPPLE (1" SIZE) REDUCER UPRIGHT SPRINKLER DETAIL NOTES: A. ELECTRICAL EQUIPMENT INCLUDES PANELS, TRANSFORMERS, DISCONNECTS, STARTERS, MOTOR CONTROL CENTERS, SWITCHGEAR, ADJUSTABLE
SPEED DRIVES, AND FUSED SWITCHES (THIS ALSO APPLIES TO ELECTRICAL GEAR MOUNTED DIRECTLY ON MECHANICAL EQUIPMENT). B. DEDICATED ELECTRICAL SPACE IS DEFINED BY NEC 110. C. NO PIPING OR
DUCTWORK MAY BE INSTALLED IN DEDICATED ELECTRICAL SPACE OR WORKING SPACE. STRUCTURAL CEILING STRUCTURAL CEILING 6'-6" SPRINKLER ALLOWEDDEDICATED ELECTRICAL SPACE WORKING SPACE 3'-0"
TO 9'-0" PER NEC 110 6'-0" DUCT WORKING SPACE SIDE VIEW LUMINAIRE PERMITTED 6'-6" MIN. SIDE VIEW DEDICATED ELECTRICAL SPACE 6'-0" OR LESS SUSPENDED CEILING SUSPENDED CEILING FRONT VIEW
6'-6" MIN. LUMINAIRE PERMITTED FRONT VIEW 30" MIN. PIPING PERMITTED LUMINAIRE PERMITTED PIPING PERMITTED TYPICAL ELECTRICAL EQUIPMENT PIPING PERMITTED MAIN ON OFF MAIN ON OFF MAIN ON
OFF MAIN ON OFF MAIN ON OFF MAIN ON OFF 6'-0" WORKING SPACE 36" MIN. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture
Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It
is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of
an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific
description of the alteration. 4/23/2021 2:24:44 PM FP001 GEN. NOTES, SYMBOLS LIST AND DETAILS FIRE PROTECTION 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer
Company AT SAI TENANT FIT-OUT FOR FIRE PROTECTION SPRINKLER DESIGN CRITERIA (NFPA-13): ALL BASEMENT AND FIRST FLOOR AREAS: ORDINARY HAZARD GROUP I, 0.15 GPM PER SQ.FT DENSITY OVER THE
HYDRAULICALLY MOST REMOTE 1500 SQ.FT. 250 GPM TOTAL HOSE STREAM ALLOWANCE. NFPA13R STANDARD IS NOT APPLICABLE TO THIS PROJECT. NOTE: PROVIDE SPRINKLERS IN ALL BATHROOMS. PROVIDE
SPRINKLERS AND FIRE PROTECTION SYSTEMS IN EXCESS OF REQUIREMENTS OF NFPA-13 AND NFPA-14 AS NOTED BY THE CONTRACT DOCUMENTS. 1. 2. 3. 4. SITE HYDRANT TEST FLOW DATA: STATIC PRESSURE:
92 PSI RESIDUAL PRESSURE: 51 PSI FLOW: 1450 GPM FLOW AT 20 PSI: 1988 GPM LOCATION: HYDRANT E-53, COLLEGE AND DRYDEN DATE: APRIL, 2020 BY: CITY OF ITHACA OBTAIN SITE PLAN FROM
STUDENT AGENCIES BUILDING CONSTRUCTION PROJECT AS REQUIRED. GENERAL NOTES: SPRINKLER AND STANDPIPE SYSTEM COMPONENT NOTES: ALL SPRINKLER PIPING ON BASEMENT AND FIRST FLOOR SHALL BE
STEEL OR DUCTILE IRON. NO CPVC SPRINKLER PIPING IS ALLOWED ON BASEMENT AND FIRST FLOOR. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL PIPING REQUIREMENTS. ALL SPRINKLER HEADS IN CEILINGS
SHALL BE CONCEALED TYPE, WITH WHITE COVER PLATES. ALL NEW SPRINKLER HEADS SHALL BE IDENTICAL TO THOSE INSTALLED BY THE ORIGINAL STUDENT AGENCIES BUILDING PROJECT UNLESS OTHERWISE NOTED.
NOT TO SCALE 2 RETURN BEND DETAIL NOT TO SCALE 1 UPRIGHT SPRINKLER HEAD DETAIL A. B. C. D. NOT TO SCALE 3 PIPING OVER ELECTRICAL EQUIPMENT DETAIL REVISION SCHEDULE NAME DATE UP UP DN
UPUP UP DN (E)FP 6" (E)FP 6" (E)FP 6" 6" (E)FP (E)FP 6" (E)FP 6" (E)6" COMBINED SERVICE ENTRANCE 6" 6" (E)FP 6"(E)6" FP STANDPIPE UP (E)6" FP STANDPIPE UP (E)FP 2 1/2" (E)FP 2 1/2"
(E)FP 2 1/2" (E)FP 2 1/2" 1 e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 N002 MECHANICAL ROOM N001 LEASEABLE SPACE 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O N003 ELECTRICAL
ROOM ST3 STAIR 3 1 M 1.9 ELEV 6.5 N006 BUILDING STORAGE N004 BUILDING STORAGE N005 LEASEABLE SPACE N007 CIRCULATION N008 CIRCULATION N009 CIRCULATION ELEV (E)6" FP STANDPIPE UP/DN 3"
(E)FP (E)FP (E)FP (E)FP 2 1/2" (E)6" FP STANDPIPE UP/DN 2 1/2" 2 1/2" (E)FDC 6" (E)ELECTRIC BELL 6" (E)FP 5 2 5 5 5 5 5 5 5 5 5 5 5 5 5 3 2" 4 5 5 5 4 4 3 4 6 4 e1 e2 e3 e4 e5 e6 e7
eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 5 4 7 2 1/2" 3 3 3 UPRIGHT SPRINKLER (TYPICAL) ELEV 473 EXISTING STAIR 1 ST1 ELECT. PANELS
589 JAN. CLOS. 590 SERVICE 591 LOADING ZONE N107 ELEV 762 TRASH/ RECYCLE N106 LEASABLE SPACE N104 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 LOBBY N102 RECEPTION
N101 VESTIBULE N100 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619
West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person,
unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall
affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 2:26:57
PM FP101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS - FIRE PROTECTION 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR 1/8" =
1'-0" 1 BASEMENT DEMOLITION FLOOR PLAN - FIRE PROTECTION 0' 2' 4' 8' 16' 1/8" = 1'-0" 2 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION 0' 2' 4' 8' 16' 1. 2. 3. ALL SPRINKLER BRANCH PIPING
SHOWN ON THIS DRAWING IS 2" UNLESS OTHERWISE NOTED. PROVIDE SUPPORTS FOR ALL EXISTING PIPING TO MAINTAIN INTEGRITY AT PIPING DEMOLITION LOCATIONS. SPRINKLER HEADS AND ASSOCIATED PIPING
OUTSIDE TENANT SPACE SHALL REMAIN INTACT UNLESS OTHERWISE NOTED. GENERAL NOTES: FP100 DEMOLITION NOTES 1 BASEMENT SPRINKLERS CONTROL VALVE ASSEMBLY 2 FIRST FLOOR SPRINKLERS CONTROL
VALVE ARRANGEMENT. 3 REMOVE UPRIGHT SPRINKLER. PREP PIPING FOR NEW 1" CONNECTION. 4 REMOVE 2" SPRINKLER BRANCH PIPING BETWEEN LOCATIONS INDICATED AND/OR BACK TO LOCATION INDICATED.
PREP 2" PIPING FOR NEW CONNECTIONS. 5 PIPING AND SPRINKLERS IN THIS AREA SHALL REMAIN INTACT UNLESS OTHERWISE NOTED. 6 REMOVE 2 1/2" SPRINKLER MAIN PIPING BETWEEN LOCATIONS INDICATED
AND/OR BACK TO LOCATION INDICATED. PREP 2 1/2" PIPING FOR NEW CONNECTIONS. 7 REMOVE 3" SPRINKLER MAIN PIPING BACK TO LOCATION INDICATED. PREP PIPING FOR NEW CONNECTION. REVISION SCHEDULE
NAME DATE e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 STORAGE 881 ELEV 1968 MECHANICAL ROOM N002 FUTURE WORK N001
ELECTRICAL ROOM N003 STAIR 3 ST3 (E)FP 6" (E)FP 6" (E)FP 6" 6" (E)FP (E)FP 6" (E)FP 6" (E)6" COMBINED SERVICE ENTRANCE 6" 6" (E)FP 6" (E)6" FP STANDPIPE UP (E)6" FP STANDPIPE UP (E)FP
2 1/2" (E)FP 2 1/2" (E)FP 2 1/2" (E)FP 2 1/2" 1 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 ELEV 473 EXISTING STAIR
1 ST1 JAN. CLOS. 590 SERVICE 591 LOADING ZONE N107 ELEV 762 TRASH/ RECYCLE N106 DINING 102 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 LOBBY N102 RECEPTION N101 VESTIBULE
N100 (E)6" FP STANDPIPE UP/DN 3" (E)FP (E)FP (E)FP (E)6" FP STANDPIPE UP/DN 2 1/2" 2 1/2" (E)FDC 6" (E)ELECTRIC BELL 6" (E)FP 1 3 3 4 7 7 8 22 3 3 3 FP 2 1/2" 6 33 5 9 5 9 5 9 9 9 9
5 9 10 2 5 9 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West
State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person,
unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall
affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 2:08:51
PM FP101 BASEMENT AND FIRST FLOOR PLANS - FIRE PROTECTION 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR 0' 2' 4' 8' 16' 1/8"
= 1'-0" 1 BASEMENT FLOOR PLAN - FIRE PROTECTION 1/8" = 1'-0" 2 FIRST FLOOR PLAN - FIRE PROTECTION 0' 2' 4' 8' 16' FP101 DRAWING NOTES 1 EXISTING FLOOR CONTROL VALVE ARRANGEMENT FOR
THIS LEVEL. 2 PROVIDE DRY PENDENT SPRINKLER HEADS TO PROTECT COOLER/FREEZER. DROP 1" FP FROM 2" BRANCH ABOVE. SEAL AT COOLER/FREEZER PENETRATION. 3 CONNECT 2" FP TO EXISTING 2". 4 CONNECT
2 1/2" FP TO EXISTING 3". 5 CONNECT 1" FP TO EXISTING 2". 6 CONNECT 2 1/2" FP TO EXISTING 2". 7 REFER TO ARCHITECTURAL PLANS FOR DECORATIVE HUNG BAFFLES. PROVIDE SPRINKLER COVERAGE
ABOVE AND BELOW AS REQUIRED. 8 DECORATIVE FRAME FROM CEILING. PROVIDE SPRINKLERS IN NEW, CIRCULAR SHAPED GYP. CEILING. 9 PROVIDE CONCEALED SPRINKLER HEAD IN NEW DROP (GYP.) CEILING.
10 COORDINATE WORK WITH HVAC MAU AND DUCTWORK IN THIS AREA. ADD SPRINKLERS AS REQUIRED. GENERAL NOTES: 1. 2. 3. 4. PROVIDE DRY PENDENT SPRINKLERS WITH GUARDS IN ALL COOLERS AND FREEZERS.
PROVIDE 200 DEG. F LISTED SPRINKLER HEADS IN ALL SPACES WITHIN 8'-0" OF ALL HOODS. MATCH SPRINKLER TYPES INSTALLED AS PART OF ORIGINAL BUILDING CONSTRUCTION UNLESS OTHERWISE NOTED.
PROVIDE COMPLETE NFPA-13 SPRINKLER DRAWINGS AND HYDRAULIC CALCULATIONS FOR THE ENTIRE PROJECT. OBTAIN APPROVAL OF DRAWINGS PRIOR TO STARTING ANY WORK. REVISION SCHEDULE NAME DATE ROOF
DRAIN WALL HYDRANT (WH) / HOSE BIBB (HB) VENT PIPING TRAP PRIMER (TP)T PRESSURE GAUGE THERMOMETER RECIRCULATION PUMP SHOCK ABSORBER (SA) SHOWER HEAD BACKFLOW PREVENTER (BFP) UNION PIPE
GUIDE PIPE ANCHOR S SHUT-OFF SWITCH RELIEF VALVE PRESSURE REDUCING VALVE SOLENOID VALVE CHECK VALVE BALANCING VALVE SHUT OFF VALVE WATER METERM INDIRECT WASTE PIPING (IW)IW FLOOR DRAIN
(FD) / FLOOR SINK (FS) CLEANOUT (CO) WALL PLATE CLEANOUT (WPCO) DECK PLATE CLEANOUT (DPCO) CAP OR PLUG PIPE CONTINUATION "P" TRAP TOP TEE CONNECTION BOTTOM/TEE CONNECTION ELBOW UP 45°OFFSET
ELBOW DOWN DESCRIPTION PLUMBING SYMBOL LIST SYMBOL NATURAL GAS PIPING (G)G ST STORM WATER SEWER PIPING (ST) STRAINER SANITARY SEWER PIPINGSAN 140 140° HOT WATER RECIRCULATING PIPING
(HWR) 140 140° HOT WATER PIPING (HW) HOT WATER RECIRCULATING PIPING (HWR) HOT WATER PIPING (HW) COLD WATER PIPING (CW) NEW PIPING LOCATED BELOW FLOOR/SLAB NEW PIPING LOCATED ABOVE FLOOR/SLAB
(E) EXISTING PIPING EC ELECTRICAL CONTRACTOR PC PLUMBING CONTRACTOR MC MECHANICAL CONTRACTOR GC GENERAL CONTRACTOR VTR VENT THRU ROOF BFF BELOW FINISHED FLOOR AFF ABOVE FINISHED FLOOR
(ETR) EXISTING TO REMAIN (E) EXISTING NTS NOT TO SCALE POINT OF DISCONNECTION POINT OF CONNECTION WORK TO BE REMOVED DRAWING KEYNOTE DEMOLITION/REMOVAL KEYNOTE X X PUMP DISCHARGE (PD)PD
FPC FIRE PROTECTION CONTRACTOR PUMP SCHEDULE NO. LOCATION SERVICE GPM HEAD FT WATER MOTOR TYPE DESIGN MAKE HP VOLTAGE PHASE RPM FIXTURE AND EQUIPMENT CONNECTION SCHEDULE DESIGNATION
DESCRIPTION COLD WATER HOT WATER WASTE OR SANITARY VENT REMARKS SHOCK ABSORBER SCHEDULE NO. FIXTURE UNIT RATING SIZE IN INCHES PDI SYMBOL SA-A 1 - 11 1/2" A SA-B 12 - 32 3/4" B SA-C
33 - 60 1" C SA-D 61 - 113 1 1/4" D SA-E 114 - 154 1 1/2" E SA-F 155 - 330 2" F WATER HEATER SCHEDULE NO. SERVICE TYPE BTUH INPUT GALLONS/ HOUR RECOVERY TEMP RISE DEG F FUEL TYPE DESIGN
MAKE WC LAV HB WATER CLOSET LAVATORY HOSE BIBB 1 1/2" 1/2" 1/2" 1/2" 4" 1 1/2" 2" 1 1/2" NOTES UR URINAL 1" 2" 2" MB MOP BASIN 3/4" 3/4" 3" 2" FD FLOOR DRAIN 4" 2" -FS 4" 2" --FLOOR
SINK RP-1 MECHANICAL ROOM DOM. HWR-115 5 25 INLINE GRUNDFOS MAGNA3-32-100FN WH-1 DOM. WATER SEMI-INST./TANK 199,000 232 100 NAT. GAS LOCHINVAR "SHIELD" SWA200N - 115 1 VARIABLE 9.7
W TO 178 W, 0.29 A-1.61 A G G 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES WH-1 24" DEEP HEAT TRAP (TYP.) STRAINER WITH VALVED BLOW-DOWN AND THREADED CAP (TYP.) THERMOMETER (TYP.) 3"
CPVC INTAKE AND 3" CPVC EXHAUST OUT TO BUILDING EXTERIOR. ROUTE AS INDICATED ON PLANS 12" DIRT LEG AND CAP FACTORY SIZED T&P RELIEF VALVE 1/2" TO CONDENSATE DRAIN CONDENSATE NEUTRALIZER
1/2" TO FLOOR DRAIN 8 GALLON THERMAL EXPANSION TANK (TX-1) CHARGE TO SYSTEM STATIC PRESSURE IN FIELD. REFER TO DETAIL ON THIS DRAWING. TO DRAIN (SEE DETAIL 2 ON THIS DRAWING) FIN. FLOOR
UNION (TYP.) MANUAL MASTER MIXING VALVE STATION. MOUNT ON WALL AT 48" ABOVE FIN. FLOOR. ALL COMPONENTS SHALL BE LEAD-FREE HWR PUMP RP-1 AQUASTAT CONTROLLER. SET TO 110 DEG. F TIME CLOCK
CONTROLLER 1" TO FLOOR DRAIN 1 1/2" CW FROM TENANT'S METERED DOMESTIC WATER CONNECTION 3/4" HWR FROM TENANT'S DOM. HOT WATER SYSTEM 115 140 11/2" 11/2" 140 11/2" 1 1/2" 140 1" A T 1151
1/2" 3/4" 1" 1" CHECK VALVE (TYP.) BALANCE VALVE SET TO 2 GPM 3/4" 1" HW(115) TO TENANT'S FIXTURES AND EQUIPMENT 11/2" 11/2" 1" HW (140) TO HOODS IN TENANT'S KITCHEN ON FLOOR ABOVE1"
140 1" INTEGRAL BASE FOR FLOOR MOUNTING CW PIPING FROM WATER HEATING PLANT 1/2" CALIBRATED PRESSURE RELIEF VALVE SET AT 120 PSI 3/4" DRAIN VALVE WITH VACUUM BREAKER. PIPE TO FLOOR SINK
IN ROOM N002 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES FINISHED FLOOR HARD COPPER RELIEF VALVE DISCHARGE LINE TO END 6" OVER FLOOR DRAIN ASME TANK WITH DIAPHRAGM AIR CHARGING VALVE.
CHARGE TANK WITH AIR PRESSURE TO MATCH BUILDING STATIC WATER PRESSURE, THEN OPEN VALVE NORMALLY OPEN SHUT-OFF VALVE 3/4" UNION DIRECTION OF FLOW SIZE OF HWR PIPING AS NOTED ON FLOOR
PLANS BALANCE VALVE - SET AT GPM REQUIRED TO BALANCE ENTIRE TENANT SPACE CHECK VALVE BALL VALVE 1. PROVIDE THIS ARRANGEMENT ON ALL HOT WATER RE-CIRCULATION BRANCHES AND WHERE
NOTED ON PLANS. SIZES NOTED ON PLANS. NOTES: SEE PLANS FOR PIPE SIZE CHECK VALVE DETAIL NOTES: A. B. C. D. COMPOUND GAUGE GAUGE COCK (TYPICAL) FLANGE CONNECTION (TYPICAL) SHUTOFF
VALVE (TYPICAL) STRAINER WITH VALVED BLOW DOWN. PRESSURE GAUGE INLINE PUMP - SEE SCHEDULE FOR CAPACITY PROVIDE REDUCER AT PUMP IF REQUIRED (TYPICAL) PRESSURE GAUGES - SELECT GAUGE RANGE
TO PLACE MAXIMUM SYSTEM OPERATING PRESSURE IN MIDDLE THIRD OF RANGE. PROVIDE UNION ON PUMP INLET AND OUTLET IF PUMP IS NOT FLANGED. INSTALL PUMP WITH SHAFT HORIZONTAL. PIPING MAY BE
INSTALLED VERTICAL, AS SHOWN, OR HORIZONTAL DEPENDING ON SITE CONDITIONS. INSTALL CHECK VALVE HORIZONTALLY OR VERTICALLY WITH FLOW UPWARD. BALANCING VALVESET FLOW TO MATCH PUMP DESIGN/SYSTEM
REQUIREMENTS 1 0 30 20 0 1 0 0 70 80 60 40 50 9 0 1 0 30 20 0 1 0 0 70 80 60 40 50 9 0 FINISHED FLOOR UNION STRUCTURAL STEEL MEMBER 5'-0" MAX. GAS FIRED EQUIPMENT WTR. HTR., MAKE UP
AIR UNIT, BOILER, ETC. SEE PLANS FOR PIPE SIZES GAS SHUT-OFF VALVE GENERAL NOTES: PROVIDE SHUT-OFF VALVE, DIRT LEG AND UNION AT EACH GAS CONNECTION ON EACH PIECE OF EQUIPMENT. VERIFY
CONNECTION SIZES, QUANTITIES AND LOCATIONS WITH HVAC TRADE. P.C. IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. A. B. C. FULL SIZE 6" LONG DIRT LEG WITH CAP DETAIL NOTES: FLOW DIRECTION
LABEL. PROVIDE 360° WRAP OVERLAPPING BOTH ENDS OF THE PIPE FUNCTION LABEL AND MATCHING THE FLOW DIRECTION OF THE PIPE CONTENTS. PIPE FUNCTION LABEL PROVIDE A PIPE LABEL FOR EACH PIPE
FUNCTION. PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE PIPE PASSES THROUGH. PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20'-0" CENTERS FOR EVERY PIPE UNLESS OTHERWISE NOTED
IN THE SPECIFICATIONS. LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM 1/2 OF PIPES IN THE AIR AND ON THE TOP 1/2 OR SIDES OF PIPES
MOUNTED LOW. LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS. A. B. C. D. E. F. DOMESTIC COLD WATER
DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street
Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting
under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such
document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 2:32:39 PM P001 GEN.
NOTES, SYMBOLS LIST, DETAILS AND SCHEDULES PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR GENERAL NOTES: A. B. C.
D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. THESE NOTES ARE APPLICABLE TO ALL PLUMBING CONTRACT DRAWINGS. DISPOSE OF ALL DEMOLITION AND/OR OTHER WASTE MATERIALS CAUSED BY WORK OF THIS
CONTRACT. LEGALLY DISPOSE OF ALL MATERIALS TO A LOCATION OFF SITE. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OWNER AND OTHER TRADES PRIOR TO DEMOLITION. PATCH HOLES IN EXISTING
CONSTRUCTION LEFT BY THE REMOVAL OF PIPING AND EQUIPMENT. MAINTAIN THE FIRE/SMOKE RATING OF EXISTING CONSTRUCTION. DEMOLITION SHALL INCLUDE, BUT NOT BE LIMITED TO: PIPING, VALVES, FIXTURES,
EQUIPMENT, HANGERS, SUPPORTS, AND INSULATION EXCEPT ASBESTOS. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE FIRESTOPPING FOR ALL PENETRATIONS. ALL PENETRATIONS THROUGH FIRE
WALLS AND FLOORS SHALL BE SLEEVED AND FIRE/SMOKE STOPPED. REFER TO CONTRACT DOCUMENTS FOR FIRE WALL AND FLOOR LOCATIONS. ALL PENETRATIONS THROUGH NON RATED WALLS SHALL BE SLEEVED AND
SEALED. SEAL WITH A NONHARDENING SEALANT ON BOTH SIDES OF WALL PENETRATION TO REDUCE NOISE TRANSMISSION. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. ADVISE OTHER TRADES OF ALL REQUIRED
SERVICE CLEARANCES. PITCH 4" AND LARGER SANITARY, STORM, AND WASTE PIPING AT 1/8" PER FOOT UNLESS OTHERWISE NOTED. FOR SANITARY, STORM, AND WASTE PIPING 3" AND SMALLER PITCH AT 1/4"
PER FOOT UNLESS OTHERWISE NOTED. COORDINATE LOCATION AND ELEVATION OF ALL STORM SEWER, SANITARY AND DOMESTIC WATER PIPING. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO THE
CONTRACTORS FAILURE TO COORDINATE TERMINATION POINTS. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. THE PLANS ARE DIAGRAMMATIC AND INDICATE THE GENERAL PIPING AND
EQUIPMENT ARRANGEMENT. ALL PIPING MAINS, EQUIPMENT, BRANCH LINES, AND SYSTEM COMPONENTS SHALL BE PROVIDED. THE PLANS ARE NOT INTENDED TO SHOW EVERY ITEM OF WORK OR EQUIPMENT. THE CONTRACTOR
SHALL PROVIDE ALL COMPONENTS NECESSARY TO COMPLETE THE SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE WITHOUT ADDITIONAL COST. ITEMS OF WORK OR EQUIPMENT SHOWN ON THE DRAWINGS
ONLY, OR CALLED FOR IN THE SPECIFICATIONS ONLY, SHALL BE PROVIDED IN THE SAME MATTER AS IF THEY APPEARED ON BOTH THE DRAWINGS AND THE SPECIFICATIONS. DRAWINGS DO NOT INDICATE ALL OFFSETS,
CHANGES IN ELEVATION, ETC. WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL MAKE ALL SUCH CHANGES IN PIPING AND LOCATIONS OF EQUIPMENT, ETC. TO ACCOMODATE WORK, OBSTACLES, AND WORK OF OTHER
CONTRACTORS. INSTALL EQUIPMENT AND PIPING TO AVOID INTERFERENCE WITH THE OPERATION, SERVICE AND MAINTENANCE OF EQUIPMENT. ADVISE OTHER TRADES OF REQUIRED SERVICE CLEARANCES. THIS CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL PATCHING OF EXISTING OR NEW FIREPROOFING WHICH IS DISTURBED OR REMOVED DURING THE COURSE OF ANY DEMOLITION OR NEW WORK THAT IS PART OF THIS CONTRACT. FIELD
VERIFY ALL FLOOR ELEVATIONS INDICATED ON THE PLANS. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTING HEIGHTS OF ALL PLUMBING FIXTURES, LOCATIONS OF GRAB BARS AND CONTROLS,
ETC. PROVIDE SHUTOFF VALVES ON ALL CW AND HW BRANCHES SERVING INDIVIDUAL PLUMBING FIXTURES. UNLESS OTHERWISE INDICATED, PLUMBING CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING AND ALL
CORING OF SLABS, WALLS AND OTHER ITEMS REQUIRED FOR PLUMBING WORK. PROVIDE TRAP GUARD INSERTS IN ALL FLOOR DRAINS. ALL FLOOR DRAINS AND FLOOR SINKS WILL BE INSTALLED IN EXISTING FLOOR
SLABS. REFER TO STRUCTURAL DRAWINGS FOR INSTALLATION DETAILS. PROVIDE ALL REQUIRED FLOOR CUTTING, FLASHING, SEALING, AND PATCHING, PROVIDE ALL REQUIRED STRUCTURAL WORK. LOCATE ALL FLOOR
SINKS AND FLOOR DRAINS WITH THEIR GRATES SLIGHTLY BELOW THE SURROUNDING FINISHED FLOOR, AND UNDER EQUIPMENT AND/OR COUNTERTOPS. DO NOT INSTALL SUCH THAT EQUIPMENT DRAINS TO FLOOR SINKS
AND FLOOR DRAINS WILL CAUSE A TRIPPING HAZARD. NOT TO SCALE 1 TENANT DOMESTIC WATER HEATING PLAN DETAIL NOT TO SCALE 2 THERMAL EXPANSION TANK DETAIL NOT TO SCALE 3 BALANCE VALVE ARRANGEMENT
DETAIL NOT TO SCALE 4 INLINE PUMP DETAIL NOT TO SCALE 5 GAS EQUIPMENT CONNECTION DETAIL NOT TO SCALE 6 PIPING IDENTIFICATION LABEL DETAIL REVISION SCHEDULE NAME DATE UP UP DN UPUP UP
DN 4" 2" (E)SAN (E)3/4" CW UP TO WH (E)ST 2" 4" ● 3" 4" 6" (E)SAN (E)SAN (E)SAN 4" 4" 4" 4" e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H
J K L N O 1 M 1.9 FEC 6.5 FEC STORAGE 881 ELEV 1968 MECHANICAL ROOM N002 LEASEABLE SPACE N001 ELECTRICAL ROOM N003 STAIR 3 ST3 BUILDING STORAGE N006 BUILDING STORAGE N004 LEASEABLE
SPACE N005 CIRCULATION N007 CIRCULATION N008 CIRCULATION N009 1 2 3 1 4 5 6 3 3 7 (E)IW 2" (E)ST (E)4" SAN (E)FD (E)WH (E)HB (E)INV. 360.00' 6" 3" 1 1/2" 4" 4"3" 4" 2" 2" 4" 1 1/2"
1 1/2" 2" 1 1/2" 4" 4" 4" 1 1/2" 3" 3" 3" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 4" 4" 4" 3" 4" 2" 1 1/2" 1 1/2" 3" 2" 2" 2"2" 2" 2" 2"2" 2" 2" 4"(E)ST (E)FD (E)G (E)G (E)G (E)SAN (E)G (E)●● (E)SAN
(E)IW (E)SAN (E)G (E)● (E) ●● (E) ● (E)IW (E) ●● (E) ●● (E)SAN (E)ST (E)IW (E)ST (E)ST (E)ST (E)ST (E)SAN (E)SAN (E)IW (E)ST (E)ST (E) ● (E)●● (E)● (E)WH e1 e2 e3 e4 e5 e6 e7 eA eB
e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 4" (E)ST 4" 4" ELEV 473 EXISTING STAIR 1 ST1 ELECT. PANELS 589 JAN. CLOS. 590 SERVICE 591 LOADING
ZONE N107 ELEV 762 TRASH/ RECYCLE N106 LEASABLE SPACE N104 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 LOBBY N102 RECEPTION N101 VESTIBULE N100 8 8 8 9 10 10 13 11
11 12 13 16 15 14 12 10 17 13 18 10 19 13 13 20 15 20 16 20 21 4" 4"3" 21 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture
Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It
is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of
an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific
description of the alteration. 4/23/2021 2:35:13 PM P101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company
AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 BASEMENT DEMOLITION FLOOR PLAN - PLUMBING 0' 2' 4' 8' 16' 1/8" = 1'-0" 2 FIRST FLOOR DEMOLITION PLAN - PLUMBING 0' 2' 4' 8' 16' GENERAL NOTES:
1. 2. FIELD VERIFY EXACT LOCATION OF ALL PIPING, STRUCTURES AND OTHER WORK AS REQUIRED FOR ALL WORK OF THIS PROJECT. RELOCATE AND REVISE ALL EXISTING PIPING AS REQUIRED TO ACCOMODATE
WORK OF THIS PROJECT. PREPARE ALL PIPING AT POINTS OF REMOVAL AS REQUIRED FOR ALL NEW CONNECTIONS, OR CAP/PLUG IF NO NEW CONNECTIONS ARE REQUIRED. P100 DEMOLITION NOTES 1 REMOVE 4"
SANITARY UP. REMOVE 4" IN BASEMENT AS REQUIRED FOR NEW RISER LOCATION. 2 REMOVE 1 1/2" IW UP. REMOVE 4" IN BASEMENT AS REQUIRED FOR NEW RISER LOCATION. 3 REMOVE 4" STORM UP AND REMOVE
4" IN BASEMENT AS REQUIRED FOR NEW RISER LOCATION. 4 REMOVE 4" SANITARY UP AND 4" STORM UP. 5 REMOVE TWO(2) - 2" VENTS UP. 6 REMOVE 2" VENT IN BASEMENT AS REQUIRED FOR NEW RISER LOCATION.
7 REMOVE 1 1/2" IW, 4" STORM AND 4" SANITARY UP. REMOVE PIPING IN BASEMENT AS REQUIRED FOR ALL NEW RISER LOCATIONS. 8 REMOVE 2" GAS COMPLETE. PROVIDE NEW 3" GAS AS INDICATED ON DRAWING
P101. 9 REMOVE 4" SANITARY DOWN. REMOVE 4" PIPING ON THIS FLOOR AS REQUIRED FOR NEW DROP LOCATION. 10 REMOVE 1 1/2" IW PIPING COMPLETE. PATCH ALL WALLS. 11 REMOVE 2" GAS AS REQUIRED
FOR INSTALLATION OF NEW HVAC MAU EQUIPMENT AND DUCTWORK. 12 REMOVE 1 1/2" HW AND CW BACK TO LOCATIONS INDICATED. 13 REMOVE 4" STORM BACK TO LOCATIONS INDICATED. 14 REMOVE 2" HW AND
CW BACK TO LOCATIONS INDICATED. 15 REMOVE 1 1/2" IW DOWN. REMOVE 1 1/2" IW PIPING ON THIS FLOOR AS REQUIRED FOR NEW DROP LOCATION. 16 REMOVE 4" SANITARY AND 4" STORM DOWN. REMOVE 4"
PIPING ON THIS FLOOR AS REQUIRED FOR NEW DROP LOCATION. 17 REMOVE EACH 2" VENT DOWN (TYP. 2). REMOVE 2" PIPING ON THIS FLOOR AS REQUIRED FOR NEW CONNECTIONS AND DROP LOCATIONS. 18 REMOVE
4" STORM DOWN. 19 REMOVE 1 1/2" IW BACK TO LOCATION INDICATED. 20 REMOVE THREE(3) SANITARY BRANCHES ON THIS FLOOR AS REQUIRED FOR NEW DROP LOCATION. 21 INSULATE ALL OVERHEAD SANITARY
PIPING IN THIS AREA WITH 1" FIBERGLASS INSULATION AND ALL SERVICE JACKET. ITEMIZE THE COST FOR THIS WORK AS AN ADD ALTERNATE TO THE BID AND IDENTIFY IT AS SUCH ON SUBMITTED BID DOCUMENT.
REVISION SCHEDULE NAME DATE e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 ELEV 1968 MECHANICAL ROOM N002 FUTURE WORK
N001 ELECTRICAL ROOM N003 STAIR 3 ST3 CIRCULATION N004 4" 2" (E)SAN (E)3/4" CW UP TO WH 2"● 3" 4" 6" (E)SAN (E)SAN 4" 4" 4" 22 16 23 26 9 ● ●● ●●● 16 29 2" 23 2719 3/4" 3/4" 23 3/4"
1" (E)ST 3/4" ● 3/4" 17 ●● ● 3/4" 25 ● 231" ● ●● ●●● 1 1/2" (E)4" SAN 15 1" 3/4" 1 1/2" 20 ●● ● 1" 11/2" 3/4" 7●● ● 7 5 3 ● 2" 14 6 4" 9 18 19 3" 16 9 3/4" 24 4 1 1/2" 9 13 28 9 24
21 12 11 4" SAN 18 2 4" 1 8 10 140 ●● 32 (E)2" IW 30 31 56 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 (E)FD (E)WH
(E)HB (E)INV. 360.00' 6" 3" 1 1/2" 4" 4"3" 4" 2" 2" 4" 4" 4" 1 1/2" 3" 3" 3" 1 1/2" 1 1/2" 1 1/2" 4" 4" 4" 3" 2" 1 1/2" 1 1/2" 3" 2" 2" 4"(E)ST JAN. CLOS. 590 SERVICE 591 ELEV 473 TRASH/
RECYCLE N106 DINING 102 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 (E)FD (E)SAN (E)●● (E)SAN (E)IW (E) ●● (E)SAN (E)IW (E)ST (E)ST (E)SAN (E)SAN (E)IW (E)ST (E)ST
(E) ● (E)●● (E)● A B Z D E (3) F AD I V AA O N MP Q Q K V R Q P S T (E)WH 4" FD 4" FD 4"FD 4" FD 4" FS 4" FS 4" FD 4" FS 4" FS WC-B WC-A WC-A LAV-A 4" FD UR(2) WC-B G 34 33 3" LAV-A
4" FS 4" FS 36 37 3" 35 35 G 34 G 3" G G 2" 2" G 38 (TYP.10) 2" ●● ● 45 2" 33 39 40 3" 3" 45 ●● ● 49 42 53 53 53 53 532" 50 38 38 55 40 40 38 (TYP.2) 38 42 IW 51 54 52 43 4" FS 41 46
4746 MB IW 44 56 48 3" 1 1/2" 42 4" FIN. FLOOR EXIST. SANITARY SUMP PUMP SYSTEM CO 4" 2" EXIST. 2" VENT GREASE TRAP ON FIN. FLOOR, WITH REMOVABLE COVER FOR ACCESS 4" FROM TENANT FLOOR
SINKS, POT SINK, ETC. REWORK PIPING AND SUMP COVER AS REQUIRED TO ACCOMMODATE NEW 4" SANITARY INTO SUMP 2" 2" BALL VALVE (TYP.) UNION (TYP.)1 1/2" TENANT METER ON WALL AT 3'-0" AFF
2" 2" FROM BUILDING CW SYSTEM 2" TO TENANT FIXTURES AND EQUIPMENT DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture
Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It
is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of
an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific
description of the alteration. 4/23/2021 3:24:34 PM P101 BASEMENT AND FIRST FLOOR PLANS PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI
TENANT FIT-OUT FOR 0' 2' 4' 8' 16' 1/8" = 1'-0" 1 BASEMENT FLOOR PLAN - PLUMBING 1/8" = 1'-0" 2 FIRST FLOOR PLAN - PLUMBING 0' 2' 4' 8' 16' P101 DRAWING NOTES 42 DROP 2" GAS TO EQUIPMENT
UNDER HOOD. REFER TO DETAIL 3 ON DRAWING P201. 43 CONNECT EACH SANITARY BRANCH TO NEW 4" DROP, RUN TO BASEMENT. 44 RUN 1 1/2" IW TO MOP SINK. 45 CONNECT 1 1/2" HW AND 1 1/2" CW TO EXISTING
PIPING. ROUTE NEW PIPING TO AVOID WORK IN KITCHEN. 46 PROVIDE TWO(2) 1" HW(140) AND TWO(2) 1" CW CONNECTIONS TO HOOD. PROVIDE VALVE AND UNION AT EACH CONNECTION. 47 DROP 2" GAS FOR
PIZZA OVEN. PROVIDE VALVE, UNION AND 6" DIRT LEG. INSTALL EMERGENCY GAS SHUT-OFF VALVE AFTER MAIN VALVE (THIS ITEM SUPPLIED BY HOOD MANUFACTURER). 48 3/4" CW, 3/4" HW(115) AND 1" HW(140)
UP FROM BASEMENT. CONNECT HW(115) AND CW TO MOP BASIN. RUN 1" HW(140) AND 1" CW AS INDICATED TO HOODS. 49 CONNECT 2" CW AND 2" HW TO EXISTING PIPING. 50 DROP 1 1/2" VENT, 1 1/2" WASTE
DOWN. 1/2" HW AND CW FOR WATER STATION/SINK AND COFFEE MAKER. 51 CONNECT 1 1/2" IW TO EXISTING IW. 1 1/2" IW DOWN. 52 CONNECT 4" STORM TO EXISTING, CONNECT 3" AND 4" SAN TO EXISTING.
DROP 4" STORM AND 4" SAN TO BASEMENT. 53 3/4" HW, 3/4" CW UP FROM BASEMENT. CONNECT TO ALL FOOD SERVICE EQUIPMENT AS REQUIRED. 54 CONNECT 1 1/2" IW, 4" STORM AND 4" SAN TO EXISTING
PIPING. DROP EACH SERVICE DOWN TO BASEMENT. 55 1 1/2" VENT UP, 1 1/2" SAN DN. 56 1/2" CW, 1/2" HW AND 1 1/2" SAN UP TO HAND SK. PROVIDE BALL VALVES ON CW AND HW PIPING. P101 DRAWING
NOTES 21 CONNECT 4" STORM AND 4" SANITARY FROM RELOCATED RISERS TO EXISTING STORM AND SANITARY. 4" ST, 4" SAN UP. 22 CONNECT 1 1/2" IW FROM RELOCATED RISER TO EXIST 1 1/2". 1 1/2" IW
UP. 23 4" SANITARY WITH TRAP UP TO FLOOR SINK. 3/4" HW AND CW UP. 24 2" VENT UP. 25 3/4" HW AND CW UP, 3" SANITARY UP FOR COMPARTMENT SINK. 26 3/4" HW AND CW UP. 27 CONNECT 2" VENT
TO EXISTING 2". 28 CONNECT 4" STORM FOR RELOCATED RISER TO EXISTING 4". 4" STORM, 2" VENT UP. 29 4" STORM, 4" SANITARY AND 1 1/2" IW UP. CONNECT TO EXISTING STORM, SANITARY AND IW.
30 CONNECT 1 1/2" SANITARY TO EXISTING 6" SANITARY. 31 1 1/2" SANITARY, 1/2" HW AND CW UP TO SINK/WATER STATION. 32 1" HW(140) UP. 33 DROP 3" GAS AT EXTERIOR OF BLDG. AND CONNECT TO
TENANT GAS METER. PROVIDE 3" VALVE. 34 SLEEVE AND SEAL 3" PIPE AT WALL PENETRATION SO THAT PIPING IS ISOLATED FROM BLDG. CONSTRUCTION. PROVIDE LINK SEAL. 35 DOMESTIC WATER PIPING FOR
ALL FIXTURES IN THIS TOILET ROOM FROM BASEMENT AS REQUIRED. 36 TERMINATE 3" INTAKE AND 3" EXHAUST (FOR BASEMENT WATER HEATER) IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS.
37 3" INTAKE, 3" EXHAUST FOR WATER HEATER DOWN TO BASEMENT. 38 2" VENT DOWN. 39 DROP 2" GAS AND CONNECT TO MAU BY HVAC TRADE. PROVIDE VALVE, UNION AND DIRT LEG. REFER TO DETAIL 5 ON
DRAWING P001. 40 CONNECT 2" VENT TO EXISTING 2". 41 CONNECT 1 1/2" IW WITH TRAP TO HVAC HEAT PUMP. PROVIDE IW PIPING AS INDICATED. P101 DRAWING NOTES 1 1" CW, 2" SAN UP FOR URINAL.
2 1 1/2" CW, 4" SAN, 2" VENT UP FOR WC. 3 CONNECT 2" CW TO EXISTING 3". 4 DROP 2" CW AT WALL. PROVIDE 1 1/2" DOM. COLD WATER METER WITH DIGITAL INTERACE AT 3'-0" AFF. PROVIDE VALVE
ON EACH SIDE OF METER. RISE UP AND RUN 2" CW TO TENANT'S SYSTEM AS INDICATED. METER MAKE: NEPTUNE T-10 WITH WIRELESS AND DIGITAL INTERFACE. REFER TO DETAIL 4 ON THIS DRAWING. 5 GREASE
TRAP ON FLOOR. REFER TO DETAIL 3 ON THIS DRAWING. 6 3" INTAKE, 3" EXHAUST FOR WATER HEATER, RUN UP IN WALL ABOVE. PIPING SHALL BE SCH. 40, CPVC. 7 1 1/2" HW AND CW, 1 1/2" SANITARY
UP FOR TROUGH LAV FIXTURE. 8 CONNECT 2" VENT FROM GREASE TRAP TO EXISTING 2" VENT UP. 9 4" SANITARY WITH TRAP UP TO FLOOR DRAIN. 10 1 1/2" CW, 4" SAN, 2" VENT UP FOR WC IN WOMEN'S TOILET
ROOM ABOVE (TYP.3). 11 4" RELOCATED SANITARY RISER UP. CONNECT TO SANITARY ON THIS LEVEL. 12 CONNECT 1 1/2" SAN, 4" SAN, 4" SAN (NEW BRANCHES) TO EXISTING 4" SANITARY. 13 DROP 3/4"
CW WITH VALVE. PROVIDE HB AT 48" AFF ON SOUTH FACE OF COLUMN D-4. 14 TENANT'S DOMESTIC WATER HEATER. REFER TO DETAIL 1 ON DRAWING P001. 15 CW, HW AND HWR FOR TENANT'S DOM. WATER HEATING
PLANT. PUMP RP-1. REFER TO DETAIL 1 ON DRAWING P001. 16 CONNECT 4" SANITARY TO EXISTING 4" SANITARY. 17 CONNECT 3/4" CW TO EXISTING 3/4" STUBBED DOWN INTO SPACE (SERVES WH IN TENANT
OUTDOOR SPACE). 18 4" SANITARY WITH TRAP, 2" VENT UP TO FLOOR SINK. 19 TWO(2) - 2" VENTS UP. 20 1" HW AND CW UP. 3" SANITARY WITH TRAP UP TO MOP BASIN. 4" SANITARY WITH TRAP UP TO FLOOR
SINK. GENERAL NOTES: 1. 2. 3. FIELD VERIFY AND COORDINATE WITH ALL EXISTING PIPING. AVOID EXISTING PIPING AS REQUIRED. COORDINATE ALL FLOOR DRAIN AND FLOOR SINK LOCATIONS WITH ALL
FOOD SERVICE EQUIPMENT. LOCATE AS REQUIRED FOR PROPER DRAINAGE OF ALL EQUIPMENT. DO NOT LOCATE UNDER EQUIPMENT LEGS/SUPPORTS OR AT INACCESSIBLE LOCATIONS. COORDINAE WITH NYSEG AS REQUIRED
TO OBTAIN AND INSTALL GAS METER FOR THIS TENANT. PROVIDE ALL REQUIRED WORK TO ESTABLISH TENANT'S GAS SERVICE. REVISION SCHEDULE NAME DATE NOT TO SCALE 3 GREASE TRAP DETAIL NOT TO SCALE
4 TENANT WATER METER DETAIL KITCHEN/FOOD SERVICE EQUIPMENT NOTED ON PLAN BY SYMBOL. REFER TO PROJECTS FOOD SERVICE DOCUMENTS FOR ADDITIONAL REQUIREMENTS. 1 QTY EQUIPMENT CATEGORYITEM
CODE FOOD SERVICE PLUMBING SCHEDULE HOT WATER SIZE COLD WATER SIZE DIRECT DRAIN SIZE INDIRECT DRAIN SIZE GAS SIZE CFH PLUMBING REMARKS - PROVIDE ALL WORK GAS RANGE 1 GAS SALAMANDER
1 3 11 HAND SINK 1/2" 1/2" 1" 406 43 3/4" 87GAS CHARBROILER GAS GRIDDLE1 3/4" 135 GAS FRYER 1 1 1 1 3 1 1 A Z 1/2" B D E 1/2" & 3/4" 90 F 1 1/2" I COFFEE MAKER 1/2" PROVIDE IN-LINE
WATER FILTER K ICE MAKER 3/8" 1 1/2" IW TO FLOOR SINK; PROVIDE WATER FILTER M THREE COMPARTMENT CORNER SINK 1/2" 1/2" 2" N 1 1/2" 3/4" 180 DEG. F HW FROM BOOSTER HEATER TO WASHER
DISHWASHER 1 SOILED DISHTABLE 1/2" 1/2" 2"O 1 WALL MOUNTED UNDER BAR HAND SINK 1/2" 1/2" 1 1/2"P GLASS WASHER 1/2" 1 1/2" IW TO FLOOR SINK Q R BAR REFRIGERATOR 1" UNDERBAR HAND
SINKS 1/2" 1/2" 1 1/2" 1 UNDERBAR 2 BAY HAND SINK 1/2" 1/2" 1 1/2"T 2 DROP-IN WATER STATION V 1/2" 1 EVAPORATOR AA/AD 3/4" IW TO FLOOR DRAIN OR FLOOR SINK IW TO FLOOR SINK GAS PRESSURE
REQUIRED: 4.5" W.C. GAS PRESSURE REQUIRED: 5.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. VENT SIZE 1 1/2" 1
1/2" 1 1/2" 1 1/2" 1 1/2" NOTES: 1. OBTAIN MANUFACTURERS DETAILS, CUT SHEETS AND INFORMATION ON ALL KITCHEN EQUIPMENT AND PROVIDE ALL REQUIRED ROUGH-INS, CONNECTIONS AND DRAINS. PROVIDE
ISOLATION SHUT-OFF VALVES FOR EACH PIECE OF EQUIPMENT. RUN DOMESTIC WATER PIPING ALONG WALL, ABOVE FLOOR TO SERVICE MULTIPLE PIECES OF EQUIPMENT FROM SUPPLIES PIPED UP FROM BASEMENT.
2. 3. 4. 11/2" 11/2" 11/2" 3" 3" FIN. FLR CO CONN. 2" WASTE TO EACH SINK COMPARTMENT (TYP. 3) 2" P-TRAP (TYP. 3) 4" FLOOR SINK (FS) CONNECT 1/2" H&C TO FAUCET 1/2" H&C TO FAUCET OR
FLEX HOSE (TYP. 3) INSTALL STOPPER (FURNISHED BY KEC) AT EACH COMPARTMENT ALL PIPING, TRAPS, ETC. BY P.C. TERMINATE 2" ABOVE RIM OF FS QUANTITY OF SINK COMPARTMENTS AS NOTED ON PLANS.
NOTES: 1. IF SINK IS UTILIZED FOR FOOD PREPARATION, INDIRECT WASTE CONN. IS REQUIRED. IF SINK IS ONLY USED FOR POT WASHING, DIRECT CONN. IS ACCEPTABLE. 2. FLOOR DRAIN/SINK CONDENSER
WATER SUPPLY CONNECTION FILTER - MOUNT AT ACCESSIBLE HEIGHT AND LOCATION. 1/2" INLINE DOUBLE CHECK VALVE SIMILAR TO WATTS #9BD CONDENSER WATER WASTE CONNECTION 1" DRAIN WITH VENTING
TEE PITCH INDIRECT WASTE PIPING TO DRAIN FINISHED FLOOR PROVIDE DRAINS TO NEAREST FLOOR DRAIN OR FLOOR SINK FROM ICE MAKER SUMP, ICE BIN AND BACKFLOW PREVENTER. TERMINATE PIPING AT
1" ABOVE DRAIN AS SHOWN. PITCH INDIRECT WASTE PIPING 1/4" PER FOOT MINIMUM. CONNECTIONS ARE DIAGRAMATIC AND SHOWN ON SIDES OF ICE MACHINE FOR CLARITY. THEY WILL NORMALLY BE ON THE BACK
OF THE MACHINE. COORDINATE FINAL POINTS OF CONNECTION WITH THE MANUFACTURER. INSULATE WATER SUPPLY PIPING AS SPECIFIED. COVER INSULATION WITH PVC JACKET. FILTER SHALL BE INSURICE NO.
2000, TWIN. 1" MINIMUM BIN DRAIN 1 1/2" 1/2" 1/2" 1/2" COLD WATER ICE MAKER SUPPLY DETAIL NOTES: A. B. C. D. E. ICE MACHINE ICE BIN UNION (TYPICAL) A G 2" CAP GAS VALVE CSA, UL LISTED
STAINLESS STEEL GAS FLEX CONNECTION PROVIDE FINAL CONNECTION TO EQUIPMENT PROVIDE THIS ARRANGEMENT FOR ALL EQUIPMENT NOTE: SIZE OF EACH VALVE AND FLEX CONNECTION AS NOTED. EQUIPMENT
DESIGNATIONS PER SCHEDULE ON THIS DRAWING FLOOR SUPPORT (TYP.) 14" CAP, INSTALL TO MAINTAIN ACCESS FOR REMOVAL FINISHED FLOOR 8" DIRT LEG EMERGENCY SHUTOFF VALVE FURNISHED BY OTHERS,
INSTALLED BY P.C. UNION, TYP. MANUAL SHUTOFF VALVE 2" 1" Z 3/4" E (TYP.3) ALL 3/4" D 3/4" B 3/4" 2" 2" 2" HEADER TIGHT TO WALL BEHIND APPLIANCES 2" G FROM 3" MAIN OFF TENANT'S METER
DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street
Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting
under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such
document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 2:38:25 PM P201 KITCHEN
EQUIPMENT SCHEDULE AND DETAILS PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR NOT TO SCALE 1 KITCHEN EQUIPMENT SCHEDULE
NOT TO SCALE 2 THREE COMPARTMENT SINK PLUMBING DETAIL NOT TO SCALE 4 ICE MACHINE CONNECTION DETAIL NOT TO SCALE 3 HOOD GAS PIPING SCHEMATIC DETAIL REVISION SCHEDULE NAME DATE PIZZA
OVEN HOOD AND KITCHEN HOOD REQUIREMENTS AND NOTES: 1. 2. 3. PIZZA OVEN HOOD: A. PROVIDE TWO(2) - 3/4" HOT WATER (140 DEG.F) CONNECTIONS FOR HOOD. B. PROVIDE ONE(1) - 1" COLD WATER CONNECTION
FOR HOOD. C. PROVIDE 1 1/2" GAS CONNECTION FOR PIZZA OVEN. INSTALL EMERGENCY GAS SHUTOFF VALVE AFTER (DOWNSTREAM FROM) MAIN SHUT-OFF VALVE. D. PROVIDE VALVE AND UNION ON ALL CONNECTIONS.
E. PROVIDE TWO(2) - 1 1/2" IW DRAINS FROM HOOD TO FLOOR SINK. MAIN KITCHEN HOOD A. PROVIDE TWO(2) - 1" HOT WATER (140 DEG.F) CONNECTIONS FOR HOOD. B. PROVIDE ONE(1) - 1" COLD WATER
CONNECTION FOR HOOD. C. PROVIDE 2" G SUPPLY FOR ALL EQUIPMENT UNDER KITCHEN HOOD. PROVIDE 2" MAIN SHUT-OFF VALVE. INSTALL EMERGENCY GAS SHUTOFF VALVE AFTER (DOWNSTREAM FROM) MAIN SHUT-OFF
VALVE. D. PROVIDE VALVE AND UNION ON ALL CONNECTIONS. E. PROVIDE TWO(2) - 1 1/2" IW DRAINS FROM HOOD TO FLOOR SINK. FOR ALL HOODS ON PROJECT OBTAIN MANUFACTURER'S TECHNICAL DRAWINGS
AND SPECIFICATIONS AND COORDINATE LOCATIONS. PROVIDE ALL REQUIRED PLUMBING TO EACH HOOD. DSD MBH THOUSAND BTU/HOUR (E) EXISTING DOUBLE LINE RECTANGULAR DUCT CONTINUED FPM FEET PER MINUTE
AIR FLOW AFF ABOVE FINISHED FLOOR PIPE ANCHOR G.C. GENERAL CONTRACTOR PIPE GUIDE E.C. ELECTRICAL CONTRACTOR EXPANSION COMPENSATOR WITH GUIDES N.C. NORMALLY CLOSED PRE-FAB EXPANSION
LOOP TEMPERATURE SENSOR STRAINER STATIC PRESSURE SENSOR PRESSURE GAUGE WATER TEMPERATURE SENSOR THERMOMETER UNION 24x12DN UP AIR VENTV 24x12 14x8 6" BOOT TAP TT THERMOSTATIC TRAP 14"
18" LATERAL FT FLOAT & THERMOSTATIC TRAP SUPPLY DIFFUSER, REGISTER OR GRILLE TD THERMODYNAMIC TRAP FLEXIBLE DUCTWORK BT BUCKET TRAP COMPRESSED AIRA DIRECTION OF FLOW BBD BOILER BLOW
DOWN CONDENSER WATER SUPPLYCS CR CONDENSER WATER RETURN CWS CHILLED WATER SUPPLY CWR CHILLED WATER RETURN D DRAIN FUEL OIL FILLFOF FUEL OIL GAUGEFOG FOS FUEL OIL SUPPLY FOR FUEL OIL
RETURN FOV FUEL OIL TANK VENT G GAS GLYCOL SUPPLYGS GLYCOL RETURNGR HPWS HEAT PUMP WATER SUPPLY HPWR HEAT PUMP WATER RETURN HWS HOT WATER SUPPLY HWR HOT WATER RETURN HG HOT GAS LPS
LOW PRESSURE STEAM LPC LOW PRESSURE CONDENSATE MPS MEDIUM PRESSURE STEAM MPC MEDIUM PRESSURE CONDENSATE HPS HIGH PRESSURE STEAM HPC HIGH PRESSURE CONDENSATE PC PUMPED CONDENSATE RD
REFRIGERANT DISCHARGE RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION VAC VACUUM CW DOMESTIC COLD WATER EXISTING WORK TO BE REMOVED DOUBLE LINE PIPE OR ROUND DUCT CONTINUED E PNEUMATIC/ELECTRIC
THERMOSTAT NTS NOT TO SCALE (DBL) DOUBLE WALL LINED DUCT CFM CUBIC FEET PER MINUTE AD ACCESS DOOR P.C. PLUMBING CONTRACTOR N.O. NORMALLY OPEN DUCT SMOKE DETECTOR HUMIDISTAT WATER FLOW
SENSOR ROUND DUCT - IN INCHES12" 24x12 DN UP 14" CONICAL TEE 18" VOLUME DAMPER CAP OR PLUG ELBOW DOWN ELBOW UP AAD AUTOMATIC AIR DAMPER FD FIRE DAMPER SD SMOKE DAMPER BDD BACK DRAFT
DAMPER M MOTORIZED DAMPER BALL VALVE GATE VALVE CHECK VALVE BALANCING VALVE BUTTERFLY VALVE PRESSURE REDUCING VALVEPRV CONTROL VALVE PRESSURE/TEMPERATURE TEST PLUG (L) (2L) ACOUSTIC
THERMAL LINING - 2" THICK M.C. MECHANICAL CONTRACTOR W/W WALL TO WALL G THERMOSTAT/SENSOR WITH GUARD G DUCT SECTION - SUPPLY DUCT SECTION - RETURN WIDTH A x DEPTH B A B R D 24x12 14"
6" BOOT TAP BG BLAST GATE FIN TUBE RADIATION VALANCE A B C REGISTER, GRILLE OR DIFFUSER TAG A = TYPE B = NECK SIZE C = CFM B C D FIN TUBE RADIATION TAG FT-A = TYPE B = FIN TUBE LENGTH
C = ENCLOSURE LENGTH D = GPM FT-A A B C D VALANCE TAG A = TYPE B = COIL SIZE C = COOLING GPM D = HEATING GPM POINT OF CONNECTION POINT OF DISCONNECTION BOTTOM TAP TRIPLE DUTY VALVETD
GLOBE VALVE THREE WAY CONTROL VALVE SUCTION DIFFUSERSD DRAIN VALVE WITH HOSE CONNECTION, CAP AND CHAIN FC FLEX CONNECTOR - DUCTWORK FLEXIBLE CONNECTOR - PIPING AIR TERMINAL UNIT AND
TAG (OPTION 1) A B C AIR TERMINAL UNIT TAG (OPTION 2) A = UNIT NO. B = MAXIMUM CFM C = MINIMUM CFM AxB FO DUCT SECTION - FLAT OVAL (FO) V VENT REDUCER S T H S ACOUSTIC THERMAL LINING
- 1-1/2" THICK EXHAUST GRILLE RETURN REGISTER SINGLE LINE PIPE CONTINUED TRANSITION SQUARE TO ROUND RISE IN DUCT - IN DIRECTION OF AIRFLOW DROP IN DUCT - IN DIRECTION OF AIRFLOW SUPPLY
DUCT TURNING UP OR DOWN RETURN DUCT TURNING UP OR DOWN SUPPLY/RETURN RECTANGULAR MAIN RECTANGULAR BRANCH SUPPLY/RETURN RECTANGULAR MAIN ROUND BRANCH SUPPLY/RETURN ROUND MAIN ROUND BRANCH
SUPPLY/RETURN ROUND MAIN ROUND BRANCH MITERED ELBOW WITH TURNING VANES SP TS FS DESCRIPTIONSYMBOL DESCRIPTION SYMBOL T RELIEF VALVE T HVAC SYMBOL LIST X X DRAWING KEYNOTE DEMOLITION
KEYNOTE A B C RADIANT CEILING PANEL TAG A = TYPE B = LENGTH C = GPM CARBON DIOXIDE SENSORC CARBON DIOXIDE SENSORCO GAS SENSORG SYMBOL DESCRIPTION SYMBOL DESCRIPTION DSD AVERAGING SENSOR
S S START/STOP O C OPEN/CLOSE E D ENABLE/DISABLE S TEMPERATURE SENSOR (DUCT OR PIPE MOUNTED) H HUMIDITY SENSOR (DUCT MOUNTED) I P ELECTRICAL INTERFACE AUTOMATIC AIR DAMPER (PARALLEL
BLADE) AUTOMATIC AIR DAMPER (OPPOSED BLADE) E ELECTRIC/ELECTRONIC CONTROL VALVE (3-WAY) E ES END SWITCH SA SUPPLY AIR RETURN AIRRA OA OUTSIDE AIR EA EXHAUST AIR M MOISTURE SENSOR OS
OCCUPANCY SENSOR M FLOW METER SUPPLY FANSF S SPACE TEMPERATURE SENSOR (WALL MOUNTED) H SPACE HUMIDITY SENSOR (WALL MOUNTED) BTU ENERGY METERBTU P DIFFERENTIAL STATIC PRESSURE SWITCH
A ALARM S STATUS PROBE SENSOR RELAYR FREEZE-STATFZ E ELECTRIC ACTUATOR TC CURRENT TRANSDUCER I ELECTRONIC INTERFACE FS FLOW SENSOR/SWITCH ANALOG INPUT (GENERAL)AI ANALOG OUTPUT (GENERAL)AO
AIR FLOW MEASURING STATION HARD WIRE INTERFACE S SOLENOID VALVE S M MANUAL SWITCH CARBON MONOXIDE ROOM SENSOR (WALL MOUNTED) CO THERMOSTATIC EXPANSION VALVE CARBON DIOXIDE ROOM SENSOR
(WALL MOUNTED) CARBON DIOXIDE SENSOR (DUCT MOUNTED) CO 2 DIGITAL INPUT (GENERAL)DI DIGITAL OUTPUT (GENERAL)DO THERMOWELL T LINE VOLTAGE THERMOSTAT P DIFFERENTIAL STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR CONTROLS SCHEMATIC SYMBOL LIST ASD ADJUSTABLE SPEED DRIVE R134a REFRIGERANT R134a SENSOR (WALL MOUNTED) C C COOLING COIL BASE MOUNTED PUMP FILTER RETURN AIR FANRF
EF EXHAUST AIR FAN H C HEATING COIL SMOKE CONTROL FANSC C NITROGEN DIOXIDE ROOM SENSOR (WALL MOUNTED) N H HUMIDIFIER E T PNEUMATIC THERMOSTAT E P ELECTRIC/PNEUMATIC SWITCH OR RELAY
P E PNEUMATIC/ELECTRIC SWITCH OR RELAY F FLOW TRANSMITTER TRANSDUCER P PRESSURE SENSOR ELECTRIC/PNEUMATIC TRANSDUCER I E ELECTRONIC/ELECTRIC TRANSDUCER PNEUMATIC CONTROL VALVE (3-WAY)
PNEUMATIC CONTROL VALVE (2-WAY) ELECTRIC/ELECTRONIC CONTROL VALVE (2-WAY) PNEUMATIC ACTUATOR MAIN TEMPERATURE CONTROL AIR SOURCE M IN LINE PUMP H R C HEAT RECOVERY COIL DATE: PROJECT:
OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York
14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction
of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and
the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:22 PM M000 GENERAL NOTES AND SYMBOLS LIST
- HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR GENERAL NOTES: A. ALL PENETRATIONS THROUGH WALLS, FLOORS AND ROOFS SHALL
BE PROVIDED FOR INSTALLATION OF MECHANICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, EQUIPMENT, DUCTWORK, PIPING, ETC. ALL PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE FIRE/SMOKE
STOPPED. ALL PENETRATIONS THROUGH NON RATED WALLS SHALL BE SEALED WITH A NON -HARDENING SEALANT ON BOTH SIDES OF WALL PENETRATION TO REDUCE NOISE TRANSMISSION. B. IT IS NOT THE INTENT
OF THE DRAWINGS TO SHOW ALL AIR VENTS OR DRAINS FOR THE INSTALLATION OF THE PIPING SYSTEMS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AIR VENTS AT ALL SYSTEM HIGH POINTS
AND IT AREAS WITHIN THE PIPING SYSTEMS THAT COULD ACCUMULATE OR TRAP AIR PREVENTING PROPER OPERATION OF THE SYSTEMS. DRAINS SHALL BE PROVIDED AT ALL LOW POINTS WITHIN THE PIPING SYSTEMS
TO FACILITATE DRAINING OF THE SYSTEM COMPLETELY. C. THE DUCTWORK SIZES AND TYPES (ROUND, AND RECTANGULAR) WERE SELECTED FOR SPACE LIMITATION. IT IS NOT ACCEPTABLE FOR THE CONTRACTOR
TO CHANGE THE SIZE OR TYPE OF DUCTWORK FOR BIDDING OR INSTALLATION UNLESS SPECIFICALLY PRE-APPROVED BY THE ENGINEER. D. ALL NEW PENETRATIONS THROUGH WALLS, FLOORS AND ROOFS SHALL BE
COORDINATED WITH THE STRUCTURAL ENGINEER PRIOR TO MAKING PENETRATIONS. ALL PENETRATIONS SHALL BE PROVIDED IN STRICT ACCORDANCE WITH THE STRUCTURAL ENGINEER'S RECOMMENDATIONS. E. IF
FLEXIBLE DUCTWORK IS UTILIZED FOR FINAL CONNECTION AT GRILLES, THE CROSS SECTIONAL AREA OF THE FLEXIBLE DUCTWORK SHALL NOT BE LESS THAN THE CROSS SECTIONAL AREA OF THE GRILLE NECK.
F. THE CONTRACTOR SHALL PROVIDE MINIMUM 16x16 ACCESS DOORS WITHIN GYPSUM CEILINGS, GYPSUM WALLS AND MASONRY WALLS AT FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS TO ALLOW
FULL ACCESS TO DUCTWORK MOUNTED ACCESS DOORS FOR SERVICING THE DAMPERS. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DRAWINGS FOR CEILING AND WALL CONSTRUCTION TYPES AND RATING REQUIREMENTS
FOR SELECTION OF ACCESS DOOR TYPES. REFER TO SPECIFICATION SECTION 230500 FOR ACCESS DOOR REQUIREMENTS. AT SMOKE DAMPER AND COMBINATION FIRE/SMOKE DAMPER INSTALLATIONS, THE CONTRACTOR
SHALL PROVIDE A MINIMUM 16x16 ACCESS DOOR AT THE DUCT MOUNTED SMOKE DETECTORS. G. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING OF EXISTING OR NEW FIREPROOFING WHICH IS DISTURBED
OR REMOVED DURING THE COURSE OF ANY DEMOLITION OR NEW WORK THAT IS PART OF THIS CONTRACT H. THE MOUNTING HEIGHT FOR ALL ROOM TEMPERATURE SENSORS AND CO2 SENSORS SHALL BE 48" INCHES
TO TOP OF THE COVER. I. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. REVISION SCHEDULE NAME DATE UP UP DEMOLITION NOTES: 1. (E)26x12 VENTILATION SUPPLY AND RETURN DUCTWORK UP AND
(E)20x12 DOWN IN CHASE. SERVED FROM ERV-1 ON ROOF ABOVE. 2. DISCONNECT AND REMOVE EXISTING VENTILATION SUPPLY AIR DUCT BACK TO THE POINT OF DISCONNECTION SHOWN. 3. DISCONNECT AND REMOVE
EXISTING VENTILATION RETURN AIR DUCT BACK TO THE POINT OF DISCONNECTION SHOWN. 4. DISCONNECT EXISTING HEAT PUMP AND STORE IN A SAFE PLACE. PREPARE HEAT PUMP FOR RELOCATION AT LOCATION
SHOWN ON DRAWING M-101. 5. DISCONNECT AND REMOVE EXISTING SUPPLY AIR DUCTWORK. 6. DISCONNECT EXISTING EXHAUST FAN EF-1 AND STORE IN A SAFE PLACE. PREPARE FOR RELOCATION AT LOCATION
SHOWN ON DRAWING M-101. 7. DISCONNECT EXISTING WALL CAP AT EXTERIOR PREPARE FOR RELOCATION AT LOCATION SHOWN ON DRAWING M-101. INFILL WALL OPENING TO MATCH EXISTING. 8. DISCONNECT AND
REMOVE EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK BACK TO POINT OF CONNECTION SHOWN. X e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F
G H J K L N O 1 M 1.9 6.5 ST1 EXISTING STAIR 1 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE N106 TRASH/ RECYCLE (E)HP-104B (E)14x10 (E)HP-104A (E)14x10 (E)HP-104C (E)14x10 (E)EWH-5
(E)EF-2 (E)EUH-3 (E)EUH-5 (E)8" (E)EUH-4 (E)EF-1 (E)10" (E)20x12 (E)16x12 N103 LEASING OFFICE N101 RECEPTION 473 ELEV 1 (E)20x12 AREA NOT IN SCOPE OF WORK (E)16x12 (E)16x12 2 3 4 4
4 5 5 5 (E)8" 117 SF WATER METER 6 7 AREA NOT IN SCOPE OF WORK 8 8 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O M 1.9 6.5 473
ELEV ST1 EXISTING STAIR 1 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE N106 TRASH/ RECYCLE (E)1" HPWS&R AREA NOT IN SCOPE OF WORK (E)HP-104A (E)HP-104B (E)HP-104C (E)1" HPWS&R (E)3/4"
HPWS&R (E)1 1/4" HPWS&R (E)1" HPWS&R (E)1 1/2" HPWS&R (E)1 1/2" HPWS&R (E)HP-102 (E)HP-103 (E)1" HPWS&R S S S 1 2 3 3 3 4 4 4 4 4 5 5 5 (E)EUH-5 (E)EUH-3 (E)EF-2 AREA NOT IN SCOPE OF
WORK 4 DEMOLITION NOTES: 1. (E)2 1/2" HPWS&R UP IN CHASE. (E)2" HPWS&R DOWN TO FLOOR BELOW. 2. EXISTING CAPPED 2" HPWS&R. 3. DISCONNECT EXISTING HEAT PUMP AND STORE IN A SAFE PLACE.
PREPARE FOR RELOCATION AT LOCATION SHOWN ON DRAWING M-101. 4. DISCONNECT AND REMOVE EXISTING HEAT PUMP PIPING SHOWN DASHED BACK TO THE POINT OF DISCONNECTION SHOWN. 5. DISCONNECT EXISTING
SENSOR AND STORE IN A SAFE PLACE. REFER TO DRAWING M-101 FOR SENSOR RELOCATION. X DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9
10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing
the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration,
and a specific description of the alteration. 4/23/2021 9:50:32 AM MD-101 FIRST AND SECOND FLOOR PLAN HVAC DEMOLITION 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA
BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 FIRST FLOOR - HVAC DEMOLITION 0' 2' 4' 8' 16' 1/8" = 1'-0" 2 FIRST FLOOR - HVAC PIPING DEMOLITION 0' 2' 4' 8' 16' REVISION SCHEDULE
NAME DATE UP UP e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 102 DINING 762 ELEV N106 TRASH/ RECYCLEST3 STAIR 3
N103 LEASING OFFICE FD/SD (E)HP-104A (E)HP-104B (E)HP-104C (E)EUH-3 (E)EUH-4 (E)HP-102 (E)16x12 (E)20x12 N107 LOADING ZONE (E)EF-2 8" N108 WATER METER N105 CORRIDOR 20x12 x 8 8 (E)
150 8" N100 VESTIBULE (E)EUH-5 (E)EWH-5 EWH-1 (E)CUH-2(E)CUH-1 FD (E)14x10 (E)14x6 FD FD (E)EUH-6 (E)EUH-7 N323 COOLER 104 WOMEN'S TOILET 103 MEN'S TOILET HOOD H-1 HOOD H-1A 14x8 106
BAR 431 SF RETAIL 105 KITCHEN EUH-8 EUH-9 14" "8 4 160 "8 4 160 x12 6 2 240 TYP=2 8" 8" "8 4 160 "8 4 160 "8 4 160 "8 4 160 "8 4 160 8" 16x10 HP-104D x12 6 3 100 TYP=4 1 2 2 2 3 4 4
5 5 9 (E)10" 8x8 HOOD H-2 14x10 14x8 36x14 MAU-1 9'-6"Lx38"Wx36"H APPROX. 815 LBS 1112 7 x 6 6 A 50 EF-8 x 8 8 2 110 TYP=2 10x6 x10 10 A 210 TYP=2 12x6 " 1 8 290 " 1 8 290 14x10 14x8
6" 6" 26x12 26x12 36x14 10x6 x22 22 A 800 14x10 8 14" 10x8 12x8 10x8 10x8 8x6 6" 14" 14" " 1 6 100 x14 6 3 150 x14 6 3 150 12" 8x8 VAV-2 10" 16x12 6 10 10 10 10 10 10 10 10 13 15 15
x22 10 3 625 VAV-1 14 10" 16 16 16 16 14x10 AREA NOT IN SCOPE OF WORK 42x14 48"x48" O.A. LOUVER IL-1 17 14x6 6" 12x6 (BELOW) 8" 2-WAY 24x24 AREA NOT IN SCOPE OF WORK 18 1919 1919 20
10x10 6" 21 10x6 (E)EF-1 12x8 22 23 16x10 12x12 16x10 x14 6 3 150 8" 24 8 12x10 16x12 12x10x22 10 3 625 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A
B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV N106 TRASH/ RECYCLE (E)HP-104C (E)HP-104B (E)HP-104A (E)EUH-3 (E)EUH-4 (E)HP-102 N103 LEASING OFFICE N105 CORRIDOR N107 LOADING ZONE N108
WATER METER ST3 STAIR 3 (E)1" HPWS&R 1" HPWS&R 1" HPWS&R 11/2" HPWS&R (E)EF-2 T T S S S S N100 VESTIBULE N101 RECEPTION N102 LOBBY (E)HP-103 11/2" HPWS&R EWH-1 T (E)EUH-5 (E)1" HPWS&R
(E)1 1/4" HPWS&R (E)3/4" HPWS&R S HP-104D 107 RETAIL 102 DINING 106 BAR 105 KITCHEN 103 MEN'S TOILET 104 WOMEN'S TOILET N323 COOLER HOOD H-1 HOOD H-1A HOOD H-2 S (E) (E) (E) (E) (E)
1 1 1 1" HPWS&R 2 2 2 2 3 4 4 4 4 4 4 AREA NOT IN SCOPE OF WORK EF-8 VAV-1 VAV-2 EUH-8 EUH-9 5 AREA NOT IN SCOPE OF WORK MAU-1 6 7 DRAWING NOTES: 1. EXISTING 26x12 VENTILATION SUPPLY
AND RETURN DUCTWORK UP IN CHASE, 20x12 DOWN. 2. PROVIDE LINED RETURN AIR PLENUM THE SAME SIZE AS UNIT CONNECTION. RETURN DUCTWORK TO BE OPEN ENDED WITH WELDED WIRE MESH. 3. PROVIDE
WALL CAP WITH BACKDRAFT DAMPER. 4. MOUNT UNIT HEATER AT 9'-0" AFF. 5. EXISTING HEAT PUMP HP-104C TO BE REPOSITIONED TO LOCATION SHOWN. 6. EXISTING HEAT PUMP HP-104BA TO BE REPOSITIONED
TO LOCATION SHOWN. 7. CONNECT NEW 16x12 VENTILATION AIR DUCT TO EXISTING 16x12 AT POINT OF CONNECTION SHOWN. 8. PROVIDE NEW DUCT STATIC PRESSURE SENSOR AND INSTALL AT THIS LOCATION.
REFER TO RISER DIAGRAM FOR MORE INFORMATION. 9. TERMINATE 16x12 VENTILATION RETURN AIR WITH WELDED WIRE MESH. 10. DUCTWORK TO BE EXPOSED IN DINING/BAR/RETAIL AREA. DUCTWORK SHALL BE
GAVANEAL AND PAINTED. COLOR SELECTION BY ARCHITECT. 11. 36x14 EXHAUST DUCT UP SIDE OF BUILDING TO EF-6 ON ROOF. REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING
S100 FOR MOUNTING AND SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL LOCATION OF DUCTWORK AND SUPPORTS WITH EXISTING WINDOWS. 12. 16x10 EXHAUST DUCT UP SIDE OF
BUILDING TO EF-7 ON ROOF. REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING S100 FOR MOUNTING AND SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL
LOCATION OF DUCTWORK AND SUPPORTS WITH EXISTING WINDOWS. 13. OUTLINE OF LOWER CEILING/SOFFIT AREA. REFER TO RCP PLAN FOR MORE INFORMATION. 14. CONNECT NEW 16x12 VENTILATION AIR DUCT
TO EXISTING AT POINT OF CONNECTION SHOWN. 15. HEAT PUMP TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE LOCATION OF HEAT PUMP WITH SLAT CEILING SO THAT HEAT PUMP REMAINS ACCESSIBLE
FOR SERVICING. REFER TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 16. PROVIDE REMOTE VOLUME DAMPERS ABOVE GYP BOARD CEILING. 17. VAV TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE
LOCATION OF VAV WITH SLAT CEILING SO THAT VAV REMAINS ACCESSIBLE FOR SERVICING. REFER TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 18. MOUNT BOTTOM OF INTAKE LOUVER AT 12" AFF.
PROVIDE 1'-0" DEEP PLENUM WITH ACCESS DOOR. 19. EXHAUST DUCTWORK AT EXTERIOR OF BUILDING TO BE PAINTED. COLOR SELECTION BY ARCHITECT. DUCTWORK IS TO ROUTE UP 6 STORIES TO ROOF. APPROX.
70 FT. 20. UNIT TO SIT ON 6" CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL FOR MORE INFORMATION. 21. ACCESS PANEL FOR EXHAUST FAN. REFER TO ARCHITECTURAL PLANS FOR MORE INFORMATION. 22.
EXISTING EXHAUST FAN EF-1 TO BE RELOCATED AT LOCATION SHOWN. 23. EXISTING WALL CAP WITH BACKDRAFT TO BE MOVED TO LOCATION SHOWN. 24. CONNECT NEW 8" DUCT TO EXISTING AT POINT OF CONNECTION
SHOWN. X DRAWING NOTES: 1. RELOCATE EXISTING SENSOR TO NEW LOCATION SHOWN. EXTENDED/MODIFY CONTROL WIRING AS REQUIRED. 2. EXTEND MODIFY HPWS&R PIPING TO RELOCATED EXISTING HEAT PUMP.
3. CONNECT NEW 1" HPWS&R PIPING TO EXISTING 2" TAP AND CONNECT TO RELOCATED HEAT PUMP AS SHOWN. 4. PIPING IN OPEN CEILING AREAS TO BE PAINTED. COLOR SELECTION BY ARCHITECT. 5. PROVIDE
REMOTE MOUNTED LCD CONTROL PANEL FOR HOOD OPERATION. 6. PROVIDE ANSUL PULL STATION AT LOCATION SHOWN. 7. WALL MOUNTED UTILITY CABINET FOR HOOD H-2. X GENERAL NOTES: A. REFER TO DRAWINGS
M401-M405 FOR COMPLETE HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING ERV TO BE RE-BALANCED FOR NEW 1250 CFM OF VENTILATION AIR FOR FIRST FLOOR LEVEL. REFER TO
RISER DIAGRAM ON M500 FOR MORE INFORMATION. GENERAL NOTES: A. REFER TO DRAWINGS M401-M405 FOR COMPLETE HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING HEAT PUMP
WATER PUMPS AND SYSTEM TO BE REBALANCED TO NEW GPM QUANITITY. REFER TO RISER DIAGRAM ON M500 FOR MORE INFORMATION. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3
4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York
13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document
in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature,
the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:31 PM M101 FIRST FLOOR PLANS - HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850
ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 FIRST FLOOR PLAN - HVAC DUCTWORK 0' 2' 4' 8' 16' 1/8" = 1'-0" 2 FIRST FLOOR PLAN - HVAC PIPING 0' 2' 4' 8' 16' REVISION
SCHEDULE NAME DATE e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 EXISTING EVAPORATIVE COOLER EVC-1 15'-0"Lx4'-0"Wx10'-6"H
APPROX. 7,970 LBS (E)ERV-1 6'-5"Wx15'-2"Lx5'-6'-0"H APPROX. 4,328 LBS ST3 STAIR 3 10'-0" MIN. (E)EF-3 (E)EWH-4 26" EF-6 EF-7 12 3 4 4 14" 3 14" 26" 5 55 5 5 5 10'-0" MIN. DRAWING NOTES:
1. 36x14 EXHAUST DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTURAL DRAWINGS FOR MOUNTING AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING.REFER TO M101 FOR CONTINUATION. 2. 16x10 EXHAUST
DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTUAL DRAWINGS FOR MOUNTING AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING. REFER TO M101 FOR CONTINUATION. 3. DUCTWORK EQUIPMENT SUPPORT RAILS,
TYPICAL. REFER TO STRUCTURAL DRAWING S100 FOR COMPLETE DETAILS. 4. ROOF EXHAUST FAN. REFER TO DETAIL ON DRAWING M400 FOR MORE INFORMATION. 5. EXTERIOR EXHAUST DUCTWORK TO BE PAINTED.
COLOR SELECTION BY ARCHITECT. X DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I
11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State
Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering
Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021
3:06:32 PM M102 ROOF PLAN HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 2 ROOF PLAN - HVAC 0' 2' 4' 8' 16'
REVISION SCHEDULE NAME DATE DECK, BEAM, OR JOIST DIFFUSER NOTE: FLEX SHALL BE 4'-0" MAXIMUM WITH (1) 90 DEG. BEND ELBOW SUPPORT FOR FLEX PLAN VIEW ELEVATION VIEW RETURN/EXHAUST DUCTWORK
RETURN/EXHAUST DUCTWORK TRANSITION ANGLE OF 30 DEG. MAXIMUM 2" WIDE DUCT COLLAR. 1" MINIMUM DIMENSION FROM PLENUM TO DUCT COLLAR 1" MINIMUM DIMENSION FROM TOP OF PLENUM TO DUCTWORK
1" MINIMUM DIMENSION FROM GRILLE NECK TO BOTTOM OF DUCTWORK RETURN/ EXHAUST GRILLE FACE RETURN/ EXHAUST GRILLE FACE RETURN/ EXHAUST GRILLE NECK SHEETMETAL PLENUM SAME SIZE AS RETURN/
EXHAUST GRILLE NECK SIZE SHEETMETAL PLENUM SAME SIZE AS RETURN/ EXHAUST GRILLE NECK SIZE 12" MINIMUM DIMENSION FROM GRILLE FACE TO TOP OF PLENUM DETAIL NOTES: A. PAINT INSIDE OF PLENUM
BOX FLAT BLACK IF INTERNAL SOUND LINING IS NOT SPECIFIED. B. ALSO APPLICABLE TO REGISTERS. CEILING TYPE AS INDICATED ON ARCHITECTURAL DRAWINGS HPWS HPWR D HEAT PUMP UNIT TEST PLUGS
P-TRAPRETURN DUCT (IF INDICATED) FILTERS ARRANGED FOR SIDE REMOVAL DETAIL NOTES: A. HANG UNIT FROM STRUCTURE WITH STEEL ROD ANDVIBRATION ISOLATORS. B. UNIT SHALL BE ACCESSIBLE FROM
BELOW. MECHANICAL AND ELECTRICAL WORK SHALL NOT BE LOCATED BELOW UNIT. ARRANGEMENT SHALL PERMIT REMOVAL OF HEAT PUMP FOR MAJOR SERVICING. C. CONTROL PANEL SHALL BE ACCESSIBLE FOR SERVICING.
D. DRAIN PIPING FROM POINT OF CONNECTION BY PLUMBING CONTRACTOR. E. WATER FLOW CONTROL VALVE IS PROVIDED BY THE HEAT PUMP MANUFACTURER AND FIELD INSTALLED BY THE HVAC CONTRACTOR. F.
SEE SPECIFICATION FOR ALL VALVING REQUIREMENTS PROVIDED WITH HEAT PUMP. FLEXIBLE CONNECTION (TYP.) STAINLESS STEEL BRAIDED HOSE (TYP.) FACTORY FLOW CONTROL VALVE ASSEMBLIES WITH S.S
HOSES CONDENSATE HOSE WATER FLOW CONTROL VALVE HEAT PUMP UNIT FC RETURN AIR (SIZED PER PLANS) LINED RETURN PLENUM, SAME SIZE AS UNIT CONNECTION. MINIMUM 18" LONG. FILTER RACK ARRANGED
FOR SIDE REMOVAL FC SUPPLY AIR MAIN 24" 18" D TYP DETAIL NOTES: A. PROVIDE RAIL FLASHING. B. LOCATION, SETTING AND SECURING OF CURB BY HVAC C. PROVIDE SHIMS WHERE REQUIRED TO LEVEL
SUPPORT. D. LENGTH OF SUPPORTS AS CALLED FOR. PROVIDE BLOCKING BENEATH SUPPORTS IN FLUTES OF METAL DECKS. E. MEDIUM STRENGTH THREADLOCKER (LOCTITE BRAND 242, OR EQUAL) SHALL BE APPLIED
TO ALL BOLTS AND NUTS PRIOR TO FINAL ASSEMBLY. F. PROVIDE WIND RESTRAINT PER SPECIFICATION SECTION 230550-WIND RESTRAINT FOR HVAC SYSTEMS. 12"MIN 6"MIN. KETED NOTES: 1 ISOLATION RAIL
FURNISHED WITH THE EXHAUST FAN. 2 BASE RAIL. VERIFY ACTUAL BASE RAIL LENGTH. BASE RAIL SHALL BE "C" CHANNEL EQUIVALENT IN STRENGTH TO THE ISOLATION RAIL. 3 PROVIDE 4" LONG PIECES
OF ANGLE IRON FOR THE MOUNTING BRACKETS TO FASTEN THE BASE RAIL TO THE EQUIPMENT SUPPORT RAILS. THE MOUNTING BRACKETS SHALL BE 4" LONG, 1 1/4"x1 1/4"x3/8" ANGLE IRON. WELD BRACKET
TO THE NEW BASE RAIL "C" CHANNEL. FASTEN THE MOUNTING BRACKET TO THE CURB SUPPORT RAIL USING A SAE GRADE 8 BOLT AND (1) SAE GRADE 8 FLAT WASHER BETWEEN THE BOLT HEAD AND THE BRACKET
PER BRACKET. THERE ARE A TOTAL OF (4) BRACKETS PER BASE RAIL. 4 FAIL-SAFE CAPTIVE DESIGN NEOPRENE-IN-SHEAR VIBRATION ISOLATOR. VERIFY ISOLATOR LOADING REQUIREMENTS. A TOTAL OF (4)
ISOLATORS PER FAN ARE REQUIRED. 5 FASTEN VIBRATION ISOLATOR TO BASE RAIL WITH SAE GRADE 8 BOLTS. PROVIDE (1) SAE GRADE 8 FLAT WASHER BETWEEN THE BOLT HEAD ANF THE ISOLATOR BASE AND
(1) SAE GRADE 8 FLAT WASHER BETWEEN THE NUT AND BASE RAIL. 6 PAINT ALL RAW EXPOSED METAL ITEMS ASSOCIATED WITH THE NEW EXHAUST FANS WITH TWO PRIMER COATS AND TWO FINAL PAINT COATS OF
EXTERIOR RUST RESISTANT PAINT. PAINT SHALL MATCH EXHAUST FAN COLOR. 7 NEW BASE RAILS SHALL EXTEND A MINIMUM OF 1'-0" PAST THE CURB SUPPORT RAIL TO PROVIDE A MOUNTING SURFACE FOR THE
DUCTWORK SUPPORT AND THE FAN INLET. 8 FASTEN THE EXHAUST FAN TO THE ISOLATION RAIL BY USING SAE GRADE 8 BOLTS. PROVIDE A SAE GRADE 8 FLAT WASHER BETWEEN THE BOLT HEAD AND THE EXHAUST
FAN AND A SAE GRADE 8 FLAT WASHER BETWEEN THE NUT AND THE ISOLATION RAIL. ALIGN EXHAUST FAN WITH THE MOUNTING HOLES IN THE ISOLATION RAILS. 9 STACK EXTENSION SHALL BE CONSTRUCTED OF
SAME MATERIAL AND TWO (2) GAUGES HEAVIER THAN CALLED FOR IN SPECIFICATIONS. PAINT TO MATCH ALL OTHER DUCTWORK. 9 6 8 1 2 6 7 3 6 4 5 DETAIL NOTES: 1. ANCHOR BOLT, SIZE & LOCATION AS
REQUIRED TO MATCH EQUIPMENT BASE. 2. PLASTIC SLEEVE & ANCHOR. 3. #3 REINFORCING BARS, 12" O.C. EACH WAY. 4. #4 DOWEK, 12" O.C. 5. CHAMFER. 6. CONCRETE PAD 3,000 PSI CONCRETE, LENGTH
& WIDTH, 6" GREATER THAN THE EQUIPMENT BASE PLATE. EQUIPMENT BASE 2" MIN. 2" MIN. FINISHED FLOOR 1" 1" 6" 3 4 1 2 6 5 X FLEX DUCT DETAIL NOTES: A. DUCT AND DIFFUSER SIZE AND TYPE AS
SHOWN ON DRAWINGS. B. FLEX DUCT MAXIMUM LENGTH IS 24" WITH A 6" MAXIMUM OFFSET. SUPPLY DIFFUSER SUPPLY AIR DUCT DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5
6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202
p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in
any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature,
the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:33 PM M400 DETAILS HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER
COMPANY AT SAI TENANT FIT-OUT FOR NOT TO SCALE 1 TYPICAL DIFFUSER INSTALLATION DETAIL - FLEXIBLE DUCT SUPPORT NOT TO SCALE 3 RTN/EXH GRILLE PLENUM DETAIL-DUCTED NOT TO SCALE 4 CEILING
MOUNTED HEAT PUMP DETAIL NOT TO SCALE 5 HORIZONTAL HEAT PUMP DUCTWORK DETAIL NOT TO SCALE 7 ROOF MOUNTED FAN SUPPORT DETAIL NOT TO SCALE 6 CONCRETE EQUIPMENT BASE DETAIL NOT TO SCALE
2 SUPPLY AIR DIFFUSER DETAIL REVISION SCHEDULE NAME DATE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning
Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation
of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is
altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description
of the alteration. 4/22/2021 3:06:34 PM M401 DETAILS HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR DETAIL PROVIDED BY
HOOD MANUFACTURER. NTS 1 HOOD INSTALLATION DETAILS SECTION VIEW - HOOD H-1/H-1A (MAIN HOOD) SECTION VIEW - HOOD H-2 (PIZZA HOOD) REVISION SCHEDULE NAME DATE DATE: PROJECT: OTHER: DRAWN
BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132
E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a
licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the
notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:35 PM M402 DETAILS HVAC 04.23.21 2017054 NED
411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR DETAIL PROVIDED BY HOOD MANUFACTURER. NTS 1 HOOD H-1/H-1A INSTALLATION DETAIL (MAIN HOOD) PLAN VIEW
- HOOD H-1 (MAIN HOOD) PLAN VIEW - HOOD H-1A (MAIN HOOD) REVISION SCHEDULE NAME DATE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8
9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing
the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration,
and a specific description of the alteration. 4/22/2021 3:06:36 PM M403 DETAILS HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR 1/8" = 1'-0" 1 HOOD H-2 INSTALLATION DETAIL (PIZZA HOOD) DETAIL PROVIDED BY HOOD MANUFACTURER. REVISION SCHEDULE NAME DATE DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D
E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse,
New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this
document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by
his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:37 PM M404 DETAILS HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY
14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR NTS 1 HOOD WIRING DIAGRAMS DETAIL PROVIDED BY HOOD MANUFACTURER. REVISION SCHEDULE NAME DATE DATE: PROJECT: OTHER: DRAWN BY: A B
C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson
Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect,
to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered
by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:38 PM M405 DETAILS HVAC 04.23.21 2017054 NED 411-415 College
Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR NTS 1 CORE FIRE SUPRESSION SYSTEM DETAIL (H-2 PIZZA HOOD) DETAIL PROVIDED BY HOOD MANUFACTURER. REVISION SCHEDULE
NAME DATE BASEMENT FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR ROOF (E)HP-315 (E)CHEMICAL POT FEEDER. (E)P-1 (E)P-2 (E)HP-104A (E)HP-001A (E)HP-214 (E)HP-104B
(E)HP-103 (E)HP-001B (E)HP-104C (E)HP-102 (E)HP-416 (E)HP-515 (E)HP-408 (VERTICAL STACK) (E)HP-308 (VERTICAL STACK) (E)BOILER B-2 (E)BOILER B-1 (E)BP-1 (E)BP-2 (E)EXPANSION TANK EXISTING
EVAPORATIVE COOLER EC-1 GENERAL NOTE: A. REFER TO PIPING PLANS FOR MORE DETAIL. B. HEAT PUMP SYSTEM RISER DAIGRAM SHOWN FOR REFERENCE AND BALANCING. C. EXISTING HEAT PUMP WATER PUMPS
SHALL BE RELABANCED TO NEW TOTAL GPM. EXISTING GPM IS 200 GPM. TOTAL NEW CONNECTED GPM IS 210 GPM. DRAWING NOTES: 1. PIPING CONTINUED ON 6TH FLOOR TO VERTICAL STACK HEAT PUMP PIPE RISER.
2. EXISTING REMOTE DIFFERENTIAL PRESSURE SENSOR PROVIDED BY PUMP MANUFACTURER. 3. OUTLINE OF RATED SHAFT ENCLOSURE. 4. RELOCATED EXISTING HEAT PUMP HP-104A. CONNECT NEW 1" HPWS&R TO
EXISTING 2" TAP AT POINT OF CONNECTION SHOWN. 5. NEW HEAT PUMP HP-104D. CONNECT NEW 1" HPWS&R TO EXISTING AT POINT OF CONNECTION SHOWN. 6. RELOCATED EXISTING HEAT PUMP. EXTEND 1" HPWS&R
TO NEW LOCATION. 7. AREA OF WORK ON FIRST FLOOR. 1 1 1 1 1 1 4 2 DP TO LOOP PUMPS 2 (E)2" HPWS&R (E)1 1/4" HPWS&R (E)1" HPWS&R (E)1 1/4" HPWS&R(E)1 1/4" HPWS&R (E)3/4" HPWS&R (E)1"
HPWS&R (E)4" HPWS&R (E)4" HPWS&R (E)2" HPWS&R (E)2" HPWS&R (E)2 1/2" HPWS&R (E)3" HPWS&R (E)3" HPWS&R (E)3" HPWS&R (E)3/4" HPWS&R (E)3/4" HPWS&R (E)HP-615 (E)3/4" HPWS&R (E)3" HPWS&R
(E)3" HPWS&R 3 3 (E)1" HPWS&R (E)AIR SEPARATOR HP-104D 4 1" HPWS&R 5 5 1" HPWS&R 6 6 6 6 (E)1 1/2" HPWS&R (E)1 1/4" HPWS&R 1" HPWS&R 1" HPWS&R (E)3/4" HPWS&R (E)1" HPWS&R 7 BASEMENT
FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR ROOF EXISTING ERV-1 ON ROOF (E)12x10 (E)12x10 (E)12x10 (E)12x10 (E)20x12 (E)20x12 (E)26x12 (E)26x12 (E)14x10
(E)14x10 (E)14x10 (E)14x10 (E)16x10 (E)16x10 (E)14x10 (E)16x8 (E)14x10 (E)16x8 (E)28x14 (E)28x14 (E)34x14 (E)34x14 (E)36x16 (E)36x16 (E)40x16 (E)40x16 (E)44x16 (E)44x16 (E)FD/SD (E)FD/SD
(E)FD/SD FD/SD (E)FD/SD (E)FD/SD (E)FD/SD DRAWING NOTES: 1. VENTILATION SUPPLY AND RETURN DUCTWORK TO SERVE FLOOR. 2. OUTLINE OF RATED SHAFT ENCLOSURE. 3. EXISTING ERV-1 ON ROOF. REFER
TO ROOF PLAN FOR MORE INFORMATION. 4. NEW 16x12 VENTILATION SUPPLY AND RETURN DUCT TO CONNECT TO EXISTING AT POINT OF CONNECTION SHOWN. 5. AREA OF WORK ON FIRST FLOOR. 6. PROVIDE REMOTE
DIFFERENTIAL PRESSURE SENSOR IN NEW DUCTWORK UPSTREAM OF NEW VAV BOX. SENSOR TO BE TIED INTO DAIKIN APPLIED SYSTEM MANAGER AND EXISTING ERV-1 OPERATION. 7. NEW 36x14 EXHAUST DUCT FROM
KITCHEN HOOD H-1/H-1A, UP SIDE OF BUILDING TO EF-6 AT ROOF LEVEL. 8. NEW 16x10 EXHAUST DUCT FROM KITCHEN HOOD H-2, UP SIDE OF BUILDING TO EF-7 AT ROOF LEVEL. GENERAL NOTE: A. REFER
TO DUCTWORK PLAN FOR MORE DETAIL. B. EXISTING ERV-1 VENTILATION SYSTEM RISER DIAGRAM SHOWN FOR REFERENCE AND BALANCING. C. EXISTING ERV-1 SYSTEM TO BE RELBALANCED TO TOTAL NEW CFM.
EXISTING CFM IS 6500 CFM. TOTAL NEW CONNECTED CFM IS 6550 CFM. 1 1 1 1 1 1 2 2 (E)FD/SD 3 (E)10" (E)10" (E)16x12 (E)16x12 VAV-1 VAV-2 16x12 16x12 4 5 1 1 DP 6 HOOD H-1/1A HOOD H-2 (E)36x14
EF-6 36x14 36x14 EF-7 16x10 16x10 16x10 7 8 745 CFM 815 CFM 1010 CFM 840 CFM 765 CFM 1775 CFM 600 CFM DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273
7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way.
If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the
date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:39 PM M500 RISER DIAGRAMS HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA
BEER COMPANY AT SAI TENANT FIT-OUT FOR NTS 2 HEAT PUMP WATER RISER DIAGRAM - HVAC NTS 1 AIRFLOW SYSTEMS RISER DIAGRAM REVISION SCHEDULE NAME DATE SEQUENCE OF OPERATION - EXISTING BUILDING
(FOR REFERENCE ONLY): EXISTING BUILDING HEAT PUMP LOOP HEAT ADDITION AND HEAT REJECTION (FOR REFERENCE ONLY): 1. THE PACKAGED FACTORY PROVIDE WATER LOOP CONTROLLER SHALL MONITOR THE
LOOP WATER TEMPERATURE AND ENABLE OR DISABLE THE SYSTEM HEAT ADDERS OR HEAT REJECTER TO MAINTAIN THE LOOP WITHIN 70 TO 90 DEGREES F. 2. THE HEAT ADDER SYSTEM CONSISTS OF (E)BOILER B-1
AND (E)BOILER B-2 AND ASSOCIATED BOILER PUMPS BP-1 AND BP-2. THE HEAT REJECTER SYSTEM CONSISTS OF THE EXISTING EVAPORATIVE TOWER (EC-1). 3. UPON A REQUIREMENT TO ADD HEAT TO THE LOOP
THE WATER LOOP CONTROLLER SHALL ENABLE THE HEAT ADDER SYSTEM TO PROVIDE HEAT TO THE LOOP UNTIL THE LOOP REACHES THE MINIMUM LOOP TEMPERATURE OF 70 DEG F. 4. UPON A REQUIREMENT TO REJECT
HEAT FROM THE LOOP, THE WATER LOOP CONTROLLER SHALL ENABLE THE EVAPORATIVE COOLER TO MAINTAIN THE LOOP UNTIL THE LOOP REACHES THE MAXIMUM LOOP TEMPERATURE OF 90 DEG F. THE EVAPORATIVE
COOLER SHALL BE STAGED AS FOLLOWS: STAGE 1: OPEN DISCHARGE DAMPERS STAGE 2: RUN SPRAY PUMP. STAGE 3: MODULATE THE FAN VFD AS REQUIRED TO MAINTAIN THE LEAVING WATER TEMPERATURE. EXISTING
HEAT RECOVERY VENTILATION UNIT ERV-1 (FOR REFERENCE ONLY): 1. THE ROOF MOUNTED VENTILATION AIR UNIT HAS FULL FACTOR DDC CONTROLS. THE ERV SHALL ENABLE/DISABLE THE BUILDING OCC/UNOCC
MODE THRU THE PACKAGED FACTORY CONTROLS. THE UNIT IS A PACKAGED UNIT WITH SUPPLY AND EXHAUST FANS, DX COOLING COIL, A HOT GAS REHEAT COIL, TOTAL ENERGY RECOVERY WHEEL FOR EXHAUST ENERGY
RECOVERY, ELECTRIC COIL IN ORDER TO PROVIDE HEATED AIR OR COOLED/DEHUMIDIFIED AIR AT SPACE NEUTRAL TEMPERATURE 68-72 DEGREES F. THE UNIT SHALL RUN AT CONSTANT VOLUME. 2. DURING SCHEDULED
BUILDING OCCUPIED HOURS, THE UNIT SHALL RUN AT SCHEDULED SUPPLY CFM. DURING SCHEDULE BUILDING UNOCCUPIED HOURS THE UNIT SHALL BE OFF. EXISTING HORIZONTAL HEAT PUMPS (FOR REFERENCE ONLY):
1. ALL HEAT PUMPS HAVE FULL FACTORY DDC CONTROLS. THE HEAT PUMP SHALL HAVE OCCUPIED AND UNOCCUPIED SPACE TEMPERATURE SET POINTS FOR THE BUILDING OCC/UNOCC SCHEDULING. THE HEAT PUMP
FANS SHALL RUN IN FAN-ON MODE DURING THE BUILDING OCCUPIED HOURS AND IN FAN-AUTO MODE DURING BUILDING UNOCCUPIED HOURS. SEQUENCE OF OPERATION: VAV-1 AND VAV-2 (VENTILATION AIR): 1.
VAV BOXES SHALL RUN BASED ON THE EXISTING BUILDING OCCUPANCY/UNOCCUPIED SCHEDULE . 2. WHEN THE DINING AREA AND RETAIL SPACE IS UNOCCUPIED AND THE KITCHEN HOOD/EXHAUST ARE ON, VAV BOX
VAV-1 SHALL OPEN AND PROVIDE LISTED CFM. VAV BOX VAV-2 (RETURN AIR) SHALL REMAIN CLOSED. 3. VAV BOXES SHALL TIE INTO EXISTING DAIKIN APPLIED SYSTEM MANAGER. EXHAUST FAN EF-8 (TOILET
ROOMS): 1. FAN SHALL RUN CONTINUOUSLY, AND BE BASED ON EXISTING BUILDING TIME CLOCK OCCUPIED/UNOCCUPIED SETTING. HORIZONTAL HEAT PUMPS: 1. EXISTING HEAT PUMPS HAVE FULL FACTORY DDC
CONTROLS. THE HEAT PUMP SHALL HAVE OCCUPIED AND UNOCCUPIED SPACE TEMPERATURE SET POINTS FOR THE BUILDING OCC/UNOCC SCHEDULING. THE HEAT PUMP FANS SHALL RUN IN FAN-ON MODE DURING THE
BUILDING OCCUPIED HOURS AND IN FAN-AUTO MODE DURING BUILDING UNOCCUPIED HOURS. 2. (1)NEW HEAT PUMP HP-104D, SHALL RUN AND CONTROL THE SAME AS EXISTING HEAT PUMPS AS LISTED ABOVE AND
TIE INTO EXISTING DAIKIN APPLIED SYSTEM MANAGER ELECTRIC UNIT HEATERS: 1. EUH'S SHALL BE PROVIDED WITH UNIT MOUNTED THERMOSTAT AND CONTROL. KITCHEN HOOD EQUIPMENT- EXHAUST HOODS (H-1/H-1A,
H-2), EXHAUST FANS EF-6 AND EF-7, AND MAKEUP AIR UNIT MAU-1: 1. OPERATION AND CONTROL OF KITCHEN HOODS, EXHAUST FANS AND MAKEUP AIR UNIT MAU-1 SHALL BE THRU PACKAGED CAPTIVEAIRE CASLINK
CONTROL SYSTEM. 3. CONTROL PANEL SHALL BE CAPABLE OF: - MODULATING EXHAUST AND MAKE-UP AIR FAN SPEEDS FOR DEMAND CONTROL VENTILATION. 2. A FACTORY REMOTE MOUNTED LCD INTERFACE SHALL
BE PROVIDED WITH BUT NOT LIMITED, TO THE FOLLOWING FEATURES: - ON/OFF PUSH BUTTON FAN AND LIGHT SWITCH ACTIVATION. - INTEGRATED GAS VALVE RESET FOR ELECTRONIC GAS VALVES - VFD FAULT
DISPALY WITH AUDIBLE AND VISUAL ALARM NOTIFICATION. - DUCT TEMPERATURE SENSOR WITH ALARM NOTIFICAITON. - ENERGY SAVING INDICATOR THAT UTLIZIES MEASURED KHW FROM THE VFDS. DATE: PROJECT:
OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York
14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction
of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and
the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/22/2021 3:06:42 PM M600 SCHEDULES AND CONTROLS -HVAC
04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 3. PROVIDE OPTIONAL OPPOSED BLADE DAMPER FOR BALANCING THRU FACE OF GRILLE.
2. COLOR SELECTION BY ARCHITECT. 1. PROVIDE OPTIONAL AIR SCOOP DAMPER REMARKS: A RETURN/EXHAUST STEEL WHITE TITUS MODEL 355-RL 2,3 4 SUPPLY/RETURN STEEL WHITE TITUS MODEL ML-39 - 4
SLOT 2 3 SUPPLY STEEL WHITE TITUS MODEL 272RL 2,3 2 SUPPLY STEEL WHITE TITUS MODEL S301FL 1,2 1 SUPPLY STEEL WHITE TITUS MODEL OMNI 2 TYPE APPLICATION MATERIAL FINISH MANUFACTURER &
MODEL NO. REMARKS REGISTER GRILLE AND DIFFUSER SCHEDULE 2. PROVIDE WITH BIRD SCREEN 1. COLOR SELECTION BY ARCHITECT. REMARKS: IL-1 TRASH/RECYCLE ROOM MAU-1 INTAKE VERTICAL ALUMINUM
8.21 48 48 6 5500 659 0.06 RUSKIN ELF6425DD 1,2 (CFM) (Sq. Ft.) (In.) (In.) (In.) FLOW (FPM) (In. WC) AREA WIDTH HEIGHT DEPTH AIR VEL MAX P.D. UNIT NO. LOCATION SERVICE TYPE MATERIAL
FREE DIMENSIONS (APPROX.) AIR PERFORMANCE MANUFACTURER & MODEL NO. REMARKS LOUVER SCHEDULE 5. HEAT PUMP TO BE PROVIDED WITH BACNET CONTROL BOARDS AND DDC WALL SENSORS COMPATIBLE WITH
EXISTING DAIKIN SYSTEM MANAGER. 4. UNIT IS AN EXISTING HEAT PUMP, SHOWN ON SCHEDULE FOR REFERENCE. 3. PROVIDE WITH FACTORY MOUNTED DISCONNECT 2. PROVIDE UNIT WITH HOSE KIT INCLUDING
ISOLATION VALVES, UNIONS, AUTOMATIC FLOW CONTROL VALVE, 2-WAY MOTORIZED VALVE, Y-STRAINER WITH BLOW DOWN, CAP AND CHAIN, TEST PORTS AND AIR VENT. 1. PROVIDE MERV 8 PLEATED FILTER REMARKS:
HP-104D 1ST FLOOR HORIZONTAL 800 0.55 1/3 MEDIUM WATER 5.0 3.5 90 99 74 64 55.1 54.6 16.3 21.8 27.8 12.45 70 62 72 106.2 29.5 23.5 4.94 208 1 30 19.9 DAIKIN WCCH024 1-3,5 (E)HP-104C
1ST FLOOR HORIZONTAL 800 0.55 1/3 MEDIUM WATER 5.0 3.5 90 99 74 64 55.1 54.6 16.3 21.8 27.8 12.45 70 62 72 106.2 29.5 23.5 4.94 208 1 30 19.9 DAIKIN WCCH024 4 (E)HP-104B 1ST FLOOR HORIZONTAL
800 0.55 1/3 MEDIUM WATER 5.0 3.5 90 99 74 64 55.1 54.6 16.3 21.8 27.8 12.45 70 62 72 106.2 29.5 23.5 4.94 208 1 30 19.9 DAIKIN WCCH024 4 (E)HP-104A 1ST FLOOR HORIZONTAL 800 0.55 1/3
MEDIUM WATER 5.0 3.5 90 99 74 64 55.1 54.6 16.3 21.8 27.8 12.45 70 62 72 106.2 29.5 23.5 4.94 208 1 30 19.9 DAIKIN WCCH024 4 DB WB DB WB AIR FLOW (CFM) EXT. STATIC (In. WC) MOTOR HP
FAN SPEED ENT. WATER TEMP. (DEG. F) LVG. WATER TEMP. (DEG. F) EAT (DEG. F) LAT (DEG. F) SENS. CAPACITY (BTUH) TOTAL CAPACITY (MBH) HEAT REJECTED (MBH) MINIMUM (EER) ENT.
WATER TEMP. (DEG. F) LVG. WATER TEMP. (DEG. F) ENT. AIR TEMP. (DEG. F) LVG. AIR TEMP. (DEG. F) TOTAL CAPACITY (MBH) HEAT EXTRACTED (MBH) MINIMUM (COP) VOLTS PHASE MOCP MCA UNIT
NO. LOCATION UNIT TYPE FAN CHARACTERISTICS FLUID WATER FLOW RATE (GPM) WATER P.D. (FT HD) COOLING HEATING UNIT ELEC. CHARACTERISTICS MANUFACTURER & MODEL No. REMARKS WATER SOURCE HEAT
PUMP SCHEDULE 10. HOOD TO HAVE WALL MOUNTED UTILITY CABINET FOR CORE PROTECTION FIRE SURPRESSION SYSTEM. REFER TO PLANS FOR LOCATION. 9. PROVIDE 3" INTERNAL STANDOFF 8. ALL KITCHEN
HOOD EXHAUST DUCTWORK (AND MAKEUP AIR DUCTWORK IF APPLICABLE) SHALL BE INSULATED AS PER SPECIFICATION SECTION. 7. PROVIDE FACTORY DAMPERS IN SUPPLY AIR CONNECTION COLLARS. 6. PROVIDE
80"Hx240"L STAINLESS STEEL BACKSPLASH 5. PROVIDE FACTORY VFD FOR DEMAND CONTROL EXHAUST FAN OPERATION. LOW HEAT MODE OPERATION BASED ON TEMP SENSOR READING RESULTS IN OPERATION AT
90% OF DESIGN CFM. 4. PROVIDE INTEGRAL HOOD LIGHTING WITH MAXIMUM OF 30" SPACING BETWEEN FIXTURES. 3. PROVIDE POLISHED SS ANSUL DROPS W/ FACTORY STANDARD GREASE TIGHT QUICKSEAL FITTINGS.
2. HOOD TO BE CONTROLLED BY REMOTE LCD OPERATOR PANEL. SEE PLANS FOR LOCATION. 1. PROVIDE PRE-PIPED OVERLAPPING COVERAGE ANSUL SYSTEM. HOOD MANUFACTURER SHALL BE RESPONSIBLE FOR FURNISHING
AND INSTALLING ANSUL PIPING FROM HOOD TO ANSUL TANKS. NOTES: H-2 PIZZA OVEN HOOD 1,500 0.92 1 12 700 CAPTIVEAIRE 5424 ND-2-PSP-F 5'-0"Lx4'-6"Wx2'-0"H 5'-0"Lx16"Wx2'-0"H 1,100 0.17 2
550 20x12 80" TYPE 1 CAPTRATE SOLO 2,4,5,7,8,10 H-1A MAIN COOKING LINE(R) 2,612 1.06 1 16 600 CAPTIVEAIRE 5424 ND-2-PSP-F 9'-6"Lx4'-6"Wx2'-0"H 9'-6"Lx20"Wx6"H 2,350 0.23 3 783 28x12
80" TYPE 1 CAPTRATE SOLO 1-9 H-1 MAIN COOKING LINE(L) 2,612 1.06 1 16 600 CAPTIVEAIRE 5424 ND-2-PSP-F 9'-6"Lx4'-6"Wx2'-0"H 9'-6"Lx20"Wx6"H 2,350 0.23 3 783 28x12 80" TYPE 1 CAPTRATE
SOLO 1-9 TOTAL CFM HOOD SP QUANTITY SIZE TOTAL CFM HOOD SP QUANTITY CFM EACH SIZE HOOD EQUIPMENT/DEPT. SERVED EXHAUST EXHAUST CONNECTIONS MAX. COOKING TEMP. (DEG F) MANUFACTURER/MODEL
HOOD DIMENSIONS PERFORATED SA PLENUM DIMENSIONS SUPPLY SUPPLY CONNECTIONS INSTALLED HEIGHT A.F.F TO BOTTOM OF HOOD HOOD CLASSIFICATION FILTERS NOTES HOOD SCHEDULE 4. PROVIDE UNIT MOUNTED
DISCONNECT. 3. PROVIDE CASLINK BUILDING MOINTORING SYSTEM FOR HOOD EXHAUST AND MAKEUP AIR CONTROL. 2. INTERLOCK MAU-1 WITH OPERATION OF EXHAUST HOOD H-1/H-1 AND H/2 1. PROVIDE MOTORIZED
BACKDRAFT DAMPER. REMARKS: MAU-1 ROOF KITCHEN HOOD MAKE-UP AIR 5800 0.5 5.177 2075 DIRECT 7.5 BY ELEC 478 440 72 5.5 208 3 27.6 21.1 CAPTIVEAIRE A2-D.500-20D 1,2,3,4 HP STARTER AIR
FLOW (CFM) EXT. STATIC (In. WC) MAX BHP FAN RPM DRIVE MOTOR INPUT (MBH) OUTPUT (MBH) TEMP RISE (F) INPUT GAS PRESSURE (IN W.C.) VOLTS PHASE MCA FLA UNIT NO. LOCATION SERVICE SUPPLY
FAN GAS UNIT ELECTRICAL MANUFACTURER & MODEL No. REMARKS MAKE-UP AIR UNIT - GAS FIRED 3. COLOR SELECTION BY ARCHITECT. 2. UNIT TO BE HUND FROM STRUCTURE FOR VERTICAL DISCHARGE, PROVIDE
WITH OPTIONAL DIFFUSER. 1. PROVIDE UNIT MOUNTED THERMOSTAT AND DISCONNECT. REMARKS: EUH-9 VESTIBULE HORIZONTAL 8.5 350 9'-0" 15 2.5 1 208 1 12.3 INDEECO 240-U1025C 1-3 EUH-8 VESTIBULE
HORIZONTAL 8.5 350 9'-0" 15 2.5 1 208 1 12.3 INDEECO 240-U1025C 1-3 (CFM) STEPS FLOW (Ft.-In.) (KW) OF MBH AIR HEIGHT (Ft.) CAPACITY NO. VOLTS PHASE AMPS UNIT NO. LOCATION TYPE CAPACITY
AIR SIDE MOUNTING THROW ELEC CHARACTERISTICS MANUFACTURER & MODEL No. REMARKS UNIT HEATER SCHEDULE - ELECTRIC 4. PROVIDE UNIT MOUNTED DISCONNECTS. 3. PROVIDE NEMA 3R SAFTEY DISCONNECT
SWITCH. 2. PROVIDE 24" DISCHARGE EXTENSION WITH VERTICAL DISCHARGE ORIENTATION. 1. PROVIDE UTILITY SET GREASE CUP. REMARKS: EF-8 WOMENS TOILET RESTROOM EXHAUST INLINE FC 470 0.5 - 1500
1056 3.5 DIRECT 1500 152W 115 60 1 BY ELEC COOK GN-642 4 EF-7 ROOF HOOD H-2 EXHAUST (PIZZA HOOD) CENT. AF 1500 3.0 0.942 1647 1043 19.5 DIRECT 1647 1.5 208 60 3 INTEGRAL VFD CAPTIVEAIRE
USBI15DD-RM 1-3 EF-6 ROOF HOOD H-1/1A EXHAUST (MAIN HOOD) CENT. AF 5224 2.6 4.36 1237 1731 29 DIRECT 1237 7.5 208 60 3 INTEGRAL VFD CAPTIVEAIRE USBI24DD-RM 1-3 (FPM) TYPE (In. WC) BHP
RPM VELOCITY TYPE BLADE CFM S.P. MAX. FAN MAX. OUTLET SONES DRIVE RPM HP VOLTS HZ PHASE STARTER UNIT NO. LOCATION SERVICE FAN CHARACTERISTICS MOTOR CHARACTERISTICS MANUFACTURER & MODEL
NO. REMARKS FAN SCHEDULE VAV-2 KITCHEN VENTILATION RETURN 1250 625 0.01 10 27 31 TITUS DESV VAV-1 KITCHEN VENTILATION SUPPLY 1250 625 0.01 10 27 31 TITUS DESV (CFM) (CFM) (In. WC) FLOW
FLOW MAX CFM (In.) AIR AIR PRESS AT SIZE AT 1" S.P. AT 1" S.P. UNIT NO. SERVICE MAX MIN MIN INLET INLET RAD N.C. DISCH N.C. MANUFACTURER & MODEL NO. REMARKS VAV - SINGLE DUCT - AIR
TERMINAL UNIT SCHEDULE REVISION SCHEDULE NAME DATE 3 a,b,c FIRE ALARM CONTROL PANEL CONT CONTACTOR THD TOTAL HARMONIC DISTRIBUTION FACP ELECTRIC WATER COOLER DISTRIBUTION PANEL WEATHERPROOF
REFRIGERATOR SPECIFICATION GROUND FAULT CIRCUIT INTERRUPTER PLUMBING CONTRACTOR OR PHOTO CELL GENERAL CONTRACTOR ELECTRICAL CONTRACTOR HEATING, VENTILATING AND AIR CONDITIONING FA MW
FIRE ALARM MICROWAVE HVAC GC PC EC REFR BSMT TYP BASEMENT TYPICAL CLG EA SPEC CONTR GEN CEILING EACH GENERATOR A AMPERE P DN EX SP AUTO DOWN EXISTING SPACE AUTOMATIC POLE DP NL NIGHT
LIGHT V VOLT ELEC GFI SW ELECTRIC SWITCH HORSEPOWER MAIN CIRCUIT BREAKER MAIN LUG ONLY GALVANIZED RIGID STEEL UNDERWRITER'S LABORATORY LTG UL GND KWH LIGHTING GROUND KILOWATT HOUR MLO
PH MCB GRS PHASE ABBREV. ABBREVIATIONS CB PNL HP CIRCUIT BREAKER PANEL DESCRIPTION PV PHOTOVOLTAIC AMPERE INTERRUPTING CURRENTAIC EM EMERGENCY CONTRACTOR AFG ABOVE FINISHED GRADE EWC
WP WG VP WIRE GUARD VANDAL PROOF POLYCARBONATE GUARD SYMBOL DESCRIPTION BASIC MATERIALS AND METHODS TOGGLE SWITCH, VOLTAGE AS INDICATED ON FIXTURE SCHEDULE, SUBSCRIPTS INDICATE TYPE:
2 - TWO POLE SWITCH 3 - THREE WAY SWITCH 4 - FOUR WAY SWITCH D - DIGITAL SWITCH L - ILLUMINATED HANDLE LV - LOW VOLTAGE, MOMENTARY CONTACT K - KEY OPERATED PL - PILOT LIGHT M - MOMENTARY
CONTACT SWITCH T - THERMAL MANUAL MOTOR STARTER O - OCCUPANCY SENSOR V - VACANCY SENSOR ET - ELAPSED TIMER a,b,c - SWITCHING DESIGNATIONS NUMBER OF LETTERS EQUALS NO. OF GANGED
SWITCHES ONE (1) TELEPHONE OUTLET AND CABLE ONE (1) TELEPHONE OUTLET AND CABLE MOUNTED 46" A.F.F. ONE (1) DATA OUTLET AND CABLE ONE (1) DATA OUTLET AND CABLE MOUNTED 46" A.F.F.
W W SYMBOL DESCRIPTION FIRE ALARM DESCRIPTIONSYMBOL LUMINAIRES MANUAL PULL STATION SMOKE DETECTOR FIXED TEMPERATURE HEAT DETECTOR, SUBSTRIPT INDICATES TYPE: 190 - 190 DEGREE F FIXED
TEMPERATURE 135 - 135 DEGREE F FIXED TEMPERATURE XP - EXPLOSION PROOF, 135 DEGREE FIXED TEMPERATURE WITH SEALED CONTACTS 190 COMBINATION SET TEMPERATURE AND RATE OF RISE HEAT
DETECTOR CARBON MONOXIDE DETECTOR DUCT SMOKE DETECTOR DETECTOR REMOTE TEST STATION AND INDICATOR NOTIFICATION APPLIANCE, VISUAL # INDICATES STROBE CANDELA IF OTHER THAN 75. C - INDICATES
CEILING 15 15 NOTIFICATION APPLIANCE, AUDIBLE AND VISUAL # INDICATES STROBE CANDELA IF OTHER THAN 75. C - INDICATES CEILING 15 CARBON MONOXIDE NOTIFICATION APPLIANCE, AUDIBLE AND VISUAL;
# INDICATES STROBE CANDELA IF OTHER THAN 75 MAGNETIC DOOR HOLDER TAMPER SWITCH SPRINKLER WATERFLOW SWITCH (PADDLE OR PRESSURE SWITCH TYPE) FAN SHUT DOWN RELAY WALL MOUNTED EXIT LUMINAIRE
CEILING MOUNTED EXIT LUMINAIRE EMERGENCY BATTERY PACK REMOTE LUMINAIRE HEAD WALL MOUNTED EMERGENCY LUMINAIRE WITH BATTERY PACK DIGITAL LIGHTING ROOM CONTROLLER LUMINAIRE CONNECTED TO
NIGHT LIGHT CIRCUIT, UNSWITCHEDNL LUMINAIRE WITH EMERGENCY BATTERY INVERTER BALLAST EM LUMINAIRE CONNECTED TO CRITICAL CIRCUIT LUMINAIRE STRIP TRACK LIGHTING SYSTEM, LENGTH AND NUMBER
OF HEADS AS INDICATED ON PLAN POLE MOUNTED SITE LUMINAIRE AND BASE, QUANTITY OF LUMINAIRES AS INDICATED FA d LUMINAIRE. UPPER CASE LETTERS INDICATE FIXTURE TYPE ON SCHEDULE, LOWER
CASE LETTER INDICATES SWITCHING DESIGNATION. FA d WALL MOUNTED LUMINAIRE. UPPER CASE LETTERS INDICATE FIXTURE TYPE ON SCHEDULE, LOWER CASE LETTER INDICATES SWITCHING DESIGNATION.
LUMINAIRE CONNECTED TO EMERGENCY CIRCUIT. EM SUBSCRIPT INDICATES EMERGENCY BATTERY RELAY. NOTIFICATION APPLIANCE CIRCUIT EXTENDER ADDRESSABLE INITIATION MODULE ADDRESSABLE CONTROL MODULE
FIRE ALARM ANNUNCIATION PANEL FIRE ALARM CONTROL PANEL SMOKE DAMPERSD DATA RACK DATA INTERMEDIATE DISTRIBUTION FRAME DATA MAIN DISTRIBUTION FRAME TELEPHONE INTERMEDIATE DISTRIBUTION
FRAME TELEPHONE MAIN DISTRIBUTION FRAME WIRELESS ACCESS POINT DATA OUTLET POWER COMMUNICATION OUTLET - QUANTITY OF COMPUTER DATA OUTLETS AND CABLES, QUANTITY OF POWER 20 AMPERE SPECIFICATION
GRADE DUPLEX RECEPTACLES, QUANTITY OF TELEPHONE OUTLETS AND CABLES, AND QUANTITY OF TELEVISION OUTLETS AND CABLES AS CALLED FOR REFER TO DETAIL ON DRAWINGS. # D - DATA OUTLETS AND CABLES
# P - POWER DUPLEX RECEPTACLES # T - TELEPHONE OUTLETS AND CABLES # V - TELEVISION OUTLETS AND CABLES (NOTE: REFER TO INDIVIDUAL DEVICE SYMBOLS FOR ADDITIONAL SUBSCRIPT DEFINITIONS)
EXAMPLE SYMBOL SHOWN INDICATES : 2 DATA, 1 TELEPHONE, 1 TV OUTLET AND 2 RECEPTACLES CIRCUITED TO PANEL CP1 #-CP1 2D2P 1T1V SYMBOL DESCRIPTION COMMUNICATIONS SYMBOLS HEAVY SOLID LINE
WEIGHT IS NEW EXISTING WIRING OR EQUIPMENT, SOLID LIGHT LINE WEIGHT IS EXISTING. EXISTING ELECTRICAL OR EQUIPMENT OR DEVICE, DASHED LIGHT LINE WEIGHT IS EXISTING TO BE REMOVED. 3 REFERENCE
TO DEMOLITION NOTE 3 REFERENCE TO DRAWING NOTE EXISTING TO BE REPLACED - INDICATES EXISTING ITEM SHALL BE REPLACED. RECONNECT TO EXISTING ELECTRICAL CONNECTIONS UNLESS OTHERWISE NOTED.
EXISTING TO BE RELOCATED - INDICATES EXISTING ITEM SHALL BE RELOCATED. DISCONNECT AND REMOVE, REINSTALL AT NEW LOCATION AND RECONNECT ITEM AS REQUIRED. EXISTING TO REMAIN - INDICATES
EXISTING ITEM SHALL REMAIN. MAINTAIN EXISTING ELECTRICAL CONNECTIONS UNLESS OTHERWISE NOTED. ELECTRIC HAND DRYER DUAL TECHNOLOGY CEILING MOUNTED OCCUPANCY SENSOR UOI WITH SUBSCRIPT.
SUBSCRIPTS INDICATE TYPE: C - ULTRASONIC PHOTOELECTRIC CONTROL TWO DUPLEX RECEPTACLE, SINGLE COVER DUPLEX RECEPTACLE, SUBSCRIPTS INDICATE TYPE: G - GROUND FAULT CIRCUIT INTERRUPTER
U - USB DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTING TYPE PUSH BUTTON a,b,c DIMMER SWITCH, VOLTAGE AS INDICATED ON FIXTURE SCHEDULE, SUBSCRIPTS INDICATE TYPE: 3 - THREE WAY
DIMMER SWITCH a,b,c - SWITCHING DESIGNATIONS NUMBER OF LETTERS EQUALS NO. OF GANGED SWITCHES PULLBOX SINGLE POINT CONNECTION TO EQUIPMENT SPECIAL PURPOSE RECEPTACLE. PROVIDE
PROPER VOLTAGE, CLASS, CURRENT RATING AND NEMA CONFIGURATION AS REQUIRED BY BRANCH CIRCUIT AND/OR MATCH CAP ON EQUIPMENT BEING FURNISHED BY OTHERS. PROVIDE CORD AND CAP. SUBSCRIPT
INDICATES TYPE: # - NEMA TYPE D - DRYER RECEPTACLE R - RANGE RECEPTACLE T - TWISTLOCK X - MATCH EQUIPMENT CAP GANGED DEVICES SOLID HALF ARROW(S) INDICATES 120 VOLT CIRCUIT TO SINGLE
POLE CIRCUIT BREAKER(S), UNLESS NOTED OTHERWISE. HOME RUN TO PANELBOARD. LETTERS/NUMBERS INDICATE PANEL. NUMBERS INDICATE CIRCUITS. NUMBER OF ARROWS EQUALS NUMBER OF CIRCUITS. CIRCUIT
SHALL BE 2-#12, 1-#12EG FROM 20A-1P CIRCUIT BREAKER, UNLESS NOTED OTHERWISE. BRANCH CIRCUIT WIRING SIZE AND NUMBER TO MATCH HOMERUN. REFER TO SPEC'S FOR RACEWAY TYPE. LP-10: # SOLID
FULL ARROW INDICATES 208 VOLT CIRCUIT TO MULTI-POLE CIRCUIT BREAKER, UNLESS NOTED OTHERWISE. 208/120 [240/120] VOLT PANELBOARD MOTOR STARTER. REFER TO ELECTRIC EQUIPMENT AND CONTROL
SCHEDULE FOR SIZE AND TYPE. DISCONNECT SWITCH AMP RATING AS INDICATED FUSED DISCONNECT SWITCH AMP RATING AS INDICATED COMBINATION DISCONNECT SWITCH AND MAGNETIC STARTER REFER TO ELECTRIC
EQUIPMENT AND CONTROL SCHEDULE M ELECTRICAL CONNECTION. REFER TO ELECTRIC EQUIPMENT AND CONTROL SCHEDULE FOR DESCRIPTION. LETTERS AND NUMBERS REFER TO "ITEM DESIGNATION" ON THE SCHEDULE.
CONTACTOR SYMBOL DESCRIPTION POWER DISTRIBUTION AND CONTROL OS PC HD VS (E) (ER) (R) , , , D TV WAP TMDF TIDF DMDF DIDF DR NAC IM CM FAAP FACP FSD TS WF DH CO F F RTS DSD CO H H S F
RC ABOVE FINISHED FLOORAFF AFI ARC FAULT INTERRUPTING AL ALUMINUM CATV CABLE TELEVISION CCTV CLOSED CIRCUIT TELEVISION CU COPPER EXPLOSION PROOFXP METAL CLAD CABLEMC LED LIGHT EMITTING
DIODE MOTOR CONTROL CENTERMCC MULTI-FUNCTION RELAYMFR MINERAL INSULATED CABLEMI NA NOT APPLICABLE NEC NATIONAL ELECTRICAL CODE NIC NOT IN CONTRACT NC NORMALLY CLOSED NO NORMALLY OPEN
NM NON-METALLIC SHEATHED CABLE NTS NOT TO SCALE SWBD SWITCHBOARD RIGID METAL CONDUITRMC EMT ELECTRICAL METALLIC TUBING WIRE OR WATTW UNSHIELDED TWISTED PAIRUTP ARS ARC ENERGY REDUCTION
SWITCH ASD ADJUSTABLE SPEED DRIVE ATS AUTOMATIC TRANSFER SWITCH AV AUDIOVISUAL AWG AMERICAN WIRE GAUGE C CONDUIT CM CONSTRUCTION MANAGER CT CABLE TRAY CPT CONTROL POWER TRANSFORMER
EG EQUIPMENT GROUND EXP EXPLOSION PROOF FURNISHED BY OTHERSFBO FIRE ALARM PANEL TRANSPONDER PANELFATP HAND HOLEHH HAND-OFF-AUTOHOA JUNCTION BOXJB KW KILOWATT KVA KILOVOLT AMPERE KV
KILOVOLT MAN HOLEMH MANUAL TRANSFER SWITCHMTS NMT NON-METALLIC TUBING OC MOUNTED OVER COUNTER OH OVERHEAD PB PULL BOX PT POTENTIAL TRANSFORMER PTZ PAN TILT ZOOM SPD SURGE PROTECTICE
DEVICE SHIELDED TWISTED PAIRSTP TV TELEVISION UG UNDERGROUND UC MOUNTED UNDER COUNTER HEIGHT OR UNDERGROUND COMMUNICATION UNINTERRUPTIBLE POWER SUPPLYUPS UE UNDERGROUND ELECTRICAL UNLESS
NOTED OTHERWISEUNO UNLESS OTHERWISE NOTEDUON ROOM CONTROLLERRC DUAL TECHNOLOGY CEILING MOUNTED VACANCY SENSOR UOI WITH SUBSCRIPT. SUBSCRIPTS INDICATE TYPE: C - ULTRASONIC VS OS PP-XX
C C DAYLIGHT SENSORDS PG POLYCARBONATE GUARD EMERGENCY LIGHTING CONTROL UNITELCC CAMERA DATA OUTLET MOUNTED ABOVE COUNTER HEIGHTAC BRANCH CIRCUIT IDENTIFICATION a 2 B NUMBER INDICATES
CIRCUIT SWITCH LEG FIXTURE TYPE 1OC NUMBER INDICATES CIRCUIT MOUNTING HEIGHT & MISC. INFO. NLGP PANEL DESIGNATION NUMBER INDICATES CIRCUIT 3 NOTE: TYPICAL FOR ALL DEVICES AND HOME RUNS
TV TELEVISION OUTLET A REFERENCE TO KITCHEN EQUIPMENT AS IDENTIFIED ON KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE. G. H. I. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE
FIRESTOPPING FOR ALL FIRE-RATED PENETRATIONS. UTILIZE REMOVABLE FIRESTOPPING MATERIAL AT CABLE TRAY PENETRATIONS. PROVIDE ACOUSTICAL SEALANT FOR ALL NON RATED PENETRATIONS. ALL FIRE
RATINGS SHALL BE MAINTAINED. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. COORDINATE EXACT LOCATION OF ALL CONDUIT ROUTES, EQUIPMENT AND DEVICES WITH EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
PROVIDE NYLON PULLSTRING IN ALL EMPTY CONDUITS. FIRE ALARM SIGNALING APPLIANCES SHALL BE MOUNTED SUCH THAT THE ENTIRE LENS IS NOT LESS THAN 80 INCHES AND NOT GREATER THAN 96 INCHES
ABOVE THE FINISHED FLOOR. CIRCUITING TO DEVICES/EQUIPMENT SHALL BE 2-#12AWG & 1-#12EG (MULTIPLE HOME RUNS IN SAME CONDUIT MAY SHARE SAME EQUIPMENT GROUND) FOR EACH 20 AMPERE CIRCUIT
UNLESS OTHERWISE NOTED. ALL CIRCUITS SHALL HAVE SEPARATE NEUTRALS (CIRCUITS SHALL NOT SHARE NEUTRALS). PROVIDE CONDUIT/WIRING (CIRCUITING) AND REQUIRED EQUIPMENT CONNECTIONS TO ALL
DEVICES/EQUIPMENT. CONNECT TO CIRCUIT(S) AS INDICATED. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE REFERENCE STANDARD EDITION OF NFPA CODES, AS CITED BY THE FIRE CODE OF
NEW YORK STATE, BUILDING CODE OF NEW YORK STATE. ALL CONDUITS AND SUPPORTS SHALL BE AS TIGHT TO DECK AS POSSIBLE. PROVIDE PULLBOX FOR EVERY 180 DEGREE OF BENDS FOR TEL/DATA AND 360
DEGREES OF BENDS FOR POWER CONDUITS. ALL ELECTRICAL DEVICES (RECEPTACLES, SWITCHES, FIRE ALARM, ETC.) SHALL BE ALIGNED HORIZONTALLY AND VERTICALLY. GENERAL NOTES: (APPLY TO ALL DRAWINGS):
A. B. C. D. E. F. J. K. M 400/3 EXISTING 2000A, 208/120V, 3PH, 4W METER CENTER MC1 TP-1 UTILITY TO PROVIDE METER EXISTING 3-1/2" CONDUIT STUBBED INTO TENANT'S BASEMENT SPACE. PROVIDE
ADDITIONAL 3-1/2"C AS REQUIRED TO EXTEND EXISTING CONDUIT TO PANEL TP-1. PROVIDE 4#500 KCM, 1#3G IN EXISTING CONDUIT FROM METER CENTER TO PANEL TP-1. FACP & ECCP (E) S S H F F WF TS
DSD RTS SD FSD M INITIATING SIGNALNACF FJF6TH FLOOR 120V, 20A CIRCUIT SIGNALNACF FJF5TH FLOOR 120V, 20A CIRCUIT SIGNALNACF FJF4TH FLOOR 120V, 20A CIRCUIT SIGNALNACF FJF3RD FLOOR 120V,
20A CIRCUIT SIGNALNACF FJF2ND FLOOR 120V, 20A CIRCUIT SIGNALNACF FJF 1ST FLOOR 120V, 20A CIRCUIT BUILDING 409 FACP (E) S H F S F F F FAAP EXISTING TELEPHONE LINES TO BUILDING 409 TMDF
CM 24VDC ELEVATOR SHUTDOWN CMELEVATOR CAPTURE DESIGNATED LEVEL CM ALTERNATE LEVEL CM FIRE HAT EC (E)(E)(E)(E)(E) (E)(E)(E)(E)(E) (E)(E)(E)(E)(E) (E)(E)(E)(E)(E) (E)(E)(E)(E)(E) (E)(E)(E)(E)(E)
(E) (E) (E) (E) (E) (E) (E) (E) (E) (E)(E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) H S CO F S IM ANSUL SYSTEM / HOOD CONTROLS FCOF DETAIL NOTES: A. OWNER TO CONTACT
NYSEG FOR ELECTRICAL SERVICE. NYSEG TO INSTALL METER IN EXISTING METER SOCKET FOR 400A COMMERCIAL SERVICE. COORDINATE INSTALLATION WITH NYSEG. B. PROVIDE WIRING INDICATED TO 400A METER
STACK. COORDINATE EXACT LOCATION OF THE 400A METER STACK FOR TENANT USE IN THE FIELD. DETAIL NOTES: A. EXTEND EXISTING EDWARDS EST-3X BUILDING FIRE ALARM SYSTEM AS REQUIRED TO ADD DEVICES
AS INDICATED ON FLOOR PLANS. B. RISER IS DIAGRAMMATIC ONLY AND DOES NOT SHOW ALL DEVICES AND WIRING. C. SYNCHRONIZE ALL STROBES. D. CO DETECTORS SHALL HAVE INTEGRAL SOUNDER OR SHALL
BE A CO SOUNDER BASE FOR ANOTHER DEVICE (HEAT DETECTOR/SMOKE DETECTOR). E. PROVIDE INITIATION MODULES AS REQUIRED TO CONNECT ANSUL SYSTEM/HOOD TO FIRE ALARM SYSTEM FOR TROUBLE AND ALARM
CONDITIONS. F. RUN WIRING IN CONDUIT IN EXPOSED CEILING AREAS. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning
Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation
of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is
altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description
of the alteration. 4/23/2021 3:21:57 PM E000 GENERAL NOTES & SYMBOL LIST ELECTRICAL 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR NTS 3 ONE-LINE DIAGARAM NTS 4 FIRE ALARM RISER REVISION SCHEDULE NAME DATE DN UPUP UP DN F F F F F M M M S S S S M e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4
5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 HP-B HP-B HP-B PP2 (30/2) (ER) 1 PP2 (30/2) (ER) PP2 (30/2) (ER) 1 1 (ER) (ER) (ER) (ER) (ER) EF-1 (ER) 2 (E) (E) DEMOLITION NOTES:
1. DISCONNECT HEAT PUMP FROM PANEL PP2 AND REMOVE BRANCH CIRCUITING BACK TO SOURCE. HEAT PUMP TO BE RELOCATED BY MECHANICAL TRADE. REFER TO E101 FOR NEW LOCATION AND CIRCUITING INFORMATION.
2. DISCONNECT EXHAUST FAN AND REMOVE BRANCH CIRCUITING BACK TO CONVENIENT LOCATION TO BE EXTENDED TO NEW LOCATION OF FAN. EXHAUST FAN TO BE RELOCATIED BY MECHANICAL TRADE. REFER TO
E101 FOR NEW LOCATION AND CIRCUITING INFORMATION. GENERAL NOTES: A. DISCONNECT ALL SMOKE DETECTORS INDICATE AS EXISTING TO BE RELOCATED (ER). STORE DETECTORS IN A SAFE SPACE. REFER
TO E101 FOR NEW LOCATION OF DETECTORS. B. DISCONNECT AND REMOVE EXISTING LIGHTING WITHIN TENANT AREA. TURN OVER TO BUILDING OWNER. REMOVE BRANCH CIRCUITING BACK TO SOURCE. DATE: PROJECT:
OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York
14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction
of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and
the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 3:22:09 PM ED101 FIRST FLOOR PLAN ELECTRICAL
DEMOLITION 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION REVISION
SCHEDULE NAME DATE FACP DMDF M F S S J J M M OS MAIN 208/120V DIST PPB (E) METER CENTER MC1 (E) SB1 (E) HP-B TP-1 1 e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9
6 7 A B C D E F G H J K L N O M 1.9 6.5 WH RCP EF-8ITHACA BEER TENANT SPACE (E) (E) (E) (E) (E) (E) 3 2 (E) (E) GENERAL NOTES: A. UNLESS OTHERWISE NOTED ALL ELECTRICAL DEVICES, EQUIPMENT,
LIGHTING, ETC. IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN AND SHOWN FOR REFERENCE ONLY. DRAWING NOTES: 1. EXTEND EXISTING 120V, 20A BRANCH CIRCUITING FOR EXTERIOR PLAZA CIRCUITS INSTALLED
IN STUDENT AGENCIES PROJECT FROM JUNCTION BOX TO TENANT PANEL TP-1. UTILIZE CIRCUITE 1,3, AND 5. 2. APPROXIMATE LOCATION OF THE EXISTING 400A METER STACK FOR TENANT USE. 3. AN EXISTING
COMMUNICATIONS CONDUIT FROM DMDF IN ELECTRIC ROOM IS STUBBED INTO THE SPACE AT THIS LOCATION. CONDUIT SHALL BE USED BY SERVICE PROVIDER TO RUN SERVICE TO THIS LOCATION. IT IS EXPECTED
THAT TENANTS IT VENDOR WILL PROVIDE A DATA RACK AT THIS LOCATION WITH EQUIPMENT TO FEED WAPS AND DATA OUTLETS IN TENANT SPACE ON FIRST FLOOR. ALL DATA OUTLETS INDICATED ON 1ST FLOOR
PLAN SHALL RUN TO THIS LOCATION. PROVIDE 3" CONDUIT THROUGH BASEMENT FLOOR AND UP THROUGH 1ST FLOOR WALL AT A CONVENIENT LOCATION FOR ROUTING OF CABLES. e1 e2 e3 e4 e5 e6 e7 eA eB e5.5
1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O M 1.9 6.5 ITHACA BEER TENANT SPACE (E) (E) (E) (E) (E) (E) (E) (E) THIS PLAN IS SHOWN FOR REFERENCE ONLY.NO WORK IS
INDICATED. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State
Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless
acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix
to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 3:22:00 PM E100
BASEMENT FLOOR PLANS POWER AND SYSTEMS / LIGHTING 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 BASEMENT PLAN
- POWER & SYSTEMS 0' 2' 4' 8' 16' 1/8" = 1'-0" 2 BASEMENT PLAN - LIGHTING REVISION SCHEDULE NAME DATE S F F F F S S F F S S S F M M H H H H S S S CO CO CO F F M M M M M M CO F F F F
F HD HD WAP WAP M OS OS J J J a-k D J J J J a-k D J J PC PC e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV
ST1 EXISTING STAIR 1 589 ELECT. PANELS 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE 102 DINING N108 WATER METER N101 RECEPTION N100 VESTIBULE N102 LOBBY
N103 LEASING OFFICE ST3 STAIR 3 591 SERVICE A C G H H I N AA2 AD1 J Q Q R K Q W X UC UC EUH-8 EUH-9 UC UC UC AB UC UC AA1 AC AC 1 J1 2 AD2 MAU-1 EF-8 (ER) (ER) (ER) (ER) HP-B HP-B HP-104D
HP-B (ER) (30/2) 53,55 TP-1 TP-1 57,59 (30/2) TP-1 58,60 (30/2) (ER) (ER) 5 7 (ER) 6 CM IM IM 7 6 9 9 AC UC UC UC UC UC 10 10 2#10, 1#10, 3/4"C 2#10, 1#10, 3/4"C 8 8 8 (E) (E) 8 8 8
6 6 6 6 6 6 6 2#10, 1#10, 3/4"C 4 4 4 2 2 2 2 2 2 11 11 11 11 11 11 11 11 68 7 7 66 64 62 TP-1 70 (30/1) 2#10, 1#10, 3/4"C TP-1 72 (30/1) 2#10, 1#10, 3/4"C AA3 AD3 10 10 12 12 13 9
9 9 8 8 8 8 AC 14 14 EF-1 (ER) 15 AC 2 AC 2 GENERAL ELECTRICAL NOTES: A. UNLESS NOTED OTHERWISE PROVIDE 2#12, 1#12G, 1/2"C AND CONNECT ALL ELECTRICAL DEVICES, EQUIPMENT AND LIGHTING
FIXTURES TO CIRCUITS IN PANEL TP-1 IN BASEMENT, CIRCUIT NUMBERS AS INDICATED ON PLAN. B. PROVIDE 2#12, 1#12, 1/2"C AND CONNECT EMERGENCY BATTERY LUMINAIRES AND EXIT SIGNS TO AREA LIGHTING
CIRCUIT AHEAD OF ALL SWITCHING AND CONTROLS. C. PROVIDE 0-10V WIRING FOR DIMMING OF ALL LIGHT FIXTURES INDICATED AS BEING DIMMED UTILIZING 0-10V DIMMING. D. PROVIDE FORWARD PHASE DIMMING
DIGITAL LIGHTING ROOM CONTROLLERS FOR ALL LIGHTING REQUIRING LINE VOLTAGE DIMMING. E. ALL LIGHTING WITHIN THE DAYLIGHTING ZONE SHALL BE ABLE TO BE DIMMED BY PHOTOCELL. F. PROVIDE SOUNDER
BASE FOR ALL CO DETECTORS. G. UNLESS OTHERWISE NOTED ALL RECEPTACLES IN KITCHEN AREA SHALL BE GFCI PROTECTED. RECEPTACLES SHALL BE NORMAL RECEPTACLES CONNECTED TO GFCI CIRCUIT BREAKERS.
THIS APPLIES TO ANY BAR AREA RECEPTACLES REQUIRED TO BE GFCI PROTECTED. H. ALL TRACK LIGHTING SHALL HAVE TIME OF DAY CONTROL TO MEET ENERGY CODE SPECIFIC APPLICATION CONTROL REQUIREMENTS.
THE DIGITAL LIGHTING CONTROLLERS FOR THESE ZONES SHALL BE PROGRAMMED FOR TIME OF DAY CONTROL WITH LOCAL SWITCH OVERRIDE. COORDINATE WITH TENANT FOR ANY ADDITIONAL LIGHTING OR SIGN CIRCUITS
TO HAVE TIME OF DAY CONTROL. PROVIDE ZONE CONTROLLER AS REQUIRED FOR TIME OF DAY FEATURE FOR THE DIGITAL CONTROLLERS. I. LOCATE DIGITAL LIGHTING CONTROLLERS ABOVE ACCESSIBLE CEILING
OR IN TENANT'S AREA IN BASEMENT BELOW SO NOT VISIBLE IN EXPOSED CEILING AREAS. J. NORTH AND WEST DAYLIGHT ZONES ARE INDICATED ON PLAN. IF THE INSTALLED LIGHTING IS OVER 150W IN A ZONE
THEN THAT ZONE WILL REQUIRE A DAYLIGHT SENSOR AND THE LIGHTING WITHIN THE ZONE SHALL DIM UP AND DOWN BASED ON THE DAYLIGHT. SWITCHES SHALL PROVIDE OVERRIDE CONTROL OF THE DAYLIGHTING
ZONE. e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV ST1 EXISTING STAIR 1 589 ELECT. PANELS 590 JAN. CLOS.
591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE 102 DINING N105 CORRIDOR N103 LEASING OFFICE ST3 STAIR 3 N108 WATER METER N100 VESTIBULE N101 RECEPTION c c c 67 2 2 2 1 3
3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 d d d d d d d d d d L4 L4 L4 L4 L4 L4 L4 L4 f f f f f f f fL1 L1 L1 L1 e e e e L2 L2 L2 h L5 L5 L5 L5 L5 L5 L5 L5 L2 L2 g g L2 h L2 L1 8 8 4 4 L7 L7
L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 10 10 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 636363 6363 63 63 63 63 63 63 63 63 63 63 63 6363636363 63 69 69
69 65 71 73 75 75 DAYLIGHTING ZONE DAYLIGHTING ZONE 67 67 11 L3 L3 a a L3 L3 b b i j j k DRAWING NOTES: 1. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR CURVED SIGNAGE.
COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE FIELD WITH SIGNAGE. 2. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR ORGANIC PENDANT LIGHTING. REFER TO ARCHITECTURAL RCP
FOR EXACT QUANTITIES OF LIGHTS. APPROXIMATELY 1/3 OF PENDANTS TO BE FED PER JUNCTION BOX. 3. PROVIDE UNISTRUT AT 9'-0" AFF TO PROVIDE PATHWAY FOR PENDANT LIGHTS. COORDINATE EXACT LOCATION
OF LIGHTS WITH ARCHITECT PRIOR TO ROUGH-IN. MC CABLE SHALL RUN IN UNISTRUT. PROVIDE ELECTRICAL BOX FOR EACH LIGHT FIXTURE MOUNTED TO UNISTRUT. 4. DIMMING CONTROL STATION FOR LIGHTING
ZONES 'a' THROUGH 'k'. PROVIDE CONTROL STATIONS SO THAT EACH ZONE HAS ON/OFF CONTROL AND SHALL BE ABLE TO BE DIMMED UP/DOWN. PROVIDE QUANTITY OF CONTROL STATIONS REQUIRED. PROVIDE ONE
CONTROL STATION WITH FOUR (4) SCENE SETTINGS AND PROGRAM SCENES AS DETERMINED BY OWNER. ALL BUTTONS SHALL BE ENGRAVED INDICATING FUNCTION. 5. PROVIDE NEMA SIZE 1, 120V, 60HZ CONTACTOR
WITH (3) N.O. CONTACTS IN NEMA 1 ENCLOSURE FOR USE AS KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. MOUNT ABOVE CEILING IN CONVENIENT LOCATION ABOVE ACCESSIBLE CEILING. CONNECT TO 120V, 20A
HOOD CIRCUIT AND CONNECT SUCH THAT ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM DEACTIVATES CONTACTOR WHICH IN TURN DEACTIVATES ALL EQUIPMENT CONNECTED TO IT. 6. PROVIDE SAME 120V, 20A
CIRCUIT AS THE KITCHEN HOOD TO GAS VALVE CONNECT TO HOOD FIRE SUPPRESSION SYSTEM SUCH THAT ACTIVATION OF THE FIRE SUPPRESSION SYSTEM DEACTIVATES GAS VALVE WHICH SHUTS OFF GAS TO COOKING
EQUIPMENT. COORDINATE EXACT LOCATION IN THE FIELD. 7. PROVIDE FIRE ALARM INITIATION MODULE AT HOOD FIRE SUPPRESSION SYSTEM CONTROL PANEL AND CONNECT TO MICROSWITCH SUCH THAT FIRE ALARM
GOES INTO ALARM UPON ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM. 8. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT #63 FROM PANEL TP-1 FOR CONNECTING TO BATHROOM LIGHT FIXTURE(S). CONNECT
SO CONTROLLED BY SWITCHES AND SENSORS AS INDICATED. 9. PROVIDE DUPLEX RECEPTACLE UNDERNEATH BANQUET SEATING. COORDINATE EXACT LOCATION WITH ARCHITECT PRIOR TO ROUGH-IN. 10. PROVIDE
JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR SIGNAGE AT THIS LOCATION. COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE FIELD WITH SIGNAGE. 11. LIGHT SWITCH TO CONTROL SIGNAGE
CIRCUIT #67 FROM PANEL TP-1. 12. PROVIDE GFCI RECEPTACLE UNDER SINK FOR PLUG IN TRANSFORMER FURNISHED BY PLUMBING TRADE. 13. DISCONNECT LOCATION FOR DISHWASHER. RUN CONDUIT DOWN TO
DISCONNECT AND BACK UP TO ABOVE CEILING. 14. PROVIDE PATHWAY FROM WIRELESS ACCESS POINT LOCATION TO DATA RACK. 15. EXTEND BRANCH CIRCUITING OF EXHAUST FAN SAVED OFF DURING DEMOLITION
TO THIS LOCATION AND CONNECT TO RELOCATED EXHAUST FAN. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior
Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of
New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered,
the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the
alteration. 4/23/2021 3:22:05 PM E101 FIRST FLOOR PLANS POWER AND SYSTEMS / LIGHTING 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR 1/8" = 1'-0" 1 FIRST FLOOR PLAN - POWER & SYSTEMS 1/8" = 1'-0" 2 FIRST FLOOR PLAN - LIGHTING 0' 2' 4' 8' 16' REVISION SCHEDULE NAME DATE M M 2 1A 3 4 6 B C D E F H K L O 3.5 5 4.7
5.4 5.9 5.8 7 A G J 3.9 EXG 1 EXG 2 EXG 3 EXG 4 EXG 5 EXG 6 EXG 7 EXG A EXG B EXG C EXG D EXG E 2A M 1 6.5 1.9 M.9 D.9 EF-6 EF-7 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C
D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse,
New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this
document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by
his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 3:32:44 PM E102 ROOF PLAN POWER AND SYSTEMS 04.23.21 2017054 Author 411-415 College
Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 ROOF PLAN - POWER AND SYSTEMS REVISION SCHEDULE NAME DATE WJD EMERGENCY BATTERY UNIT WITH LIGHT HEADS
7'-6" CEILING RECEPTACLE EB EXIT LIGHT SWITCH 2. MOUNTING HEIGHTS TO CENTER OF OUTLETS UNLESS OTHERWISE NOTED. IN MASONRY CONSTRUCTION THE ABOVE MOUNTING HEIGHTS SHALL BE USED FOR
REFERENCE TO NEAREST BLOCK OR BRICK COURSING. THE ABOVE MOUNTING HEIGHTS SHALL BE ADHERED TO UNLESS SPECIFICALLY NOTED OR DETAILED OTHERWISE ON THE DRAWINGS. 1. DETAIL NOTES: 1'-6"
SAFETY SWITCH OR STARTER 6'-7" MAX. TO HIGHEST SWITCH WALL PHONE 3'-10" HORN/LIGHT LENS ON TOP FINISHED FLOOR PULLSTATION ENTIRE LENS SHALL BE MINIMUM 80" AFF AND NOT GREATER THAN 96"
AFF. WHERE NOT PERMITTED BY CEILING HEIGHT DEVICE SHALL BE MOUNTED WITHIN 6" OF THE CEILING. 0' - 8" 8" LOAD CEILING SENSOR 120/277V SWITCH DETAIL NOTES: PROVIDE ADDITIONAL SENSORS
AS INDICATED ON THE PLANS AND AS RECOMMENDED BY THE MANUFACTURERS. PROVIDE INDICATED SWITCHING. CONTRO L OUTPUT COMMON +24 VDC SWITCH PACK NEUTRAL LINE 2 1 2 1 SEQUENCE OF OPERATION
ROOM UNOCCUPIED: LIGHTING TO BE OFF AFTER TIME DELAY FROM LAST MOTION SENSING. ROOM OCCUPIED: UPON SENSING OF MOTION IN THE SPACE, THE SENSOR SHALL ENABLE THE SWITCH PACK TO ENERGIZE
THE LIGHTING (LOAD). LIGHTING SHALL REMAIN ENERGIZED UNTIL MOTION IS NOT SENSED (INITIATE TIME DELAY, SET FOR 30 MINUTES). 1. 2. PANEL NUMBER BRANCH BREAKER NUMBER 4LN3B-17 DYMO LABEL,
VERIFY COLOR WITH OWNER, ADHERE TO COVERPLATE USING CONTACT CEMENT. FACTORY ADHESIVE WILL NOT BE SUFFICIENT. ACTUAL CIRCUIT INFORMATION SHALL BE AS INSTALLED AND NOT NECESSARILY THE
SAME CIRCUIT NUMBER AS SHOWH ON THE PLANS. GROUNDING PIN ON TOP OR TO LEFT OF OUTLET ON HORIZONTALLY MOUNTED RECEPTACLES 4LN3B-17 PROVIDE GREEN GROUND WIRE IN ALL RECEPTACLE CIRCUITS.
CONNECT TO GROUND BUS IN PANEL. DO NOT INSTALL RECEPTACLES, COMPUTER OR TELEPHONE OUTLETS BACK TO BACK. INSTALL IN ADJACENT STUD CAVITIES, TO REDUCE SOUND TRANSMISSION. TYPICAL DETAIL
NOTES: A. B. ZONE 2 ZONE 1 CLASS 2 0-10V CONTROL WIRING LIGHT FIXTURES W/ 0-10V DIMMING LIGHT FIXTURES W/ 0-10V DIMMING LINE VOLTAGE LINE VOLTAGE DIMMING ROOM CONTROLLER (1-3 RELAYS)120/277V
NEUTRAL ON/ OFF S1 S2 ON/ OFF S1 S2 DIMMING CONTROL STATION DIMMING CONTROL STATION CEILING VACANCY SENSOR CEILING VACANCY SENSOR CEILING VACANCY SENSOR TO ADDITIONAL DIMMING ROOM CONTROLLERS
CAT. 5e UTP CAT. 5e UTP CAT. 5e UTP CAT. 5e UTP GENERAL DETAIL NOTES: A. DIMMING CONTROL SYSTEM DESIGN MAKE SHALL BE LEGRAND/WATTSTOPPER CONTROLS FAMILY. a. ROOM CONTROLLER, MANUAL
ON MODE: LMRC-212. b. DIMMING CONTROL STATION WITH ON,OFF, UP, DOWN AND 2 PRESETS: LMSW-105 B. ALL LOW VOLTAGE CABLING SHALL BE PLENUM RATED WHERE INSTALLED ABOVE CEILINGS SAND IN CONDUIT/SURFACE
RACEWAY WHERE EXPOSED. C. IN ROOMS WITH DAYLIGHTING ZONES, FIXTURES WITHIN THE DAYLIGHTING ZONE SHALL BE DIMMED BASED ON LIGHT LEVEL SEEN BY PHOTOCELL. FIXTURES IN THE DAYLIGHTING ZONES
SHALL BE ABLE TO BE MANUALLY OVERRIDDEN. D. PROVIDE QUANTITY OF ROOM CONTROLLERS FOR EACH ROOM/AREA AS REQUIRED TO CONTROL ALL ZONES INDICATED ON FLOOR PLANS. E. UNLESS OTHERWISE NOTED,
IN ROOMS WHERE MULTIPLE DIMMING CONTROL STATIONS ARE SHOWN, ONLY ONE STATION SHALL BE THE CONTROL STATION INDICATED AND THE OTHERS SHALL BE SINGLE BUTTON SWATCHES FOR ON/OFF CONTROL
ONLY ( SHALL ACT AS A 3-WAY SWITCH). DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12
H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State
Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering
Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021
3:22:06 PM E500 DETAILS ELECTRICAL 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR NTS 1 Typical Equipment and Wiring Devices
Mounting Heights NTS 4 Ceiling Mounted Occupancy Sensor NTS 2 Typical Receptacle Identification NTS 3 TYPICAL DIGITAL LIGHTING ROOM CONTROLLER DIAGRAM REVISION SCHEDULE NAME DATE REFERENCE
NOTES: A. EXHAUST FAN IS FOR PIZZA HOOD 1/1a. HOOD IS FURNISHED WITH ADJUSTABLE SPEED DRIVE IN CONTROL PANEL FOR FAN. PROVIDE CIRCUIT INDICATED TO DRIVE IN-HOOD CONTROL PANEL AND PROVIDE
CONDUIT AND WIRING FROM DRIVE TO EXHAUST FAN. FAN TO BE INTERLOCKED WITH MAU-1. B. PROVIDE 2#12 IN CONDUIT HOOD CONTROL PANEL TO MAU-1. PROVIDE 2#16 IN 1/2"C FOR 24VAC WIRING FROM HOOD
CONTROL PANEL TO MAU-1 BOARD FOR START/STOP. C. EXHAUST FAN IS FOR MAIN KITCHEN HOOD . PROVIDE POWER WIRING TO FAN FROM PANEL TP-1. PROVIDE #12 OUTDOOR RATED STP IN 1/2" CONDUIT FROM
HOOD CONTROL PANEL TO EXHAUST FAN. D. PROVIDE CAT5 CABLE FROM HOOD CONTROL PANEL TO UNIT. REFER TO WIRIING DIAGRAMS ON MECHANICAL DRAWINGS. REFERENCE NOTES: A. SEPARATE PIECE OF EQUIPMENT
THAT WILL SHARE NEMA 5-15R RECEPTACLE OF EQUIPMENT SHOWN ABOVE. B. EQUIPMENT IS LOCATED BENEATH HOOD AND SHALL BE CONNECTED THROUGH THE KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. REFER TO
DRAWING NOTES ON FLOOR PLAN. C. DRIVE FOR EF-7 LOCATED IN HOOD CONTROL CABINET. D. CIRCUIT INDICATED IS FOR WALK-IN COOLER LIGHTING AND CONTROLS. PROVIDE CIRCUIT INDICATED AND PROVIDE
INTERCONNECTING WIRING BETWEEN SWITCHES AND LIGHT FIXTURES FURNISHED WITH UNIT. SEAL CONDUITS AT WALL PENETRATIONS. E. PROVIDE WIRING FROM HOOD CONTROL PANEL TO ACCESSORY COMPONENTS
FURNISHED WITH HOOD AS FOLLOWS: MICROSWITCH 1 AND 2, HOOD LIGHTS, TEMP SENSOR, HOOD 1 CAPTURE VOLUME SENSOR, HOOD 1A CAPTURE VOLUME SENSOR, HOOD 3 VOLUME CAPTURE SENSOR, HOOD 1A PSP
SENSOR. COORDINATE ALL REQUIREMENTS WITH CAPITVAIRE IN THE FIELD. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS. F. PROVIDE OCTAGON BOX FOR FIRE SUPPRESSION SYSTEM REMOTE MANUAL PULL
STATION, COORDINATE EXACT LOCATION IN THE FIELD. PROVIDE 1/2" CONDUIT FROM BOX TO 6" ABOVE CEILING FOR USE BY FIRE SUPPRESSION SYSTEM INSTALLER. G. THIS HOOD DOES NOT HAVE A CONTROL
PANEL. PROVIDE WIRING FROM MAIN HOOD CONTROL PANEL TO LIGHT FIXTURES FURNISHED WITH THIS HOOD. H. COORDINATE LOCATION OF CONDENSING UNIT WITH INSTALLER PRIOR TO ROUGH-IN. I. CONTROL
PANEL REQUIRES ETHERNET CONNECTION. PROVIDE CONDUIT TO ABOVE ACCESSIBLE CEILING FOR WIRING BY TENANT'S IT VENDOR. GENERAL NOTES: A. COORDINATE ALL KITCHEN EQUIPMENT RECEPTACLE LOCATIONS
AND EQUIPMENT CONNECTIONS WITH FINAL LAYOUT OF EQUIPMENT. INSTALL ALL LUMINAIRES, SWITCHES, CONTROL PANELS, PUSH BUTTONS, FURNISHED LOOSE WITH THE EQUIPMENT. PROVIDE ALL REQUIRED INTERCONNECTING
POWER AND CONTROL CONDUIT AND WIRING. B. UNLESS NOTED OTHERWISE, ALL NEMA 5-20R RECEPTACLES SHALL BE GFCI PROTECTED. FOR ACCESSIBILITY REQUIREMENTS GFCI PROTECTION SHALL BE AT THE CIRCUIT
BREAKER. C. COORDINATE ELEVATIONS OF RECEPTACLES IN THE FIELD WITH EQUIPMENT VENDOR. D. REFER TO ELECTRIC EQUIPMENT AND CONTROL SCHEDULE FOR HOOD EXHAUST FAN ELECTRICAL REQUIREMENTS.
E. RECEPTACLES FOR SPECIFIC EQUIPMENT INDICATED IN THIS SCHEDULE ARE NOT SHOWN ON THE FLOOR PLANS. ALL RECEPTACLES SHOWN ON THE FLOOR PLANS ARE ADDITIONAL RECEPTACLES FOR USE AS CONVENIENCE
OUTLETS. F. ALL EQUIPMENT BELOW EACH KITCHEN HOOD SHALL HAVE POWER RUN THROUGH A KITCHEN EQUIPMENT SHUTDOWN CONTACTOR FOR THAT HOOD WHICH SHALL BE CONNECTED TO THE HOOD CONTROL PANEL
SUCH THAT ALL EQUIPMENT BELOW THE HOOD IS SHUT DOWN UPON ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM. CONNECT ELECTRONIC GAS VALVE TO HOOD CONTROL PANEL SUCH THAT ACTIVATION OF THE SYSTEM
TURNS OFF THE GAS VALVE. G. NF = NON FUSED. H. DISCONNECTS INDICATED AS 20A NON FUSED SHALL BE MOTOR RATED TOGGLE SWITCHES. I. PROVIDE DISCONNECT SWITCH FOR EACH HARD WIRED PIECE OF
EQUIPMENT. INSTALL ALL DISCONNECTS IN CONVENIENT LOCATION SO THAT THEY ARE VISIBLE FROM EQUIPMENT AND ACCESSIBLE. J. FOR EQUIPMENT WITH A QUANTITY OF MORE THAN ONE, MULTIPLE CIRCUIT
NUMBERS INDICATE THE CIRCUITS TO BE USED. EACH PIECE OF EQUIPMENT SHALL BE ON A DEDICATED CIRCUIT UNLESS NOTED OTHERWISE. IF ONLY ONE CIRCUIT IS INDICATED UTILIZE CIRCUIT FOR MULTIPLE
PIECES OF EQUIPMENT. K. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS FOR ALL WIRING REQUIRED TO BE DONE BY ELECTRICAL CONTRACTOR RELATIING THE HOODS, EXHAUST FANS AND MAKEUP AIR
UNIT. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State
Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless
acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix
to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 4/23/2021 3:22:07 PM E600
SCHEDULES ELECTRICAL 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 2 PIZZA HOOD LIGHTS, ANSUL 1 120 1 TP-1 20A 42 2#12 1#12
1/2"C X 20 NF F,G 1 MAIN HOOD LIGHTS, CONTROLS,... 1 120 1 TP-1 20A 42 2#12 1#12 1/2"C X 20 NF C,E,F, I AD3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 25,27 3#12 1#12 1/2"C X 30 NF AD2
COOLER EVAPORATOR 1 120 1 TP-1 20A 23 2#12 1#12 1/2"C X 20 NF AD1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D AC STRIP WARMERS 36" 2 7 120 1 TP-1 20A 14, 16 2#12
1#12 1/2"C X 20 NF AB GLYCOL CHILLER (ON TOP OF AD1) 1 120 1 TP-1 20A 12 2#12 1#12 1/2"C X 20 NF AA3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 17,19 3#12 1#12 1/2"C X 30 NF AA2 COOLER
EVAPORATOR 1 120 1 TP-1 20A 15 2#12 1#12 1/2"C X 20 NF AA1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D Y MERCHANDISER 7.3 120 1 TP-1 20A 40 2#12 1#12 1/2"C NEMA
5-20R X MERCHANDISER 1 8.3 120 1 TP-1 20A 38 2#12 1#12 1/2"C NEMA 5-20R W CROWLER SEAMER 1 6 120 1 TP-1 20A 36 2#12 1#12 1/2"C X 20A NF R BACK BAR REFRIGERATOR 1 1/5 2.5 120 1 TP-1
20A 34 2#12 1#12 1/2"C NEMA 5-20R Q GLASSWASHER 3 7.5 120 1 TP-1 20A 29,31,33 2#12 1#12 1/2"C X 20 NF N DISHWASHER 1 28.5 208 3 TP-1 40A 28,30,32 3#8 1#10 3/4"C X 60 NF J1 PIZZA TOPPING
RAILS 1 1.3 120 1 -- -- -- -- -- -- NEMA 5-20R A. J PIZZA PREP TABLE 1 4.3 120 1 TP-1 20A 26 2#12 1#12 1/2"C NEMA 5-20R I COFFEE MAKER 1 11.4 120 1 TP-1 20A 24 2#12 1#12 1/2"C NEMA
5-20R H FOOD PREP TABLE 2 6.5 120 1 TP-1 20A 22 2#12 1#12 1/2"C NEMA 5-20R G REACH IN REFRIGERATOR 1 7.4 120 1 TP-1 20A 20 2#12 1#12 1/2"C NEMA 5-20R C CHEFS TABLE 1 3.5 120 1 TP-1
20A 18 2#12 1#12 1/2"C NEMA 5-20R B A GAS RANGE W/ CONVECTION... 2 4.3 120 TBD TP-1 20A 21 2#12 1#12 1/2"C NEMA 5-20R B PHASE GND CONDUIT HP KW AMPS NEMA PLUG AND RECEPT HARD WIRED
SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE KITCHEN EQUIPMENT DESIGNATION DESCRIPTION QTY. LOAD VOLTAGE PHASE PANEL CIRCUIT BREAKER CIRCUIT NUMBER BRANCH CIRCUIT
WIRING CONNECTION TYPE NEMA 1 DISC. SWITCH NEMA 3R DISC. SWITCH NEMA 4SS DISC. SWITCH NOTES KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE RCP RECIRCULATON PUMP BASEMENT 1/4 1 120
5.8 TP-1 #61 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X RCP WH WATER HEATER BASEMENT 1 120 6.0 TP-1 #44 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X 20 NF AU N WH EF-8 EXHAUST FAN WOMENS TOILET
0.152 1 120 1.3 TP-1 #49 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X IU EF-8 EF-7 EXHAUST FAN ROOF 1 1/2 3 208 6.6 TP-1 #77,79,81 20/3 3#12 1#12 EG 1/2"C 3#12 1#12 EG 1/2"C IU IU A EF-7
EF-6 EXHAUST FAN ROOF 7 1/2 3 208 24.2 TP-1 #41,43,45 70/3 3#8 1#10 3/4"C 3#8 1#10 3/4"C IU IU C, D EF-6 MAU-1 MAKE UP AIR UNIT ROOF 7 1/2 3 208 26.4 TP-1 #35,37,39 70/3 3#8 1#10 3/4"C
3#8 1#10 3/4"C IU X X B, D MAU-1 HP-104D HEAT PUMP 1ST FLOOR 1 208 19.9 TP-1 #46,48 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X 30 NF AU N HP-104D EUH-9 ELECTRIC UNIT HEATER VESTIBULE 5
1 208 24.0 TP-1 #54,56 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X IU EUH-9 EUH-8 ELECTRIC UNIT HEATER VESTIBULE 5 1 208 24.0 TP-1 #50,52 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X IU EUH-8
PHASE GROUND CONDUIT PHASE GROUND CONDUIT SWITCH AMPS FUSE SIZE LOC. WEATHER PROOF REF. NOTES ITEM ID NAME ROOM LOCATION HP KW PHASE SYSTEM VOLTS MCA or SYSTEM AMPS PANEL AND CIRCUIT(S)
CIRCUIT BREAKER or "FU" FOR FUSE POWER WIRING FROM PANEL TO CONTROL UNIT POWER WIRING FROM CONTROL UNIT TO EQUIPMENT NEMA SIZE STARTER NEMA TYPE MANUAL MOTOR STARTER MANUAL MOTOR STARTER
WITH RELAY MAGNETIC STARTER COMBINATION MAGNETIC STARTER COMBINATION REDUCED VOLTAGE STARTER COMBINATION STARTER MP/FUSE (F) SIZE ADJUSTABLE SPEED DRIVE ADJUSTABLE SPEED DRIVE WITH
BYPASS ADJUSTABLE SPEED DRIVE WITH REDUNDANT ASD PACKAGED CONTROL UNIT FURNISHED BY OTHERS DUPLEX PUMP CONTROLLER BY OTHERS FIRE ALARM FAN SHUTDOWN REQUIRED SUPPLY DUCT SMOKE DETECTOR
W/ REMOTE TEST STATION RETURN DUCT SMOKE DETECTOR W/ REMOTE TEST STATION EXHAUST DUCT SMOKE DETECTOR W/ REMOTE TEST STATION THERMOSTAT CONNECTION AQUASTAT CONNECTION MOTORIZED DAMPER
CONNECTION START/STOP PUSHBUTTONS HAND/OFF/AUTO SELECTOR SWITCH CONTROL DEVICE LOCATION SAFETY SWITCH ITEM ID EQUIPMENT POWER SOURCE, PROTECTION & WIRING CONTROL DEVICES AS SHOWN ON
THE PLANS BY ITEM DESIGNATION G. "IU" INDICATES INTEGRAL WITH UNIT. F. "NF" INDICATES NON-FUSED. E. "AU" INDICATES CONTROL DEVICES IS LOCATED AT THE UNIT. D. PROVIDE OVERLOADS, SIZE
AS REQUIRED, BY THE DIVISION 15 CONTRACTOR. C. ALL DEVICES SHALL BE SURFACE MOUNTED UNLESS OTHERWISE NOTED. B. ITEM NUMBER INDICATES EQUIPMENT NUMBER A. ALL DEVICES PROVIDED BY THE
DIVISION 16 CONTRACTOR. ELECTRIC EQUIPMENT AND CONTROL SCHEDULE GENERAL NOTES: REVISION SCHEDULE NAME DATE GENERAL NOTES: A. ALL FIXTURES ARE TO BE SELECTED BY THE OWNER. SPECIFIED
FIXTURES ARE SUGGESTIONS AT THIS POINT. B. PROVIDE LED LAMPS FOR ALL LIGHT FIXTURES INDICATED FOR USE WITH INCANDESCENT LAMPS. C. ALL RESTAURANT AND BAR AREA LIGHTING TO BE DIMMABLE
AND SHALL BE CONNECTED AND CONTROLLED BY DIGITAL LIGHTING ROOM CONTROLLERS WITH CONTROL BY DIMMING CONTROL STATIONS. REFER TO FLOOR PLANS. REFERENCE NOTES: A. PROVIDE QUANTITY OF GFCI
CIRCUIT BREAKERS AS REQUIRED FOR ALL RECEPTACLE CIRCUITS WITHIN THE KITCHEN. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture
Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It
is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of
an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific
description of the alteration. 4/23/2021 3:22:07 PM E601 SCHEDULES ELECTRICAL 04.23.21 2017054 Author 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT
FOR LED EXIT SIGN, RED LETTERS, BRUSHED ALUMINUM FACE WITH NI-CAD BATTERY BACKUP AND SELF-DIAGNOSTICS LITHONIA TLE SIGNATURE SERIES OR APPROVED EQUAL LED MODULE 120V WALL/ CEILING
1W EMERGENCY BATTERY LIGHTING UNIT, WHITE THERMOPLSTIC HOUSING, TWO ADJUSTABLE LED LAMP HEADS, NI-CAD BATTERY, SELF DIAGNOSTICS, COLOR TO BE CHOSEN BY OWNER LITHONIA ELM4L SERIES OR
APPROVED EQUAL LED LAMP HEADS, 3.3W PERR LAMP HEAD, 640 LUMENS TOTAL 120V WALL 1.35W L6 ARCHITECTUAL CHANNEL/SOCKET FIXTURE TIVOLI: WB SERIES LED 120V SURFACE TBD L5 1"x4" FLAT LED
PANEL FIXTURE SIGNIFY: FPZ SERIES LED, 3500K, 4500 LUMENS 120V RECESSED TBD L4 4" RECESSED DOWNLIGHT TBD LED 120V / DIMMABLE RECESSED TBD L3 4" MONOPOINT LED FIXTURE TBD LED 120V /
DIMMABLE PENDANT TBD L2 LED TRACK LIGHTING TBD LED 120V / DIMMABLE TRACK TBD L1 DECORATIVE LED PENDANT FIXTURE CONTECH LIGHTING: RLM80 SERIES LED 120V / DIMMABLE PENDANT 5W TYPE DESCRIPTION
MFR. & CATALOG No. LAMP VOLTAGE/DRIVER MOUNTING UNIT WATTS REFERENCE NOTES LUMINAIRE SCHEDULE 1 20 3 6 30 2 N001 2 70 3 TP-1 LEASEABLE SPACE X 208/120 3 4 400 400A 65k X 1 40 3 2 15
2 47 9 20 1 84 A VOLT PHASE WIRE F S ACTIVE SPARE SPACE NAME ROOM LOCATION DIST. BRANC H CIR. MLO MCB MFS THRU FEED LUGS SUB FEED LUGS QUANTITY FRAME / SWITCH SIZE TRIP / FUSE SIZE-FU
POLES PANEL INFORMATION TYPE VOLTAGE RATING BUS RATING MAIN AMPERE RATING KAIC (RMS SYM) MOUNT BRANCH CIRCUIT DEVICES TOTAL NO. OF CIRCUITS NOTES PANELBOARD SCHEDULE REVISION SCHEDULE
NAME DATE WJD
210021_2021-04-23_IthacaBeerCompanyTenantFitOut_Specs(1).pdf
ROCHESTER · BUFFALO · SYRACUSE · SCHENECTADY www.meengineering.com Submitted to: HOLT Architects, P.C. 619 West State Street, Suite A Ithaca, NY 14850 Submitted
from: M/E Engineering, P.C. 300 Trolley Boulevard Rochester, NY 14606 April 23, 2021 M/E Reference 210021 SPECIFICATIONS Ithaca Beer Company - SAI Tenant Fit-Out
THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI CONSTRUCTION DOCUMENTS - APRIL 23, 2021 M/E REFERENCE 210021 P:\2021\21-0000\210021\Design\Specs\FrontEnd\TOC-Sp
ecs.doc TABLE OF CONTENTS SECTION DESCRIPTION DIVISION 01 - GENERAL REQUIREMENTS 019113 GENERAL COMMISSIONING REQUIREMENTS DIVISION 21 - FIRE SUPPRESSION 210500 BASIC FIRE SUPPRESSION
REQUIREMENTS 210523 VALVES 210553 FIRE PROTECTION IDENTIFICATION 211010 PIPING SYSTEMS AND ACCESSORIES 211300 FIRE SUPPRESSION SPRINKLER SYSTEMS DIVISION 22 - PLUMBING 220500 BASIC
PLUMBING REQUIREMENTS 220513 MOTORS 220523 VALVES 220540 ELECTRIC WIRING 220553 PLUMBING IDENTIFICATION 220593 ADJUSTING AND BALANCING 220700 INSULATION 221010 PIPING SYSTEMS AND ACCESSORIES
221030 PUMPS 221100 WATER SUPPLY 221300 SANITARY, WASTE AND STORM DRAINAGE SYSTEMS 223010 EQUIPMENT 223400 WATER HEATERS 224000 PLUMBING FIXTURES AND TRIM 227010 NATURAL GAS SYSTEMS
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING 230500 BASIC MECHANICAL REQUIREMENTS 230504 ELECTRIC WIRING 230513 MOTORS 230519 GAUGES AND THERMOMETERS 230523 VALVES 230530
ROOF CURBS 230550 WIND RESTRAINT FOR HVAC SYSTEMS 230553 MECHANICAL IDENTIFICATION 230593 TESTING, ADJUSTING AND BALANCING 230710 INSULATION 232010 PIPING SYSTEMS AND ACCESSORIES TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI CONSTRUCTION DOCUMENTS - APRIL 23, 2021 M/E REFERENCE 210021 TABLE OF CONTENTS – CONT’D 233100 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION
233400 FANS 233600 VARIABLE VOLUME TERMINAL UNITS 233713 REGISTERS AND DIFFUSERS 233723.16 LOUVERS AND PENTHOUSES 233813 PACKAGED KITCHEN EXHAUST HOOD 237323.13 INDOOR DIRECT FIRED
GAS MAKE-UP AIR UNIT 238146.10 WATER SOURCE HEAT PUMP AND ACCESSORIES 238239 UNIT HEATERS AND CABINET UNIT HEATERS (ELECTRIC) DIVISION 26 - ELECTRICAL 260500 BASIC ELECTRICAL REQUIREMENTS
260501 BASIC MATERIALS AND METHODS 262000 ELECTRIC DISTRIBUTION 232913 MOTOR CONTROLLERS 265000 LIGHTING 265500 LIGHTING CONTROL DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 283102
ANALOG ADDRESSABLE FIRE ALARM SYSTEM TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL
COMMISSIONING REQUIREMENTS 019113 - 1 SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 OVERVIEW A. This section of the specification describes the process
for commissioning, defines the responsibilities of the contractors and design professionals, and outlines the duties of other members of the commissioning team. B. The commissioning
process shall be applied to all equipment, components, and systems as listed in this section, including specific interfaces to and from equipment and systems provided under separate
contracts. C. Building Commissioning work is a joint team effort to ensure that all systems function together properly to meet the design intent, and to document system performance
parameters for fine-tuning of control sequences and operations procedures. The commissioning process shall encompass and coordinate the traditionally separate functions of system documentation,
equipment start-up, control system calibration, testing and balancing, training, and performance testing. This section does not supersede other requirements of the specification though,
it may, expand on some of them. 1.2 THE COMMISSIONING TEAM A. The commissioning team shall consist of: 1. Design Engineer (DE) 2. Mechanical Contractor (MC) 3. Plumbing Contractor (PC)
4. Electrical Contractor (EC) 5. General Contractor (GC) 6. All appropriate Contractors and Sub-Contractors 7. Approved Representatives of Mechanical, Electrical and Equipment Manufacturers
8. Design Architect (ARCH) 9. Facility Staff (FS) 10. Owner's Representative (OR) 1.3 STANDARD AND CODE COMPLIANCE A. Commissioning will be accomplished to comply with, and in accordance
with the requirements of the following: 1. 2020 Energy Conservation Construction Code of New York State, Section C408 System Commissioning. TENANT FIT-OUT FOR ITHACA BEER COMPANY -
SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING REQUIREMENTS 019113 - 2 1.4 COORDINATION A. Management - The
Contractor(s) coordinates the commissioning activities through the Owner's Representative (OR). All members shall work together to fulfill their contracted responsibilities and meet
the objectives of the contract documents. B. Scheduling - The Contractors, through the OR, will provide sufficient time for scheduling commissioning activities with respect to the Owner's
participation. The Contractors will integrate all commissioning activities into the overall project schedule. All parties will address scheduling problems and make necessary notifications
in a timely manner in order to expedite the commissioning process. 1.5 COMMISSIONING PLAN A. The Design Engineer will develop the Commissioning Plan which shall be followed by the installing
contractors. B. The Commissioning Plan shall contain the information necessary to document the commissioning process. C. The Commissioning Plan will include the following: 1. Narrative
description of the activities that will be accomplished during the commissioning process. 2. List of the specific equipment and systems which are scheduled to be commissioned. 3. Functions
to be tested. 4. Conditions under which the testing will be performed. 5. Measurable criteria of acceptable performance. 1.6 COMMISSIONING PROCESS A. The following narrative provides
a brief overview of the commissioning tasks that shall be performed during construction and the general order in which they occur. 1. The prefunctional checklists, developed by the
Contractor(s), are to be completed before and during the startup process. 2. Prefunctional checklists, TAB and startup must be completed before functional performance testing. 3. Items
of non-compliance in material, installation, or setup shall be corrected at no expense to the Owner. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING REQUIREMENTS 019113 - 3 4. The Contractor ensures that the Subcontractors' prefunctional checklists
are executed and documented and that startup and initial checkout are performed. The DE verifies that the TAB has been completed. 5. The Contractor(s) develops equipment and system
functional test procedures. 6. The performance tests are executed by the Contractor in cooperation with the OR with the assistance of the facility staff. 7. The Contractor provides
the Commissioning Record. 8. Commissioning is to be completed before substantial completion. 9. Deferred testing and/or seasonal verifications are to be conducted as specified or required.
10. Design Engineer (DE) confirms that commissioning activities have been completed. 1.7 DESCRIPTION OF WORK A. Commissioning will be performed for the following equipment and systems,
and as described in the 2020 Energy Conservation Construction Code of New York State, Section C408 System Commissioning. 1. HVAC Systems 2. HVAC System Testing and Balancing 3. Temperature
Control Systems 4. Lighting Controls, Occupancy Sensors, Time of Day Controls, Daylight Controls, Programmable Controls, 5. Domestic Hot Water Equipment B. The Contractors shall review
and verify the commissioning activities to meet the Owner's project schedule and requirements for the interface between all trades in order to prevent delays in the Commissioning Process.
C. Seasonal commissioning is required under full load conditions during peak heating and peak cooling seasons, as well as part load conditions in the spring and fall. Simulations of
peak load conditions may be implemented to allow for complete commissioning of the work. D. Systems that are not weather dependent shall be tested under full and partial load to the
fullest extent possible. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING
REQUIREMENTS 019113 - 4 1.8 ROLES AND RESPONSIBILITIES A. Design Engineer/Professional: 1. Develops the Commissioning Plan. 2. Include commissioning requirements in the project
construction documents. 3. Confirm, upon project completion, that commissioning has been performed by the Contractor(s) or their authorized representative. B. Contractor(s): 1. Follow
the general commissioning process as outlined in the Commissioning Plan. 2. Develop and utilize Prefunctional Checklists and Functional Test Procedures for all equipment/systems to
be commissioned. 3. Provide and document all air and water systems balancing required for the project. 4. Prepare a preliminary commissioning report. This report will minimally include
the following: a. List of deficiencies identified during functional performance testing. b. Listing of deferred or seasonal testing that cannot be completed at this time. c. Listing
of climatic conditions that will be required to conduct deferred/seasonal tests. d. Functional Performance Test reports completed to date. 5. Make available a copy of the preliminary
commissioning report to the Code Office having jurisdiction. 6. Develop an operations and maintenance manual to be provided to the Owner that will minimally include the following (Some
of these items may be addressed elsewhere in the project specifications): a. Submittal data of equipment requiring maintenance. b. Manufacturer's maintenance manual for all commissioned
equipment. c. Name, address, and contact information for all relevant service agencies. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING REQUIREMENTS 019113 - 5 d. Building direct digital control system information including wiring diagrams, schematics and
sequences of operations. e. Lighting and lighting control system submittals. f. Schedule for inspection of lighting control systems. g. General narrative of how each commissioned system
is intended to operate. 7. Develop a final commissioning report to be delivered to the building Owner. The report will minimally include the following: a. Functional Performance Testing
results. b. Final results of previously identified system deficiencies. c. Functional testing procedure documentation. C. Owner: 1. Participate in the contractor performed training
sessions to the extent possible. 2. Provide any system operation schedules and set point information available to the contractor to allow for proper system start-up and operation. 1.9
REFERENCES A. Systems commissioning shall generally be accomplished in accordance with the latest version of commissioning publications from one the following industry associations:
1. American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) Guideline 1.1, HVAC&R Technical Requirements for the Commissioning Process. 2. Associated Air Balancing
Council, Commissioning Reference Manual. 3. Building Commissioning Association - The Building Commissioning Handbook. 1.10 DOCUMENTATION A. Each Contractor shall provide to the OR three
(3) copies of the following items as soon as they become available: 1. Certified and approved start-up and testing report forms for all subsystem equipment that comprise the System.
Commissioning documentation shall include control schematics of the total system and all subsystems. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING REQUIREMENTS 019113 - 6 2. Records of required inspections for code compliance, and documentation
of approved permits and licenses to operate components of the system. 3. Operating data which shall include all necessary instructions to the Owner's operating staff in order to operate
the system to specified performance standards. 4. Maintenance data which shall include all necessary information required to maintain all equipment in continuous operating condition,
such as the testing, balancing and adjusting report and the as-built drawings. 5. Written notice that building equipment and systems have been completed, tested and are fully operational.
6. Checklist of all submitted contract deliverables such as; operation and maintenance manuals, spare parts, warranties, training, documentation, etc. PART 2 - PRODUCTS 2.1 TESTING
A. The Contractor shall provide any equipment or device required for access such as platforms, scaffolds, and spare filters as may be necessary for all verification and testing. B.
All standard testing equipment required to perform startup and initial checkout and required performance testing shall be provided by the Contractor for the equipment being tested.
C. All testing equipment shall be of sufficient quality and accuracy to test and/or measure system performance within the tolerances specified in the specifications, calibration certification
will be provided. PART 3 - EXECUTION 3.1 DESIGN CRITERIA AND INTENT A. Design criteria and intent shall be as described in the technical specification sections and contract drawings.
The basis of design developed by the DE will be also referenced. 3.2 MEETINGS A. Initial Meeting: 1. The Contractor(s), through the OR, will schedule, plan and conduct an initial commissioning
meeting. The Contractors and their responsible parties are required to attend. 3.3 STARTUP, CONSTRUCTION CHECKLISTS AND INITIAL CHECKOUT A. The following procedures apply to all equipment/systems
to be commissioned. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GENERAL COMMISSIONING REQUIREMENTS
019113 - 7 B. General: Prefunctional checklists are required to verify that the equipment and systems are fully connected and operational. The prefunctional checklists for a
given system must be successfully completed and approved prior to startup and formal performance testing of equipment or subsystems of the given system. C. Startup and Checkout Plan:
The Contractors shall develop prefunctional checklists and startup shall be identified in the commissioning scoping meeting and on the checklist forms. 1. The Contractor/Subcontractor
responsible for the purchase of the equipment shall develop the full startup plan by combining the manufacturer's detailed startup and checkout procedures and the prefunctional checklists.
D. Execution of Construction Checklists and Startup: 1. The Owner and facility personnel as necessary, shall observe procedures for primary equipment. 2. For lower-level components
of equipment, (e.g., sensors, controllers), the OR shall be offered the opportunity to observe a sampling of the startup procedures. 3. The Contractors, Subcontractors and Vendors shall
execute startup and provide the OR with a signed and dated copy of the completed startup and construction checklists. 4. Only individuals employed by the Contractor (Technicians, Engineers,
Tradesmen, Vendors, etc.) who have direct knowledge and witnessed that a line item task on the construction checklist was actually performed shall check off that item. It is not acceptable
for non-witnessing onsite supervisors to fill out these forms. E. Deficiencies, Non-Conformance, and Approval of Checklists and Startup (Master Issues Log): 1. The Contractor shall
ensure that the Subcontractors clearly list any outstanding items of the initial startup and construction checklist procedures that were not completed successfully, on an attached sheet.
The form and any outstanding deficiencies shall be provided, to the OR within two (2) days of test completion. 3.4 FUNCTIONAL PERFORMANCE TESTING A. Requirements: The functional performance
testing shall demonstrate that each system is operating according to the documented design intent and contract documents. Functional performance testing facilitates bringing the systems
from a state of individual substantial completion to full dynamic operation. Additionally, during the testing process, areas of deficient performance are identified and corrected,
improving the operation and functioning of the systems. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 GENERAL COMMISSIONING REQUIREMENTS 019113 - 8 3.5 DOCUMENTATION, NON-CONFORMANCE, AND APPROVAL OF TESTS A. Documentation: The Contractors shall complete all documentation
for performance testing. 3.6 DEFERRED TESTING A. Unforeseen Deferred Tests: If any check or test cannot be completed due to the project completion level, weather conditions, or time
of season, execution of checklists and functional performance testing may be delayed upon approval of the OR. These tests will be conducted in the same manner as the seasonal tests
as soon as possible. Contractors will not be due any additional compensation. B. Seasonal Testing: During the warranty period, seasonal testing (tests delayed until weather conditions
are closer to the system's design) shall be completed as part of this contract. The Contractor shall coordinate this activity through the OR. Any final adjustments to the O&M manuals
and as-built's due to the testing shall be made by the Contractor. 3.7 COMMISSIONING RECORD A. The Contractor is responsible to compile, organize and index the following commissioning
data, for all commissioned equipment into labeled, indexed and tabbed, or in an electronic format, as preferred by the Owner. 1. Commissioning Plan. (Design Engineer provided.) 2.
System reports including available design narratives and criteria including sequences. Each system shall contain the startup plan and report, approvals, corrections, construction checklists,
completed performance tests, trending and analysis, training plan and recommended recommissioning schedule. 3. Complete issues log inclusive of all items and resolutions. 4. Final Commissioning
Report including an executive summary and a list of participants and roles. 5. All outstanding non-compliance items shall be specifically listed. Recommendations for improvement to
equipment or operations, future actions, commissioning process changes, etc. shall also be listed. Each non-compliance issue shall be referenced to the specific performance test, inspection,
trend log, etc. where the deficiency is documented. ROCHESTER · BUFFALO · SYRACUSE · SCHENECTADY www.meengineering.com Submitted to: Ithaca Beer Company
411-415 College Ave Ithaca, NY 14850 Submitted from: M/E Engineering, P.C. 300 Trolley Boulevard Rochester NY 14606 April 23, 2021 M/E Reference 210021 COMMISSIONING PLAN Construction
Phase Tenant Fit-Out for Ithaca Beer Company - SAI COMMISSIONING PLAN M/E ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850 APRIL 23, 2021 TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI TOC - 1 This proprietary document is the property of M/E Engineering, P.C. and shall not be altered or utilized for any other purpose than intended use without specific written
authorization of M/E Engineering, P.C. Furthermore, M/E Engineering, P.C. is not responsible for any unauthorized use of this document. TABLE OF CONTENTS PAGES SECTION 1 OVERVIEW
1 SECTION 2 GENERAL BUILDING INFORMATION 3 SECTION 3 COMMISSIONING TEAM MEMBERS 3 SECTION 4 CONTRACTORS/SUB-CONTRACTORS 3 SECTION 5 COMMISSIONING PROCESS 3 COMMISSIONING PLAN M/E
ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850 APRIL 23, 2021 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Page 1 This proprietary document is the property of M/E Engineering,
P.C. and shall not be altered or utilized for any other purpose than intended use without specific written authorization of M/E Engineering, P.C. Furthermore, M/E Engineering, P.C.
is not responsible for any unauthorized use of this document. COMMISSIONING PLAN PROJECT: TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Date: APRIL 23, 2021 1. Overview A. Definitions:
1. Acceptance: A contractually defined action that permits an activity to commence or continue. 2. Basis of Design: A document that records the concepts, calculations, decisions,
and product selections used to meet the Owner's Project Requirements and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative
descriptions and lists of individual items that support the design process. 3. Commissioning: See Commissioning Process. 4. Commissioning Activity: A component of the Commissioning
Process. 5. Commissioning Field Report: A document that records the activities and results of the Commissioning Process. 6. Commissioning Plan: A document that outlines the organization,
schedule, allocation of resources, and documentation requirements of the Commissioning Process. 7. Commissioning Process: A quality-focused process for enhancing the delivery of a
project. The process focuses on verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained
to meet the Owner's Project Requirements. 8. Commissioning Process Progress and Approval Form: A document that indicates activities completed as part of the Commissioning Process,
approval status of the activities, and significant findings from those activities; it is continuously updated during the course of a project. 9. Commissioning Team: The individuals
who through coordinated actions, are responsible for implementing the Commissioning Process. 10. Construction Documents: This includes a wide range of documents, which will vary from
project to project, Owner's needs, regulations, laws, and countries. Construction documents usually include the project manual (specifications), plans (drawings) and General terms of
the contract, especially those required by subcontractors and manufacturer's representative, suppliers and manufacturers of equipment, assemblies and systems. COMMISSIONING PLAN M/E
ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850 APRIL 23, 2021 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Page 2 This proprietary document is the property of M/E Engineering,
P.C. and shall not be altered or utilized for any other purpose than intended use without specific written authorization of M/E Engineering, P.C. Furthermore, M/E Engineering, P.C.
is not responsible for any unauthorized use of this document. 11. Continuous Commissioning Process: A continuation of the Commissioning Process well into the Occupancy and Operations
Phase to verify that a project continues to meet current and evolving Owner's Project Requirements. The Continuous Commissioning Process activities are on-going for the life of the
facility. 12. Contract Documents: This includes a wide range of documents, which will vary from project to project, owner's needs, regulations, laws, and countries. It frequently
includes price agreements, construction management process, subcontractor agreements or requirements, requirements and procedures for submittals, changes, and other construction requirements,
timeline for completion, and the Construction Documents. 13. Coordination Drawings: Drawings showing the work of all trades to illustrate that equipment can be installed in the space
allocated without compromising equipment function or access for maintenance and replacement. These drawings graphically illustrate and dimension manufacturers' recommended maintenance
clearances. 14. Functional Test Procedure: A written protocol that defines methods, personnel, and expectations for tests conducted on components, equipment, assemblies, systems, and
interfaces among systems. 15. Verification: The process by which specific documents, components, equipment, assemblies, systems, and interfaces among systems are confirmed to comply
with the criteria described in the Owner's Project Requirements. B. Commissioning Scope: 1. Commissioning is a systematic process of ensuring that selected systems perform interactively
according to the design intent and the owner's operational needs. This is achieved by beginning in the design phase, documenting the design intent and continuing through construction,
acceptance and the warranty period with actual verification of performance. C. Commissioned Systems: 1. The following equipment and systems will be commissioned in this project by the
respective contractors. Refer to Section 5 for additional details. All general references to equipment in this document refer only to equipment that is to be commissioned. a. HVAC
Systems b. HVAC System Testing and Balancing c. Lighting Controls, Occupancy Sensors, Time of Day Controls, Daylight Controls, Programmable Controls d. Domestic Hot Water Equipment
COMMISSIONING PLAN M/E ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850 APRIL 23, 2021 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Page 3 This proprietary document is the
property of M/E Engineering, P.C. and shall not be altered or utilized for any other purpose than intended use without specific written authorization of M/E Engineering, P.C. Furthermore,
M/E Engineering, P.C. is not responsible for any unauthorized use of this document. 2. General Building Information Project: TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Location: 411-415
COLLEGE AVE, ITHACA NY 14850 Building Type: 3. Commissioning Team Members Team Member Co. & Contact Names Office, Cell, Fax, Email Owner Primary Contact Architect Project Architect
Engineer Design Engineer Construction Contractors 4. Contractors/Sub-Contractors A. Mechanical B. Electrical C. Plumbing D. General Note: Contractor(s) will be responsible for
providing the project commissioning services in accordance with the requirements of the project Specification Section 019113, applicable code(s) and this Commissioning Plan. 5. Commissioning
Process A. This section sequentially details the commissioning process by commissioning task or activity. 1. Commissioning Scoping Meeting: a. A commissioning scoping meeting is planned
and conducted by the Contractor. In attendance are the respective representatives of the Owner, Facility Staff, DE and the mechanical, electrical, controls, and TAB Contractor. At
the meeting, commissioning parties are introduced and the commissioning process is reviewed, and management and reporting lines determined. The Cx Plan is reviewed, process questions
are addressed, lines of reporting and communications determined and the work products list discussed. COMMISSIONING PLAN M/E ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850
APRIL 23, 2021 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI Page 4 This proprietary document is the property of M/E Engineering, P.C. and shall not be altered or utilized for any
other purpose than intended use without specific written authorization of M/E Engineering, P.C. Furthermore, M/E Engineering, P.C. is not responsible for any unauthorized use of this
document. 2. Miscellaneous Management Protocols: a. The following protocols will be used on this project: Issue Protocol Scheduling of Commissioning Tasks Contractor provides to Owner's
Representative. Question/Clarifications in regards to Commissioning Specification and/or Commissioning Plan Contractor provides to Design Engineer. Schedule of Training Contractor
provides to Owner's Representative who will notify Owner. Turnover of Commissioning Documentation Contractor delivers to Owner's Representative. For Scheduling Commissioning Activities
Contractor to coordinate with Owner's Representative. For Commissioning Deficiencies Contractor notifies Owner's Representative and resolves deficiencies with Subcontractor and Equipment
Manufacturer Representatives 3. Execution of Pre-functional Checklists and Startup: a. The contractors and manufacturer's representatives execute and submit a signed copy of the completed
start-up reports and/or Prefunctional checklists to the OR. Further details are found in the Contract Documents. 4. Deficiencies and Non-Conformance: a. The Contractor works with
the subcontractors and or manufacturer's representative to correct and retest deficiencies or uncompleted items, with involvement from the DE and others as required. The installing
contractors or manufacturer's representatives correct all areas that are deficient or incomplete according to the start-up tests. 5. Execution of Functional Testing Procedures: a.
Overview and Process: 1) The Contractor schedules functional tests through the OR. The Contractor personnel oversees, witnesses and documents the functional testing of all equipment
and systems according to the Contract Documents and the Cx Plan. The Contractors execute the tests. The control system is tested before it is used to verify performance of other components
or systems. The air balancing and water balancing is completed and debugged before functional testing of air-related or water-related equipment or systems. Testing proceeds from components
to subsystems to systems and finally to interlocks and connections between systems. COMMISSIONING PLAN M/E ENGINEERING, P.C. 411-415 COLLEGE AVE, ITHACA NY 14850 APRIL 23, 2021 TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI Page 5 This proprietary document is the property of M/E Engineering, P.C. and shall not be altered or utilized for any other purpose than intended
use without specific written authorization of M/E Engineering, P.C. Furthermore, M/E Engineering, P.C. is not responsible for any unauthorized use of this document. b. Deficiencies
and Retesting: 1) The Contractor documents the results of the test. Corrections of minor deficiencies identified are made during the tests. The Contractor records the results of the
test on the procedure or test form. Deficiencies or non-conformance issues are noted and reported to the OR. Contractors correct all deficiencies, notify the OR. Contractor will
schedule re-testing with OR. c. Commissioning Record: 1) The Contractor will compile, organize and index the following commissioning data by equipment/system into labeled, indexed and
tabbed, three-ring binders or electronically, based on Owner preference. 2) The Final Commissioning Record is provided to the Owner and Design Engineer for review. END OF COMMISSIONING
PLAN 019113 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 /
M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 1 SECTION 210500 - BASIC FIRE SUPPRESSION REQUIREMENTS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor,
tools, materials, accessories, parts, transportation, taxes, and related items, essential for installation of the work and necessary to make work, complete, and operational. Provide
new equipment and material. References to codes, specifications and standards called for in the specification sections and on the drawings mean, the latest edition, amendment and revision
of such referenced standard in effect on the date of these contract documents. All materials and equipment shall be installed in accordance with the manufacturer's recommendations.
B. Provide all labor and materials required to provide a NFPA-13 compliant sprinkler system to protect all spaces within the project area and as noted on the drawings. 1.2 LICENSING
A. The Contractor shall hold a license to perform the work as issued by the authority having jurisdiction. B. Electrical work shall be performed by, or under, the direct supervision
of a licensed electrician. 1.3 PERMITS A. Apply for and obtain all required permits and inspections, pay all fees and charges including all service charges. Provide certificate of
approval from the Authority having jurisdiction prior to request for final payment. 1.4 CODE COMPLIANCE A. Provide work in compliance with the following: 1. 2020 Building Code of New
York State. 2. 2020 Existing Building Code of New York State. 3. 2020 Fire Code of New York State. 4. 2020 Plumbing Code of New York State. 5. 2020 Mechanical Code of New York State.
6. 2020 Fuel Gas Code of New York State. 7. 2020 Property Maintenance Code of New York State. 8. 2020 Energy Conservation Code of New York State TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 2 9. Accessible and Usable
Buildings and Facilities, ICC A117.1 (2009). 10. New York State Department of Labor Rules and Regulations. 11. New York State Department of Health. 12. National Electrical Code (NEC)
13. Occupational Safety and Health Administration (OSHA). 14. Local Codes and Ordinances. 15. Life Safety Code, NFPA 101. 16. City of Ithaca Plumbing Department. 17. NFPA 13. 1.5 GLOSSARY
ACI American Concrete Institute AGA American Gas Association AGCA Associated General Contractors of America, Inc. AIA American Institute of Architects AISC American Institute of Steel
Construction AFBMA Anti-Friction Bearing Manufacturer's Association AMCA Air Moving and Conditioning Association, Inc. ANSI American National Standards Institute ARI Air Conditioning
and Refrigeration Institute ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. ASME American Society of Mechanical Engineers ASPE American Society
of Plumbing Engineers ASTM American Society for Testing Materials AWSC American Welding Society Code AWWA American Water Works Association FM Factory Mutual Insurance Company IBR Institute
of Boiler & Radiation Manufacturers IEEE Institute of Electrical and Electronics Engineers IRI Industrial Risk Insurers TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 3 NEC National Electrical Code NEMA National Electrical
Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association NYS/DEC New York State Department of Environmental Conservation SBI Steel Boiler
Institute SMACNA Sheet Metal and Air Conditioning Contractors National Association UFPO Underground Facilities Protective Organization UL Underwriter's Laboratories, Inc. OSHA Occupational
Safety and Health Administration XL - GAP XL Global Asset Protection Services 1.6 DEFINITIONS Acceptance Owner acceptance of the project from Contractor upon certification by Owner's
Representative. As Specified Materials, equipment including the execution specified/shown in the contract documents. Basis of Design Equipment, materials, installation, etc. on which
the design is based. (Refer to the article, Equipment Arrangements, and the article, Substitutions.) Code Requirements Minimum requirements. Concealed Work installed in pipe and duct
shafts, chases or recesses, inside walls, above ceilings, in slabs or below grade. Coordination Drawings Show the relationship and integration of different construction elements and
trades that require careful coordination during fabrication or installation, to fit in the space provided or to function as intended. Delegated-Design Services Performance and Design
criteria for Contractor provided professional services. Where professional design services or certifications by a design professional are specifically required of a Contractor, by
the Contract Documents. Provide products and systems with the specific design criteria indicated. If criteria indicated is insufficient to perform services or certification required,
submit a written request for additional information to the Engineer. Submit wet signed and sealed certification by the responsible design professional for each product and system specifically
assigned to the Contractor to be designed or certified by a design professional. Examples: structural maintenance ladders, stairs and platforms, pipe anchors, seismic compliant system,
wind, structural supports for material equipment, sprinkler hydraulic calculations. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 4 Equal, Equivalent, Equal To, Equivalent To, As Directed and As Required Shall all be interpreted
and should be taken to mean "to the satisfaction of the Engineer". Exposed Work not identified as concealed. Extract Carefully dismantle and store where directed by Owner's Representative
and/or reinstall as indicated on drawings or as described in specifications. Furnish Purchase and deliver to job site, location as directed by the Owner's Representative. Inspection
Visual observations by Owner's site Representative. Install Store at job site if required, proper placement within building construction including miscellaneous items needed to affect
placement as required and protect during construction. Take responsibility to mount, connect, start-up and make fully functional. Labeled Refers to classification by a standards agency.
Manufacturers Refer to the article, Equipment Arrangements, and the article, Substitutions. Prime Professional Architect or Engineer having a contract directly with the Owner for professional
services. Product Data Illustrations, standard schedules, performance charts, instructions, brochures, wiring diagrams, finishes, or other information furnished by the Contractor to
illustrate materials or equipment for some portion of the work. Provide (Furnish and Install) Contractor shall furnish all labor, materials, equipment and supplies necessary to install
and place in operating condition, unless otherwise specifically stated. Relocate Disassemble, disconnect, and transport equipment to new locations, then clean, test, and install ready
for use. Remove Dismantle and take away from premises without added cost to Owner, and dispose of in a legal manner. Review and Reviewed Should be taken to mean to be followed by "for
the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents". Roughing Pipe, duct, conduit, equipment layout and
installation. Samples Physical full scale examples which illustrate materials, finishes, coatings, equipment or workmanship, and establishes standards by which work will be judged.
Satisfactory As specified in contract documents. Shop Drawings Fabrication drawings, diagrams, schedules and other instruments, specifically prepared for the work by the Contractor
or a Sub-contractor, manufacturer, supplier or distributor to illustrate some portion of the work. Site Representative Owner's Inspector or "Clerk of Works" at the work site. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 5
Submittals Defined (Technical) Any item required to be delivered to the Engineer for review as requirement of the Contract Documents. The purpose of technical submittals is to demonstrate
for those portions of the work for which a submittal is required, the manner in which the Contractor proposes to conform to the information given and design concepts expressed and required
by the Contract Documents. 1.7 SHOP DRAWINGS/PRODUCT DATA/SAMPLES A. Provide submittals on all items of equipment and materials to be furnished and installed. Submittals shall be
accompanied by a transmittal letter, stating name of project and contractor, name of vendor supplying equipment, number of drawings, titles, specification sections (name and number)
and other pertinent data called for in individual sections. Submittals shall have individual cover sheets that shall be dated and contain: Name of project; name of prime professional;
name of prime contractor; description or names of equipment, materials and items; and complete identification of locations at which materials or equipment are to be installed. Individual
piecemeal or incomplete submittals will not be accepted. Similar items, (all types specified) shall be submitted at under one cover sheet per specification section (e.g. valves, plumbing
fixtures, etc.). Number each submittal by trade. Indicate deviations from contract requirements on Letter of Transmittal. Submittals will be given a general review only. Corrections
or comments made on the Submittals during the review do not relieve Contractor from compliance with requirements of the drawings and specifications. The Contractor is responsible for:
confirming and correcting all quantities; checking electrical characteristics and dimensions; selecting fabrication processes and techniques of construction; coordinating his work
with that of all other trades; and performing his work in a safe and satisfactory manner. If submitting hard copies, submit four (4) copies for review. B. The Engineer will review
up to two (2) submissions of any single submittal. The Contractor will be invoiced on an hourly rate basis for the time spent reviewing the same shop drawing in excess of twice. C.
If submittals are to be submitted electronically, all requirements in Item A apply. Submittals shall be emailed in PDF format to specific email address provided by the Construction
Manager, General Contractor, Architect or Project Manager. Name of project shall be in subject line of email. Send emails to merochsubmittalclerk@meengineering.com. 1.8 PROTECTION
OF PERSONS AND PROPERTY A. Contractor shall assume responsibility for construction safety at all times and provide, as part of contract, all trench or building shoring, scaffolding,
shielding, dust/fume protection, mechanical/electrical protection, special grounding, safety railings, barriers, and other safety feature required to provide safe conditions for all
workmen and site visitors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION
REQUIREMENTS 210500 - 6 1.9 EQUIPMENT ARRANGEMENTS A. The contract documents are prepared using one manufacturer as the Basis of Design, even though other manufacturers' names
are listed. If Contractor elects to use one of the listed manufacturers other than Basis of Design, submit detailed drawings, indicating proposed installation of equipment. Show maintenance
clearances, service removal space required, and other pertinent revisions to the design arrangement. Make required changes in the work of other trades, at no increase in any contract.
Provide larger motors, feeders, breakers, and equipment, additional control devices, valves, fittings and other miscellaneous equipment required for proper operation, and assume responsibility
for proper location of roughing and connections by other trades. Remove and replace doorframes, access doors, walls, ceilings, or floors required to install other than Basis of Design.
If revised arrangement submittal is rejected, revise and resubmit specified Basis of Design item which conforms to Contract Documents. 1.10 SUBSTITUTIONS A. If Contractor desires to
bid on any other kind, type, brand, or manufacture of material or equipment than those named in specifications, secure prior approval. To request such approval, Contractor shall submit
complete information comparing (item-for-item) material or equipment offered with design material or equipment. Include sufficient information to permit quick and thorough comparison,
and include performance curves on same basis, capacities, power requirements, controls, materials, metal gauges, finishes, dimensions, weights, etc., of major parts. If accepted, an
addendum will be issued to this effect ahead of bid date. Unless such addendum is issued, substitution offered may not be used. 1.11 ROUGHING A. The Contract Drawings have been prepared
in order to convey design intent and are diagrammatic only. Drawings shall not be interpreted to be fully coordinated for construction. B. Due to small scale of Drawings, it is not
possible to indicate all offsets, fittings, changes in elevation, interferences, etc. Make necessary changes in contract work, equipment locations, etc., as part of a contract to accommodate
work to obstacles and interferences encountered. Before installing, verify exact location and elevations at work site. DO NOT SCALE plans. If field conditions, details, changes in
equipment or shop drawing information require an important rearrangement, report same to Owner's Representative for review. Obtain written approval for all major changes before installing.
C. Install work so that items both existing and new are operable and serviceable. Eliminate interference with removal of coils, motors, filters, belt guards and/or operation of doors.
Provide easy, safe, and code mandated clearances at controllers, motor starters, valve access, and other equipment requiring maintenance and operation. Provide new materials, including
new piping and insulation for relocated work. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 7 D. Coordinate work with other trades and determine exact route or location of each duct, pipe, conduit, etc., before fabrication
and installation. Coordinate with Architectural Drawings. Obtain from Owner's Representative exact location of all equipment in finished areas, such as thermostat, fixture, and switch
mounting heights, and equipment mounting heights. Coordinate all work with the architectural reflected ceiling plans and/or existing Architecture. Mechanical and electrical drawings
show design arrangement only for diffusers, grilles, registers, air terminals, lighting fixtures, sprinklers, speakers, and other items. Do not rough-in contract work without reflected
ceiling location plans. E. Before roughing for equipment furnished by Owner or in other contracts, obtain from Owner and other Contractors, approved roughing drawings giving exact location
for each piece of equipment. Do not "rough in" services without final layout drawings approved for construction. Cooperate with other trades to insure proper location and size of
connections to insure proper functioning of all systems and equipment. For equipment and connections provided in this contract, prepare roughing drawing as follows: 1. New Equipment:
Obtain equipment roughing drawings and dimensions, then prepare roughing-in-drawings. If such information is not available in time, obtain an acknowledgement in writing, then make
space arrangements as required with Owner's Representative. 1.12 COORDINATION DRAWINGS A. Before construction work commences, Contractors for all trades shall submit coordination drawings
in the form of CAD drawing files, drawn at not less than 1/4 in. scale. Such drawings will be required throughout all areas, for all Contracts. These drawings shall show resolutions
of trade conflicts in congested areas. Mechanical Equipment Rooms shall be drawn early in coordination drawing process simultaneous with all other congested areas. Prepare Coordination
Drawings as follows: 1. The HVAC Contractor shall prepare the base plan CAD coordination drawings showing all ductwork, all pertinent heating piping, and equipment. These drawings
may be CAD files of the required Ductwork Shop Drawings. The drawings shall be coordinated with lighting fixtures, sprinklers, air diffusers, other ceiling mounted items, ceiling heights,
structural work, maintenance clearances, electric code clearance, reflected ceiling plans, and other contract requirements. Reposition proposed locations of work after coordination
drawing review by the Owner's Representative. Provide adjustments to exact size, location, and offsets of ducts, pipes, conduit, etc., to achieve reasonable appearance objectives.
Provide these adjustments as part of contract. Minor revisions need not be redrawn. 2. The HVAC Contractor shall provide CAD files and submit the base plan CAD Coordination Drawings
to all Contractors. 3. The Fire Protection Contractor shall draw the location of piping and equipment on the base plan CAD Coordination Drawings, indicating areas of conflict and
suggested resolutions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION
REQUIREMENTS 210500 - 8 4. The Electrical Contractor shall draw the location of lighting fixtures, cable trays, and feeders over 1-1/2 in. on the base plan CAD Coordination Drawings,
indicating areas of conflict and suggested resolution. 5. The General Construction Contractor shall indicate areas of architectural/structural conflicts or obstacles on the CAD Coordination
Drawings, and coordinate to suit the overall construction schedule. 6. The Construction Manager shall expedite all Coordination Drawing work and coordinate to suit the overall construction
schedule. In the case of unresolved interferences, he shall notify the Owner's Representative. The Owner's Representative will then direct the various contractors as to how to revise
their drawings as required to eliminate installation interferences. 7. If a given Contract proceeds prior to resolving conflicts, then if necessary, that Contract shall change its work
at no extra cost in order to permit others to proceed with a coordinated installation. Coordination approval will be given by areas after special site meetings involving all Contracts.
B. The purpose of the coordination drawing process is to identify and resolve potential conflicts between Contracts, and between Contracts and existing or new building construction,
before they occur in construction. Coordination drawings are intended for the respective Contractor's use during construction and shall not replace any Shop Drawings, or record drawings
required elsewhere in these contract documents. 1.13 REMOVAL WORK A. Where existing equipment removals are called for, submit complete list to Owner's Representative. All items that
Owner wishes to retain that do not contain asbestos or PCB Material shall be delivered to location directed by Owner. Items that Owner does not wish to retain shall be removed from
site and legally disposed of. Where equipment is called for to be relocated, contractor shall carefully remove, clean and recondition, then reinstall. Remove all abandoned piping,
wiring, equipment, lighting, ductwork, tubing, supports, fixtures, etc. Visit each room, crawl spaces, and roofs to determine total Scope of Work. The disturbance or dislocation of
asbestos-containing materials causes asbestos fibers to be released into the building's atmosphere, thereby creating a health hazard to workmen and building occupants. Consistent with
Industrial Code Rule 56 and the content of recognized asbestos-control work, the Contractor shall apprise all of his workers, supervisory personnel, subcontractors, Owner and Consultants
who will be at the job site of the seriousness of the hazard and of proper safeguards and work procedures which must be followed, as described in New York State Department of Labor
Industrial Code Rule 56. B. For materials indicated to contain lead, that are being affected by demolition or construction, the contractor shall be in accordance with all Federal, State
and Local law requirements regarding worker exposure to lead disturbance and abatement procedures. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 9 1.14 EQUIPMENT AND MATERIAL INSTALLATION A. Provide materials that meet the following
minimum requirements: 1. All materials shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less, in accordance with NFPA 255. 2. All equipment and material
for which there is a listing service shall bear a UL label. 3. Electrical equipment and systems shall meet UL Standards and requirements of the NEC. B. Exterior and wet locations shall
utilize materials, equipment supports, mounting, etc. suitable for the intended locations. Metals shall be stainless steel, galvanized or with baked enamel finish as a minimum. Finishes
and coatings shall be continuous and any surface damaged or cut ends shall be field corrected in accordance with the manufacturer's recommendations. Hardware (screws, bolts, nuts,
washers, supports, fasteners, etc.) shall be: 1. Stainless steel where the associated system or equipment material is stainless steel or aluminum. 2. Hot dipped galvanized or stainless
steel where the associated system or equipment is steel, galvanized steel or other. 1.15 CUTTING AND PATCHING A. Each trade shall include their required cutting and patching work unless
shown as part of the General Construction Contract. Refer to General Conditions of the Contract for Construction, for additional requirements. Cut and drill from both sides of walls
and/or floors to eliminate splaying. Patch cut or abandoned holes left by removals of equipment or fixtures. Patch adjacent existing work disturbed by installation of new work including
insulation, walls and wall covering, ceiling and floor covering, other finished surfaces. Patch openings and damaged areas equal to existing surface finish. Cut openings in prefabricated
construction units in accordance with manufacturer's instructions. 1.16 CONCEALMENT A. Conceal all contract work above ceilings and in walls, below slabs, and elsewhere throughout building.
If concealment is impossible or impractical, notify Owner's Representative before starting that part of the work and install only after his review. In areas with no ceilings, install
only after Owner's Representative reviews and comments on arrangement and appearance. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 10 1.17 CHASES A. New Construction: 1. Certain chases, recesses, openings, shafts, and wall pockets
will be provided as part of General Construction Contract. Mechanical and Electrical Contracts shall provide all other openings required for their contract work. 2. Check Architectural
and Structural Design and Shop Drawings to verify correct size and location for all openings, recesses and chases in general building construction work. 3. Assume responsibility for
correct and final location and size of such openings. 4. Rectify improperly sized, improperly located or omitted chases or openings due to faulty or late information or failure to check
final location. 5. Provide 18 gauge galvanized sleeves and inserts. Extend all sleeves 2 in. above finished floor. Set sleeves and inserts in place ahead of new construction, securely
fastened during concrete pouring. Correct, by drilling, omitted or improperly located sleeves. Assume responsibility for all work and equipment damaged during course of drilling.
Firestop all unused sleeves. 6. Provide angle iron frame where openings are required for contract work, unless provided by General Construction Contractor. B. In Existing Buildings:
1. Drill holes for floor and/or roof slab openings. 2. Multiple pipes smaller than 1 in. properly spaced and supported may pass through one 6 in. or smaller diameter opening. 3. Seal
voids in fire rated assemblies with a fire-stopping seal system to maintain the fire resistance of the assembly. Provide 18 gauge galvanized sleeves at fire rated assemblies. Extend
sleeves 2 in. above floors. 4. In wall openings, drill or cut holes to suit. Provide 18 gauge galvanized sleeves at shafts and fire rated assemblies. Provide fire-stopping seal between
sleeves and wall in drywall construction. Provide fire stopping similar to that for floor openings. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 11 1.18 PENETRATION FIRESTOPPING A. Fire-Stopping for Openings Through Fire
and Smoke Rated Wall and Floor Assemblies: 1. Provide materials and products listed or classified by an approved independent testing laboratory for "Penetration Fire-Stop Systems".
The system shall meet the requirements of "Fire Tests of Penetrations Fire-Stops" designated ASTM E814. 2. Provide fire-stop system seals at all locations where piping, tubing, conduit,
electrical busways/cables/wires, ductwork and similar utilities pass through or penetrate fire rated wall or floor assembly. Provide fire-stop seal between sleeve and wall for drywall
construction. 3. The minimum required fire resistance ratings of the wall or floor assembly shall be maintained by the fire-stop system. The installation shall provide an air and watertight
seal. 4. The methods used shall incorporate qualities which permit the easy removal or addition of electrical conduits or cables without drilling or use of special tools. The product
shall adhere to itself to allow repairs to be made with the same material and permit the vibration, expansion, and/or contraction of any items passing through the penetration without
cracking, crumbling and resulting reduction in fire rating. 5. Plastic pipe/conduit materials shall be installed utilizing intumescent collars. 6. Provide a submittal including products
intended for use, manufacturer's installation instructions, and the UL details for all applicable types of wall and floor penetrations. 7. Fire-stopping products shall not be used for
sealing of penetrations of non-rated walls or floors. B. Acceptable Manufacturers: 1. Dow Corning Fire-Stop System Foams and Sealants. 2. Nelson Electric Fire-Stop System Putty, CLK
and WRP. 3. S-100 FS500/600, Thomas & Betts. 4. Carborundum Fyre Putty. 5. 3-M Fire Products. 6. Hilti Corporation. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 12 1.19 NON-RATED WALL PENETRATIONS A. Each trade shall be responsible
for sealing wall penetrations related to their installed work, including but not limited to ductwork, piping, conduits, etc. See individual specification sections for requirements.
1.20 SUPPORTS A. Provide required supports, beams, angles, hangers, rods, bases, braces, and other items to properly support contract work. Modify studs, add studs, add framing, or
otherwise reinforce studs in metal stud walls and partitions as required to suit contract work. If necessary, in stud walls, provide special supports from floor to structure above.
For precast panels/planks and metal decks, support mechanical/electrical work as determined by manufacturer and the Engineer. Provide heavy gauge steel mounting plates for mounting
contract work. Mounting plates shall span two or more studs. Size, gauge, and strength of mounting plates shall be sufficient for equipment size, weight, and desired rigidity. B.
Equipment, piping, conduit, raceway, etc. supports shall be installed to minimize the generation and transmission of vibration. C. Materials and equipment shall be solely supported
by the building structure and connected framing. Gypboard, ceilings, other finishes, etc. shall not be used for support of materials and equipment. 1.21 APPLIED FIREPROOFING A. Scope:
Provide Encapsulation of surfaces where applied fireproofing materials have been disturbed, removed, or left missing by the removal of hangers or upper attachments, or when new hangers
or upper attachment are installed. B. Fire Resistance Rating: Fireproofing shall meet the original hourly rating when applied to the construction assembly where materials have been
removed or disturbed, or is missing. C. Fire Hazard Classification: Fireproofing shall be listed in the Underwriters Laboratories Building Materials Directory with the following performance
properties: 1. Flame Spread: 10 or less. 2. Smoke Developed: 5 or less. D. Product Data: Provide manufacturer's product descriptions for each required fireproofing material. Include
application instructions, including primer/adhesive requirements and recommended minimum thickness and density for each required hourly rating. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 13 E. Fire Proofing Manufacturer:
1. Retro-Guard cementitious replacement fireproofing by Grace Construction Products, or equivalent Cafco Blaze Shield, and Cafco 300 by Isolatek. 2. Physical Properties: a. Dry Field
Density (ASTM E 605): 15 lb/cu ft minimum average. b. Cohesion/Adhesion (Bond Strength) (ASTM E 736): 200 lb/sq ft minimum average. c. Compressive Strength (ASTM E 761): 500 lb/sq
ft minimum. d. Impact (Bond Impact) Resistance (ASTM E 760): Shall not crack or delaminate. e. Effect of Deflection (ASTM E 759): Shall not crack or delaminate. f. Corrosion Resistance
(ASTM E 937): No evidence of corrosion. g. Air Erosion (ASTM E 859): Maximum 0.025 g/sq ft weight loss. h. Provide primer or adhesive recommended by the fireproofing manufacturer
to obtain required bond strength for the specific fireproofing and substrate. F. Apply fireproofing prior to installation of ductwork, piping, conduits, and other suspended items.
Hangers, clips and other supports for these items shall be installed before application of fireproofing. G. Examine the substrate and conditions under which fireproofing is to be applied.
Do not proceed with the fireproofing work until unsatisfactory conditions have been corrected. Verify that hangers, clips, sleeves, and other items that will penetrate the fireproofing
are in place. Check paint on substrate for compatibility with primer/fireproofing and adequacy of bond strength in accordance with fireproofing manufacturer's instructions. H. Surface
Preparation: Remove dirt, dust, oil, grease, loose paint and rust, mill scale, and other foreign matter that may impair the bonding of the fireproofing to the substrate. Clean substrate
free of contamination from chemicals and solvents. Apply primer/adhesive where necessary to obtain bond strength of fireproofing to steel shop paint and where recommended by the fireproofing
manufacturer. I. Apply the fireproofing in accordance with UL fire test report and the manufacturer's application instructions. Thickness and density of fireproofing shall be in accordance
with the approved product data and as required to produce the hourly fire resistance rating required. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 14 1.22 ACCESS PANELS A. Provide access panels for required access to respective
Contract work. Location and size shall be the responsibility of each Contract. Bear cost of construction changes necessary due to improper information or failure to provide proper
information in ample time. Access panels over 324 square inches shall have two cam locks. Provide proper frame and door type for various wall or ceiling finishes. Access panels
shall be equal to "Milcor" as manufactured by Inland Steel Products Co., Milwaukee, Wisconsin. Provide Contractor for General Trades with a set of architectural plans with size and
approximate locations of access panels shown. 1.23 FIRE PROTECTION EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting and restarting all systems which
are affected by work shown on the Contract Documents unless specifically noted otherwise. B. Provide roughing and final connections to all equipment. Provide fittings and connections,
adapters, and all necessary piping and fittings to equipment and sprinklers. Provide drain valve discharge piping from all equipment and system drains. C. Refer to Contract Documents
for roughing schedules, and equipment and lists indicating scope of connections required. 1.24 STORAGE AND PROTECTION OF MATERIALS AND EQUIPMENT A. Store Materials on dry base, at least
6 in. aboveground or floor. Store so as not to interfere with other work or obstruct access to buildings or facilities. Provide waterproof/windproof covering. Remove and provide
special storage for items subject to moisture damage. Protect against theft or damage from any cause. Replace items stolen or damaged, at no cost to Owner. B. Refer to Section 016000
- Product Requirements for additional information. 1.25 FREEZING AND WATER DAMAGE A. Take all necessary precautions with equipment, systems and building to prevent damage due to freezing
and/or water damage. Repair or replace, at no change in contract, any such damage to equipment, systems, and building. Perform first seasons winterizing in presence of Owner's operating
staff. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS
210500 - 15 1.26 OWNER INSTRUCTIONS A. Before final acceptance of the work, furnish necessary skilled labor to operate all systems. Instruct designated person on proper operation,
and care of all systems/equipment. Repeat instructions, if necessary. Obtain written acknowledgement from person instructed prior to final payment. Contractor is fully responsible
for system until final acceptance, even though operated by Owner's personnel, unless otherwise agreed in writing. List under clear plastic, operating, maintenance, and starting precautions
procedures to be followed by Owner for operating systems and equipment. 1.27 OPERATION AND MAINTENANCE MANUALS A. Prepare three (3) Operation and Maintenance Manuals. Include in each
O&M Manual, a copy of each approved Shop Drawing, wiring diagrams, piping diagrams spare parts lists, as-built drawings and manufacturer's instructions. Include typewritten instructions,
describing equipment, starting/operating procedures, emergency operating instructions, summer-winter changeover, freeze protection, precautions and recommended maintenance procedures.
Include name, address, and telephone number of installing contractor and of supplier manufacturer Representative and service agency for all major equipment items. Provide a table
of contents page and dividers based upon specification section numbers. Bind above items in a three ring binder with name of project on the cover. Deliver three (3) copies to Owner's
Representative for review before request for final acceptance. B. Operation and Maintenance Manuals shall also be submitted electronically, in PDF format on CD or flash drive. 1.28
RECORD DRAWINGS A. The Contractor shall obtain at his expense one (1) set of construction Contract Drawings, (including non-reproduction black and white prints or electronic files)
for the purpose of recording as-built conditions. B. The Contractor shall perform all survey work required for the location and construction of the work and to record information necessary
for completion of the record drawings. Record drawings shall show the actual location of the constructed facilities in the same manner as was shown on the bid drawings. All elevations
and dimensions shown on the drawings shall be verified or corrected so as to provide a complete and accurate record of the facilities as constructed. C. It shall be the responsibility
of the Contractor to mark EACH sheet of the contract documents in red and to record thereon in a legible manner, any and all approved field changes and conditions as they occur. A
complete file of approved field sketches, diagrams, and other changes shall also be maintained. At completion of the work, the complete set of red marked contract documents, plus all
approved field sketches and diagrams shall be submitted to the engineer and used in preparation of the record drawings. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 16 D. A complete set of red marked contract drawings shall
be submitted, at one time, as the "Record" set. If there are no changes to a specific drawing, the contractor shall indicate "NO CHANGES" on that drawing. ALL drawings shall be included
in the "Record" set. E. The complete set of red marked Contract Documents or electronic files shall be certified by the Contractor as reflecting record conditions and submitted to the
engineer for review. F. The Contractor shall have the marked up set scanned, if they are not already electronic files, and then submit them to the Engineer as the "Record Set". G. Refer
to Section 017839 - Project Record Documents for additional requirements. 1.29 FINAL INSPECTION A. Upon completion of all Engineering Site Observation list items, the Contractor shall
provide a copy of the Engineering Site Observation Report back to the Engineer with each items noted as completed or the current status of the item. Upon receipt, the Engineer will
schedule a final review. 1.30 CLEANING A. It is the Contractor's responsibility to keep clean all equipment and fixtures provided under this contract for the duration of the project.
Each trade shall keep the premises free from an accumulation of waste material or rubbish caused by his operations. The facilities require an environment of extreme cleanliness, and
it is the Contractor's responsibility to adhere to the strict regulations regarding procedures on the existing premises. After all tests are made and installations completed satisfactorily:
1. Thoroughly clean entire installation, both exposed surfaces and interiors. 2. Remove all debris caused by work. 3. Remove tools, surplus, materials, when work is finally accepted.
1.31 SYSTEM START-UP AND TESTING A. All new and/or altered sprinkler and standpipe systems shall be started up, tested and operated by the contractor. This work shall be completed
prior to building occupancy with the Contractor responsible for being on site during the entire operation. B. Prior to commencement of work, the Contractor(s) effecting such system
shall survey all building fire protection systems and components, including fire alarm. Prior to the conclusion of this project, the Contractor shall verify with the Project Inspector
that all building systems have been returned to their proper conditions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC FIRE SUPPRESSION REQUIREMENTS 210500 - 17 1.32 TRANSFER OF ELECTRONIC FILES A. M/E Engineering, P.C. will provide electronic files for the Contractor's
use in the preparation of sheetmetal shop drawings, coordination drawings, or record drawings related to the project, and the following terms and conditions: 1. The Contractor shall
submit a formal request for electronic drawing files on the M/E Engineering, P.C. website, by utilizing the following website link: www.meengineering.com/contractor_request.php. 2.
M/E Engineering, P.C.'s electronic files will be exported from MicroStation into DWG/DXF files that are compatible with AutoCad as requested. M/E Engineering, P.C. makes no representation
as to the compatibility of these files with the Contractor's hardware or the Contractor's software beyond the specific release of the referenced specifications. 3. M/E Engineering can
only provide CAD files of M/E/P/FP drawing levels for which we are the Engineer of Record. CAD files of Architectural backgrounds, reflected ceiling plans, structural plans, etc. must
be obtained separately from the Architect of Record. 4. Data contained on these electronic files is part of M/E Engineering, P.C.'s instruments of service shall not be used by the Contractor
or anyone else receiving data through or from the Contractor for any purpose other than as convenience in the preparation of shop drawings for the referenced project. Any other use
or reuse by the Contractor or by others will be at the Contractor's sole risk and without liability or legal exposure to M/E Engineering, P.C. The Contractor agrees to make no claim
and hereby waive, to the fullest extent permitted by law, any claim or cause of action of any nature against M/E Engineering, P.C., its officers, directors, employees, agents or sub-consultants
which may arise out of or in connection with the Contractor's use of the electronic files. 5. Furthermore, the Contractor shall, to the fullest extent permitted by law, indemnify and
hold harmless, M/E Engineering, P.C. from all claims, damages, losses and expenses, including attorney's fees arising out of or resulting from the Contractor's use of these electronic
files. 6. These electronic files are not contract documents. Significant difference may arise between these electronic files and corresponding hard copy contract documents due to addenda,
change orders or other revisions. M/E Engineering, P.C. makes no representation regarding the accuracy or completeness of the electronic files the Contractor receives. In the event
that a conflict arises between the signed contract documents prepared by M/E Engineering, P.C. and electronic files, the signed contract documents shall govern. The Contractor is responsible
for determining if any conflicts exist. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC
FIRE SUPPRESSION REQUIREMENTS 210500 - 18 By the Contractor's use of these electronic files the Contractor is not relieved of the Contractor's duty to comply with the contract
documents, including and without limitation, the need to check, confirm and coordinate all dimensions and details, take field measurements, field verify conditions and coordinate the
Contractor's work with that of other contractors for the project. END OF SECTION 210500 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SYSTEM VALVES 210523 - 1 SECTION 210523 - FIRE SUPPRESSION SYSTEM VALVES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor,
materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract Document. 1.2 SUBMITTALS A. Submit manufacturer's
data in accordance with Basic Fire Suppression Requirements. Obtain approval prior to ordering material. B. Provide submittals for all items specified under Part 2 of this section.
PART 2 - PRODUCTS 2.1 VALVES A. General: Valves shall have the following requirements: 1. Working pressure stamped or cast on bodies. 2. Stem packing serviceable without removing valve
from line. 3. UL listed and FM approved and labeled for intended fire protection service. Sprinkler systems 175 WWP; stamped/cast on body. 4. All valves shall be provided with tamper
switches unless noted otherwise. B. Acceptable Manufacturers: 1. Gate Valves: Kennedy, Mueller, Nibco, Stockham, Victaulic, Watts. 2.2 MISCELLANEOUS A. Trim and Test Valves: Ball,
plug, angle or globe type; bronze body; threaded ends; UL listed. 1. Ball Valves: Bronze two-piece body, full port, threaded ends, chrome plated ball, blowout proof stem, reinforced
TFE seats, 300 psi working pressure, UL listed, FM approved; Nibco Model KT-585-70-UL. B. Hose Thread Drain Valves: 1. Ball Valve: Bronze body, hardened chrome ball with hose thread
end, cap and chain; Watts #B6001CC (sweat connection), Watts #B6000CC (threaded connection). TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SYSTEM VALVES 210523 - 2 PART 3 - EXECUTION 3.1 INSTALLATION A. Provide all shutoff, check, drain and other type
valves as required by Code as indicated and as required for proper system maintenance, isolation and safety. B. Locate valves for easy access and provide separate support where necessary.
Install valves with stems at or above the horizontal position. Install swing check valves in horizontal position with hinge pin level. C. Provide hose thread drain valves at all low
points to enable complete drainage of all portions of the system. Provide each drain valve with a threaded cap. D. Install valves per respective listing/approval. E. Use 250 WWP,
FM approved anti-water hammer check valves at discharge and bypass of fire pumps, otherwise use swing type. F. Use ball valves for auxiliary drains and inspector test valves on dry
pipe and pre-action systems. END OF SECTION 210523 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 FIRE PROTECTION IDENTIFICATION 210553 - 1 SECTION 210553 - FIRE PROTECTION IDENTIFICATION PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and
services as required for the complete installation designed in Contract Documents. 1.2 QUALIFICATIONS A. All identification devices shall comply with ANSI A13.1 for lettering size,
length of color field, colors, and viewing angles. 1.3 SUBMITTALS A. Submit manufacturer's technical product data and installation instructions for each identification material and
device. Submit valve schedule for each piping system typewritten on an 8-1/2 in. x 11 in. paper (minimum), indicating code number, location and valve function. Submit schedule of
pipe, equipment and name identification for review before labeling. 1.4 ACCEPTABLE MANUFACTURERS A. Allen Systems, Inc., Brady (W.H.) Co.; Signmark Div., Emedco, Industrial Safety Supply
Co., Inc., Lab Safety Supply, Seton Name Plate Corp. PART 2 - PRODUCTS 2.1 GENERAL A. Provide manufacturer's standard products of categories and types required for each application.
In cases where there is more than one type specified for an application, selection is installer's option, but provide single selection for each product category. B. All adhesives used
for labels in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC) limits as called for in the current version of U.S. Green Building Council LEED
Credits EQ 4.1 and EQ 4.2. 2.2 PIPING IDENTIFICATION A. Identification Types: 1. Snap-on type: Provide manufacturer's standard pre-printed, semi rigid snap-on, color coded pipe markers,
complying with ANSI-A13.1. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE PROTECTION
IDENTIFICATION 210553 - 2 2. Pressure sensitive type: Provide manufacturer's standard pre-printed, permanent adhesive, color coded, pressure sensitive vinyl pipe markers complying
with ANSI A13.1. Provide a 360° wrap of flow arrow tape at each end of pipe label. 3. Stencil paint: Apply black or yellow stencil paint directly to covering or bare pipe; color to
contrast with background. Stencil as follows: O.D. PIPE OR COVERING SIZE STENCIL LETTER 3/4 in., 1 in., 1-1/4 in. 1/2 in. 1-1/2 in., 2 in. 3/4 in. 2-1/2 in. and over 1-1/4 in. B. Lettering:
1. Piping labeling shall conform to the following list: PIPE FUNCTION IDENTIFICATION Fire Protection Water FIRE PROTECTION WATER 2.3 EQUIPMENT IDENTIFICATION A. General: 1. Provide
engraved vinyl nameplates for each major piece of mechanical equipment provided, 2-1/2 in. x 3/4 in. size. PART 3 - EXECUTION 3.1 GENERAL A. Provide piping identification with directional
flow arrows for all piping provided on project, maximum every 20'-0" or piping installed through rooms, provide at least one pipe label in each room, for each pipe function. END OF
SECTION 210553 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS
AND ACCESSORIES 211010 - 1 SECTION 211010 - FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services
to perform operations required for the complete installation and related Work as required in Contract Documents. 1.2 SUBMITTALS A. Provide a schedule of pipe materials, fittings and
connections to be utilized on this project. B. Provide a detailed matrix listing the specific UL approved firestop system assembly to be used for each type of piping provided and
each type of construction to be penetrated along with all associated UL assembly details. PART 2 - PRODUCTS 2.1 GENERAL A. Pipe and fittings shall be new, marked with manufacturer's
name and comply with applicable ASTM and ANSI Standards. 2.2 STEEL PIPING AND FITTINGS A. Pipe: ASTM A53, or ASTM A106 seamless, Schedule 40 weight; black finish as called for; ends
chamfered for welding or grooved for grooved mechanical connections. B. Fittings: Same material and pressure class as adjoining pipe. 1. Welded Fittings: Factory forged, seamless
construction, butt weld type chamfered ends. Where branch connections are two or more sizes smaller than main size, use of "Weldolets", "Thredolets" or "Sockolets" acceptable. Mitered
elbows, "shaped" nipples, and job fabricated reductions not acceptable unless specifically called for. Socket weld type, 2000 psi wp, where called for. 2. Threaded Fittings: Class
125, cast or malleable iron, black or galvanized, as called for; UL listed and FM approved for fire protection systems. Street type 45° and 90° elbows are not acceptable. C. Flanges,
Unions, and Couplings: 1. Threaded Connections: a. Flanges: Cast iron companion type; for sizes 2-1/2 in. and larger. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 2 b. Unions: Malleable iron, bronze to iron
seat, 300 lb. wwp; for sizes 2 in. and smaller. c. Couplings: Malleable iron. Steel thread protectors are not acceptable as couplings. 2. Welded Connections: a. Flanges: Welding
neck type. Slip-on type not allowed unless noted and shall not be installed in conjunction with butterfly valves. 3. Grooved Mechanical Connections: a. Couplings: Ductile iron, ASTM
A395 and ASTM A536, with painted coating, designed for rolled grooved piping, hot dipped galvanized finish complying with ASTM A153 where called for. b. Gaskets: Grade "E" EPDM synthetic
rubber, -30°F to 230°F temperature range, suitable for water service. c. Bolts and Nuts: Heat treated, hex head carbon steel, ASTM A183, cadmium plated or zinc electroplated. d. Fittings:
Elbows, tees, laterals, reducers, adapters as required shall be ductile iron conforming to ASTM A395 and A536. Fittings shall have grooves designed to accept grooved end couplings
of the same manufacturer. e. Victaulic, rigid system, Style 005 couplings cast with offsetting angle pattern bolt pads to provide system rigidity and support in accordance with ANSI
B31.1 and B 31.9. UL listed and FM approved; 300 psi wwp; follow all terms of listings/approvals. f. Acceptable Manufacturers: Grinnell, Gruvlok by Anvil, Victaulic or approved equal.
D. Gauge and Instrument Connections: Nipples and plugs for adapting gauges and instruments to piping system shall be IPS brass. 2.3 THINWALL STEEL PIPE A. Pipe: ASTM A53, or A135,
with Schedule 10 wall thickness for 2-1/2 in. through 5 in.; 0.134 in. for 6 in. and 0.188 in. for 8 in. and 10 in.; black or galvanized finish as called for; roll grooved ends. B.
Fittings: Same construction as noted for steel pipe, ends roll grooved for grooved mechanical connections. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 3 2.4 COPPER TUBE AND FITTINGS A. Pipe: ASTM B88; Type L,
hard temper. Plans show copper tube sizes. B. Tees, Elbows, and Reducers: Wrought copper, ASME B16.22 or cast bronze, ASME B16.18; solder end connections. C. Unions and Flanges:
2 in. and smaller use unions, solder type, cast bronze, ground joint, 150 lb. swp: 2-1/2 in. and over use flanges, cast bronze, companion type, ASME drilled, solder connection, 150
lb. swp. D. Solder Materials: No-lead solder, using alloys made from tin, copper, silver and nickel. Harris, Inc., "Stay-Safe 50" and "Bright", Engelhard "Silvabright 100", Canfield
"Watersafe" or approved equal. E. Brazing Materials: Class BcuP-5 for brazing copper to brass, bronze to copper. Harris, Inc. "Stay-Silv 15" or approved equal. 2.5 SPECIAL FITTINGS
A. Copper to Cast Iron: Cast bronze, cast iron to sweat adapter. B. Copper to Steel Piping: 1. Cast bronze copper to iron male or female adapter with shoulder for drainage piping only.
2. Dielectric pipe fittings. C. Steel to Cast Iron: Cast iron soil pipe connector with spigot and IPS male thread end (Manhoff fittings). 2.6 DIELECTRIC PIPE FITTINGS A. Description:
Assembly or fitting having insulating material isolating joined dissimilar metals to prevent galvanic action and stop corrosion. B. Unions: Factory fabricated, for 250 psi minimum
working pressure at 180°F, threaded or solder ends, insulating material suitable for system fluid, pressure and temperature. C. Flanges: Factory fabricated, companion flange assembly,
for 150 or 300 psig minimum pressure to suit system fluid pressures and temperatures with flange insulation kits and bolt sleeves. D. Acceptable Manufacturers: EPCO, Capitol Manufacturing,
Victaulic, Watts or approved equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION
PIPING SYSTEMS AND ACCESSORIES 211010 - 4 2.7 HANGERS, INSERTS AND SUPPORTS A. Hangers, Inserts, Clamps: B-Line, Grinnell, Michigan Hanger, PHD Manufacturing. B. Hangers: 1.
Adjustable, wrought malleable iron or steel with electroplated zinc or cadmium finish. Copper plated or PVC coated where in contact with copper piping. Hotdipped galvanized finish
for exterior locations. 2. Adjustable ring type where piping is installed directly on hanger for piping 3 in. and smaller. 3. Adjustable steel clevis type for piping 4 in. and larger.
4. Nuts, washers and rods with electroplated zinc or cadmium finish. Hot-dipped galvanized finish for exterior locations. C. Spacing Schedule (Maximum Distance between Hangers (ft.-in.):
NOMINAL PIPE SIZE (IN.) 3/4 1 1-1/4 1-1/2 2 2-1/2 3 3-1/2 4 5 6 8 Steel Pipe N/A 12-0 12-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 Copper Tube 8-0 8-0 10-0 10-0 12-0 12-0 12-0
12-0 15-0 15-0 15-0 15-0 Rod Size (in.) 3/8 3/8 3/8 3/8 3/8 3/8 3/8 3/8 3/8 1/2 1/2 1/2 D. Beam Attachments: 1. C-Clamp style, locknut, restraining strap, electroplated finish, UL listed,
FM approved for pipe sizes 2 in. and smaller, complying with NFPA 13 and 14. 2. Center loaded style with clamp attachments that engage both edges of beam, electroplated finish, UL listed,
FM approved, for pipe sizes larger than 2 in., refer to "Supports" for additional requirements, complying with NFPA 13 and 14. E. Inserts: Carbon steel body and square insert nut,
galvanized finish, maximum loading 1300 lbs., for 3/8 in. to 3/4 in. rod sizes, reinforcing rods on both sides, MSS-SP-69 Type 19 or approved equal, complying with NFPA 13 and 14. F.
Supports: 1. For all piping larger than 2 in., provide intermediate structural steel members for hanger attachment. Members shall span across the bar joists at panel points of joists.
Secure member to structure. Select size of members based on a minimum factor of safety of four. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 5 2. For weights under 1,000 lbs.: "Drill-In" inserts, "U" shaped Channel,
beam clamps or other structurally reviewed support. The factor of safety shall be at least four. Follow manufacturer's recommendations. 3. For Metal Decks: Drill hole through for
hanger rods and imbed a welded plate in concrete or use devices designed for this application, with a safety factor of four. 4. Acceptable Manufacturers: Hilti, ITW Ramset, Phillips
"Red Head" or approved equal. G. Hangers for fire protection piping as specified and in accordance with NFPA 13 and NFPA 14. Hangers and building attachments shall be UL listed and
FM approved for fire protection service. Adjustable swivel ring type hangers are permitted for 3 in. and smaller piping. 2.8 PIPING ACCESSORIES A. Escutcheon Plates: Steel or cast
brass, split hinge type with setscrew, high plates where required for extended sleeves. Chrome plated in finished areas. B. All bushings and nipples required for instruments and gauges
shall be brass. 2.9 SLEEVES A. Standard Type: 1. Schedule 40 black steel pipe sleeves for structural surfaces, two (2) pipe sizes larger than the pipe, and as recommended by the sealing
element manufacturer. Provide full circle water stop collar for sleeves located within below grade walls, wet wells and waterproofed surfaces. The collar shall be fabricated from
steel plate and welded to the sleeve around its entire circumference. 2. Schedule 40 PVC sleeves or sheet metal sleeves for nonstructural surfaces and existing construction. Sheet
metal sleeves shall be 18 gauge minimum and braced to prevent collapsing. 2.10 SEALING ELEMENTS A. Expanding neoprene link type, watertight seal consisting of interlocking links with
zinc plated bolts. 1. Acceptable Manufacturers: Thunderline "Link-Seal" Series 200, 300 or 400, Pyropac, Calipco. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 6 2.11 FIRESTOP SYSTEM FOR OPENINGS THROUGH FIRE RATED
WALL AND FLOOR ASSEMBLIES A. Materials for firestopping seals shall be listed by an approved independent testing laboratory for "Through-Penetration Firestop Systems". The system shall
meet the standard fire test for Through-Penetration Firestop Systems designated ASTM E814. Firestop system seals shall be provided at locations where piping pass through fire rated
wall, floor/ceiling, or ceiling/roof assembly. Minimum required fire resistant ratings of the assembly shall be maintained by the Firestop System. Installation shall conform to the
manufacturer's recommendations and other requirements necessary to meet the testing laboratory's listing for the specific installation. 2.12 PIPING MATERIALS AND SCHEDULE A. See Exhibit
"A" - Piping Materials at end of this Section for Fire Protection piping. B. See Exhibit "B" - Testing at end of this Section for Fire Protection piping. 3.1 EQUIPMENT AND SYSTEMS A.
Install equipment and systems in accordance with provisions of each applicable section of these Specifications, and Local/State Codes/Regulations having jurisdiction. Accurately establish
grade and elevation of piping before setting sleeves. Install piping without springing or forcing, except where specifically called for, making proper allowance for expansion and anchoring.
Changes in size shall be made with reducing fittings. Reducing couplings are not acceptable. Arrange piping at equipment with necessary offsets, unions, flanges, and valves, to allow
for easy part removal and maintenance. Offset piping and change elevation as required, to coordinate with other work. Avoid contact with other mechanical or electrical systems. Provide
adequate means of draining and venting systems. Conceal piping unless otherwise called for. B. Copper tubing shall be cut with a wheeled tubing cutter or other approved copper tubing
cutter tool. The tubing must be cut square to permit proper joining with the fittings. Ream pipes after cutting and clean before installing. C. Cap or plug equipment and pipe openings
during construction. Install piping parallel with lines of building, properly spaced to provide clearance for insulation. Make changes in direction and branch connections with fittings.
Do not install valves, unions and flanges in inaccessible locations. Materials within a system and between systems shall be consistent. If this is not possible, install dielectric
fittings. 3.2 PIPING OVER ELECTRICAL EQUIPMENT A. Contractor shall route piping to avoid installation directly over electric equipment, including, but not limited to panels, transformers,
disconnects, starters, motor control center, adjustable speed drives and fused switches. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 7 B. Piping shall not be installed in the dedicated electric and working
space as defined by NEC 110. Dedicated electrical space is generally equal to the depth and width of electrical equipment, and extends 6 ft. above the electrical equipment, or to a
structural ceiling. Dedicated working space is a minimum of 30 in. wide or the width of equipment (whichever is larger) a minimum of 6 ft.-6 in. tall, with a depth of 3ft. to 9 ft.
depending on the voltage. 3.3 HANGERS, INSERTS AND SUPPORTS A. Piping shall not be supported by wires, band iron, chains, from other piping, or by vertical expansion bolts. Support
piping with individual hangers from concrete inserts, wood construction, welded supports, or beam clamps of proper configuration and loading design requirements for each location; replace
if not suitable. Follow manufacturer's safe loading recommendations. Suspend with rods of sufficient length for swing and of size called for, using four (4) nuts per rod. Provide
additional structural steel members, having one coat rustproof paint, where required for proper support. Provide oversized hangers on diesel engine exhaust piping where insulation/supports
must pass between pipe and hanger. Hangers, when attached to joists, shall only be placed at the top or bottom chord panel point. Only concentric type hangers are permissible on piping
larger than 2-1/2 in.; "C" types are permitted for piping 2 in. and smaller on joists. Provide riser clamps for each riser at each floor. 3.4 PIPE CONNECTIONS A. Threaded Connections:
Clean out tapering threads, made up with pipe dope; screwed until tight connection. Pipe dope must be specifically selected for each application. B. Grooved Mechanical Joints: Pipes
joined with grooved fittings shall be joined by a listed combination of fittings, couplings, gaskets and grooves of a single manufacturer. Lubricate and install gasket and couplings.
Follow manufacturer's recommendations. Grooved ends shall be clean and free of indentations, projections and roll marks in the area from pipe end to groove. C. Brazed Connections:
Make joints with silver brazing alloy in accordance with manufacturer's instructions. Remove working parts of valves before applying heat. D. Dielectric Pipe Fittings: Protect fittings
from excessive heat. 3.5 WELDING A. Welding shall be performed in compliance with the welding procedure specifications prepared by the National Certified Pipe Welding Bureau. Welded
piping fabricated by qualified welder. Use certified welder where specifically required by code or insurance company. If indicated and permitted for fire protection systems, all provisions
for welded pipe shall additionally be in accordance with NFPA Standard 13. Use full length pipe where possible; minimum distance between welds, 18 in. on straight runs. Welds must
be at least full thickness of pipe with inside smooth and remove cutting beads, slag and excess material at joints; chamfer ends. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 8 Minimum gap 1/8 in., maximum 1/4
in., for butt welds. Overlaps on position and bench welds to be not less than 3/4 in. One internal pass and one external pass minimum required on slip-on flanges. Do not apply heat
to rectify distorted pipe due to concentrated welding; replace distorted pipe. B. When welding galvanized pipe, apply cold galvanizing on joint following welding. 3.6 SLEEVES A. Provide
for pipes passing through floors, walls or ceilings. Not required for floors that are core-drilled, except where floor is waterproofed. Extend 1/8 in. above finished floor in finished
areas. In above grade Mechanical Rooms and other areas with floor drains use steel pipe sleeves 2 in. above floor. Use steel pipe sleeves in bearing wall, structural slabs, beams
and other structural surfaces, and where called for. Sleeves shall be as small as practical, consistent with insulation, so as to preserve fire rating. Fill abandoned sleeves with
concrete. Provide rubber grommet seals for pipes passing through ducts or air chambers or built-up housings. 3.7 SLEEVE PACKING A. Seal void space at sleeves as follows: 1. Interior
locations: Firmly pack with fiberglass and caulk. 2. Exterior walls above grade: Use sealing element. 3. Exterior walls below grade and above floors: Use sealing element. 4. Cored
holes: Use sealing element. 5. Fire rated, partitions and floor slabs: Use fire rated sealing elements, materials and methods. Provide per manufacturer's instructions to maintain
firestop. 6. Waterproofed walls/floors: Use waterproof sealing element, device or compound. 3.8 ESCUTCHEON PLATES A. Provide polished chrome setscrew type escutcheon plates for all
exposed piping passing through floors, walls or ceilings, in all rooms except in Boiler, Fan and Mechanical Rooms. 3.9 TESTS A. Fire suppression systems shall be hydrostatically tested
at 200 psi for two (2) hours in accordance with NFPA 13 and 14. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 9 B. Provide all necessary items to complete proper testing of work. Perform all testing in accordance
with governing Codes, local utilities and other agencies having jurisdiction and as specified. Pay all costs to perform tests. Perform all testing in a safe manner. Isolate existing
systems. 3.10 PIPE LINE SIZING A. Pipe sizes called for are to be maintained. Pipe size changes made only as reviewed by Owner's Representative and shall be justified by hydraulic
calculations. Where discrepancy in size occurs, the larger size shall be provided. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION PIPING SYSTEMS AND ACCESSORIES 211010 - 10 EXHIBIT "A" - PIPING MATERIALS (Notes at end of Exhibit "A") SERVICE PIPE MATERIALS
FITTINGS CONNECTIONS Sprinkler (wet) Schedule 40, black steel, 2 in. and smaller Cast or malleable iron Threaded Schedule 10, black steel 2-1/2 in. and larger Ductile iron Roll grooved
mechanical type couplings NOTES FOR EXHIBIT A: NOTE 1: Provide schedule 40 galvanized steel pipe and fittings for all aboveground exterior locations passing through exterior walls such
as downstream of inspector's test and auxiliary drain valves, between fire department connection and associated check valve, and where called for. EXHIBIT "B" - TESTING SERVICE TEST
REQUIREMENTS Sprinklers Test hydrostatically at 200 psi for two (2) hours in accordance with NFPA 13. END OF SECTION 211010 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 1 SECTION 211300 - FIRE SUPPRESSION SPRINKLER SYSTEMS PART
1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract
Documents. 1.2 QUALITY ASSURANCE A. Comply with the 2020 International Code referenced edition of the following National Fire Protection Association (NFPA) Standards: 1. NFPA 13: Standard
for the Installation of Sprinkler Systems. 2. NFPA 25: Inspection, Testing and Maintenance of Water-Based Fire Protection Systems. 3. NFPA 72: National Fire Alarm Code. 4. NFPA 241:
Standard for Safeguarding Construction, Alteration and Demolition Operations. B. Follow all requirements, recommendations and appendices to comply with the latest edition of the following
publications, codes, standards, and listings/approvals: 1. Factory Mutual Engineering Corporation (FM) Approval Guide. 2. Underwriters Laboratories, Inc. (UL) Fire Protection Equipment
Directory. 3. 2020 International Fire Code. 4. 2017 Uniform Code Supplement. 5. OSHA Rules and Regulations. 6. Requirements of Insurance Underwriter and other Authorities Having Jurisdiction.
7. Requirements of the City of Ithaca and City of Ithaca Fire Department. C. Equipment, devices, hangers and components shall be UL listed or and FM approved and labeled for the intended
fire protection service. D. The fire protection work shall be performed by an experienced firm regularly engaged in the installation of fire protection sprinkler systems. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 2 E. Preparation
of working plans, calculations and site observation of systems shall be completed by a NICET Level III technician under the direction of a qualified New York State Registered Professional
Engineer. 1.3 SYSTEM DESCRIPTION A. The fire protection system shall be a wet pipe automatic sprinkler system arranged to properly protect all spaces. Sprinklers shall be supplied
from a Class I manual wet standpipe system unless otherwise noted. B. Water is supplied from a 12 in. municipal water main located at Oak Avenue, through a 6 in. underground water main
to the system's main riser. Water supply data at the municipal main indicates the following: 1. 94 psi static. 2. 68 psi residual with 791 gpm flowing. C. The residual hydrant is located
at Oak Avenue with the flow hydrant located at College Avenue and Dryden Road. The flow test information above is submitted for information only. This contractor shall arrange for
a new flow test on the municipal main prior to performing hydraulic calculations. These results shall be used as the basis of design. D. An existing fire department connection shall
allow the servicing fire department to augment the system's normal automatic water supply. E. The system shall be hydraulically calculated in accordance with all provisions of the Contract
Documents and any Authority Having Jurisdiction. F. Use of room design method will not be permitted. Calculations shall be based upon the specific hazard for the areas being protected.
The following minimum requirements shall be provided as actually installed in the protected spaces. 1. Ordinary Hazard Group 1: All basement and first floor areas. a. Water density:
0.15 gpm/sq. ft. b. Hydraulic remote area: 1500 sq. ft. c. Interior hose demand: 250 gpm. d. Exterior hose demand: 0 gpm. G. Maximum coverage for any sprinkler head shall not exceed
NFPA requirements and the listing for the sprinklers provided. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 3 H. A minimum 10% safety factor shall be provided between the available municipal water supply curve and the total
system demand point. The total system demand point shall be at the municipal water main and include the calculated sprinkler and interior hose stream demands plus the exterior hose
stream demand at the residual pressure required for proper system operation. I. The maximum flow velocity shall not exceed 20 ft. per second in the piping system and 15 ft. per second
in mains with paddle type waterflow indicators. J. Water supply control valves shall be electrically supervised and mechanically locked for proper position. Waterflow and supervisory
circuits shall be in accordance with the requirements of electrical specifications. Electric connections to sprinkler system shall be by Division 26. Furnish wiring diagrams for all
equipment to project's electrical contractor and in the submittals. K. Provide 3/16 in. x 1 in. cadmium plated carbon steel chains and master keyed all brass case hardened padlocks
to lock water supply valves in the proper position. 1.4 SUBMITTALS A. Product Data: 1. Submit manufacturer's catalog cut, specifications and installation instructions for each item
or component of fire protection system. Clearly indicate pertinent information such as, but not limited to: a. Manufacturer's model number. b. Materials, size, finish and type of connection.
c. Pressure ratings of components. d. FM approval/UL listing. B. Certification: Submit Contractor's NICET certification and number. C. Samples: 1. If requested, submit sample of sprinklers.
D. Drawings and Calculations: 1. All drawings and hydraulic calculations shall be signed and sealed by a New York State Registered Professional Engineer. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 4 2. Submit complete
NFPA 13 drawings and hydraulic calculations with cross reference to applicable drawings, water supply data, and equipment schedule with ratings for the system to the Owner's Representative,
Insurance Underwriter, and other Authorities Having Jurisdiction. Drawings shall include complete building and stair tower cross sections. 3. Submit hydraulic calculations for each
design density/remote area with items in NFPA 13 incorporated including sketches to indicate flow quantities, sprinklers operating and direction of flow for pipes in looped and gridded
systems. 4. Drawings shall be fabrication drawings provided to indicate actual sprinkler, standpipe and equipment layouts. Drawings shall be 1/4" = 1'-0" scale on reproducible sheets
of uniform size. Drawings shall show all data required and listed by NFPA 13, chapter 23. 5. Submit all drawings and hydraulic calculations in one (1) complete package. E. Record Drawings
and Documents: 1. Submit Record Drawings, hydraulic calculations, test reports, and NFPA Above and Below Ground Material and Test Certificates to the Owner's Representative, Insurance
Underwriter and other Authorities Having Jurisdiction. PART 2 - PRODUCTS 2.1 GENERAL A. Mixing of manufacturers or models of the same or similar component will not be acceptable. 2.2
PRESSURE GAUGES A. Water Pressure Gauge: 1. Anodized aluminum case, 3-1/2 in. diameter, glass lens, brass movement, 1/4 in. NPT male bottom connection with gauge cock. 2. 0 to 300 psi
range, in 5 psi increments with accuracy to meet ANSI B40.1. 2.3 SPRINKLERS AND ACCESSORIES A. Brass or bronze, 1/2 in. orifice, 1/2 in. NPT. 165°F and 200°F intermediate temperature
classification for ordinary hazards. Use 286°F sprinklers in Mechanical, Electrical and Elevator Rooms; in vicinity of heat equipment/sources (all cooling equipment); and in accordance
with NFPA 13. Use 200°F sprinklers in all kitchen spaces. 1. Finished Ceiling Areas: White polyester finish sprinklers, concealed pendent sprinklers with matching coverplate, Reliable
Model F1FR56. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS
211300 - 5 2. Unfinished Ceiling Areas: Natural brass/bronze finish pendent or upright sprinklers as required. B. Sprinkler Types and Design Equipment: 1. Quick Response Pendent
and Upright: Reliable Model F1FR56. 2. Quick Response Concealed Pendent: Reliable Model F1FR56. 3. Quick Response Dry Pendent and Horizontal Sidewall: Reliable Model F3QR. C. Flexible
Sprinkler Drops: 1. FM Approved braided Type 304 stainless steel tube with union joints, factory tested to 400 psi and listed for up to three (3) 90° bends including bracket for mounting
to ceiling or building structure. a. Design Equipment: Victaulic "VicFlex". D. Sprinkler Guards: 1. Steel wire cage with base plate and retaining clamps. Same manufacturer as sprinkler.
2. Design Equipment: Reliable Model C-1. E. Sprinkler Cabinets and Spare Sprinklers: 1. Steel or aluminum construction with shelves and shell holes to accommodate the number of spare
sprinklers required by NFPA 13. 2. Bright red finish with hinged front door and label. 3. Sprinkler wrenches compatible for each type used. 4. Spare sprinklers for each system of the
type and proportion of those used in each system. 5. Design Equipment: Reliable Model A-4. F. Acceptable Manufacturers: Reliable, Tyco, Victaulic, Viking or approved equal. 2.4 INSPECTOR'S
TEST EQUIPMENT A. Test and Drain Valve: 1. Combined test and drain valves, sight glass and interchangeable restricting orifice, pressure relief, sized for smallest orifice in sprinkler
zone. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS
211300 - 6 2. Design Equipment: AGF Manufacturing "Test and Drain", Model M1011A. 3. Acceptable Manufacturers: AGF Manufacturing, Viking, Victaulic or approved equal. 2.5 SYSTEM
COMPONENT IDENTIFICATION A. At control, test and drain valves, provide permanently marked identification signs constructed of 18 gauge steel with baked enameled finish. The signs shall
be permanently mounted on the piping or wall at the valve, or on the valve, but shall not be hung on the valve with wires or chains which permits easy removal of the sign. The sign
shall clearly indicate the valve's purpose and what portion of the structure it serves. Additional signs, shall be provided at each alarm check and dry pipe valve to clearly indicate
hydraulic calculation data. 2.6 ADDITIONAL SPRINKLERS AND SPRINKLER GUARDS A. Include allowance for providing 10 additional sprinklers with required piping, fittings, hangers and 5
additional sprinkler guards installed at locations where job conditions or equipment selections may be required. Provide a credit for sprinklers and guards not installed. PART 3 -
EXECUTION 3.1 INSTALLATION A. The nature of the work requires coordination with other trades. Shop fabrication shall be done at the Contractor's risk. Relocation of piping and components
to avoid obstructions may be necessary. Relocation, if required, shall be done at the Contractor's expense. The installation shall be performed in a workmanlike manner as determined
by the Owner's Representative and in accordance with the Contract Documents, manufacturer's printed installation instructions, and submitted and Owner's Representative reviewed drawings.
B. Piping shall not pass directly over electric panelboards, switchboards, motor control centers, and similar electric and telephone equipment. However, protection for these spaces
shall be provided. Refer to details on the drawings. C. Piping shall be installed concealed above finish ceiling area with sprinklers located in the center points of ceiling tiles
where ceiling tiles are used. All concealed sprinklers shall be white finish. D. Provide a readily removable flushing connection consisting of a cap at each end of cross mains. E.
Provide sprinkler guards for sprinklers in mechanical and storage spaces, less than 8 ft. above finished floor subject to mechanical damage. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 7 F. Pipe ball drip valves at a floor
drain or to the exterior. Pipe 2 in. main drains and water motor gong drains to discharge to the exterior at approximately 2 ft. above finished grade. G. Securely install the spare
sprinkler cabinets to the building wall in Room N002. H. Inspector's test valves shall be installed 7 ft. or less above the finished floor. I. Fire department connections shall be installed
3 ft. above finished grade and horn/strobe units approximately 10 ft. above finished grade. J. Upright sprinklers directly on branch lines shall be installed with their frame parallel
to the piping. K. Provide sprinkler protection under ductwork, groups of ductwork and other obstructions to water spray and distribution. Use intermediate level sprinklers if subject
to waterspray from above. L. Exposed pipe shall be left clean for painting. M. Coordinate and activate the systems or portions of the system to operational status as soon as possible.
3.2 PIPING, VALVES AND HANGERS A. Refer to other applicable sections. B. All piping shall be installed to permit drainage of the system through a main drain valve. Where a change in
piping direction prevents drainage of the system, auxiliary drains shall be provided. The auxiliary drain assembly shall consist of a lockable ball valve, nipple and cap or plug and
shall be located 7 ft. or less above the finished floor. Pipe drain to an accessible location. 3.3 TESTS A. General: 1. Pipe installation shall be inspected by Owner's Representative
prior to being covered by building construction or backfill. 2. Give the Owner's Representative advance notice of final tests. Perform tests in a safe manner. Provide written certification
that tests have been successfully completed. Use NFPA Above and Below Ground Material and Test Certificate Forms. 3. Correct system leaks prior to final test. Do not utilize water
additives, caulking, etc. to correct leaks. Provide appliances, equipment, instruments, devices and personnel. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FIRE SUPPRESSION SPRINKLER SYSTEMS 211300 - 8 4. Flushing: Follow Contract Documents and utilize open end pipe
sections if possible. B. Pressure Tests: 1. Hydrostatic Tests: Minimum 200 psi and in accordance with NFPA 13 for two (2) hours. a. Air test not accepted as final test. 2. Do not subject
existing systems to excess pressures. C. Alarm Tests: 1. Demonstrate activation of all existing alarms on the project (serving the project spaces). 3.4 SYSTEM TURNOVER A. Prior to final
acceptance, instruct the Owner's Representative in the proper operation, maintenance, testing, inspection and emergency procedures for all systems furnished, for a period of time as
needed. Provide one (1) new original pamphlet of NFPA 25. Indicate in writing to the Owner's Representative the provisions for proper maintenance, testing, and inspection of the systems
as required by local fire codes. END OF SECTION 211300 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 BASIC PLUMBING REQUIREMENTS 220500 - 1 SECTION 220500 - BASIC PLUMBING REQUIREMENTS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, tools, materials, accessories,
parts, transportation, taxes, and related items, essential for installation of the work and necessary to make work, complete, and operational. Provide new equipment and material unless
otherwise called for. References to codes, specifications and standards called for in the specification sections and on the drawings mean, the latest edition, amendment and revision
of such referenced standard in effect on the date of these contract documents. All materials and equipment shall be installed in accordance with the manufacturer's recommendations.
B. Provide all labor and materials required to provide complete and operational plumbing systems for the building. 1.2 LICENSING A. The Contractor shall hold a license to perform the
work as issued by the authority having jurisdiction. B. Plumbing contract work shall be performed by, or under, the direct supervision of a licensed master plumber licensed by the City
of Ithaca). C. Electrical contract work shall be performed by, or under, the direct supervision of a licensed electrician. 1.3 PERMITS A. Apply for and obtain all required permits and
inspections, pay all fees and charges including all service charges. Provide certificate of approval from the Authority having jurisdiction prior to request for final payment. 1.4
CODE COMPLIANCE A. Provide work in compliance with the following: 1. 2020 Building Code of New York State. 2. 2020 Existing Building Code of New York State. 3. 2020 Fire Code of New
York State. 4. 2020 Plumbing Code of New York State. 5. 2020 Mechanical Code of New York State. 6. 2020 Fuel Gas Code of New York State. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 2 7. 2020 Property Maintenance Code of New
York State. 8. 2020 Energy Conservation Code of New York State 9. Accessible and Usable Buildings and Facilities, ICC A117.1 (2009). 10. New York State Department of Labor Rules and
Regulations. 11. New York State Department of Health. 12. National Electrical Code (NEC) 13. Occupational Safety and Health Administration (OSHA). 14. Local Codes and Ordinances. 15.
Life Safety Code, NFPA 101. 16. City of Ithaca Plumbing Department. 1.5 GLOSSARY ACI American Concrete Institute AGA American Gas Association AGCA Associated General Contractors of
America, Inc. AIA American Institute of Architects AISC American Institute of Steel Construction AFBMA Anti-Friction Bearing Manufacturer's Association AMCA Air Moving and Conditioning
Association, Inc. ANSI American National Standards Institute ARI Air Conditioning and Refrigeration Institute ASHRAE American Society of Heating, Refrigerating and Air Conditioning
Engineers, Inc. ASME American Society of Mechanical Engineers ASPE American Society of Plumbing Engineers ASTM American Society for Testing Materials AWSC American Welding Society Code
AWWA American Water Works Association FM Factory Mutual Insurance Company IBR Institute of Boiler & Radiation Manufacturers IEEE Institute of Electrical and Electronics Engineers TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 3 IRI Industrial
Risk Insurers NEC National Electrical Code NEMA National Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association NYS/DEC
New York State Department of Environmental Conservation SBI Steel Boiler Institute SMACNA Sheet Metal and Air Conditioning Contractors National Association UFPO Underground Facilities
Protective Organization UL Underwriter's Laboratories, Inc. OSHA Occupational Safety and Health Administration XL - GAP XL Global Asset Protection Services 1.6 DEFINITIONS Acceptance
Owner acceptance of the project from Contractor upon certification by Owner's Representative. As Specified Materials, equipment including the execution specified/shown in the contract
documents. Basis of Design Equipment, materials, installation, etc. on which the design is based. (Refer to the article, Equipment Arrangements, and the article, Substitutions.) Code
Requirements Minimum requirements. Concealed Work installed in pipe and duct shafts, chases or recesses, inside walls, above ceilings, in slabs or below grade. Coordination Drawings
Show the relationship and integration of different construction elements and trades that require careful coordination during fabrication or installation, to fit in the space provided
or to function as intended. Delegated-Design Services (Performance and Design criteria for Contractor provided professional services). Where professional design services or certifications
by a design professional are specifically required of a Contractor, by the Contract Documents. Provide products and systems with the specific design criteria indicated. If criteria
indicated is insufficient to perform services or certification required, submit a written request for additional information to the Engineer. Submit wet signed and sealed certification
by the responsible design professional for each product and system specifically assigned to the Contractor to be designed or certified by a design professional. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 4 Examples: structural
maintenance ladders, stairs and platforms, pipe anchors, seismic compliant system, wind, structural supports for material equipment, sprinkler hydraulic calculations. Equal, Equivalent,
Equal To, Equivalent To, As Directed and As Required Shall all be interpreted and should be taken to mean "to the satisfaction of the Engineer". Exposed Work not identified as concealed.
Extract Carefully dismantle and store where directed by Owner's Representative and/or reinstall as indicated on drawings or as described in specifications. Furnish Purchase and deliver
to job site, location as directed by the Owner's Representative. Inspection Visual observations by Owner's site Representative. Install Store at job site if required, proper placement
within building construction including miscellaneous items needed to affect placement as required and protect during construction. Take responsibility to mount, connect, start-up and
make fully functional. Labeled Refers to classification by a standards agency. Manufacturers Refer to the article, Equipment Arrangements, and the article, Substitutions. Prime Professional
Architect or Engineer having a contract directly with the Owner for professional services. Product Data Illustrations, standard schedules, performance charts, instructions, brochures,
wiring diagrams, finishes, or other information furnished by the Contractor to illustrate materials or equipment for some portion of the work. Provide (Furnish and Install) Contractor
shall furnish all labor, materials, equipment and supplies necessary to install and place in operating condition, unless otherwise specifically stated. Relocate Disassemble, disconnect,
and transport equipment to new locations, then clean, test, and install ready for use. Remove Dismantle and take away from premises without added cost to Owner, and dispose of in a
legal manner. Review and Reviewed Should be taken to mean to be followed by "for the limited purpose of checking for conformance with information given and the design concept expressed
in the Contract Documents". Roughing Pipe, duct, conduit, equipment layout and installation. Samples Physical full scale examples which illustrate materials, finishes, coatings, equipment
or workmanship, and establishes standards by which work will be judged. Satisfactory As specified in contract documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 5 Shop Drawings Fabrication drawings, diagrams, schedules and other
instruments, specifically prepared for the work by the Contractor or a Sub-contractor, manufacturer, supplier or distributor to illustrate some portion of the work. Site Representative
Owner's Inspector or "Clerk of Works" at the work site. Submittals Defined (Technical) Any item required to be delivered to the Engineer for review as requirement of the Contract
Documents. The purpose of technical submittals is to demonstrate for those portions of the work for which a submittal is required, the manner in which the Contractor proposes to conform
to the information given and design concepts expressed and required by the Contract Documents. 1.7 SHOP DRAWINGS/PRODUCT DATA/SAMPLES A. Provide submittals on all items of equipment
and materials to be furnished and installed. Submittals shall be accompanied by a transmittal letter, stating name of project and contractor, name of vendor supplying equipment, number
of drawings, titles, specification sections (name and number) and other pertinent data called for in individual sections. Submittals shall have individual cover sheets that shall be
dated and contain: Name of project; name of prime professional; name of prime contractor; description or names of equipment, materials and items; and complete identification of locations
at which materials or equipment are to be installed. Individual piecemeal or incomplete submittals will not be accepted. Similar items, (all types specified) shall be submitted at
under one cover sheet per specification section (e.g. valves, plumbing fixtures, etc.). Number each submittal by trade. Indicate deviations from contract requirements on Letter of
Transmittal. Submittals will be given a general review only. Corrections or comments made on the Submittals during the review do not relieve Contractor from compliance with requirements
of the drawings and specifications. The Contractor is responsible for: confirming and correcting all quantities; checking electrical characteristics and dimensions; selecting fabrication
processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner. If submitting hard copies,
submit four (4) copies for review. B. The Engineer will review up to two (2) submissions of any single submittal. The Contractor will be invoiced on an hourly rate basis for the time
spent reviewing the same shop drawing in excess of twice. C. If submittals are to be submitted electronically, all requirements in Item A apply. Submittals shall be emailed in PDF
format to specific email address provided by the Construction Manager, General Contractor, Architect or Project Manager. Name of project shall be in subject line of email. Send emails
to merochsubmittalclerk@meengineering.com. D. Refer to Section 013300 - Submittal Procedures for additional requirements. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 6 1.8 PROTECTION OF PERSONS AND PROPERTY A. Contractor shall assume
responsibility for construction safety at all times and provide, as part of contract, all trench or building shoring, scaffolding, shielding, dust/fume protection, mechanical/electrical
protection, special grounding, safety railings, barriers, and other safety feature required to provide safe conditions for all workmen and site visitors. 1.9 EQUIPMENT ARRANGEMENTS
A. The contract documents are prepared using one manufacturer as the Basis of Design, even though other manufacturers' names are listed. If Contractor elects to use one of the listed
manufacturers other than Basis of Design, submit detailed drawings, indicating proposed installation of equipment. Show maintenance clearances, service removal space required, and
other pertinent revisions to the design arrangement. Make required changes in the work of other trades, at no increase in any contract. Provide larger motors, feeders, breakers, and
equipment, additional control devices, valves, fittings and other miscellaneous equipment required for proper operation, and assume responsibility for proper location of roughing and
connections by other trades. Remove and replace doorframes, access doors, walls, ceilings, or floors required to install other than Basis of Design. If revised arrangement submittal
is rejected, revise and resubmit specified Basis of Design item which conforms to Contract Documents. 1.10 SUBSTITUTIONS A. If Contractor desires to bid on any other kind, type, brand,
or manufacture of material or equipment than those named in specifications, secure prior approval. To request such approval, Contractor shall submit complete information comparing
(item-for-item) material or equipment offered with design material or equipment. Include sufficient information to permit quick and thorough comparison, and include performance curves
on same basis, capacities, power requirements, controls, materials, metal gauges, finishes, dimensions, weights, etc., of major parts. If accepted, an addendum will be issued to this
effect ahead of bid date. Unless such addendum is issued, substitution offered may not be used. 1.11 UTILITY COMPANY SERVICES A. Plumbing Contractor shall make arrangements with NYSEG
for gas service (including gas meter) to the tenant's equipment. Coordinate all activities between the Owner and Utility Company. The installation of the gas service meter and all
gas piping shall comply with the published Utility Company standards. PAY ALL UTILITY COMPANY CHARGES; INCLUDE CHARGES IN THE BASE BID. 1.12 ROUGHING A. The Contract Drawings have
been prepared in order to convey design intent and are diagrammatic only. Drawings shall not be interpreted to be fully coordinated for construction. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 7 B. Due to small scale of Drawings,
it is not possible to indicate all offsets, fittings, changes in elevation, interferences, etc. Make necessary changes in contract work, equipment locations, etc., as part of a contract
to accommodate work to obstacles and interferences encountered. Before installing, verify exact location and elevations at work site. DO NOT SCALE plans. If field conditions, details,
changes in equipment or shop drawing information require an important rearrangement, report same to Owner's Representative for review. Obtain written approval for all major changes
before installing. C. Install work so that items both existing and new are operable and serviceable. Eliminate interference with removal of coils, motors, filters, belt guards and/or
operation of doors. Provide easy, safe, and code mandated clearances at controllers, motor starters, valve access, and other equipment requiring maintenance and operation. Provide
new materials, including new piping and insulation for relocated work. D. Coordinate work with other trades and determine exact route or location of each duct, pipe, conduit, etc.,
before fabrication and installation. Coordinate with Architectural Drawings. Obtain from Owner's Representative exact location of all equipment in finished areas, such as thermostat,
fixture, and switch mounting heights, and equipment mounting heights. Coordinate all work with the architectural reflected ceiling plans and/or existing Architecture. Mechanical and
electrical drawings show design arrangement only for diffusers, grilles, registers, air terminals, lighting fixtures, sprinklers, speakers, and other items. Do not rough-in contract
work without reflected ceiling location plans. E. Before roughing for equipment furnished by Owner or in other contracts, obtain from Owner and other Contractors, approved roughing
drawings giving exact location for each piece of equipment. Do not "rough in" services without final layout drawings approved for construction. Cooperate with other trades to insure
proper location and size of connections to insure proper functioning of all systems and equipment. For equipment and connections provided in this contract, prepare roughing drawing
as follows: 1. New Equipment: Obtain equipment roughing drawings and dimensions, then prepare roughing-in-drawings. If such information is not available in time, obtain an acknowledgement
in writing, then make space arrangements as required with Owner's Representative. 1.13 COORDINATION DRAWINGS A. Before construction work commences, Contractors for all trades shall
submit coordination drawings in the form of CAD drawing files, drawn at not less than 1/4 in. scale. Such drawings will be required throughout all areas, for all Contracts. These
drawings shall show resolutions of trade conflicts in congested areas. Mechanical Equipment Rooms shall be drawn early in coordination drawing process simultaneous with all other congested
areas. Prepare Coordination Drawings as follows: 1. The HVAC Contractor shall prepare the base plan CAD coordination drawings showing all ductwork, all pertinent heating piping, and
equipment. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS
220500 - 8 These drawings may be CAD files of the required Ductwork Shop Drawings. The drawings shall be coordinated with lighting fixtures, sprinklers, air diffusers, other ceiling
mounted items, ceiling heights, structural work, maintenance clearances, electric code clearance, reflected ceiling plans, and other contract requirements. Reposition proposed locations
of work after coordination drawing review by the Owner's Representative. Provide adjustments to exact size, location, and offsets of ducts, pipes, conduit, etc., to achieve reasonable
appearance objectives. Provide these adjustments as part of contract. Minor revisions need not be redrawn. 2. The HVAC Contractor shall provide CAD files and submit the base plan
CAD Coordination Drawings to all Contractors. 3. The Plumbing Contractor and then the Fire Protection Contractor shall draw the location of piping and equipment on the base plan CAD
Coordination Drawings, indicating areas of conflict and suggested resolutions. 4. The Electrical Contractor shall draw the location of lighting fixtures, cable trays, and feeders over
1-1/2 in. on the base plan CAD Coordination Drawings, indicating areas of conflict and suggested resolution. 5. The General Construction Contractor shall indicate areas of architectural/structural
conflicts or obstacles on the CAD Coordination Drawings, and coordinate to suit the overall construction schedule. 6. The Construction Manager shall expedite all Coordination Drawing
work and coordinate to suit the overall construction schedule. In the case of unresolved interferences, he shall notify the Owner's Representative. The Owner's Representative will
then direct the various contractors as to how to revise their drawings as required to eliminate installation interferences. 7. If a given Contract proceeds prior to resolving conflicts,
then if necessary, that Contract shall change its work at no extra cost in order to permit others to proceed with a coordinated installation. Coordination approval will be given by
areas after special site meetings involving all Contracts. B. The purpose of the coordination drawing process is to identify and resolve potential conflicts between Contracts, and between
Contracts and existing or new building construction, before they occur in construction. Coordination drawings are intended for the respective Contractor's use during construction
and shall not replace any Shop Drawings, or record drawings required elsewhere in these contract documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 9 1.14 REMOVAL WORK A. Where existing equipment removals are called for, submit
complete list to Owner's Representative. All items that Owner wishes to retain that do not contain asbestos or PCB Material shall be delivered to location directed by Owner. Items
that Owner does not wish to retain shall be removed from site and legally disposed of. Where equipment is called for to be relocated, contractor shall carefully remove, clean and recondition,
then reinstall. Remove all abandoned piping, wiring, equipment, lighting, ductwork, tubing, supports, fixtures, etc. Visit each room, crawl spaces, and roofs to determine total Scope
of Work. The disturbance or dislocation of asbestos-containing materials causes asbestos fibers to be released into the building's atmosphere, thereby creating a health hazard to workmen
and building occupants. B. See Specification Section 003126 for additional requirements. 1.15 EQUIPMENT AND MATERIAL INSTALLATION A. Provide materials that meet the following minimum
requirements: 1. All materials shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less, in accordance with NFPA 255. 2. All equipment and material
for which there is a listing service shall bear a UL label. 3. Potable water systems and equipment shall be built according to AWWA Standards. 4. Gas-fired equipment and system shall
meet AGA Regulations and shall have AGA label. 5. Electrical equipment and systems shall meet UL Standards and requirements of the NEC. B. Exterior and wet locations shall utilize materials,
equipment supports, mounting, etc. suitable for the intended locations. Metals shall be stainless steel, galvanized or with baked enamel finish as a minimum. Finishes and coatings
shall be continuous and any surface damaged or cut ends shall be field corrected in accordance with the manufacturer's recommendations. Hardware (screws, bolts, nuts, washers, supports,
fasteners, etc.) shall be: 1. Stainless steel where the associated system or equipment material is stainless steel or aluminum. 2. Hot dipped galvanized or stainless steel where the
associated system or equipment is steel, galvanized steel or other. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 10 1.16 CUTTING AND PATCHING A. Each trade shall include their required cutting and patching work. Cut and drill
from both sides of walls and/or floors to eliminate splaying. Patch cut or abandoned holes left by removals of equipment or fixtures. Patch adjacent existing work disturbed by installation
of new work including insulation, walls and wall covering, ceiling and floor covering, other finished surfaces. Patch openings and damaged areas equal to existing surface finish.
Cut openings in prefabricated construction units in accordance with manufacturer's instructions. 1.17 CONCEALMENT A. Conceal all contract work above ceilings and in walls, below slabs,
and elsewhere throughout building. If concealment is impossible or impractical, notify Owner's Representative before starting that part of the work and install only after his review.
In areas with no ceilings, install only after Owner's Representative reviews and comments on arrangement and appearance. 1.18 CHASES A. New Construction: 1. Certain chases, recesses,
openings, shafts, and wall pockets will be provided as part of General Construction Contract. Mechanical and Electrical Contracts shall provide all other openings required for their
contract work. 2. Check Architectural and Structural Design and Shop Drawings to verify correct size and location for all openings, recesses and chases in general building construction
work. 3. Assume responsibility for correct and final location and size of such openings. 4. Rectify improperly sized, improperly located or omitted chases or openings due to faulty
or late information or failure to check final location. 5. Provide 18 gauge galvanized sleeves and inserts. Extend all sleeves 2 in. above finished floor. Set sleeves and inserts
in place ahead of new construction, securely fastened during concrete pouring. Correct, by drilling, omitted or improperly located sleeves. Assume responsibility for all work and
equipment damaged during course of drilling. Firestop all unused sleeves. 6. Provide angle iron frame where openings are required for contract work, unless provided by General Construction
Contractor. B. In Existing Buildings: 1. Drill holes for floor and/or roof slab openings. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 11 2. Multiple pipes smaller than 1 in. properly spaced and supported may pass through one 6
in. or smaller diameter opening. 3. Seal voids in fire rated assemblies with a fire-stopping seal system to maintain the fire resistance of the assembly. Provide 18 gauge galvanized
sleeves at fire rated assemblies. Extend sleeves 2 in. above floors. 4. In wall openings, drill or cut holes to suit. Provide 18 gauge galvanized sleeves at shafts and fire rated
assemblies. Provide fire-stopping seal between sleeves and wall in drywall construction. Provide fire stopping similar to that for floor openings. 1.19 PENETRATION FIRESTOPPING A.
Fire-Stopping for Openings Through Fire and Smoke Rated Wall and Floor Assemblies: 1. Provide materials and products listed or classified by an approved independent testing laboratory
for "Penetration Fire-Stop Systems". The system shall meet the requirements of "Fire Tests of Penetrations Fire-Stops" designated ASTM E814. 2. Provide fire-stop system seals at all
locations where piping, tubing, conduit, electrical busways/cables/wires, ductwork and similar utilities pass through or penetrate fire rated wall or floor assembly. Provide fire-stop
seal between sleeve and wall for drywall construction. 3. The minimum required fire resistance ratings of the wall or floor assembly shall be maintained by the fire-stop system. The
installation shall provide an air and watertight seal. 4. The methods used shall incorporate qualities which permit the easy removal or addition of electrical conduits or cables without
drilling or use of special tools. The product shall adhere to itself to allow repairs to be made with the same material and permit the vibration, expansion, and/or contraction of any
items passing through the penetration without cracking, crumbling and resulting reduction in fire rating. 5. Plastic pipe/conduit materials shall be installed utilizing intumescent
collars. 6. Provide a submittal including products intended for use, manufacturer's installation instructions, and the UL details for all applicable types of wall and floor penetrations.
7. Fire-stopping products shall not be used for sealing of penetrations of non-rated walls or floors. B. Acceptable Manufacturers: 1. Dow Corning Fire-Stop System Foams and Sealants.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 12
2. Nelson Electric Fire-Stop System Putty, CLK and WRP. 3. S-100 FS500/600, Thomas & Betts. 4. Carborundum Fyre Putty. 5. 3-M Fire Products. 6. Hilti Corporation. 1.20 NON-RATED WALL
PENETRATIONS A. Each trade shall be responsible for sealing wall penetrations related to their installed work, including but not limited to ductwork, piping, conduits, etc. See individual
specification sections for requirements. 1.21 SUPPORTS A. Provide required supports, beams, angles, hangers, rods, bases, braces, and other items to properly support contract work.
Modify studs, add studs, add framing, or otherwise reinforce studs in metal stud walls and partitions as required to suit contract work. If necessary, in stud walls, provide special
supports from floor to structure above. For precast panels/planks and metal decks, support mechanical/electrical work as determined by manufacturer and the Engineer. Provide heavy
gauge steel mounting plates for mounting contract work. Mounting plates shall span two or more studs. Size, gauge, and strength of mounting plates shall be sufficient for equipment
size, weight, and desired rigidity. B. Equipment, piping, conduit, raceway, etc. supports shall be installed to minimize the generation and transmission of vibration. C. Materials and
equipment shall be solely supported by the building structure and connected framing. Gypboard, ceilings, other finishes, etc. shall not be used for support of materials and equipment.
1.22 APPLIED FIREPROOFING A. Scope: Provide Encapsulation of surfaces where applied fireproofing materials have been disturbed, removed, or left missing by the removal of hangers or
upper attachments, or when new hangers or upper attachment are installed. B. Fire Resistance Rating: Fireproofing shall meet the original hourly rating when applied to the construction
assembly where materials have been removed or disturbed, or is missing. C. Fire Hazard Classification: Fireproofing shall be listed in the Underwriters Laboratories Building Materials
Directory with the following performance properties: 1. Flame Spread: 10 or less. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 13 2. Smoke Developed: 5 or less. D. Product Data: Provide manufacturer's product descriptions for
each required fireproofing material. Include application instructions, including primer/adhesive requirements and recommended minimum thickness and density for each required hourly
rating. 1. Retro-Guard cementitious replacement fireproofing by Grace Construction Products, or equivalent Cafco Blaze Shield, and Cafco 300 by Isolatek. 2. Physical Properties: a.
Dry Field Density (ASTM E 605): 15 lb/cu ft minimum average. b. Cohesion/Adhesion (Bond Strength) (ASTM E 736): 200 lb/sq ft minimum average. c. Compressive Strength (ASTM E 761):
500 lb/sq ft minimum. d. Impact (Bond Impact) Resistance (ASTM E 760): Shall not crack or delaminate. e. Effect of Deflection (ASTM E 759): Shall not crack or delaminate. f. Corrosion
Resistance (ASTM E 937): No evidence of corrosion. g. Air Erosion (ASTM E 859): Maximum 0.025 g/sq ft weight loss. h. Provide primer or adhesive recommended by the fireproofing manufacturer
to obtain required bond strength for the specific fireproofing and substrate. E. Apply fireproofing prior to installation of ductwork, piping, conduits, and other suspended items.
Hangers, clips and other supports for these items shall be installed before application of fireproofing. F. Examine the substrate and conditions under which fireproofing is to be applied.
Do not proceed with the fireproofing work until unsatisfactory conditions have been corrected. Verify that hangers, clips, sleeves, and other items that will penetrate the fireproofing
are in place. Check paint on substrate for compatibility with primer/fireproofing and adequacy of bond strength in accordance with fireproofing manufacturer's instructions. G. Surface
Preparation: Remove dirt, dust, oil, grease, loose paint and rust, mill scale, and other foreign matter that may impair the bonding of the fireproofing to the substrate. Clean substrate
free of contamination from chemicals and solvents. Apply primer/adhesive where necessary to obtain bond strength of fireproofing to steel shop paint and where recommended by the fireproofing
manufacturer. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS
220500 - 14 H. Apply the fireproofing in accordance with UL fire test report and the manufacturer's application instructions. Thickness and density of fireproofing shall be in
accordance with the approved product data and as required to produce the hourly fire resistance rating required. 1.23 ACCESS PANELS A. Provide access panels for required access to respective
Contract work. Location and size shall be the responsibility of each Contract. Bear cost of construction changes necessary due to improper information or failure to provide proper
information in ample time. Access panels over 324 square inches shall have two cam locks. Provide proper frame and door type for various wall or ceiling finishes. Access panels shall
be equal to "Milcor" as manufactured by Inland Steel Products Co., Milwaukee, Wisconsin. Provide Contractor for General Trades with a set of architectural plans with size and approximate
locations of access panels shown. 1.24 PLUMBING EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting, chemically treating and restarting any systems which
are affected by work shown on the Contract Documents unless specifically noted otherwise. B. Provide roughing and final connections to all equipment. Provide loose key stops, sanitary
"P" traps, tailpiece, adapters, and all necessary piping and fittings from roughing point to equipment. Provide installation of all sinks, faucets, traps and tailpieces. Provide cold
water line with ball valve and backflow prevention device at locations called for. Provide continuation of piping and connection to equipment that is furnished by others. Provide
relief valve discharge piping from equipment relief valves to floor drains. C. Provide valved water outlet adjacent to equipment requiring same. Provide equipment type floor drains,
or drain hubs, adjacent to equipment. D. Refer to Contract Documents for roughing schedules, and equipment and lists indicating scope of connections required. E. Provide for Owner furnished
and Contractor furnished equipment all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains, as required. 1.25 STORAGE AND PROTECTION
OF MATERIALS AND EQUIPMENT A. Store Materials on dry base, at least 6 in. aboveground or floor. Store so as not to interfere with other work or obstruct access to buildings or facilities.
Provide waterproof/windproof covering. Remove and provide special storage for items subject to moisture damage. Protect against theft or damage from any cause. Replace items stolen
or damaged, at no cost to Owner. B. Refer to Section 016000 - Product Requirements for additional information. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500 - 15 1.26 FREEZING AND WATER DAMAGE A. Take all necessary precautions with
equipment, systems and building to prevent damage due to freezing and/or water damage. Repair or replace, at no change in contract, any such damage to equipment, systems, and building.
Perform first seasons winterizing in presence of Owner's operating staff. B. Before final acceptance of the work, furnish necessary skilled labor to operate all systems by seasons.
Instruct designated person on proper operation, and care of systems/equipment. Repeat instructions, if necessary. Obtain written acknowledgement from person instructed prior to final
payment. Contractor is fully responsible for system until final acceptance, even though operated by Owner's personnel, unless otherwise agreed in writing. List under clear plastic,
operating, maintenance, and starting precautions procedures to be followed by Owner for operating systems and equipment. 1.27 OPERATION AND MAINTENANCE MANUALS A. Prepare three (3)
Operation and Maintenance Manuals. Include in each O&M Manual, a copy of each approved Shop Drawing, wiring diagrams, piping diagrams spare parts lists, as-built drawings and manufacturer's
instructions. Include typewritten instructions, describing equipment, starting/operating procedures, emergency operating instructions, summer-winter changeover, freeze protection,
precautions and recommended maintenance procedures. Include name, address, and telephone number of installing contractor and of supplier manufacturer Representative and service agency
for all major equipment items. Provide a table of contents page and dividers based upon specification section numbers. Bind above items in a three ring binder with name of project
on the cover. Deliver three (3) copies to Owner's Representative for review before request for final acceptance. B. Operation and Maintenance Manuals shall also be submitted electronically,
in PDF format on CD or flash drive. 1.28 RECORD DRAWINGS A. The Contractor shall obtain at his expense one (1) set of construction Contract Drawings, (including non-reproduction black
and white prints or electronic files) for the purpose of recording as-built conditions. B. The Contractor shall perform all survey work required for the location and construction of
the work and to record information necessary for completion of the record drawings. Record drawings shall show the actual location of the constructed facilities in the same manner
as was shown on the bid drawings. All elevations and dimensions shown on the drawings shall be verified or corrected so as to provide a complete and accurate record of the facilities
as constructed. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS
220500 - 16 C. It shall be the responsibility of the Contractor to mark EACH sheet of the contract documents in red and to record thereon in a legible manner, any and all approved
field changes and conditions as they occur. A complete file of approved field sketches, diagrams, and other changes shall also be maintained. At completion of the work, the complete
set of red marked contract documents, plus all approved field sketches and diagrams shall be submitted to the engineer and used in preparation of the record drawings. D. A complete
set of red marked contract drawings shall be submitted, at one time, as the "Record" set. If there are no changes to a specific drawing, the contractor shall indicate "NO CHANGES"
on that drawing. ALL drawings shall be included in the "Record" set. E. The complete set of red marked Contract Documents or electronic files shall be certified by the Contractor as
reflecting record conditions and submitted to the engineer for review. F. The Contractor shall have the marked up set scanned, if they are not already electronic files, and then submit
them to the Engineer as the "Record Set". 1.29 FINAL INSPECTION A. Upon completion of all Engineering Site Observation list items, the Contractor shall provide a copy of the Engineering
Site Observation Report back to the Engineer with each items noted as completed or the current status of the item. Upon receipt, the Engineer will schedule a final review. 1.30 CLEANING
A. It is the Contractor's responsibility to keep clean all equipment and fixtures provided under this contract for the duration of the project. Each trade shall keep the premises free
from an accumulation of waste material or rubbish caused by his operations. The facilities require an environment of extreme cleanliness, and it is the Contractor's responsibility
to adhere to the strict regulations regarding procedures on the existing premises. After all tests are made and installations completed satisfactorily: 1. Thoroughly clean entire installation,
both exposed surfaces and interiors. 2. Remove all debris caused by work. 3. Remove tools, surplus, materials, when work is finally accepted. 1.31 SYSTEM START-UP AND TESTING A. Prior
to commencement of work, the Contractor(s) effecting such system shall survey all building plumbing systems and components. Make written notice to the Owner regarding existing damages,
missing items and incomplete systems. Prior to the conclusion of this project, the Contractor shall verify with the Project Inspector that all building system has been returned to
their proper conditions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS
220500 - 17 1.32 TRANSFER OF ELECTRONIC FILES A. M/E Engineering, P.C. will provide electronic files for the Contractor's use in the preparation of sheetmetal shop drawings, coordination
drawings, or record drawings related to the project, and the following terms and conditions: 1. The Contractor shall submit a formal request for electronic drawing files on the M/E
Engineering, P.C. website, by utilizing the following website link: www.meengineering.com/contractor_request.php. 2. M/E Engineering, P.C.'s electronic files will be exported from
MicroStation into DWG/DXF files that are compatible with AutoCad as requested. M/E Engineering, P.C. makes no representation as to the compatibility of these files with the Contractor's
hardware or the Contractor's software beyond the specific release of the referenced specifications. 3. M/E Engineering can only provide CAD files of M/E/P/FP drawing levels for which
we are the Engineer of Record. CAD files of Architectural backgrounds, reflected ceiling plans, structural plans, etc. must be obtained separately from the Architect of Record. 4.
Data contained on these electronic files is part of M/E Engineering, P.C.'s instruments of service shall not be used by the Contractor or anyone else receiving data through or from
the Contractor for any purpose other than as convenience in the preparation of shop drawings for the referenced project. Any other use or reuse by the Contractor or by others will
be at the Contractor's sole risk and without liability or legal exposure to M/E Engineering, P.C. The Contractor agrees to make no claim and hereby waive, to the fullest extent permitted
by law, any claim or cause of action of any nature against M/E Engineering, P.C., its officers, directors, employees, agents or sub-consultants which may arise out of or in connection
with the Contractor's use of the electronic files. 5. Furthermore, the Contractor shall, to the fullest extent permitted by law, indemnify and hold harmless, M/E Engineering, P.C. from
all claims, damages, losses and expenses, including attorney's fees arising out of or resulting from the Contractor's use of these electronic files. 6. These electronic files are not
contract documents. Significant difference may arise between these electronic files and corresponding hard copy contract documents due to addenda, change orders or other revisions.
M/E Engineering, P.C. makes no representation regarding the accuracy or completeness of the electronic files the Contractor receives. In the event that a conflict arises between the
signed contract documents prepared by M/E Engineering, P.C. and electronic files, the signed contract documents shall govern. The Contractor is responsible for determining if any conflicts
exist. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC PLUMBING REQUIREMENTS 220500
- 18 By the Contractor's use of these electronic files the Contractor is not relieved of the Contractor's duty to comply with the contract documents, including and without limitation,
the need to check, confirm and coordinate all dimensions and details, take field measurements, field verify conditions and coordinate the Contractor's work with that of other contractors
for the project. END OF SECTION 220500 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTORS
220513 - 1 SECTION 220513 - MOTORS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services as required for the complete installation designed in
Contract Documents. PART 2 - PRODUCTS 2.1 MOTORS A. General Requirements: 1. Motors built for 60 Hz operation, three phase for 1 HP and larger; single phase for 3/4 HP and smaller.
In compliance with NEMA Standards, wound specifically for nameplate voltage, and selected for appropriate duty and environment. 1.15 minimum service factor at rated voltage and frequency.
Bearings rated 20,000 life hours. V-belt connected motors with adjustable slide rail bases and pulleys. Motors shall have Class F insulation system, with Class B temperature rise.
Maximum allowable motor temperature rise for open dripproof or totally enclosed fan cooled (TEFC) type at 1.15 service factor shall be 80°C above 40°C ambient up to 300 HP. NEMA locked
rotor kVA code as required to match unit equipment torque characteristics. Single-phase motors shall be capacitor start, induction run, or split phase type. Polyphase motors shall
be constant speed, squirrel cage, unless otherwise called for. Nameplates shall have as a minimum, all information as described in NEMA Standard MG-120.60. 2. Motors for use with variable
speed drive applications shall be inverter duty rated in accordance with NEMA. These motors shall meet NEMA corona inception voltage requirements, withstanding peak voltages up to
1600 volts, and be manufactured in accordance with NEMA MG-1 Part 31. 3. Nominal Motor Voltage Table: Nominal System Voltage Motor Nameplate 480V - 3 phase 460 volt 277V - 1 phase 265
volt 240V - 1 phase and 3 phase 230 volt 208V - 1 phase and 3 phase 200 volt 120V - 1 phase 115 volt TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTORS 220513 - 2 4. Motor Application: Environment/location Motor Enclosure Type General Purpose Open Drip-proof, TEFC
or encapsulated Outdoors, below grade or high humidity areas, pool filter rooms TEFC Hazardous Explosion-proof 5. Make: Need not be all of same make, but one of the following: General
Electric, Gould, Reliance, Westinghouse. PART 3 - EXECUTION 3.1 MOTORS A. Furnished by equipment manufacturer and especially manufactured and/or selected, mounted, and installed for
intended use. Install motors accessible for maintenance. END OF SECTION 220513 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 VALVES 220523 - 1 SECTION 220523 - VALVES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform
operations required for the complete installation and related Work as required in Contract Document. 1.2 SUBMITTALS A. Submit manufacturer's data in accordance with Basic Mechanical
and Electrical Requirements. Obtain approval prior to ordering material. B. Provide submittals for all items specified under Part 2 of this section. PART 2 - PRODUCTS 2.1 VALVES -
GENERAL A. Valves shall have following requirements: 1. Working pressure stamped or cast on bodies. 2. Stem packing serviceable without removing valve from line. 3. All valves and accessories
provided on the project and used to convey water for potable use shall be lead free in accordance with NSF Standard, Standard 61, Section 9 - Standard for Drinking Water and Lavatory
Faucets and NSF Standard 372 - Maximum Lead Requirements. Compliance shall be via third party testing and certification. B. Acceptable Manufacturers: 1. Balance Valves: Armstrong,
Bell & Gossett, Red White, Taco, Tour and Anderson. 2. Ball Valves: Apollo, Hammond, Milwaukee, Nibco, Red White, Watts. 3. Gate and Check Valves: Hammond, Milwaukee, Nibco, Red White,
Stockham, Watts. 4. To establish a standard of quality and identify features, certain manufacturer's numbers are given in the following paragraphs. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VALVES 220523 - 2 2.2 DOMESTIC WATER VALVES A. Gate Valves: 1. 4 in. and
Larger, Cold Water Service: Epoxy coated, resilient wedge, OS&Y, flanged ends, 175 wwp, UL/FM; Watts 408 RW. 2. 3 in. and Smaller: Bronze, solid wedge disc, rising stem, 125 SWP;
Milwaukee 1152 (threaded ends, union bonnet) or Milwaukee 149 (sweat ends, threaded bonnet.) B. Check Valves: 1. 3 in. and Larger: IBBM, renewable seat and disc, bolted flange cap,
flanged ends, 125 SWP; Milwaukee F-2974. 2. 2 in. and Smaller: Lead-free swing check with silicone bronze body, bonnet and trim, PTFE disc seat and stainless steel seat disc washer,
200 psi working pressure, Nibco T-413-Y-LF (threaded) or Nibco's S-413-Y-LF (solder). 3. Silent Type: Lead-free spring check with silicone bronze body, stainless steel trim and PTFE
disc: 250 psi working pressure; Nibco T-480-4-LF (threaded) or Nibco S-480-Y-LF (solder). C. Ball Valves: 1. 2-1/2 in. and Larger: Lead-free, forged copper silicon 2-piece body, chrome
plated brass ball, full port, teflon seats and stem packing, separate packing and handle nut, blowout proof stem extended for insulation, vinyl insulator for handle, 600 WOG, 125 WSP;
Watts LF-FBV-3C Series (threaded ends) or Watts LF-FBVS-3C series (sweat ends). 2. 2 in. and Smaller: Lead-free, brass 2-piece body, 316 stainless steel ball and stem, full port, teflon
seats and stem packing, separate packing and handle nut, blow out proof stem extended for insulation, vinyl insulator for handle, 600 WOG, 150 SWP: Watts #LFB-6080 (threaded ends)
or Watts #LFB-6081 (sweat ends). 3. Press fit style ball valves if a press-fitting system is to be utilized. D. Balance Valves: 1. 2 in. and Smaller: Lead-free, brass body, chrome
plated brass ball, glass and carbon filled PTFE seat rings, Viton packing, threaded or solder ends, differential readout ports, calibrated nameplate and memory stop indicator rated
for 125 psi; and pre-formed insulation to permit access for balancing and readout; Watts Series LFCSM-61-S. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VALVES 220523 - 3 a. Balance valve sizes shall be based upon gpm range rather than pipe size. Balance Valve Size GPM
Range 1/2 in. Up to 2.5 3/4 in. 2.5 - 4.5 1 in. 4.5 - 10 1-1/2 in. 15 - 30 E. Valves for Gauges and Instruments: 1. 1/2 in. Size: Brass bar stock for 1000 psi and 300°F; Trerice
No. 735 needle valve. F. Hose Thread Drain Valves: 1. Ball valve, bronze body, hardened chrome ball with hose thread end, cap and chain; Watts #B6001CC (sweat connection), Watts #B6000CC
(threaded connection). 2.3 GAS VALVES A. Plug Valves: 1. 2 in. and Smaller: Semi-steel body and plug, short pattern, 100% pipe area round port, full bore lubricated plug, wrench operated
with handle, sealing compound suitable with natural gas, threaded ends, 200 WOG, UL Listed for natural gas; Homestead Figure 651. 2. 2-1/2 in. thru 4 in.: Semi-steel body and plug,
short pattern, 100% pipe area round port, full bore lubricated plug, wrench operated with handle, sealing compound suitable with natural gas, flanged ends, 200 WOG, UL listed for natural
gas; Homestead Figure 652. B. Ball Valves: 1. 2 in. and Smaller: Ball type, two-piece, full port, brass body with chrome plated brass ball, teflon seats, threaded ends, 600 psi WOG,
UL listed for natural gas, Watts FBV-3C-UL. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
VALVES 220523 - 4 PART 3 - EXECUTION 3.1 INSTALLATION A. Provide all shutoff, check, balancing and other type valves as indicated, as required by Code and as required for proper
system maintenance, isolation and safety. Provide at major building and systems sections. Provide shutoff valves on all branch lines serving two fixtures or more, at all equipment,
fixtures, before and after automatic control valves, and at future connections. B. Locate valves for easy access and provide separate support where necessary. Install valves with stems
at or above the horizontal position. Install swing check valves in horizontal position with hinge pin level. C. Provide drain valves with hose thread connections on all equipment.
Provide hose thread drain valves at all low points to enable complete drainage of all piping systems including, water mains, branches, at base of vertical risers and at strainers.
D. Inspect valves for proper operation before installation. Install underground valve boxes vertically over each valve. Adjust top of box to proper grade. Immediately backfill with
crushed stone and carefully tamp into place. Unless otherwise noted, leave in the open position. 3.2 DOMESTIC WATER SYSTEM A. The main water service shutoff valve inside the building
and valves for a 3 in. and larger water meter assembly shall be OS&Y gate valves in accordance with the local water authority requirements. B. Install balance valves in each hot water
circulation branch and where noted. 3.3 NATURAL GAS SYSTEM A. Ball valves shall be UL listed for use in natural gas systems, or certified by another acceptable third-party testing agency.
END OF SECTION 220523 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING
220540 - 1 SECTION 220540 - ELECTRIC WIRING PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services for the complete installation of motor control wiring
and instrumentation control wiring as required in Contract Documents. Provide wiring and conduit, required to connect devices furnished as part of or adjunctive to the system and for
motor control regardless of the source of supply. Control wiring includes 120 volt and lower voltage wiring for control signals directing equipment operation. Control circuits shall
be 120 volt maximum. Provide wiring in accordance with requirements specified in Division 26, "Electrical" and the National Electrical Code. Provide devices required for proper system
operation, including special electrical switches, transformers, disconnect switches, relays, and circuit breaker protection. B. Coordinate all work with Division 26, "Electrical". 1.2
WORK NOT INCLUDED A. Power wiring for motors, motor starters and associated starting and control equipment, as well as the motor starters (except in the case of equipment specified
to have packaged controls/starters), are included in Division 26, "Electrical", unless otherwise called for. 1.3 QUALIFICATIONS A. Wiring installed in compliance with all requirements
of Division 26, "Electrical". 1.4 SUBMITTALS A. Provide complete wiring diagrams for equipment and systems. Deliver wiring diagrams to proper trades in time for roughing of conduit,
equipment connections, and avoid delay in construction schedule. Wiring diagrams and roughing information to be wired as part of the Work of Division 26, "Electrical", shall be clearly
indicated. PART 2 - PRODUCTS 2.1 PRODUCTS A. Refer to Division 26 specifications for required wiring materials. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING 220540 - 2 PART 3 - EXECUTION 3.1 GENERAL A. Check electrical wiring pertaining to equipment
for completeness and correctness of connections. Correct any misapplied motor and/or motor starter, improper thermal overload device, or device which fails to function and resultant
damage, whether due to incorrect connections or improper information on wiring diagrams. 3.2 WIRING FOR CONTROL SYSTEMS A. Provide motor control and instrumentation wiring for all plumbing
equipment including pumps, aquastats, timeclock controllers and float controls. All wiring shall be in conduit, unless otherwise noted. Refer to Section 260501 for type of conduit
to be used in specific applications. Provide 18 in. length flexible conduit at motors and devices subject to vibration. Conduit supported on 5 ft. centers. Do not attach directly
to hot surfaces, piping, or ductwork. Control wiring shall be in separate conduit from all other wiring. Provide green grounding wire circuited from starter, and run ground wire through
conduit to each remote auxiliary relay, pushbutton station, remote panel heating device, thermostat, or device with potentials in excess of 50 volts. Size ground wire as required by
NEC. B. Provide pushbutton stations, pilot lights, selector switches, auxiliary starter contacts, and other devices required to provide specified functions. C. Where allowable by Code
and contract documents, control wiring may be installed without conduit. Installation and wire insulation types shall be as described by NEC, Article 725. All low voltage wiring circuits
50V and under shall: 1. Be adequately supported using bridle rings or other approved method when installed horizontally above accessible ceilings or run exposed in unfinished areas.
2. Be run in wall cavity or surface metal raceway where no access is available to wall cavity, in finished areas. 3. Be installed in conduit when installed vertically in Mechanical
Rooms from panels and devices up to ceiling. 4. Be installed in conduit in all cases not specifically covered by the above cases, or where subject to physical damage. 5. Have the proper
insulation and meet the requirements of NEC Article 300-22 when installed in plenums or other spaces used for environmental air. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING 220540 - 3 3.3 EQUIPMENT WIRING A. Provide power and control wiring between
shipping splits, and between remote panels, thermostats, disconnect switches, and their respective units. Provide control wiring from the package control system, to each respective
motor or device. Properly mount control package. Power wiring to and including disconnect switch shall be by Division 26, "Electrical". B. Provide all control wiring required for
proper operation of pumps, including time clock and aquastat system wiring for domestic hot water re-circulation pumps. 3.4 FIELD WIRING IN STARTERS, CONTROLLERS, AND PANELS A. Wiring
within starters, controllers, and panels, shall be routed neatly in gutter space, away from moving and/or heat producing parts. Provide 30 ampere, 600 volt rated terminal blocks.
Do not place more than two wire connections on pilot device or relay terminal. Where more than two circuit connections are required, use terminal blocks. Provide nylon self-insulated,
locking type spade lugs for all control wires. Cables and wires shall be neatly bundled and lashed with nylon cable straps. END OF SECTION 220540 THIS PAGE INTENTIONALLY
LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING IDENTIFICATION 220553
- 1 SECTION 220553 - PLUMBING IDENTIFICATION PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services as required for the complete installation designed
in Contract Documents. 1.2 QUALIFICATIONS A. All identification devices shall comply with ANSI A13.1 for lettering size, length of color field, colors, and viewing angles. 1.3 SUBMITTALS
A. Submit manufacturer's technical product data and installation instructions for each identification material and device. Submit valve schedule for each piping system typewritten
on an 8-1/2 in. x 11 in. paper (minimum), indicating valve number, location and valve function. Submit schedule of pipe, equipment and name identification for review before stenciling
or labeling. 1.4 MAKES A. Allen Systems, Inc., Brady (W.H.) Co.; Signmark Div., Industrial Safety Supply Co., Inc., Seton Name Plate Corp. PART 2 - PRODUCTS 2.1 GENERAL A. Provide manufacturer's
standard products of categories and types required for each application. In cases where there is more than one type specified for an application, selection is installer's option, but
provide single selection for each product category. B. All adhesives used for labels in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC) limits
as called for in the current version of U.S. Green Building Council LEED Credits EQ 4.1 and EQ 4.2. 2.2 PIPING IDENTIFICATION A. Identification Types: 1. Pressure Sensitive Type: Provide
manufacturer's standard pre-printed, permanent adhesive, color coded, pressure sensitive vinyl pipe markers complying with ANSI A13.1. Provide a 360° wrap of flow arrow tape at each
end of pipe label. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING IDENTIFICATION
220553 - 2 2. Snap-On Type: Provide manufacturer's standard pre-printed, semi rigid snap-on, color coded pipe markers, complying with ANSI-A13.1. B. Lettering: 1. Piping labeling
shall conform to the following list: PIPE FUNCTION IDENTIFICATION Cold Water DOMESTIC COLD WATER Hot Water DOMESTIC HOT WATER Hot Water Recirculating DOMESTIC HOT WATER RECIRCULATING
140 Degree Hot Water DOMESTIC HOT WATER - 140°F Sanitary Waste SANITARY WASTE Indirect Waste INDIRECT WASTE Storm STORM Vent VENT Pump Discharge PUMP DISCHARGE Natural Gas NATURAL GAS
2.3 VALVE IDENTIFICATION A. Valve Tags: 1. Standard brass valve tags, 2 in. diameter with 1/2 in. high black-filled numerals. Attach to valve with brass jack chain and "S" hook. Identify
between heating and plumbing services with 1/4 in. letters above the valve number. 2. Acceptable Manufacturers: Seton Style No. M4507, or approved equal. B. Valve Chart: 1. Provide
valve chart for all valves provided as a part of this project. Frame and place under clear glass. Mount in Mechanical Room. 2.4 EQUIPMENT IDENTIFICATION A. General: 1. Provide engraved
vinyl nameplates for each major piece of mechanical equipment provided, 2-1/2 in. x 3/4 in. size. 2. Acceptable Manufacturers: Seton Style No. M4562, or approved equal. 2.5 ABOVE CEILING
EQUIPMENT LOCATOR A. 3/4 in. diameter adhesive stickers placed on ceiling grid and color-coded. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING IDENTIFICATION 220553 - 3 B. The color for all plumbing valves shall be BLUE. PART 3 - EXECUTION 3.1 GENERAL A. Provide
valve tags for all valves provided on project. Provide valve tag chart mounted in mechanical room. B. Provide equipment tags for all equipment provided on project. C. Provide piping
identification with directional flow arrows for all piping on project, maximum intervals of 20'-0". For piping installed through rooms, provide at least one (1) pipe label in each
room, for each pipe function. END OF SECTION 220553 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ADJUSTING AND BALANCING 220593 - 1 SECTION 220593 - ADJUSTING AND BALANCING PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide
labor, materials, equipment and services to perform operations required for complete adjusting and balancing Work as required in Contract Documents. 1.2 SUBMITTALS A. Provide information
in report form listing items required by specifications. Report shall be typed and three copies submitted for review. Results shall be guaranteed. Contractor shall be subject to
recall to site to verify report information before acceptance of the report by the Owner's Representative. B. Report format shall consist of the following: 1. Title sheet with job name,
contractor, engineer, date, balance contractor's name, address, telephone number and contact person's name and the balancing technician's name. 1.3 QUALIFICATIONS A. Follow procedures
and methods published by one or more of the following: 1. Individual manufacturer requirements and recommendations. B. Maintain qualified person at project for system operation, trouble
shooting and perform mechanical adjustments in conjunction with balancing procedure. C. Balancing contractor shall be current member of AABC or NEBB. 1.4 GENERAL REQUIREMENTS A. Before
concealment of systems visit the job site to verify and advise on type and location of balancing devices and test points. Make changes as required to balancing facilities. B. Place
systems in satisfactory operating condition. 1. Adjusting and balancing shall be accomplished as soon as the systems are complete and before Owner takes possession. 2. Prior to balancing
adjust balancing devices for full flow; fill, vent and clean hydronic systems, replace temporary strainers. 3. Initial adjustment and balancing to quantities as called for or as directed
by the engineer, to satisfy job conditions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
ADJUSTING AND BALANCING 220593 - 2 PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. Provide tools, ladders, recording meters, gauges, thermometers, velometers, anemometers, inclined
gauge manometers, magnehelic gauges, amprobes, voltmeters, psychrometers and tachometers required. Instruments used shall be accurately calibrated as per AABC or NEBB requirements.
PART 3 - EXECUTION 3.1 PREPARATION A. Examine Bid Documents and notify Owner's Representative of any questions regarding balancing, within thirty (30) days after receipt of bid and
prior to starting work. 3.2 WATER SIDE A. Test, adjust and record the following: 1. Hot Water Recirculating Pump: a. Check rotation b. GPM c. Running suction pressure d. Running discharge
pressure e. Running load amps f. RPM - motor g. Complete nameplate motor and pump 2. Recirculation Balancing Valves: a. Balance every valve to setting required to ensure domestic hot
water to all fixtures within 10 seconds of opening faucet. END OF SECTION 220593 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 INSULATION 220700 - 1 SECTION 220700 - INSULATION PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to
perform operations required for the complete installation and related Work as required in Contract Documents. 1.2 SUBMITTAL A. Shall include product description, manufacturer's installation
instructions, types and recommended thicknesses for each application, and location of materials. PART 2 - PRODUCTS 2.1 GENERAL A. Insulation, jackets, adhesive, and coatings shall comply
with the following: 1. Treatment of jackets or facing for flame and smoke safety must be permanent. Water-soluble treatments not permitted. 2. Insulation, including finishes and adhesives
on the exterior surfaces of pipes and equipment, shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less. 3. Asbestos or asbestos bearing materials
are prohibited. 4. Comply with 2015 International Energy Conservation Code as amended by Part 1 of the 2016 Supplement to the New York State Energy Conservation Code. 5. All adhesives
and sealants used for insulation in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC) limits as called for in the current version of U.S. Green
Building Council LEED Credits EQ E4.1 and EQ E4.2. 6. Provide materials which are the standard products of manufacturers regularly engaged in the manufacture of such products and that
essentially duplicate items that have been in satisfactory use for at least two (2) years prior to bid opening. Provide insulation systems in accordance with the approved MICA or NAIMA
Insulation Standards. 7. Insulation shall be clearly marked with manufacturer's name, identification of installed thermal resistance (R) value, out-of-package R value, flame spread
and smoke developed indexes in accordance with Energy Code requirements. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 INSULATION 220700 - 2 2.2 ACCEPTABLE MANUFACTURERS A. Fiberglass: Knauf, Johns Manville, Owen-Corning, Certainteed B. Calcium Silicate: Industrial Insulation
Group (ILG). C. Adhesives: Childers Products, Foster. 2.3 PIPE INSULATION (RIGID FIBERGLASS TYPE) A. Product meeting ASTM C 547, ASTM C 585, and ASTM C 795; rigid, molded, noncombustible.
B. 'K' Value: ASTM C 335, 0.23 at 75°F mean temperature. Maximum Service Temperature: 1000°F. C. Vapor Retarder Jacket: ASJ/SSL conforming to ASTM C 1136 Type I, secured with self-sealing
longitudinal laps and butt strips. D. Field-Applied PVC Fitting Covers with Flexible Fiberglass Insulation: Proto Corporation 25/50 or Indoor/Outdoor, UV-resistant fittings, jacketing
and accessories, white or colored. Fitting cover system shall consist of pre-molded, high-impact PVC materials with blanket type fiberglass wrap inserts. Blanket fiberglass wrap inserts
shall have a thermal conductivity ('K') of 0.26 at 75°F mean temperature. Closures shall be stainless steel tacks, matching PVC tape, or PVC adhesive per manufacturer's recommendations.
E. Field-Applied PVC Fitting Covers with Molded Fiberglass Inserts: Hamfab Products, Division of ICA Inc., UV-resistant fittings, jacketing and accessories, white or colored. Fitting
cover system consists of pre-molded, high-impact PVC materials with rigid molded fiberglass inserts. Closures to be stainless steel tacks, matching PVC tape, or PVC adhesive per manufacturer's
recommendations. F. Prefabricated Thermal Insulating Fitting Covers: Comply with ASTM C 450 for dimensions used in pre-forming insulation to cover valves, elbows, tees, and flanges.
2.4 CALCIUM SILICATE A. Flat-, curved- and grooved-block sections of noncombustible, inorganic, hydrous calcium silicate with a non-asbestos fibrous reinforcement. Comply with ASTM
C 533, Type I, rated for a maximum temperature of 1700 degree F. 2.5 FIELD-APPLIED JACKETS A. Piping: 1. PVC Pipe Jacket: High-impact, ultraviolet-resistant PVC; 30 mils thick; roll
stock ready for shop or field cutting and forming. Adhesive: As recommended by insulation material manufacturer. PVC Jacket Color: White. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 220700 - 3 2. Stainless-Steel Jacket: ASTM A 666, Type 304 or 316;
0.010 inch thick; and factory cut and rolled to indicated sizes. Moisture Barrier: 3-mil- thick, heatbonded polyethylene and kraft paper. Elbows: Gore type, for 45- and 90-degree
elbows in same material, finish, and thickness as jacket. Jacket Bands: Stainless steel, Type 304, 3/4 inch wide. 2.6 COATINGS, MASTICS, ADHESIVES AND SEALANTS A. Vapor Barrier Coatings:
Used in conjunction with reinforcing mesh to coat insulation on below ambient services temperatures. Permeance shall be no greater than 0.08 perms at 45 mils dry as tested by ASTM
F1249. Foster 30-65 Vapor Fas; Childers CP-34, or approved equal. B. Lagging Adhesives: Used in conjunction with canvas or glass lagging cloth to protect equipment/piping indoors.
Foster 30-36 Sealfas; Childers CP-50AMV1 Chil Seal, or approved equal. C. Weather Barrier Mastic: Used outdoors to protect above ambient insulation from weather. Foster 46-50 Weatherite;
Childers CP-10 Vi Cryl, or approved equal. D. Fiberglass Adhesive: Used bond low density fibrous insulation to metal surfaces. Shall meet ASTM C916 Type II. Foster 85-60; Childers
CP-127, or approved equal. E. Insulation Joint Sealant: Used as a vapor sealant on below ambient piping with polyisocyanurate and cellular glass insulation. Foster 95-50; Childers
CP-76, or approved equal. F. Metal Jacketing Sealant: Used as a sealant on metal jacketing seams to prevent water entry. Foster 95-44; Childers CP-76, or approved equal. G. Reinforcing
Mesh: Used in conjunction with coatings/mastics to reinforce. Foster Mast A Fab; Childers Chil Glass #10, or approved equal. 2.7 PIPE SUPPORT INSULATION INSERTS A. 20 lbs./cu. ft.
molded fiberglass, for -120°F to +450°F service temperature, noncombustible, 0.30 thermal conductivity (k), same thickness as pipe insulation. B. Acceptable Manufacturers: Hamfab "H"
Block, or approved equal. 2.8 MATERIALS AND SCHEDULES A. See Exhibits at the end of this section. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 220700 - 4 PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A. All materials shall be installed by skilled labor regularly
engaged in this type of work. All materials shall be installed in strict accordance with manufacturer's recommendations, building codes, and industry standards. B. Locate insulation
and cover seams in the least visible location. All surface finishes shall be extended in such a manner as to protect all raw edges, ends and surfaces of insulation. No glass fibers
shall be exposed to the air. C. All pipe insulation shall be continuous through hangers, sleeves, walls, ceiling, floor, or roof openings, unless not allowed by fire stop system. Refer
to Sections 220500, "Basic Plumbing Requirements" and 221010, "Piping Systems and Accessories" for firestop systems. D. Provide thermal insulation on clean, dry surfaces and after piping
and equipment (as applicable) have been tested. Do not cover pipe joints with insulation until required tests are completed. E. All cold surfaces must be insulated. Vapor barrier
must be maintained; insulation shall be applied with a continuous, unbroken moisture and vapor seal. All hangers, supports, anchors, or other projections that are secured to cold surfaces
shall be insulated and vapor sealed to prevent condensation. Cover valves, fittings and similar items in each piping system with insulation as applied to adjoining pipe run. Extra
care must be taken on piping appurtenances to insure a tight fit to the piping system. For piping systems with fluid temperatures below ambient, all vapor retarder jacket (ASJ) seams
must be coated with vapor barrier coating. All associated elbows, fittings, valves, etc. must be coated with vapor barrier coating and reinforcing mesh to prevent moisture ingress.
Valve extension stems require Elastomeric insulation that is tight fitting to the adjoining fiberglass system insulation. Pumps, strainers, drain valves, etc. must be totally encapsulated
with Elastomeric insulation. F. Items such as manholes, handholds, clean-outs, plugged connections, pet cocks, air vents, ASME stamp, and manufacturers' nameplates, may be left un-insulated
unless omitting insulation would cause a condensation problem. When such is the case, appropriate tagging shall be provided to identify the presence of these items. Provide neatly
beveled edges at interruptions of insulation. G. Provide protective insulation as required to prevent personal injury. H. All pipes shall be individually insulated. I. If any insulation
material becomes wet because of transit or job site exposure to moisture or water, the contractor shall not install such material, and shall remove it from the job site. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 220700 - 5 J. All exposed surfaces shall be
white, unless noted otherwise. 3.2 PIPE INSULATION A. Insulate piping systems including fittings, valves, flanges, unions, strainers, and other attachments installed in piping system,
whether exposed or concealed. B. Insulation installed on piping operating below ambient temperatures must have a continuous vapor retarder. All joints, seams and fittings must be sealed.
Insulation shall be continuous through hangers on all water piping and storm water piping. C. Hanger Shields: Refer to Section 221010 "Piping Systems and Accessories". D. Hanger shields
shall be installed between hangers or supports and the piping insulation. E. Joints in section pipe covering made as follows: 1. All ends must be firmly butted and secured with appropriate
butt-strip material. On high-temperature piping, double layering with staggered joints may be appropriate. When double layering, the inner layer should not be jacketed. 2. Standard:
Longitudinal laps and butt joint sealing strips cemented with white vapor barrier coating, or factory supplied pressure sensitive adhesive lap seal. 3. Vapor Barrier: For cold services,
Longitudinal laps and 4 in. vapor barrier strip at butt joints shall be sealed with white vapor barrier coating. Seal ends of pipe insulation at valves, flanges, and fittings with
white vapor barrier coating. F. Fittings, Valves and Flanges: 1. Domestic Hot and Cold Water: Premolded fitting insulation of the same material and thickness as the adjacent pipe insulation.
Vapor seal domestic cold water with two (2) coats of white vapor barrier coating. 2. White PVC jacketing, with continuous solvent weld of all seams. Tape all fittings. G. For piping
exposed to the elements, jacketing shall be stainless steel with a factory applied moisture barrier. Fitting covers shall be of similar materials. The insulation and jacketing shall
be held firmly in place with a friction type Z lock or a minimum 2 in. overlap joint. All joints shall be sealed completely along the longitudinal seam and installed so as to shed
water. All circumferential joints shall be sealed by use of preformed butt strips; minimum 2 in. wide or a minimum 2 in. overlap. Butt strips shall overlap the adjacent jacketing
a minimum 1/2 in. and be completely weather sealed. Jacket at elbows and tees shall be mitered, or pre-manufactured fitting jackets shall be provided, with additional aluminum holding
bands, as required. All joints shall be sealed watertight using specified metal jacketing sealant as recommended by the manufacturer. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI
411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 220700 - 6 H. Apply PVC jacket where indicated, with 1 in. overlap at longitudinal
seams and end joints. Seal with manufacturers recommended adhesive. I. Apply PVC jacketing to exposed insulated pipe, valves, fittings, and specialties, at an elevation of 8 feet or
less above finished floor in mechanical/electrical rooms, penthouses, and services aisles/pipe chases. Fittings of aluminum-jacketed piping may be either aluminum or standard PVC fitting
covers. J. Piping in exterior walls, spaces, overhangs, attics, or where subject to freezing: Insulate pipe with double the thickness called for. Piping in wall chases: In addition
to the above, pack chase with loose glass fiber insulation. K. Provide insulation on exposed hot and cold plumbing piping to within 18 in. of fixture or equipment connection. L. Insulate
exposed domestic water and waste piping for plumbing fixtures designated for use by the handicapped. 3.3 EQUIPMENT INSULATION A. Apply insulation with joints firmly butted as close
as possible to the equipment surface. Insulation shall be secured as required with adhesive, mechanical fasteners or banding material. Fasteners shall be located a maximum of 3 in.
from each edge and spaced no greater than 12 in. on center. B. Vapor retarders shall overlap a minimum of 2 in. at all seams and be sealed with appropriate pressure-sensitive tape or
mastic. All penetrations, facing damage, and mechanical fasteners shall be covered with a minimum 2 in. overlap of tape and vapor barrier coating. C. Fiberglass Equipment Insulation:
Secure fiberglass with pins, studs, or clips. Field apply 8 oz. knit fiberglass cloth, cemented and applied over standard jacket. Properly cut at fittings to avoid wrinkles and coat
with white mastic coating. Leave ready for painting. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 INSULATION 220700 - 7 EXHIBIT "I" - PIPE INSULATION MATERIALS (Notes at end of Exhibit "I") SERVICE INSULATION MATERIAL THICKNESS REMARKS Domestic cold water Glass fiber
1-1/2 in. and larger: 1 in. 1-1/4 in. and smaller: 1/2 in. SEE NOTES 1, 2 Domestic hot, tempered and circulation water (105°F - 140°F) Glass fiber 1-1/2 in. and larger: 2 in. 1-1/4
in. and smaller: 1 in. SEE NOTE 1 Domestic hot, tempered and circulation water (141°F - 200°F) Glass fiber 1-1/2 in. and larger: 2 in. 1-1/4 in. and smaller: 1-1/2 in. SEE NOTE 1
AC unit drains, overflows and indirect waste piping associated with any HVAC equipment Glass fiber All sizes: 1/2 in. Storm and secondary storm water Glass fiber All sizes: 1 in.
Insulate body of roof drain and storm water piping, horizontal and vertical. Sanitary and waste Glass fiber All sizes: 1/2 in. SEE NOTE 2, 3 NOTES FOR EXHIBIT I: NOTE 1: Exposed insulation
at all kitchen equipment shall be covered with a stainless steel jacket. NOTE 2: Insulation on sanitary and waste piping located within plumbing chases and crawl spaces is not required.
NOTE 3: When PVC piping is installed for storm, sanitary and vent piping within return air plenums, the piping shall be insulated and enclosed in materials listed and labeled for installation
within a plenum. END OF SECTION 220700 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 1 SECTION 221010 - PIPING SYSTEMS AND ACCESSORIES PART 1 - GENERAL 1.1 WORK INCLUDED
A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract Documents. 1.2 SUBMITTALS A.
Provide a schedule of all pipe materials, fittings and connections that will provided on this project. B. Provide a detailed matrix listing the specific UL approved firestop system
assembly to be used for each type of piping provided and each type of construction to be penetrated along with all associated UL assembly details. PART 2 - PRODUCTS 2.1 GENERAL A. Pipe
and fittings shall be new, marked with manufacturer's name and comply with applicable ASTM and ANSI Standards. B. All items here-in used to convey water for potable use shall be lead
free in accordance with NSF, Standard 61, Section 9 - Standard for Drinking Water and Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. Compliance shall be via third
party testing and certification. C. All adhesives, sealers and primers used for piping in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC)
limits called for in the current version of U.S. Green Building Council LEED Credits EQ4.1 and EQ4.2. 2.2 STEEL PIPING AND FITTINGS A. Pipe: ASTM A53, or ASTM A106 seamless, Schedule
40 weight; black or galvanized finish as called for; ends chamfered for welding or grooved for grooved mechanical connections. B. Fittings: Same material and pressure class as adjoining
pipe. 1. Welded fittings: Factory forged, seamless construction, butt weld type chamfered ends. Where branch connections are two or more sizes smaller than main size, use of "Weldolets",
"Thredolets" or "Sockolets" acceptable. Mitered elbows, "shaped" nipples, and job fabricated reductions not acceptable unless specifically called for. Socket weld type, 2000 psi wp,
where called for. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES
221010 - 2 2. Threaded fittings: Cast or malleable iron, black or galvanized, as called for; drainage type where called for; UL listed and FM approved for fire protection systems.
Street type 45° and 90° elbows are not acceptable. C. Flanges, Unions, and Couplings: 1. Threaded Connections: a. Flanges: Cast iron companion type; for sizes 2-1/2 in. and larger.
b. Unions: Malleable iron, bronze to iron seat, 300 lb. wwp; for sizes 2 in. and smaller. c. Couplings: Malleable iron. Steel thread protectors are not acceptable as couplings. 2.
Welded Connections: a. Flanges: Welding neck type. Slip-on type not allowed unless noted and shall not be installed in conjunction with butterfly valves. D. Gauge and Instrument Connections:
Nipples and plugs for adapting gauges and instruments to piping system shall be IPS brass. 2.3 COPPER TUBE AND FITTINGS A. Pipe: ASTM B88; Type K or L, hard temper. Soft temper only
as called for. Plans show copper tube sizes. B. Fittings: Wrought copper and copper alloy, ASME B16.22 or cast copper alloy, ASME B16.18; solder end connections. C. Unions and Flanges:
2 in. and smaller use unions, solder type, cast bronze, ground joint, 150 lb. swp: 2-1/2 in. and over use flanges, cast bronze, companion type, ASME drilled, solder connection, 150
lb. swp. D. Flux Materials: Flux shall comply with ASTM B813 and the provisions of the International Plumbing Code. E. Solder Materials: No-lead solder, using alloys made from tin,
copper, silver and nickel. Harris, Inc., "Stay-Safe 50" and "Bright", Engelhard "Silvabright 100", Canfield "Watersafe" or approved equal. F. Brazing Materials: Class BcuP-5 for brazing
copper to brass, bronze to copper. Harris, Inc. "Stay-Silv 15" or approved equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 3 2.4 COPPER TUBE AND FITTINGS - PRESS FITTINGS A. Tubing Standard: Copper tubing shall conform to
ASTM B75 or ASTM B88. B. Fitting Standard: Copper fittings shall conform to ASME B16.18, ASME B16.22, or ASME B16.26. C. Press Fittings: Copper press fittings shall conform to the
material and sizing requirements of ASME B16.18 or ASME B16.22. O-rings for copper press fittings shall be EPDM. D. Acceptable Manufacturers: Apollo, Mueller, Nibco, Viega. 2.5 COPPER
TUBE AND FITTINGS - GROOVED MECHANICAL CONNECTIONS A. Pipe: ASTM B88, Type K or L, hard temper. B. Fittings: Wrought copper, roll grooved mechanical connections, ASTM B-75, ANSI B16.22
for 4 in. size. Cast bronze, rolled grooved mechanical connections, ASTM B584, ANSI B16.18 for sizes 5 in. - 8 in. C. Couplings: Ductile iron, ASTM A-536, with copper colored alkyd
enamel finish, designed for rolled grooved piping. D. Gaskets: Grade "E" EPDM synthetic rubber, copper color coded, -30°F to 230°F temperature range, suitable for water service. E.
Bolts and Nuts: Heat treated, hex head carbon steel, ASTM A183, cadmium plated or zinc electroplated finish. F. Design Equipment: Victaulic Style 606 couplings. G. Acceptable Manufacturers:
Grinnell, Gruvlok, Victaulic. 2.6 COPPER DRAINAGE TUBE AND FITTINGS A. Pipe: ASTM B306, Type DWV, hard temper. 1. Copper not allowed for urinal waste. B. Fittings: Wrought copper,
ANSI B16.29 or cast bronze, ANSI B16.23; solder end connections. C. Flux Materials: Flux shall comply with ASTM B813 and the provisions of the New York State Plumbing Code. D. Solder
Materials: No lead solder, using alloys made from tin, copper, silver and nickel. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 4 E. Acceptable Manufacturers: Harris, Inc., "Stay-Safe 50" and "Bright", Engelhard "Silvabright
100", Canfield "Watersafe", or approved equal. 2.7 BRASS PIPE AND FITTINGS A. Piping: ASTM B43, semi-annealed, red brass containing not less than 85% copper; chrome plated where called
for. B. Fittings: Cast brass, sps, malleable iron pattern, reinforced corresponding to weight of pipe; chrome plated with high polished finish where called for. 2.8 HUB AND SPIGOT
CAST IRON SOIL PIPE AND FITTINGS A. Pipe: ASTM A74 service weight cast iron, bitumen coated. B. Fittings: Cast iron, service weight, hub and spigot, drainage pattern, bitumen coated.
C. Connections: ASTM C564 neoprene gaskets and lubricant. D. All cast iron soil pipe and fittings shall be marked with the collective trademark of the Cast Iron Soil Pipe Institute
(CISPI) and be listed by NSF International. 2.9 NO-HUB CAST IRON SOIL PIPE AND FITTINGS A. Pipe: ASTM A888, CISPI Standard 301, no-hub cast iron, bitumen coated. 1. For above grade
only. B. Fittings: Cast iron, no-hub drainage pattern, bitumen coated. C. Couplings: 1. 1-1/2 in. to 2 in.: CISPI standard 310 with 300 series stainless steel corrugated shield and
clamp assembly with ASTM C564 neoprene sealing sleeve (or) same as specified for 3 in. and larger. 2. 3 in. and Larger: 24 gauge, Type 304 stainless steel housing clamp assembly with
ASTM C564 neoprene sealing sleeve, 60 in. lbs. minimum torque rating, shall meet requirements of pipe manufacturer and shall be compatible with specified pipe. Acceptable Manufacturers:
Clamp-All Coupling System, Tyler "Wide Body", Husky "Series 2000", Mission "Heavy Weight" or approved equal. D. All cast iron soil pipe and fittings shall be marked with the collective
trademark of the Cast Iron Soil Pipe Institute (CISPI) and be listed by NSF International. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 5 2.10 PVC SOLID WALL PIPE AND FITTINGS - DWV SYSTEM A. Pipe: PVC Schedule 40 solid wall
pipe, iron pipe size conforming to ASTM D1785 and ASTM D2665. Pipe shall be manufactured from PVC compounds as identified in ASTM D1784. Both pipe and fittings shall conform to National
Sanitation Foundation Standard 14. B. Fittings: Type DWV, socket type conforming to ASTM D2665. Fittings shall be manufactured from PVC compounds as identified in ASTM D1784. Solvent
cement joints shall be made utilizing a two-step process with primer manufactured for thermoplastic piping and solvent cement conforming to ASTM D2564. 2.11 SPECIAL FITTINGS A. Copper
to Cast Iron: Cast bronze, cast iron to sweat adapter. B. Copper to Steel Piping: 1. Cast bronze copper to iron male or female adapter with shoulder for drainage piping only. 2. Dielectric
pipefittings. C. Steel to Cast Iron: Cast iron soil pipe connector with spigot and IPS male thread end (Manhoff fittings). D. No-Hub, Cast Iron, PVC, CPVC: Proper adapter to piping
being connected. 2.12 DIELECTRIC PIPE FITTINGS A. Description: Assembly or fitting having insulating material isolating joined dissimilar metals to prevent galvanic action and stop
corrosion. B. Unions: Factory fabricated, for 250 psi minimum working pressure at 180°F, threaded or solder ends, insulating material suitable for system fluid, pressure and temperature.
C. Flanges: Factory-fabricated, companion-flange assembly, for 150 or 300 psig minimum pressure to suit system fluid pressures and temperatures with flange insulation kits and bolt
sleeves. D. Acceptable Manufacturers: EPCO, Capitol Manufacturing, Watts or approved equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 6 2.13 HANGERS, INSERTS AND SUPPORTS A. Hangers, Inserts, Clamps: B-Line, Grinnell,
Michigan Hanger, PHD Manufacturing. B. Hangers: 1. Adjustable, wrought malleable iron or steel with electroplated zinc or cadmium finish. PVC coated where in contact with copper piping.
2. Adjustable ring type where piping is installed directly on hanger for piping 3 in. and smaller. 3. Adjustable steel clevis type for piping 4 in. and larger. 4. Nuts, washers and
rods with electroplated zinc or cadmium finish. 5. Provide hot dipped galvanized finish for hangers and accessories installed in exterior locations and interior areas with moist environment
conditions such as pools, pool filter rooms, areaways, garages and similar areas. C. Spacing Schedule: Pipe Size Steel Copper Plastic Cast Iron Rod Size 3/4 in. to 1 in. 8 ft. 6 ft.
3 ft. Each 3/8 in. 1-1/4 in. to 2 in. 10 ft. 6 ft. 3 ft. Horizontal 3/8 in. 2-1/2 in. to 4 in. 12 ft. 10 ft. 4 ft. Joint 5 ft. 1/2 in. 5 in. and over 12 ft. 10 ft. 4 ft. Maximum 5/8
in. 8 in. 12 ft. 10 ft. 4 ft. O.C. 3/4 in. Over 8 in. To suit loading conditions. D. Cast Iron No-Hub Supports: 1. In accordance with manufacturer's recommendations. 2. Vertical piping
supported at each stack base, at each floor and 15 ft. on center, maximum. Freestanding vertical pipe should be adequately staked or braced during construction to maintain alignment.
Bases of stacks shall be supported on concrete, brick laid in cement mortar, metal brackets attached to the building construction or by other methods approved by the Owner's Representative.
3. Horizontal piping supported within 24 in. each side of the coupling joint at 10 ft. intervals for 10 ft. pipe lengths and at 5 ft. intervals for 5 ft. pipe lengths. Supports or
hangers placed to maintain alignment and grade with provision made to prevent shear. Greater than 3 in. diameter pipe braced at changes of direction to prevent horizontal movement.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010
- 7 E. Beam Attachments: 1. C-Clamp style, locknut, restraining strap, electroplated finish, UL listed, FM approved for pipe sizes 2 in. and smaller. 2. Center loaded style with clamp
attachments that engage both edges of beam, electroplated finish, UL listed, FM approved, for pipe sizes larger than 2 in., refer to "Supports" for additional requirements. F. Inserts:
Carbon steel body and square insert nut, galvanized finish, maximum loading 1300 lbs., for 3/8 in. to 3/4 in. rod sizes, reinforcing rods on both sides, MSS-SP-69 Type 19 or approved
equal. G. Supports: 1. Provide intermediate structural steel members where required for hanger attachment. Members shall span across the bar joists at panel points of joists. Secure
member to structure. Select size of members based on a minimum factor of safety of four. 2. For Weights Under 1000 lbs.: "Drill-In" inserts, "U" shaped Channel, beam clamps or other
structurally reviewed support. The factor of safety shall be at least four. Follow manufacturer's recommendations. 3. For Weights Above 1000 lbs.: Drill through floor slabs and provide
flat flush plate welded to top of rod or provide additional "Drill-In" inserts and hangers to reduce load per hanger below 1000 lbs. 4. For Metal Decks: Drill hole through for hanger
rods and imbed a welded plate in concrete or use devices designed for this application, with a safety factor of four. 5. Acceptable Manufacturers: Hilti, ITW Ramset, Phillips "Red
Head" or approved equal. H. Trapeze Hangers: 1. For plumbing systems only. 2. Hangers shall be supported with rod sized with a safety factor of four. 3. May be manufactured type "U"
shaped channel, or suitable angle iron or channel. Round off all sharp edges. 4. Securely fasten piping to trapeze with "U" bolt or pipe clamps, dissimilar metals shall not touch,
use isolation gaskets. Fasten piping to trapeze at every third support. 5. Acceptable Manufacturers: B-Line, Kindorf, Unistrut or approved equal. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 8 I. Hanger Insulation Shields:
1. Hanger insulation shields shall be provided for all water and storm water piping. Hangers shall attach directly to pipe for all remaining services. 2. Piping 2 in. and Smaller:
Pipe insulated with glass fiber insulation shall be protected at point of support by a sheet metal shield. Shield shall be #18 gauge, galvanized steel, minimum 120 degree arc, formed
to fit insulation thickness and 12 in. long. Tape shields to pipe insulation. 3. Piping 3 in. and Larger: Pipe insulated with glass fiber insulation shall be protected at point of
support by a sheet metal shield and pipe support insulation insert(s) between pipe and hanger. Shield shall be #18 gauge, galvanized steel, minimum 120 degree arc, formed to fit insulation
thickness and 12 in. long. Tape shields to pipe insulation. Provide temporary blocking to maintain proper spacing for insulation. J. Provide continuous support for unpigmented polypropylene
piping. K. Piping systems with material not listed above shall be supported and protected in accordance with manufacturer's recommendations. 2.14 PIPING ACCESSORIES A. Escutcheon Plates:
Steel or cast brass, split hinge type with setscrew, high plates where required for extended sleeves. Chrome plated in finished areas and at plumbing fixtures. B. All cleanout plugs,
bushings and nipples, required for instruments and gauges shall be brass. C. Hubless cast iron fitting restraints shall be Holdrite Series #117 or approved equal. 2.15 SLEEVES A. Standard
Type: 1. Schedule 40 black steel pipe sleeves for structural surfaces, two pipe sizes larger than the pipe, and as recommended by the sealing element manufacturer. Provide full circle
water stop collar for sleeves located within below grade walls, wet wells and waterproofed surfaces. The collar shall be fabricated from steel plate and welded to the sleeve around
its entire circumference. 2. Schedule 40 PVC sleeves or sheet metal sleeves for nonstructural surfaces and existing construction. Sheet metal sleeves shall be 18 gauge minimum and
braced to prevent collapsing. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS
AND ACCESSORIES 221010 - 9 2.16 SEALING ELEMENTS A. Expanding neoprene link type, watertight seal consisting of interlocking links with zinc plated bolts. 1. Acceptable Manufacturers:
Thunderline "Link-Seal" Series 200, 300 or 400, Pyropac, Calipco. 2.17 FIRESTOP SYSTEM FOR OPENINGS THROUGH FIRE RATED WALL AND FLOOR ASSEMBLIES A. Materials for firestopping seals
shall be listed by an approved independent testing laboratory for "Through-Penetration Firestop Systems". The system shall meet the standard fire test for Through-Penetration Firestop
Systems designated ASTM E814. Firestop system seals shall be provided at locations where piping pass through fire rated wall, floor/ceiling, or ceiling/roof assembly. Minimum required
fire resistant ratings of the assembly shall be maintained by the Firestop System. Installation shall conform with the manufacturer's recommendations and other requirements necessary
to meet the testing laboratory's listing for the specific installation. 2.18 STRAINERS A. Description: Y-Pattern, self-cleaning, except where otherwise indicated, full size of connecting
piping, Type 304 stainless steel screens, 125 lb. SWP, unless otherwise indicated. B. Copper Piping 2-1/2 in. and Smaller: Lead free, cast bronze body, threaded ends, tapped retainer
cap with closure plug, 20 mesh screen, Watts #LF777S. C. Steel Piping 2-1/2 in. and Smaller: Iron body, threaded ends, tapped retainer cap with closure plug, 20 mesh screen, Watts
#77S D. Piping 3 in. and Larger, Cold Water Applications: Lead free, cast iron body, flanged ends, standard screen openings, FDA approved epoxy coating, tapped retainer cap and gasket
with closure plug; Watts #77F-DI-FDA-125. 2.19 PIPING MATERIALS AND SCHEDULE A. See Exhibit "A", "Schedule of Piping Materials" at end of this Section for (Plumbing) piping. B. See
Exhibit "B", "Testing" at end of this Section. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
PIPING SYSTEMS AND ACCESSORIES 221010 - 10 PART 3 - EXECUTION 3.1 EQUIPMENT AND SYSTEMS A. Install equipment and systems in accordance with provisions of each applicable Section
of these Specifications, and Local/State Codes/Regulations having jurisdiction. Accurately establish grade and elevation of piping before setting sleeves. Install piping without springing
or forcing, except where specifically called for, making proper allowance for expansion and anchoring. Changes in sizes shall be made with reducing fittings. Reducing couplings are
not acceptable. Arrange piping at equipment with necessary offsets, unions, flanges, and valves, to allow for easy part removal and maintenance. Offset piping and change elevation
as required to coordinate with other work. Avoid contact with other mechanical or electrical systems. Provide adequate means of draining and venting units, risers, circuits and systems.
Conceal piping unless otherwise called for. Copper tubing shall be cut with a wheeled tubing cutter or other approved copper tubing cutter tool. The tubing must be cut square to
permit proper joining with the fittings. Ream pipes after cutting and clean before installing. Cap or plug equipment and pipe openings during construction. Install piping parallel
with lines of building, properly spaced to provide clearance for insulation. Make changes in direction and branch connections with fittings. Do not install valves, unions and flanges
in inaccessible locations. Materials within a system and between systems shall be consistent. If this is not possible, install dielectric fittings. 3.2 PIPING OVER ELECTRICAL EQUIPMENT
A. Contractor shall route piping to avoid installation directly over electric equipment, including, but not limited to panels, transformers, disconnects, starters, motor control center,
adjustable speed drives and fused switches. B. Piping shall not be installed in the dedicated electric and working space as defined by NEC 110. Dedicated electrical space is generally
equal to the depth and width of electrical equipment, and extends 6 ft. above the electrical equipment, or to a structural ceiling. Dedicated working space is a minimum of 30 in. wide
or the width of equipment (whichever is larger) a minimum of 6 ft.-6 in. tall, with a depth of 3ft. to 9 ft. depending on the voltage. 3.3 HANGERS, INSERTS AND SUPPORTS A. Piping shall
not be supported by wires, band iron, chains, from other piping, or by vertical expansion bolts. Support piping with individual hangers from concrete inserts, wood construction, welded
supports, or beams clamps of proper configuration and loading design requirements for each location; replace if not suitable. Follow manufacturer's safe loading recommendations. Suspend
with rods of sufficient length for swing and of size called for, using four (4) nuts per rod. Provide additional structural steel members, having one coat rustproof paint, where required
for proper support. Provide oversized hangers where insulation/supports must pass between pipe and hanger. Provide continuous support or extra supports for plastic piping per manufacturer's
requirements. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES
221010 - 11 Hangers, when attached to joists, shall only be placed at the top or bottom chord panel point. Only concentric type hangers are permissible on piping larger that
2-1/2 in.; "C" types are permitted for piping 2 in. and smaller on joists. Provide riser clamps for each riser at each floor. Use trapeze hangers where a group of piping can be installed.
B. Provide a pipe hanger or support within 12 inches of pipe unions and piping connections to equipment, in order to facilitate disconnections of piping without pipe sagging. 3.4 PIPE
CONNECTIONS A. No-Lead Solder Connections: Nonacid flux and clean off excess flux and solder. B. Press Connections: Copper press fittings shall be made in accordance with the manufacturer's
installation instructions. The tubing shall be fully inserted into the fitting and the tubing marked at the shoulder of the fitting. The fitting alignment shall be checked against
the mark on the tubing to assure the tubing is fully engaged (inserted) in the fitting. The joints shall be pressed using the tool approved by the manufacturer. C. Brazed Connections:
Make joints with silver brazing alloy in accordance with manufacturer's instructions. Remove working parts of valves before applying heat. D. Threaded Connections: Clean out tapering
threads, made up with pipe dope; screwed until tight connection. Pipe dope must be specifically selected for each application. E. Flanged Joints: Select appropriate gasket material,
size, type and thickness for service applications. Install gasket concentrically positioned. Use suitable lubricants on bolt threads. F. Dielectric Pipe Fittings: Provide dielectric
unions at ALL equipment connections where dissimilar metals meet. In addition, provide dielectric unions in all open type piping systems (condensing water, domestic water, etc.) where
dissimilar metals are to be joined. G. Grooved Mechanical Joints: Pipe to be prepared in accordance with the latest manufacturer's grooving specification. Use manufacturer's recommended
grooving tools. Pipe shall be checked to be sure it is free of indentations, projections; weld seams or roll marks on the exterior of the pipe over the entire gasket seating area.
Pipe ends are to be square cut. Lubricant shall be applied to gasket and/or pipe ends and housing interiors to eliminate pinching the gasket. H. Solvent-Cement Plastic Piping Joints:
Clean and dry joining surfaces. Join pipe and fittings according to the following: 1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.
Apply primer. 2. PVC Piping: Join according to ASTM D 2855. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 12 3.5 WELDING A. Welding shall be performed in compliance with the welding procedure specifications prepared by the
National Certified Pipe Welding Bureau. Welded pipe fabricated by certified welder. Contractor shall submit proof of current certification of each welder if requested by Owner. Use
full-length pipe where possible; minimum distance between welds, 18 in. on straight runs. Welds must be at least full thickness of pipe inside smooth and remove cutting beads, slag
and excess material at joints; chamfer ends. Minimum gap 1/8 in., maximum 1/4 in., for butt welds. Overlaps on position and bench welds to be not less than 3/4 in. One internal pass
and one external pass minimum required on slipon flanges. Do not apply heat to rectify distorted pipe due to concentrated welding; replace distorted pipe. B. When welding galvanized
pipe, apply cold galvanizing on joint following welding. 3.6 SLEEVES A. Provide for pipes passing through all floors, walls or ceilings. Not required for floors that are core-drilled,
except where floor is waterproofed. B. Extend 1/8 in. above finished floor in finished areas. In above grade Mechanical Rooms and other areas with floor drains, use steel pipe sleeves
2 in. above floor. C. Use steel pipe sleeves in bearing wall, structural slabs, beams and other structural surfaces, and where called for. D. Sleeves shall be as small as practical,
consistent with insulation, so as to preserve fire rating. E. Fill abandoned sleeves with concrete. F. Provide rubber grommet seals for pipes passing through ducts or air chambers or
built-up housings. 3.7 SLEEVE PACKING A. Seal void space at sleeves as follows: 1. Interior Locations: Firmly pack with fiberglass and caulk. 2. Exterior Walls and Below Grade Cored
Holes: Use sealing element. 3. Cored Holes: Use sealing element. 4. Fire Rated, Partitions and Floor Slabs: Use fire rated sealing elements, materials and methods. Provide per manufacturer's
instructions to maintain firestop. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS
AND ACCESSORIES 221010 - 13 5. Waterproofed Walls/Floors: Use waterproof sealing element, device or compound. 3.8 ESCUTCHEON PLATES A. Provide polished chrome setscrew type escutcheon
plates for all exposed piping passing through floors, walls or ceilings, in all rooms except in Boiler, Fan and Mechanical Rooms. 3.9 TESTS A. Refer to Exhibit "B" at the end of this
section for testing of Plumbing Systems. B. Provide all necessary items to complete proper testing of work. Perform all testing in accordance with governing Codes, local utilities
and other agencies having jurisdiction and as specified. Pay all costs to perform tests. Perform all testing in a safe manner. Isolate existing systems. C. Domestic Water: 1. Do
not cover joints with insulation until required tests are completed and the Owner's Representative accepts the system. 2. Make leaks tight; no caulking permitted. Replace defective
fittings, pipe or connections. Piping shall be tight and show no loss of pressure. 3. Air test not acceptable as final test. 4. Confirm in writing that tests and flushing have been
conducted and successfully completed. Submit copy of the test report to Owner's Representative. D. Sanitary and Storm: 1. There shall be no loss of water when testing interior piping.
2. Air test not acceptable as final test. 3. Should any leaks, defective joints or defective construction be detected in sewers and/or floors or walls of appurtenant structures, they
shall be permanently stopped. Should any defective pipes, fitting or accessories be discovered they shall be removed and replaced at the Contractor's expense. 4. Confirm in writing
that tests have been conducted and successfully completed. Submit copy of the test report to Owner's Representative. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 14 3.10 DOMESTIC WATER PIPING CLEANING AND DISINFECTION A. Cleaning
and disinfecting shall be in accordance with requirements of New York State Department of Health and authority having jurisdiction. Prior to disinfecting, flush piping to remove any
sediment and debris. B. Clean and disinfect water distribution piping systems and parts of existing potable water systems that have been altered, extended or repaired. C. After disinfection
procedures, submit water samples in sterile bottles to an approved Department of Health Laboratory. Samples shall be proven equal to the water quality served to the public from the
existing water supply system and acceptable to the Department of Health. Flush and disinfect all sections of pipe that fail the laboratory tests. Submit test results indicating water
is potable. 3.11 PIPE LINE SIZING A. Pipe sizes called for are to be maintained. Pipe size changes made only as reviewed by Owner's Representative. Where discrepancy in size occurs,
the larger size shall be provided. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS
AND ACCESSORIES 221010 - 15 EXHIBIT "A" - PIPING MATERIALS (PLUMBING) (Notes at end of Exhibit "A") SERVICE PIPE MATERIALS FITTINGS CONNECTIONS Domestic water interior/hot, cold
and circulating 3 in. and smaller Type L copper Wrought or cast copper No-lead solder Type L copper Wrought or cast copper Press fit Sanitary, sanitary vent Service weight cast
iron soil pipe Cast iron hub and spigot Neoprene compression type gasket Service weight cast iron soil pipe No hub No hub neoprene gasket and stainless steel clamp assembly Type DWV
copper Wrought copper No-lead solder (SEE NOTE 4) Schedule 40 PVC, solid wall PVC, socket type Primer and solvent cement (SEE NOTE 3) Storm Service weight cast iron soil pipe Cast
iron hub and spigot Neoprene compression type gasket Service weight cast iron soil pipe No hub No hub neoprene gasket and stainless steel clamp assembly Schedule 40 PVC, solid wall
PVC, socket type Primer and solvent cement (SEE NOTE 3) Type DWV copper Wrought copper No-lead solder Indirect waste Type DWV copper Wrought copper No-lead solder Schedule 40 PVC,
solid wall PVC, socket type Solvent cement (SEE NOTE 3) Natural gas (exterior above grade) Schedule 40, black steel Butt welded steel, 2-1/2 in and larger Welded (SEE NOTE 2) TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 16 SERVICE
PIPE MATERIALS FITTINGS CONNECTIONS Schedule 40, black steel Malleable iron, 2 in. and smaller Threaded (SEE NOTE 2) Natural gas (interior) Schedule 40, black steel Malleable iron,
2 in. and smaller Threaded (SEE NOTE 2) Schedule 40, black steel Butt welded steel, 2-1/2 in. and larger Welded (SEE NOTE 2) NOTES FOR EXHIBIT A: NOTE 1: Provide ductile iron, double
thickness cement - lined pipe and fittings up to the water meter inlet valve in accordance with the City of Ithaca Water Bureau Requirements. Pipe and fittings shall be flanged. NOTE
2: Provide one coat of alkyd primer and two coats of exterior acrylic latex gloss enamel on all exposed exterior and interior piping. Color as selected by Architect. NOTE 3: PVC piping
shall not be installed within return air plenums. NOTE 4: Copper piping shall not be used for urinal waste piping. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 221010 - 17 EXHIBIT "B" - TESTING SERVICE TEST REQUIREMENTS Domestic water Test
hydrostatically at 150 PSI for two (2) hours or at 1.5 times the working pressure when working pressure exceeds 100 PSI Sanitary, sanitary vent, storm Maintain 10 ft. head of water
for two (2) hours. Indirect waste Maintain 10 ft. head of water for two (2) hours. Natural gas Refer to Section 227010 - "Natural Gas Systems". END OF SECTION 221010
THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PUMPS
221030 - 1 SECTION 221030 - PUMPS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation
and related Work as required in Contract Documents. 1.2 QUALITY ASSURANCE A. Follow all requirements, recommendations and appendices to comply with the following publications, codes,
standards and listings/approvals: 1. All items here-in used to convey water for potable use shall be lead free in accordance with NSF 61, Standard 61, Section 9 - Standard for Drinking
Water and Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. Compliance shall be via third party testing and certification. 1.3 SUBMITTALS A. Submit manufacturer's
data in accordance with the Basic Mechanical and Electrical Requirements. Obtain approval prior to ordering material. B. Provide submittals for all items specified under Part 2 of
this Section. PART 2 - PRODUCTS 2.1 HOT WATER CIRCULATING PUMP (RP-1) A. Pump: Inline centrifugal variable speed, all stainless steel, system fluid lubricated, 145 psi working pressure,
230°F water temperature, ceramic shaft and radial rings, flange mount. B. Motor: Impedance protected, stainless steel can and static o-ring seals to isolate stator from system fluid,
non-overloading throughout the pump curve. C. Electric Control: Provide time clock and aquastat for each pump and wiring to motor starter. Starter and time clock by Electrical Contractor.
D. Refer to schedule on drawings for capacity and electrical characteristics. E. Design Make: Grundfos "Magna 3" Series. Refer to schedule on drawings. F. Acceptable Manufacturers:
Armstrong, Bell and Gossett, Grundfos. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PUMPS
221030 - 2 PART 3 - EXECUTION 3.1 INSTALLATION A. Pumps shall be installed, aligned and started in accordance with manufacturers written installation instruction. B. Install pumps
in locations to provide access for maintenance and replacement of parts. C. Support pumps and piping separately so that piping does not support pumps. D. Provide the services of a factory
trained mechanic to start up the system based on factory recommendations. Provide Owner instruction at time of start up. Submit three (3) copies of start up report to the Owner's
Representative. 3.2 HOT WATER CIRCULATING PUMP A. Install shutoff valve and strainer on pump suction; check valve, balancing valve and shutoff valve in pump discharge. Install pressure
gauge on suction and discharge piping. Adjust gpm of each circulating pump to capacity as noted. 3.3 TESTING A. Test hot water recirculating pump for proper operation. B. Test sanitary
and storm pumping systems for operation at specified liquid depths. C. Test high all water alarms for operation at specified liquid depth. D. Certify in writing that tests have been
performed and the systems are properly operating. Submit three (3) copies of all test reports to the Owner's Representative. END OF SECTION 221030 TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SUPPLY 221100 - 1 SECTION 221100 - WATER SUPPLY PART 1 - GENERAL
1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract Documents.
1.2 QUALITY ASSURANCE A. Follow all requirements, recommendations and appendices to comply with the following publications, codes, standards, and listings/approvals: 1. ANSI/AWWA C600:
AWWA Standard for Installation of Ductile Iron Water Mains and Their Appurtenances. 2. NFPA 24: Standard for the Installation of Private Fire Service Mains and Their Appurtenances.
3. New York State Health Department. 4. City of Ithaca municipality and fire department requirements and standards. 5. All items here-in used to convey water for potable use shall be
lead free in accordance with NSF 61, Standard 61, Section 9 - Standard for Drinking Water and Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. Compliance shall be
via third party testing and certification. 1.3 SUBMITTALS A. Provide submittals for all items specified under Part 2 of this Section. PART 2 - PRODUCTS 2.1 WATER PIPING A. Piping Materials:
Refer to Specification Section 221010, "Piping Systems and Accessories". 2.2 WATER METER A. Water Service: AWWA Standard C702 compound type. Provide domestic water meter for tenant's
domestic water use monitoring. 1. Acceptable Manufacturers: Hersey, Neptune, Rockwell, Trident, or approved equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SUPPLY 221100 - 2 2. Design Make: Neptune T-10 meter, 1-1/2" size. a. Provide with "E-Coder" high resolution
remote reading equipment. B. Provide 3" lead free plate strainer ahead of meter. 1. Make: Neptune high copper alloy, lead free. 2.3 BACKFLOW PREVENTERS AND ACCESSORIES A. Reduced
Pressure Type (RPZ) 1. Fused epoxy coated iron body, stainless steel bolts and internal parts, stainless steel check seats. Device shall be lead free. 2. Four (4) test cocks, lead
free strainer and full port ball valve shutoffs. 3. Design Equipment: Watts LF009. 4. Acceptable Manufacturers: Ames, Febco, Wilkins, Watts. B. Double Check Detector Assembly Type:
1. Stainless Steel body, stainless steel bolts and internal parts, removable bronze seats, epoxy coated OS&Y gate valves, lead free. 2. Four (4) test cocks, OS&Y resilient wedge gate
valves. 3. UL/FM listed and approved. 4. Same size as fire service. 5. Detector assembly consisting of an approved double check valve backflow preventer, approved water meter and shutoffs.
6. Design Equipment: Watts Series LF757DCDA. 7. Acceptable Manufacturers: Ames, Febco, Wilkins, Watts. PART 3 - EXECUTION 3.1 GENERAL A. Coordinate work with all other trades and
utility company. B. Inspect pipe, fittings and equipment prior to installation. Remove all defective materials from the site. C. Do not backfill until inspection by Owner's Representative.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SUPPLY 221100 - 3 D. Install pipe
and equipment in accordance with manufacturer's recommendations and in a workmanlike manner as determined by the Owner's Representative. 3.2 WATER SERVICE A. Install all piping on firm
bed, using caution where piping passes over excavation. Provide concrete thrust blocks to support hydrant and prevent movement at all changes in direction of piping. Thrust blocks
not required for Type K copper piping installation. Provide rods, clamps and retainer glands on all elbows and fittings in accordance with manufacturer's recommendations to prevent
fitting from blowing off under line pressure. Coat all clamps, rods, nuts with two coats of bitumastic. B. Minimum earth cover shall be 5 ft. - 0 in. unless otherwise noted. C. Water
mains crossing sanitary or storm sewers shall be installed to provide a minimum vertical distance of 1 ft. - 6 inches between the outside of the pipes where the water main is above
or below the sewer. Locate the water pipe so that the crossing of the sewer occurs at the mid-section of a full length of pipe. The minimum horizontal separation between water mains
and sewer mains shall be 10 ft. - 0 in. measured from the outside of the pipes. If separation or distance of joints from pipe crossing cannot be established, encase water piping in
6 in. concrete for a distance 10 ft. - 0 in. each side of crossing. 3.3 WATER METER A. Provide line size lead free strainer on inlet side of meter. Provide concrete base or pipe stands
to support meter assembly. Provide bypass piping with sealed valve around meter. B. Provide meter with all equipment to allow remote reading and monitoring, and data collection. 3.4
BACKFLOW PREVENTERS A. The backflow preventer installation shall be installed in accordance to the New York State Health Department and/or Tompkins County Health Department approved
drawings. B. Prior to installation of backflow preventers, obtain the approved drawings from the Engineer, or as noted on drawings. C. Provide hub style drain for emergency relief
drain with a pipe separation of at least two (2) pipe diameters from backflow preventer relief outlet, or as noted on the drawings. 3.5 PIPING A. Run slightly off level to low points;
provide drain valves at low points. Provide shock absorbers where shown, or specified. Branch headers serving flush valves shall be full size as shown. Exposed water piping in Kitchen
shall be chrome plated brass (from insulation to fixture or equipment connection.). TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 WATER SUPPLY 221100 - 4 Provide dielectric pipe fittings when connecting to piping systems of dissimilar metals. All supply piping to fixtures,
faucets, hydrants and flush valves shall be anchored to prevent movement. B. Provide shock absorbers where flush valves and quick closing valves are used as specified in Section 223010.
3.6 CLEANING AND DISINFECTING A. Refer to Specification Section 221010, "Piping Systems and Accessories" for domestic water piping cleaning and disinfecting requirements. 3.7 TESTS
A. Provide all necessary items to complete proper testing of work. Perform all testing in accordance with governing codes, local utilities and other agencies having jurisdiction and
as specified. Pay all costs to perform tests. Perform all testing in a safe manner. B. Upon completion of construction, all backflow prevention devices provided under this contract
shall be tested. Tests shall be performed by a certified backflow preventer tester registered by the New York State Department of Health. Provide three (3) copies of Form DOH-1013
for each device with Part A completed by the tester. Submit forms to Engineer. C. Test each vacuum breaker according to authorities having jurisdiction and the device's reference
standard. D. Refer to Specification Section 221010, "Piping Systems and Accessories" for pipe testing requirements. END OF SECTION 221100 TENANT FIT-OUT FOR ITHACA BEER COMPANY -
SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SANITARY, WASTE AND STORM DRAINAGE SYSTEMS 221300 - 1 SECTION 221300 - SANITARY,
WASTE AND STORM DRAINAGE SYSTEMS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation
and related Work as required in Contract Documents. B. This section pertains to all sanitary, indirect waste and storm piping installed the project. 1.2 SUBMITTALS A. Provide submittals
for all items specified under Part 2 of this section. PART 2 - PRODUCTS 2.1 PLUMBING DRAINAGE SYSTEM A. Piping Materials: Refer to Section 221010, "Piping Systems and Accessories".
PART 3 - EXECUTION 3.1 GENERAL A. Prior to commencing work, the Contractor shall verify inverts and locations. Any discrepancy between plans and field conditions shall be reported
to the Owner or Engineer. No work shall start until discrepancies have been resolved. All costs related to Contractor's failure to verify and report discrepancies will be borne by
the Contractor. B. Install pipe and equipment in accordance with manufacturer's recommendations and in a workmanlike manner as determined by the Owner's Representative. 3.2 PIPE INSTALLATION
A. Minimum Pitch: 3 in. and under - 1/4 in. per ft.; 4 in. to 6 in. - 1/8 in. per ft. B. Slope piping as indicated on drawing; verify inverts given. Inspect piping before installation
to detect apparent defects. Remove defective piping from site. Lay piping beginning at low point of system, true to grades and alignment indicated, with unbroken continuity of invert.
Install piping and gaskets in accordance with manufacturer's recommendations and other special installation requirements. Clean interior of piping of dirt and other foreign material
as work progresses. Place plugs in ends of pipe at end of day or whenever work stops. Flush lines if required to remove collected debris. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SANITARY, WASTE AND STORM DRAINAGE SYSTEMS 221300 - 2 C. Inspect piping to determine
whether line displacement or other damage has occurred. Make inspections after lines have been installed. If inspection indicates poor alignment, debris, displaced pipe, leaks, or
other defects, correct such defects, and reinspect. 3.3 TESTING A. Refer to Specification Section 221010, "Piping Systems and Accessories" for pipe testing requirements. END OF SECTION
221300 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 EQUIPMENT 223010 - 1 SECTION
223010 - EQUIPMENT PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work
as required in Contract Document. 1.2 SUBMITTALS A. Provide submittals for all items specified under Part 2 of this section. PART 2 - PRODUCTS 2.1 FLOOR DRAINS (FD) A. Drain Description:
All Floor Drains Type A unless otherwise noted. 1. Type A: Cast iron body, flashing collar with weepholes, nickel bronze, 7 in. diameter adjustable strainer; Jay R. Smith Figure #2010-A.
B. Where floor drains are not installed in slabs on grade, provide flashing collar and flash with 24 in. square neoprene flashing or equal. C. Make: Josam, Jay R. Smith, Mifab, Watts
or Zurn. 2.2 FLOOR SINKS (FS) A. Jay R. Smith No. 3160Y-13, 10" deep floor sink with dome strainer and 3/4 grate. B. Make: Jay R. Smith, Mifab, Watts or Zurn. 2.3 CLEANOUTS A. Floors:
Cast iron body, nickel-bronze top with adjustable feature, bronze plug and flashing clamp where required, carpet marker and tile cover where applicable; Jay R. Smith Series #4028.
B. Walls: Cast iron ferrule, with bronze plug and stainless steel smooth access cover. 1. Horizontal: Jay R. Smith Figure #4402. 2. Vertical: Jay R. Smith Figure #4531. C. Make:
Josam, Jay R. Smith, Wade, Watts or Zurn. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 EQUIPMENT
223010 - 2 2.4 HOSE BIBBS (INTERIOR) A. Inside sill faucet, vacuum breaker, lead-free, solder connection, 3/4 in. hose thread outlet, lock shield cap, loose key control, flanged
female inlet, polished chrome plate finish for finished rooms, rough chromium for unfinished rooms. B. Make: Woodford Model 84, Prier, Chicago Faucets or Acorn in finished room; Chicago
Faucets #998 in Mechanical Rooms, Boiler Room, Penthouse, or other unfinished rooms. 2.5 SHOCK ABSORBERS A. Hydropneumatically controlled with permanently sealed expansion chamber pre-charged
with non-combustible gas; lead-free, threaded connection, meets or exceeds Plumbing and Drainage Institute Standard PDI WH-201 and ASSE Standard 1010. 1. Bellows Type: Stainless steel
construction with stainless steel bellows. 2. Piston Type: Hard drawn copper body with brass piston, cap and adapter, and elastomer seals. B. Elastomer or rubber compound type bellows
not allowed. C. Make: Watts #LF15M2, Precision Plumbing Products, Jay R. Smith, or Zurn. 2.6 TRAP GUARDS A. Elastomeric, normally closed seal to prevent evaporation of P-traps. Inserts
into throat of floor drain. Provide for each new floor drain. B. Make: ProVent Systems, Inc. "ProSet Trap Guard". Provide for all Type A floor drains. 2.7 WATER PRESSURE GAUGES
A. Construction to be Bourdon tube type; 4-1/2 in. diameter, minimum dial face, stamped stainless steel, replaceable glass lens, with snap-on rings. Phosphor bronze tube, bronze bushed
rotary movement, silver brazed or soldered to brass socket and brass tip, 1/4 in. bottom connection. Accuracy, on (1.0) percent of included scale range. White dial face with black
numerals, graduated in pounds; equipped with bronze pulsation dampener or snubber and needle valve. B. Make: Trerice, Weiss, Weksler, Winters. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 EQUIPMENT 223010 - 3 2.8 PIPING SYSTEM THERMOMETERS A. Industrial type, plastic,
aluminum or steel case, glass or plastic front, non-toxic organic liquid filled, red reading column, white or silver V-shaped scale, black numerals. Union flange mounted, separable
socket with thermowell, extension necks were required; range as called for service. Universal adjustable type, 9 in. scale. For installation in water systems where the maximum temperature
is less than 120°F, graduations of 1°F, accurate to within 1/2°F. For installation greater than 120°F, graduations of 2°F, accurate to within 1°F. B. Bimetal dial thermometers, stainless
steel case, 4-1/2 in. diameter white dial face with black numbers, glass replaceable lens, bimetal coil element, white dial face with black numerals graduated in degrees F, with stainless
steel stem for separable socket with thermowell, length to suit installation. Provide adjustable joint of a finish that matches the case, 180 degrees adjustment in vertical plane,
360 degree adjustment in horizontal plane, with locking device. Liquid thermometers are not acceptable. Accuracy plus or minus one percent, range span. C. Make: Trerice, Weiss, Weksler,
Winters. 2.9 TEMPERATURE MIXING VALVE A. Valve shall mix 140°F hot water with 40°F cold water to obtain a water outlet temperature of 120°F. The mixing valve system shall consist
of the following: 1. 3/4 in. inlets and 1 in. outlets. Flow capacity of 19 gpm at 5 psi pressure drop, and 38 gpm at 20 psi pressure drop. 2. Combination strainer check stops with
union at each inlet, union on outlet, tamper resistant temperature adjustment control. Balance valves and digital controller. 3. Provide valves on hot, cold and tempered water piping
with fittings, nipples, trim piping and escutcheon plates. Horizontal stem dial thermometers on hot, cold and tempered water piping. 4. Install lead free mixing valve and trim exposed
on wall. B. Make: Powers LFSH1432-1-1. C. Acceptable Manufacturers: Lawler, Leonard, Powers. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 EQUIPMENT 223010 - 4 PART 3 - EXECUTION 3.1 EQUIPMENT CONNECTIONS A. Plumbing Contractor shall: 1. Provide all roughing and final
water, waste, vent and or gas connections to all fixtures and equipment requiring same as called for on Contract Documents. 2. Refer to Contract Documents for roughing schedules, and
equipment and lists indicating scope of connections required. 3. Provide loose key stops, "P" traps, adapters, gas or air cocks and all necessary piping and fittings from roughing point
to equipment. 4. Install controls and devices furnished by others. 5. Provide cold water line with gate valve and backflow prevention device at locations called for. Continuation and
connection to equipment by others. 6. Install relief valve discharge piping from equipment relief valves. 7. Provide for Owner furnished equipment: a. Connect complete and ready for
use, including all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains, insulation, sheet metal work, controls, dampers, etc.,
as required by Owner. 3.2 CLEANOUTS A. Install cleanouts out of traffic patterns and flush to floor. Provide offset from sanitary line served. Do not locate under doors or under lockers.
Maintain distance between cleanouts on piping 4 in. and smaller, 50 ft.; over 4 in., 100 ft. At changes in direction greater than 45°. Install at base of soil, waste, vent, stacks
and roof conductors and where called for. B. Cleanouts: Same nominal size as pipe, but not larger than 4 in. 3.3 HOSE BIBBS A. Install at low points of piping system. 3.4 SHOCK ABSORBERS
A. Install in vertical position. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 EQUIPMENT
223010 - 5 3.5 THERMOMETERS A. Provide on piping system where called for and shown, with thermometer well at each location, mounted in oversize tee or elbow to provide as little
restriction as possible to fluid flow, stems or proper length to allow accurate reading. Arrange to be easily read from floor. B. Select range such that the maximum system working
temperature is in the middle onethird of the scale. 3.6 PRESSURE GAUGES A. Provide in piping system where called for and shown, with needle valve and pulsation damper or snubber at
each location. Arrange to be easily read from the floor. B. Select range such that the maximum system working temperature is in the middle onethird of the scale. 3.7 TEMPERATURE MIXING
VALVE A. Provide where called for. Provide 28 in. deep heat trap on hot water supply line ahead of connection to mixing valve. B. Provide factory-trained technician to start up, adjust
and inspect the mixing valve and piping for correct installation and temperature adjustment. END OF SECTION THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER HEATERS 223400 - 1 SECTION 223400 - WATER HEATERS
PART 1 - GENERAL 1.1 SCOPE OF WORK A. Work of this section shall be performed in accordance with the requirements of the Contract Documents, including but not limited to Instructions
to Bidders, Agreement and General Conditions, General Requirements and Basic Mechanical/Electrical Requirements. B. Provide labor, materials, equipment and services to perform work
and related work required by Contract Documents for a complete operating system. 1.2 SUBMITTALS A. Submit manufacturer's data for approval in accordance with Basic Mechanical/Electrical
Requirements. Obtain approval prior to ordering material. B. Provide submittals for all products to be installed including, but not limited to: 1. Water Heater. 2. Tank Protective
Valves. 3. Expansion Tank. 4. All Heater and Tank Accessories. 5. All System Wiring Diagrams. 6. Tank Lining. 7. Mixing valve station. 1.3 SPECIAL COORDINATION A. Coordinate with all
work of other trades in Mechanical Room. B. Furnish Division 26 "Electric" with dimensional drawings showing location of electrical connections, location of equipment mounted on walls,
and of other equipment requiring electrical connections, removals or replacements. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 WATER HEATERS 223400 - 2 PART 2 - PRODUCTS 2.1 WATER HEATER - COMMERCIAL GAS A. 90 gallon, glass lined 150 PSI ASME certified and stamped
storage tank, high efficiency heater. Three (3) year commercial warranty. B. Provide high temperature limit, operating temperature control and insulation to meet current energy codes.
C. Provide temperature and pressure relief valve, ASME stamped and rated for full heating capacity. Pipe relief to drain. D. Provide low water cut off. E. Design Equipment: Lochinvar
Model SWA200N. F. Acceptable Manufacturers: A.O. Smith, Lochinvar, State or approved equal. 2.2 THERMAL EXPANSION TANK A. Vertical steel expansion tank constructed and designed per
ASME Code Section VIII, 150 PSI working pressure, steel outer shell, rigid polypropylene liner, heavy duty butyl rubber diaphragm and non-ferrous system connection tapping, suitable
for potable hot water, factory pre-charged at 40 PSI. Tank will have a 12 in. diameter and a height of 20 in. with a 8 gallon total volume and 0.80 maximum acceptance factors. The
manufacturer will be Model TTA20 by Thrush. B. Acceptable Manufacturers: Amtrol, Thrush, Watts, Wessels or approved equal. 2.3 TANK PROTECTIVE VALVES A. Pressure Relief Valves: 1.
ASME stamped and rated. 2. Open at 125 lbs. pressure sized for full heating capacity. 3. Make: Bell & Gossett, Kunkle, Watts or approved equal. B. Temperature and Pressure Relief Valve:
1. ASME stamped and rated (for steam or hot water). 2. Size for full heat input. 3. Complying with Federal Spec. MIL-V-13612C. 4. Valve shall be sized and selected by manufacturer for
tank and heater installed. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER HEATERS
223400 - 3 5. Make: Camco, Cash-Acme, Watts, or approved equal. PART 3 - EXECUTION 3.1 WATER HEATERS A. Install each heater on a 4 in. high concrete pad. B. Pipe pressure and temperature
relief valve drain to discharge to nearest floor drain. C. Provide all electric wiring and equipment in accordance with manufacturer's wiring diagrams and instructions. Make all final
connections. D. Provide all piping, valves and fittings in accordance with manufacturer's piping instructions. Make all final connections. E. Provide equipment in accordance with contract
drawings and all local codes. F. Provide start-up services of a factory trained technician to inspect the installation based on factory recommendations. Items include but are not limited
to: 1. Verification of proper piping arrangement. 2. Electric supply connection(s). 3. Verification of proper temperature rise across heater(s). 4. Operating and safety controls. 5.
Proper operation of equipment. 6. Verification of piping arrangement and aquastat location. 7. Relief valve settings. 8. All control settings. G. Submit three (3) copies of startup
reports in writing with all factory checkout data signed by the factory authorized service agent to the Owner's Representative. H. Place equipment in operation. I. The installation
of water heaters shall be based on the details shown on the drawings and specified in this Section. Approved water heaters provided other than type shown or specified shall be installed
in accordance with manufacturer's recommended installation instructions and piping diagrams. END OF SECTION THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING FIXTURES AND TRIM 224000 - 1 SECTION 224000 - PLUMBING
FIXTURES AND TRIM PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work
as required in Contract Documents. 1.2 SUBMITTALS A. Submit manufacturer's data in accordance with Basic Mechanical/Electrical Requirements. Obtain approval prior to ordering material.
B. Provide submittals for all items specified under Part 2 - Products of this section. 1.3 DESCRIPTION OF FIXTURES A. Fixtures and trim shall be of those manufacturers listed, unless
otherwise indicated. Fixtures for this project shall be of same manufacturer. 1. China Fixtures: American Standard, Kohler, Mansfield, or Toto. 2. Flush Valves: Sloan, Zurn. 3. Faucets:
American Standard, Delta, Elkay, Moen or Symmons. All faucets shall be lead-free in accordance with NSF 61 and NSF 372. 4. Closet Seats: Bemis, Beneke, Church or Olsonite. 5. Fixture
Carriers: Jay R. Smith, Watts, Wade, Josam or Zurn. 6. Sinks: Elkay, Just or Kohler. 7. Supplies, Stops and Traps: Brasscraft, EBC, McGuire or Sanitary Dash. B. Exposed parts of
trim shall have polished chrome plated finish. C. Tubular drainage products ("P" traps, nipples, etc.) shall be 17 gauge brass. 1.4 QUALITY ASSURANCE A. Comply with requirements of
the Plumbing Fixture Law of the New York State Department of Environmental Conservation. B. Comply with the American Disabilities Act Guidelines and ANSI A117.1 "Accessible and Usable
Buildings and Facilities". TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING FIXTURES
AND TRIM 224000 - 2 C. All items here-in used to convey water for potable use shall be lead free in accordance with NSF Standard 61, Section 9 Standard for Drinking Water and
Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. Compliance shall be via third-party testing and certification. D. All fixture trim used to convey water for potable
use shall be lead free. PART 2 - PRODUCTS 2.1 WATER CLOSETS A. WC-A 1. American Standard #2234.015, elongated bowl, vitreous china, floor mount, 141/8 inches high, 1.28 gallon per
flush, fully glazed trapway, fitted with the following: a. Sloan battery operated sensor flush valve, #8111-1.28-OR. b. Church #9500SCC extra heavy while elongated seat, open front,
stainless steel self-sustaining check hinges. Less cover. c. Cast iron flange with stainless steel bolts and wax setting ring. d. Plastic bolt caps. B. WC-B: 1. American Standard
#3043.001, elongated bowl, vitreous china, floor mount, 141/8 inches high, 1.28 gallon per flush, fully glazed trapway, fitted with the following: 2. Sloan battery operated sensor flush
valve, #8111-1.28-OR. 3. Church #9500SCC extra heavy while elongated seat, open front, stainless steel self-sustaining check hinges. Less cover. 4. Cast iron flange with stainless
steel bolts and wax setting ring. 5. Plastic bolt caps. 2.2 UR-A: 1. American Standard #6590.501, Washbrook 0.5 GPF, wall hung, vitreous china, washout urinal with extended shields,
stainless steel strainer, outlet connection threaded 2 in. female, 3/4 in. top spud, fitted with following: a. Sloan battery operated sensor flush valve, #8186-XD, 0.5 gpf. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING FIXTURES AND TRIM 224000 - 3 b. Jay R.
Smith Series 637 carrier with rectangular uprights, bearing and base plates. c. Where noted on the Architectural Plans, provide in accordance with all ADA requirements. 2.3 LAVATORIES
A. LAV-A: 1. Elkay Model EWMA4820, two station stainless steel wall hung hand wash sink trough, fitted with the following: a. Two Elkay LKB722C sensor faucets, AC plug in type.
b. McGuire #155WE grid strainer and offset tail piece, McGuire #8902 trap, "P" trap, 1-1/2 in. x 1-1/2 in., with cleanout plug, chrome plated escutcheon. Trap with slip joint mechanical
connections. c. McGuire #LF165LKF quarter turn stop valves, escutcheons, stainless steel braided hose supplies. d. Provide fixture in compliance with all ADA requirements. 2.4 MOP BASINS
A. MB-A: 1. Fiat Model MSB-2424, 24 in. x 24 in. x 12 in. deep, stainless steel flat strainer, 3 in. outlet, stainless steel cap on all sides, white color, with the following: a. T&S
Brass #B-0665-BSTP, lead-free, exposed wall mounted faucet with integral stops, rough chrome finish, lever handles, top-brace spout with bucket hook, hose end and vacuum breaker. b.
Fiat # 832AA Hose and Hose Bracket. c. Fiat #889CC Mop Hanger. d. Fiat #MSG Stainless Steel Wall Guards. e. Provide silicone sealant between wall, floor and mop basin. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PLUMBING FIXTURES AND TRIM 224000 - 4 PART 3 - EXECUTION
3.1 FIXTURES, EQUIPMENT AND SYSTEMS A. Install fixtures, equipment and systems as shown on Drawings or specified herein in accordance with provisions of each applicable Specification
Section and all local and state codes having jurisdiction. 3.2 INSTALLATION OF PLUMBING FIXTURES A. Install plumbing fixtures level and plumb, in accordance with fixture manufacturers
written installation instructions. B. Carefully drill holes for through bolts to avoid chipping blocks or plaster. C. Except where carriers are specified, attach hangers or brackets
to walls as follows: 1. Masonry Construction: Secure fixture hangers to partition by thru-bolts extending through a steel plate on opposite side of partition. Obtain Owner's Representative's
approval prior to work. 2. Metal Stud Construction: Anchor backing for fixtures or equipment to 1/8 in. x 12 in. steel plate bolted or riveted to at least three studs. Obtain Owner's
Representative's approval prior to work. D. Seal fixtures in contact with walls, floors and counters using a sanitary-type, one-part, mildew-resistant, silicone caulk. Match color
to fixture color. E. Set self-rimming lavatories and sinks in a bed of silicone caulk. F. Install floor-mounted, floor-outlet water closets with closet flanges and gasket seals. G.
Install wall-hanging, back-outlet water closets with support manufacturer's tiling frame or setting gage. H. Install wall-hanging, back-outlet urinals with gasket seals. I. Fasten wall-hanging
plumbing fixtures securely to supports attached to building substrate when supports are specified and to building wall construction where no support is indicated. J. Fasten counter-mounting-type
plumbing fixtures to casework. K. Metering faucets shall be adjusted for minimum ten (10) second run time, but not more than 0.25 gallons per cycle. L. Immediately after installation,
provide protective covering over fixtures and trim. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 PLUMBING FIXTURES AND TRIM 224000 - 5 3.3 MOUNTING HEIGHT AND LOCATION A. Mount fixtures at height and location as indicated on Architectural plans and elevations. B.
Mount accessible fixtures in conformance with the requirements of ANSI A117.1. 3.4 CONNECTIONS A. Install piping connections between plumbing fixtures and piping systems and plumbing
equipment specified in other sections of Division 22. 3.5 ADJUSTING AND CLEANING A. Operate and adjust faucets and controls. Replace damaged and malfunctioning fixtures, fittings and
controls. B. Adjust water pressure at electric water coolers, faucets and flush valves to provide proper flow and stream. C. Replace washers of leaking and dripping faucets and stops.
D. Clean fixtures, fittings, spout and drain strainers with manufacturers' recommended cleaning methods and materials. E. Test fixtures to demonstrate proper operation upon completion
of installation and after units are water pressurized. Replace malfunctioning fixtures and components and retest. Repeat procedure until all units operate properly. END OF SECTION
224000 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 NATURAL GAS SYSTEMS 227010 - 1 SECTION 227010 - NATURAL GAS SYSTEMS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to
perform operations required for the complete installation and related Work as required in Contract Documents. 1.2 SUBMITTALS A. Provide manufacturer's data sheets and installation instructions
for all equipment and accessories in this section in accordance with Basic Mechanical/Electrical Requirements and Division 01. 1.3 QUALITY ASSURANCE A. Follow all requirements, recommendations,
and appendices to comply with the following publications, codes, standards, and listings: 1. 2020 Fuel Gas Code of New York State. 2. American Gas Association. 3. Local Utility Company
(NYSEG). B. Provide equipment and accessories that are listed and labeled by a nationally recognized testing laboratory. 1.4 GAS SERVICE A. All new underground gas service piping from
the street main to, and including, the gas meter will be installed by local utility company. B. The contractor shall provide application to NYSEG for tenant's gas meter. C. This
Contractor shall provide the meter pad, pipe bollards and meter enclosure. 1.5 GAS PRESSURE A. The maximum allowable gas pressure inside the building is 1/2 psi. PART 2 - PRODUCTS 2.1
GAS PIPING A. Piping Materials: Refer to Specification Section 221010, "Piping Systems and Accessories". TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 NATURAL GAS SYSTEMS 227010 - 2 B. All exposed exterior and interior piping shall be primed and painted with one coat
of alkyd primer and two coats of exterior acrylic latex gloss enamel. Color shall be as selected. 2.2 VALVES A. Refer to Specification Section 220523, "Valves". PART 3 - EXECUTION
3.1 ARRANGEMENTS A. Make arrangements with local utility (NYSEG) to provide the gas service and meter at the indicated location. B. Contact the utility company for the cost of the service,
its fees and required permits. Pay all costs and include within the base bid. C. The future service load is 1,593,000 Btuh. The pressure at the meter outlet shall be set at 7 in.
wc. D. Coordinate all service requirements with the utility company. 3.2 GAS METER FENCE ENCLOSURE A. Provide chain link fence enclosure with roof and locked swing gate at each exterior
gas meter location. Enclosure size and swing gate at location required by utility company. B. Installation of fencing shall meet the requirements of ASTM F-567 (Part 3) and utility
company. C. All posts shall be set in minimum 12 in. diameter concrete to at lease three feet below grade. Posts shall extend a minimum of 7 ft. above grade. D. Intermediate post shall
be spaced a maximum of 10 ft. on center. Posts shall be provided at all corners, ends and gate openings. E. Posts shall be set at least 24 in. away from any part of the gas meter-regulator
assembly or as required by utility company. F. Entire fenced area extending a minimum of 6 in. outside of the enclosure shall be surfaced with a layer of crushed stone, a minimum of
6 in. thick. Place stone atop black landscaping fabric. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 NATURAL GAS SYSTEMS 227010 - 3 3.3 GAS DISTRIBUTION SYSTEM A. Provide distribution system from gas meter outlet, including meter pad, fence enclosure, mains, risers, branches,
drips, shut-offs and other required parts. Connect to equipment or appliances indicated or specified as requiring gas for their operation. B. Provide shutoff valve at the meter outlet.
Provide all parts and accessories needed to connect to meter. C. Furnish sleeve and sealing element for above ground gas piping entry through outside wall. Make entry gas and watertight.
3.4 PIPING INSTALLATION A. Install gas piping at a uniform slope of 1/4 in. in 15 ft. to prevent traps. Horizontal lines shall slope upward to risers to the equipment. B. Drips and
Sediment Traps: Install drips at points where condensate may collect. Locate where readily accessible to permit cleaning and emptying. Do not install where condensate would be subject
to freezing. C. Make reductions in pipe sizes using eccentric reducer fittings installed with the level side down. Connect branch piping from top or side of horizontal piping. D. Install
unions in pipes 2 in. and smaller, adjacent to each valve, regulator and at final connection to each piece of equipment. Unions are not required on flanged devices. 3.5 WELDING A.
Welding shall be performed in compliance with the welding procedure specifications prepared by the National Certified Pipe Welding Bureau. Welded pipe fabricated by certified welder.
Contractor shall submit proof of current certification of each welder if requested by the Owner. Use full-length pipe where possible; minimum distance between welds, 18 in. on straight
runs. Welds must be at least full thickness of pipe with inside smooth; remove cutting beads, slag and excess material at joints; chamfer ends. Minimum gap 1/8 in., maximum 1/4 in.
for butt welds. Overlaps on position and bench welds to be not less than 3/4 in. One internal pass and one external pass minimum required on slip-on flanges. Do not apply heat to
rectify distorted pipe due to concentrated welding; replace distorted pipe. Exercise caution to prevent heat related damage to plastic parts within the gas meter or regulators. B.
Welder qualifications: Welded piping fabricated by certified welder. Welder shall be certified under ASME or API Code III. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 NATURAL GAS SYSTEMS 227010 - 4 3.6 GAS PIPING TESTS A. Test natural gas systems according to 2015 International
Fuel Gas Code and the local utility requirements unless otherwise noted: 1. Test pressure shall be 1-1/2 times working pressure, but not less than 3 psi for two (2) hours for steel
piping. 2. Pressure testing of plastic piping shall be per utility's requirements. B. Tests shall be witnessed by utility company. Make arrangements, provide all necessary items to
complete testing and pay all costs. C. All tests shall be performed prior to the connection of equipment. Regulator shall be isolated from test pressures. Soap test shall be conducted
on all joints. Repair leaks and defects with new materials. Retest system until satisfactory results are obtained. D. Verify correct pressure settings for pressure regulators. E.
Provide written certification that tests have been conducted and satisfactorily completed. Submit to Owner's Representative. 3.7 GAS LINE PURGING A. At completion of pressure test,
purge all natural gas systems according to 2020 International Fuel Gas Code and the utility company requirements. B. Provide three (3) days notice to utility company to have the meter
unlocked for service and equipment start up. Make all arrangements and pay all fees as required by the Utility Company. END OF SECTION TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI
411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 1 SECTION 230500 - BASIC MECHANICAL REQUIREMENTS
PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, tools, materials, accessories, parts, transportation, taxes, and related items, essential for installation of the work and necessary
to make work, complete, and operational. Provide new equipment and material unless otherwise called for. References to codes, specifications and standards called for in the specification
sections and on the drawings mean, the latest edition, amendment and revision of such referenced standard in effect on the date of these contract documents. All materials and equipment
shall be installed in accordance with the manufacturer's recommendations. 1.2 LICENSING A. The Contractor shall hold a license to perform the work as issued by the authority having
jurisdiction. B. Plumbing contract work shall be performed by, or under, the direct supervision of a licensed master plumber. C. Electrical contract work shall be performed by, or under,
the direct supervision of a licensed electrician. 1.3 PERMITS A. Apply for and obtain all required permits and inspections, pay all fees and charges including all service charges.
Provide certificate of approval from the Authorities Having Jurisdiction prior to request for final payment. B. Provide electrical inspection certificate of approval from Middle Department
Inspection Agency, Commonwealth Inspection Agency, or an Engineer approved Inspection Agency prior to request for final payment. 1.4 CODE COMPLIANCE A. Provide work in compliance with
the following: 1. 2020 Building Code of New York State. 2. 2020 Existing Building Code of New York State. 3. 2020 Fire Code of New York State. 4. 2020 Plumbing Code of New York State.
5. 2020 Mechanical Code of New York State. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MECHANICAL REQUIREMENTS 230500 - 2 6. 2020 Fuel Gas Code of New York State. 7. 2020 Property Maintenance Code of New York State. 8. 2020 Energy Conservation Code of New
York State 9. Accessible and Usable Buildings and Facilities, ICC A117.1 (2009). 10. New York State Department of Labor Rules and Regulations. 11. New York State Department of Health.
12. National Electrical Code (NEC) 13. Occupational Safety and Health Administration (OSHA). 14. Local Codes and Ordinances. 15. Life Safety Code, NFPA 101. 16. City of Ithaca Plumbing
Department. 1.5 GLOSSARY ACI American Concrete Institute AGA American Gas Association AGCA Associated General Contractors of America, Inc. AIA American Institute of Architects AISC
American Institute of Steel Construction AFBMA Anti-Friction Bearing Manufacturer's Association AMCA Air Moving and Conditioning Association, Inc. ANSI American National Standards Institute
ARI Air Conditioning and Refrigeration Institute ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. ASME American Society of Mechanical Engineers
ASPE American Society of Plumbing Engineers ASTM American Society for Testing Materials AWSC American Welding Society Code AWWA American Water Works Association FM Factory Mutual Insurance
Company TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500
- 3 IBR Institute of Boiler & Radiation Manufacturers IEEE Institute of Electrical and Electronics Engineers IRI Industrial Risk Insurers NEC National Electrical Code NEMA National
Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association NYS/DEC New York State Department of Environmental Conservation
SBI Steel Boiler Institute SMACNA Sheet Metal and Air Conditioning Contractors National Association UFPO Underground Facilities Protective Organization UL Underwriter's Laboratories,
Inc. OSHA Occupational Safety and Health Administration XL - GAP XL Global Asset Protection Services 1.6 DEFINITIONS Acceptance Owner acceptance of the project from Contractor upon
certification by Owner's Representative. As Specified Materials, equipment including the execution specified/shown in the contract documents. Basis of Design Equipment, materials, installation,
etc. on which the design is based. (Refer to the article, Equipment Arrangements, and the article, Substitutions.) Code Requirements Minimum requirements. Concealed Work installed
in pipe and duct shafts, chases or recesses, inside walls, above ceilings, in slabs or below grade. Coordination Drawings Show the relationship and integration of different construction
elements and trades that require careful coordination during fabrication or installation, to fit in the space provided or to function as intended. Delegated-Design Services Performance
and Design criteria for Contractor provided professional services. Where professional design services or certifications by a design professional are specifically required of a Contractor,
by the Contract Documents. Provide products and systems with the specific design criteria indicated. If criteria indicated is insufficient to perform services or certification required,
submit a written request for additional information to the Engineer. Submit wet signed and sealed certification by the licensed design professional for each product and system specifically
assigned to the Contractor to be TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL
REQUIREMENTS 230500 - 4 designed or certified by a design professional. Examples: structural maintenance ladders, stairs and platforms, pipe anchors, seismic compliant system,
wind, structural supports for material equipment, sprinkler hydraulic calculations. Equal, Equivalent, Equal To, Equivalent To, As Directed and As Required Shall all be interpreted
and should be taken to mean "to the satisfaction of the Engineer". Exposed Work not identified as concealed. Extract Carefully dismantle and store where directed by Owner's Representative
and/or reinstall as indicated on drawings or as described in specifications. Furnish Purchase and deliver to job site, location as directed by the Owner's Representative. Inspection
Visual observations by Owner's site Representative. Install Store at job site if required, proper placement within building construction including miscellaneous items needed to affect
placement as required and protect during construction. Take responsibility to mount, connect, start-up and make fully functional. Labeled Refers to classification by a standards agency.
Manufacturers Refer to the article, Equipment Arrangements, and the article, Substitutions. Prime Professional Architect or Engineer having a contract directly with the Owner for professional
services. Product Data Illustrations, standard schedules, performance charts, instructions, brochures, wiring diagrams, finishes, or other information furnished by the Contractor to
illustrate materials or equipment for some portion of the work. Provide (Furnish and Install) Contractor shall furnish all labor, materials, equipment and supplies necessary to install
and place in operating condition, unless otherwise specifically stated. Relocate Disassemble, disconnect, and transport equipment to new locations, then clean, test, and install ready
for use. Remove Dismantle and take away from premises without added cost to Owner, and dispose of in a legal manner. Review and Reviewed Should be taken to mean to be followed by "for
the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents". Roughing Pipe, duct, conduit, equipment layout and
installation. Samples Physical full scale examples which illustrate materials, finishes, coatings, equipment or workmanship, and establishes standards by which work will be judged.
Satisfactory As specified in contract documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MECHANICAL REQUIREMENTS 230500 - 5 Shop Drawings Fabrication drawings, diagrams, schedules and other instruments, specifically prepared for the work by the Contractor or
a Sub-contractor, manufacturer, supplier or distributor to illustrate some portion of the work. Site Representative Owner's Inspector or "Clerk of Works" at the work site. Submittals
Defined (Technical) Any item required to be delivered to the Engineer for review as requirement of the Contract Documents. The purpose of technical submittals is to demonstrate for
those portions of the work for which a submittal is required, the manner in which the Contractor proposes to conform to the information given and design concepts expressed and required
by the Contract Documents. 1.7 EXISTING CONDITIONS A. Contractor shall review all available record documents of existing construction or other existing conditions and hazardous material
information. Owner does not guarantee that existing conditions are the same as those indicated in these documents. Contractor shall record existing conditions via measured drawings
and preconstruction photographs or video. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued
as damage caused by salvage, removal or construction operations. B. Owner will occupy portions of the building immediately adjacent to the area(s) of removals. Conduct removals so
Owner's operations are not disrupted. Contractor shall locate, identify, disconnect and seal or cap mechanical, plumbing, fire protection and/or electrical systems serving areas of
removals, unless noted otherwise in the contract documents. Contractor shall arrange shut-down of systems with the Owner. Piping and ductwork indicated to be removed shall be removed
and capped or plugged with compatible materials. If services/systems are required to be removed, relocated or abandoned, provide temporary services/systems the bypass area(s) of removals
to maintain continuity of services/systems to other parts of the building, as required. 1.8 SHOP DRAWINGS/PRODUCT DATA/SAMPLES A. Provide submittals on all items of equipment and materials
to be furnished and installed. Submittals shall be accompanied by a transmittal letter, stating name of project and contractor, name of vendor supplying equipment, number of drawings,
titles, specification sections (name and number) and other pertinent data called for in individual sections. Submittals shall have individual cover sheets that shall be dated and contain:
Name of project; name of prime professional; name of prime contractor; description or names of equipment, materials and items; and complete identification of locations at which materials
or equipment are to be installed. Individual piecemeal or incomplete submittals will not be accepted. Similar items, (all types specified) shall be submitted at under one cover sheet
per specification section (e.g. lighting fixtures, valves, plumbing fixtures, etc.). Submittals shall include all required documentation for each product listed in the specification
section at the same time as a complete package. Number each submittal by trade. Indicate deviations from contract requirements on Letter of Transmittal. Submittals will be given
a general review only. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS
230500 - 6 Corrections or comments made on the Submittals during the review do not relieve Contractor from compliance with requirements of the drawings and specifications. The
Contractor is responsible for: confirming and correcting all quantities; checking electrical characteristics and dimensions; selecting fabrication processes and techniques of construction;
coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner. If submitting hard copies, submit four (4) copies for review. B. The
Engineer will review up to two (2) submissions of any single submittal. The Contractor will be invoiced on an hourly rate basis for the time spent reviewing the same shop drawing in
excess of twice. C. If submittals are to be submitted electronically, all requirements in Item A apply. Submittals shall be emailed in PDF format to specific email address provided
by the Construction Manager, General Contractor, Architect or Project Manager. Name of project shall be in subject line of email. Send emails to: merochsubmittalclerk@meengineering.com.
1.9 PROTECTION OF PERSONS AND PROPERTY A. Contractor shall assume responsibility for construction safety at all times and provide, as part of contract, all trench or building shoring,
scaffolding, shielding, dust/fume protection, mechanical/electrical protection, special grounding, safety railings, barriers, and other safety feature required to provide safe conditions
for all workmen and site visitors. 1.10 EQUIPMENT ARRANGEMENTS A. The contract documents are prepared using one manufacturer as the Basis of Design, even though other manufacturers'
names are listed. If Contractor elects to use one of the listed manufacturers other than Basis of Design, submit detailed drawings, indicating proposed installation of equipment.
Show maintenance clearances, service removal space required, and other pertinent revisions to the design arrangement. Make required changes in the work of other trades, at no increase
in any contract. Provide larger motors, feeders, breakers, and equipment, additional control devices, valves, fittings and other miscellaneous equipment required for proper operation,
and assume responsibility for proper location of roughing and connections by other trades. Remove and replace doorframes, access doors, walls, ceilings, or floors required to install
other than Basis of Design. If revised arrangement submittal is rejected, revise and resubmit specified Basis of Design item which conforms to Contract Documents. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 7 1.11 SUBSTITUTIONS
A. If Contractor desires to bid on any other kind, type, brand, or manufacture of material or equipment than those named in specifications, secure prior approval. To request such approval,
Contractor shall submit complete information comparing (item-for-item) material or equipment offered with design material or equipment. Include sufficient information to permit quick
and thorough comparison, and include performance curves on same basis, capacities, power requirements, controls, materials, metal gauges, finishes, dimensions, weights, etc., of major
parts. If accepted, an addendum will be issued to this effect ahead of bid date. Unless such addendum is issued, substitution offered may not be used. 1.12 CONTINUITY OF SERVICES
A. The building will be in use during construction operations. Maintain existing systems in operation within all rooms of building at all times. Refer to "General Conditions of the
Contract for Construction" for temporary facilities for additional contract requirements. Schedules for various phases of contract work shall be coordinated with all other trades and
with Owner's Representative. Provide, as part of contract, temporary mechanical and electrical connections and relocations as required to accomplish the above. Obtain approval in
writing as to date, time, and location for shutdown of existing mechanical/electrical facilities or services. 1.13 UTILITY COMPANY SERVICES A. Division 26 shall make arrangements with
National Grid for electric service to the Owner's distribution equipment. Provide underground or overhead electric service as called for and transformers, meter sockets or meter compartments
as required by the Utility Company. Coordinate all activities between the Owner and Utility Company. The installation of the electric service shall comply with the published Utility
Company standards. PAY ALL UTILITY COMPANY CHARGES; INCLUDE CHARGES IN THE BASE BID. B. Division 22 shall make arrangements with National Grid for gas service to the Owner's distribution
system. Provide service to the building as required by the Utility Company. Coordinate all activities between the Owner and Utility Company. The installation of the gas service shall
comply with the published Utility Company standards. PAY ALL UTILITY COMPANY CHARGES; INCLUDE CHARGES IN THE BASE BID. 1.14 ROUGHING A. The Contract Drawings have been prepared in
order to convey design intent and are diagrammatic only. Drawings shall not be interpreted to be fully coordinated for construction. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 8 B. Due to small scale of Drawings, it is not possible
to indicate all offsets, fittings, changes in elevation, interferences, etc. Make necessary changes in contract work, equipment locations, etc., as part of a contract to accommodate
work to avoid obstacles and interferences encountered. Before installing, verify exact location and elevations at work site. DO NOT SCALE plans. If field conditions, details, changes
in equipment or shop drawing information require an important rearrangement, report same to Owner's Representative for review. Obtain written approval for all major changes before
installing. C. Install work so that items both existing and new are operable and serviceable. Eliminate interference with removal of coils, motors, filters, belt guards and/or operation
of doors. Provide easy, safe, and code mandated clearances at controllers, motor starters, valve access, and other equipment requiring maintenance and operation. Provide new materials,
including new piping and insulation for relocated work. D. Coordinate work with other trades and determine exact route or location of each duct, pipe, conduit, etc., before fabrication
and installation. Coordinate with Architectural Drawings. Obtain from Owner's Representative exact location of all equipment in finished areas, such as thermostat, fixture, and switch
mounting heights, and equipment mounting heights. Coordinate all work with the architectural reflected ceiling plans and/or existing Architecture. Mechanical and electrical drawings
show design arrangement only for diffusers, grilles, registers, air terminals, lighting fixtures, sprinklers, speakers, and other items. Do not rough-in contract work without reflected
ceiling location plans. E. Before roughing for equipment furnished by Owner or in other Divisions, obtain from Owner and other Divisions, approved roughing drawings giving exact location
for each piece of equipment. Do not "rough in" services without final layout drawings approved for construction. Cooperate with other trades to insure proper location and size of
connections to insure proper functioning of all systems and equipment. For equipment and connections provided in this contract, prepare roughing drawing as follows: 1. Existing Equipment:
Measure the existing equipment and prepare for installation in new location. 2. New Equipment: Obtain equipment roughing drawings and dimensions, then prepare roughing-in-drawings.
If such information is not available in time, obtain an acknowledgement in writing, then make space arrangements as required with Owner's Representative. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 9 1.15 COORDINATION DRAWINGS
A. Before construction work commences, Divisions for all trades shall submit coordination drawings in the form of CAD drawing files, drawn at not less than 1/4 in. scale. Such drawings
will be required throughout all areas, for all Contracts. These drawings shall show resolutions of trade conflicts in congested areas. Mechanical Equipment Rooms shall be drawn early
in coordination drawing process simultaneous with all other congested areas. Prepare Coordination Drawings as follows: 1. Division 23 shall prepare the base plan CAD coordination drawings
showing all ductwork, all pertinent heating piping, and equipment. These drawings may be CAD files of the required Ductwork Shop Drawings. The drawings shall be coordinated with lighting
fixtures, sprinklers, air diffusers, other ceiling mounted items, ceiling heights, structural work, maintenance clearances, electric code clearance, reflected ceiling plans, and other
contract requirements. Reposition proposed locations of work after coordination drawing review by the Owner's Representative. Provide adjustments to exact size, location, and offsets
of ducts, pipes, conduit, etc., to achieve reasonable appearance objectives. Provide these adjustments as part of contract. Minor revisions need not be redrawn. 2. Division 23 shall
provide CAD files and submit the base plan CAD Coordination Drawings to all Divisions. 3. Divisions 21 and 22 shall draw the location of piping and equipment on the base plan CAD Coordination
Drawings, indicating areas of conflict and suggested resolutions. 4. Divisions 26, 27 and 28 shall draw the location of lighting fixtures, cable trays, and feeders over 1-1/2 in. on
the base plan CAD Coordination Drawings, indicating areas of conflict and suggested resolution. 5. The General Construction Trade shall indicate areas of architectural/structural conflicts
or obstacles on the CAD Coordination Drawings, and coordinate to suit the overall construction schedule. 6. The General Construction Trade shall expedite all Coordination Drawing work
and coordinate to suit the overall construction schedule. In the case of unresolved interferences, he shall notify the Owner's Representative. The Owner's Representative will then
direct the various trades as to how to revise their drawings as required to eliminate installation interferences. 7. If a given trade proceeds prior to resolving conflicts, then if
necessary, that trade shall change its work at no extra cost in order to permit others to proceed with a coordinated installation. Coordination approval will be given by areas after
special site meetings involving all Divisions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MECHANICAL REQUIREMENTS 230500 - 10 B. The purpose of the coordination drawing process is to identify and resolve potential conflicts between trades, and between trades
and existing or new building construction, before they occur in construction. Coordination drawings are intended for the respective trade's use during construction and shall not replace
any Shop Drawings, or record drawings required elsewhere in these contract documents. 1.16 REMOVAL WORK A. Where existing equipment removals are called for, submit complete list to
Owner's Representative. All items that Owner wishes to retain that do not contain asbestos or PCB material shall be delivered to location directed by Owner. Items that Owner does
not wish to retain shall be removed from site and legally disposed of. Removal and disposal of material containing asbestos, lead paint, mercury and PCB's shall be in accordance with
Federal, State and Local law requirements. Where equipment is called for to be relocated, contractor shall carefully remove, clean and recondition, then reinstall. Remove all abandoned
piping, wiring, equipment, lighting, ductwork, tubing, supports, fixtures, etc. Visit each room, crawl spaces, and roofs to determine total Scope of Work. The disturbance or dislocation
of asbestos-containing materials causes asbestos fibers to be released into the building's atmosphere, thereby creating a health hazard to workmen and building occupants. Consistent
with Industrial Code Rule 56 and the content of recognized asbestos-control work, the Contractor shall apprise all of his workers, supervisory personnel, subcontractors, Owner and Consultants
who will be at the job site of the seriousness of the hazard and of proper safeguards and work procedures which must be followed, as described in New York State Department of Labor
Industrial Code Rule 56. B. For materials indicated to contain lead, that are being affected by demolition or construction, the contractor shall comply with all Federal, State and Local
law requirements regarding worker exposure to lead disturbance and abatement procedures. C. Refer to the Owner's Lead Paint Survey. The Survey identifies the surfaces within the buildings
that were tested for lead by collecting paint samples and performing laboratory analysis. If any unidentified surfaces are to be impacted the lead content shall be tested by analytical
determinations conducted by a qualified laboratory approved by the Owner. The contractor shall review the current owner’s lead paint reports on file before starting any work which
may disturb existing surfaces. 1.17 REFRIGERANT RECOVERY A. Existing equipment to be removed, as shown on the plans may contain refrigerant and refrigerant oils. This refrigerant
and refrigerant oil must be handled n accordance with Federal, State and Local law requirements. B. Removal and recovery of refrigerant shall be in accordance with the current edition
of Section 608 of the Clean Air Act of 1990, including all final regulations. C. Refrigerant recovery must be performed by a technician, certified by an EPA-approved certification program,
using refrigerant recovery and recycling equipment certified by an EPA-approved testing organization. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 11 D. Owner "reserves the right of first refusal" on ownership of recovered refrigerant.
Should Owner choose to maintain ownership of refrigerant, refrigerant shall be reclaimed, cleaned by this Contractor to ARI 700-1993 Standard of Purity, by an EPA certified refrigerant
reclaimer. Refrigerant shall be turned over to the Owner in suitable marked containers to be stored on site, at a place of the Owner's choosing. 1.18 EQUIPMENT AND MATERIAL REQUIREMENTS
A. Provide materials that meet the following minimum requirements: 1. Materials shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less, in accordance
with NFPA 255. 2. All equipment and material for which there is a listing service shall bear a UL label. 3. Potable water systems and equipment shall be built according to AWWA Standards.
4. Gas-fired equipment and system shall meet AGA Regulations and shall have AGA label. 5. All electrical equipment and systems, as a whole, shall be tested and listed by an OSHA approved
Nationally Recognized Testing Laboratory (NRTL) for the intended use in accordance with the applicable standards and have a physical label indicating such. 6. Fire protection equipment
shall be UL listed and FM approved. B. Exterior and wet locations shall utilize materials, equipment supports, mounting, etc. suitable for the intended locations. Metals shall be stainless
steel, galvanized or with baked enamel finish as a minimum. Finishes and coatings shall be continuous and any surface damaged or cut ends shall be field corrected in accordance with
the manufacturer's recommendations. Hardware (screws, bolts, nuts, washers, supports, fasteners, etc.) shall be: 1. Stainless steel where the associated system or equipment material
is stainless steel or aluminum. 2. Hot dipped galvanized or stainless steel where the associated system or equipment is steel, galvanized steel or other. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 12 1.19 CUTTING AND PATCHING
A. Each trade shall include their required cutting and patching work unless shown as part of the General Construction Contract. Refer to General Conditions of the Contract for Construction,
for additional requirements. Cut and drill from both sides of walls and/or floors to eliminate splaying. Patch cut or abandoned holes left by removals of equipment or fixtures. Patch
adjacent existing work disturbed by installation of new work including insulation, walls and wall covering, ceiling and floor covering, other finished surfaces. Patch openings and
damaged areas equal to existing surface finish. Cut openings in prefabricated construction units in accordance with manufacturer's instructions. 1.20 PAINTING A. Paint all insulated
and bare piping, pipe hangers and supports exposed to view in mechanical equipment rooms, penthouse, boiler rooms and similar spaces. Paint all bare piping, ductwork and supports exposed
to the out-of-doors with rust inhibiting coatings. Paint all equipment that is not factory finish painted (i.e. expansion tanks, etc.). B. All painting shall consist of one (1) prime
coat and two (2) finish coats of non-lead oil base paint, unless otherwise indicated herein. Provide galvanized iron primer for all galvanized surfaces. All surfaces must be thoroughly
cleaned before painting. Review system color coding prior to painting with the Owner's Representative or Architect. C. All items installed after finished painting is completed and
any damaged factory finish paint on equipment furnished under this contract must be touched up by the Contractor responsible for same. D. Include painting for patchwork with color to
match adjacent surfaces. Where color cannot be adequately matched, paint entire surface. Provide one (1) coat of primer and two (2) finish coats or as called for in the Specifications.
E. All primers and paint used in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC) limits called for in the current version of U.S. Green Building
Council LEED Credits EQ 4.1 and EQ 4.2. 1.21 EXISTING CEILING REMOVAL AND RE-INSTALLATION A. In a renovation project, any existing ceiling removal and re-installation work required
for the completion of a Contractors or Subcontractors work, shall be removed and reinstalled by that Contractor or Subcontractor. This applies in any areas not called for to have a
new ceiling installed. B. The ceiling removal and re-installation shall include lay-in ceiling tile and grid, to the extent necessary to accomplish the work. Removed ceiling tile and
grid shall be safely stored during the course of the work, and it shall be re-installed to the original existing condition. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 13 C. The ceiling removal and re-installation shall include gypsum
board or plaster ceilings and the associated suspension systems. Removed ceiling areas shall be patched with materials to match the existing ceiling, and painted to match. If paint
cannot be matched exactly, paint the entire ceiling a similar color. 1.22 CONCEALMENT A. Conceal all contract work above ceilings and in walls, below slabs, and elsewhere throughout
building. If concealment is impossible or impractical, notify Owner's Representative before starting that part of the work and install only after their review. In areas with no ceilings,
install only after Owner's Representative reviews and comments on arrangement and appearance. 1.23 CHASES A. New Construction: 1. Certain chases, recesses, openings, shafts, and wall
pockets will be provided as part of General Construction Trade. Mechanical and Electrical trades shall provide all other openings required for their contract work. 2. Check Architectural
and Structural Design and Shop Drawings to verify correct size and location for all openings, recesses and chases in general building construction work. 3. Assume responsibility for
correct and final location and size of such openings. 4. Rectify improperly sized, improperly located or omitted chases or openings due to faulty or late information or failure to check
final location. 5. Provide 18 gauge galvanized sleeves and inserts. Extend all sleeves 2 in. above finished floor. Set sleeves and inserts in place ahead of new construction, securely
fastened during concrete pouring. Correct, by drilling, omitted or improperly located sleeves. Assume responsibility for all work and equipment damaged during course of drilling.
Firestop all unused sleeves. 6. Provide angle iron frame where openings are required for contract work, unless provided by General Construction trade. B. In Existing Buildings: 1.
Drill holes for floor and/or roof slab openings. 2. Multiple pipes smaller than 1 in. properly spaced and supported may pass through one 6 in. or smaller diameter opening. 3. Seal voids
in fire rated assemblies with a fire-stopping seal system to maintain the fire resistance of the assembly. Provide 18 gauge galvanized sleeves at fire rated assemblies. Extend sleeves
2 in. above floors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS
230500 - 14 4. In wall openings, drill or cut holes to suit. Provide 18 gauge galvanized sleeves at shafts and fire rated assemblies. Provide fire-stopping seal between sleeves
and wall in drywall construction. Provide fire stopping similar to that for floor openings. 1.24 PENETRATION FIRESTOPPING A. Fire-Stopping for Openings Through Fire and Smoke Rated
Wall and Floor Assemblies: 1. Provide materials and products listed or classified by an approved independent testing laboratory for "Penetration Fire-Stop Systems". The system shall
meet the requirements of "Fire Tests of Penetrations Fire-Stops" designated ASTM E814. 2. Provide fire-stop system seals at all locations where piping, tubing, conduit, electrical busways/cables/wir
es, ductwork and similar utilities pass through or penetrate fire rated wall or floor assembly. Provide fire-stop seal between sleeve and wall for drywall construction. 3. The minimum
required fire resistance ratings of the wall or floor assembly shall be maintained by the fire-stop system. The installation shall provide an air and watertight seal. 4. The methods
used shall incorporate qualities which permit the easy removal or addition of electrical conduits or cables without drilling or use of special tools. The product shall adhere to itself
to allow repairs to be made with the same material and permit the vibration, expansion, and/or contraction of any items passing through the penetration without cracking, crumbling and
resulting reduction in fire rating. 5. Plastic pipe/conduit materials shall be installed utilizing intumescent collars. 6. Provide a submittal including products intended for use, manufacturer's
installation instructions, and the UL details for all applicable types of wall and floor penetrations. 7. Fire-stopping products shall not be used for sealing of penetrations of non-rated
walls or floors. B. Acceptable Manufacturers: 1. Dow Corning Fire-Stop System Foams and Sealants. 2. Nelson Electric Fire-Stop System Putty, CLK and WRP. 3. S-100 FS500/600, Thomas
& Betts. 4. Carborundum Fyre Putty. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL
REQUIREMENTS 230500 - 15 5. 3-M Fire Products. 6. Hilti Corporation. 1.25 NON-RATED WALL PENETRATIONS A. Each trade shall be responsible for sealing wall penetrations related
to their installed work, including but not limited to ductwork, piping, conduits, etc. See individual specification sections for requirements. 1.26 SUPPORTS A. Provide required supports,
beams, angles, hangers, rods, bases, braces, and other items to properly support contract work. Modify studs, add studs, add framing, or otherwise reinforce studs in metal stud walls
and partitions as required to suit contract work. If necessary, in stud walls, provide special supports from floor to structure above. B. For precast panels/planks and metal decks,
support mechanical/electrical work as determined by manufacturer and the Engineer. Provide heavy gauge steel mounting plates for mounting contract work. Mounting plates shall span
two or more studs. Size, gauge, and strength of mounting plates shall be sufficient for equipment size, weight, and desired rigidity. C. For finished areas without a finished ceiling
system such as classrooms, offices, conference rooms, etc., where decking and structure is exposed, and ductwork/piping/conduit is exposed: All mounting brackets, channel support systems
and mounting hardware for ductwork, piping, lighting, etc. shall be concealed and approved by the Architect/Engineer prior to the installation. AirCraft cable style hanging for ductwork
is required. It is recommended that room mockups be done and receive Architect/Engineer approval prior to proceeding with installation. D. Equipment, piping, conduit, raceway, etc.
supports shall be installed to minimize the generation and transmission of vibration. E. Materials and equipment shall be solely supported by the building structure and connected framing.
Gypboard, ceilings, other finishes, etc. shall not be used for support of materials and equipment. 1.27 APPLIED FIREPROOFING A. Scope: Provide encapsulation of surfaces where applied
fireproofing materials have been disturbed, removed, or left missing by the removal of hangers or upper attachments, or when new hangers or upper attachment are installed. B. Fire Resistance
Rating: Fireproofing shall meet the original hourly rating when applied to the construction assembly where materials have been removed or disturbed, or is missing. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 16 C. Fire Hazard
Classification: Fireproofing shall be listed in the Underwriters Laboratories Building Materials Directory with the following performance properties: 1. Flame Spread: 10 or less.
2. Smoke Developed: 5 or less. D. Product Data: Provide manufacturer's product descriptions for each required fireproofing material. Include application instructions, including primer/adhesive
requirements and recommended minimum thickness and density for each required hourly rating. E. Fire Proofing Manufacturer: 1. Retro-Guard cementitious replacement fireproofing by Grace
Construction Products, or equivalent Cafco Blaze Shield, and Cafco 300 by Isolatek. 2. Physical Properties: a. Dry Field Density (ASTM E 605): 15 lb/cu ft minimum average. b. Cohesion/Adhesion
(Bond Strength) (ASTM E 736): 200 lb/sq ft minimum average. c. Compressive Strength (ASTM E 761): 500 lb/sq ft minimum. d. Impact (Bond Impact) Resistance (ASTM E 760): Shall not
crack or delaminate. e. Effect of Deflection (ASTM E 759): Shall not crack or delaminate. f. Corrosion Resistance (ASTM E 937): No evidence of corrosion. g. Air Erosion (ASTM E 859):
Maximum 0.025 g/sq ft weight loss. h. Provide primer or adhesive recommended by the fireproofing manufacturer to obtain required bond strength for the specific fireproofing and substrate.
F. Apply fireproofing prior to installation of ductwork, piping, conduits, and other suspended items. Hangers, clips and other supports for these items shall be installed before application
of fireproofing. G. Examine the substrate and conditions under which fireproofing is to be applied. Do not proceed with the fireproofing work until unsatisfactory conditions have been
corrected. Verify that hangers, clips, sleeves, and other items that will penetrate the fireproofing are in place. Check paint on substrate for compatibility with primer/fireproofing
and adequacy of bond strength in accordance with fireproofing manufacturer's instructions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 17 H. Surface Preparation: Remove dirt, dust, oil, grease, loose paint and rust, mill scale,
and other foreign matter that may impair the bonding of the fireproofing to the substrate. Clean substrate free of contamination from chemicals and solvents. Apply primer/adhesive
where necessary to obtain bond strength of fireproofing to steel shop paint and where recommended by the fireproofing manufacturer. I. Apply the fireproofing in accordance with UL fire
test report and the manufacturer's application instructions. Thickness and density of fireproofing shall be in accordance with the approved product data and as required to produce
the hourly fire resistance rating required. 1.28 ACCESS PANELS A. Provide access panels for required access to respective trade's work. Location and size shall be the responsibility
of each trade. Access panels provided for equipment shall provide an opening not smaller than 22 in. by 22 in. Panels shall be capable of opening a minimum of 90 degrees. Bear cost
of construction changes necessary due to improper information or failure to provide proper information in ample time. Access panels over 324 square inches shall have two cam locks.
Provide proper frame and door type for various wall or ceiling finishes. Access panels shall be equal to "Milcor" as manufactured by Inland Steel Products Co., Milwaukee, Wisconsin.
Provide General Construction trade with a set of architectural plans with size and locations of access panels. 1.29 CONCRETE BASES A. Provide concrete bases for all floor mounted equipment.
Provide 3,000 lb. concrete, chamfer edges, trowel finish, and securely bond to floor by roughening slab and coating with cement grout. Bases 4 in. high (unless otherwise indicated);
shape and size to accommodate equipment. Provide anchor bolts in equipment bases for all equipment provided for the project, whether mounted on new concrete bases or existing concrete
bases. 1.30 HVAC EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting, chemically treating and restarting any systems which are affected by work shown on
the Contract Documents unless specifically noted otherwise. B. Provide final connections to all equipment as required by the equipment. Provide final connections, including domestic
water piping, wiring, controls, and devices from equipment to outlets left by other trades. Provide equipment waste, drip, overflow and drain connections extended to floor drains.
C. Provide for Owner furnished and Contractor furnished equipment all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains, insulation,
sheet metal work, controls, dampers, as required. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MECHANICAL REQUIREMENTS 230500 - 18 D. Refer to manufacturer drawings and specifications for requirements of special equipment. Verify connection requirements before bidding.
1.31 PLUMBING EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting, chemically treating and restarting any systems which are affected by work shown on the
Contract Documents unless specifically noted otherwise. B. Provide roughing and final connections to all equipment. Provide loose key stops, sanitary "P" traps, tailpiece, adapters,
gas or air cocks, and all necessary piping and fittings from roughing point to equipment. Provide installation of sinks, faucets, traps, tailpiece furnished by others. Provide cold
water line with gate valve and backflow prevention device at locations called for. Provide continuation of piping and connection to equipment that is furnished by others. Provide
relief valve discharge piping from equipment relief valves. C. Provide valved water outlet adjacent to equipment requiring same. Provide equipment type floor drains, or drain hubs,
adjacent to equipment. D. Install controls and devices furnished by others. E. Refer to Contract Documents for roughing schedules, and equipment and lists indicating scope of connections
required. F. Provide for Owner furnished and Contractor furnished equipment all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains,
as required. G. Refer to Manufacturer drawings and specifications for requirements of special equipment. Verify connection requirements before bidding. 1.32 ELECTRICAL EQUIPMENT CONNECTIONS
A. Provide complete power connections to all electrical equipment. Provide control connections to equipment. Heavy duty NEC rated disconnect ahead of each piece of equipment. Ground
all equipment in accordance with NEC. B. Provide for Owner furnished and Contractor furnished equipment all power wiring, electric equipment, control wiring, switches, lights, receptacles,
and connections as required. C. Refer to Manufacturer's drawings/specifications for requirements of special equipment. Verify connection requirements before bidding. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 19 1.33 STORAGE
AND PROTECTION OF MATERIALS AND EQUIPMENT A. Store Materials on dry base, at least 6 in. aboveground or floor. Store so as not to interfere with other work or obstruct access to buildings
or facilities. Provide waterproof/windproof covering. Remove and provide special storage for items subject to moisture damage. Protect against theft or damage from any cause. Replace
items stolen or damaged, at no cost to Owner. B. Division 23 shall provide airtight plastic covers over all supply and return air openings prior to the start of construction by any
trade. The plastic shall be maintained airtight throughout the project construction and removed only with the approval of the Project Inspector. C. Ductwork shall be delivered to the
site from the fabrication shop with air tight plastic covers over all ends of the ducts. The plastic covers shall be in place during transportation and shall be removed prior to installation.
1.34 FREEZING AND WATER DAMAGE A. Take all necessary precautions with equipment, systems and building to prevent damage due to freezing and/or water damage. Repair or replace, at no
change in contract, any such damage to equipment, systems, and building. Perform first seasons winterizing in presence of Owner's operating staff. 1.35 OWNER INSTRUCTIONS A. Before
final acceptance of the work, furnish necessary skilled labor to operate all systems by seasons. Instruct designated person on proper operation, and care of systems/equipment. Repeat
instructions, if necessary. Obtain written acknowledgement from person instructed prior to final payment. Contractor is fully responsible for system until final acceptance, even though
operated by Owner's personnel, unless otherwise agreed in writing. List under clear plastic, operating, maintenance, and starting precautions procedures to be followed by Owner for
operating systems and equipment. 1.36 OPERATION AND MAINTENANCE MANUALS A. Submit by email (preferred) or digital media, thru the normal project submittal process. Include a copy of
each final approved Shop Drawing, wiring diagrams, piping diagrams, spare parts lists, final testing and balancing report, as-built drawings and manufacturer's instructions. Include
typewritten instructions, describing equipment, starting/operating procedures, emergency operating instructions, summer-winter changeover, freeze protection, precautions and recommended
maintenance procedures. Include name, address, and telephone number of installing contractor and of supplier manufacturer Representative and service agency for all major equipment
items. Provide a table of contents page and dividers based upon specification section numbers. Submit in a compiled and bookmarked PDF format as outlined below. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 20 B. Provide content
for Operation and Maintenance Manuals as specified in individual Specification Sections, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content
formatted and organized as required by this Section. 1. Engineer and Commissioning Agent will comment on whether content of operation and maintenance submittals is acceptable. 2. Where
applicable, clarify and update reviewed manual content to correspond to revisions and field conditions. C. Submit Operation and Maintenance Manuals in the following format: 1. Submit
by uploading to web-based project software site, or by email to Architect, as a formal project submittal in conformance with the project specific submittal procedures. Enable reviewer
comments on draft submittals. 2. Electronic Files: Use electronic files prepared by manufacturer where available. Where scanning of paper documents is required, configure scanned file
for minimum readable file size. 3. File Names and Bookmarks: Bookmark individual documents based on file names. Name document files to correspond to system, subsystem, and equipment
names used in the table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks
reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel on opening file. D. Initial Manual Submittal:
Submit draft copy of each manual at least 30 days before commencing Owner training. Engineer and Commissioning Agent will comment on whether general scope and content of manual are
acceptable. E. Final Manual Submittal: Submit O&M manual in final form prior to requesting inspection for Substantial Completion and at least 2 weeks before commencing Owner training.
Engineer and Commissioning Agent will return copy with review comments. 1. Correct or revise O&M manual to comply with Engineer's and Commissioning Agent's comments. Submit copies
of each corrected manual within 2 weeks of receipt of Engineer's and Commissioning Agent's comments. 1.37 RECORD DRAWINGS A. The Contractor shall obtain at his expense one (1) set of
construction Contract Drawings, (including non-reproduction black and white prints or electronic files) for the purpose of recording as-built conditions. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 21 B. The Contractor shall
perform all survey work required for the location and construction of the work and to record information necessary for completion of the record drawings. Record drawings shall show
the actual location of the constructed facilities in the same manner as was shown on the bid drawings. All elevations and dimensions shown on the drawings shall be verified or corrected
so as to provide a complete and accurate record of the facilities as constructed. C. It shall be the responsibility of the Contractor to mark EACH sheet of the contract documents in
red and to record thereon in a legible manner, any and all approved field changes and conditions as they occur. A complete file of approved field sketches, diagrams, and other changes
shall also be maintained. At completion of the work, the complete set of red marked contract documents, plus all approved field sketches and diagrams shall be submitted to the engineer
and used in preparation of the record drawings. D. A complete set of red marked contract drawings shall be submitted, at one time, as the "Record" set. If there are no changes to a
specific drawing, the contractor shall indicate "NO CHANGES" on that drawing. ALL drawings shall be included in the "Record" set. E. The complete set of red marked Contract Documents
or electronic files shall be certified by the Contractor as reflecting record conditions and submitted to the engineer for review. F. The Contractor shall have the marked up set scanned,
if they are not already electronic files, and then submit them to the Engineer as the "Record Set". 1.38 FINAL INSPECTION A. Upon completion of all Engineering Site Observation list
items, the Contractor shall provide a copy of the Engineering Site Observation Report back to the Engineer with each items noted as completed or the current status of the item. Upon
receipt, the Engineer will schedule a final review. 1.39 TEMPORARY HEATING AND COOLING A. Refer to the General Conditions of the Contract for Construction and Supplemental General Conditions.
B. Systems and equipment installed as part of this project shall not be used for temporary heating or cooling. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 22 1.40 MAINTENANCE OF HVAC SYSTEMS DURING TEMPORARY USE PERIODS A. Provide
each air handling system with a set of prefilters in addition to the permanent filters. Furnish four sets of prefilters for each system for use when system is operated for temporary
heating or cooling. During such use, change prefilters as often as directed by Owner's Representative. Provide MERV-8 filters in all open ended ducts, return grilles and registers
to keep dust out of ductwork. Change as often as necessary. Remove all such temporary filters upon completion. Use supply fans only. Do not operate return fans. B. Blank-off outside
air intake opening during temporary heating period. Install first set of permanent filters and prefilters. C. Adjust dampers on supply system. D. Set all heating coil control valves
for manual operation. E. Do not install any grilles or diffusers at room terminal ends of ducts until permission is given. F. Assume responsibility for systems and equipment at all
times, even though used for temporary heat or ventilating. Repair or replace all dented, scratched or damaged parts of systems prior to final acceptance. G. Remove concrete, rust,
paint spots, other blemishes, then clean. H. Just prior to final acceptance, remove used final filter and install new set. Deliver all unused sets of prefilters to the Owner and obtain
written receipt. Properly lubricate system bearings before and during temporary use. Maintain thermostats, freeze stats, overload devices, and all other safety controls in operating
condition. 1.41 CLEANING A. It is the Contractor's responsibility to keep clean all equipment and fixtures provided under this contract for the duration of the project. Each trade
shall keep the premises free from an accumulation of waste material or rubbish caused by his operations. The facilities require an environment of extreme cleanliness, and it is the
Contractor's responsibility to adhere to the strict regulations regarding procedures on the existing premises. After all tests are made and installations completed satisfactorily:
1. Thoroughly clean entire installation, both exposed surfaces and interiors. 2. Remove all debris caused by work. 3. Remove tools, surplus, materials, when work is finally accepted.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 -
23 1.42 SYSTEM START-UP AND TESTING A. All new heating and ventilating systems shall be started up and operated at normal operating temperature for a period of 24 hours to "bake-off"
the equipment. The associated ventilation system shall run on 100% outside air during the bake-off for an additional eight hours to purge the building. This work shall be completed
prior to [fall school] occupancy or on a Saturday, with the Contractor responsible for being on site during the entire purge and bake-off operation. B. Work of any contract which includes
system "bake-off", system start-up, system cut-over or staff training shall not be done one week prior to and one week after the commencement of school except upon written approval
by the Owner. C. Prior to commencement of work, the Division(s) effecting such system shall survey all building mechanical, plumbing, fire protection and electrical systems and components
and make written notice to the Owner regarding any damage, missing items and/or incomplete systems. Prior to the conclusion of this project, the Contractor shall verify with the Project
Inspector that all building systems have been returned to their original conditions. D. Start-up and testing of HVAC systems shall occur while the building is not occupied by students
and only after notice to the Project Inspector is made at least 24 hours in advance. Division 23 shall be responsible for providing temporary filter media over all supply air registers
and diffusers during the HVAC system start-up procedure. Division 23 shall provide airtight plastic covers over all supply and return air openings prior to the start of construction
by any contractor. The plastic shall be maintained airtight throughout the project construction and removed only with the approval of the Project Inspector. 1.43 TRANSFER OF ELECTRONIC
FILES A. M/E Engineering, P.C. will provide electronic files for the Contractor's use in the preparation of sheet metal shop drawings, coordination drawings, or record drawings related
to the project, subject to a $50.00 charge per drawing file, $2500.00 charge for a Revit model and the following terms and conditions: 1. The Contractor shall submit a formal request
for electronic drawing files on the M/E Engineering, P.C. website, by utilizing the following website link: http://www.meengineering.com/contact-pages/contractor-request 2. M/E Engineering,
P.C. makes no representation as to the compatibility of these files with the Contractor's hardware or the Contractor's software beyond the specific release of the referenced specifications.
3. M/E Engineering can only provide CAD files of M/E/P/FP drawing levels for which we are the Engineer of Record. CAD files of Architectural backgrounds, reflected ceiling plans, structural
plans, etc. must be obtained separately from the Architect of Record. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC MECHANICAL REQUIREMENTS 230500 - 24 4. Data contained on these electronic files is part of M/E Engineering, P.C.'s instruments of service shall not
be used by the Contractor or anyone else receiving data through or from the Contractor for any purpose other than as convenience in the preparation of shop drawings for the referenced
project. Any other use or reuse by the Contractor or by others will be at the Contractor's sole risk and without liability or legal exposure to M/E Engineering, P.C. The Contractor
agrees to make no claim and hereby waive, to the fullest extent permitted by law, any claim or cause of action of any nature against M/E Engineering, P.C., its officers, directors,
employees, agents or sub-consultants which may arise out of or in connection with the Contractor's use of the electronic files. 5. Furthermore, the Contractor shall, to the fullest
extent permitted by law, indemnify and hold harmless, M/E Engineering, P.C. from all claims, damages, losses and expenses, including attorney's fees arising out of or resulting from
the Contractor's use of these electronic files. 6. These electronic files are not contract documents. Significant difference may arise between these electronic files and corresponding
hard copy contract documents due to addenda, change orders or other revisions. M/E Engineering, P.C. makes no representation regarding the accuracy or completeness of the electronic
files the Contractor receives. In the event that a conflict arises between the signed contract documents prepared by M/E Engineering, P.C. and electronic files, the signed contract
documents shall govern. The Contractor is responsible for determining if any conflicts exist. By the Contractor's use of these electronic files the Contractor is not relieved of the
Contractor's duty to comply with the contract documents, including and without limitation, the need to check, confirm and coordinate all dimensions and details, take field measurements,
field verify conditions and coordinate the Contractor's work with that of other contractors for the project. 1.44 VIDEO RECORDING OF TRAINING SESSIONS A. The contractor shall video
record all training sessions required by their discipline. Video shall be in Windows Media Player video format saved on flash drives. Two (2) copies on flash drives are to be provided
as a formal submittal. . Flash drives are to be tagged with project name, training session name(s), installing Contractor and date of training. The flash drive shall include a scanned
version of the training session sign in list(s), including the presenter and the owner's participants. 1.45 ENERGY INCENTIVES A. The Contractor, his Subcontractors and Suppliers shall
provide to the Owner all paperwork necessary to support the Owners pursuit of incentives related to energy conservation as offered by the utility company or state sponsored incentive
programs. This shall include at a minimum, receipts, and quantities and data sheets for energy efficient equipment such as: lighting, motors, variable frequency drives, etc. END OF
SECTION 230500 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING 230504 -
1 SECTION 230504 - ELECTRIC WIRING PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services for the complete installation of motor control wiring and
temperature control wiring as required in Contract Documents. Provide wiring and conduit, required to connect devices furnished as part of or adjunctive to the automatic temperature
control system and for motor control regardless of the source of supply. Control wiring includes 120 volt and lower voltage wiring for control signals directing equipment operation.
Control circuits shall be 120 volt maximum. Provide wiring in accordance with requirements specified in Division 26, "Electrical" and the National Electrical Code. Provide devices
required for proper system operation, including special electrical switches, transformers, disconnect switches, relays, and circuit breaker protection. B. Coordinate all work with Division
26, "Electrical". 1.2 WORK NOT INCLUDED A. Power wiring for motors, motor starters and associated starting and control equipment, as well as the motor starters (except in the case of
equipment specified to have packaged control/starters), are included in Division 26, "Electrical", unless otherwise called for. 1.3 QUALIFICATIONS A. Wiring shall be installed in compliance
with all requirements of Division 26, "Electrical". 1.4 SUBMITTALS A. Provide complete wiring diagrams for equipment systems. Deliver wiring diagrams to proper trades in time for roughing
of conduit, equipment connections, and avoid delay in construction schedule. Wiring diagrams and roughing information to be wired as part of the Work of Division 26, "Electrical",
shall be clearly indicated. PART 2 - PRODUCTS 2.1 PRODUCTS A. Refer to Division 26 specifications for required wiring materials. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING 230504 - 2 PART 3 - EXECUTION 3.1 GENERAL A. Check electrical wiring pertaining
to equipment for completeness and correctness of connections. Correct any misapplied motor and/or motor starter, improper thermal overload device, or device which fails to function
and resultant damage, whether due to incorrect connections or improper information on wiring diagrams. 3.2 WIRING FOR CONTROL SYSTEMS A. Provide motor control and temperature control
wiring for equipment. All wiring shall be in conduit, unless otherwise noted. Refer to Section 260501 for type of conduit to be used in specific applications. Provide 18 in. length
flexible conduit at motors and devices subject to vibration. Conduit supported on 5 ft. centers. Do not attach directly to hot surfaces, piping, or ductwork. Control wiring shall
be in separate conduit from all other wiring. Provide green grounding wire circuited from starter, and run ground wire through conduit to each remote auxiliary relay, pushbutton station,
remote panel heating device, thermostat, or device with potentials in excess of 50 volts. Size ground wire as required by NEC. B. All temperature control wiring shall be plenum rated
type, meeting the requirements of NEC Article 300. C. Provide pushbutton stations, pilot lights, selector switches, auxiliary starter contacts, and other devices required to provide
specified functions. D. Where allowable by Code and contract documents, temperature control wiring may be installed without conduit. Installation and wire insulation types shall be
as described by NEC, Article 725. All low voltage wiring circuits 50 volt and under shall: 1. Be adequately supported using bridle rings spaced a maximum of 3 ft. on centers or other
approved method when installed horizontally above accessible ceilings or run exposed in unfinished areas. 2. Be installed in conduit when run in wall cavity or surface metal raceway
where no access is available to wall cavity, in finished areas. 3. Be installed in conduit when installed vertically in Mechanical/Utility Rooms from panels and devices up to above
ceiling, or 10 ft. above finished floor if no ceiling. 4. Be installed in conduit in all cases not specifically covered by the above cases, or where subject to physical damage. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC WIRING 230504 - 3 3.3 EQUIPMENT WIRING
A. Provide power and control wiring between sections of electrical radiation units, between shipping splits, and between remote panels, thermostats, disconnect switches, and their respective
units. Provide control wiring from the package control system, to each respective electric heat coil, reheat coil or motor. Properly mount control package. Power wiring to and including
disconnect switch shall be by Division 26 "Electrical". 3.4 FIELD WIRING IN STARTERS, CONTROLLERS AND PANELS A. Wiring within starters, controllers, and temperature control panels,
shall be routed neatly in gutter space, away from moving and/or heat producing parts. Provide suitably rated terminal blocks. Do not place more than two wire connections on pilot
device or relay terminal. Where more than two circuit connections are required, use terminal blocks. Provide nylon insulated, ring spade terminal for all control wires. Cables and
wires shall be neatly bundled and lashed with nylon cable straps. END OF SECTION 230504 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTORS 230513 - 1 SECTION 230513 - MOTORS PART 1 - GENERAL 1.1 DESCRIPTION A. Provide
labor, materials, equipment and services as required for the complete installation designed in Contract Documents. 1.2 SUBMITTALS A. Submit manufacturer's product data on all motors.
B. Product Data: For each motor, provide dimensions; mounting arrangements; frame type, enclosure type, location for conduit entries; shipping and operating weights; and manufacturer's
technical data on features, performance, electrical ratings and characteristics. C. Motor Performance Data: For each motor, include the following manufacturers' data: 1. Motor Performance:
Percent Efficiency, Power Factor, Torque, RPM, Duty Rating and Design Category. 1.3 QUALITY ASSURANCE A. Manufacturer Qualifications: 1. Motor manufacturer shall be based and headquartered
in the United States of America and shall design and manufacture motors in the United States. 2. Motor manufacturer shall have over fifteen (15) years-experience in the motor industry
and shall maintain active company-wide quality assurance program. 3. Motor manufacturer shall maintain an authorized service center within 60 miles of the project site, capable of providing
training, parts and emergency maintenance and repairs. B. Motor performance shall be warranted against material and workmanship defects by manufacturer's limited warranty and service
policy for the period of at least 18 months from the day of shipment from the factory or the manufacturer's warehouse. 1. Premium efficiency motors shall be warranted for 36 months.
2. Severe duty motors (as applicable) shall be warranted for 60 months. 3. Extended warranty shall be offered for certain products or as agreed by additional terms and specified elsewhere.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTORS 230513 - 2 PART 2 - PRODUCTS 2.1
MOTORS A. General Requirements: 1. Motors built for 60 Hz operation, three phase for 1/2 HP and larger; single phase for 1/3 HP and smaller. a. In compliance with NEMA Standards, wound
specifically for nameplate voltage, and selected for appropriate duty and environment. b. 1.15 minimum service factor at rated voltage and frequency. c. Bearings: Bearings shall have
a rated fatigue life of L-10 (B-10) of 150,000 hours for direct-coupled applications and 50,000 hours for belted applications minimum. Belted rating shall be based on radial loads
and pulley sizes called out in NEMA MG 1-14.43. The calculation will be determined from the pulley centerline being at the end of the motor shaft. d. V-belt connected motors with adjustable
slide rail bases and pulleys. e. Motors shall have Class F insulation system, with Class B temperature rise, insulation meeting NEMA MG 1 Part 31. Maximum allowable motor temperature
rise for open drip-proof or totally enclosed fan cooled (TEFC) type at 1.15 service factor shall be 105°C above 40°C ambient with a total temperature rating of 155°C. f. NEMA locked
rotor kVA code as required to match unit equipment torque characteristics. g. Single-phase motors shall be capacitor start, induction run, or split phase type. h. Polyphase motors shall
be constant speed, squirrel cage, unless otherwise specified. i. Nameplates shall have as a minimum, all information as described in NEMA Standard MG-1-20.60. Motor nameplate shall
be mounted on enclosure with stainless steel fastening pins. 2. Motors for use with adjustable speed drive applications shall be premium efficiency inverter duty rated in accordance
with NEMA and be capable of a 20:1 turndown. a. These motors shall meet NEMA corona inception voltage requirements, withstanding peak voltages up to 1600 volts, and be manufactured
in accordance with NEMA MG 1 Part 30 and 31. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
MOTORS 230513 - 3 b. All motors controlled by adjustable speed drives shall be equipped with circumferential micro-fiber shaft grounding rings to provide protection from electrical
bearing damage, to meet NEMA MG 1, 31.4.4.3. Provide AEGIS Bearing Protection Ring Kit (or equal), installed in accordance with the manufacturer's recommendation. For motors controlled
by adjustable speed drives and 50hp or greater the motor shall have a ceramic electrically insulating bearing assembly on the opposite end of the grounding brushes 3. Three phase motors
rated 1 HP and greater shall be copper winding, re-lubable ball bearings, 1.15 service factor, premium efficiency, energy-saver type with a guaranteed NEMA nominal full-load efficiency,
by IEEE Standard 112 Test Method "B". Efficiency rating shall appear on nameplate, and shall be not less than as follows; per NEMA MG 1 Part 12, Table 12-12, nominal minimum efficiencies:
MINIMUM NOMINAL FULL-LOAD MOTOR EFFICIENCY HP ODP MOTORS (RPM) TEFC MOTORS (RPM) 1200 1800 3600 1200 1800 3600 1.0 82.5 85.5 77 82.5 85.5 77.0 1.5 86.5 86.5 84 87.5 86.5 84 2.0 87.5
86.5 85.5 88.5 86.5 85.5 3.0 88.5 89.5 85.5 89.5 89.5 86.5 5.0 89.5 89.5 86.5 89.5 89.5 88.5 7.5 90.2 91.0 88.5 91.0 91.7 89.5 10 91.7 91.7 89.5 91.0 91.7 90.2 15 91.7 93.0 90.2 91.7
92.4 91.0 20 92.4 93.0 91.0 91.7 93.0 91.0 25 93.0 93.6 91.7 93.0 93.6 91.7 30 93.6 94.1 91.7 93.0 93.6 91.7 40 94.1 94.1 92.4 94.1 94.1 92.4 50 94.1 94.5 93.0 94.1 94.5 93.0 60 94.5
95.0 93.6 94.5 95.0 93.6 75 94.5 95.0 93.6 94.5 95.4 93.6 100 95.0 95.4 93.6 95.0 95.4 94.1 125 95.0 95.4 94.1 95.0 95.4 95.0 150 95.4 95.8 94.1 95.8 95.8 95.0 200 95.4 95.8 95.0 95.8
96.2 95.4 4. Nominal Motor Voltage Table: Nominal System Voltage Motor Nameplate 480V - 3 phase 460 volt 240V - 1 phase and 3 phase 230 volt 208V - 1 phase and 3 phase 200 volt 120V
- 1 phase 115 volt TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTORS 230513 - 4 5.
Motor Application; Provide the following enclosure types unless noted otherwise: Environment/Location Motor Enclosure Type General Purpose Open drip-proof, TEFC with cast iron frame,
or encapsulated Outdoors, below grade or high humidity TEFC with cast iron frame Hazardous Explosion-proof Packaged Refrigeration Compressors Hermetic or semi-hermetic 6. Acceptable
Manufacturers: Motors need not all be of the same manufacturer. Subject to the requirements of this section provide products by the following: a. General Electric Energy & Saver NEMA
Premium Efficiency/(ODP); General Electric X$D Ultra NEMA Premium Efficiency (TEFC). b. Century/A.O. Smith Speed Plus c. Baldor-Reliance Super E. d. Lincoln Ultimate E CTAC. e. Marathon
XRI. f. Siemens GO100A. g. Nidec Motor Co. (U.S. Motors) Premium Efficient. PART 3 - EXECUTION 3.1 MOTORS A. Furnished by equipment manufacturer and especially manufactured and/or selected,
mounted, and installed for intended use. Install motors accessible for maintenance and belt adjustment. 3.2 REPLACEMENT OF EXISTING MOTORS A. Verify motor characteristics, including
voltage, shaft length, speed, rotation, horsepower and frame type, and provide motors as called for. Modify or replace existing motor mounts and bases to accommodate the replacement
motors. END OF SECTION 230513 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GAUGES AND THERMOMETERS
230519 - 1 SECTION 230519 - GAUGES AND THERMOMETERS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the
complete installation and related Work as required in Contract Documents. 1.2 SUBMITTAL A. Submit product data for gauges, thermometers and thermowells. PART 2 - PRODUCTS 2.1 WATER
PRESSURE GAUGES A. Construction to be Bourdon tube type; 4-1/2 in. diameter minimum, dial face, in cast aluminum case, replaceable glass lens, with snap-on rings. Phosphor bronze tube,
bronze bushed rotary movement, silver brazed or soldered to brass socket and brass tip. 1/4 in. bottom connection. Accuracy, one (1.0) percent of included scale range. White dial
face with black numerals, graduated in pounds; equipped with bronze pulsation dampener or snubber. B. Make: American, Ashcroft, Crosby, Duro, Marsh, Moeller, Trerice, Weiss, Weksler,
Winters. 2.2 PIPING SYSTEM THERMOMETERS A. Industrial type, plastic, aluminum or steel case, glass or plastic front, non-toxic organic liquid filled, red reading column, white or silver
V-shaped scale, black numerals. Union flange mounted, separable socket with thermowell, extension necks where required; range as called for service. Universal adjustable type, 9 in.
scale. For installation in hot water systems, graduations of 2°F., accurate to within 1°F. For installation in water systems where the maximum temperature is less than 120°F, graduations
of 1°F, accurate to within 1/2°F. B. Make: American, Moeller, Trerice, Weiss, Weksler, Winters. 2.3 DIGITAL LIGHT POWERED THERMOMETER A. High impact ABS case. Range for -40° to 300°F
3/8 in. LCD display. Accuracy of 1% of reading or 1°F, whichever is greater. 1/10° resolution. Internal potentiometer for recalibration. 10 LUX rating. 10 second updates. Ambient
operating range of -30° to 140°F. Glass passivated thermistor sensor. Industrial glass stem assembly. Provide suitable thermowell. B. Make: Weiss, Winters. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GAUGES AND THERMOMETERS 230519 - 2 2.4 PRESSURE/TEMPERATURE TEST PLUGS
A. 1/4 in. NPT plug shall be capable of reading either a pressure or temperature. 1/8 in. o.d. dual seal core of Nordel 275°F with zero leakage from vacuum to 500 psig. B. Test kit
consisting of: one 2-1/2 in. test gauge 0-100 psi, one gauge adapter 1/8 in. probe, and two 5 in. stem pocket testing thermometers - one 0° to 220° and one 25° to 125°F. C. Makes: Peterson
Equipment Company, Sisco P/T plugs. PART 3 - EXECUTION 3.1 GENERAL A. Provide where called for in the drawings and as noted below. B. All gauges and thermometers shall be provided with
pressure and temperature ranges appropriate for the system in which they are installed. Select to operate in the middle third of the range under normal operating conditions. Gauges
and thermometers shall be suitable for the environment of their installed location, and if installed outdoors shall be acceptable for operation down to an ambient temperature of -20°F.
3.2 WATER PRESSURE GAUGES A. Heating water and chilled water coils: 0 to 60 psi range. B. Provide 1/4 in. ball valve in each pump inlet and outlet tapping, or in piping adjacent to
same. Range 30 in. vacuum to 100 psi. C. Heat exchangers: 0 to 60 psi range. D. Compression tanks: 0 to 100 psi range. E. Each water make-up valve assembly: 0 to 60 psi range. 3.3
THERMOMETERS A. Provide thermowells mounted in oversize tee, or elbow if necessary, to provide as little restriction as possible to fluid flow. Provide thermometer stems and thermowell
depths of proper length to allow accurate reading. Locate adjacent to control sensing equipment. Install and adjust angles so as to be easily read from floor. B. Cooling Coil: Inlet
and outlet; range 20° to 120°F. C. Boiler Inlet and outlet; range 30° to 300°F. D. Hot Water Zone: Supply and return pipe; range 30° to 300°F. E. Snow Melting: Supply and return;
range 0° to 160°F. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 GAUGES AND THERMOMETERS
230519 - 3 F. Heating Coil: Inlet and outlet; range 0° to 220°F. G. Condenser: Inlet and outlet; range 0° to 100°F. 3.4 TEST PLUG A. Provide test plugs at locations as called
for. END OF SECTION 230519 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 VALVES 230523 - 1 SECTION 230523 - VALVES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services as required
for the complete installation and related Work designed in Contract Documents. 1.2 SUBMITTAL A. Submit product data for valves and accessories. PART 2 - PRODUCTS 2.1 VALVES A. General:
Valves shall have following requirements: 1. Working pressure stamped or cast on bodies. 2. Stem packing serviceable without removing valve from line. 3. Valves on insulated services
shall have handle extensions so that the handle is fully beyond the insulation jacketing. 4. Where possible, all valves of like type shall be of a single manufacturer. B. Acceptable
Manufacturers: 1. Ball Valves: Apollo, Hammond, Jamesbury, Milwaukee, Watts, Nibco, Victaulic. 2. Butterfly Valves: Apollo, DeZurik, Jamesbury, Keystone, Milwaukee, Watts, Nibco,
Victaulic. 3. High Performance Butterfly Valves: Keystone, Bray, Velan, Milwaukee. 4. To establish a standard of quality and to identify features, certain manufacturer's numbers are
given in the following paragraphs. C. Check Valves: 1. 2-1/2 in. and Larger: Iron body, cast iron disc with bronze disc face rings and bronze seat ring, bolted flange cap, flanged
ends, 125 SWP, Milwaukee F-2974A. 2. 2 in. and Smaller: Bronze, swing check, threaded ends, 125 SWP, Milwaukee 1509. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VALVES 230523 - 2 3. Silent Check Valves, 2 in. and Smaller: Renewable seat, bronze body with bronze
trim and stainless steel spring, 125 lb. SWP. Apollo 61-500 Series. 4. Silent Check Valves, 2 in. and Larger: Cast iron body, 304 stainless steel seat, disc, spring, bushing and screw,
125 lb. SWP. Milwaukee 1400. D. Ball Valves for Water Service: 1. For chilled and hot water systems 3 in. and under: Bronze body with hardened chrome-plated brass ball PTFE seats,
full porting, 600 lb., W.O.G., adjustable packing gland, insulated handle, screwed or soldered ends, blowout proof stem. Provide handle extension on insulated services. 2. Grooved
end valves for chilled, hot and condenser water systems 1-1/2 in. through 6 in. ductile iron body, chrome plated carbon steel ball and stem, standard port, blowout proof, 800 psi CWP,
lever handle or gear operator with hand wheel. Victaulic Series 726. 3. Provide extended operations handle on non-thermal conductive material and protective sleeve that allows operation
of valve without breaking the vapor seal or disturbing insulation. 4. Manufacturer: Conbraco Apollo 76-100-64. 5. Oval handle. 6. Provide extended operations handle on non-thermal
conductive material and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation, with tee handle. E. Valves for Gauges and Instruments:
1. 1/4 in., bronze body, hardened chrome plated brass ball, glass reinforced carbon impregnated seats, standard porting, 400 lb. W.O.G., adjustable packing gland, screwed ends, tee
handle, Watts B6000TH. F. Grooved Butterfly Valves for Water Service: 1. Bi-directional bubble tight shutoff against working pressure of 300 psi. 2. Body: Grooved type, coated ductile
iron. 3. Disc: Nickel coated ductile iron. 4. Seat: EPDM. 5. Stem: Stainless steel with EPDM seals. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VALVES 230523 - 3 6. Operators: Valves up to 6 in. with lever operators; valves 8 in. and larger with heavy duty manual
gear actuators. 7. Victaulic VIC-300 Master Seal (2 in. to 12 in.). 8. Victaulic VIC-AGS (14 in. to 24 in.). G. Lug Type Butterfly Valves for Water Service: 1. Rated for working pressure
200 psi, bi-directional dead end service, bubble-tight. 2. Body: Lug type, cast iron ASTM A126, or ductile iron. 3. Disc: Aluminized bronze. 4. Seat: EPDM, resilient seat. Rated
to 250oF. 5. Stem: 316 or 416 stainless steel. Single offset. 6. Operator: Lockable Lever for sizes through 6 in. Manual hand wheel gear actuator for sizes 8 in. and larger. 7.
Milwaukee CL223E (2 in. - 6 in.), CL323E (8 in. and larger), or Watts BF-03. H. High Performance Butterfly Valves for Water Service: 1. 100% bubble-tight bi-directional shutoff against
working pressure of 285 psi when installed between ANSI Class 150 flanges. 2. Body: ANSI Class 150 lug type, carbon steel ASTM A216, or ductile iron. Body to have internally cast
travel stops. 3. Disc: 316 stainless steel, beveled construction. Disc and stem shall be of double offset design. 4. Seat: Replaceable Teflon reinforced resilient seat, for water
temperatures up to 250°F at 150 psi. 5. Stem: 316 or 416 stainless steel mounted within corrosion resistant bearings. 6. Operators: Valves up to 6 in. with lockable lever operators;
valves 8 in. and larger with heavy duty manual hand wheel gear actuators. 7. Keystone Figure 312. I. Hose Thread Drain Valves: 1. Ball valve, bronze body, hardened chrome ball with
hose thread end, cap and chain. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VALVES 230523
- 4 PART 3 - EXECUTION 3.1 INSTALLATION A. General: 1. Provide valves of type called for and where required to service equipment. 2. Provide at major building and systems sections.
3. Provide chain wheels, guides, and chain loops for valves, where called for or in Mechanical Rooms where valves are mounted higher than 8'-0" AFF. 4. Isolating valves for individual
fan convectors, room units, terminal units, or other similar apparatus may be inside cabinet or at connection to branch mains where accessible. 5. Locate valves with handles at horizontal
position when 5 ft. or more above the floor, for greater visibility and easier use. Otherwise, locate valves with handles at or above horizontal position. Swing check valves in upright
position only. 6. Butterfly valves may be used for water service over 2 in. unless otherwise noted. 7. Ball valves may be used for water service through 3 in., unless otherwise noted.
8. Provide hose threaded valves at low points, strainers, equipment, and as called for. END OF SECTION 230523 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ROOF CURBS 230530 - 1 SECTION 230530 - ROOF CURBS PART 1 - GENERAL 1.1 DESCRIPTION A. Provide labor, materials, equipment
and services as required for the complete installation of roof curbs as shown in Contract Documents. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 230550 - Wind Restraint for HVAC
Systems. 1.3 SUBMITTALS A. Typical detail and schedule for equipment. Details shall include cross-sectional view illustrating clearly the type of curb being submitted, i.e. double
wall insulated, with or without cant. PART 2 - PRODUCTS 2.1 ROOF CURBS AND PIPE/DUCT/EQUIPMENT SUPPORTS A. Basis of Design: Subject to compliance with requirements of this section,
provide Roof Products and Systems Corp. (RPS) or comparable product by one of the following: 1. RPI (Roof Products Inc.) 2. ThyCurb 3. Greenheck B. Configuration: Coordinate curb type
with roof deck construction and insulation thickness. 1. Self-flashing without cant strip, with mounting flange (RPS Series 2A). 2. Built-in cant and mounting flange (RPS Series 3A).
3. Built-in raised cant and mounting flange (RPS Series 4A). C. Provide wind restraint as called for in Item 1.2 above. 2.2 FAN CURBS/DUCT CURBS A. Double wall, 1-1/2 in. minimum thickness,
fully insulated in the interior cavity with rigid insulation. Curb constructed of galvanized steel, 1-1/2 in. 3# density insulation with continuous welded corner seams and painted
at all welds. 20 gauge up to 36 in., 18 gauge 38 to 72 in., 16 gauge over 72 in. in any dimension. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 ROOF CURBS 230530 - 2 B. Kitchen exhaust fan curbs shall be 24 in. high with hinges and service hold-open chain or cable;
all other fan curbs shall be 18 in. high or as otherwise noted on the drawings. C. Provide curb with adhesive backed closed cell foam gasket on the top edge to make airtight seal between
curb and ventilator, fan, or air handling unit. Gasketing for kitchen exhaust fan curbs shall be woven ceramic gasket tape rated for the operating temperature. D. Basis of Design:
RPS - RC Roof Curbs. 2.3 EQUIPMENT SUPPORTS A. Double wall, minimum 18 in. high. Constructed of 18 gauge galvanized steel with continuous welded corner seams and painted at all welds.
Constructed of heavier gauge steel where standard rail cannot support unit weight. Provide with top cap counter flashing. Width to be 5-1/2 inches. B. Basis of Design: RPS - Equipment
Rail ER2. PART 3 - EXECUTION 3.1 GENERAL A. Height as recommended by equipment manufacturer, not less than described in this specification. This Contractor shall be responsible for
exact size, length, and location and shall set and secure each curb to the roof. Shim and level curb as required. Provide curb and supports for all roof-mounted equipment. All roof
penetrations shall be made through an appropriate curb. All roof mounted equipment including fans, air handling units, etc, shall be set on an equipment support unless otherwise noted.
Refer to Contract Drawings for details on plenums extending from curbs. END OF SECTION 230530 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 WIND RESTRAINT FOR HVAC SYSTEMS 230550 - 1 SECTION 230550 - WIND RESTRAINT FOR HVAC SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES
A. Support and brace mechanical and electrical systems, as called for, to resist directional wind forces (lateral, longitudinal and vertical). 1.2 APPLICABLE CODES AND STANDARDS A.
Provide work in compliance with the following codes and standards: 1. 2020 Building Code of New York State (Section 1609 and 1613). 2. 2020 Mechanical Code of New York State (Section
301, Item 301.15). 3. American Society of Civil Engineers (ASCE) Minimum Design Loads for Buildings and Other Structures with Supplement No. 1 - Standard ASCE/SEI 716. 1.3 QUALITY
ASSURANCE A. General: 1. The contractor shall provide Professional Engineer stamped and signed engineering calculations and details of wind restraint systems to meet total design lateral
force requirements for support and restraint of mechanical systems. Engineer shall be licensed to practice in the state in which the project is located. 2. The wind restraint engineering
calculations and details shall provide the quantity of attachments and size/type of attachments for the mounting of an equipment curb or support rail to the building structure, and
for attachment of the equipment or system to the equipment curb or support rail. It is not the intent for manufactured equipment curbs or support rails to be certified by their respective
manufacturers, nor is it the intent for them to be certified by the Professional Engineer who is providing the wind restraint calculations and connection methodology. 3. Systems requiring
wind restraint including, but not limited to: a. Exhaust fans. b. Ductwork. c. Roof curbs and pipe/duct/equipment supports associated with any of the equipment listed above. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WIND RESTRAINT FOR HVAC SYSTEMS 230550 - 2 1.4
SUBMITTALS A. Submit wind force level (Fp) calculations from applicable building code. Submit preapproved restraint selections, installation details, and plans indicating locations
of restraints. B. Calculations, plans, restraint selection, and installation details shall be stamped and signed by a professionally licensed engineer experienced in wind restraint
design. C. Submit manufacturer's product data. D. For each piece of equipment that requires wind restraint as outlined in this section, include the following: 1. Dimensioned Outline
Drawings of Equipment Unit: Identify the center of gravity and locate and describe mounting and anchoring provisions. 2. Anchorage: Provide detailed description of equipment anchorage
devices on which the calculations are based and their installation requirements. Identify anchor bolts, studs and other mounting devices. Provide information on the size, type and spacing
of mounting brackets, holes and other provisions. E. The Contractor shall provide photographs of the installed roof mounted equipment, showing the fully installed wind restraint anchoring,
prior to the roofing material installation, as a formal submittal for verification that the work has been completed. PART 2 - PRODUCTS 2.1 CODE INFORMATION A. This project is subject
to the wind bracing requirements of the codes listed above. The following criteria are applicable to this project: 1. Nominal Design Wind Speed (V) (Per ASCE 7-10): 115 mph. 2.
Risk Category (Per ASCE 7-10): IV 3. Exposure Category (Per ASCE 7-10): D 4. Height and Exposure Adjustment Coefficient (Per ASCE 7-10): 60. 2.2 WIND BRACING AND SUPPORT OF SYSTEMS
AND COMPONENTS A. General: 1. Design analysis shall include calculated dead loads, wind loads, and capacity of materials utilized for the connection of the equipment or system to the
structure. 2. Analysis shall detail anchoring methods, fastener sizes and spacing, etc. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 WIND RESTRAINT FOR HVAC SYSTEMS 230550 - 3 3. All wind restraint devices shall be designed to accept without failure the forces calculated
per the applicable building code and as summarized in Section 2.1. B. Friction from gravity loads shall not be considered resistance to wind forces. PART 3 - EXECUTION 3.1 INSTALLATION
A. Wind Restraint of Ductwork and Equipment: 1. All restraint systems shall be installed in strict accordance with the wind restraint design submittal. 2. The interaction between mechanical
and electrical equipment and the supporting structures shall be designed into the restraint systems. 3. Installation of restraints shall not cause any change in position of equipment
or ductwork, resulting in stresses or misalignment. 4. Exhaust fans with hinge kits shall have wind restraint fasteners installed on the hinged side, same as the three (3) non-hinged
sides. 5. No rigid connections between equipment and the building structure shall be made that degrade the noise and vibration-isolation system specified. 6. Do not install any equipment
or duct that makes rigid connections with the building unless isolation is not specified. 7. Prior to installation, bring to the Architect's/Engineer's attention any discrepancies between
the specifications and the field conditions, or changes required due to specific equipment selection. END OF SECTION 230550 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WIND RESTRAINT FOR HVAC SYSTEMS 230550 - 1 SECTION 230550 - WIND RESTRAINT FOR HVAC SYSTEMS PART 1 -
GENERAL 1.1 SECTION INCLUDES A. Support and brace mechanical and electrical systems, as called for, to resist directional wind forces (lateral, longitudinal and vertical). 1.2 APPLICABLE
CODES AND STANDARDS A. Provide work in compliance with the following codes and standards: 1. 2020 Building Code of New York State (Section 1609 and 1613). 2. 2020 Mechanical Code
of New York State (Section 301, Item 301.15). 3. American Society of Civil Engineers (ASCE) Minimum Design Loads for Buildings and Other Structures with Supplement No. 1 - Standard
ASCE/SEI 716. 1.3 QUALITY ASSURANCE A. General: 1. The contractor shall provide Professional Engineer stamped and signed engineering calculations and details of wind restraint systems
to meet total design lateral force requirements for support and restraint of mechanical systems. Engineer shall be licensed to practice in the state in which the project is located.
2. The wind restraint engineering calculations and details shall provide the quantity of attachments and size/type of attachments for the mounting of an equipment curb or support rail
to the building structure, and for attachment of the equipment or system to the equipment curb or support rail. It is not the intent for manufactured equipment curbs or support rails
to be certified by their respective manufacturers, nor is it the intent for them to be certified by the Professional Engineer who is providing the wind restraint calculations and connection
methodology. 3. Systems requiring wind restraint including, but not limited to: a. Exhaust fans. b. Ductwork. c. Roof curbs and pipe/duct/equipment supports associated with any of
the equipment listed above. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WIND RESTRAINT
FOR HVAC SYSTEMS 230550 - 2 1.4 SUBMITTALS A. Submit wind force level (Fp) calculations from applicable building code. Submit preapproved restraint selections, installation details,
and plans indicating locations of restraints. B. Calculations, plans, restraint selection, and installation details shall be stamped and signed by a professionally licensed engineer
experienced in wind restraint design. C. Submit manufacturer's product data. D. For each piece of equipment that requires wind restraint as outlined in this section, include the following:
1. Dimensioned Outline Drawings of Equipment Unit: Identify the center of gravity and locate and describe mounting and anchoring provisions. 2. Anchorage: Provide detailed description
of equipment anchorage devices on which the calculations are based and their installation requirements. Identify anchor bolts, studs and other mounting devices. Provide information
on the size, type and spacing of mounting brackets, holes and other provisions. E. The Contractor shall provide photographs of the installed roof mounted equipment, showing the fully
installed wind restraint anchoring, prior to the roofing material installation, as a formal submittal for verification that the work has been completed. PART 2 - PRODUCTS 2.1 CODE INFORMATION
A. This project is subject to the wind bracing requirements of the codes listed above. The following criteria are applicable to this project: 1. Nominal Design Wind Speed (V) (Per
ASCE 7-10): 115 mph. 2. Risk Category (Per ASCE 7-10): IV 3. Exposure Category (Per ASCE 7-10): D 4. Height and Exposure Adjustment Coefficient (Per ASCE 7-10): 60. 2.2 WIND BRACING
AND SUPPORT OF SYSTEMS AND COMPONENTS A. General: 1. Design analysis shall include calculated dead loads, wind loads, and capacity of materials utilized for the connection of the equipment
or system to the structure. 2. Analysis shall detail anchoring methods, fastener sizes and spacing, etc. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WIND RESTRAINT FOR HVAC SYSTEMS 230550 - 3 3. All wind restraint devices shall be designed to accept without failure
the forces calculated per the applicable building code and as summarized in Section 2.1. B. Friction from gravity loads shall not be considered resistance to wind forces. PART 3 - EXECUTION
3.1 INSTALLATION A. Wind Restraint of Ductwork and Equipment: 1. All restraint systems shall be installed in strict accordance with the wind restraint design submittal. 2. The interaction
between mechanical and electrical equipment and the supporting structures shall be designed into the restraint systems. 3. Installation of restraints shall not cause any change in position
of equipment or ductwork, resulting in stresses or misalignment. 4. Exhaust fans with hinge kits shall have wind restraint fasteners installed on the hinged side, same as the three
(3) non-hinged sides. 5. No rigid connections between equipment and the building structure shall be made that degrade the noise and vibration-isolation system specified. 6. Do not install
any equipment or duct that makes rigid connections with the building unless isolation is not specified. 7. Prior to installation, bring to the Architect's/Engineer's attention any discrepancies
between the specifications and the field conditions, or changes required due to specific equipment selection. END OF SECTION 230550 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 1 SECTION 230593 - TESTING, ADJUSTING AND BALANCING
PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for complete adjusting and balancing Work as required in Contract
Documents. B. Review drawings for balancing requirements for existing building systems. Design will add load to existing building systems and require rebalancing of these systems to
the new connected loads. C. This Section specifies the requirements and procedures of, mechanical systems testing, adjusting, and balancing. Requirements include measurement and establishment
of the fluid quantities of the mechanical systems as required to meet design specifications, and recording and reporting the results. D. Test, adjust, and balance the following mechanical
systems: 1. Supply air systems, all pressure ranges; including constant volume and variable volume systems. 2. Return air systems. 3. Exhaust air systems; including kitchen exhaust
systems. 4. Hydronic systems; including constant flow and variable flow systems. E. This Section does not include: 1. Specifications for materials for patching mechanical systems; 2.
Specifications for materials and installation of adjusting and balancing devices. If devices must be added to achieve proper adjusting and balancing, refer to the respective system
sections for materials and installation requirements. 3. Requirements and procedures for piping and ductwork systems leakage tests. 1.2 SUBMITTALS A. Provide information in report form
listing items required by specifications. Results shall be guaranteed. Contractor shall be subject to recall to site to verify report information before acceptance of the report by
the Owner's Representative. B. Strategies and Procedures Plan: Within thirty (30) days of Contractor's Notice to Proceed, submit testing and balancing strategies and step-by-step procedures
as specified in Section 3.1.B, "Preparation", and consistent with those listed in Part 3 of this specification. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 2 C. System Readiness Checklists: Within thirty (30) days of Contractor's
Notice to Proceed, AABC agency shall provide system readiness checklists as specified in Section 3.1.C, "Preparation", to be used and filled out by the installing contractors verifying
that systems are ready for Testing and Balancing. D. Examination Report: Provide a summary report of the examination review required in Section 3.1.D to the Engineer, documenting issues
that may preclude the proper testing and balancing of the systems. E. Certified report format shall consist of the following: 1. Title sheet with job name, contractor, engineer, date,
balance contractor's name, address, telephone number and contact person's name and the balancing technician's name. 2. Individual test sheets for air handlers, terminal units, air distribution,
exhaust fans, duct traverses, pumps, air handling coils, reheat coils, radiation, convectors, cabinet unit heaters and unit ventilators. 3. Manufacturer's pump and fan curves for equipment
installed with design and actual operating conditions indicated. 4. TAB Report Forms: Use standard forms from AABC's "National Standards for Testing and Balancing Heating, Ventilating,
and Air Conditioning Systems" or NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems". 1.3 DEFINITIONS A. System testing, adjusting and balancing
is the process of checking and adjusting all the building environmental systems to produce the design objectives. It includes: 1. The balance of air and water distribution; 2. Adjustment
of total system to provide design quantities; 3. Electrical measurement; 4. Verification of performance of all equipment and automatic controls. B. Test: To determine quantitative
performance of equipment. C. Adjust: To regulate the specified fluid flow rate and air patterns at the terminal equipment (e.g., reduce fan speed, throttling). D. Balance: To proportion
flows within the distribution system (submains, branches, and terminals) according to specified design quantities. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 3 E. Procedure: Standardized approach and execution of sequence of
work operations to yield reproducible results. F. Report Forms: Test data sheets arranged for collecting test data in logical order for submission and review. This data should also
form the permanent record to be used as the basis for required future testing, adjusting, and balancing. G. Terminal: The point where the controlled fluid enters or leaves the distribution
system. There are supply inlets on water terminals, supply outlets on air terminals, return outlets on water terminals, and exhaust or return supply or outside air inlets or outlets
on terminals such as registers, grilles, diffusers, and louvers. H. Main: Duct or pipe containing the system's major or entire fluid flow. I. Submain: Duct or pipe containing part
of the systems' capacity and serving two or more branch mains. J. Branch Main: Duct or pipe serving two or more terminals. K. Branch: Duct or pipe serving a single terminal. 1.4 QUALIFICATIONS
A. Follow procedures and methods published by one or more of the following: 1. Associated Air Balance Council (AABC) or National Environmental Balancing Bureau (NEBB). 2. Individual
manufacturer requirements and recommendations. B. Maintain qualified personnel at project for system operation and trouble shooting. TAB contractor shall change sheaves and perform
mechanical adjustments in conjunction with balancing procedure. C. Balancing contractor shall be current member of AABC or NEBB. D. Instrumentation Type, Quantity, Accuracy, and Calibration:
As described in the AABC National Standards for Total System Balance. 1.5 GENERAL REQUIREMENTS A. Before concealment of systems visit the job site to verify and advise on type and
location of balancing devices and test points. Make changes as required to balance facilities. B. Place systems in satisfactory operating condition. 1. Adjusting and balancing shall
be accomplished as soon as the systems are complete and before Owner takes possession. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 4 2. Prior to balancing, adjust balancing devices for full flow; fill, vent and clean hydronic systems,
replace temporary filters and strainers. 3. Initial adjustment and balancing to quantities as called for or as directed by the engineer, to satisfy job conditions. 4. All outdoor conditions
(Db, Wb, and a description of the weather conditions) at the time of testing shall be documented in the report. 5. Provide sheaves and belts as required to meet system performance requirements
for all belt-driven fan motors 10 HP and greater. Adjust and align sheaves to obtain proper settings and operation. Verify motors are not overloading. 6. Installing contractor shall
replace balancing cocks, flow balancers and dampers in new systems that cannot be manipulated to satisfy balancing requirements. 7. Identify flow balancers, balancing cocks and dampers
in existing systems that cannot be manipulated to satisfy balancing requirements. 8. Traverse main ducts to determine total system air quantities after all outlets have been set prior
to final adjustment if the system does not meet design requirements. A sum of room CFM's is not acceptable. 9. If duct construction and/or installation prohibits proper traverse readings,
provide coil measurements at main coils and/or fresh air intake traverse with units operating in 100% outside air mode (where applicable). 1.6 CONTRACTOR RESPONSIBILITIES A. Provide
Testing and Balancing agency one complete set of contract documents, change orders, and approved submittals in digital and hard copy formats. B. Controls contractor shall provide required
BAS hardware, software, personnel and assistance to Testing and Balancing agency as required to balance the systems. Controls Contractor shall also provide trending report to demonstrate
that systems are complete. C. Coordinate meetings and assistance from suppliers and contractors as required by Testing and Balancing agency. D. Provide additional valves, dampers, sheaves
and belts as required by Testing and Balancing agency. E. Flag all manual volume dampers with fluorescent or other high-visibility tape. F. Provide access to all dampers, valves, test
ports, nameplates and other appurtenances as required by Testing and Balancing agency. G. Installing contractor shall replace or repair insulation as required by Testing and Balancing
agency. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING
230593 - 5 H. Have the HVAC systems at complete operational readiness for Testing and Balancing to begin. As a minimum verify the following: 1. Airside: a. All ductwork is complete
with all terminals installed. b. All volume, smoke and fire dampers are open and functional. c. Clean filters are installed. d. All fans are operating, free of vibration, and rotating
in correct direction. e. ASD start-up is complete and all safeties are verified. f. System readiness checklists are completed and returned to Testing and Balancing agency. 2. Hydronics:
a. Piping is complete with all terminals installed. b. Water treatment is complete. c. Systems are flushed, filled and air purged. d. Strainers are pulled and cleaned. e. Control valves
are functioning per the sequence of operation. f. All shutoff and balance valves have been verified to be 100% open. g. Pumps are started, and proper rotation is verified. h. Pump gauge
connections are installed directly at the pump inlet and outlet flange or in discharge and suction pipe prior to any valves or strainers. i. ASD start-up is complete and all safeties
have been verified. j. System readiness checklists are completed and returned to Testing and Balancing agency. I. Promptly correct deficiencies identified during Testing and Balancing.
J. Maintain a construction schedule that allows the Testing and Balancing agency to complete work prior to occupancy. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 6 PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. Provide tools, ladders,
recording meters, gauges, thermometers, velometers, anemometers, Pitot tubes, inclined gauge manometers, magnehelic gauges, amprobes, voltmeters, psychrometers and tachometers required.
B. Instrumentation Calibration: Calibrate instruments at least every six (6) months or more frequently if required by instrument manufacturer. 1. Keep an updated record of instrument
calibration that indicates date of calibration and the name of party performing instrument calibration. PART 3 - EXECUTION 3.1 PREPARATION A. Examine Bid Documents and submittals and
notify Owner's Representative and Engineer of any questions regarding balancing. 1. Examine the Contract Documents to become familiar with Project requirements and to discover conditions
in systems' designs that may preclude proper Testing and Balancing of systems and equipment. 2. Examine the approved submittals for HVAC systems and equipment. 3. Examine equipment
performance data including fan and pump curves. B. Prepare a Testing and Balancing Strategies and Procedures Plan that includes: 1. Equipment and systems to be tested. 2. Strategies
and step-by-step procedures for balancing the systems. 3. Instrumentation to be used. 4. Sample forms with specific identification for all equipment. C. Prepare system-readiness checklists,
as described in the AABC National Standards for Total System Balance, for use by contractors in verifying system readiness for Testing and Balancing. These shall include, at a minimum:
1. Airside: a. All ductwork is complete with all terminals installed. b. All volume, smoke and fire dampers are open and functional. c. Clean filters are installed. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 7 d. All fans
are operating, free of vibration, and rotating in correct direction. e. Permanent electrical power wiring and ASD start-up is complete and all safeties are verified. f. Automatic temperature-control
systems are operational. g. Ceilings are installed. h. Windows and doors are installed. i. Suitable access to balancing devices and equipment is provided. j. Equipment and duct access
doors are securely closed. 2. Hydronics: a. Piping is complete with all terminals installed. b. Water treatment is complete. c. Systems are flushed, filled and air purged. d. Strainers
are pulled and cleaned. e. Control valves are functioning per the sequence of operation. f. All shutoff and balance valves have been verified to be 100% open. g. Pumps are started and
proper rotation is verified. h. Pump gauge connections are installed directly at the pump inlet and outlet flange or in discharge and suction pipe prior to any valves or strainers.
i. Permanent electrical power wiring and ASD start-up is complete and all safeties are verified. j. Suitable access to balancing devices and equipment is provided. D. Examine construction
and notify Owner's Representative and Engineer of outstanding issues related to balancing, as part of "Examination Report" submittal. 1. Examine ceiling plenums and underfloor air plenums
used for supply, return, or relief air to verify that they are properly separated from adjacent areas. 2. Examine HVAC equipment and verify that bearings are greased, belts are aligned
and tight, clean permanent filters are installed, and controls are ready for operation. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 8 3. Examine terminal units, such as variable-air-volume boxes, and verify that they are accessible
and their controls are connected, configured by the controls contractor and functioning. 4. Examine strainers to verify that Mechanical Contractor has replaced startup screens with
permanent screens and that all strainers have been cleaned. 5. Examine two-way valves for proper installation and function. 6. Examine three-way valves for proper installation for their
intended function of diverting or mixing fluid flows. 7. Examine heat-transfer coils for correct piping connections and for clean and straight fins. 8. Examine air vents to verify that
mechanical contractor has removed all air from all hydronic systems. 9. Examine systems for installed balancing devices, such as test ports, gage cocks, thermometer wells, flow-control
devices, balancing valves and fittings, weld-olets, and manual volume dampers prior to pressure testing. Note the locations of devices that are not accessible for testing and balancing.
3.2 GENERAL PROCEDURES FOR TESTING AND BALANCING A. Perform testing and balancing procedures on each system according to the procedures contained in AABC's "National Standards for Testing
and Balancing Heating, Ventilating, and Air Conditioning Systems" or NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and this Section. B.
Cut insulation, ducts, pipes, and equipment cabinets for installation of test probes to the minimum extent necessary to allow adequate performance of procedures. After testing and
balancing, close probe holes and patch insulation with new materials identical to those removed. Restore vapor barrier and finish according to insulation Specifications for this Project.
C. Mark equipment and balancing device settings with paint or other suitable, permanent identification material, including damper-control positions, valve position indicators, fanspeed-control
levers, and similar controls and devices, to show final settings. D. Take and report testing and balancing measurements in inch-pound (IP) units. 3.3 GENERAL PROCEDURES FOR BALANCING
AIR SYSTEMS A. Prepare test reports for both fans and outlets. Obtain manufacturer's outlet factors and recommended testing procedures. Crosscheck the summation of required outlet
volumes with required fan volumes. B. Prepare schematic diagrams of systems' "as-built" duct layouts. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY
14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 9 C. For variable-air-volume systems, develop a plan to simulate diversity. D.
Determine the best locations in main and branch ducts for accurate duct airflow measurements. E. Check airflow patterns from the outside-air louvers and dampers and the return and exhaust-air
dampers, through the supply-fan discharge and mixing dampers. F. Locate start-stop and disconnect switches, electrical interlocks, and motor starters. G. Verify that motor starters
are equipped with properly sized thermal protection. H. Check dampers for proper position to achieve desired airflow path. I. Check for airflow blockages. J. Check condensate drains
for proper connections and function. K. Check for proper sealing of air-handling unit components. L. Check for proper sealing of air duct system. 3.4 PROCEDURES FOR CONSTANT-VOLUME
AIR SYSTEMS A. Adjust fans to deliver total indicated airflows within the maximum allowable fan speed listed by fan manufacturer. 1. Measure fan static pressures to determine actual
static pressure as follows: a. Measure outlet static pressure as far downstream from the fan as practicable and upstream from restrictions in ducts such as elbows and transitions. b.
Measure static pressure directly at the fan outlet or through the flexible connection. c. Measure inlet static pressure of single-inlet duct as near the fan as possible, upstream from
flexible connection and downstream from duct restrictions. d. Measure inlet static pressure of double-inlet fans through the wall of the plenum that houses the fan. 2. Measure static
pressure across each component that makes up an air-handling unit, rooftop unit, and other air-handling and treating equipment. a. Simulate dirty filter operation and record the point
at which maintenance personnel must change filters. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 TESTING, ADJUSTING AND BALANCING 230593 - 10 3. Measure static pressures entering and leaving other devices such as sound traps, heat recovery equipment, and air washers,
under final balanced conditions. 4. Compare design data with installed conditions to determine variations in design static pressures versus actual static pressures. Compare actual
system effect factors to identify where variations occur. Recommend corrective action to align design and actual conditions. 5. Obtain approval from Engineer for adjustment of fan
speed higher or lower than indicated speed. Make required adjustments to sheaves sizes, motor sizes, and electrical connections to accommodate fan-speed changes. 6. Do not make fan-speed
adjustments that result in motor overload. Consult equipment manufacturers about fan-speed safety factors. Modulate dampers and measure fan-motor amperage to ensure that no overload
will occur. Measure amperage in full cooling, full heating, economizer, and any other operating modes to determine the maximum required brake horsepower. B. Adjust volume dampers for
main duct, submain ducts, and major branch ducts to indicated airflows within specified tolerances. 1. Measure static pressure at a point downstream from the balancing damper and adjust
volume dampers until the proper static pressure is achieved. a. Where sufficient space in submain and branch ducts is unavailable for Pitot-tube traverse measurements, measure airflow
at terminal outlets and inlets and calculate the total airflow for that zone. 2. Re-measure each submain and branch duct after all have been adjusted. Continue to adjust submain and
branch ducts to indicated airflows within specified tolerances. C. Measure terminal outlets and inlets without making adjustments. 1. Measure terminal outlets using a direct-reading
hood or outlet manufacturer's written instructions and calculating factors. D. Adjust terminal outlets and inlets for each space to indicated airflows within specified tolerances of
indicated values. Make adjustments using volume dampers rather than extractors and the dampers at air terminals. 1. Adjust each outlet in same room or space to within specified tolerances
of indicated quantities without generating noise levels above the limitations prescribed by the Contract Documents. 2. Adjust patterns of adjustable outlets for proper distribution
without drafts. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING
230593 - 11 3.5 PROCEDURES FOR VARIABLE-AIR-VOLUME SYSTEMS A. Compensating for Diversity: When the total airflow of all terminal units is more than the indicated airflow of the
fan, place a selected number of terminal units at a maximum setpoint airflow condition until the total airflow of the terminal units equals the indicated airflow of the fan. Select
the reduced airflow terminal units so they are distributed evenly among the branch ducts. B. Pressure-Independent, Variable-Air-Volume Systems: After the fan systems have been adjusted,
adjust the variable-air-volume systems as follows: 1. Set outside-air dampers at minimum, and return-and exhaust-air dampers at a position that simulates full-cooling load. 2. Select
the terminal unit that is most critical to the supply-fan airflow and static pressure. Measure static pressure. Adjust system static pressure so the entering static pressure for the
critical terminal unit is not less than the sum of terminalunit manufacturer's recommended minimum inlet static pressure plus the static pressure needed to overcome terminal-unit discharge
system losses. 3. Measure total system airflow. Adjust to within indicated airflow. 4. Set terminal units at maximum airflow and adjust controller or regulator to deliver the designed
maximum airflow. Use terminal-unit manufacturer's written instructions to make this adjustment. When total airflow is correct, balance the air outlets downstream from terminal units
as described for constant-volume air systems. 5. Set terminal units at minimum airflow and adjust controller or regulator to deliver the designed minimum airflow. Check air outlets
for a proportional reduction in airflow as described for constant-volume air systems. a. If air outlets are out of balance at minimum airflow, report the conditions but leave outlets
balanced for maximum airflow. 6. Re-measure the return airflow to the fan while operating at maximum return airflow and minimum outside airflow. Adjust the fan and balance the return-air
ducts and inlets as described for constant-volume air systems. 7. Measure static pressure at the most critical terminal unit and adjust the staticpressure controller at the main supply-air
sensing station to ensure that the adequate static pressure is maintained at the most critical unit. 8. Record the final fan performance data. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 12 C. Pressure-Dependent, Variable-Air-Volume
Systems with Diversity: After the fan systems have been adjusted, adjust the variable-air-volume systems as follows: 1. Set system at maximum indicated airflow by setting the required
number of terminal units at minimum airflow. Select the reduced airflow terminal units so they are distributed evenly among the branch ducts. 2. Adjust supply fan to maximum indicated
airflow with the variable-airflow controller set at maximum airflow. 3. Set terminal units at full-airflow condition. 4. Adjust terminal units starting at the supply-fan end of the
system and continuing progressively to the end of the system. Adjust inlet dampers of each terminal unit to indicated airflow. When total airflow is correct, balance the air outlets
downstream from terminal units as described for constant-volume air systems. 5. Adjust terminal units for minimum airflow. 6. Measure static pressure at the sensor. 7. Measure the return
airflow to the fan while operating at maximum return airflow and minimum outside airflow. Adjust the fan and balance the return-air ducts and inlets as described for constant-volume
air systems. 3.6 GENERAL PROCEDURES FOR HYDRONIC SYSTEMS A. Prepare test reports for pumps, coils and heat exchangers. Obtain approved submittals and any manufacturer-recommended
testing procedures. Cross check the summation of required coil and heat exchanger gpms with pump design flow rate. B. Verify that hydronic systems are ready for testing and balancing:
1. Check liquid level in expansion tank and verify that tank is set to specified pressure for system fill and expansion. 2. Check that makeup water has adequate pressure to highest
vent. 3. Check that control valves are in their proper positions. 4. Check that air has been purged from the system. 5. Locate start-stop and disconnect switches, electrical interlocks,
and motor starters. 6. Verify that motor starters are equipped with properly sized thermal protection. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 13 3.7 PROCEDURES FOR CONSTANT-FLOW HYDRONIC SYSTEMS A. Adjust pumps to deliver
total design gpm. 1. Measure total water flow. a. Position valves for full flow through coils. b. Measure flow by main flow meter, if installed. c. If main flow meter is not installed,
determine flow by pump total dynamic head (TDH) or exchanger pressure drop. 2. Measure pump TDH as follows: a. Measure discharge pressure directly at the pump outlet flange or in discharge
pipe prior to any valves or fittings. b. Measure inlet pressure directly at the pump inlet flange or in suction pipe prior to any valves or strainers. c. Convert pressure to head and
correct for differences in gauge heights. d. On single stage centrifugal pumps, verify pump impeller size by measuring the TDH with the discharge valve closed. Note the point on manufacturer's
pump curve at zero flow and verify that the pump has the intended impeller size. e. With all valves open, read pump TDH. Adjust pump discharge valve until design water flow is achieved.
3. Monitor motor performance during procedures and do not operate motor in an overloaded condition. B. Adjust flow measuring devices installed in mains and branches to design water
flows. 1. Measure flow in main and branch pipes. 2. Adjust main and branch balance valves for design flow. 3. Re-measure each main and branch after all have been adjusted. C. Adjust
flow measuring devices installed at terminals for each space to design water flows. 1. Measure flow at all terminals. 2. Adjust each terminal to design flow. 3. Re-measure each terminal
after all have been adjusted. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING
AND BALANCING 230593 - 14 4. Position control valves to bypass the coil and adjust the bypass valve to maintain design flow. 5. Perform temperature tests after all flows have
been balanced. D. For systems with pressure-independent valves at the terminals: 1. Measure differential pressure and verify that it is within manufacturer's specified range. 2. Perform
temperature tests after all flows have been verified. E. For systems without pressure-independent valves or flow measuring devices at the terminals: 1. Measure and balance coils by
either coil pressure drop or temperature method. 2. If balanced by coil pressure drop, perform temperature tests after all flows have been verified. F. Verify final system conditions
as follows: 1. Re-measure and confirm that total water flow is within design. 2. Re-measure all final pump operating data, TDH, volts, amps, static profile. 3. Mark all final settings.
G. Verify that all memory stops have been set. 3.8 PROCEDURES FOR VARIABLE-FLOW HYDRONIC SYSTEMS A. Adjust the variable-flow hydronic system as follows: 1. Verify that the differential
pressure (DP) sensor is located per the Contract Documents. 2. Determine if there is diversity in the system. B. For systems with no diversity: 1. Follow procedures outlined for constant-flow
hydronic systems. 2. Prior to verifying final system conditions, determine the system DP setpoint. 3. If the pump discharge valve was used to set total system flow with ASD at 60 Hz,
at completion open discharge valve 100% and allow ASD to control system DP setpoint. Record pump data under both conditions. 4. Mark all final settings and verify that all memory stops
have been set. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING
230593 - 15 C. For systems with diversity: 1. Determine diversity factor. 2. Simulate system diversity by closing required number of control valves, as approved by the design
Engineer. 3. Follow procedures outlined for constant flow hydronic systems. 4. Open control valves that were shut. Close a sufficient number of control valves that were previously
open to maintain diversity, and balance the terminals that were just opened. 5. Prior to verifying final system conditions, determine the system DP setpoint. 6. If the pump discharge
valve was used to set total system flow with ASD at 60 Hz, at completion open discharge valve 100% and allow ASD to control system DP setpoint. Record pump data under both conditions.
7. Mark all final settings and verify that all memory stops have been set. D. For systems with pressure-independent valves at the terminals: 1. Measure differential pressure and verify
that it is within manufacturer's specified range. 2. Perform temperature tests after all flows have been verified. 3.9 TOLERANCES A. Set HVAC system's air flow rates and water flow
rates within the following tolerances: 1. Supply, Return, and Exhaust Fans: Zero to plus 10 percent. 2. Air Outlets and Inlets: Plus or minus 10 percent. 3. Minimum Outside Air: Zero
to plus 10 percent. 4. Maintaining pressure relationships as designed shall have priority over the tolerances specified above. 5. Heating-Water Flow Rate: Plus or minus 10 percent.
6. Cooling-Water Flow Rate: Plus or minus 10 percent. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 TESTING, ADJUSTING AND BALANCING 230593 - 16 3.10 FINAL TEST AND BALANCE REPORT A. The report shall be a complete record of the HVAC system performance, including conditions
of operation, items outstanding, and any deviations found during the Testing and Balancing process. The final report also provides a reference of actual operating conditions for the
owner and/or operations personnel. All measurements and test results that appear in the reports must be made on site and dated by the technicians or Test and Balance Engineers. B.
The report must be organized by systems and shall include the following information as a minimum: 1. Title Page: a. AABC or NEBB Certified Company Name. b. Company Address. c. Company
Telephone Number. d. Project Identification Number. e. Location. f. Project Architect. g. Project Engineer. h. Project Contractor. i. Project Number. j. Date of Report. k. Certification
Statement. l. Name, Signature, and Certification Number. 2. Table of Contents. 3. National Performance Guaranty. 4. Report Summary: a. The summary shall include a list of items that
do not meet design tolerances, with information that may be considered in resolving deficiencies. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 17 5. Instrument List: a. Type b. Manufacturer c. Model d. Serial Number e. Calibration
Date C. Required air side data - Test, adjust and record the following: 1. Motors: a. RPM b. BHP c. Full load amps d. Sheave sizes, number and size of belts e. Shaft diameter f. Complete
nameplate data 2. Fans: a. Cfm b. RPM c. Suction static pressure d. Discharge static pressure e. Sheave sizes, number and size of belts, key sizes, shaft, diameter f. Complete nameplate
data g. Sketch of system's inlet and outlet connections h. Location of test port 3. Duct: Traverse Zones a. Cfm b. Static Pressure 4. AHU - MAU & heat pumps (In both minimum O.A.
and economizer modes): a. Minimum outdoor air Cfm b. Total discharge and return Cfm c. Static profile thru unit d. Complete nameplate data 5. Coil: a. Entering air temperature (DB/WB)
b. Leaving air temperature (DB/WB) c. Static differential d. Face velocity and area e. Cfm TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 TESTING, ADJUSTING AND BALANCING 230593 - 18 f. Complete nameplate data 6. Registers/Grilles/Diffusers: a. Cfm b. Set, adjust and
record air flow pattern 7. Filter Banks: a. Nameplate data b. Static pressure drop D. Required Fluid Data: Test, adjust and record the following: 1. Heat Transfer Devices: Including,
but not limited to air handlers, convectors, fin tube radiation sections, unit ventilators, fan coils, cabinet heaters, unit heaters, heat pumps, heat exchangers. a. GPM (coil and bypass)
b. Entering water temperature c. Leaving water temperature d. Water pressure drop e. Complete nameplate data 2. Pumps: a. Check rotation b. GPM c. Pump off pressures (suction and discharge)
d. Running suction pressure e. Running discharge pressure f. Running load amps g. RPM - motor h. Complete nameplate motor and pump i. Marked up pump curve illustrating final operating
conditions E. The final test and balance report shall be provided as a formal project submittal for review by the Engineer of Record. END OF SECTION 230593 TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 1 SECTION 230710 - INSULATION PART 1 - GENERAL
1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract Documents.
1.2 SUBMITTAL A. Submit product data, product description, manufacturer's installation instructions, types and recommended thicknesses for each application, and location of materials.
1.3 RELATED WORK SPECIFIED ELSEWHERE A. Section 230710.50 - Removable Insulation Blankets. B. Section 232010 - Piping Systems and Accessories. C. Section 233100 - Sheet Metal and Ductwork
Accessories Construction. PART 2 - PRODUCTS 2.1 GENERAL A. Insulation, jackets, adhesive, and coatings shall comply with the following: 1. Treatment of jackets or facing for flame and
smoke safety must be permanent. Water-soluble treatments not permitted. 2. Insulation, including finishes and adhesives on the exterior surfaces of ducts, pipes, and equipment, shall
have a flame spread rating of 25 or less and a smoke developed rating of 50 or less, when tested in accordance with ASTM E84. 3. Asbestos or asbestos bearing materials are prohibited.
4. Comply with 2020 Energy Conservation Code of New York State. 5. All adhesives, coatings and sealants used for insulation in the interior of the building shall comply with the maximum
Volatile Organic Compound (VOC) limits as called for in the current version of U.S. Green Building Council LEED Credits EQ 4.1 and EQ 4.2. 6. Provide materials which are the standard
products of manufacturers regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least two (2) years prior
to bid opening. Provide insulation systems in accordance with the approved MICA or NAIMA Insulation Standards. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 2 7. Insulation shall be clearly marked with manufacturer's name, identification of installed
thermal resistance (R) value, out-of-package R value, flame spread and smoke developed indexes in accordance with Energy Code requirements. 2.2 ACCEPTABLE MANUFACTURERS A. Fiberglass:
Knauf/Manson, Johns Manville, Owen-Corning, Certainteed. (Board, Blanket and Liner) B. Polyisocyanurate: Dow Trymer 2000XP, HyTherm. C. Calcium Silicate: Industrial Insulation Group
(ILG). D. Flexible Elastomeric: Armacell, K-Flex. E. Adhesives, Coatings, Mastics, Sealants: Childers, Foster. 2.3 PIPE INSULATION (RIGID FIBERGLASS TYPE) A. Product meeting ASTM
C 547, ASTM C 585, and ASTM C 795; rigid, molded, noncombustible. B. 'K' Value: ASTM C 335, 0.23 at 75°F mean temperature installed value. Maximum Service Temperature: 1000°F. C.
Vapor Retarder Jacket: ASJ/SSL conforming to ASTM C 1136 Type I, secured with self-sealing longitudinal laps and butt strips. D. Field-Applied PVC Fitting Covers with Flexible Fiberglass
Insulation: Proto Corporation 25/50 or Indoor/Outdoor, UV-resistant fittings, jacketing and accessories, white or colored. Fitting cover system consists of pre-molded, high-impact
PVC materials with blanket type fiberglass wrap inserts. Blanket fiberglass wrap inserts shall have a thermal conductivity ('K') of 0.26 at 75°F mean temperature. Closures to be stainless
steel tacks, matching PVC tape, or PVC adhesive per manufacturer's recommendations. E. Prefabricated Thermal Insulating Fitting Covers: Comply with ASTM C 450 for dimensions used in
pre-forming insulation to cover valves, elbows, tees, and flanges. 2.4 FLEXIBLE TYPE INSULATION A. Flexible Elastomeric Thermal Insulation: Closed-cell, foam material. Comply with
ASTM C 534, Type I for tubular materials and Type II for sheet materials. Maximum thermal conductivity (k) shall be 0.25 BTU-in/ft2 hr. °F at 75°F mean temperature. Adhesive: As
recommended by insulation material manufacturer. B. Insulation shall have a flame-spread index of less than 25 and a smoke-developed index of less than 50 as tested by ASTM E 84 and
CAN/ULC S-102, "Method of Test for Surface Burning Characteristics of Building Materials". TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 3 2.5 DUCT INSULATION A. Duct insulation shall have a thermal resistance (R) value identification mark by the
manufacturer applied no less than every 10 ft., as per Energy Code requirements. B. Flexible Fiber Glass Blanket: 1. Product meeting ASTM C 553 Types I, II and III, and ASTM C 1290;
Greenguard compliant. 2. 'K' Value of 0.27 at 75°F mean temperature. Maximum Service Temperature (Faced): 250°F. 3. Vapor Retarder Jacket: FSK conforming to ASTM C 1136 Type II.
4. Installation: Maximum allowable compression is 25%. Securement: Secured in place using outward cinching staples in combination with appropriate pressuresensitive aluminum foil
tape. 5. Density: 0.75 or 1.0 PCF. See Exhibit II for the thickness requirement at each density. C. Rigid Fiber Glass Board: 1. Product meeting ASTM C 612 Type IA and IB. 2. 'K'
Value of 0.23 at 75°F mean temperature. Maximum Service Temperature: 450º F. 3. Vapor Retarder Jacket: ASJ conforming to ASTM C 1136 Type I, or FSK or PSK conforming to ASTM C 1136
Type II. Provide ASJ jacket for ductwork to be painted. 4. Securement: Secured in place using adhesive and mechanical fasteners spaced a minimum of 12 in. on center with a minimum
of 2 rows per side of duct. Insulation shall be secured with speed washers and all joints, breaks and punctures sealed with appropriate pressure-sensitive foil tape. a. Concealed
Areas: Minimum 3 lb./ft.3. b. Exposed Areas: 6 lb./ft.3 minimum density for duct less than 8 ft. - 0 in. above finished floor. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 4 D. Kitchen Hood Exhaust Duct Wrap: John Mansville Firetemp Wrap, Certainteed
FlameChek, Unifrax FyreWrap or approved equal. Wrap shall be compliant with ASTM E2336 Fire Resistive Duct Enclosure System, fully tested against internal grease ducts fires (ASTM
E-2336), external fires (ASTM E 119/UL263), through penetration insulated duct fires (ASTM 814/UL1479), wall fires (ASTM E 119), and surface burning (ASTM E 84/UL723). Wrap for grease
duct applications shall use two layers of 1-1/2 in. wrap. The interior layer is applied with a butt joint. The second layer is offset a minimum of six inches from the initial layer.
It is applied with an overlap of three inches and the insulated duct is banded with stainless steel straps. E. Polyisocyanurate Board: Closed cell polyisocyanurate core bonded to
a triple laminated foil facing on both sides. Comply with ASTM C1289 Type I Class I. "K" value: 0.17 BTU in/(hr. sq.ft. degree F) at 75 deg. F. 2.6 EQUIPMENT INSULATION A. Rigid
Fiber Glass Board: 1. Product meeting ASTM C 612 Type IA and IB. 2. Concealed Areas: a. Density: Minimum 3 PCF. b. 'K' Value of 0.23 at 75°F mean temperature. Maximum Service Temperature:
450°F. c. Vapor Retarder Jacket: ASJ conforming to ASTM C 1136 Type I, or FSK conforming to ASTM C 1136 Type II. 3. Exposed Areas: a. Density: Minimum 6 PCF b. 'K' Value: ASTM C
177, 0.22 at 75°F mean temperature. B. Foam Board. Polyisocyanurate core. Foil faced on one side and opposite side faced with white acrylic coated embossed aluminum, 4-mil. equal
to "Dow Chemical Thermax Heavy Duty". 2.7 FIELD-APPLIED JACKETS A. Ductwork: 1. Alumaguard Jacketing: Self adhesive, 60 mil thick, rubberized bitumen, foil faced membrane. Polyguard
Products, Inc. Alumaguard 60, or equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION
230710 - 5 2.8 COATINGS, MASTICS, ADHESIVES AND SEALANTS A. Vapor Barrier Coatings: Used in conjunction with reinforcing mesh to coat insulation on below ambient services temperatures.
Permeance shall be no greater than 0.08 perms at 45 mils dry as tested by ASTM F1249. Foster 30-65 Vapor Fas; Childers CP-34, or approved equal. B. Lagging Adhesives: Used in conjunction
with canvas or glass lagging cloth to protect equipment/piping indoors. Foster 30-36 Sealfas; Childers CP-50AMV1 Chil Seal, or approved equal. C. Weather Barrier Mastic: Used outdoors
to protect above ambient insulation from weather. Foster 46-50 Weatherite; Childers CP-10 Vi Cryl, or approved equal. D. Fiberglass Adhesive: Used bond low density fibrous insulation
to metal surfaces. Shall meet ASTM C916 Type II. Foster 85-60; Childers CP-127, or approved equal. E. Elastomeric Insulation Adhesive: Used to bond elastomeric insulation. Foster
85-75; Childers CP-82, or approved equal. F. Elastomeric Insulation Coating: Water based coating used to protect outside of elastomeric insulation. Foster 30-65, Childers CP-34 or
approved equal. G. Insulation Joint Sealant: Used as a vapor sealant on below ambient piping with polyisocyanurate and cellular glass insulation. Foster 95-50; Childers CP-76, or
approved equal. H. Metal Jacketing Sealant: Used as a sealant on metal jacketing seams to prevent water entry. Foster 95-44; Childers CP-76, or approved equal. I. Reinforcing Mesh:
Used in conjunction with coatings/mastics to reinforce. Foster Mast A Fab; Childers Chil Glass #10, or approved equal. 2.9 MATERIALS AND SCHEDULES A. See Exhibits at the end of this
section. PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A. All materials shall be installed by skilled labor regularly engaged in this type of work. All materials shall be installed in
strict accordance with manufacturer's recommendations, building codes, and industry standards. B. Locate insulation and cover seams in the least visible location. All surface finishes
shall be extended in such a manner as to protect all raw edges, ends and surfaces of insulation. No glass fibers shall be exposed to the air. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 6 C. All pipe and duct insulation shall be continuous through
hangers, walls, ceiling and floor openings, and through sleeves, unless not allowed by Fire Stop System. Refer to Section 230500 "Basic Requirements" for Fire Stop Systems. D. Provide
thermal insulation on clean, dry surfaces and after piping, ductwork and equipment (as applicable) have been tested. Do not cover pipe joints with insulation until required tests are
completed. E. All cold surfaces that may "sweat" must be insulated. Vapor barrier must be maintained; insulation shall be applied with a continuous, unbroken moisture and vapor seal.
All hangers, supports, anchors, or other projections that are secured to cold surfaces shall be insulated and vapor sealed to prevent condensation. Cover valves, fittings and similar
items in each piping system with insulation as applied to adjoining pipe run. Extra care must be taken on piping appurtenances to insure a tight fit to the piping system. For piping
systems with fluid temperatures below ambient, all vapor retarder jacket (ASJ) seams must be coated with vapor barrier coating. All associated elbows, fittings, valves, etc. must be
coated with vapor barrier coating and reinforcing mesh to prevent moisture ingress. Valve extension stems require Elastomeric insulation that is tight fitting to the adjoining fiberglass
system insulation. Pumps, strainers, air separators, drain valves, etc. must be totally encapsulated with Elastomeric insulation. F. Items such as boiler manholes, handholds, clean-outs,
ASME stamp, and manufacturers' nameplates, may be left un-insulated unless omitting insulation would cause a condensation problem. When such is the case, appropriate tagging shall
be provided to identify the presence of these items. Provide neatly beveled edges at interruptions of insulation. G. Provide protective insulation as required to prevent personnel
injury: Piping from zero to seven feet above all floors and access platforms including hot (above 140°F) piping and any other related hot surface. H. All pipes shall be individually
insulated. I. If any insulation material has become wet because of transit or job site exposure to moisture or water, the contractor shall not install such material, and shall remove
it from the job site. 3.2 DUCTWORK INSULATION A. Provide external thermal insulation for duct. Not required where ducts have internal acoustical insulation. Make special provisions
at dampers, damper motors, thermometers, instruments, and access doors. Apply as follows: 1. Rigid Board Type: Impale board over mechanical fasteners, welded pins or adhered clips,
12 in. to 18 in. centers; minimum of two (2) rows per side. Secure insulation with washer clips. Self-adhesive clips are not acceptable. Staple all joints. Seal breaks and joints
in vapor barrier with 4 in. wide matching tape and 4 in. glass-fab applied with specified vapor barrier coating. Apply tape over corner beading where exposed. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 7 2. Flexible Blanket Type: Install Duct
Wrap to obtain specified R-value using a maximum compression of 25%. Installed R-value shall be per ECC of NYS. Firmly butt all joints. The longitudinal seam of the vapor retarder
must be overlapped a minimum of 2 in. Where vapor retarder performance is required, all penetrations and damage to the facing shall be repaired using pressuresensitive foil tape, and
coated with vapor barrier coating prior to system startup. Pressure-sensitive foil tapes shall be a minimum 3 in. wide and shall be applied with moving pressure using a squeegee or
other appropriate sealing tool. Closure shall have a 25/50 Flame Spread/Smoke Developed Rating per UL 723. Duct wrap shall be additionally secured to the bottom of rectangular ductwork
over 18 in. wide using mechanical fasteners on 18 in. centers. Self-adhesive clips are not acceptable. Care should be exercised to avoid over-compression of the insulation during
installation. 3. Kitchen Hood Exhaust Duct Wrap: Install duct wrap in strict accordance with the manufacturer's written installation methods. 4. Exterior Kitchen exhaust Ductwork:
Finish with alum guard jacket. All joints shall be positioned so as to shed water; with a minimum 3 in. overlap, and completely weather sealed with specified metal jacketing sealant.
Color to be selected by architect. 3.3 EQUIPMENT INSULATION A. Apply insulation with joints firmly butted as close as possible to the equipment surface. Insulation shall be secured
as required with adhesive, mechanical fasteners or banding material. Fasteners shall be located a maximum of 3 in. from each edge and spaced no greater than 12 in. on center. B. Vapor
retarders shall overlap a minimum of 2 in. at all seams and be sealed with appropriate pressure-sensitive tape and vapor barrier coating. All penetrations, facing damage, and mechanical
fasteners shall be covered with a minimum 2 in. overlap of tape and vapor barrier coating. C. Fiberglass Equipment Insulation: Secure fiberglass with pins, studs, or clips. Field
apply 8 oz. knit fiberglass cloth, cemented and applied over standard jacket. Properly cut at fittings to avoid wrinkles and coat with white lagging adhesive/coating. Leave ready
for painting. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 8 EXHIBIT
"I" - PIPE INSULATION MATERIALS SERVICE INSULATION MATERIAL THICKNESS REMARKS Water Source Heat Pump water Not insulated Not insulated TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INSULATION 230710 - 9 EXHIBIT "II" - DUCT INSULATION MATERIALS SERVICE INSULATION
MATERIAL THICKNESS REMARKS HVAC Supply Within mechanical rooms or exposed at 8 feet or less above finished floor: Rigid fiberglass Concealed: Flexible fiberglass ……………..……..1-1/2
in. .….……….2 in. at 1.0 PCF or …….….2.2 in. at 0.75 PCF Min. installed R value of 6 Min. installed R value of 6 Supply ducts, exposed within the conditioned space served ……………….
…NOT INSULATED… Does not include the associated supply ductwork within the Mechanical Room or supply duct to the conditioned space. Interior ductwork indicated to be lined ………………. …NOT
INSULATED… …………… Return-air ducts within heated building envelope ………………. …NOT INSULATED… …………… Neutral ventilation air supply (between 65°F and 80°F) ……………….. … NOT INSULATED … ……………
Outside air ducts and plenums. Rigid fiberglass ………………….……. 2 in. Min. installed R value of 8 Provide neat fit at intake plenum Exhaust, relief or vent ducts and plenums Exposed: Rigid
fiberglass Concealed: Flexible fiberglass ………………...………1-1/2 in. ………………...………2 in. Min. installed R value of 6 Insulate 15 ft. from exterior opening and plenums Concealed kitchen UL1978
Grease duct ……Two (2) Layers @ 1-1/2 in. Ductwork routed up side of TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 INSULATION 230710 - 10 SERVICE INSULATION MATERIAL THICKNESS REMARKS hood exhaust wrap building shall be wrapped and jacketed. This is for both kitchen
exhaust systems. Outdoor exhaust Ductwork Polyisocyanurate board Rigid Fiberglass ………...………………..2-1/2 in. ………...………………..3 in. Min. installed R value of 12 Cover with Alumaguard jacketing
applied per manufacturer's recommendations. END OF SECTION 230710 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 1 SECTION 232010 - PIPING SYSTEMS AND ACCESSORIES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials,
equipment and services as required for the complete installation designed in Contract Documents. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 078413 - Penetration Firestop Systems.
1.3 SUBMITTALS A. Anchors and guides. Provide detailed fabrication drawings for all field-fabricated anchors and intermediate structural elements. B. Schedule of pipe materials, fittings
and connections. C. Grooved mechanical connection system. PART 2 - PRODUCTS 2.1 GENERAL A. Pipe and fittings shall be new, marked with manufacturer's name and comply with applicable
ASTM and ANSI Standards. B. All adhesives, sealants, primers and paint used for piping in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC)
limits called for in the current version of U.S. Green Building Council LEED Credits EQ 4.1 and EQ 4.2. 2.2 STEEL PIPING AND FITTINGS A. Pipe: ASTM A53, Schedule 40 weight standard
wall thickness (0.375 in.), 12 in. and larger; black or galvanized finish as called for; ends chamfered for welding or roll grooved for grooved mechanical connections. B. Fittings:
Same material and pressure class as adjoining pipe. 1. Welded Fittings: Factory forged, seamless construction, butt weld type, chamfered ends. Where branch connections are two or
more sizes smaller than main size, use of "Weldolets", "Thredolets", or "Sockolets" are acceptable. Socket weld type, 2000 psi wp, where required. 2. Threaded Fittings: Cast or
malleable iron, black or galvanized, as required; drainage type where called for. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 2 3. Shop Fabricated Connections and Fittings: a. Shop Fabricated Branch Connections: Fabricated
branch connections constructed in strict conformance to the appropriate ASME B 31 Code of Construction may be acceptable as reviewed by the Engineer. All fabricated connections shall
be constructed under controlled shop conditions using automated equipment. Calculations for all fabricated connections demonstrating conformance to ASME code and project design criteria
shall be prepared and submitted for acceptance prior to fabrication. Certified welding procedures, shop quality control procedures and certifications of welders and inspectors shall
be submitted to the Engineer prior to fabrication. C. Flanges, Unions and Couplings: 1. Threaded Connections: a. Flanges: Cast iron companion type; for sizes 2-1/2 in. and larger.
b. Unions: Malleable iron, bronze to iron seat, 300 lb. wwp; for sizes 2 in. and smaller. c. Couplings: Malleable iron, 150 or 300 lb. wwp, based on system pressure. Steel thread
protectors are not acceptable as couplings. 2. Grooved Mechanical Connections: a. Couplings: Ductile iron, ASTM A536, with painted coating, designed for rolled grooved piping, hot
dipped galvanized finish were required. 1) Grade "EHP" EPDM synthetic rubber, -30°F to 250°F temperature range, suitable for water service. 2) Gasket lubricant furnished by coupling
manufacturer. b. Bolts and Nuts: Head treated, hex head carbon steel (ASTM A183 and A449) cadmium plated or zinc electroplated. c. Fittings: Elbows, tees, laterals, reducers, adapters
as required. Same construction as couplings. The use of mechanical tees is permitted only when a branch size is two or more sizes smaller than the main size. Reducing couplings,
strapless mechanical tees and segment-welded elbows are not acceptable. d. Design Equipment: Victaulic rigid system, Style 107N Quick Vic couplings for 12 in. and smaller. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 3 e. Design
Equipment: Victaulic flexible system, Style 177 and 77 couplings. If used for locations with vibration attenuation and/or stress relief requirements, three (3) couplings shall be
placed in close proximity to the vibration source. f. Victaulic AGS Piping System 14 in. through 24 in.: Rigid Style W07 with Grade "E" FlushSeal gasket. g. Victaulic AGS Piping System
14 in. through 24 in.: Flexible Style W77 with Grade "E" FlushSeal gasket. h. Make: Victaulic, Anvil, Tyco/Grinnell, Shurjoint. D. Gauge and Instrument Connections: Nipples and plugs
for adapting gauges and instruments to piping system shall be IPS brass. E. Base Elbows: 1. Cast iron or steel type, flange connections; Crane 500 or equivalent. Made from welding
elbows, with welded pipe support and steel base. Reducing elbows where necessary. ELBOW SIZE SUPPORT SIZE BASE PLATE 2 in. to 3 in. 1-1/4 in. 6 in. x 6 in. x 1/4 in. 4 in. to 6 in.
2-1/2 in. 8 in. x 8 in. x 1/4 in. 8 in. and larger 6 in. 14 in. x 14 in. x 5/16 in. 2. Anchor bolt holes in each corner of base for securely bolting to floor or concrete base; minimum
3/4 in. bolts. 2.3 COPPER TUBE AND FITTINGS - SOLDER JOINT A. Pipe: ASTM B88; Type K, L or M, hard temper. Soft temper only where specified. Plans show copper tube sizes. B. Tees,
Elbows, Reducers: Wrought copper, ANSI B16.22 or cast bronze; ANSI B16.8 solder end connections. C. Unions and Flanges: 2 in. and smaller use unions, solder type, cast bronze, ground
joint, 150 lb. swp: 2-1/2 in. and over use flanges, cast bronze, companion type, ASME drilled, solder connection, 150 lb. swp. D. Solder Materials: No-lead solder, using alloys made
from tin, copper, silver and nickel. E. Make: Harris "Stay-Safe 50" and "Bright", Engelhard "Silverbright 100", Willard Industries "Solder Safe (silver bearing), Canfield "Watersafe"
or approved equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES
232010 - 4 2.4 STAINLESS STEEL PIPE AND FITTINGS - PRESSURE-SEALED JOINTS A. Pipe: Type 304/304L, Schedule 10S, stainless steel conforming to ASTM A312 with plain ends. B. Couplings
and fittings shall be formed of precision cold drawn stainless steel pipe with synthetic rubber O-ring seals. C. O-ring seals shall be molded of synthetic rubber, Grade HNBR suitable
for potable water up to 210°F or Grade EPDM suitable for water up to 250°F. D. Fitting ends shall be pressed onto pipe using only a tool specifically designed for this purpose. Pipe
ends must be fully inserted into the coupling and fitting housing up to the pipe stop. 500 psig maximum CWP rating. E. Fittings: Elbows, tees, laterals, reducers, adapters as required.
Same construction as couplings. F. Design Basis: Victaulic Vic Press 316, Shurjoint, Viega Pro Press Stainless. 2.5 COPPER TUBE AND FITTINGS - PRESS FITTINGS A. Tubing Standard:
Copper tubing shall conform to ASTM B75 or ASTM B88. B. Fitting Standard: Copper fittings shall conform to ASME B16.18, ASME B16.22, or ASME B16.26. C. Press Fitting: Copper press
fittings shall conform to the material and sizing requirements of ASME B16.18 or ASME B16.22. O-rings for copper press fittings shall be EPDM. D. Make: Viega Pro-Press, Nibco, Tyco
Grinnell, Elkhart Apolloxpress, Mueller. 2.6 COPPER DRAINAGE TUBE AND FITTINGS - SOLDER JOINT A. Pipe: ASTM B306, Type DWV, hard temper. B. Fittings: Wrought copper, ANSI B16.29 or
cast bronze, ANSI B16.23; solder end connections. C. Solder Materials: No lead solder, using alloys made from tin, copper, silver and nickel. D. Make: Harris "Stay-Safe 50" and "Bright",
Engelhard "Silverbright 100", Canfield "Watersafe" or approved equal. 2.7 COPPER TUBE AND FITTINGS - GROOVED MECHANICAL CONNECTIONS A. Pipe: ASTM B88, Type K or L, hard temper. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 5 B. Fittings:
Wrought copper, roll grooved mechanical connections, ASTM B-75, ANSI B16.22 for sizes 2 in. - 4 in. Cast bronze, rolled grooved mechanical connections, ASTM B-584, ANSI B16.18 for
sizes 5 in. - 8 in., with copper tube dimensioned grooved ends designed to accept rolled grooved couplings (flaring of tube and fitting ends to IPS dimensions is not permitted). C.
Couplings: Ductile iron, ASTM A-536, with copper colored alkyd enamel finish, designed for rolled grooved piping. Housings cast with offsetting, angle pattern, bolt pads to provide
rigidity. D. Gaskets: Grade "EHP" EPDM synthetic rubber, color-coded, -30°F to 250°F temperature range, suitable for water service. E. Bolts and Nuts: Heat treated, hex head carbon
steel, ASTM A183 and A449, cadmium plated or zinc electroplated finish. F. Design Equipment: Victaulic Style 607 couplings. G. Make: Victaulic, Anvil, Tyco/Grinnell, Shurjoint. 2.8
COPPER TUBE AND FITTINGS - BRAZED JOINT A. Pipe: ASTM B88, Type K or L, hard temper. B. Tees, Elbows and Reducers: Wrought copper, ANSI B16.22 or cast bronze, ANSI B16.18. C. Unions
and Flanges: Unions for 2 in. and smaller. Brazed type cast bronze ground joint, 150 lb. swp; flanged for 2-1/2 in. and larger, brazed type, cast bronze, companion type, gasketed
and bolted, ASME drilled 150 lb. swp. D. Brazing Materials: Class BcuP-2 for brazing copper to brass, bronze or copper. Harris, Inc. Stay-Silv 0 or approved equal. 2.9 DIELECTRIC
PIPE FITTINGS A. Description: Assembly or fitting having insulating material isolating joined dissimilar metals to prevent galvanic action and stop corrosion. B. Unions: Factory fabricated,
for 250 psi minimum working pressure at 180°F, threaded or solder ends, insulating material suitable for system fluid, pressure and temperature. C. Flanges: Factory-fabricated, companion-flange
assembly, for 150 or 300 psig minimum pressure to suit system fluid pressures and temperatures with flange insulation kits and bolt sleeves. D. Waterway Fittings: 300 psi maximum working
pressure at 230°F, male threaded or grooved ends, electroplated ductile iron or steel body with LTHS high temperature polyolefin polymer liner. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 6 E. Make: EPCO, Capitol Manufacturing,
Watts, Victaulic, or approved equal. F. The use of brass valves, brass nipples (3 in. and larger) and Shurjoint epoxy coated transition coupling IPS-CTS may be used for dielectric isolation.
Dielectric transition fittings shall be Shurjoint Model DE30-GG for sizes 2 in. through 8 in., which shall provide effective insulation between the steel and copper systems to avoid
galvanic local cell and stray current problems. The dielectric transition fitting shall be made of ductile iron per ASTM A536 Gr. 65-45-12, electric deposition coated, with a virgin
PP (propylene) lining. 2.10 HANGERS, INSERTS, AND SUPPORTS A. Hangers, Inserts, Clamps: B-Line, Grinnell, Michigan Hanger, PHD Manufacturing, Anvil, Hilti. B. Hangers: 1. Adjustable,
wrought malleable iron or steel with electroplated zinc or cadmium finish. Copper plated or PVC coated where in contact with copper piping. Hotdipped galvanized finish for exterior
locations. 2. Adjustable ring type where piping is installed directly on hanger for piping 3 in. and smaller. 3. Adjustable steel clevis type for 4 in, and larger, and where insulation
passes through hanger. 4. Hangers sized to permit passage of insulation through the hanger for all piping. 5. Nuts, washers and rods with electroplated zinc or cadmium finish. Hot-dipped
galvanized finish for exterior locations. C. Hanger Shields: 1. Pre-Insulated Type: a. Insulated pipes shall be protected at point of support by a 360° insert of high density, 100 psi
waterproof calcium silicate, encased in a 180° sheet metal shield. Insulation insert to be same thickness as adjoining pipe insulation and extend 1 in. beyond sheet metal shield.
Insulation shall be provided with a factory installed ASJ. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 7 2. Field-Insulated Type: a. #18 USSG, galvanized steel shields, minimum 120° arc. Provide ICAHAMFAB-BLOCK, 18# density molded
fiberglass inserts, between pipe and hanger shield to maintain proper spacing for insulation. Insulation inserts shall extend 1 in. beyond the sheet metal shields. Material shall
comply with ASTM E84 25/50, have a thermal conductivity of K=.30 (stable) and have a service temperature of -120°F to +650°F. Install in accordance with manufacturer's printed instructions.
3. Shield Sizing: PIPE SIZE SHIELD LENGTH MINIMUM GAUGE 1/2 in. to 3-1/2 in. 9 in. 20 4 in. 9 in. 20 5 in. and 6 in. 9 in. 20 8 in. to 12 in. 12 in. 18 14 in. to 24 in. 18 in. 16 4.
Hanger shield gauges listed are for use with band type hangers only. For point loading (roller support), increase shield thickness by one gauge, and length by 50%. D. Hanger Spacing
Schedules: (Based upon most stringent requirement of MCNYS and ASME B31.9) COPPER OR PLASTIC PIPE SIZE COPPER PIPE HANGER SPACING PLASTIC PIPE HANGER SPACING HANGER ROD SIZE 3/4 to
1 in. 6 ft. 3 ft. 3/8 in. 1-1/4 in. 6 ft. 4 ft. 3/8 in. 1-1/2 to 2 in. 8 ft. 4 ft. 3/8 in. 2-1/2 to 4 in. 10 ft. 4 ft. 1/2 in. 5 in. and larger 10 ft. 4 ft. 3/4 in. STEEL PIPE SIZE
STEEL PIPE HANGER SPACING HANGER ROD SIZE 3/4 to 1 in. 8 ft. 3/8 in. 1-1/4 in. 10 ft. 3/8 in. 1-1/2 to 2-1/2 in. 12 ft. 3/8 in. 3 to 4 in. 12 ft. 1/2 in. 5 in. and larger 12 ft. 3/4
in. E. Inserts: Carbon steel body and square insert nut, galvanized finish, maximum loading 1,300 lbs., for 3/8 in. to 3/4 in. rod sizes. Drill through decking for hanger rods and
secure devices with integral support plate strap with sheet metal screws. Devices shall have a safety factor of four. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 8 F. Beam Attachments: 1. C-Clamp, locknut, electroplated finish,
UL listed, FM approved, for pipe sizes 2 in. and smaller. 2. Center load style with clamp attachments that engage both edges of beam, electroplated finish, UL listed, FM approved, for
pipe sizes larger than 2 in., refer to "Supports" for additional requirements. 3. Welded beam attachments may be considered only upon the review and acceptance of the structural engineer
of record with written confirmation of weld meet configuration, location and service/pipe size submitted to the Mechanical Engineer for review. G. Supports: 1. Provide intermediate
structural steel members where required for hanger attachment. Secure member to structure. Select size of members based on a minimum factor of safety of four. 2. For Weights Under
1000 lbs.: Insert, "U" shaped channel, beam clamps or other structurally reviewed support. The factor of safety shall be at least four. Follow manufacturer's recommendations. 3.
For Weights Above 1000 lbs.: Drill through floor slabs and provide flush plate welded to top of rod or provide additional inserts and hangers to reduce load per hanger below 1000 lbs.
4. Make: Hilti, ITW Ramset, Phillips "Red Head", or approved equal. H. Trapeze Hangers: 1. For use on 1-1/2 in. and smaller piping only. 2. Hangers shall be supported with rod sized
with a safety factor of four. 3. May be manufactured type "U" shaped channel, or suitable angle iron or channel. Round off all sharp edges. 4. Securely fasten piping to trapeze with
"U" bolt or straps, dissimilar metals shall not touch, use isolation gaskets. 5. Make: B-Line, Kindorf, Unistrut, or approved equal. 2.11 PIPING ACCESSORIES A. Escutcheon Plates:
Provide escutcheon plates on uninsulated piping in exposed and finished areas. Steel or cast brass polished chrome, split hinge type with setscrew, high plates where required for extended
sleeves. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES
232010 - 9 B. Pipe Guides: Cylindrical steel guide sleeve, proper length for travel, integral bottom base anchor, top half removable. Split steel spider to bolt to pipe, copper
plated spider for copper pipe. Insulated style where pipe is required to be insulated. Make: Tri-State Industries, or equal. C. Anchors: 1. Pipe support; same material as pipe; as
manufactured by Pipe Shields Model C1000 or C2000, Keflex, Metraflex, Flexonics or Advanced Thermal Systems. 2. Pipe Anchors: a. Anchors shall be designed and located as to prevent
stress to piping or building structural components from exceeding those permitted by ASME B31.9 and to prevent transfer of loading and stressing to connected equipment. D. Pipe Roll
Stand: Cast iron roll stand. Make: Advanced Thermal Systems, Carpenter and Patterson, ITT Grinnell, Pipe Shields. 2.12 SLEEVES A. Standard Type: 1. Schedule 40 black steel pipe sleeves
shall be used for sleeves in horizontal and vertical applications through structural surfaces. Sleeves shall extend a minimum of 1 in. beyond both sides of the structure surface being
penetrated. The sleeve shall be sized to account for the total diameter of the service, inclusive of insulation and the appropriate annular space for firestopping installation or requirements
of the sealing element manufacturer. 2. Full circle water stop collar for sleeves located in below grade walls, wet wells and waterproofed surfaces. The collar shall be fabricated
from steel plate and welded to the sleeve around its entire circumference. 3. Schedule 40, PVC sleeves or sheet metal sleeves for nonstructural surfaces. Sheet metal sleeves shall
be 18 gauge minimum and braced to prevent collapsing. Sleeves shall extend a minimum of 1/2 in. beyond both sides of the non-structural vertical surface being penetrated. The sleeve
shall be sized to account for the total diameter of the service, inclusive of insulation and the appropriate annular space for firestopping. B. Pre-Insulated Type: 1. Adjustable or
fixed length metal cans, 24 gauge minimum sized for 1 in. spacing between insulation and can. Insulation shall consist of a 360° waterproofed calcium silicate insert sized to extend
1 in. beyond wall or floor penetration. Calcium silicate insert shall be the same thickness as adjoining pipe insulation. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 10 Spacing between shield and can packed at each end with double
neoprene rope positively fastened. 2.13 SEALING ELEMENTS A. Expanding neoprene link type, watertight seal consisting of interlocking links with zinc plated bolts. 1. Make: Thunderline
"Link-Seal" Series 200, 300 or 400, Pyropac, Calipco. B. Waterproof Type: 1. Exterior Walls, Below Grade, Above Floor: Synthetic rubber material with zinc plated bolts. Make: "Link-Seal"
Series 200, 300 or 400, Pyropac, Calipco. 2.14 FIRESTOP SYSTEM FOR OPENINGS THROUGH FIRE RATED WALL FLOOR ASSEMBLIES A. Materials for firestopping seals shall be listed by an approved
independent testing laboratory for "Penetration Firestop Systems". The system shall meet the standard fire test for Penetration Firestop Systems designated ASTM E814. Firestop system
shall be provided at locations where piping passes through fire rated wall, floor/ceiling, or ceiling/roof assembly. Minimum required fire resistant ratings of the assembly shall be
maintained by the Firestop System. Installation shall conform with the manufacturer's recommendations and other requirements necessary to meet the testing laboratory's listing for
the specific installation. 2.15 PIPING MATERIALS AND SCHEDULE A. See Exhibit "A", "Schedule of Piping Materials" at end of this Section for (HVAC) piping. PART 3 - EXECUTION 3.1 EQUIPMENT
AND SYSTEMS A. Provide equipment and systems in accordance with laws, codes, and provisions of each applicable section of these specifications. Accurately establish grade and elevation
of piping before setting sleeves. Install piping without springing or forcing (except where specifically called for), making proper allowance for expansion and anchoring. Arrange
piping at equipment with necessary offsets, union, flanges, and valves, to allow for easy part removal and maintenance. Offset piping and change elevation as required to coordinate
with other work. Avoid contact with other mechanical or electrical systems. Provide adequate means of draining and venting units, risers, circuits and systems. Install drains consisting
of a tee fitting with a 3/4 in. ball valve with hose end cap and chain, at low points in hydronic piping system mains, and elsewhere as required for system drainage. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 11 B. Conceal
piping unless otherwise called for. Copper tubing shall be cut with a wheeled tubing cutter or other approved copper tubing cutter tool. The tubing must be cut square to permit proper
joining with the fittings. Ream pipes after cutting and clean before installing. Cap or plug equipment and pipe openings during construction. Install piping parallel with lines of
building, properly spaced to provide clearance for insulation. Make changes in direction and branch connections with fittings unless submitted and accepted per Part 2. Do not install
valves, union and flanges in inaccessible locations. Provide trap seal of adequate depth on drain pans. C. Provide reducers at all control valves, where control valve is smaller than
pipeline size. Reducers for steam control valves shall be eccentric type. Provide unions at each side of every control valve and reducers directly adjacent to the unions. D. Provide
reducers at all balance valves, where balance valve is smaller than pipeline size. 3.2 PIPING OVER ELECTRICAL EQUIPMENT A. Contractor shall route piping to avoid installation directly
over electric equipment, including, but not limited to panels, transformers, disconnects, starters, motor control center, adjustable speed drives and fused switches. B. Piping shall
not be installed in the dedicated electric and working space as defined by NEC 110. Dedicated electrical space is generally equal to the depth and width of electrical equipment, and
extends 6 ft. above the electrical equipment, or to a structural ceiling. Dedicated working space is a minimum of 30 in. wide or the width of equipment (whichever is larger) a minimum
of 6 ft.-6 in. tall, with a depth of 3 ft. to 9 ft. depending on the voltage. 3.3 WATER SYSTEMS A. Top connection for upfeed, bottom or side connection for downfeed. Grade off level;
up in direction of flow and down toward drain. 3.4 HANGERS, INSERTS AND SUPPORTS A. Piping shall not be supported by wires, band iron, chains, or from other piping. Support each pipe
with individual hangers from concrete inserts, welded supports, or beam clamps of proper configuration and point loading design requirements for each location including the designated
safety factor. Trapeze hangers are acceptable for racking of multiple pipes of 1-1/2 in. or less in size. Follow manufacturer's safe loading recommendations. Suspend with rods of
sufficient length for swing and of size as called for, using four nuts per rod. Provide additional rustproofed structural steel members, where required for proper support. Provide
oversized hangers where insulation/supports must pass between pipe and hanger. Only concentric type hangers are permissible on piping larger than 2-1/2 in., "C" types are permitted
for piping 2-1/2 in. and smaller. Provide riser clamps for each riser at each floor. B. Provide a pipe hanger within 12 in. of pipe unions and piping connections to equipment, in order
to facilitate disconnections of piping without pipe sagging. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 12 3.5 HANGERS ATTACHED TO JOISTS A. Individual hangers may be suspended directly from the bottom chord panel point provided that
the sum of the concentrated loads within the chord panel does not exceed 100 pounds and the attachments are concentric to the chord. (Eccentrically loaded joists using beam clamps
or other attachment methods are not acceptable.) B. For nominal concentrated loads between panel chords, which have been accounted for in the specified uniform design load for the joists,
this Contractor is to provide struts to transfer the load to a panel point on the opposite chord as reviewed and acceptable by the Structural Engineer of Record. 3.6 PIPE CONNECTIONS
A. Solder Connections: Nonacid flux and clean off excess flux and solder. B. Press Connections: Copper press fittings shall be made in accordance with the manufacturer's installation
instructions. The tubing shall be fully inserted into the fitting and the tubing marked at the shoulder of the fitting. The fitting alignment shall be checked against the mark on
the tubing to assure the tubing is fully engaged (inserted) in the fitting. The joints shall be pressed using the tool approved by the manufacturer. C. Brazed Connections: Make joints
with silver brazing alloy in accordance with manufacturer's instructions. Remove working parts of valves before applying heat. "Walseal" fittings may be used; if sufficient alloy is
showing, face braze such joints. D. Threaded Connections: Clean out tapering threads, made up with pipe dope; screwed until tight connection. Pipe dope must be specific for each application.
E. Flanged Joints: Select appropriate gasket material, size, type and thickness for service applications. Install gasket concentrically positioned. Use suitable lubricants on bolt
threads. F. Dielectric Pipe Fittings: Provide dielectric protection devices at ALL equipment connections where dissimilar metals meet. In addition, provide dielectric unions in all
open type piping systems (condensing water, domestic water, etc.) where dissimilar metals are to be joined. Dielectric protection devices are not required in typical closed systems
such as heating water, chilled water, heat pump loop, etc. except for the equipment connections. Dielectric protection systems are not required for air or gas systems. G. Grooved Mechanical
Joints: Pipe to be prepared in accordance with the latest Grooving Specification of the manufacturer utilized. Pipe shall be checked to be sure it is free of indentations, projections;
weld seams or roll marks on the exterior of the pipe over the entire gasket seating area. Pipe ends are to be square cut. Lubricant shall be applied to gasket and/or pipe ends and
housing interiors to eliminate pinching the gasket. All grooved couplings, fittings, and specialties shall be the products of a single manufacturer. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 - 13 A factory-trained field representative
of the mechanical joint manufacturer shall provide on-site training for contractor's field personnel in the proper use of grooving tools and installation of grooved piping products.
Provide a field report verifying that factory trained representative has provided on-site training and that Contractor has coupled recommended installation procedures. Factory-trained
representative shall periodically review the product installation. Contractor shall remove and replace any improperly installed products. H. HDPE Pipe Connections: Shall be joined
by heat fusion. All procedures shall meet the requirements of Title 49 of the Code of Federal Regulations 192.285 as it applies to heat fusion. 3.7 HANGER SHIELDS A. Provide at hangers
for all piping. Pre-insulated type or field-insulated type at Contractor's option. 3.8 SLEEVES A. Standard Type: Provide for piping, except as called for. B. Extend 1/8 in. above
finished areas. In above grade mechanical and other areas with floor drains; use steel pipe sleeves 2 in. above floor. Use pipe sleeves in bearing walls, structural slabs, beams and
other structural surfaces, and where called for. Sleeves shall be as small as practical, consistent with insulation, so as to preserve fire rating. Fill abandoned sleeves with concrete.
Provide rubber grommet seals for pipes passing through ducts or air chambers or built-up housings. 3.9 ANCHORS A. Provide piping system anchors where shown on the plans, and as recommended
by the expansion joint/loop manufacturer. Where an anchor is shown at a change in piping direction, it shall fully control movement in both directions. In lieu of a single anchor
fabricated for two directional control, two (2) individual anchors may be provided. Provide detailed fabrication drawings for all field-fabricated anchors. B. Design anchors and equipment
and piping supports including comprehensive structural engineering analysis by a qualified professional engineer, licensed to practice in the State of New York using the performance
and design criteria specific to this project. 3.10 ALIGNMENT GUIDES A. Provide alignment guides to guide expansion and to avoid end-loading and torsional stress. B. Install two (2)
or more guide(s) on each side of flexible expansion loop. Install guides nearest to expansion joint not more than four (4) pipe diameters from expansion joint. C. Attach guides to
pipe and secure guides to building structure. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
PIPING SYSTEMS AND ACCESSORIES 232010 - 14 3.11 SLEEVE PACKING A. Seal void space at sleeves as follows: 1. Interior Locations: Firmly pack with fiberglass and caulk. 2. Exterior
Walls and Below Grade Cored Holes: Use sealing element. 3. Fire Rated, Partitions and Floor Slabs: Use fire rated sealing elements, materials and methods. Provide per manufacturer's
instructions to maintain firestop. 4. Waterproofed Walls and Floors: Use waterproof sealing element, device, or compound. 3.12 ESCUTCHEON PLATES A. Provide polished chrome escutcheon
plates for uninsulated exposed piping passing through floors, walls or ceilings in finished areas. B. Water Treatment: 1. After system cleaning, furnish report of water test to determine
quality. 2. Provide complete water treatment facilities to Owner, including water analysis, feed equipment, metering equipment, pumps, and chemical, obtained from Calgon, Vulcan, Bird
Archer, Heating Economy Service, Inc., Mogul, GarrattCallahan Company, Metropolitan, or Allen-Murray. 3. Recommendations for water treatment reviewed by Owner's Representative before
systems are placed into service. 4. Add water treatment as necessary to prevent deterioration of piping system and equipment due to oxygen, acid, scaling, etc. 5. Water treatments shall
be deemed complete when circulation has been established throughout, and water runs clear and clean from deposits and discoloration. Submit typewritten letter to inform Owner's Representative
upon completion of the Work. 3.13 TESTS A. Test piping and accessories before insulation, or concealment. Repeat as many times as necessary to prove tight system. Notify Owner's Representative
at least seven days in advance of each test. Isolate valves and equipment not capable of withstanding test pressures. Make leaks tight; no caulking permitted. Remove and replace
defective fittings, pipe or connections. Furnish necessary pumps, gauges, equipment, piping, valving, power and labor for testing. Certify that tests have been successfully completed.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PIPING SYSTEMS AND ACCESSORIES 232010 -
15 B. Schedule of Test Requirements: 1. Heat Pump Water: Hydrostatic, 100 psig at high point of system; two (2) hours duration. 2. Refrigeration: a. After installation, charge system
with dry nitrogen to manufacturer's recommended pressure. b. System shall hold this charge with no pressure drop for 24 hours. 3. Test: No change in pressure under stable temperature
conditions. 4. Equipment: Test at working pressures. 3.14 PROTECTION AGAINST PHYSICAL DAMAGE A. In concealed locations where piping, other than cast-iron or steel, is installed through
holes or notches in studs, joists, rafters or similar members less than 1-1/2 in. from the nearest edge of the member, the pipe shall be protected by shield plates. Protective steel
shield plates having a minimum thickness of 0.0575 in. (No. 16 gage) shall cover the area of the pipe where the member is notched or bored, and shall extend note less than 2 in. above
sole plates and below top plates. 3.15 PIPE LINE SIZING A. Pipe sizes called for are to be maintained. Pipe sizing changes made only as reviewed by Owner's Representative. Where discrepancy
in size occurs, the larger size shall be provided. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
PIPING SYSTEMS AND ACCESSORIES 232010 - 16 EXHIBIT "A" - PIPING MATERIALS (HVAC) (Notes are at end of Exhibit "A") SERVICE PIPE MATERIALS FITTINGS CONNECTIONS Heat pump water
(optional) Schedule 40, black steel Grooved, rigid couplings Mechanical with gasket, 1-1/2 in. and larger (SEE NOTE 1) Heat pump water (optional) Type L copper Wrought copper or cast
bronze, solder end No-lead solder Heat pump water (optional) Type L copper Wrought copper or cast bronze Mechanical with gasket, 1-1/2 in. and larger (SEE NOTE 1) Heat pump water (optional)
Type L copper Wrought copper or cast bronze Viega Pro-Press, Nibco Press, Elkhart Apolloxpress Vent, overflow, drain Schedule 40, galvanized steel or Type M copper Cast iron drainage
type or wrought copper Threaded or solder NOTES FOR EXHIBIT "A" NOTE 1: Grooved piping shall not be installed in shafts. END OF SECTION 232010 TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 1 SECTION 233100 -
SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services required for the complete installation designed
in Contract Documents. 1.2 QUALITY ASSURANCE A. Ductwork shall be fabricated and installed in compliance with latest edition of the following standards. 1. SMACNA Duct Construction
Standards - Metal and Flexible Ductwork. 2. SMACNA Duct Liner Application Standard. 3. SMACNA HVAC Air Duct Leakage Test Manual. 4. 2020 Energy Conservation Construction Code of New
York State. 5. SMACNA Kitchen Ventilation and Food Service Equipment Fabrication and Installation Guidelines. 6. NFPA Standard 96. 7. Plans and Specifications which exceed the requirements
in any of the referenced standards. 8. 2020 Mechanical Code of New York State. B. All sheet metal shall be fabricated and installed by an experienced Contractor specializing in this
type of work. C. All ductwork and fittings shall have a computer generated label affixed to the exterior surface of each section, detailing all applicable information including the
duct dimensions, gauge, reinforcement type/class and connection type by systems manufacturer. Galvanizing thickness shall be clearly stenciled on each duct section. D. All ductwork
on the project shall meet the SMACNA Duct Cleanliness For New Construction Guidelines, "Advanced Level" of duct cleanliness for production, delivery, storage and installation of ductwork.
1.3 SUBMITTALS A. Ductwork Shop Drawings. B. Duct Access Doors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 2 C. Flexible Duct. D. Submit a complete shop standard manual including miscellaneous materials, and
construction details for all shop fabricated materials including, but not limited to, volume dampers, turning vanes, duct sealant, equipment flexible connections, access doors, flexible
duct, acoustical duct lining, etc. 1.4 GENERAL A. All adhesives, sealants, primers and paint used for ductwork in the interior of the building shall comply with the maximum Volatile
Organic Compound (VOC) limits called for in the current version of U.S. Green Building Council LEED Credits EQ 4.1 and EQ 4.2. 1.5 DUCTWORK CLASSIFICATION A. Duct systems are to be
classified and constructed per the SMACNA Velocity-Pressure classification system as follows: 1. All ductwork shall be constructed for a minimum pressure class of 2 in. w.g. (unless
stated otherwise) for the following systems, as applicable: a. Supply duct downstream of terminal units. b. Typical low pressure supply ductwork. c. Typical return ductwork. d. Typical
low pressure exhaust ductwork. 2. Supply duct upstream of terminal units shall be constructed for a minimum pressure class of 3 in. w.g. unless otherwise stated or required as per below.
3. Pressure classes above 3 in. w.g. shall be provided as follows, based upon the external static pressure as scheduled for each specific fan. Scheduled External Static Pressure Pressure
Class Over 3 in. up to 4 in. w.g. 4 in. w.g. Over 4 in. up to 6 in. w.g. 6 in. w.g. Over 6 in. up to 10 in. w.g. 10 in. w.g. 1.6 DUCTWORK SHOP DRAWINGS A. Prepare minimum 1/4 in. scale
drawings: 1. Detailed ductwork shop drawings shall include size, layouts and pressure classifications. Any ductwork installed without benefit of review by the Engineer of Record may
be subject to replacement at the expense of the Contractor. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 3 2. Constructed from actual field inspections and measurements so as to assure a complete job. 3. Incorporate
dimensions of actual equipment proposed for use on the project. 4. Showing adequate sections, elevations, and plan views and indicating the bottom of ductwork elevations from the finished
floor. 5. Indicating all volume dampers, fire dampers, smoke dampers, damper access doors and other accessories required for a completed project. B. Call to the attention of the Engineers
immediately, any major deviations from the Contract Drawings, which must be made. All deviations shall be documented in writing. C. Indicate roof, wall and floor opening dimensions
and locations shown on shop drawings. D. Submit prints to each Contractor of the other trades for review for interference's and coordination with their work. PART 2 - PRODUCTS 2.1 DUCTWORK
MATERIALS A. Unless otherwise called for, provide materials in accordance with Exhibit I at the end of this section. 2.2 SQUARE AND RECTANGULAR DUCTWORK A. Galvanized Sheetmetal: Comply
with ASTM A653 and A924, with G90/Z275 coating. Stainless-steel Sheets: Comply with ASTM A 480/A 480M, Type 304 or 316, as indicated in Exhibit "I"; cold rolled, annealed, sheet. Exposed
surface finish shall be No. 2B, No. 2D or No. 3 as indicated in Exhibit "I". Aluminum sheets: Comply with ASTM B 209 (ASTM B 209M) Alloy 3003, H14 temper; with mill finish for concealed
ducts, and standard, one-side bright finish for duct surfaces exposed to view. Gauges per SMACNA HVAC Duct Construction Standards, Metal and Flexible. B. Transverse and longitudinal
duct seams reinforcement shall conform to appropriate tables and figures per SMACNA Velocity-Pressure Classification for duct construction. 1. Transverse joints shall be sealed with
duct joint sealant. "Ductmate" or "Nexus" 4-bolt connection systems may be used in lieu of standard construction. 2. Field assembled longitudinal seams shall be sealed with duct sealant.
Factory or shop fabricated rolled or machine pressed longitudinal seams does not require sealant. C. Corner closures shall be required as described and illustrated by SMACNA Duct Construction
Standards. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES
CONSTRUCTION 233100 - 4 D. Throat radius on all elbows shall not be less than the dimension of the duct plane of radius. Where this cannot be maintained, use shorter radius with
internal guide vanes, or square elbow with turning vanes. E. Bracing and hanging of ductwork shall be per SMACNA Standards for size and system class of ductwork being used. F. Any transformations
shall not reduce the ductwork cross-sectional area. Maximum angle in straight duct, 20° for diverging flow and 30° for contraction flow. Transformation from square to round or flat
to oval seams welded or brazed. 2.3 ROUND DUCTWORK A. Standard Round Ductwork: 1. Galvanized Sheet metal: Comply with ASTM A653 and A924, with G90/Z275 coating. Stainless-steel Sheets:
Comply with ASTM A 480/A 480M, Type 304 or 316, as indicated in Exhibit "I"; cold rolled, annealed, sheet. Exposed surface finish shall be No. 2B, No. 2D or No. 3 as indicated in Exhibit
"I". Aluminum sheets: Comply with ASTM B 209 (ASTM B 209M) Alloy 3003, H14 temper; with mill finish for concealed ducts, and standard, one-side bright finish for duct surfaces exposed
to view. Gauges per SMACNA Duct Construction Standards. Spiral lock-seam or longitudinal fusion-welded. 2. All spiral ducts shall have locked seams so made as to eliminate leakage
under pressure for which this system has been designed. Longitudinal seams duct shall have fusion-welded butt seams. 3. Round Ductwork Fittings: a. All fittings fabricated per SMACNA
Standards for round and flat-oval ductwork, material to match straight pieces of ductwork. b. Fittings shall have continuous, welded seams. c. 90° tees shall be conical type. 90° tees
and 45° laterals up to and including 12 in. diameter tap size shall have a radiused entrance into the tap, produced by machine or press forming. The entrance shall be free of any restrictions.
d. Round taps off the bottom of rectangular ducts down to diffusers shall be made with a 45° square to round shoe-tap. 4. Elbows: a. Diameters 3 in. through 8 in.: Two-section stamped
and continuously welded elbows, material to match straight pieces of ductwork. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No.
20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 5 b. Over 8 in.: Gored construction with standing seam construction and internally
sealed or continuously welded. Less than 35° - two gores, 36° to 71° - three gores, over 71° - five gores. c. Fabricated to a centerline radius of 1.5 times the cross-section diameter.
5. Joints: a. For duct construction pressure 3 in. w.g. or greater: 1) Round Joints: a) Unexposed Duct 3 in. - 30 in. Diameter: Connect round duct with a one piece interior slip coupling,
at least two gauges heavier than duct wall, beaded at center and fastener to duct with screws. Seal joint with an approved sealant applied continuously around both end of coupler prior
to assembling and after fastening. b) All Exposed Duct and Unexposed Duct 30 in. - 72 in. Diameter: Install using a three piece, gasket flangedjoint consisting of two internal flanges,
with integral mastic sealant, and one external closure band, which compress the gasket between the internal flanges. (1) Acceptable Manufacturer: Ductmate Industries "Spiralmate"
system or approved equal. c) Above 72 in. Diameter: Install using companion angle flanged joints as defined in Figure 3-1 of the 2005 SMACNA Manual, "HVAC Duct Construction Standards,
Metal and Flexible" Third Edition. Refer to manual for proper sizing and construction details. d) Dust collection systems and exposed duct 3 in. - 14 in. use a one piece, polyethylene
lined gasket connector with integrated bolt for the closure system. (1) Acceptable Manufacturer: Ductmate Industries "Quicksleeve" or approved equal. b. Pipe-to-pipe joints in diameters
up to 60 in. shall be by the use of sleeve couplings, reinforced by rolled beads. c. Pipe-to-fitting joints in diameters up to 60 in. shall be by slip-fit of projecting collar of the
fitting into the pipe. d. Insertion length of sleeve coupling and fitting collar shall be 2 in. up to 36 in. diameter and 4 in. above 36 in. diameter. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 6 e. Pipe-to-pipe
and pipe-to-fitting connections in ductwork above 60 in. in diameter shall be made by angle ring flanges. The flange on the pipe shall be a 2 in. x 2 in. x 3/16 in. angle attached
to the pipe with a continuous weld. The fittings shall have a loose ring "Van Stone" flange. A 5/8 in. flange shall be provided to act as a gasketing surface for sealing with the
angle ring being a rolled, welded ring 2 in. x 2 in. x 3/16 in. Bolt hole spacing for angle rings shall be 6 in. centers. f. If longitudinal seam duct greater than 60 in. in diameter
is supplied in lengths greater than 4 ft., one angle ring must be welded to the duct on 4 ft. centers for support. 2.4 DUCTWORK SEALING A. SMACNA Duct Sealing Classification shall be
used for duct systems using the following criteria: 1. Ductwork and all plenums with pressure class ratings shall be constructed to Seal Class A, as required to meet the requirements
of SMACNA Duct Construction Standards and with standard industry practice, including transverse joints, longitudinal seams, fitting connections, and all penetrations of the duct wall.
2. Openings for rotating shafts shall be sealed with bushings or other devices that seal off air leakage. Pressure sensitive tape shall not be used. 3. All connections shall be sealed,
including but not limited to spin-ins, taps, other branch connections, access doors, access panels and duct connections to equipment. 4. Sealing that would void product listings is
not required. 5. Spiral lock seams need not be sealed. B. Duct sealant for indoor applications shall be non-fibrated, water based, Hardcast IronGrip IG-601, Ductmate PRO Seal, Foster
32-17 or Childers CP146. C. Duct sealant for outdoor applications shall be fibrated, water based, Hardcast Versa-Grip VG-102, Ductmate Fiberseal, Foster 32-17 or Childers CP148. D.
Sealants and tapes shall be listed and labeled in accordance with UL 181A or UL181B and marked according to type. 2.5 TURNING VANES A. Provide in mitered elbows as shown on contract
drawings. Vanes 36 in. or longer shall be double wall air foil type. All turning vanes shall be installed as per the latest SMACNA Standards. Turning vane size and spacing shall
be as per SMACNA. Turning vane spacing greater than SMACNA Standards is not acceptable. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 7 B. Turning vanes shall be Harper or equivalent double wall turning vanes
fabricated from the same material as the duct. C. Turning vane front and back panels shall be securely locked together with adequate crimping to prevent twisting of vane. Vane shall
be capable of withstanding 250 pounds of tensile load when secured according to the manufacturer's instructions. D. Rails for mounting turning vanes shall have self locking, friction
fit tabs designed to facilitate proper alignment of vanes. Tab spacing shall be as specified in Figure 4-3 of the 2005 SMACNA Manual, "HVAC Duct Construction Standards, Metal and Flexible".
Rail systems with non-compliant tab spacing shall not be accepted. E. Acoustical Turning Vane: Shall be used in applications that require quiet operating systems. Mounting rails
shall have friction insert tabs that align the vanes automatically. F. Acceptable Manufacturer: Ductmate Industries PRO-Rail Turning Vane or approved equal. 2.6 DAMPERS IN DUCTWORK
A. Blade Type Volume Dampers: Constructed per SMACNA, one gauge heavier than duct material, securely fastened to 3/8 in. sq., cold rolled steel operator rod. Provide Ventlock 639
elevated dial regulator for 2 in. insulated ductwork. B. Multiple Blade Type Volume Dampers: Provide multiple blade volume dampers in ductwork above 12 in. in height. 1. Heavy duty,
manual balancing dampers suitable for application in HVAC systems with velocities to 1,500 ft. per minute, open position and max. pressure of 3 in. w.g. close position. Ruskin MD 35
or equivalent. 2. Fabrication: a. Frame: 5 in. x minimum 16 gauge roll formed, galvanized steel hatshaped channel, reinforced at corners. Structurally equivalent to 13 gauge U-channel.
3. Blades: a. Style: Single skin with 3 longitudinal grooves. b. Action: Opposed. c. Orientation: Horizontal. d. Material: Minimum 16 gauge equivalent thickness, galvanized steel.
e. Width: Nominal 6 in. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK
ACCESSORIES CONSTRUCTION 233100 - 8 4. Bearings: Molded synthetic sleeve, turning in extruded hole in frame. 5. Linkage: Concealed in frame. 6. Axles: Minimum 1/2 in. diameter,
plated steel, hex-shaped, mechanically attached to blade. 7. Control Shaft: 3/8 in. square plated steel. 8. Finish: Mill galvanized. a. Actuator: Hand quadrant for 3/8 in. square
extended shaft. b. Hand Quadrant Standoff Bracket: 2 in. standoff for insulated ductwork. c. Oillite bearings. d. Factory Sleeve: Minimum 20 gauge thickness, minimum 12 in. length.
C. Fire and Smoke Dampers: See "Fire and Smoke Dampers" Section. D. Automatic Air Dampers: Furnished as part of "Building Management System" Section 230923, and installed by this
Contractor. E. Remote Balancing Dampers: For round ducts 4 inches to 24 inches in diameter, Greenheck RBDR-50, or equivalent. 1. Ratings: 1 in. wg. pressure differential, 2000 fpm,
180 deg. F. 2. Construction: Reinforced 20 ga. galvanized steel frame, 20 ga. galvanized steel blade, 3/8 in. sq. plated steel axle, synthetic (acetal) sleeve type bearings, 9 volt
actuator. 3. Options: (Edit as required): a. "EZ Balance" remote control device with 9 volt battery and 5 ft. RJ11 cable. b. Diffuser body connectors. c. Single gang wall plates with
RJ11 ports (1, 2, 3, 4, or 6 port). Colors: white, ivory or stainless steel. d. Round wall/ceiling mounting plate with one port. e. 14, 25 or 50 ft. plenum rated RJ11 cable, as required.
f. RJ11 cable connectors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK
ACCESSORIES CONSTRUCTION 233100 - 9 2.7 FLEXIBLE AIR DUCTS AND CONNECTORS A. Flexible air ducts and connectors shall be constructed in compliance with NFPA Bulletin 90A, 90B and
UL Standard 181 and shall be listed and labeled as Class I Air Duct. B. Flexible air ducts and connectors shall be tri-laminate: 1. Consisting of corrosion resistant galvanized steel
helix encapsulated by a double lamination of polyethylene or spun bond nylon. 2. Factory applied (R 6.0 or R 8.0) fiberglass exterior insulation, sheathed in a seamless, tri-directionally
reinforced, metalized polyester, exterior vapor barrier. 3. R-value shall be classified by Underwriters Laboratories, and certified by the Air Diffusion Council, in accordance with
ADC Flexible Duct Performance and Installation Standard (1991), using ASTM C-518, at installed wall thickness, on flat insulation only. Comply with ASHRAE/IESNA 90.1. 4. Recommended
operating pressure for flexible ductwork shall be three times maximum system press but not less than 6 in. w.g. positive pressure for 4 in. - 20 in. dia., 5 in. wg. negative pressure
through 16 in. dia., 1 in. negative pressure for 18 in. and 20 in. dia. Maximum velocity of 5500 fpm. 5. Operating temperature range - 20°F to 250°F, intermittent @1/2 in. pos. w.g.
max., -20°F to 140°F, continuous at maximum pressure. 6. Flame Spread: 25 max. smoke developed rating: 50 max. 7. Porous inner core flexible duct shall not be used. C. Static pressure
and thermal performance shall be tested and certified in accordance with Air Diffusion Council (ADC) Test Code FD-72-R1 under conditions of 140°F for 164 hours and 180°F for 4 hours.
D. Acoustical performance shall be certified in accordance with ASTM E 477 and/or Air Diffusion Council Test Code FD-72-R1. 1. Minimum Acoustic Performance: a. The insertion loss (dB)
of a 6 foot length of duct when tested in accordance with ASTM E477 at a velocity of 1000 feet per minute shall be at least: 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8 inch dia.
26 27 27 31 32 27 12 inch dia 22 26 24 31 31 20 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 10 E. Friction loss and leakage for flexible duct only shall be certified in accordance with Air Diffusion Council
Test Code FD-72-R1. Leakage for connections shall be accordance with UL 181 requirements. F. Basis-of-Design: Flexmaster 6B (R-6.0). G. Acceptable Manufacturers: 1. Dundas-Jafine
Type SPC R6.0/ Type SPC R8.0. 2. Hart & Cooley Type F216 (R-6.0)/ Type F218 (R-8.0) 3. Flexible Technologies, Inc. Thermaflex Type M-KE (R-6.0)/ Type M-KE (R8.0) 4. Atco Rubber Products,
Inc. Type 036 (R-6.0)/Type 031 (R-8.0). 5. Superior Air Ducts Type SF 082 (R-8.0) 2.8 FLEXIBLE CONNECTIONS TO FANS AND EQUIPMENT A. Basis of Deign: Ventfabrics, Inc. B. Acceptable
Manufacturers: Ductmate Industries, Inc., Duro Dyne Inc., Elgen Manufacturing, Ward Industries, Inc.; a division of Hart & Cooley, Inc. C. Materials: Flame-retardant or noncombustible
fabrics, water and mildew resistant UL Standard 214. D. Coatings and Adhesives: Comply with UL 181, Class 1. E. Metal-Edged Connectors: Factory fabricated with a fabric strip wide
attached to two (2) strips of 2-3/4-in. wide, 0.028-in. thick, galvanized sheet steel or 0.032 in. thick aluminum sheets. Provide metal compatible with connected ducts. F. Indoor System,
Flexible Connector Fabric: Glass fabric double coated with neoprene. 1. Minimum Weight: 26 oz./sq. yd. 2. Tensile Strength: 480 lbf/in. in the warp and 360 lbf/in. in the filling.
3. Service Temperature: Minus 40 to plus 200°F. G. Outdoor System, Flexible Connector Fabric: Glass fabric double coated with weatherproof, synthetic rubber resistant to UV rays and
ozone. 1. Minimum Weight: 24 oz./sq. yd. 2. Tensile Strength: 530 lbf/in. in the warp and 440 lbf/in. in the filling. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 11 3. Service Temperature: Minus 50 to plus
250°F. H. Thrust Limits: Combination coil spring and elastomeric insert with spring and insert in compression, and with a load stop. Include rod and angle-iron brackets for attaching
to fan discharge and duct. 1. Frame: Steel, fabricated for connection to threaded rods and to allow for a maximum of 30 degrees of angular rod misalignment without binding or reducing
isolation efficiency. 2. Outdoor Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load. 3. Minimum Additional Travel: 50 percent of the required
deflection at rated load. 4. Lateral Stiffness: More than 80 percent of rated vertical stiffness. 5. Overload Capacity: Support 200 percent of rated load, fully compressed, without
deformation or failure. 6. Elastomeric Element: Molded, oil-resistant rubber or neoprene. 7. Coil Spring: Factory set and field adjustable for a maximum of 1/4-in. movement at start
and stop. 2.9 ACCESS DOORS A. General: 1. Provide access doors of adequate size to allow easy access to the equipment that will require maintenance. Provide insulated or acoustically
lined doors to prevent condensation where applicable. 2. Manufacturer to provide an installed neoprene gasket around perimeter of access door for airtight seal. 3. Systems 3 in. w.g.
or less shall utilize a hinged, cam, or hinged and cam square framed access door. 4. Systems 4 in. w.g. and above shall utilize a sandwich type access door. Construct doors in accordance
with Figure 7-3 of the 2005 SMACNA Manual, "HVAC Duct Construction Standards, Metal & Flexible" Third Edition. 5. Approved Manufacturer: Ductmate Industries "Sandwich" style door or
approved equal. 6. All access doors shall be continuous piano hinged type, unless noted otherwise. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 12 7. Non-hinged only allowed where clearance to ceiling does not
allow a full 90° swing. 8. Double panel insulated type when used in insulated duct. 9. Single panel uninsulated type allowed in un-insulated duct. 10. Pressure rated according to system
in which being installed. Door-to-frame and frame-to-duct gasketing. 11. Provide specified Seal Class A or B ductwork sealing around frame, and hand adjust the latch tension for proper
seal, on all access doors other than sandwich panel (Ductmate) style. 12. MINIMUM access door size for ducts 12 in. or less in depth is 12 in. x 8 in. 13. MINIMUM access door size for
ducts 12 in. to 18 in. in depth is 18 in. x 14 in. 14. MINIMUM access door size for ducts more than 18 in. in depth is 24 in. x 18 in. 15. In ducts which require multiple section fire
dampers due to duct size, provide one access door for each fire damper section. 16. Access doors for fire and smoke dampers shall be permanently labeled with 1/2 in. high lettering
reading "SMOKE DAMPER" or "FIRE DAMPER". 17. Grease exhaust duct doors shall be grease and air tight, UL 1978 listed, meet NFPA 96 standards and all mechanical codes. Grease duct access
doors can be sandwich type or with a weld on frame, with/without hinge. Approved Manufacturer: Ductmate Industries "Ultimate" style door or approved equal. 18. All grease duct access
doors used must be accompanied by independent testing in conjunction with each manufacturer's respective wrap system for high temperature applications. B. Door Types: 1. Low Pressure
Systems (2 in. w.g. pressure class): National Controlled Air ADH1, Ruskin ADH22, Vent Products 9701, Air Balance FSA-100, Safe Air SAH, Nailor. 2. Medium and High Pressure Systems
(3 in. w.g. pressure class and higher): a. Rectangular Duct: Ductmate Industries "Ultimate" Style Door, or equal. b. Round Duct: Ductmate Industries Round Sandwich type, or equal.
8 in. x 4 in. for ducts 14 in. and less in diameter. Ductmate Industries Round Sandwich type 16 in. x 12 in. for ducts more than 14 in. in diameter. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 13 c. Furnish
and install factory supplied protector molding on cut medal edge for all Ductmate access doors. 3. Kitchen Hood Exhaust Systems: In accordance with the latest requirements of NFPA
96, grease-tight, flanged and bolted. Approved Manufacturer: Ductmate Industries "Ultimate" style door or approved equal. 2.10 EXHAUST HOODS AND HOOD CONNECTIONS A. General Requirements:
1. Provide hoods and/or duct connections to hoods/fans where furnished by others. 2. Duct material, thickness and joints as required for gases and vapors involved and per SMACNA. 3.
Clearance between bottom of hood and floor shall be 80 in. 4. Provide continuous internal channel brackets for supporting lighting fixtures, coordinate with and install to suit Division
26 "Electrical". B. Kitchen Hood Duct Connections: 1. Exposed duct shall be 304 stainless steel, #3 polish finish, welded construction. 2. Concealed duct shall be black steel, welded,
flanged and gasketed. 3. Metal gauges comparable to similar duct sizes with adequate stiffening, 16 gauge minimum thickness. 4. Support from building structural members. 2.11 ACOUSTIC-THERMAL
DUCT LINING IN DUCTWORK A. General: Comply with NFPA Standard 90 and NAIMA Standard AHC-101. B. Materials: ASTM C 1071, Type I. Glass mineral wool insulation coated with an antimicrobial
EPA registered coating that seals the airstream surface fibers into a smooth, low-friction surface acoustic ductliner shall be of thickness shown in the table. Density at 1.5 PCF.
Maximum "K" value to be 0.24 btu/in. /sq. ft. /degrees F. /hr. when tested in accordance to ASTM C177. Acoustic duct liner to be suitable for use up to 6000 feet per minute air velocity
and temperatures up to 250°F. The acoustic duct liner shall not accelerate the corrosion of steel, copper or aluminum. The liner shall not absorb greater than 3% by weight when tested
per ASTM C1104. Acoustic duct liner shall provide the minimum sound absorption coefficients shown below when tested per ASTM C423 and ASTM E795, Mounting Type A. OCTAVE BAND FREQUENCIES
HZ Thickness 125 250 500 1000 2000 4000 NRC TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 14 1-1/2 in. .23 .50 .87 .92 .93 .93 .80 2 in. .37 .76 1.02 1.00 .98 .92 .95 C. Thickness: Unless otherwise noted,
all supply air ductwork indicated to be acoustically lined, shall have 1-1/2 in. thick liner with a minimum R value of 6. Return or exhaust ductwork, if acoustically lined, shall be
of a thickness specifically noted. Note that per the symbol list (L) equals 1-1/2 in. thick. If called for on the plans, (2L) equals 2 in. thick. D. Fire Hazard Classification: Flame
spread rating of not more than 25 and a smoke developed rating of no higher than 50, when tested in accordance with ASTM E84, UL 723, UL/ULC S102-M88 and NFPA 255. E. Liner Adhesive:
Comply with NFPA Standard 90A, ASTM C919, and maximum VOC requirements of LEED EQ 4.1 and EQ 4.2. F. Mechanical Fasteners: Galvanized steel, suitable for adhesive attachment, mechanical
attachment, or welding attachment to duct. Provide fasteners that do not damage the liner when applied as recommended by the manufacturer, that do not cause leakage in the duct, and
will indefinitely sustain a 50 pound tensile dead load test perpendicular to the duct wall. 1. Fastener Pin Length: As required for thickness of insulation, and without projecting
more than 1/8 inch into the airstream. 2. Adhesive for Attachment of Mechanical Fasteners: Comply with the "Fire Hazard Classification" of duct liner system. G. Design Equipment:
Knauf Atmosphere. H. Acceptable Makes: Knauf Atmosphere, Certainteed ToughGard R. OCTAVE BAND FREQUENCIES HZ Thickness 125 250 500 1000 2000 4000 NRC 1-1/2 in. .10 .47 .85 1.01 1.02
.99 .85 2 in. .25 .66 1.00 1.05 1.02 1.01 .95 I. For duct velocities above 4000 fpm, provide metal "build-outs" of proper height, welded to the ductwork for turning vanes and dampers.
2.12 CABLE SUSPENSION SYSTEM A. Ductwork not required to be exterior insulated in exposed installations may be installed using a cable suspension system. B. Ductwork shall be installed
using load rated, stainless steel cable suspension systems. Cables shall be pre-cut lengths, type 316 stainless steel with fused ends, and pre-made end attachments. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100
- 15 C. Cable grips shall be of 316 stainless steel and have an internal tamperproof cable release mechanism. D. Stress distribution saddles shall be prescribed in addition for the
support of rectangular duct on corners as necessary. E. Hangers shall have a manufacturer's published safe working load and have a 5 to 1 safety factor. F. Hang and support ductwork
as defined in the latest edition of SMACNA Manual, "HVAC Duct Construction Standards, Metal & Flexible". G. Adjustable steel cable hanging system consisting of spring loaded, serrated
clamping mechanism shall be tested and certified in compliance with all applicable SMACNA standards for upper and lower attachment methods. 1. All approved systems must be installed
using matching components including steel cable, clamping mechanism and hardware approved by the manufacturer for its corresponding load rating. No Substitution of manufacturer's components
is permitted. 2. Approved systems must be installed per the manufacturer's specific instructions and must not exceed the stated working load rating at any point throughout the system.
H. Supports, bar/angle reinforcements, and other products that are not part of the duct that are manufactured of uncoated mild steel shall either be painted with two (2) coats of primer
or shall be manufactured of a galvanized equivalent material. I. Approved Manufacturer: Ductmate Industries "Clutcher" Cable Hanging System or Gripple Inc. 2.13 DUCT ACCESSORY HARDWARE
A. Instrument Test Holes: Cast iron or cast aluminum to suit duct material, including screw cap and gasket. Size to allow insertion of pitot tube and other testing instruments and
of length to suit duct-insulation thickness. B. Ventlock 699 or 699-2 based upon insulation thickness. C. Install duct test holes where required for duct traverse testing and balancing
purposes. PART 3 - EXECUTION 3.1 REQUIREMENTS A. Equipment and systems shall be installed in accordance with local and state codes and regulations having jurisdiction. Bracing and
hanging of ductwork shall be per SMACNA - HVAC Duct Construction Standard. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 16 B. Install all ductwork concealed and tight to the structure above unless noted otherwise
on shop drawings. Fabricate only after the approval of shop drawings, and in locations to avoid interferences. Ductwork installed without approved shop drawings, which requires removal/modificatio
n and/or reinstallation due to conflicts or improper installation shall be repaired at no cost to the Owner. C. Sizes given on contract drawings are inside dimensions. D. Keep openings
continuously closed and sealed with protective plastic wrapping during construction to prevent entrance of dirt and debris. E. Extend access openings, damper rods and levers, to outside
of external insulation make systems airtight. F. No piping, conduit or other obstruction to airflow is permitted in ductwork. G. Provide necessary openings, hanger inserts, framing,
chases, and recesses, not provided by other trades. H. Exposed exhaust or return registers and grilles shall be flush with face of duct; exposed supply registers and grilles shall be
mounted outside airstream with 45° shoe-tap extension collars. I. Provide 14 gauge sleeves for ducts passing through Mechanical Room floors. Set sleeves 4 in. above finished floor
in Mechanical Rooms, seal watertight to floor. J. Where a return or exhaust duct is shown to be left open ended, provide hardware mesh screen at opening. K. Do not utilize flexible
ductwork or connection in any way to connect variable or constant volume boxes to ductwork. L. For duct penetrations of non-rated walls, provide sheet metal angle framing or sheet metal
closure panels around the entire perimeter of each duct wall penetration on both sides of the wall, where the gap exceeds 1/4 inch. Where the gap is less than 1/4 inch, the gap may
be caulked on both sides of the wall. Non-rated wall penetrations SHALL NOT be fire caulked under any circumstances. M. For duct penetrations of rated walls, see Specification Section
230500 - Basic Mechanical and Electrical Requirements. N. Ductwork that is called for to be welded shall be fully welded, continuous around the entire perimeter at all joints/seams,
and shall be fully airtight and watertight. 3.2 FLEXIBLE CONNECTIONS A. Provide flexible connections for the intake and discharge connections of duct connected to fans and air handling
equipment. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES
CONSTRUCTION 233100 - 17 B. Round connections are to be made with adhesive and metal drawbands with ends tightly bolted. C. Rectangular connections shall be made with material
securely held in grooved seam between flanges. Attach with adhesive and mechanical fasteners on 6 in. centers. D. Connections shall be made with a minimum of 2 in. space between duct
and equipment collars, installed in line, and with 1 in. excess material folded so as not to interfere with airflow through connection. E. Mechanically fastened and sealed, with specified
duct sealant, at duct and equipment connections. 3.3 FLEXIBLE AIR DUCTS AND CONNECTORS A. "Air duct" applies to conduit or passageway for conveying air to or from heating, cooling,
air conditioning or ventilating equipment but not including the plenum as defined in NFPA 90A. "Air connector" applies to conduit for transferring air between an air duct or plenum
and an air terminal device or an air inlet or an air outlet as defined by the NFPA 90A. B. For round to oval connections, provide round-oval flexible adapter. C. Flexible air ducts
and connectors shall be provided in fully extended condition, free from kinks. D. Flexible air ducts and connectors shall not be used in systems with entering air temperatures in excess
of 250°F. E. Flexible air ducts and connectors shall use only the minimum length required to make the connection and shall be installed in the horizontal or vertical position. Flexible
elbows are not acceptable. Do not exceed a maximum length of 48 in., fully extended. F. Flexible air ducts and connectors shall use minimum 1/2 in. wide positive locking, steel worm
drive clamp, or nylon plenum rated straps for joints and connections. One clamp or strap for the inside core liner and one clamp or strap for the outer jacketing. When non-metallic
(nylon) straps are used, they should be listed and labeled to standard UL 181B. Fastener package should be marked UL 181 B-C. G. Collars to which flexible duct is attached shall be
beaded and a minimum of 2 in. in length. Wrap twice with UL 181 tape and secure with clamp or strap. Sleeves used for joining two sections of flexible duct shall be beaded and a minimum
of 4 in. in length. The draw band shall be positioned behind the bead on the metal collar. H. Outer vapor barrier and insulation shall be slid over inner core and collar, wrapped twice
with UL 151 tape and secured with a clamp or strap. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 18 I. Connections shall be per SMACNA "HVAC Duct Construction Standards - Metal and Flexible", Air Diffusion
Council "Flexible Duct Performance and Installation Standards" and NAIMA Installation Standards. J. Flexible duct shall be supported at manufacturer's recommended intervals, but no
greater distance than 2'-6" on center and prior to all 90 degree bends. Maximum permissible sag shall be 1/2 in. per foot of support spacing. Provide a minimum of one hanger on each
run of flexible duct. K. A connection to rigid duct or equipment shall be considered a support joint. Long horizontal duct runs with sharp bends shall have additional supports before
and after the bend approximately one duct diameter from the centerline of the bend. L. Hanger or saddle material in contact with the flexible duct shall be of sufficient width to prevent
any restriction of the internal diameter of the duct when the weight of the supported section rests on the hanger or saddle material. In no case shall the material contacting the flexible
duct be less than 1-1/2 in. wide. Factory installed suspension systems integral to the flexible duct are an acceptable alternative hanging method when the manufacturer's recommended
procedures are followed. M. The hanger shall be strapped around the flexible duct and secured to the structure above. Hangers shall not be attached to other mechanical or electrical
objects. Hangers may be attached to an approved trapeze. Ceiling grid shall not be used to fabricate a trapeze. Support hangers shall be installed horizontal. Screws shall not be
used to penetrate the flexible duct to attach to the hanger. N. Provide flexible duct connections and splices in accordance with manufacturer's recommended installation instructions.
O. Seal flexible duct connections with sealing materials listed and labeled in accordance with UL 181B. Mechanically secure connections with approved clamping materials. 3.4 TURNING
VANES A. Install only in square elbows of equal dimensions. B. Install as per latest SMACNA Standards. C. Secure vane runners to duct with spot welding, riveting or sheet metal screws.
D. When installing in ductwork with internal insulation. 1. Install runners in ductwork inside insulation and bolt through insulation and duct sides, welding bolts to insure rigid installation.
Provide build-outs for duct Velocity-Pressure classes above 2 in. w.g. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 19 3.5 DUCT CLEANLINESS AND CLEANING AFTER INSTALLATION A. Duct Cleanliness: 1. All ductwork
on the project shall meet the SMACNA Duct Cleanliness For New Construction Guidelines, "Advanced Level" of duct cleanliness for production, delivery, storage and installation of ductwork.
2. Prior to shipment to the jobsite, all duct ends and openings must be covered with a heavy duty, dual-ply, clear polyethylene protective film. Open ends are to be kept covered during
transport, storage, and installation. As ductwork is installed at the job site, open ends are to be covered to maintain cleanliness. 3. The film must be securely affixed to protect
against dirt and debris, and must be translucent to facilitate inspection of interior surfaces without removing the film. The film is have a elongation rating of 600% and a break strength
of 13.1 lbs./in. The film shall contain no VOC's, and shall leave no residue on duct after removal. 4. Manufacturer: Ductmate Industries ProGuard (heavy duty grade clear). B. Cleaning
After Installation: 1. Interior surfaces shall be free of dust and debris prior to initial start up. Protect equipment which may be harmed by excessive dirt with filters, or bypass
during cleaning. Provide adequate access into ductwork for cleaning purposes. Any cleaning of duct systems shall comply with recommendations of NAIMA and NADCA. 2. Clean external
surfaces of foreign substances that might cause corrosion, deterioration of the metal, or where ductwork is to be painted. 3. Clean debris from system before fans are turned on. 4.
Keep openings continuously closed during the construction period. 5. Pay damages resulting from dirt blown on painted or other finished surfaces. 6. Repair or replace damaged fan wheels,
dampers, or other system parts damaged as a result of debris. 7. Clean system as many times as required until the entire system is dirt free. 3.6 INSTALLATION OF ROUND DUCTWORK A. Use
factory-fabricated couplings for joints. B. After the joint is slipped together, sheet metal screws are placed 1/2 in. from the joint bead for mechanical strength. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 -
20 C. Sealer is applied to the outside of the joint and covering the screw heads. D. Flanged joints shall be made with neoprene rubber gaskets. 3.7 TEST OF DUCTWORK A. Conduct duct
leakage tests per SMACNA "HVAC Air Duct Leakage Test Manual" and per the requirements of the 2015 International Energy Conservation Code, for all ductwork systems designed to operate
at static pressures of 3.0 in. w.g. or greater. Representative sections totaling no less than 25% of the total duct area, per system, for the designated pressure class shall be tested
as well as all associated ductwork located out-of-doors. All areas shall be as selected by the Engineer. Positive pressure leakage testing is acceptable for negative pressure ductwork.
The rate of air leakage (CL) must be less than or equal to 4.0, as determined by equation 4 - 8 in 2015 IECC, which reads: CL=F/P0.65 where F = measured leakage rate in CFM per 100
sq. ft. of duct surface, and P = static pressure of the test. When leakage above stated limits occurs, ascertain location of leaks and repair as required. Repeat tests as required
to obtain allowable leakage rates. Prepare a report similar to that suggested by SMACNA and submit for review. Duct testing shall be conducted in the presence of the Owner's Representative.
B. Provide test reports indicating pressure tests performed. Include date, section tested, test pressure and leakage rate. C. Ductwork not required to be tested for leakage, shall
be checked and guaranteed to meet the standards of the specified SMACNA Duct Seal Class A. Air balancing and testing shall be used to determine satisfactory operation of duct systems.
Balancing reports indicating excessive leakage amounts shall be required to rebuild, repair or seal ductwork having excessive leakage. 3.8 DAMPERS AND AIR CONTROL DEVICES A. Provide
volume dampers at all air outlets, diffusers, grilles and as noted on plans. Provide volume dampers at all low pressure supply, return and exhaust, branch ducts and as noted on the
plans. B. Provide dampers necessary to permit proper balancing of air quantities. Comply with code requirements for smoke and fire control. Prevent introduction of uncontrolled outside
air into building through roof and wall openings. C. When dampers are installed in acoustically lined ductwork, install with insulated "buildouts" per SMACNA. D. Install fire dampers
in accordance with "Fire Dampers" Section and applicable codes. E. Install all dampers furnished as part of "Building Management System" Section. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 21 3.9 ACCESS DOORS
A. Provide for access to upstream side of duct mounted reheat coils, dampers, damper motors, fire dampers, smoke dampers, smoke detectors, control devices, fan bearings, and equipment
requiring periodic inspection or service. Provide labels for fire and smoke dampers as called for in Part 2 - Products. B. For ducts that are too small to install an access door of
the minimum specified size, provide a 12 in. long section of removable ductwork for maintenance and inspection access. Removable ductwork shall be fastened between device requiring
access and next duct section with duct flanges or Donaldson Torit clamp with PVC foam seal. For ducts that are required to be insulated, provisions shall be made to allow insulation
to be easily removed and re-installed. C. Provide access service openings as required by NFPA 96 at 20 ft. intervals along horizontal ducts and at each vertical riser for kitchen hood
exhaust. 3.10 DUCT SUPPORTS A. Provide per SMACNA, same material as duct. Hanger bands to extend down sides and turn under bottom 2 in. Minimum two metal screws per hanger. Angle
iron on larger duct spaced per building structural system but not greater that 8 ft. Provide extra support angles as required. 3.11 AIR AND WATERTIGHT DUCTWORK A. Where water and snow
may accumulate on ductwork or where odors or corrosive gasses may collect, ductwork and plenums shall be made watertight by soldering, brazing or welding of joints. Grade ducts down
toward waste points and/or toward louvers. Provide valve and drain piping from low point to waste point. 1. Kitchen hood exhaust ductwork. ACOUSTIC-THERMAL DUCT LINING B. Increase
metal duct dimensions to accommodate lining. Adhere lining to interior side of duct; minimum 90% coverage of Benjamin Foster 85-20 fire retardant adhesive, UL approved. Stapling method
of attaching will not be permitted. Mechanical fasteners shall not pierce the sheet metal. Installing fasteners with spacing as per SMACNA Standards. Multiple layers of liner to
achieve indicated thickness is prohibited. C. Abutting edges of acoustic linings shall be sealed with a fire resistant neoprene coating, and exposed edges of acoustic linings shall
be installed with sheet metal nosing to prevent erosion. D. Lining shall not impart odor to the air, delaminate or be loosened by the airstream under normal operating conditions. Lining
which is damaged during fabrication or shipment shall not be installed. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 22 E. Supply ductwork downstream of terminal units shall have 1-1/2 in. thick acoustical lining
for a minimum of 10 feet. All air outlets shall be installed downstream of this minimum distance. 3.12 SMOKE DETECTION A. Smoke detectors shall be furnished by Division 26 "Electrical".
This Contractor shall install detectors located in ductwork. Clearly indicate locations of smoke detectors on the sheet metal shop drawings. B. Increase duct size at smoke detectors,
where required for proper installation, per smoke detector manufacturer's recommendations. Coordinate minimum duct size required with Division 26 "Electrical". 3.13 DUCT SEALING A.
Preparation: 1. Clean surfaces of dirt, oil, grease and loose of foreign matter that could impair adhesion, using soap and water or solvent. 2. Allow surfaces to dry completely before
proceeding. B. Installation of Sealant System: 1. Apply sealant system to duct joints, fasteners, and seams in accordance with manufacturer's instructions. 2. Apply sealant by brush,
putty knife or caulk gun, to full coverage. Remove excess adhesive immediately. 3. Completely seal duct joint, fasteners and seams without voids, to a minimum 20 mil thick wet film.
4. Apply and store at ambient temperature of 40°F to 100°F; and protect from freezing until dry. C. Field Quality Control: 1. Allow duct sealant system to cure a minimum of 72 hours
before operating the system. 2. Do not apply external duct insulation or coatings until the joints have been inspected by the Owner's Representative. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 23 EXHIBIT
I - DUCTWORK MATERIALS SERVICE MATERIAL SPECIAL REQUIREMENTS Supply, return, vent, relief, outside and exhaust Lock forming quality, galvanized steel ASTM A653 and A924, galvaneal/paint
grip if not insulated and exposed Joints and features as called for Accessories, dampers and air turns Same material and gauge as parent duct --------------- Exposed Kitchen hood Type
304 stainless steel, with #3 polished finish where exposed Braze or weld airtight/watertight Concealed kitchen hood exhaust 16 gauge black steel Joints welded airtight/watertight, flanged
and gasketed at connections to hood END OF SECTION 233100 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FANS 233400 - 1 SECTION 233400 - FANS PART 1 - GENERAL 1.1 DESCRIPTION A. Provide labor, materials, equipment
and services as required for the complete installation designed in Contract Drawings. 1.2 SUBMITTALS A. Submit product data for all fans, motors, drives, and accessories. Include all
fan curves fan operating point, and sound data. 1.3 QUALITY ASSURANCE A. Capacity, size and arrangement, static pressure, brake horsepower, component parts and accessories shall be
provided as called for or scheduled. Guaranteed full capacity delivery through duct systems finally installed and under conditions listed. The manufacturer shall guarantee sound-power
level ratings not exceeding those of the design equipment. All equipment shall be statically and dynamically balanced to acceptable tolerances with weights permanently fastened. Fan
wheels shall be rebalanced in the field, if necessary. B. Pressure Classification: Maximum Total Sp Class Up to 3-3/4 in. WG-STD I Up to 6-3/4 in. WG-STD II Up to 12-3/4 in. WG-STD
III C. Conventional Motors: 1. Motor sizes shall be as scheduled. Refer to Specification Section 230513 for motor types, efficiency requirements, and acceptable motor manufacturers.
All belt-driven fan motors shall be mounted on either an adjustable slide base or a pivoting base. D. EC Motors: 1. Motors shall be Electronically Commutated Type (EC), variable speed,
DC, brushless motors specifically designed for use with single phase, 277 volt (or 120 volt), 60 hertz electrical input. 2. Motor shall be complete with and operated by a single-phase
integrated controller/inverter that operates the wound stator and senses rotor position to electronically commutate the stator. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FANS 233400 - 2 3. Motors shall be designed for synchronous rotation. Motor rotor shall be
permanent magnet type with near zero rotor losses. Motor shall have built-insoft start and soft speed change ramps. 4. Motor shall be able to be mounted with shaft in horizontal or
vertical orientation. Motor shall be permanently lubricated with ball bearings. Motors shall be direct coupled to the blower. 5. Motor shall maintain a minimum of 85% efficiency over
its entire operating range and have a turndown to 20% of full speed, (80% turndown). 6. Provide manual fan speed output control for field adjustment of the fan airflow setpoint. 7.
Inductors shall be provided to minimize harmonic distortion and line noise. 8. Provide isolation between fan motor assembly and unit casing to eliminate any vibration from the fan to
the terminal unit casing. 9. Provide a motor that is designed to overcome reverse rotation and not affect life expectancy. 10. The fan manufacturer shall provide a factory installed
PWM controller for either manual or DDC controlled fan CFM adjustment. The manual PWM controller shall be field adjustable with a standard screwdriver. The remote PWM controller shall
be capable of receiving a 0-10 VDC signal from the DDC controller (provided by the controls contractor) to control the fan CFM. When the manual PWM controller is used, the factory
shall present the fan CFMs as shown on the schedule. 11. Acceptable Manufacturers: Emerson Ultratech, U.S. Motors-Nidec, GE-ECM, A.O. Smith or equivalent. E. Drive Systems: 1. Provide
fans with belt or direct drive systems as scheduled. V-belt drives as recommended by drive manufacturer, unless otherwise specified or scheduled. a. Size drive for 200% of motor rating
when motor is 10 HP and larger. Size for 150% of motor rating when motor is less than 10 HP. b. Motors 5 HP and larger shall be provided with a minimum of two (2) belts. All belt
sets shall be matched. c. Cast iron or cast steel pulleys. d. Provide belt and shaft guards for each driven device. Provide openings in both the motor and fan sections of the guard
so that the motor and fan speeds can be checked without removing the belt guard. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 FANS 233400 - 3 e. Belts shall be oil and heat resistant, non-static type. f. Drives shall be precision machined cast iron type, keyed and
securely attached to the wheel and motor shafts. g. All belt drive fan motor selections must include an allowance for medium drive losses as established by AMCA Publication 203. F.
Motor Pulleys: 1. 5 HP and Smaller: Adjustable type to produce 15% speed change above and below scheduled fan speed. 7-1/2 HP and Larger: Fixed type. 2. 5 HP and Smaller: "A" section,
2.6 in. minimum pitch diameter. 3. 7-1/2 HP to 20 HP: "B" section, 4.6 in. minimum pitch diameter. 4. 25 HP and Larger: "C" section 7.0 in. minimum pitch diameter. 5. Drive ratio
not over 4:1. G. Bearings: 1. Bearings shall be designed and individually tested specifically for use in air handling applications. Construction shall be heavy-duty regreasable ball
type in a pillow block cast iron housing selected for a minimum L50 life in excess of 200,000 hours as maximum cataloged operating speed. H. Wheels and Propellers: 1. All wheels and
propellers shall be balanced in accordance with AMCA Standard 204-96, balance quality and vibration levels for fans. Wheel shall overlap an aerodynamic aluminum inlet cone to provide
maximum performance and efficiency. 2. Blades on all sizes shall be continuously welded to the backplate and deep spun inlet shroud. 3. All hubs shall be keyed and securely attached
to the fan shaft. I. Blower Shafts: 1. All blower shafts shall be AISI-C-1045 hot rolled and accurately turned, ground and polished. Shafting shall be sized for a critical speed of
at least 125% of maximum cataloged operating speed. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 FANS 233400 - 4 J. Coating: 1. All steel fan components shall contain an electrostatically applied, baked polyester powder coating. Paint must exceed 1,000 hour salt
spray under ASTM B117 test method. K. Vibration isolation for units shall be furnished by the fan manufacturer unless otherwise noted. Provide rubber in shear type vibration isolators.
L. Certifications: 1. Fan shall be listed by Underwriters Laboratories (UL 705) and UL listed for Canada (CUL 705). Fan shall bear the AMCA certified ratings seal for sound and air
performance. 2. All units shall bear an engraved aluminum nameplate and shall be shipped in ISTA certified transit-tested packaging. PART 2 - PRODUCTS 2.1 INLINE BLOWERS/INLINE FANS
A. Manufacturers: Subject to compliance with requirements of this section, provide products by one of the following: 1. Acme, Cook, Greenheck, Hartzell, New York Blower, Twin City,
PennBarry. B. Ceiling, Wall or Inline Mounted, Direct Driven, Centrifugal Exhaust Fan: 1. Construction: a. The fan housing shall be minimum 20 gauge galvanized steel and acoustically
insulated. b. Blower and motor assembly shall be mounted to a minimum 14 gauge reinforcing channel. Motor shall be resiliently mounted. c. Unit shall be supplied with integral wiring
box. d. Discharge position shall be convertible from right angle to straight through by moving interchangeable panels. The outlet duct collar shall include reinforced aluminum dampers
with continuous aluminum hinge rods and brass bushings. To accommodate different ceiling thickness, an adjustable prepunched mounting bracket shall be provided. e. A powder painted
white steel grille shall be provided as standard. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
FANS 233400 - 5 2. Wheel: a. Wheels shall be twin DWDI centrifugal forward curved type, constructed of galvanized steel. 3. Accessories: a. Disconnect switch - Factory mounted
and wired. b. Fan Speed Controller (For Direct Drive Models Only) [- Factory mounted and wired. 4. Basis-of-Design: Cook Gemini. 2.2 ROOF FANS A. Manufacturers: Subject to compliance
with requirements of this section, provide products by one of the following: 1. CaptiveAire, Cook, Greenheck, Twin City, PennBarry. B. Centrifugal Vent Set Kitchen Exhaust Ventilator:
1. Construction: a. Fan shall be bolted and welded construction utilizing corrosion resistant fasteners. The scroll wrapper shall be a minimum of 14 gauge steel and the scroll side
panels shall be minimum 12 gauge steel. The entire fan housing shall have continuously welded seams for leak proof operation and shall have a minimum 1-1/2 in. outlet discharge flange.
The fan housing shall be rotatable to any one (1) of eight (8) discharge positions. b. A performance cut-off shall be furnished to prevent the recirculation of air in the fan housing.
c. Bearing support shall be minimum 10 gauge welded steel. d. Lifting eyes shall be provided for ease of installation. e. Side access inspection ports shall be provided with quick release
latches for access to the motor compartment without removing the weather cover. 2. Wheel: a. Wheel shall be steel. Non-overloading, centrifugal backward inclined, flat blade type.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 FANS 233400 - 6 3. Accessories: a. Discharge
Shutter b. Drain c. Inlet/Outlet Companion Flanges d. OSHA Belt Guard e. Weather Cover f. Hinged Access Door g. Grease Collection System h. Required Rails & supports 4. Certifications:
a. For grease laden vapor applications, fan shall be listed by Underwriters Laboratories (U.L. 762) and U.L. listed for Canada (Power Ventilator for Restaurant Exhaust Appliances. 5.
Design Equipment: As shown on schedule sheet. 2.3 CONTROL (MOTORIZED) DAMPERS A. Manufacturers: Subject to compliance with requirements of this section, provide products by one of
the following: 1. Ruskin, Tamco, Greenheck. B. Provide control dampers as shown on the drawings and diagrams, to meet the following minimum construction standards: 1. Leakage: Class
1, 4 CFM/sq. ft. at 1 in. w.c., tested per AMCA Standard 500-D98, and AMCA Standard 500-D-98, and AMCA Standard 511 and bearing AMCA's Certified Ratings for both air performance and
air leakage. 2. Frame: 16 gauge galvanized steel structural hat channel with tabbed corners for reinforcement to meet 13 gauge criteria. 3. Blades: 14 gauge (equivalent thickness
galvanized steel) roll forward air foil type for low pressure drop and low noise generation. Blades shall be parallel for two-position dampers and opposed, for modulating dampers.
4. Blade Seals: Ruskiprene, suitable for -72°F to 275°F mechanically locked into the blade edge. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 FANS 233400 - 7 5. Jamb Seals: Flexible metal compression type. 6. Blade Axles: 1/2 in. plated steel hexagonal positively locked
into the damper blade. Linkage concealed out of the airstream. 7. Bearings: Corrosion resistant, permanently lubricated stainless steel sleeve. 8. Dampers subject to corrosive fumes
or humidity shall be constructed of stainless steel. 9. Dampers over 48 in. in length and height shall be made in multiple sections. 10. Where damper sizes are not specifically indicated,
they shall be sized by the Building Management System Contractor. Maximum velocity shall be 1500 FPM and maximum pressure drop 0.1 in. w.g. 11. Where shown or required for proof of
closure or open position, provide factory installed damper positioning switch package Ruskin Model SP-100. 12. Dampers shall be as manufactured by Ruskin CD 60 control damper, or equivalent
Tamco, Greenheck or Nailor. 13. Basis of Design: Ruskin CD6. PART 3 - EXECUTION 3.1 INSTALLATION OF EQUIPMENT A. Provide equipment in accordance with manufacturer's instructions.
All fans shall meet the intent of the system performance requirements. Provide rubber in-shear vibration isolation for all fans unless otherwise called for. Provide necessary support
steel for equipment. Provide guards for all exposed belts, shafts, and fan wheels. Change pulley sizes or adjust sheaves as required to make systems deliver specified quantities of
air as listed on the Contract Drawings. END OF SECTION 233400 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VARIABLE VOLUME TERMINAL UNITS 233600 - 1 SECTION 233600 - VARIABLE VOLUME TERMINAL UNITS PART 1 - GENERAL 1.1
DESCRIPTION A. Provide labor, materials, equipment and services as required for the complete installation as shown on the Contract Drawings. 1.2 SUBMITTALS A. Submit product data for
terminal units including room number, maximum and minimum CFM, accessories, pressure drops, discharge and sound power data by octave band. Clearly indicate box sizes being proposed.
PART 2 - PRODUCTS 2.1 TERMINAL UNITS A. General Unit Construction: 1. Unit casing shall be constructed of 22 gauge welded galvanized steel. Each unit shall be internally lined with
1/2 in. minimum 1-1/2 lb./ft.3 fiberglass insulation which meets NFPA 90A and UL 181. Factory label each unit with size, location, minimum and maximum CFM, and calibration chart.
Air terminal units shall be capable of operating at 10 in. w.g., pressure maximum without damage. Maximum casing leakage at 3 in. W.G. shall be 11 cfm. 2. Units to be certified under
ARI Standard 880-94 Certification Program and carry ARI seal. 3. Units to be provided with a factory control enclosure suitable for field installed controls. 4. Units shall be provided
with factory access door option. B. Control and Volume Regulating Devices: 1. Internal unit damper shall be constructed of galvanized steel with blade-end seals for tight shut-off with
a maximum damper leakage of 7 CFM against a maximum of 3 in. w.g. Damper shall be mounted on a galvanized steel shaft extending through the unit on torque free bearings. Terminal
shall have normally open dampers. Minimum and maximum air quantities shall be factory set, but may be field adjustable. Neither the radiated or discharge sound power levels shall
exceed the ratings of design equipment as scheduled on the Contract Drawings. C. Design Equipment: Titus DESV. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 VARIABLE VOLUME TERMINAL UNITS 233600 - 2 D. Acceptable Makes: Anemostat, Carrier, Carnes, Envirotech, Krueger,
Titus, Tuttle and Bailey. PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A. Suspended terminal units from the building structural system independent of the ceiling, ductwork and piping
systems. If this cannot be accomplished, provide additional intermediate angle iron from which the units shall be suspended. Level each unit. Access to the terminal unit controls
shall be accomplished by removal of ceiling panels or through an access door. Coordinate locations of access doors. END OF SECTION 233600 TENANT FIT-OUT FOR ITHACA BEER COMPANY -
SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 REGISTERS AND DIFFUSERS 233713 - 1 SECTION 233713 - REGISTERS AND DIFFUSERS PART
1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services required for the complete installation designed in Contract Documents. 1.2 SUBMITTALS A. Registers/Grilles/Diffusers
: Submit room schedule listing size, CFM, throw, direction of throw, accessories, finish, material type, color chart, pressure drop and noise criteria. 1.3 GENERAL REQUIREMENTS A. Each
manufacturer shall check noise level ratings for registers and diffusers to insure that the sizes selected will not produce noise to exceed N.C. - 24, measured at occupant level; notify
Owner's Representative of problems prior to shop drawing submittal. See noise control specification for RGD selections for NC rating. B. Pressure drop, airflow and noise criteria selection
is based on design equipment. Manufacturers not submitting design makes must provide written certification in front of submittal that equipment submitted has been checked against and
performs equal to the design make. C. Borders and frames shall be coordinated with materials and ceiling systems to integrate with architectural ceiling details and finishes scheduled.
D. Locations of ceiling mounted air terminal devices shall be coordinated with locations shown on architectural reflected ceiling plans. E. Ceiling-Mounted Outlets and Inlets: Drawings
indicate general arrangement of ducts, fittings and accessories. Air outlet and inlet locations have been indicated to achieve design requirements for air volume, noise criteria, airflow
pattern, throw and pressure drop. For units installed in lay-in ceiling panels, locate units in the center of panel. Where architectural features or other items conflict with installation,
notify Architect for a determination of final location. 1.4 REQUIREMENTS FOR REGISTERS A. General: 1. A register is defined as a grille plus a volume damper. 2. Registers shall be installed
"sight-proof" where possible, i.e.: High wall register with horizontal blades inclined up, or along a wall with blades facing the wall. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI
411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 REGISTERS AND DIFFUSERS 233713 - 2 3. Borders and frames shall be of the same material
as register face unless specified otherwise. B. Mounting Frames: 1. Provide with screw holes in register face punched and countersunk at factory, and mounting frame drilled and tapped
to suit. Sponge rubber gasket between frame and wall or ceiling for all surface mounted frames. 2. Frame shall be overlap type and shall be suitable for type of ceiling where register
is to be installed. C. Finishes: 1. Baked enamel (of colors as selected from the manufacturer's standard color chart), as scheduled. D. Design Equipment: Titus unless otherwise noted.
E. Manufacturers: Anemostat, Carnes, Krueger, Titus, Price, Tuttle and Bailey, Nailor. 1.5 REQUIREMENTS FOR DIFFUSERS A. General: 1. Provide four way blow unless otherwise noted. 2.
Where manufacturer's size recommendations require duct sizes or connections differing from design Contractor shall provide at no change in contract price. 3. Suitable for recessed mounting
unless otherwise indicated. 4. Provide square to round neck transitions as required. 5. Provide sponge rubber gasket for all surfaced mounted frames. B. Finishes: 1. Baked enamel (of
colors as selected from the manufacturer's standard color chart), as scheduled. C. Frame style shall be suitable for type ceiling in which diffuser is to be installed. D. Design Equipment:
Titus unless otherwise noted. E. Manufacturers: Anemostat, Carnes, Krueger, Titus, Price, Tuttle and Bailey, Nailor. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 REGISTERS AND DIFFUSERS 233713 - 3 PART 2 - PRODUCTS 2.1 SUPPLY TYPES (PER R, G & D SCHEDULE) 2.2 RETURN/EXHAUST
TYPES (PER R, G & D SCHEDULE) PART 3 - EXECUTION 3.1 INSTALLATION A. Install equipment in strict accordance with manufacturer's instructions. Rough in or install per reflected ceiling
plan or in location instructed by Owner's Representative. B. Provide approved air extractors behind all duct mounted supply registers in exposed ductwork. C. When the final connection
to an exhaust or return grille is made, a 12 in. minimum height plenum box must be supplied to all grilles. Plenum dimensions shall match grille size. Paint inside of plenum box flat
black. D. Seal all supply and return registers, grilles and diffusers during construction operations to limit dust entering HVAC systems and ductwork. Seals may be removed just prior
to testing and balancing, but not without the approval of the Owner's Representative. END OF SECTION 233713 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LOUVERS AND PENTHOUSES 233723.16 - 1 SECTION 233723.16 - LOUVERS
AND PENTHOUSES PART 1 - GENERAL 1.1 DESCRIPTION A. Provide labor, materials, equipment and services required for the complete installation designed in Contract Documents. 1.2 SUBMITTALS
TO THE ARCHITECT/ENGINEER A. Louvers including all blade types, finishes, and arrangements. B. Penthouses including materials, finishes and accessories. C. Provide original color charts
for selection of finish. PART 2 - PRODUCTS 2.1 LOUVERS A. Factory constructed high performance drainable, fixed, extruded aluminum louvers. B. Provide mullions where blade lengths exceed
60 in. C. Sill extension and sill style as required by job conditions. D. Louver to be flanged or un-flanged as required for the wall type in which it will be installed. E. Heads, sills
and jambs to be one piece structural members of 6063-T6 alloy with integral caulking slot and retaining beads. F. Mullions shall be sliding interlock with internal drain(s). G. Blades
to be one piece extrusions with gutter(s) designed to catch and direct water to jamb and mullion drains. H. Extrusion thicknesses shall be as follows: Heads, Sills, jambs and mullions:
0.115". Fixed Blades: 0.125" I. Closed cell PVC compression gaskets shall be provided between bottom of the mullion or jamb and the top of the sill to insure leak tight connections.
J. All fasteners to be aluminum or stainless steel. K. All louvers to be furnished with 5/8 in. flattened expanded mesh, aluminum bird screen with a .055 in. thick extruded aluminum
frame. Screens and screen frames to be standard mill finish. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 LOUVERS AND PENTHOUSES 233723.16 - 2 L. All louvers shall be finished with powder coating of a color to be selected at the time of submittal review. Coating to be 1.5
to 3 mil. thick full strength 100% resin Fluoropolymer coating. Finish to adhere to a 4H Hardness rating. The louver manufacturer shall supply an industry standard 20-year limited
warranty against failure or excessive fading of the Fluoropolymer powder coat finish. M. Design Equipment: Ruskin ELF. N. Makes: Construction Specialties, Inc., American Warming &
Ventilating Inc., Arrow United Industries, Louvers & Dampers, Inc., Ruskin, Nailor. PART 3 - EXECUTION 3.1 GENERAL A. Install louvers and penthouses as per manufacturer's recommendations.
3.2 LOUVERS A. Size called for is approximate wall/or masonry opening size. Adjust slightly to suit construction or coursing (review architectural drawings or field conditions for
rough opening sizes.) Slope ductwork, and plenum to louver weephole or provide drain. END OF SECTION 233723.16 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PACKAGED KITCHEN EXHAUST HOOD 233813 - 1 SECTION 233813 - PACKAGED KITCHEN EXHAUST HOOD PART 1 - GENERAL 1.1
WORK INCLUDED A. Provide labor, materials, equipment and services required for the complete installation designed in Contract Documents. 1.2 SUBMITTALS A. Submit product data and shop
drawings on packaged exhaust hood. PART 2 - PRODUCTS 2.1 GENERAL A. The kitchen exhaust shall be full length capture type exhaust only, bringing 100% of the exhausted air across the
plane of the canopy. The canopy shall be fabricated in accordance with National Fire Protection Association (NFPA) Bulletin #96, bear the National Sanitation Foundation Seal of Approval
(NFS) and be approved by: Council of American Building Officials, Building Officials and Code Administrators International (BOCA), and shall be UL listed. B. The canopy shall be constructed
of 430 stainless steel with a #3 or #4 polish where exposed. All seams, joints and penetration of the hood enclosure to the lower outermost perimeter that direct and captures grease-laden
vapor and exhaust gases shall have liquid tight continuous external weld. C. The hood shall be furnished with U.L. classified filters, supplied in size and quantity as required by
ventilator. D. UL listed incandescent light fixtures shall be installed at approximately 4 ft. centers. Lights shall be prewired to a junction box situated on the top of the hood for
field connection to power. Wiring shall conform to the requirements of the National Electrical Code. E. A UL listed fire damper with fusible link shall be installed in each exhaust
collar. F. Refer to drawings for Hood Sizes and CFM requirements. 2.2 STANDARDS OF CONSTRUCTION A. Materials: Exposed areas - 430 stainless steel with a #3 or #4 polish. Unexposed
- 18 gauge galvanized steel all continuously welded. B. Welding: Heliarc - all external welds are liquidtight, ground and polished. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 PACKAGED KITCHEN EXHAUST HOOD 233813 - 2 C. Lights: UL listed incandescent vaporproof - shock
resistant globes (no bulbs) mounted on 3 in. centers (approximate). D. Wiring: Prewired to junction box - Electrical connections in field by others. E. Grease Filters: UL listed self-balancing
heavy gauge aluminum. F. Canopy Height: 24 in. G. Grease Troughs: Removable, supplied of material corresponding to hood. H. Grease Cups: Stainless Steel, removable. I. Duct Collars:
Exhaust: 4 in. high J. Hanger Brackets: Welded to top of canopy - for use with 1/2 in. full threaded rod. K. Control Panel: Remote mounted with stainless steel faceplate. Separate
toggle switches with pilot lights for exhaust fans and canopy lights. A label identifying each function is included. L. Fire Protection System: 1. Fire protection system shall be furnished
by the kitchen hood exhaust system manufacturer and is to be an Ansul R-102 system. The system shall contain the following: a. Fire suppression agent tank in cabinet with pressure
gauge and all necessary safety devices. b. Remote pull station at exit doors. c. Fusible links all mounted and wired within hood assembly. d. Duct and appliance nozzles all piped within
hood assembly. e. Wire rope system with pulley elbows all mounted within conduit furnished and installed by kitchen hood system manufacturer. f. Fire agent piping from tanks and hood
by kitchen hood exhaust system manufacturer. g. A electric gas valve is to be furnished by hood manufacturer, installed by the Plumbing Contractor and wired to Ansul Control Panel System
by Electric Contractor. Refer to Plumbing package for size. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 PACKAGED KITCHEN EXHAUST HOOD 233813 - 3 h. Expellant Gas Hose: The complete Ansul System shall be housed in an assembly enclosure including all controls, tanks
to provide a completely operating fire suppression system in accordance with NFPA 96 standards and shall be installed in accordance with Underwriters Laboratories, Inc. M. Check, Test
and Balance: 1. The kitchen exhaust system shall be inspected, tested and balanced by the manufacturer's factory representative. The factory representative shall ensure proper and
satisfactory operation of the kitchen exhaust system and shall provide a written and detailed report of this check, test and startup to the Engineer and Owner. N. Design Make: CaptiveAire.
PART 3 - EXECUTION 3.1 GENERAL A. The entire packaged kitchen exhaust hood shall be installed by a factory authorized installer per the manufacturer's recommendations. END OF SECTION
233813 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 INDOOR DIRECT-FIRED GAS MAKE-UP AIR UNIT 237323.13 - 1 SECTION 237323.13 - INDOOR DIRECT-FIRED GAS MAKE-UP AIR UNIT PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor,
materials, equipment and services as required for the complete installation as shown on the Contract Documents. 1.2 SUBMITTALS A. Submit product data for packaged make-up air unit and
accessories. Include installation details, complete installation drawings, installation and start-up instructions, wiring diagrams, and instruction manuals from manufacturer of equipment.
1.3 QUALIFICATIONS A. Complete unit and accessories shall comply with the New York State Energy Conservation Construction Code. Unit shall have UL, AGA and IRI labels. PART 2 - PRODUCTS
2.1 MAKE-UP AIR UNIT A. General: 1. Provide a complete packaged indoor direct fired gas make-up air unit including fans, piping and controls. Factory assembled, internally wired, and
ready to operate. 2. Blower section casing shall be fabricated of die formed 16 gauge galvanized steel. All casings shall be air tight. Complete access shall be provided to all components
through gasketed access panels and doors. 3. Supply fans shall be double width, double inlet centrifugal type with FC fan wheels. Fans are tested in accordance with AMCA 210. The
shaft shall be designed for a maximum operating speed not to exceed 75% of its first critical speed. Bearings are to be external heavy duty industrial prelubricated type. 100,000
hour life of the bearings. Blowers to be driven by a V-belt package sized with capacity of 25% greater than the motor horsepower. Units shall be provided with a control compartment.
4. Burner section shall contain a Maxon NP burner constructed of rust resistant cast iron bodies (which serve as the gas manifold) drilled to discharge the fuel between diverging stainless
steel mixing plates. The entire burner assembly is mounted directly in the air stream being heated. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INDOOR DIRECT-FIRED GAS MAKE-UP AIR UNIT 237323.13 - 2 5. All controls mounted within this compartment are to be wired
to a numbered terminal strip. All wiring is to be color coded and in accordance with NEC. A circuit diagram of the approved electrical drawing shall be provided with the unit. All
electrical components shall bear the UL label. 6. Unit controls shall consist of a spark ignition system with flame rod sensing of flame, high temperature limit switch set as 185 degrees,
flame safeguard with alarm contacts, ignition transformer, air proving differential switch and a series 44 modulation control system. 7. The gas train shall be FM approved with 30:1
turndown. 92% efficient. 8. Space temperature control, gas modulating control system consists of Maxitrol electronic gas modulating system which includes a Series 44 discharge air sensor
(55 - 90 degree range) mounted in the blower discharge, a modulatory regulator valve mounted in the gas piping manifold, an amplifier installed in the electric control panel, a 115
to 24 volt transformer and a Selectrastat mounted in the area where the temperature is to be sensed. 9. All units are to be provided with a starter for external overload protection,
a control transformer and a fusible disconnect switch. 10. Two-Speed/Two Winding Motor. 11. V-Bank Filter Section: Constructed of 16 gauge galvanized steel. Provide 2 in. 30% efficiency
filters. 12. 1 in., 1-1/2 lb. fiberglass insulation pin spotted to casing of entire unit. 13. Inlet On-Off Duct Stat: Automatically turns burner off when inlet air temperature equals
desired discharge air temperature. Works as a lockout for the burner. Temperature range of 25-225 SPDT. 14. Time Freeze Protection: Consists of an on-off discharge duct stat and
timer. Prevents continued discharge of cold air if burner is not functioning. Factory set at 45 degrees. If the discharge air temperature is below 45 deg. 3 minutes after burner
is first called to come on, the unit is shut off. The timer's purpose is to keep the thermostat from shutting the unit off during the purge cycle. 15. Provide CASLink building monitoring
system communications module. 16. Provide spring vibration isolators for hanging of unit. 17. Motorized inlet damper. 18. Clogged filter switch. 19. UV flame sensor. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 INDOOR DIRECT-FIRED GAS MAKE-UP AIR UNIT 237323.13 - 3
20. Remote control station with fan and heat switches, burner on light, alarm light, and Maxitrol selector or Selectrastat. 21. Main gas regulator 22. Modulating gas valve, safety shut-off
valves. B. Design Equipment: CaptiveAire. C. Make: Trane, Carrier or equal. PART 3 - EXECUTION 3.1 GENERAL A. Install unit in strict accordance with manufacturer's instructions.
B. Arrange to have equipment manufacturer's technician to verify installation for compliance with manufacturer's recommendations. C. Arrange to have equipment manufacturer's technician
perform start-up of equipment, instruct Owner's Representative in the proper operation of the equipment. D. Unit shall be mounted indoors on concrete housekeeping pad as shown on contract
documents. END OF SECTION 237323.13 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 1 SECTION 23 8146.10 - WATER SOURCE HEAT PUMP AND ACCESSORIES PART 1 - GENERAL
1.1 WORK INCLUDED A. Provide labor, materials, equipment and services as required for the complete installation designed in Contract Documents. B. Provide installation supervision and
start-up services. C. The contractor shall furnish and install where shown on the plans, packaged water source heat pump units. Sizes, types and performance shall be as indicated in
the unit schedule. Each unit shall be complete with factory furnished components and accessories as shown in the plans and as herein specified. D. Electrical work required as an integral
part of the temperature control work is indicated on the mechanical drawings, and is the responsibility of this contractor to provide the complete system to perform the full sequence
of operation shown, or as described in this specification. 1.2 SUBMITTALS A. Heat pump units and accessories. Power and control wiring diagrams, fan curves or charts, W.P.D., dimensions,
weights, options for duct connections installation and start up manuals. PART 2 - PRODUCTS 2.1 QUALITY ASSURANCE A. Heat pump performance shall be certified in accordance with ARI/ISO
Standard 13256-1 and shall have the correct ARI/ISO and CUL labels affixed to the cabinet. Heat pump performance at scheduled project operating conditions shall be substantiated by
computer generated output data. B. Heat pumps shall be listed by a nationally recognized safety-testing laboratory or agency, such as Underwriters Laboratory (UL), or Electrical Testing
Laboratory (ETL), or Canadian Standards Association (CSA). TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 2 2.2 WARRANTY A. Contractor shall provide one full year warranty for furnishing parts on site, and labor to replace
any part of the unit which becomes defective in normal operation, from the date of start-up by the manufacturer’s representative, or first beneficial use of the unit. The compressor
shall be warranted for an additional four years. 1. Manufacturer’s warranty time periods may or may not coincide with the contractor’s time period of obligation, but where the manufacturer’s
warranty contains an expiration date based upon the equipment shipping date, the contractor shall not be relieved of responsibility for covering the full time periods listed above.
2. The contractor shall be responsible for all shipping expenses not included by the manufacturer, both to procure the replacement part, and to return any defective parts to the manufacturer,
as they may require. 3. The contractor’s replacement warranty obligation after the first year shall be limited to furnishing of replacement parts only, and shall not include repair
labor costs or materials such as refrigerant, oils, dehydration, refrigerant moisture dryers, air filters, or drive belts. 4. The owner shall be responsible for providing replacement
filters beyond the spares provided in the original contract, and for filter installation labor. 2.3 HORIZONTAL HEAT PUMPS A. Unit shall be supplied completely factory assembled, piped,
internally wired, fully charged with R-410A, horizontal unit and capable of operating over an entering water temperature range from 45°F to 120°F on standard range models, and 30° to
120°F on extended range models. All equipment must be rated and certified in accordance with AHRI/ISO 13256-1 and must be tested, investigated, and determined to comply with the requirements
of the standards for Heating and Cooling Equipment UL-1995 for the US and CAN/CSA-C22.2 NO. 236 for Canada. Each unit shall be ETL, ETLC and CE Listed. Each unit shall be run tested
at the factory. The installing contractor shall be responsible for furnishing and installing Water Source Heat Pumps as indicated on the plans and per installation instructions. B.
Electrical – A control box shall be located within the unit and shall contain controls for compressor, reversing valve and fan motor operation and shall have either, a 50VA or (optional)
75VA transformer and a terminal block for low voltage field wiring connections. Unit shall be name-plated to accept time delay fuses or HACR circuit breaker for branch over-current
protection of the power source. Unit control system shall provide heating or cooling as required by the set points of the wall thermostat. The unit control scheme shall provide for
fan operation simultaneous with compressor operation (fan interlock) regardless of the thermostat type. The unit shall be capable of providing an output signal to an LED on the thermostat
or to a central monitoring panel to indicate a “fault” condition from the activation of any one of the safety switches. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 3 C. Casings - Shall be fabricated from heavy gauge
G-60 galvanized sheet metal with interior surfaces lined with 1/2-inch thick, 1.5 lb., coated fiberglass insulation. The insulation shall have a flame spread of less than 25 and a smoke
developed classification of less than 50 per ASTM E-84 and UL 723. All fiberglass shall be coated and have exposed edges tucked under flanges to prevent the introduction of glass fibers
into the air stream. All insulation must meet NFPA 90A requirements. D. Ceiling Suspended Water Source Heat Pumps - Each horizontal water source heat pump shall be provided with a kit
of four hanger bracket assemblies, each comprised of heavy steel hanger bracket, integral rubber-in-shear vibration isolator, cap screw, and plated isolator washer. Units with more
than four hanger brackets SHALL NOT be accepted. Hanger bracket assembly shall accommodate a 3/8" or 1/2" diameter threaded hanger rod. No external channel or angle trapeze hangers
shall be allowed. E. Configuration – Units shall be provided configured as shown on the plans, in one of the following air-flow arrangements (Note: “Right” or “Left” side shall be determined
when viewing the compressor compartment end panel): F. Blower Motor - Unit shall have a direct drive centrifugal fan motor assembly. A twospeed PSC blower motor shall be provided on
7,000 BtuH through 12,000 BtuH units. Factory motor wiring shall be set for optimum fan performance, with means provided for easy field wiring modifications to an alternate speed.
Field wire cutting, stripping, or terminal application to conductors shall not be required for motor speed change. An optional ECM motor may be provided on 15,000 BTUH through 70,000
BTUH. The ECM motor shall utilize a permanent magnet rotor, which is connected to the shaft through resilient rings to absorb high frequency torque ripple. The ECM motor shall deliver
precise speed and economical performance regardless of system static pressure. G. Blower - All heat pumps shall be side or end discharge, as shown on Drawings. The blower discharge
shall be interchangeable from side to end-discharge or vice-versa by field exchange of the blower panel and fan mounting panel. Units shall have a removable orifice ring to facilitate
blower wheel and motor removal without the need to disconnect duct work. Units without orifice ring are not acceptable. H. Refrigerant Circuit - Units shall have a R-410A sealed refrigerant
circuit, which includes a rotary, reciprocating or scroll compressor, thermostatic expansion valve, an aluminum lanced-fin and rifled copper tube refrigerant-to-air heat exchanger,
reversing valve, coaxial, tube-in-tube, refrigerant-to-water heat exchanger. The coaxial coil shall be made of a copper inner tube and a steel outer tube and shall be deeply fluted
to enhance heat transfer and minimize fouling and scaling. The coaxial coil shall be made have a working pressure of 500 psig on the waterside of the unit and 600 psig on the refrigerant
side for all R-410A units. The compressor shall have thermal overload protection. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 4 I. Compressor - The hermetic compressor shall be mounted on compressor manufacturer furnished
rubber grommets. The compressor shall be mounted on compressor manufacturer furnished rubber grommets on a mass plate under the compressor. The mass plate shall have a dual material
assembly. The top is heavy gauge galvanized steel. The bottom is a visoelastic isolation material. The isolation material is 1/8" thick, 1 lb./sq. ft. with a barrier layer to improve
the sound transmission loss. The assembly reduces absorbs compressor vibration that can be transmitted to the cabinet. J. Safety Controls - Safety controls shall include a minimum
of 3 safety devices; high refrigerant pressure switch, low refrigerant pressure switch and a low refrigerant suction temperature sensor. The low refrigerant suction temperature sensor
shall provide freeze protection for the water coil and the air coil. Refrigerant gauge access fittings shall be factory installed on high and low pressure refrigerant lines to facilitate
field service. Activation of any safety device shall prevent the compressor from operating via a microprocessor lockout circuit. The lockout circuit shall be reset at the thermostat
or at the unit disconnect switch. K. Cold Start-up - Manufacturer shall guarantee heat pump conditioners to start and operate in an ambient temperature of 40 degrees F with entering
air at 40 degrees F, with entering water at 70 degrees F, with both air and water at the flow rates used in the ARI/ISO standard rating test, for initial system start-up in winter.
(This is not a normal or continuing operating condition, and it is assumed that such a start-up is only for the purpose of bringing the building or space up to initial occupancy temperature.)
L. Air Section - The air section of the unit shall be isolated from the compressor and control section with an insulated divider panel, to minimize the transmission of compressor noise,
and to permit operational service testing with the compressor compartment cover removed, without having air bypass the air-to-refrigerant coil. M. Filters - Units shall have 2" thick,
4-sided filter rack with duct collar to accommodate a 2" thick MERV 8 filter. Filter rack shall have a removable access door on the side to accommodate filter removal. N. Supply
and return connections shall be FPT fittings, brazed to copper water tubes and securely mounted flush to the cabinet corner post allowing for connection to a flexible hose without the
use of a back-up wrench. Condensate drain connection shall be not be less than 3/4" FPT fitting securely mounted flush to the cabinet base pan. Supply, return, and condensate shall
be connected to loop and drain piping as detailed on plans. Piping connections at the unit which require brazing or soldering by the installer (which might damage the unit) shall not
be allowed. O. Plastic Drain Pan - condensate pan shall be constructed of high density polyethylene (HDPE) plastic to prevent corrosion and sweating. The bottom of the drain pan shall
be sloped on two planes to provide complete drainage of water from the pan to meet IAQ requirements. The water source heat pump unit as standard shall be supplied with electronic condensate
overflow protection. A mechanical float switch will not be accepted. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 5 P. Thermostat - Programmable, auto or manual changeover two-stage heat / two-stage cool, night setback
override. Thermostat shall have backlit display and have a control range from 45 deg F to 90 deg F with accuracy of +/- 1 deg F. Q. Control System: 1. Unit shall have a microprocessor-
based control system. The unit control logic shall provide heating and cooling operation as required by the wall thermostat set point. The control system shall provide the following
for stand-alone operation: a. The use of standard non-programmable or programmable wall thermostats. b. Fan operation simultaneous with the compressor (fan interlock) regardless of
thermostat logic. c. Time delay compressor operation. d. Delayed de-energizing of the reversing valve for quiet reversing valve operation. e. Compressor short cycle protection of a
minimum of three minutes before restart is possible. f. Random unit start-up after coming off on unoccupied mode. g. Single grounded wire connection for activation of the unoccupied
or unit shutdown modes. h. Night setback temperature setpoint input signal from the wall thermostat. i. Override signal from wall thermostat to override unoccupied mode for 2 hours.
j. Brownout protection to suspend unit operation if the supply voltage drops below 80% of normal. k. Condensate overflow protection to suspend cooling operation in an event of a full
drain pan. l. Suspended compressor operation upon activation of the refrigerant safety devices. m. Cooling operation activated for 60 seconds upon activation of the low suction temperature
sensor - defrost cycle. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SOURCE HEAT PUMP
AND ACCESSORIES 238146.10 - 6 n. Method of defeating compressor, reversing valve and fan time delays for fast service diagnostics. o. Remote reset - Provides means to remotely
reset automatic lock-outs generated by high/low pressure faults and/or low temperature faults. p. Fault retry clears faults the first two times they occur within a 24-hour period and
triggers automatic lock-out on 3rd fault. R. Unit shall have LED annunciators to aid in diagnosing unit operation by indicating the water source heat pump operating mode and alarm conditions.
If there are no current alarm conditions, a green LED on the annunciator board will indicate normal unit operating mode. If an alarm condition exists, the unit controller will send
the fault condition to the LED annunciator, which will assist in troubleshooting the unit. S. Accessories: 1. Factory mounted non-fused disconnect 2. 2" filter racks 3. MERV 8 pleated
filter 4. Autoflow hose kits including isolation valves, unions, automatic flow control valve, 2-way motorized valve, Y-strainer with blow down ball valve, cap & chain, test ports,
and air vent. 5. Condensate hose 6. Thermostat T. Basis of Design 1. Daikin CCH U. Acceptable Make 1. Daikin, Trane, Climate Master PART 3 - EXECUTION 3.1 INSTALLATION A. Install equipment
in strict accordance with manufacturer's instructions and to as to be compatible with intent of the respective system performance requirements. B. No field provided apparatus, electrical
or mechanical, shall be fastened to the heat pump cabinet with screws, without the prior written approval by the manufacturer’s representative. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 7 C. A discrete grounding conductor
shall be provided, sized in accordance with the National Electrical Code, for each heat pump unit. The use of conduit or water piping for grounding purposes shall not be allowed. D.
Piping, electrical conduits, lighting fixtures, etc. shall not be located under any ceiling suspended unit, so as to interfere with unit removal for service or replacement. E. Piping
and electrical connections shall be located to eliminate any interference with removal and replacement of the filter. F. Contractor shall clean each unit of construction dust and debris,
and install new filters at time of commissioning, G. Heat pump units shall not be used as “construction heaters” at any time during any phase of construction. Very low temperatures,
harmful vapors, gypsum dust from dry wall finishing, may all damage the unit and affect its efficiency and useful service life. Failure to properly protect the unit from construction
dirt and debris and from condensation forming within the unit may cause electronic component failure, and void the manufacturer’s warranty. H. Coordinate installation with work as part
of "Control Systems" Section. I. Manufacturer’s Field Service – Engage the services of factory authorized service technician representative to provide equipment Start Up to verify installation
for proper operation and compliance with manufacturer's recommendations, and to assist the contractor in making adjustments, and to assist in field testing as follows: 1. Inspect for
visible damage to casing, coils and internal parts. 2. Inspect for visible traces of refrigerant leaks (oil, etc.) and then leak check. 3. Inspect all electrical connections and torque
to manufacturer’s recommendations, both power and control. Verify correctness. 4. Verify that filters are provided as specified and are installed properly. 5. Verify that proper clearances
for both operation and servicing have been provided. 6. Verify that the unit has been cleaned of all construction dust and debris. 7. Verify proper fan rotation and v-belt drive alignment
and tension where applicable. 8. Start unit according to the manufacturer’s written instructions. 9. Observe initial unit operation to verify suitability for continuous operation for
a period of time of sufficient duration to permit system air balancing. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 WATER SOURCE HEAT PUMP AND ACCESSORIES 238146.10 - 8 J. Coordinate heat pump locations and installation with other contracts through the required coordination
drawings, so that future heat pump removals will not be hindered by piping, conduit, light fixtures, etc. hung below heat pumps. K. All heat pumps shall be installed with the manufacturer's
recommended minimum service clearances. END OF SECTION 238146.10 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E
Reference 210021 UNIT HEATERS AND CABINET UNIT HEATERS (ELECTRIC) 238239 - 1 SECTION 238239 - UNIT HEATERS AND CABINET UNIT HEATERS (ELECTRIC) PART 1 - GENERAL 1.1 DESCRIPTION
A. Provide labor, materials, equipment and services as required for the complete installation and related work as shown on the Contract Documents. 1.2 SUBMITTALS A. Submit product data
for unit heaters and cabinet unit heaters. PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. Free from expansion and contraction noises and strains. Fan speed shown on Schedule shall not
be exceeded. Each piece of equipment shall be factory-boxed and tagged by room number. Cabinet unit heaters and unit heaters shall have baked enamel finish with color selected by
the Architect from manufacturer's standard colors. Rating in accordance with standard test codes adopted jointly by IUGA and ASHRAE. 2.2 CABINET UNIT HEATERS A. General: 1. Rough-in
dimensions must not exceed those of design equipment. B. Cabinet: 1. Front and exposed parts, 16-gauge furniture steel, all others, 18 gauge steel. 2. Fronts shall be removable for
access to interior parts. 3. Recessed or semi-recessed equipment to have four-side overlap, trim strips not acceptable. C. Fan And Motor: 1. Fans, forward curved, centrifugal type,
direct drive from motor shafts. 2. Driven by totally enclosed motor with overload protection and lifetime lubrication. a. Integral manual motor starter. 3. Shall be quiet in operation,
not to exceed 45 db measured 5 ft. away, at high speed. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 UNIT HEATERS AND CABINET UNIT HEATERS (ELECTRIC) 238239 - 2 4. Throwaway filter. D. Heating Element (Electric): 1. Nickel-chrome steel resistance wire embedded in refractory
enclosed in steel sheath with spiral wound fins. 2. High limit automatic reset cutout switch wired in series with each element to protect from overheating and located in discharge airstream.
3. Fan delay switch to keep fan in operation until heat in element is dissipated after element is de-energized. 4. Built-in transformer to convert line voltage current to fan, and control
voltage if different from line voltage. E. Control and Piping Accessories: 1. No control valve. 2. Unit mounted line voltage thermostat. 3. Wall mount fan speed switch. F. Electric:
1. Design Equipment: Indeeco. 2. Make: Airtherm, Berko, Markel, Q-Mark, Trane. PART 3 - EXECUTION 3.1 INSTALLATION - GENERAL A. Provide equipment in accordance with manufacturer's
printed instructions. Report untrue walls before installation. Report cases where clearance below suspended heaters is less than 7-1/2 ft. Provide clearance for piping and conduit.
Support units independent of piping. Support units from building structure, with screws or bolts, no nailing allowed. Be responsible for proper location and size of recesses. Coordinate
installation of recessed or semi-recessed equipment in recesses. Provide framing in recess and shims. Use sponge rubber gasket air-seal between front enclosure and wall. END OF SECTION
238239 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500
- 1 SECTION 260500 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, tools, materials, accessories, parts, transportation, taxes, and related
items, essential for installation of the work and necessary to make work, complete, and operational. Provide new equipment and material unless otherwise called for. References to
codes, specifications and standards called for in the specification sections and on the drawings mean, the latest edition, amendment and revision of such referenced standard in effect
on the date of these contract documents. All materials and equipment shall be installed in accordance with the manufacturer's recommendations. 1.2 LICENSING A. The Contractor shall
hold a license to perform the work as issued by the authority having jurisdiction. B. Plumbing contract work shall be performed by, or under, the direct supervision of a licensed master
plumber. C. Electrical contract work shall be performed by, or under, the direct supervision of a licensed electrician. 1.3 PERMITS A. Apply for and obtain all required permits and
inspections, pay all fees and charges including all service charges. Provide certificate of approval from the Authorities Having Jurisdiction prior to request for final payment. B.
Provide electrical inspection certificate of approval from Middle Department Inspection Agency, Commonwealth Inspection Agency, or an Engineer approved Inspection Agency prior to request
for final payment. 1.4 CODE COMPLIANCE A. Provide work in compliance with the following: 1. 2020 Building Code of New York State. 2. 2020 Existing Building Code of New York State.
3. 2020 Fire Code of New York State. 4. 2020 Plumbing Code of New York State. 5. 2020 Mechanical Code of New York State. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 2 6. 2020 Fuel Gas Code of New York State. 7. 2020 Property
Maintenance Code of New York State. 8. 2020 Energy Conservation Code of New York State 9. Accessible and Usable Buildings and Facilities, ICC A117.1 (2009). 10. New York State Department
of Labor Rules and Regulations. 11. New York State Department of Health. 12. National Electrical Code (NEC) 13. Occupational Safety and Health Administration (OSHA). 14. Local Codes
and Ordinances. 15. Life Safety Code, NFPA 101. 16. City of Ithaca Plumbing Department. 1.5 GLOSSARY ACI American Concrete Institute AGA American Gas Association AGCA Associated General
Contractors of America, Inc. AIA American Institute of Architects AISC American Institute of Steel Construction AFBMA Anti-Friction Bearing Manufacturer's Association AMCA Air Moving
and Conditioning Association, Inc. ANSI American National Standards Institute ARI Air Conditioning and Refrigeration Institute ASHRAE American Society of Heating, Refrigerating and
Air Conditioning Engineers, Inc. ASME American Society of Mechanical Engineers ASPE American Society of Plumbing Engineers ASTM American Society for Testing Materials AWSC American
Welding Society Code AWWA American Water Works Association FM Factory Mutual Insurance Company TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 3 IBR Institute of Boiler & Radiation Manufacturers IEEE Institute of Electrical and Electronics
Engineers IRI Industrial Risk Insurers NEC National Electrical Code NEMA National Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection
Association NYS/DEC New York State Department of Environmental Conservation SBI Steel Boiler Institute SMACNA Sheet Metal and Air Conditioning Contractors National Association UFPO
Underground Facilities Protective Organization UL Underwriter's Laboratories, Inc. OSHA Occupational Safety and Health Administration XL - GAP XL Global Asset Protection Services
1.6 DEFINITIONS Acceptance Owner acceptance of the project from Contractor upon certification by Owner's Representative. As Specified Materials, equipment including the execution specified/shown
in the contract documents. Basis of Design Equipment, materials, installation, etc. on which the design is based. (Refer to the article, Equipment Arrangements, and the article, Substitutions.)
Code Requirements Minimum requirements. Concealed Work installed in pipe and duct shafts, chases or recesses, inside walls, above ceilings, in slabs or below grade. Coordination Drawings
Show the relationship and integration of different construction elements and trades that require careful coordination during fabrication or installation, to fit in the space provided
or to function as intended. Delegated-Design Services Performance and Design criteria for Contractor provided professional services. Where professional design services or certifications
by a design professional are specifically required of a Contractor, by the Contract Documents. Provide products and systems with the specific design criteria indicated. If criteria
indicated is insufficient to perform services or certification required, submit a written request for additional information to the Engineer. Submit wet signed and sealed certification
by the licensed design professional for each product and system specifically assigned to the Contractor to be TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 4 designed or certified by a design professional. Examples: structural maintenance
ladders, stairs and platforms, pipe anchors, seismic compliant system, wind, structural supports for material equipment, sprinkler hydraulic calculations. Equal, Equivalent, Equal
To, Equivalent To, As Directed and As Required Shall all be interpreted and should be taken to mean "to the satisfaction of the Engineer". Exposed Work not identified as concealed.
Extract Carefully dismantle and store where directed by Owner's Representative and/or reinstall as indicated on drawings or as described in specifications. Furnish Purchase and deliver
to job site, location as directed by the Owner's Representative. Inspection Visual observations by Owner's site Representative. Install Store at job site if required, proper placement
within building construction including miscellaneous items needed to affect placement as required and protect during construction. Take responsibility to mount, connect, start-up and
make fully functional. Labeled Refers to classification by a standards agency. Manufacturers Refer to the article, Equipment Arrangements, and the article, Substitutions. Prime Professional
Architect or Engineer having a contract directly with the Owner for professional services. Product Data Illustrations, standard schedules, performance charts, instructions, brochures,
wiring diagrams, finishes, or other information furnished by the Contractor to illustrate materials or equipment for some portion of the work. Provide (Furnish and Install) Contractor
shall furnish all labor, materials, equipment and supplies necessary to install and place in operating condition, unless otherwise specifically stated. Relocate Disassemble, disconnect,
and transport equipment to new locations, then clean, test, and install ready for use. Remove Dismantle and take away from premises without added cost to Owner, and dispose of in a
legal manner. Review and Reviewed Should be taken to mean to be followed by "for the limited purpose of checking for conformance with information given and the design concept expressed
in the Contract Documents". Roughing Pipe, duct, conduit, equipment layout and installation. Samples Physical full scale examples which illustrate materials, finishes, coatings, equipment
or workmanship, and establishes standards by which work will be judged. Satisfactory As specified in contract documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 5 Shop Drawings Fabrication drawings, diagrams, schedules and
other instruments, specifically prepared for the work by the Contractor or a Sub-contractor, manufacturer, supplier or distributor to illustrate some portion of the work. Site Representative
Owner's Inspector or "Clerk of Works" at the work site. Submittals Defined (Technical) Any item required to be delivered to the Engineer for review as requirement of the Contract Documents.
The purpose of technical submittals is to demonstrate for those portions of the work for which a submittal is required, the manner in which the Contractor proposes to conform to the
information given and design concepts expressed and required by the Contract Documents. 1.7 EXISTING CONDITIONS A. Contractor shall review all available record documents of existing
construction or other existing conditions and hazardous material information. Owner does not guarantee that existing conditions are the same as those indicated in these documents.
Contractor shall record existing conditions via measured drawings and preconstruction photographs or video. Inventory and record the condition of items to be removed and salvaged.
Provide photographs or video of conditions that might be misconstrued as damage caused by salvage, removal or construction operations. B. Owner will occupy portions of the building
immediately adjacent to the area(s) of removals. Conduct removals so Owner's operations are not disrupted. Contractor shall locate, identify, disconnect and seal or cap mechanical,
plumbing, fire protection and/or electrical systems serving areas of removals, unless noted otherwise in the contract documents. Contractor shall arrange shut-down of systems with
the Owner. Piping and ductwork indicated to be removed shall be removed and capped or plugged with compatible materials. If services/systems are required to be removed, relocated or
abandoned, provide temporary services/systems the bypass area(s) of removals to maintain continuity of services/systems to other parts of the building, as required. 1.8 SHOP DRAWINGS/PRODUCT
DATA/SAMPLES A. Provide submittals on all items of equipment and materials to be furnished and installed. Submittals shall be accompanied by a transmittal letter, stating name of project
and contractor, name of vendor supplying equipment, number of drawings, titles, specification sections (name and number) and other pertinent data called for in individual sections.
Submittals shall have individual cover sheets that shall be dated and contain: Name of project; name of prime professional; name of prime contractor; description or names of equipment,
materials and items; and complete identification of locations at which materials or equipment are to be installed. Individual piecemeal or incomplete submittals will not be accepted.
Similar items, (all types specified) shall be submitted at under one cover sheet per specification section (e.g. lighting fixtures, valves, plumbing fixtures, etc.). Submittals shall
include all required documentation for each product listed in the specification section at the same time as a complete package. Number each submittal by trade. Indicate deviations
from contract requirements on Letter of Transmittal. Submittals will be given a general review only. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 6 Corrections or comments made on the Submittals during the review do not relieve
Contractor from compliance with requirements of the drawings and specifications. The Contractor is responsible for: confirming and correcting all quantities; checking electrical characteristics
and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory
manner. If submitting hard copies, submit four (4) copies for review. B. The Engineer will review up to two (2) submissions of any single submittal. The Contractor will be invoiced
on an hourly rate basis for the time spent reviewing the same shop drawing in excess of twice. C. If submittals are to be submitted electronically, all requirements in Item A apply.
Submittals shall be emailed in PDF format to specific email address provided by the Construction Manager, General Contractor, Architect or Project Manager. Name of project shall be
in subject line of email. Send emails to: merochsubmittalclerk@meengineering.com. 1.9 PROTECTION OF PERSONS AND PROPERTY A. Contractor shall assume responsibility for construction
safety at all times and provide, as part of contract, all trench or building shoring, scaffolding, shielding, dust/fume protection, mechanical/electrical protection, special grounding,
safety railings, barriers, and other safety feature required to provide safe conditions for all workmen and site visitors. 1.10 EQUIPMENT ARRANGEMENTS A. The contract documents are
prepared using one manufacturer as the Basis of Design, even though other manufacturers' names are listed. If Contractor elects to use one of the listed manufacturers other than Basis
of Design, submit detailed drawings, indicating proposed installation of equipment. Show maintenance clearances, service removal space required, and other pertinent revisions to the
design arrangement. Make required changes in the work of other trades, at no increase in any contract. Provide larger motors, feeders, breakers, and equipment, additional control
devices, valves, fittings and other miscellaneous equipment required for proper operation, and assume responsibility for proper location of roughing and connections by other trades.
Remove and replace doorframes, access doors, walls, ceilings, or floors required to install other than Basis of Design. If revised arrangement submittal is rejected, revise and resubmit
specified Basis of Design item which conforms to Contract Documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 7 1.11 SUBSTITUTIONS A. If Contractor desires to bid on any other kind, type, brand, or manufacture of material
or equipment than those named in specifications, secure prior approval. To request such approval, Contractor shall submit complete information comparing (item-for-item) material or
equipment offered with design material or equipment. Include sufficient information to permit quick and thorough comparison, and include performance curves on same basis, capacities,
power requirements, controls, materials, metal gauges, finishes, dimensions, weights, etc., of major parts. If accepted, an addendum will be issued to this effect ahead of bid date.
Unless such addendum is issued, substitution offered may not be used. 1.12 CONTINUITY OF SERVICES A. The building will be in use during construction operations. Maintain existing
systems in operation within all rooms of building at all times. Refer to "General Conditions of the Contract for Construction" for temporary facilities for additional contract requirements.
Schedules for various phases of contract work shall be coordinated with all other trades and with Owner's Representative. Provide, as part of contract, temporary mechanical and electrical
connections and relocations as required to accomplish the above. Obtain approval in writing as to date, time, and location for shutdown of existing mechanical/electrical facilities
or services. 1.13 UTILITY COMPANY SERVICES A. Division 26 shall make arrangements with National Grid for electric service to the Owner's distribution equipment. Provide underground
or overhead electric service as called for and transformers, meter sockets or meter compartments as required by the Utility Company. Coordinate all activities between the Owner and
Utility Company. The installation of the electric service shall comply with the published Utility Company standards. PAY ALL UTILITY COMPANY CHARGES; INCLUDE CHARGES IN THE BASE BID.
B. Division 22 shall make arrangements with National Grid for gas service to the Owner's distribution system. Provide service to the building as required by the Utility Company.
Coordinate all activities between the Owner and Utility Company. The installation of the gas service shall comply with the published Utility Company standards. PAY ALL UTILITY COMPANY
CHARGES; INCLUDE CHARGES IN THE BASE BID. 1.14 ROUGHING A. The Contract Drawings have been prepared in order to convey design intent and are diagrammatic only. Drawings shall not
be interpreted to be fully coordinated for construction. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 8 B. Due to small scale of Drawings, it is not possible to indicate all offsets, fittings, changes in elevation, interferences,
etc. Make necessary changes in contract work, equipment locations, etc., as part of a contract to accommodate work to avoid obstacles and interferences encountered. Before installing,
verify exact location and elevations at work site. DO NOT SCALE plans. If field conditions, details, changes in equipment or shop drawing information require an important rearrangement,
report same to Owner's Representative for review. Obtain written approval for all major changes before installing. C. Install work so that items both existing and new are operable
and serviceable. Eliminate interference with removal of coils, motors, filters, belt guards and/or operation of doors. Provide easy, safe, and code mandated clearances at controllers,
motor starters, valve access, and other equipment requiring maintenance and operation. Provide new materials, including new piping and insulation for relocated work. D. Coordinate
work with other trades and determine exact route or location of each duct, pipe, conduit, etc., before fabrication and installation. Coordinate with Architectural Drawings. Obtain
from Owner's Representative exact location of all equipment in finished areas, such as thermostat, fixture, and switch mounting heights, and equipment mounting heights. Coordinate
all work with the architectural reflected ceiling plans and/or existing Architecture. Mechanical and electrical drawings show design arrangement only for diffusers, grilles, registers,
air terminals, lighting fixtures, sprinklers, speakers, and other items. Do not rough-in contract work without reflected ceiling location plans. E. Before roughing for equipment furnished
by Owner or in other Divisions, obtain from Owner and other Divisions, approved roughing drawings giving exact location for each piece of equipment. Do not "rough in" services without
final layout drawings approved for construction. Cooperate with other trades to insure proper location and size of connections to insure proper functioning of all systems and equipment.
For equipment and connections provided in this contract, prepare roughing drawing as follows: 1. Existing Equipment: Measure the existing equipment and prepare for installation in
new location. 2. New Equipment: Obtain equipment roughing drawings and dimensions, then prepare roughing-in-drawings. If such information is not available in time, obtain an acknowledgement
in writing, then make space arrangements as required with Owner's Representative. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 9 1.15 COORDINATION DRAWINGS A. Before construction work commences, Divisions for all trades shall
submit coordination drawings in the form of CAD drawing files, drawn at not less than 1/4 in. scale. Such drawings will be required throughout all areas, for all Contracts. These
drawings shall show resolutions of trade conflicts in congested areas. Mechanical Equipment Rooms shall be drawn early in coordination drawing process simultaneous with all other congested
areas. Prepare Coordination Drawings as follows: 1. Division 23 shall prepare the base plan CAD coordination drawings showing all ductwork, all pertinent heating piping, and equipment.
These drawings may be CAD files of the required Ductwork Shop Drawings. The drawings shall be coordinated with lighting fixtures, sprinklers, air diffusers, other ceiling mounted
items, ceiling heights, structural work, maintenance clearances, electric code clearance, reflected ceiling plans, and other contract requirements. Reposition proposed locations of
work after coordination drawing review by the Owner's Representative. Provide adjustments to exact size, location, and offsets of ducts, pipes, conduit, etc., to achieve reasonable
appearance objectives. Provide these adjustments as part of contract. Minor revisions need not be redrawn. 2. Division 23 shall provide CAD files and submit the base plan CAD Coordination
Drawings to all Divisions. 3. Divisions 21 and 22 shall draw the location of piping and equipment on the base plan CAD Coordination Drawings, indicating areas of conflict and suggested
resolutions. 4. Divisions 26, 27 and 28 shall draw the location of lighting fixtures, cable trays, and feeders over 1-1/2 in. on the base plan CAD Coordination Drawings, indicating
areas of conflict and suggested resolution. 5. The General Construction Trade shall indicate areas of architectural/structural conflicts or obstacles on the CAD Coordination Drawings,
and coordinate to suit the overall construction schedule. 6. The General Construction Trade shall expedite all Coordination Drawing work and coordinate to suit the overall construction
schedule. In the case of unresolved interferences, he shall notify the Owner's Representative. The Owner's Representative will then direct the various trades as to how to revise their
drawings as required to eliminate installation interferences. 7. If a given trade proceeds prior to resolving conflicts, then if necessary, that trade shall change its work at no extra
cost in order to permit others to proceed with a coordinated installation. Coordination approval will be given by areas after special site meetings involving all Divisions. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 10 B. The
purpose of the coordination drawing process is to identify and resolve potential conflicts between trades, and between trades and existing or new building construction, before they
occur in construction. Coordination drawings are intended for the respective trade's use during construction and shall not replace any Shop Drawings, or record drawings required elsewhere
in these contract documents. 1.16 REMOVAL WORK A. Where existing equipment removals are called for, submit complete list to Owner's Representative. All items that Owner wishes to retain
that do not contain asbestos or PCB material shall be delivered to location directed by Owner. Items that Owner does not wish to retain shall be removed from site and legally disposed
of. Removal and disposal of material containing asbestos, lead paint, mercury and PCB's shall be in accordance with Federal, State and Local law requirements. Where equipment is called
for to be relocated, contractor shall carefully remove, clean and recondition, then reinstall. Remove all abandoned piping, wiring, equipment, lighting, ductwork, tubing, supports,
fixtures, etc. Visit each room, crawl spaces, and roofs to determine total Scope of Work. The disturbance or dislocation of asbestos-containing materials causes asbestos fibers to
be released into the building's atmosphere, thereby creating a health hazard to workmen and building occupants. Consistent with Industrial Code Rule 56 and the content of recognized
asbestos-control work, the Contractor shall apprise all of his workers, supervisory personnel, subcontractors, Owner and Consultants who will be at the job site of the seriousness of
the hazard and of proper safeguards and work procedures which must be followed, as described in New York State Department of Labor Industrial Code Rule 56. B. For materials indicated
to contain lead, that are being affected by demolition or construction, the contractor shall comply with all Federal, State and Local law requirements regarding worker exposure to lead
disturbance and abatement procedures. C. Refer to the Owner's Lead Paint Survey. The Survey identifies the surfaces within the buildings that were tested for lead by collecting paint
samples and performing laboratory analysis. If any unidentified surfaces are to be impacted the lead content shall be tested by analytical determinations conducted by a qualified laboratory
approved by the Owner. The contractor shall review the current owner’s lead paint reports on file before starting any work which may disturb existing surfaces. 1.17 REFRIGERANT RECOVERY
A. Existing equipment to be removed, as shown on the plans may contain refrigerant and refrigerant oils. This refrigerant and refrigerant oil must be handled n accordance with Federal,
State and Local law requirements. B. Removal and recovery of refrigerant shall be in accordance with the current edition of Section 608 of the Clean Air Act of 1990, including all final
regulations. C. Refrigerant recovery must be performed by a technician, certified by an EPA-approved certification program, using refrigerant recovery and recycling equipment certified
by an EPA-approved testing organization. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC
ELECTRICAL REQUIREMENTS 260500 - 11 D. Owner "reserves the right of first refusal" on ownership of recovered refrigerant. Should Owner choose to maintain ownership of refrigerant,
refrigerant shall be reclaimed, cleaned by this Contractor to ARI 700-1993 Standard of Purity, by an EPA certified refrigerant reclaimer. Refrigerant shall be turned over to the Owner
in suitable marked containers to be stored on site, at a place of the Owner's choosing. 1.18 EQUIPMENT AND MATERIAL REQUIREMENTS A. Provide materials that meet the following minimum
requirements: 1. Materials shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less, in accordance with NFPA 255. 2. All equipment and material for
which there is a listing service shall bear a UL label. 3. Potable water systems and equipment shall be built according to AWWA Standards. 4. Gas-fired equipment and system shall meet
AGA Regulations and shall have AGA label. 5. All electrical equipment and systems, as a whole, shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory
(NRTL) for the intended use in accordance with the applicable standards and have a physical label indicating such. 6. Fire protection equipment shall be UL listed and FM approved. B.
Exterior and wet locations shall utilize materials, equipment supports, mounting, etc. suitable for the intended locations. Metals shall be stainless steel, galvanized or with baked
enamel finish as a minimum. Finishes and coatings shall be continuous and any surface damaged or cut ends shall be field corrected in accordance with the manufacturer's recommendations.
Hardware (screws, bolts, nuts, washers, supports, fasteners, etc.) shall be: 1. Stainless steel where the associated system or equipment material is stainless steel or aluminum. 2.
Hot dipped galvanized or stainless steel where the associated system or equipment is steel, galvanized steel or other. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 12 1.19 CUTTING AND PATCHING A. Each trade shall include their
required cutting and patching work unless shown as part of the General Construction Contract. Refer to General Conditions of the Contract for Construction, for additional requirements.
Cut and drill from both sides of walls and/or floors to eliminate splaying. Patch cut or abandoned holes left by removals of equipment or fixtures. Patch adjacent existing work disturbed
by installation of new work including insulation, walls and wall covering, ceiling and floor covering, other finished surfaces. Patch openings and damaged areas equal to existing surface
finish. Cut openings in prefabricated construction units in accordance with manufacturer's instructions. 1.20 PAINTING A. Paint all insulated and bare piping, pipe hangers and supports
exposed to view in mechanical equipment rooms, penthouse, boiler rooms and similar spaces. Paint all bare piping, ductwork and supports exposed to the out-of-doors with rust inhibiting
coatings. Paint all equipment that is not factory finish painted (i.e. expansion tanks, etc.). B. All painting shall consist of one (1) prime coat and two (2) finish coats of non-lead
oil base paint, unless otherwise indicated herein. Provide galvanized iron primer for all galvanized surfaces. All surfaces must be thoroughly cleaned before painting. Review system
color coding prior to painting with the Owner's Representative or Architect. C. All items installed after finished painting is completed and any damaged factory finish paint on equipment
furnished under this contract must be touched up by the Contractor responsible for same. D. Include painting for patchwork with color to match adjacent surfaces. Where color cannot
be adequately matched, paint entire surface. Provide one (1) coat of primer and two (2) finish coats or as called for in the Specifications. E. All primers and paint used in the interior
of the building shall comply with the maximum Volatile Organic Compound (VOC) limits called for in the current version of U.S. Green Building Council LEED Credits EQ 4.1 and EQ 4.2.
1.21 EXISTING CEILING REMOVAL AND RE-INSTALLATION A. In a renovation project, any existing ceiling removal and re-installation work required for the completion of a Contractors or
Subcontractors work, shall be removed and reinstalled by that Contractor or Subcontractor. This applies in any areas not called for to have a new ceiling installed. B. The ceiling
removal and re-installation shall include lay-in ceiling tile and grid, to the extent necessary to accomplish the work. Removed ceiling tile and grid shall be safely stored during
the course of the work, and it shall be re-installed to the original existing condition. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 13 C. The ceiling removal and re-installation shall include gypsum board or plaster ceilings
and the associated suspension systems. Removed ceiling areas shall be patched with materials to match the existing ceiling, and painted to match. If paint cannot be matched exactly,
paint the entire ceiling a similar color. 1.22 CONCEALMENT A. Conceal all contract work above ceilings and in walls, below slabs, and elsewhere throughout building. If concealment
is impossible or impractical, notify Owner's Representative before starting that part of the work and install only after their review. In areas with no ceilings, install only after
Owner's Representative reviews and comments on arrangement and appearance. 1.23 CHASES A. New Construction: 1. Certain chases, recesses, openings, shafts, and wall pockets will be provided
as part of General Construction Trade. Mechanical and Electrical trades shall provide all other openings required for their contract work. 2. Check Architectural and Structural Design
and Shop Drawings to verify correct size and location for all openings, recesses and chases in general building construction work. 3. Assume responsibility for correct and final location
and size of such openings. 4. Rectify improperly sized, improperly located or omitted chases or openings due to faulty or late information or failure to check final location. 5. Provide
18 gauge galvanized sleeves and inserts. Extend all sleeves 2 in. above finished floor. Set sleeves and inserts in place ahead of new construction, securely fastened during concrete
pouring. Correct, by drilling, omitted or improperly located sleeves. Assume responsibility for all work and equipment damaged during course of drilling. Firestop all unused sleeves.
6. Provide angle iron frame where openings are required for contract work, unless provided by General Construction trade. B. In Existing Buildings: 1. Drill holes for floor and/or
roof slab openings. 2. Multiple pipes smaller than 1 in. properly spaced and supported may pass through one 6 in. or smaller diameter opening. 3. Seal voids in fire rated assemblies
with a fire-stopping seal system to maintain the fire resistance of the assembly. Provide 18 gauge galvanized sleeves at fire rated assemblies. Extend sleeves 2 in. above floors.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 -
14 4. In wall openings, drill or cut holes to suit. Provide 18 gauge galvanized sleeves at shafts and fire rated assemblies. Provide fire-stopping seal between sleeves and wall in
drywall construction. Provide fire stopping similar to that for floor openings. 1.24 PENETRATION FIRESTOPPING A. Fire-Stopping for Openings Through Fire and Smoke Rated Wall and Floor
Assemblies: 1. Provide materials and products listed or classified by an approved independent testing laboratory for "Penetration Fire-Stop Systems". The system shall meet the requirements
of "Fire Tests of Penetrations Fire-Stops" designated ASTM E814. 2. Provide fire-stop system seals at all locations where piping, tubing, conduit, electrical busways/cables/wires, ductwork
and similar utilities pass through or penetrate fire rated wall or floor assembly. Provide fire-stop seal between sleeve and wall for drywall construction. 3. The minimum required
fire resistance ratings of the wall or floor assembly shall be maintained by the fire-stop system. The installation shall provide an air and watertight seal. 4. The methods used shall
incorporate qualities which permit the easy removal or addition of electrical conduits or cables without drilling or use of special tools. The product shall adhere to itself to allow
repairs to be made with the same material and permit the vibration, expansion, and/or contraction of any items passing through the penetration without cracking, crumbling and resulting
reduction in fire rating. 5. Plastic pipe/conduit materials shall be installed utilizing intumescent collars. 6. Provide a submittal including products intended for use, manufacturer's
installation instructions, and the UL details for all applicable types of wall and floor penetrations. 7. Fire-stopping products shall not be used for sealing of penetrations of non-rated
walls or floors. B. Acceptable Manufacturers: 1. Dow Corning Fire-Stop System Foams and Sealants. 2. Nelson Electric Fire-Stop System Putty, CLK and WRP. 3. S-100 FS500/600, Thomas
& Betts. 4. Carborundum Fyre Putty. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL
REQUIREMENTS 260500 - 15 5. 3-M Fire Products. 6. Hilti Corporation. 1.25 NON-RATED WALL PENETRATIONS A. Each trade shall be responsible for sealing wall penetrations related
to their installed work, including but not limited to ductwork, piping, conduits, etc. See individual specification sections for requirements. 1.26 SUPPORTS A. Provide required supports,
beams, angles, hangers, rods, bases, braces, and other items to properly support contract work. Modify studs, add studs, add framing, or otherwise reinforce studs in metal stud walls
and partitions as required to suit contract work. If necessary, in stud walls, provide special supports from floor to structure above. B. For precast panels/planks and metal decks,
support mechanical/electrical work as determined by manufacturer and the Engineer. Provide heavy gauge steel mounting plates for mounting contract work. Mounting plates shall span
two or more studs. Size, gauge, and strength of mounting plates shall be sufficient for equipment size, weight, and desired rigidity. C. For finished areas without a finished ceiling
system such as classrooms, offices, conference rooms, etc., where decking and structure is exposed, and ductwork/piping/conduit is exposed: All mounting brackets, channel support systems
and mounting hardware for ductwork, piping, lighting, etc. shall be concealed and approved by the Architect/Engineer prior to the installation. AirCraft cable style hanging for ductwork
is required. It is recommended that room mockups be done and receive Architect/Engineer approval prior to proceeding with installation. D. Equipment, piping, conduit, raceway, etc.
supports shall be installed to minimize the generation and transmission of vibration. E. Materials and equipment shall be solely supported by the building structure and connected framing.
Gypboard, ceilings, other finishes, etc. shall not be used for support of materials and equipment. 1.27 APPLIED FIREPROOFING A. Scope: Provide encapsulation of surfaces where applied
fireproofing materials have been disturbed, removed, or left missing by the removal of hangers or upper attachments, or when new hangers or upper attachment are installed. B. Fire Resistance
Rating: Fireproofing shall meet the original hourly rating when applied to the construction assembly where materials have been removed or disturbed, or is missing. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 16 C. Fire Hazard
Classification: Fireproofing shall be listed in the Underwriters Laboratories Building Materials Directory with the following performance properties: 1. Flame Spread: 10 or less.
2. Smoke Developed: 5 or less. D. Product Data: Provide manufacturer's product descriptions for each required fireproofing material. Include application instructions, including primer/adhesive
requirements and recommended minimum thickness and density for each required hourly rating. E. Fire Proofing Manufacturer: 1. Retro-Guard cementitious replacement fireproofing by Grace
Construction Products, or equivalent Cafco Blaze Shield, and Cafco 300 by Isolatek. 2. Physical Properties: a. Dry Field Density (ASTM E 605): 15 lb/cu ft minimum average. b. Cohesion/Adhesion
(Bond Strength) (ASTM E 736): 200 lb/sq ft minimum average. c. Compressive Strength (ASTM E 761): 500 lb/sq ft minimum. d. Impact (Bond Impact) Resistance (ASTM E 760): Shall not
crack or delaminate. e. Effect of Deflection (ASTM E 759): Shall not crack or delaminate. f. Corrosion Resistance (ASTM E 937): No evidence of corrosion. g. Air Erosion (ASTM E 859):
Maximum 0.025 g/sq ft weight loss. h. Provide primer or adhesive recommended by the fireproofing manufacturer to obtain required bond strength for the specific fireproofing and substrate.
F. Apply fireproofing prior to installation of ductwork, piping, conduits, and other suspended items. Hangers, clips and other supports for these items shall be installed before application
of fireproofing. G. Examine the substrate and conditions under which fireproofing is to be applied. Do not proceed with the fireproofing work until unsatisfactory conditions have been
corrected. Verify that hangers, clips, sleeves, and other items that will penetrate the fireproofing are in place. Check paint on substrate for compatibility with primer/fireproofing
and adequacy of bond strength in accordance with fireproofing manufacturer's instructions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 17 H. Surface Preparation: Remove dirt, dust, oil, grease, loose paint and rust, mill scale,
and other foreign matter that may impair the bonding of the fireproofing to the substrate. Clean substrate free of contamination from chemicals and solvents. Apply primer/adhesive
where necessary to obtain bond strength of fireproofing to steel shop paint and where recommended by the fireproofing manufacturer. I. Apply the fireproofing in accordance with UL fire
test report and the manufacturer's application instructions. Thickness and density of fireproofing shall be in accordance with the approved product data and as required to produce
the hourly fire resistance rating required. 1.28 ACCESS PANELS A. Provide access panels for required access to respective trade's work. Location and size shall be the responsibility
of each trade. Access panels provided for equipment shall provide an opening not smaller than 22 in. by 22 in. Panels shall be capable of opening a minimum of 90 degrees. Bear cost
of construction changes necessary due to improper information or failure to provide proper information in ample time. Access panels over 324 square inches shall have two cam locks.
Provide proper frame and door type for various wall or ceiling finishes. Access panels shall be equal to "Milcor" as manufactured by Inland Steel Products Co., Milwaukee, Wisconsin.
Provide General Construction trade with a set of architectural plans with size and locations of access panels. 1.29 CONCRETE BASES A. Provide concrete bases for all floor mounted equipment.
Provide 3,000 lb. concrete, chamfer edges, trowel finish, and securely bond to floor by roughening slab and coating with cement grout. Bases 4 in. high (unless otherwise indicated);
shape and size to accommodate equipment. Provide anchor bolts in equipment bases for all equipment provided for the project, whether mounted on new concrete bases or existing concrete
bases. 1.30 HVAC EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting, chemically treating and restarting any systems which are affected by work shown on
the Contract Documents unless specifically noted otherwise. B. Provide final connections to all equipment as required by the equipment. Provide final connections, including domestic
water piping, wiring, controls, and devices from equipment to outlets left by other trades. Provide equipment waste, drip, overflow and drain connections extended to floor drains.
C. Provide for Owner furnished and Contractor furnished equipment all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains, insulation,
sheet metal work, controls, dampers, as required. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC ELECTRICAL REQUIREMENTS 260500 - 18 D. Refer to manufacturer drawings and specifications for requirements of special equipment. Verify connection requirements before bidding.
1.31 PLUMBING EQUIPMENT CONNECTIONS A. Contractor is responsible for draining, filling, venting, chemically treating and restarting any systems which are affected by work shown on the
Contract Documents unless specifically noted otherwise. B. Provide roughing and final connections to all equipment. Provide loose key stops, sanitary "P" traps, tailpiece, adapters,
gas or air cocks, and all necessary piping and fittings from roughing point to equipment. Provide installation of sinks, faucets, traps, tailpiece furnished by others. Provide cold
water line with gate valve and backflow prevention device at locations called for. Provide continuation of piping and connection to equipment that is furnished by others. Provide
relief valve discharge piping from equipment relief valves. C. Provide valved water outlet adjacent to equipment requiring same. Provide equipment type floor drains, or drain hubs,
adjacent to equipment. D. Install controls and devices furnished by others. E. Refer to Contract Documents for roughing schedules, and equipment and lists indicating scope of connections
required. F. Provide for Owner furnished and Contractor furnished equipment all valves, piping, piping accessories, traps, pressure reducing valves, gauges, relief valves, vents, drains,
as required. G. Refer to Manufacturer drawings and specifications for requirements of special equipment. Verify connection requirements before bidding. 1.32 ELECTRICAL EQUIPMENT CONNECTIONS
A. Provide complete power connections to all electrical equipment. Provide control connections to equipment. Heavy duty NEC rated disconnect ahead of each piece of equipment. Ground
all equipment in accordance with NEC. B. Provide for Owner furnished and Contractor furnished equipment all power wiring, electric equipment, control wiring, switches, lights, receptacles,
and connections as required. C. Refer to Manufacturer's drawings/specifications for requirements of special equipment. Verify connection requirements before bidding. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 19 1.33 STORAGE
AND PROTECTION OF MATERIALS AND EQUIPMENT A. Store Materials on dry base, at least 6 in. aboveground or floor. Store so as not to interfere with other work or obstruct access to buildings
or facilities. Provide waterproof/windproof covering. Remove and provide special storage for items subject to moisture damage. Protect against theft or damage from any cause. Replace
items stolen or damaged, at no cost to Owner. B. Division 23 shall provide airtight plastic covers over all supply and return air openings prior to the start of construction by any
trade. The plastic shall be maintained airtight throughout the project construction and removed only with the approval of the Project Inspector. C. Ductwork shall be delivered to the
site from the fabrication shop with air tight plastic covers over all ends of the ducts. The plastic covers shall be in place during transportation and shall be removed prior to installation.
1.34 FREEZING AND WATER DAMAGE A. Take all necessary precautions with equipment, systems and building to prevent damage due to freezing and/or water damage. Repair or replace, at no
change in contract, any such damage to equipment, systems, and building. Perform first seasons winterizing in presence of Owner's operating staff. 1.35 OWNER INSTRUCTIONS A. Before
final acceptance of the work, furnish necessary skilled labor to operate all systems by seasons. Instruct designated person on proper operation, and care of systems/equipment. Repeat
instructions, if necessary. Obtain written acknowledgement from person instructed prior to final payment. Contractor is fully responsible for system until final acceptance, even though
operated by Owner's personnel, unless otherwise agreed in writing. List under clear plastic, operating, maintenance, and starting precautions procedures to be followed by Owner for
operating systems and equipment. 1.36 OPERATION AND MAINTENANCE MANUALS A. Submit by email (preferred) or digital media, thru the normal project submittal process. Include a copy of
each final approved Shop Drawing, wiring diagrams, piping diagrams, spare parts lists, final testing and balancing report, as-built drawings and manufacturer's instructions. Include
typewritten instructions, describing equipment, starting/operating procedures, emergency operating instructions, summer-winter changeover, freeze protection, precautions and recommended
maintenance procedures. Include name, address, and telephone number of installing contractor and of supplier manufacturer Representative and service agency for all major equipment
items. Provide a table of contents page and dividers based upon specification section numbers. Submit in a compiled and bookmarked PDF format as outlined below. TENANT FIT-OUT FOR
ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 20 B. Provide content
for Operation and Maintenance Manuals as specified in individual Specification Sections, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content
formatted and organized as required by this Section. 1. Engineer and Commissioning Agent will comment on whether content of operation and maintenance submittals is acceptable. 2. Where
applicable, clarify and update reviewed manual content to correspond to revisions and field conditions. C. Submit Operation and Maintenance Manuals in the following format: 1. Submit
by uploading to web-based project software site, or by email to Architect, as a formal project submittal in conformance with the project specific submittal procedures. Enable reviewer
comments on draft submittals. 2. Electronic Files: Use electronic files prepared by manufacturer where available. Where scanning of paper documents is required, configure scanned file
for minimum readable file size. 3. File Names and Bookmarks: Bookmark individual documents based on file names. Name document files to correspond to system, subsystem, and equipment
names used in the table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks
reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel on opening file. D. Initial Manual Submittal:
Submit draft copy of each manual at least 30 days before commencing Owner training. Engineer and Commissioning Agent will comment on whether general scope and content of manual are
acceptable. E. Final Manual Submittal: Submit O&M manual in final form prior to requesting inspection for Substantial Completion and at least 2 weeks before commencing Owner training.
Engineer and Commissioning Agent will return copy with review comments. 1. Correct or revise O&M manual to comply with Engineer's and Commissioning Agent's comments. Submit copies
of each corrected manual within 2 weeks of receipt of Engineer's and Commissioning Agent's comments. 1.37 RECORD DRAWINGS A. The Contractor shall obtain at his expense one (1) set of
construction Contract Drawings, (including non-reproduction black and white prints or electronic files) for the purpose of recording as-built conditions. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 21 B. The Contractor shall
perform all survey work required for the location and construction of the work and to record information necessary for completion of the record drawings. Record drawings shall show
the actual location of the constructed facilities in the same manner as was shown on the bid drawings. All elevations and dimensions shown on the drawings shall be verified or corrected
so as to provide a complete and accurate record of the facilities as constructed. C. It shall be the responsibility of the Contractor to mark EACH sheet of the contract documents in
red and to record thereon in a legible manner, any and all approved field changes and conditions as they occur. A complete file of approved field sketches, diagrams, and other changes
shall also be maintained. At completion of the work, the complete set of red marked contract documents, plus all approved field sketches and diagrams shall be submitted to the engineer
and used in preparation of the record drawings. D. A complete set of red marked contract drawings shall be submitted, at one time, as the "Record" set. If there are no changes to a
specific drawing, the contractor shall indicate "NO CHANGES" on that drawing. ALL drawings shall be included in the "Record" set. E. The complete set of red marked Contract Documents
or electronic files shall be certified by the Contractor as reflecting record conditions and submitted to the engineer for review. F. The Contractor shall have the marked up set scanned,
if they are not already electronic files, and then submit them to the Engineer as the "Record Set". 1.38 FINAL INSPECTION A. Upon completion of all Engineering Site Observation list
items, the Contractor shall provide a copy of the Engineering Site Observation Report back to the Engineer with each items noted as completed or the current status of the item. Upon
receipt, the Engineer will schedule a final review. 1.39 TEMPORARY HEATING AND COOLING A. Refer to the General Conditions of the Contract for Construction and Supplemental General Conditions.
B. Systems and equipment installed as part of this project shall not be used for temporary heating or cooling. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 22 1.40 MAINTENANCE OF HVAC SYSTEMS DURING TEMPORARY USE PERIODS A. Provide
each air handling system with a set of prefilters in addition to the permanent filters. Furnish four sets of prefilters for each system for use when system is operated for temporary
heating or cooling. During such use, change prefilters as often as directed by Owner's Representative. Provide MERV-8 filters in all open ended ducts, return grilles and registers
to keep dust out of ductwork. Change as often as necessary. Remove all such temporary filters upon completion. Use supply fans only. Do not operate return fans. B. Blank-off outside
air intake opening during temporary heating period. Install first set of permanent filters and prefilters. C. Adjust dampers on supply system. D. Set all heating coil control valves
for manual operation. E. Do not install any grilles or diffusers at room terminal ends of ducts until permission is given. F. Assume responsibility for systems and equipment at all
times, even though used for temporary heat or ventilating. Repair or replace all dented, scratched or damaged parts of systems prior to final acceptance. G. Remove concrete, rust,
paint spots, other blemishes, then clean. H. Just prior to final acceptance, remove used final filter and install new set. Deliver all unused sets of prefilters to the Owner and obtain
written receipt. Properly lubricate system bearings before and during temporary use. Maintain thermostats, freeze stats, overload devices, and all other safety controls in operating
condition. 1.41 CLEANING A. It is the Contractor's responsibility to keep clean all equipment and fixtures provided under this contract for the duration of the project. Each trade
shall keep the premises free from an accumulation of waste material or rubbish caused by his operations. The facilities require an environment of extreme cleanliness, and it is the
Contractor's responsibility to adhere to the strict regulations regarding procedures on the existing premises. After all tests are made and installations completed satisfactorily:
1. Thoroughly clean entire installation, both exposed surfaces and interiors. 2. Remove all debris caused by work. 3. Remove tools, surplus, materials, when work is finally accepted.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 -
23 1.42 SYSTEM START-UP AND TESTING A. All new heating and ventilating systems shall be started up and operated at normal operating temperature for a period of 24 hours to "bake-off"
the equipment. The associated ventilation system shall run on 100% outside air during the bake-off for an additional eight hours to purge the building. This work shall be completed
prior to [fall school] occupancy or on a Saturday, with the Contractor responsible for being on site during the entire purge and bake-off operation. B. Work of any contract which includes
system "bake-off", system start-up, system cut-over or staff training shall not be done one week prior to and one week after the commencement of school except upon written approval
by the Owner. C. Prior to commencement of work, the Division(s) effecting such system shall survey all building mechanical, plumbing, fire protection and electrical systems and components
and make written notice to the Owner regarding any damage, missing items and/or incomplete systems. Prior to the conclusion of this project, the Contractor shall verify with the Project
Inspector that all building systems have been returned to their original conditions. D. Start-up and testing of HVAC systems shall occur while the building is not occupied by students
and only after notice to the Project Inspector is made at least 24 hours in advance. Division 23 shall be responsible for providing temporary filter media over all supply air registers
and diffusers during the HVAC system start-up procedure. Division 23 shall provide airtight plastic covers over all supply and return air openings prior to the start of construction
by any contractor. The plastic shall be maintained airtight throughout the project construction and removed only with the approval of the Project Inspector. 1.43 TRANSFER OF ELECTRONIC
FILES A. M/E Engineering, P.C. will provide electronic files for the Contractor's use in the preparation of sheet metal shop drawings, coordination drawings, or record drawings related
to the project, subject to a $50.00 charge per drawing file, $2500.00 charge for a Revit model and the following terms and conditions: 1. The Contractor shall submit a formal request
for electronic drawing files on the M/E Engineering, P.C. website, by utilizing the following website link: http://www.meengineering.com/contact-pages/contractor-request 2. M/E Engineering,
P.C. makes no representation as to the compatibility of these files with the Contractor's hardware or the Contractor's software beyond the specific release of the referenced specifications.
3. M/E Engineering can only provide CAD files of M/E/P/FP drawing levels for which we are the Engineer of Record. CAD files of Architectural backgrounds, reflected ceiling plans, structural
plans, etc. must be obtained separately from the Architect of Record. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC ELECTRICAL REQUIREMENTS 260500 - 24 4. Data contained on these electronic files is part of M/E Engineering, P.C.'s instruments of service shall not
be used by the Contractor or anyone else receiving data through or from the Contractor for any purpose other than as convenience in the preparation of shop drawings for the referenced
project. Any other use or reuse by the Contractor or by others will be at the Contractor's sole risk and without liability or legal exposure to M/E Engineering, P.C. The Contractor
agrees to make no claim and hereby waive, to the fullest extent permitted by law, any claim or cause of action of any nature against M/E Engineering, P.C., its officers, directors,
employees, agents or sub-consultants which may arise out of or in connection with the Contractor's use of the electronic files. 5. Furthermore, the Contractor shall, to the fullest
extent permitted by law, indemnify and hold harmless, M/E Engineering, P.C. from all claims, damages, losses and expenses, including attorney's fees arising out of or resulting from
the Contractor's use of these electronic files. 6. These electronic files are not contract documents. Significant difference may arise between these electronic files and corresponding
hard copy contract documents due to addenda, change orders or other revisions. M/E Engineering, P.C. makes no representation regarding the accuracy or completeness of the electronic
files the Contractor receives. In the event that a conflict arises between the signed contract documents prepared by M/E Engineering, P.C. and electronic files, the signed contract
documents shall govern. The Contractor is responsible for determining if any conflicts exist. By the Contractor's use of these electronic files the Contractor is not relieved of the
Contractor's duty to comply with the contract documents, including and without limitation, the need to check, confirm and coordinate all dimensions and details, take field measurements,
field verify conditions and coordinate the Contractor's work with that of other contractors for the project. 1.44 VIDEO RECORDING OF TRAINING SESSIONS A. The contractor shall video
record all training sessions required by their discipline. Video shall be in Windows Media Player video format saved on flash drives. Two (2) copies on flash drives are to be provided
as a formal submittal. . Flash drives are to be tagged with project name, training session name(s), installing Contractor and date of training. The flash drive shall include a scanned
version of the training session sign in list(s), including the presenter and the owner's participants. 1.45 ENERGY INCENTIVES A. The Contractor, his Subcontractors and Suppliers shall
provide to the Owner all paperwork necessary to support the Owners pursuit of incentives related to energy conservation as offered by the utility company or state sponsored incentive
programs. This shall include at a minimum, receipts, and quantities and data sheets for energy efficient equipment such as: lighting, motors, variable frequency drives, etc. END OF
SECTION 260500 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS
260501 - 1 SECTION 260501 - BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.1 DESCRIPTION A. The drawings are diagrammatic, unless detailed dimensioned drawings are included, and
show only approximate locations of equipment, fixtures, panelboards, conduits, and wiring devices. Exact locations are subject to the approval of the Owner's Representative. The general
run of electrical feeders, branch circuits, and conduits, indicated on the drawings, is not intended to be the exact routing. Exact routings of conduit shall suit the job conditions.
B. Circuit designations, in the form of "Home Runs" on branches, indicate the designation of the branch circuit, the size and the quantity of branch circuit conductors, and the panel
board or interconnection box from which the branch circuit is served. C. Make measurements at the site and in the building during construction for all systems installed as the work
progresses in such a manner that the equipment, piping, vents, ducts, conduit, and boxes will fit in the space available. Maintain headroom and if in unfinished areas, be as neatly
installed, as obscure and "out-of-the-way" as physically possible. Where more than one trade is involved in an area, space or chase, all shall cooperate and install their own work
to utilize the space equally between them in proportion to their individual requirements. In general, ductwork shall be given preference except where grading of piping becomes a problem,
followed by piping then electrical wiring. If, after installation of any equipment, piping, ducts, conduit, and boxes, it is determined that ample maintenance and passage space has
not been provided, rearrange work and /or furnish other equipment as required for ample maintenance space. D. Any changes in the size or location of the material or equipment supplied,
which may be necessary in order to meet field conditions or in order to avoid conflicts between trades, shall be brought to the immediate attention of the Owner's Representative and
approval received before such alterations are made. 1.2 QUALITY ASSURANCE A. Electric equipment shall be installed in a neat and workmanlike manner. All methods of construction, details
of workmanship, that are not specifically described or indicated in the contract documents, shall be subject to the control and approval of the Owner's Representative. B. Equipment
and materials shall be of the quality and manufacture indicated in their respective sections of the specifications. The equipment specified is based upon the acceptable manufacturers
listed. Equipment types, device ratings, dimensions, etc., correspond to the nomenclature dictated by those manufacturers. Where "or equal" is stated, equipment shall be equal in every
way to that of the equipment specified and subject to approval. All equipment shall be tested at the factory. Unless specified elsewhere, standard factory inspection and operational
tests will be acceptable. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND
METHODS 260501 - 2 1.3 SUBMITTALS A. Submit product data for the following equipment, materials and products, including all fittings and accessories: 1. Wireway and Wire Trough
2. Channel Support Systems 3. Wiring Devices Including Dimmers 4. Telephone/Data Communication Outlets 5. Flashing, Sealing, Firestopping Materials PART 2 - PRODUCTS 2.1 MATERIALS
A. Conduit, Raceway and Tubing: 1. Rigid Metal Conduit (RMC) shall be hot-dipped galvanized or electro-galvanized steel, UL listed "rigid metal conduit." a. Acceptable Manufacturers:
1) Republic Conduit 2) Allied Tube and Conduit 3) Wheatland Tube Company 4) Approved equal 2. Electrical Metallic Tubing (EMT) shall be electro-galvanized steel; UL listed. a. Acceptable
Manufacturers: 1) Republic Conduit 2) Allied Tube and Conduit 3) Wheatland Tube Company 4) Approved equal 3. Flexible Metal Conduit shall be constructed one continuous length of electrogalvanized,
spirally wound steel strip with interlocking convolutions and interior surfaces free from burrs and sharp edges. Shall be UL listed "flexible metal conduit" or "liquidtight flexible
metal conduit" as required. a. Acceptable Manufacturers: 1) Republic Conduit 2) Allied Tube and Conduit 3) Wheatland Tube Company 4) American Flexible Conduit Company TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 3 B. Conduit Fittings:
1. Fittings for rigid metal conduit shall be fully threaded and shall be of the same material as the respective raceway system. Fittings for electrical metallic tubing shall be single
screw indenter fittings for conduits up to 2 in. and double screw indenter fittings for conduits 2 in. and larger. Connectors shall also have insulated throat or plastic insulating
bushing up to and including 1 in. size. For sizes 1-1/4 in. and larger, provide plastic insulating bushing. Die-cast, pressure cast fittings shall not be used. Fittings for rigid
non-metallic conduit shall be solvent cemented in accordance with the manufacturer's instructions. a. Acceptable Manufacturers: 1) O.Z. Gedney 2) Steel City 3) Thomas & Betts 4) Crouse-Hinds
5) Carlon C. Wireway and Wire Trough: 1. Wireway and Wire Trough shall be hinged cover type wireway with provisions for full lay-in along the entire length of run. Wireway shall be
steel, enclosed with gray enamel finish. Provide NEMA 1 units for interior/dry/clean locations and NEMA 12 for interior dry maintenance/shop/utility locations. Size to meet NEC fill
requirements or larger as noted on Contract Documents. Provide knockouts along runs. Recess in wall where required for flush mounted equipment. Hinge shall be on the bottom of front
face for horizontal mounting. Provide all elbows, tees, pullboxes, fittings, hangers, reducers, supports, supports, etc., to meet installation requirements. a. Acceptable Manufacturers:
1) Square D "Square Duct" 2) General Electric 3) Hoffman 4) Meco D. Channel Support Systems: 1. Channel Support Systems shall be provided for racking of conduit, trapeze suspensions,
equipment support, cable racks and panel racks. Channel shall be steel with electroplated zinc finish for interior dry locations. Provide necessary accessories such as bolts, screws,
anchors, connection plates, and straps as required to perform the necessary functions. Wet location and exterior channel support systems shall be steel with hot dipped galvanized finish
and stainless steel hardware as a minimum. Cut ends shall be touched up with suitable matching finish. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 4 a. Acceptable Manufacturers: 1) Unistrut 2) Globe 3) Kindorf 4) B-Line E. Conductors
and Cables: 1. Conductors shall be insulated for 600 volts, unless otherwise noted, and shall be standard AWG and kcmil sizes. Conductors shall be 98% copper, thermal plastic or cross-linked
polymer insulated, heat and moisture resistant. Conductor sizes No. 18 AWG and smaller shall be a solid single strand; No. 16 AWG and larger shall be multiple stranded. Minimum conductor
size shall be #12 AWG except smaller sizes may be used for communications and special systems. Conductor sizes shall be as called for. Conductors shall be labeled with UL seal and
be marked with the manufacturer's name, wire size and insulation type. Insulation for all 600 volt conductors shall be Type THHN/THWN-2 or Type XHHW-2, unless otherwise noted. All
exterior and underground conductors shall be XHHW-2. Luminaire fixture wire shall conform to the latest Underwriters Laboratories requirements. Flexible cords and cables for general
portable use shall be Type SO or SOOW or as noted. Cables for special use shall be of the type specified for the application. a. Color Coding: 1) All circuits shall be color coded
according to the following schedule. Three Phase 120/208V 240V Ground Green Neutral White A or L1 Black B or L2 Red C or L3 Blue b. Acceptable Manufacturers: 1) General Cable 2)
Prysmian 3) South Wire 4) Okonite 5) Senator TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MATERIALS AND METHODS 260501 - 5 2. Metal Clad, Type "MC" Cable shall consist of thermal plastic insulated copper conductors of size and quantity indicated, protected by
a positive interlocked armor of galvanized steel. The conductors shall be twisted together and shall have an overall moisture and fire resistant fibrous covering. The cable shall
have an integral green insulated full size equipment grounding conductor running its entire length. Where dimming is called for the cable is allowed to include dimming control wiring
with a voltage rating to match the power. The cable shall meet the requirements of the NEC for "Type MC" Metal Clad Cable and shall bear the UL Label. a. Acceptable Manufacturers:
1) Southwire 2) AFC Cable 3) Approved equal F. Terminal Lugs and Connectors: 1. The lug shall be capable of continuous operation at the current rating of the cable it is used on. The
lug shall be UL listed per UL 486A, using industry standard crimping tools and dies. Terminal lugs shall be solderless, pressure type with UL label for "CU/AL" conductor terminations.
The lug shall be a closed-end compression (crimp) type, constructed of seamless, alloy suitable for copper and/or aluminum conductors to match the conductor. The lug shall be made
with a chamfered inside end, for ease of conductor insertion. Both one and two hole lugs shall be NEMA sized for standard stud sizes and spacing. The lug shall be designed for use
at the system voltage. a. Acceptable Manufacturers: 1) 3M Scotchlok 30,000 and 31,000 Series 2) Burndy 3) O.Z./Gedney 4) Thomas and Betts 2. The conductor connection shall be capable
of continuous operation at the current rating of the cables it is used on. The connection shall be UL listed per UL 486A, using industry standard crimping tools and ides. The connector
shall be an inline compression (crimp) type, constructed of seamless, tin-plated copper. The connector shall be constructed with chamfered inside-ends and with center cable stops.
The connector shall be designed for use at the system voltage. a. Acceptable Manufacturers: 1) 3M Scotchlok 10,000 and 11,000 Series 2) Burndy 3) O.Z./Gedney 4) Thomas and Betts TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 6 3. "Split-bolt"
Connectors shall be solderless type. a. Acceptable Manufacturers: 1) Burndy 2) Kearney 3) O.Z./Gedney 4) Thomas and Betts 5) Anderson 4. "TWIST ON" Connectors shall be spiral steel
spring type and insulated with vinyl cap and skirt. a. Acceptable Manufacturers: 1) 3-M Company "Scotch-Lok" 2) Ideal "Wing-Nuts" 3) Approved equal G. Boxes: 1. Outlet boxes shall be
galvanized steel, not less than 2-1/2 in. deep, unless restricted by the surroundings, 4 in. square or octagonal, with knockouts. Boxes and associated fittings, plates and devices
shall be mechanically fastened (screwed), friction fitting is not acceptable. Outlet boxes exposed to moisture, surface mounted, exterior, wet or damp locations shall be cadmium cast
alloy complete with external threaded hubs and gasketed screw fastened covers. Minimum box size shall be as indicated in the NEC for the conductors and devices installed. Boxes shall
be approved for the environmental condition where they will be installed. a. Acceptable Manufacturers: 1) Steel City 2) Raco 3) Appleton 4) Crouse Hinds 2. Telephone/Data Communications
Outlet Boxes: a. 4 in. x 4 in. outlet box with single gang plaster ring with cover plate suitable for indicated communications outlet and conduit routed to accessible ceiling space.
Cover plate shall match the receptacle cover type. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 BASIC MATERIALS AND METHODS 260501 - 7 3. Pull and junction boxes shall be constructed of not less than 14 gauge galvanized steel with trim for flush or surface mounting
in accordance with the location to be installed. Provide screw-on type covers. Boxes installed in damp or wet locations shall be of raintight construction with gasketed cover and
threaded conduit hubs. In no case shall boxes be sized smaller than as indicated NEC for conduit and conductor sizes installed. Boxes shall be approved for the environmental condition
of the location where they will be installed. a. Acceptable Manufacturers: 1) Hoffman 2) Keystone 3) Approved equal H. Terminal and Equipment Cabinets: 1. Terminal and equipment cabinets
shall be code gauge galvanized steel with removable endwalls. Fronts shall be of code gauge steel, flush or surface type (as indicated) with concealed trim clamps, concealed hinges,
flush lock, and grey baked enamel finish. Boxes and front shall be UL listed and shall be minimum 35 in. H x 24 in. W x 6 in. D. Provide removable insulated plywood terminal board
mounted on inside back wall of cabinet. a. Acceptable Manufacturer: 1) Square D "Mono-Flat" 2) Approved equal I. Wiring Devices: 1. Wiring Devices (toggle switches, key switches, receptacles,
dimmers, occupancy sensors, etc.) shall be specification grade as a minimum. Switch handle and receptacle face shall be as directed by the Owner's Representative. Provide device cover
plates of rounded nylon colored to match the device in finished areas and rounded raised (Steel City 450/460 series) only for surface mounted locations in unfinished areas. Provide
neoprene gasketed cast aluminum/zinc box with hinged (for receptacle) rain tight cast aluminum/zinc lockable while in use cover with stainless steel hardware for devices designated
"WP". a. Acceptable Manufacturers: 1) Pass and Seymour 2) Hubbell 3) Leviton TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No.
20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 8 2. Toggle/Snap Switches: a. Units shall be quiet operation, quick make/quick break, rated for 20A/120-277V/1hp
at 120/277V, side/back wired, or with 90° rear plug in termination with pig tail, with nylon/polycarbonate toggle, self grounding mounting screw clip plate (not staple), ground terminal
and silver alloy contacts. Units shall meet latest Federal Specification WS896, NEMA WD-1 and UL Test 20. Single pole units shall be Hubbell HBL1221, P&S 20AC1 or Leviton 1221-2.
Provide two pole, three way, four way, illuminated handle, keyed, etc. type of the same quality and model. b. Momentary Contact: Units shall be as indicated above (20A, 277V, nylon
handle, side/back wired), three position, two circuit/three wire with spring return to center position, provide where indicated and as needed for proper system operation. Hubbell
HBL 1557, P&S 1250, Leviton 1256 or approved equal. Provide keyed operation or pilot light where indicated. When used for lighting controls for vacancy sensor control, provide jumper
across the circuit terminals. 3. Receptacles: a. Provide receptacles where indicated on the drawings and where called for. Provide type receptacle as indicated and if not indicated
then utilize general receptacle. b. General Receptacle: Units shall be NEMA 5-20R, duplex, 20A, 125V, side/back wired, #14 to 10AWG screw terminals or with 90° rear plug in termination
with pig tail with nylon face, indented brass contacts for three point connection, self grounding stainless steel mounting screw clip plate and green ground terminal. Shall meet requirements
of Federal Specification W-C-596, NEMA WD-6 and UL 498. 1) Units shall have 0.03" thick brass contacts, 0.04 inch galvanized steel mounting strap and be: Hubbell BR20, P&S BR20 or
Leviton BR20 (Commercial grade). c. Ground Fault Interrupting Receptacles: Units shall be as specified above for General Receptacle and have 5mA interrupting ground fault level, test/reset
front buttons, full through feed capability, power off on reverse wired sensing, 10kA short circuit current rating, be tamper/weather resistant and in compliance with UL 943. Unit
shall self-test function to periodically test the components automatically and indicate a failure condition utilizing an LED. Shall be Hubbell GFR5362, P&S 2096TR or Leviton S7599TR.
d. Tamper Resistant Receptacles: Units shall be as specified above for General Receptacle and have protective shutters to prevent entry into the line or grounded front openings unless
all plug prongs are present. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS
AND METHODS 260501 - 9 e. USB Power Receptacle: Units shall be as specified above for General Receptacle but have two 15A 125V outlets and two USB charging (3.1A total, 5VDC,
USB 2.0/3.0) outlets. Overall depth shall not exceed 1.35 in. Shall be Hubbell USB20A5 or approved equal. f. Special Receptacles: provide other type receptacles as indicated herein
or on the drawings. Such receptacles shall be Hubbell, P&S or Leviton highest grade available. J. Flashing, Sealing, Fire-stopping: 1. Fire-Stopping for Openings Through Fire and Smoke
Rated Wall and Floor Assemblies: a. Provide materials and products listed or classified by an approved independent testing laboratory for "Through-Penetration Fire-Stop Systems". The
system shall meet the requirements of "Fire Tests of Through-Penetration Fire-Stops" designated ASTM E814. b. Provide fire-stop system seals at all locations where piping, tubing, conduit,
electrical busways/cables/wires, ductwork and similar utilities pass through or penetrate fire rated wall or floor assembly. Provide firestop seal between sleeve and wall for drywall
construction. c. The minimum required fire resistance ratings of the wall or floor assembly shall be maintained by the fire-stop system. The installation shall provide an air and watertight
seal. d. The methods used shall incorporate qualities, which permit the easy removal or addition of electrical conduits or cables without drilling or use of special tools. The product
shall adhere to itself to allow repairs to be made with the same material and permit the vibration, expansion and/or contraction of any items passing through the penetration without
cracking, crumbling and resulting reduction in fire rating. 2. Acceptable Manufacturers: a. Dow Corning Fire-Stop System Foams and Sealants b. Nelson Electric Fire-Stop System Putty,
CLK and WRP c. S-100 FS500/600, Thomas & Betts d. Carborundum Fyre Putty e. 3-M Fire Products TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 10 PART 3 - EXECUTION 3.1 INSTALLATION A. Unless otherwise noted, wiring for all systems
indicated in the contract documents shall consist of insulated conductors installed in raceways. Raceways shall be continuous from outlet box to outlet box and from outlet box to cabinet,
junction or pull box. Secure and bond raceways to all boxes and cabinets so that each system of raceways is electrically continuous throughout. Unless otherwise indicated on the drawings,
install all wiring in the following raceway system: 1. Wiring 600 Volts or Less in Dry Locations: Electrical metallic tubing or type MC cable where allowed. 2. Wiring 600 Volts or
Less in Outdoors, Above Grade Locations: Rigid metal conduit. 3. All Wiring Installed in Corrosive Locations: Schedule 80 rigid non-metallic conduit. 4. Flexible metal conduit shall
be used for final connection to all motors, final connection to rotating or vibrating equipment, final connections to dry type transformers and final connections to recessed lighting
fixtures. Liquidtight flexible conduit shall be used in all wet or damp locations. Maximum length of flexible conduit shall be 36 in., except that from outlet boxes to lighting fixture
maximum length shall be 6 ft. Provide green insulated equipment grounding conductor in all flexible metal conduit. 5. Where allowed, branch circuits may be type MC cable between homerun
junction box and equipment/device connection in drywall partitions only. Homerun junction box to be a maximum of 20 ft. from equipment/device. B. Raceways: 1. Sized as indicated
on the drawings. Where sizes are not indicated, raceways shall be sized as required by the National Electrical Code in accordance with the quantity, size, and type of the insulation
conductors to be installed. Raceways shall be minimum 1/2 in. trade size for branch circuit wiring and minimum 3/4 in. trade size for all telephone intercommunications, instrumentation,
fire alarm, television and computer systems and for all branch circuit "Home Runs" to panelboards. 2. Installed to provide adequate grounding between all outlets and the established
electrical system ground. 3. Cut square, free of burrs due to field cutting or manufacture, and bushed where necessary. Bolt length shall not extend more than 1/4 in. beyond a nut.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 -
11 4. Installed with exterior surfaces not less than 6 in. from any surface with normal operating temperature of 200°F or higher. 5. Plugged at the ends of each roughed-in raceway
with an approved cap or disc to prevent the entrance of foreign materials during construction. 6. Concealed throughout except where exposure is permitted by the Owner's Representative.
All exposed raceways shall be painted to match existing adjacent surface finish as directed by the Architect. 7. Installed parallel or perpendicular to floors, walls and ceilings where
exposed wiring is permitted. 8. Installed with a minimum of bends and offsets. All bends shall be made without kinking or destroying the cross section contour of the raceway. Factory
made bends are acceptable and should be considered for raceways larger than 2 in. 9. Installed with UL approved rain-tight and concrete-tight couplings and connectors. 10. Firmly fastened
within 3 ft. of each outlet box, junction box, cabinet or fitting. Raceways shall not be attached to or supported by wooden plug anchors or supported from mechanical work such as ductwork,
piping, etc. 11. Installed with a #14 AWG fish wire in all telephone, intercommunication, "Spare" or "Empty" conduit runs to facilitate future installation of conductors. 12. Installed
with expansion fittings at all building expansion joints such that no undue stress is placed on any electrical raceway due to the proper functioning of expansion joints. 13. Arranged
in a neat manner for access and allow for access to work installed by other trades. 14. If it is necessary to burn holes through webs of beams or girders, call such points to the attention
of the Owner's Representative and receive written approval both as to location and size of hole before proceeding with work. All holes shall be burned no larger than absolutely necessary.
15. Become familiar with the general construction of the building and place sleeves, inserts, etc., as required. All penetrations through existing floors shall be core drilled and
sleeved. 16. All raceways shall be supported adequately by malleable iron pipe clamps or other approved methods. In exterior or wet locations, supports shall allow not less than 1/4
in. air space between raceway and wall. Firmly fasten raceway within 3 ft. of each outlet box, junction box, cabinet or fitting. The following table lists maximum spacing between
conditions, strength of supporting members, etc. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
BASIC MATERIALS AND METHODS 260501 - 12 17. Furnish and install such supports at no additional cost to owner. Conduit Trade Size Type of Run Horizontal Spacing in Feet Vertical
Spacing in Feet 1/2 in., 3/4 in. Concealed 7 10 1 in., 1-1/4 in. Concealed 8 10 1-1/2 in. and larger Concealed 10 10 1/2 in., 3/4 in. Exposed 5 7 1 in., 1-1/4 in. Exposed 7 8 1-1/2
in. and larger Exposed 10 10 18. Where raceways puncture roof, install pitch pockets as required in order that the roof warranty is maintained. Coordinate with representative of roofing
material manufacturer. 19. At each flush mounted panelboard, terminal cabinet, control cabinet, etc., provide four (4) spare 3/4 in. raceways from panelboard, etc., to an area above
the nearest accessible ceiling space. Make 90° turn above the ceiling, arranged for further continuation of raceway, and cap. 20. Provide a bushing at each conduit termination unless
fitting at box where conduit terminates has hubs designed in such a manner to afford equal protection to conductors. Provide grounding type insulated bushings on all conduit sizes
2 in. trade size and largerand on all feeder raceways regardless of size. Provide standard bushings for conduits 1 in. and smaller unless otherwise stated. 21. Differing Temperatures:
For raceways routed between areas with differing temperatures (interior to exterior, walk in coolers/freezers, environmental chambers, etc.) install raceway as follows: a. Provide
a thermal break, 4 in. minimum of stainless steel or Schedule 40 PVC conduit within space wall/separation. b. Seal raceway penetration through the wall/separation. c. Provide a box
on each side of the space wall/separation. d. Provide raceway interior sealant (duct seal or suitable foam) to provide a complete air barrier after conductors are installed. e. Mounting
of raceway and boxes on equipment shall be coordinated and approved by the equipment manufacturer. 22. Raceway installed in wet/damp locations or on exterior walls shall have a spacer
manufactured for this purpose provided to maintain a space/void between the mounting surface and the raceway. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 13 C. Wiring Methods: 1. Conductors shall not be installed until raceway
system, including all outlets, cabinets, bushings and fittings, is completed. Verify that all work of other trades which may cause conductor damage is completed. Use only U.L. approved
cable lubricants when necessary. Do not use mechanical means to pull conductors No. 8 or smaller. 2. In general, conductors shall be the same size from the last protective device to
the load. 3. All wiring systems shall be properly grounded and continuously polarized throughout, following the color-coding specified. Connect branch circuit wiring at panelboards,
as required, in order to provide a "balanced" three-phase load on feeders. 4. Provide insulated green ground conductor in each branch circuit. 5. All feeder connections shall be made
to bus and other equipment using solderless, pressure type terminal lugs. 6. Branch circuits connected to a 20A circuit breaker shall be sized as indicated except for lengths exceeding
75 ft. For circuits longer than 75 ft. to 100 ft. utilize No. 10 AWG conductors (line, neutral and ground) and for circuits from 100 ft. to 150 ft. utilize No. 8 AWG (line, neutral
and ground) unless otherwise indicated. Conduit size shall be modified in accordance with the NEC. 7. For splices and taps, No. 10 AWG and smaller, use solderless "twist on" connectors
having spiral steel spring and insulated with a vinyl cap and skirt. 8. For splices and taps, No. 8 and larger, use insulated solderless set screw AL/CU or hydraulically compressed
sleeve fittings suitable for the intended use. 9. Use cast connections for ground conductors. 10. Provide minimum 6 in. of spare/slack of each conductor in each junction or pull box
and termination. 11. Make all splices and connections in accessible boxes and cabinets only. 12. Cover uninsulated splices, joints, and free ends of conductor with rubber and friction
tape of PVC electrical tape. Plastic insulating caps may serve as insulation. Heat shrink sleeves shall be acceptable for crimp type splices. 13. On termination at branch circuit
outlets, leave a minimum of 8 in. free conductor for installation of devices and fixtures. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT
Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 14 14. Feeder conductors shall be continuous from point of origin to load termination without
splice. If this is not practical, contact the Owner's Representative and receive written approval for splicing prior to installation of feeder(s). Where feeder conductors pass through
junction and pull boxes, bind and lace conductors of each feeder together. For parallel sets of conductors, match lengths of conductors as near equal as possible. 15. Branch circuit
conductors installed in panelboards, and control conductors installed in control cabinets and panels shall be neatly bound together using "TyRaps" or equal. 16. Lighting fixtures, detectors,
etc., in mechanical equipment, boiler and pump rooms shall be installed with exposed wiring after equipment, ductwork, piping, etc., are in place. In general, lighting shall be as
located on the drawings; where conflicts exist, locate lights for best distribution. 17. Provide cable/conductor vertical support in accordance with the NEC. D. Outlet Boxes: 1. Consider
location of outlets shown on drawings as approximate only. Study architectural, process piping, mechanical, plumbing, structural, roughing-in, etc., drawings and note surrounding areas
in which each outlet is to be located. Locate outlet so that when fixtures, motors, cabinets, equipment, etc., are placed in position, outlet will serve its desired purpose. Where
conflicts are noted between drawings, contact Owner's Representative for decision prior to installation. Comply with the NEC relative to position of outlet boxes in finished ceilings
and walls. 2. Prior to installation, relocate any outlet location a distance of 5 ft. in any direction from location indicated on drawings if so directed by the Owner's Representative.
Prior to completion of wall construction, adjust vertical height of any outlet from height indicated if so directed by Owner's Representative. The above modifications shall be made
at no additional cost to the Owner. 3. Where outlets at different mounting heights are indicated on drawings adjacent to each other (due to lack of physical space to show symbol on
drawings), install outlets on a common vertical line. 4. Where switch outlets are shown adjacent to strike side of door, locate edge of outlet box approximately 3 in. from door frame.
5. Outlet boxes in separate rooms shall not be installed "back-to-back" without the approval of the Owner's Representative. 6. Outlet boxes shall be sized to accommodate the wiring,
splices and device(s) to be installed in accordance with the NEC. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 /
M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 15 7. Outlet boxes installed in plaster, gypsum board or wood paneled hollow cavity walls shall be installed flush with
raised plaster covers or raised tile covers. Boxes shall be mechanically fastened and supported by two (2) adjacent structural members (studs) with cross brackets (Garvin Industries
Model BMB or approved equal). 8. Outlet boxes installed in tile, brick or concrete block walls shall be installed flush and have extra-deep type raised tile covers or shall be 3-1/2
in. deep boxes with square corners and dimensions to accommodate conductors installed. 9. Surface ceiling mounted outlet boxes shall be minimum 4 in. square, 1-1/2 in. deep, galvanized
sheet metal. 10. Surface wall mounted outlet boxes shall be cast type boxes. 11. Floor outlet boxes shall be installed flush with finished floor, adjust level and tile as required.
Where finished floor is terrazzo, provide boxes specifically designed for installation in terrazzo. Where floors are to receive carpet or flooring material, coordinate with appropriate
trade and provide insert. Rectangular covers shall be parallel and perpendicular with the building or, if used, floor tile/floor joints/pattern. Coordinate cover type with the flooring
and device type. 12. Install a device cover plate over each and every outlet indicated on drawings. Do not install plates until painting, cleaning and finishing of surfaces surrounding
the outlet are complete. Install single one-piece multi-gang covers over multi-gang devices. E. Receptacles: 1. Provide hospital grade receptacle for all hospital construction. 2.
Ground opening shall be up for vertical installation and on the left for horizontal installation. F. Toggle Switches: 1. Switches shall be installed in accessible locations near room/space
entryway(s). 2. Provide lighted handle switches in mechanical rooms, elevator pits, electric rooms, etc. 3. Switches shall have neutral pulled through the box even if not used.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 -
16 G. Junction and Pull Boxes: 1. Install junction and pull boxes in readily accessible locations. Access to boxes shall not be blocked by equipment, piping, ducts and the like. Provide
all necessary junction or pull boxes required due to field conditions and size as require by the National Electrical Code. H. Equipment Mounting Heights: 1. Unless otherwise noted,
mount devices and equipment at heights measured from finished floor to device/equipment centerline as follows: a. Toggle switches (up position "on") 46 in. b. Wall lighting controls
(dimmer, digital switch, etc. 46 in. c. Receptacle outlets (long dimension vertical, ground" pole farthest from floor) 18 in. d. Receptacle outlets above counters 8 in. above counters
e. Receptacle outlets, above hot water or steam baseboard heaters. Do not install receptacle outlets above electric baseboard heaters 30 in. f. Receptacle outlets, hazardous areas;
also for refrigerators 48 in. g. Receptacle outlets, weatherproof, abovegrade 24 in. h. Telephone outlets 18 in. i. Telephone outlets, wall mounted 46 in. j. T.V. outlet 18 in.
k. Fire alarm manual stations 46 in. l. Fire alarm combination audio/visual and standalone visual device (entire strobe lens at heights indicated) 80 in. to bottom of the notification
device m. Standalone fire alarm audio device 90 in. (min) to 96 in. (max) TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 17 n. Distribution panelboards, to top of backbox 72 in. o. Terminal cabinets, control cabinets, to top of backbox
72 in. p. Disconnect switches, motor starters, enclosed circuit breakers. 48 in. 2. Where structural or other interferences prevent compliance with mounting heights listed above, consult
Owner's Representative for approval to change location before installation. I. Hangers and Supports: 1. Provide steel angles, channels and other materials necessary for the proper support
and erection of motor starters, distribution panelboards, large disconnect switches, large circuit breakers, pendant mounted lighting fixtures, etc. 2. Panelboards, disconnect switches,
circuit breakers, cabinets, large pull boxes, adjustable speed drives, cable support boxes and starters shall be secured to the building structure and not supported from conduits.
Small panelboards, etc., as approved by Owner's Representative, may be supported on walls. Racks for support of conduits and heavy electrical equipment shall be secured to building
construction by substantial structural supports. J. Identification: 1. Provide engraved lamicoid identification nameplates on switchboards, main service disconnects, transfer switches,
motor control centers and on all panelboards using designation shown in panelboard schedule. Include voltage, phase, equipment served, voltage source to panel or equipment. 2. Provide
engraved lamicoid identification nameplates for each circuit breaker in the main distribution panel listing the panelboard or equipment connected to each device. 3. Provide engraved
lamicoid identification nameplates on all items of equipment including individual circuit breaker enclosures and disconnect switches, listing the equipment connected to the particular
device provided under Specification Section 262000, including, but not limited to: starters, disconnect switches, adjustable speed drives, circuit breakers, etc. Include voltage,
phase, equipment served, voltage source to panel or equipment. 4. Provide complete type written directory for each panelboard listing room number, function, etc., for each circuit breaker.
Directory shall be placed in a plastic clear sleeve in the interior of the panelboard door. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 BASIC MATERIALS AND METHODS 260501 - 18 5. Nameplates shall be engraved black, with white core, with Helvetica medium 3/16 in.
lettering. 1/8 in. lettering is acceptable where space of 3/16 in. is not available. 6. Identify junction and pullboxes for particular service and circuit such as power, emergency
power, lighting, fire alarm, telephone, interphone, public address, nurse call, etc. using stencil lettering on cover. 7. Using adhesive backed printed tape label (white background,
black lettering) all receptacle and switch coverplates, power poles, etc. listing panel designation and circuit number. Tape shall be attached to outside or inside of receptacle or
switch coverplates, as determined by Owner's representative. K. Spare Parts: 1. Deliver to Owner and obtain receipt for spare parts including key switches, fuses, etc. 3.2 TESTS A.
Branch circuits shall be tested during installation for continuity and identification and shall pass operational tests to determine that all circuits perform the function for which
they are designed. For all feeder and exterior branch circuit wiring rated 600 volts or less, provide 1,000 volt "Megger" insulation test prior to energizing feeders. Use a 1,000-volt
motor driven megger for all tests. Test voltage shall be applied until readings reach a constant value, and until three (3) equal readings, each one (1) minute apart, are obtained.
Minimum megger reading shall be 45 megohms for feeder conductors. Document test results and submit for approval prior to energizing conductors. END OF SECTION 260501 TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC DISTRIBUTION 262000 - 1 SECTION 262000
- ELECTRIC DISTRIBUTION PART 1 - GENERAL 1.1 DESCRIPTION A. Provide a complete distribution system as indicated on the Contract Documents and as specified herein. 1.2 QUALITY ASSURANCE
A. All methods of construction, details of workmanship, that are not specifically described or indicated in the contract documents, shall be subject to the control and approval of the
Owner's Representative. Equipment and materials shall be of the quality and manufacture indicated in their respective sections of the specifications. The equipment specified is based
upon the acceptable manufacturers listed. Equipment types, device ratings, dimensions, etc., correspond to the nomenclature dictated by those manufacturers. Where "or equal" is stated,
equipment shall be equivalent in every way to that of the equipment specified and subject to approval. All equipment shall be tested at the factory. Unless specified elsewhere, standard
factory inspection and operational tests will be acceptable. B. Installation shall be in accordance with NFPA-70 (National Electrical Code), National Electrical Safety Code (NESC),
state codes, local codes, and requirements of authority having jurisdiction. C. Equipment shall be designed, manufactured, assembled, and tested in accordance with the latest revisions
of applicable published ANSI, NEMA, UL and IEEE Standards. 1.3 SUBMITTALS A. Submit the following product data/information: 1. Manufacturer and equipment type. 2. Standard catalog
information sheet. 3. Detailed shop drawings indicating plan, elevation, end and isometric views. Top and bottom conduit areas shall be clearly shown and dimensioned on the drawings.
4. Complete Bill of Materials. 5. All relevant ratings including, but not limited to, voltage, current, interrupting and withstand. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC DISTRIBUTION 262000 - 2 B. Overcurrent Device Information. Submit product data and
information for the following equipment, materials, products, etc.: 1. Distribution and branch circuit panelboards. 2. Disconnect switches. 1.4 WARRANTY A. Provide full system warranty
(labor, travel, equipment, etc.) in accordance with Division 1 and a minimum of one (1) year from acceptance. PART 2 - PRODUCTS 2.1 MATERIALS A. Branch Circuit Panelboards (480Y/277
volt, 208Y/120 volt, 240/120 volts): 1. Provide branch circuit panelboard as indicated in the "Panelboard Schedule" and as located on the drawings. Panelboards shall be equipped with
quick make/quick break thermal-magnetic, molded case circuit breakers as scheduled. Shall be NRTL listed for use as service entrance equipment where used at the service entrance. 2.
Panelboard bussing and lugs shall be copper. Provide grounding bus in each panelboard, securely bonded to the box. Panelboard bus structure and main lugs or main circuit breaker shall
have current ratings as indicated. Such ratings shall be established by heat rise tests, conducted in accordance with UL Standard 67. 3. Provisions for additional circuit breakers
shall be such that field addition of connectors or mounting hardware will not be required to add circuit breakers to the panelboard. Bus connections shall be bolt-on. 4. Each panelboard,
as a complete unit, shall have a short circuit current rating equal to or greater than the rating shown on the Panelboard Schedule or on the plans. All panelboards shall be fully rated.
"Series Ratings" are NOT acceptable. Reducing breaker ratings on the basis of series rating is not acceptable. 5. The panelboard bus assembly shall be enclosed in a steel cabinet.
The rigidity and gauge of steel to be specified in UL Standard 50 cabinets. Wiring gutter space shall be in accordance with UL Standard 67 for panelboards. Each front shall include
a door and have a flush, stainless steel, cylinder type lock with catch and spring-loaded door pull. All panelboard locks shall be keyed alike. Doors shall be mounted by completely
concealed steel hinges. A circuit directory frame and card with a clear plastic covering shall be provided on the inside of the door. Fronts shall be of code gauge, full-finished
steel with rust inhibiting iron phosphate sealer and baked enamel finish. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 ELECTRIC DISTRIBUTION 262000 - 3 Minimum box width shall be 20 in. Provide full length piano-hinged trim allowing access to wiring gutters without removal
of trim. 6. Panelboards with main circuit breaker shall have inherent and listed coordination of the main and branch circuit breakers. 7. Ratings shall be as indicted on the Panelboard
Schedule. 8. Manufacturers: Subject to compliance with Contract Documents, the following manufacturers are acceptable: a. 208Y/120 Volt and 240/120 Volt: 1) Square D "NQ" - Design
Make. 2) Eaton Corporation "PRL1". 3) General Electric by ABB "AQ". 4) Siemens. B. Circuit Breakers: 1. Circuit breakers below 400 amp frame shall be molded case with inverse time and
instantaneous tripping functions, unless indicated otherwise in contract documents. 2. Listed combination of coordinated circuit breakers shall be verified by the equipment manufacturer
utilizing published data sheets. Confirm listings shall be submitted. 3. Lugs shall be mechanical, rated for 60/75° AL/Cu. 4. Branch circuit breakers shall be quick-make, quick-break,
thermal-magnetic and trip indicating, and multipole breakers shall have common trip. Single pole 15 and 20 ampere circuit breakers shall be UL listed as "Switching Breakers" at 120V
ac or 277 V ac and carry the SWD marking. 5. Ground-Fault circuit breakers shall be quick-make, quick-break, thermalmagnetic, 5 milliampere ground fault sensing and trip indicating,
and multipole breakers shall have common trip. The ground fault circuit breakers shall not occupy any more space than a standard breaker of the same number of poles. 6. Ground Fault
Protective circuit breakers shall be utilized for electric heating equipment and where indicated. These shall be quick-make, quick-break, thermal-magnetic, 30 milliampere ground fault
sensing and trip indicating, and multipole breakers shall have common trip. The ground fault circuit breakers shall not occupy any more space than a standard breaker of the same number
of poles. 7. Ratings shall be as indicated in the Contract Documents. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 ELECTRIC DISTRIBUTION 262000 - 4 8. Manufacturers: Shall match panelboard manufacturer and shall be compatible with the panelboard the circuit breakers
are being installed in. 9. Enclosed circuit breakers shall be molded case, thermal-magnetic type, ratings as noted, with overcenter, trip-free, toggle-type operating mechanism, quick
make/quick break action and positive handle indication. Multiple pole breakers shall be common trip type. Each circuit breaker shall have a permanent trip unit containing individual
thermal and magnetic trip elements in each pose. Provide provisions for padlocking in the "off" position. Breakers shall be calibrated for operation in an ambient temperature of 40°C
and shall be suitable for mounting and operating in any position. Breakers shall have removable lugs, UL listed for copper and aluminum conductors. Breakers shall be installed in
NEMA 1 general purpose, surface enclosures, unless otherwise noted. a. Manufacturers: Subject to compliance with Contract Documents, the following manufacturers are acceptable: 1)
Square D 2) Cutler Hammer 3) General Electric by ABB 4) Siemens C. Disconnect Switches: 1. Shall be heavy-duty type three-pole, with "Quick Make/Quick Break" operating handle mechanically
interlocked with the cover, horsepower and voltage rated to match equipment served. Where indicated switches shall be provided with dualelement, time delay, rejection type fuses.
Switches shall be installed in NEMA 1 for indoor use, NEMA 3R for outdoor use. Provide provisions for padlocking in the "off" position. Provide neutral bar in single phase or three
phase, four wire circuits, and ground bar in all switches. Provide auxiliary contacts where called for. 2. Manufacturers: Subject to compliance with Contract Documents, the following
manufacturers are acceptable: a. Square-D - Design Make. b. Cutler Hammer. c. General Electric. d. Siemens. D. Fuses: 1. All fuses rated 600 volts and below shall be rejection type
dual-element, timedelay type. Provide two (2) complete sets of fuses for all fusible devices. Deliver spare fuses to the Owner and obtain receipt. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ELECTRIC DISTRIBUTION 262000 - 5 2. Manufacturers: Subject to compliance
with Contract Documents, the following manufacturers are acceptable: a. Fuses 600 Amperes and Below: Bussman Type FRS-R (600 volts), Bussman Type FRN-R (300 volts) or equivalent. b.
Fuses Rated Above 600 Amperes: Bussman Type KRP-C or equivalent. PART 3 - EXECUTION 3.1 INSTALLATION A. All equipment shall be grounded per the NEC. B. Electrical distribution equipment
shall have lugs/terminations suitable for the indicated conductor size. Where conductors have been oversized for voltage drop and where approved by the Engineer it shall be allowed
to reduce the conductor size using hydraulically crimpled splice in a box next to the distribution equipment to allow for standard lug termination. C. Provide pad lockable branch circuit
breaker device to hold circuit breaker in the closed position, but not prevent overcurrent protection, for all branch circuits serving fire alarm controls panels, emergency lighting
and life safety branch circuits. D. Identification: 1. Identify all items of equipment as described in Section 260501-3.1, Identification. Identification shall be provided for switchboards,
panelboards, transformers, ASD's, motor starters, disconnect switches, enclosed circuit breakers, switchboard main/distribution breakers, MCC's automatic transfer switches, UPS's, generators,
surge suppression devices, control panels, switchgear, etc. 2. Switchboards, panelboards, MCC's, switchgear, etc. shall have a label indicating name/tag ID, feeder source, conductor
color convention and for service entrance locations the available short circuit current. 3.2 CLEANING A. At the completion of the project, while equipment is de-energized, it shall
be thoroughly cleaned to a shipped condition using methods in accordance with the manufacturer's recommendations. Utilize vacuum for cleaning and not compressed gas. 3.3 SPARE PARTS
A. Deliver loose equipment to the Owner and obtain receipt for fuses, keys to panelboards, etc. END OF SECTION 262000 THIS PAGE INTENTIONALLY LEFT BLANK TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS 262913 - 1 SECTION 262913 - MOTOR CONTROLLERS
PART 1 - GENERAL 1.1 DESCRIPTION A. Provide labor, materials, equipment and services as required for the complete installation and full operation of separately enclosed, preassembled,
motor controls, rated 600V and less. 1.2 DEFINITIONS A. ASD: Adjustable speed drive motor controller. B. CPT: Control power transformer. C. DDC: Direct digital control. Building
management/control system. D. EMI: Electromagnetic interference. E. PWM: Pulse width modulated. F. RFI: Radio-frequency interference. 1.3 SUBMITTALS A. Submit manufacturer's product
data for each type and rating of motor controller indicated. 1. Include dimensions, weights, enclosure types, rating capacities, operating characteristics, electrical characteristics,
furnished specialties and accessories, mounting and attachment details, method of field assembly, components, and location / size of each field connection. 2. Include diagrams for power,
signal, and control wiring. B. As part of Operation and Maintenance Data, provide manufacturer's written instructions for testing, adjusting, and reprogramming microprocessor control
modules, setting fieldadjustable timers, controls, and status and alarm points, and setting field-adjustable overload relays. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS 262913 - 2 1.4 QUALITY ASSURANCE A. All methods of construction, details of workmanship,
that are not specifically described or indicated in the contract documents, shall be subject to the control and approval of the Owner's Representative. Equipment and materials shall
be of the quality and manufacture indicated in their respective sections of the specifications. The equipment specified is based upon the acceptable manufacturers listed. Equipment
types, device ratings, dimensions, etc., correspond to the nomenclature dictated by those manufacturers. Where "or equal" is stated, equipment shall be equivalent in every way to that
of the equipment specified and subject to approval. All equipment shall be tested at the factory. Unless specified elsewhere, standard factory inspection and operational tests will
be acceptable. B. Installation shall be in accordance with the manufacturer's recommendations, NFPA-70 (National Electrical Code), National Electrical Safety Code (NESC), state codes,
local codes, and requirements of authority having jurisdiction. C. Equipment shall be designed, manufactured, assembled, and tested in accordance with the latest revisions of applicable
published ANSI, NEMA, UL and IEEE Standards. D. Equipment and systems shall be NRTL tested and labeled. 1.5 WARRANTY A. Provide full system warranty (labor, travel, equipment, etc.)
in accordance with Division 1 with a minimum of one (1) year from acceptance. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Acceptable manufacturers include: B. Manual and Magnetic Motor Controllers:
1. Square-D - Design Make 2. Cutler Hammer 3. General Electric 4. Allen-Bradley 5. Siemens 2.2 MOTOR STARTERS A. Provide motor starters as listed on the Electric Equipment and Control
Schedule on the drawings. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS
262913 - 3 B. Starters, contactors and controllers shall comply with NEMA standards having general purpose NEMA 1 or 1B enclosure unless otherwise called for. Provide explosion
proof, weather resistant or watertight construction as required. Starters shall be minimum NEMA size 0 with solid state overloads in each phase sized per NEC, motor full load amperage,
service factor, and motor operating conditions. C. Pad lock arrangements shall be provided to lock the disconnect device in the "off" position. Magnetic starters shall be provided
with a control power transformer with 120V secondary and primary and secondary fusing and be sized to accept the loads imposed there on. Starters shall have LED type pilot lights.
Each starter subject to electrical interlock and/or automatic control shall have necessary auxiliary contacts. D. Auxiliary Devices: Provide pushbutton stations, pilot lights, devices,
relays, transformers, selector switches, electric thermostats, auxiliary starter contacts as required for functions called for. Provide separate relay for each speed to operate electric
dampers or other devices as required for multispeed motor circuit. E. Manual Motor Starter: 1. Provide all starters with thermal overload(s); and pilot light(s), and handle lockout
provisions. Gang starter with selector switch for multispeed applications. Provide single or 2-pole as required: a. 120 volt, single-pole, surface mounted: Square-D FG-5P and handle
guard. b. 240 volt, two-pole, surface mounted: Square-D FG-6P and handle guard. c. 120 volt, single-pole, H-O-A selector, surface mounted: Square-D FG71P and handle guard. d. 240
volt, two-pole, H-O-A selector, surface mounted: Square-D FG-72P and handle guard. F. Manual Motor Starter - Speed Controller: Shall be similar to "Manual Motor Starter," above, except
two-gang with motor speed control sized to handle motor indicated, with positive full on and full off bypass of speed control unit. G. Manual Starter with Relay: Shall be similar to
"Manual Motor Starter," above, except to include a two-gang box with relay sized for load indicated, and hand-off-automatic switch. Connect relay for 120V operation on load side of
starter in "automatic" mode. Coordinate connection of Form C maintained contact for control with Mechanical Contractor. H. Magnetic Starter: Shall be single-speed, across-the-line
type rated in accordance with NEMA standards, sizes and horsepower ratings. Starters shall be mounted in NEMA 1 enclosures unless otherwise indicated. Magnetic starters shall be equipped
with fused control power transformer for 120V control power and double break silver alloy contacts; all contacts shall be replaceable without removing starter or disconnecting power
wiring. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS 262913 - 4
Starter shall have straight-through wiring. Coils shall be of molded construction and shall be replaceable from the front without removing starter. Overload relays shall be solid
state type with replaceable control circuit module. Thermal units shall be of onepiece construction and interchangeable. Starter shall be inoperative if thermal unit is removed.
Provide hand-off-auto selector switch and "run" pilot light in cover. Wire for maintained contact unless otherwise noted. I. Combination Magnetic Starter: Shall be similar to "Magnetic
Starter," above, except shall include fusible disconnect switch connected ahead of starter. The disconnect handle shall be in control of the disconnect device with the door open or
closed. Disconnect handle shall be clearly marked as to whether the disconnect device is "on" or "off". J. Packaged Control Unit: Shall be furnished and mounted by others, and
[installed and] connected by Electrical Contractor. Generally consists of one or more starters, disconnect switches and additional control devices prewired. K. Contactor: Shall be
similar to "Magnetic Starter", above, except without thermal overload units. 2.3 ENCLOSURES A. Enclosures: NEMA 250, to comply with environmental conditions at installed location.
Provide Type 1 for dry and clean indoor locations, Type 3R for outdoor locations, Type 4X stainless steel for kitchen and wash-down areas, and Type 12 for areas subject to dust, falling
dirt, and dripping non corrosive liquids. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas, surfaces, and substrates to receive motor controllers, with installer present, for compliance
with requirements for installation tolerances, and other conditions affecting performance of the Work. B. Examine motor controllers before installation. Reject motor controllers that
are wet, moisture damaged, or mold damaged. C. Examine roughing-in for conduit systems to verify actual locations of conduit connections before motor controller installation. D. Prepare
written report, endorsed by Installer, listing conditions detrimental to performance of the Work. E. Proceed with installation only after unsatisfactory conditions have been corrected.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS 262913 - 5 3.2 INSTALLATION
A. Wall-Mounted Manual and Magnetic Controllers: Install on walls with tops at uniform height, and by bolting units to wall or mounting on lightweight structural-steel channels bolted
to wall. For controllers not at walls, provide freestanding racks. B. Install fuses, heaters in thermal-overload relays (based on actual nameplate full-load amperes) after motors are
installed, and install, connect, and fuse thermal-protector monitoring relays furnished with motor-driven equipment. C. Maintain minimum clearances and workspace at equipment according
to manufacturer's written instructions and NFPA 70. D. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's
limitations on bending radii. Install lacing bars and distribution spools. E. Setting of Overload Relays: Select and set overloads on the basis of full-load current rating as shown
on motor nameplate. Adjust setting value for special motors as required by NFPA 70 for motors that are high-torque, high-efficiency, and so on. F. Comply with NECA 1. 3.3 CONTROL WIRING
INSTALLATION A. Bundle, train, and support wiring in enclosures. B. Connect selector switches and other automatic-control devices where applicable. C. Connect selector switches to bypass
only those manual- and automatic-control devices that have no safety functions when switches are in manual-control position. D. Connect selector switches with control circuit in both
manual and automatic positions for safety-type control devices such as low- and high-pressure cutouts, high-temperature cutouts, and motor-overload protectors. 3.4 IDENTIFICATION A.
Identify motor controllers, components, and control wiring. Identify field-installed conductors, interconnecting wiring, and components; provide warning signs. Label each ASD with
engraved nameplate. Label each enclosure-mounted control and pilot device. Identify all items as described in Section 260501 3.5 FIELD QUALITY CONTROL A. Engage a factory-authorized
service representative to test and inspect components, assemblies, and equipment installations, including connections. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR CONTROLLERS 262913 - 6 B. Tests and Inspections for Manual and Magnetic Motor Controllers: 1.
Comply with the provisions of NFPA 70B, "Testing and Test Methods" Chapter. 2. Visual and Mechanical Inspection: a. Compare equipment nameplate data with drawings and specifications.
b. Inspect physical and mechanical condition, anchorage, alignment, and grounding, and that the controller is clean. c. Inspect contactors: Verify mechanical operation and contact
gap, wipe, alignment, and pressure are according to manufacturer's published data. d. Motor-Running Protection: Verify overload element rating is correct for its application and if
protection is provided by fuses, verify correct fuse rating. e. Inspect bolted electrical connections for high resistance using one of the two following methods: 1) Use a low-resistance
ohmmeter. Compare bolted connection resistance values with values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50
percent of the lowest value. 2) Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS
Table 100.12. Bolt-torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS Table 100.12. f. Verify appropriate
lubrication on moving current-carrying parts and on moving and sliding surfaces. C. Motor controllers will be considered defective if they do not pass tests and inspections. D. Prepare
test and inspection reports, including a certified report that identifies the ASD and describes results. Include notation of deficiencies detected, remedial action taken, and observations
made after remedial action. 3.6 STARTUP SERVICE A. Engage a factory-authorized service representative to perform startup service. Complete installation and startup checks according
to manufacturer's written instructions. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 MOTOR
CONTROLLERS 262913 - 7 3.7 ADJUSTING A. Set field-adjustable switches, auxiliary relays, time-delay relays, timers, and overloadrelay pickup and trip ranges. B. Adjust carrier
frequency for optimal operation with load and conditions. C. Adjust the trip settings of instantaneous-only circuit breakers and thermal-magnetic circuit breakers with adjustable, instantaneous
trip elements. Initially adjust to 6 times the motor nameplate full-load amperes and attempt to start motors several times, allowing for motor cool-down between starts. If tripping
occurs on motor inrush, adjust settings in increments until motors start without tripping. Do not exceed 8 times the motor full-load amperes (or 11 times for NEMA Premium Efficient
motors if required). Where these maximum settings do not allow starting of a motor, notify Architect before increasing settings. 3.8 DEMONSTRATION A. Engage a factory-authorized service
representative to train Owner's maintenance personnel to adjust, operate, reprogram, and maintain motor controllers. END OF SECTION 262913 THIS PAGE INTENTIONALLY
LEFT BLANK TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 1 SECTION
265000 - LIGHTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
Sections, apply to this Section. 1.2 DESCRIPTION A. Provide interior and exterior lighting systems, including luminaires, hangers, supports, fittings, lamps, wiring, connections and
controls, as indicated in the Contract Documents for complete and operational systems. The lighting layouts on the drawings are diagrammatic only. Refer to architectural "Reflected
Ceiling Plans" for exact location of interior luminaires. Luminaires, in general, have been specified for the particular type of ceiling in which they are to be installed. Verify
the ceiling construction details and provide luminaires suitable for the respective ceiling types and room finish schedule. 1.3 REFERENCES A. The following standards, criteria, codes,
etc. shall be followed in the manufacture and installation of the lighting systems. 1. NFPA 2. NEC 3. IESNA 4. NEMA 5. ANSI 6. UL 1.4 QUALITY ASSURANCE A. Luminaires shall be as
specified in the "Luminaire Schedule". Luminaire types, appearance, characteristics, photometrics, finishes, etc., correspond to the specified manufacturer and associated series or
catalog number listed in the "Luminaire Schedule". Products of other listed acceptable manufacturers shall be equivalent in every way to that of the luminaire specified. The Engineer
reserves the right to disapprove any luminaire type submitted which they feel is not equal in quality, appearance or performance to the luminaire specified. B. Manufacturer's luminaire
series or catalog numbers listed in the "Luminaire Schedule" indicate quality, type, and style, but may not cover required special design details. Provide luminaires having such special
details as noted in the "Luminaire Schedule", as indicated by the specified luminaire model number and as required for proper installation. C. All luminaires shall be new and bear
a Nationally Recognized Testing Laboratories (NRTL) label for the service intended. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 2 D. Luminaires shall be products of manufacturers regularly engaged in the manufacture of the type of luminaires specified
and shall be the manufacturer's latest standard design that complies with specification requirements. E. Verify the availability of all luminaires proposed to be used in the execution
of the work prior to submitting same for approval. The discontinuance of production of any luminaire after such approval has been granted shall not relieve the Contractor from furnishing
an approved luminaire of comparable quality and design at no additional cost. F. Photometric and operational data shall be provided only by qualified and certified organizations.
Certification documentation shall be submitted with the luminaire information. G. Should there be any difference between drawings and schedules, secure from Architect/Engineer such
information as necessary prior to providing proposal. When finishes are not definitely specified, they shall be as selected by the Architect and not be limited to standard finishes.
H. Locations indicated for luminaires are approximate. Field coordinate exact locations as near as possible to the location indicated. Coordinate with the Engineer for any major
location changes. 1.5 SUBMITTALS A. Product Data: For each luminaire type, include in a single submittal, in order of luminaire designation, the catalog "cut" sheet with complete manufacturer
and model number. Product data should include the following: 1. Manufacturer and Catalog Number. 2. Features, accessories, materials and finishes. 3. Physical description and dimensions
of luminaires. 4. Life, power input, output (lumens, distribution, CCT, and CRI) and energyefficiency data. 5. Photometric data and adjustment factors based on laboratory tests (space
to mounting height ratio, coefficient of utilization complete values, IES distribution hard and electronic copy, candlepower distribution by angle and luminaire efficiency). Format
shall be in accordance with IES TM-27. 6. Power, signal, and control wiring diagrams between luminaires and controllers. 7. Lens/Louver Type. 8. Driver/ballast with each type luminaire
as applicable (type, sound rating, overload protection, voltage, input/fixture wattage, ballast factor, power factor, etc.). TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 3 9. Integral battery inverters. 10. Emergency lighting units, including batteries
and chargers. 11. Certification of IES LM-79, IES LM-80 and TM-21 testing for LED luminaires. Luminaires shall be tested in accordance with IES LM and TM standards. 12. Warranty.
B. Color Chips: Provide color chips of available finishes for luminaires upon request of Architect/Engineer. 1.6 DELIVERY, STORAGE AND HANDLING A. Luminaires and equipment shall be
delivered with NRTL and manufacturer's labels intact and legible. Broken, cracked and damaged materials and equipment shall be removed from the site immediately and be replaced with
new materials and equipment. Luminaires and accessories shall be stored in protected dry locations in their original unbroken package or container. Luminaires shall be protected from
dust and dampness both before and after installation. Luminaires shall be protected from paint and cleaning solvents during all phases of construction. PART 2 - PRODUCTS 2.1 LUMINAIRE
REQUIREMENTS A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. NRTL Compliance: Luminaires for hazardous locations shall be listed and labeled for indicated class and division hazard by a NRTL. C. UL Compliance: Comply with UL 1598 and UL 8750.
D. Recessed Luminaires: Comply with NEMA LE 4. 2.2 LIGHT-EMITTING DIODE (LED) LUMINAIRES A. Luminaires shall be identical in construction features, options and appearance to the luminaries
specified in the Luminaire Schedule. LED luminaires include white and RGBW systems as indicated on the luminaire schedule. B. Luminaires shall be provided with all cables, controllers,
power supplies, drivers, connectors, terminators and accessories required for a complete installation. LED system shall utilize pulse width modulation, non-linear scaling techniques
and reverse polarity protection. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING
265000 - 4 C. Provide dimming down to 10% as a minimum, or to percentage indicated or called for on the drawings. Unless otherwise indicated, the dimming control shall be a 0-10VDC
signal D. LED luminaires shall be high brightness and binned for forward voltage, luminous flux and wavelength. E. LED luminaires shall be tested in accordance with IESNA LM-79 (luminous
output, power input, luminaire efficacy (lumens/watt), color temperature and color rendering index), IESNA LM-80 (L70, output luminous maintenance, 10,000 hour minimum test, calculation
method is not acceptable) and IESNA TM-21/28. Luminaire output shall be a minimum of 100 lumens/watt. Rated life shall be a minimum of 50,000 hours at 70% output. Testing shall be
performed by a US Department of Energy (DOE) accredited laboratory. F. Drivers shall be solid state Class 1 power supply/driver with universal input (120-277V). The system shall have
a minimum 90% power factor, 3.5 maximum crest factor, minimum efficiency of 90%, a maximum of 20% THD and overload protection. Adequate heat sink capability shall be provided to ensure
the rated life. Unit shall meet FCC rules and regulations. G. The luminaire (to include LED sources and drivers) shall have a full five (5) year minimum warranty for replacement
and labor. 1. Acceptable LED Node Manufacturers: a. Philips b. Osram c. Cree d. Nichea e. Lumiled 2.3 LUMINAIRE CONSTRUCTION A. Metal Parts: 1. Free of burrs and sharp corners and edges.
2. Sheet metal components shall be steel unless otherwise indicated. 3. Form and support to prevent warping and sagging. B. Doors, Frames, and Other Internal Access: Smooth operating,
free of light leakage under operating conditions, and designed to permit relamping without use of tools. Designed to prevent doors, frames, lenses, diffusers, and other components
from falling accidentally during relamping and when secured in operating position. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 5 C. Lenses: 1. Shall be listed materials tested in accordance with ASTM D-635, "Rate of Burning and/or Extent and Time
of Burning of Self-Supporting Plastics in a Horizontal Position" and burns less than 2/5 inches per minute. 2. The products shall have a smoke density of less than 75 when tested in
accordance with ASTM D-2843, standard test method for "Density of Smoke from the Burning or Decomposition of Plastics". 3. The flame spread rating shall not exceed 0-25 and smoke developed
rating shall not exceed 450 in accordance with ASTM E-84, standard test method for "Surface Burning Characteristics of Building Materials". 4. Self-ignition shall not occur below 600°F,
in accordance with ASTM D-1929, standard test method for "Ignition Properties of Plastics". 5. Materials shall remain in place 15 minutes at 175°F and fall from frame at 200° below
ignition temperature in accordance with ASTM D-648, "Deflection Temperature of Plastics Under Flexural Load". 2.4 LUMINAIRE SCHEDULE A. Luminaire schedule is found on the contract drawings.
PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions for compliance with requirements for installation tolerances and other conditions affecting performance
of Work. B. Examine roughing-in for luminaire to verify actual locations of luminaire and electrical connections before luminaire installation. C. Proceed with installation only after
unsatisfactory conditions have been corrected. 3.2 GENERAL INSTALLATION A. Comply with NECA 1. B. All luminaires shall be installed as per manufacturer furnished installation instructions.
C. Provide for every luminaire as shown on the plans, or as scheduled on the drawings. D. Location of all ceiling and wall mounted luminaires shall be as indicated on the Architectural
and Electrical drawings. The contractor shall verify ceiling type, construction, and material prior to ordering. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 6 E. Provide luminaires with an IC rating for luminaires installed in direct contact with
insulation. F. Provide plaster frames for plaster ceilings and flanged frames for drywall ceilings. G. Install luminaires level, plumb, and square with ceilings and walls unless otherwise
indicated. H. Luminaires shall be suitable and as recommended by the manufacturer for the actual intended mounting method and materials. I. Supports: 1. Sized and rated for luminaire
weight. 2. Able to maintain luminaire position after cleaning and relamping. 3. Provide support for luminaire without causing deflection of ceiling or wall. 4. Luminaire-mounting devices
shall be capable of supporting a horizontal force of 100 percent of luminaire weight and a vertical force of 400 percent of luminaire weight. J. Flush-Mounted Luminaires: 1. Secured
to outlet box. 2. Attached to ceiling structural members at four points equally spaced around circumference of luminaire. 3. Trim ring flush with finished surface. K. Wall-Mounted Luminaires:
1. Attached to structural members in walls, to a minimum 20 gauge backing plate attached to wall structural members, or using through bolts and backing plates on either side of wall.
2. Do not attach luminaires directly to gypsum board. L. Ceiling-Grid-Mounted Luminaires: 1. Secure to any required outlet box. 2. Use approved devices and support components to connect
luminaire to building structure in a minimum of four locations, spaced near corners of luminaire. Utilize #10 steel wire; similar to that used to support the ceiling grid. 3. Provide
UL listed seismic hold-down clips and fasten to luminaires and to ceiling grid members at or near each luminaire corner. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 7 4. Install luminaires of sizes less than ceiling grid as indicated on reflected
ceiling plans or center in acoustical panel and support luminaire independently with at least two metal channels spanning and secured to ceiling tees. M. Cove Lighting: 1. Installed
so as to produce a continuous and unbroken band of light with no shadows or light gaps. N. Provide all necessary accessories for "end-to-end" mounting where continuous rows of luminaires
are indicated. All luminaire assemblies shall be grounded. O. Luminaires installed in continuous rows may be fed by a single outlet if luminaires are UL approved and suitable for through
wiring in luminaire raceway. P. New luminaires may be provided to replace existing luminaires indicated to remain or be reused, subject to shop drawing approval. 3.3 GROUNDING A. Ground
all non-current carrying parts of all lighting luminaires. B. All grounding shall be accomplished with NRTL tested grounding connectors suitable for this purpose. 3.4 FINAL CLEANING
A. Immediately prior to acceptance, damp clean diffusers, glassware, luminaire trim, reflectors, lamps, louvers, lens and similar objects of all luminaires. Remove all dirt, corrosion,
foreign material, finger marks, and blemishes. Replace all burned out lamps and failed components. 3.5 FIELD QUALITY CONTROL A. Perform the following tests and inspections: 1. Operational
Test: After installing luminaires, switches, and accessories, and after electrical circuitry has been energized, test units to confirm proper operation. 2. Test of Emergency Lighting:
Under supervision of Engineer, interrupt power supply to demonstrate proper operation. Verify transfer from normal power to battery power and retransfer to normal. B. Luminaire will
be considered defective if it does not pass operation tests and inspections. C. Prepare test and inspection reports. D. Replace luminaires damaged during shipment, construction, or
installation. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING 265000 - 8 3.6
STARTUP SERVICE A. Comply with requirements for startup specified in Section 260936 "Lighting Controls." 3.7 ADJUSTING A. Provide adjusting the direction of aim of luminaires to suit
occupied conditions. Adjustment may be required during hours of darkness. B. Final distribution shall be acceptable to the Owner and may take several attempts. 3.8 REMOVAL OF BALLASTS
IN EXISTING LUMINAIRES A. Assume ballasts contain PCB material unless labeled otherwise or test samples show materials are not PCB; submit a test report. Remove all ballasts from existing
luminaires indicated on contract documents. Dispose of all ballasts which do not have non PCB labels in PCB containers and pay all costs to have containers taken to EPA approved incinerators
and disposed of all EPA regulations. Follow all EPA regulations for transporting material. If ballast has leaked in existing luminaires, remove material deposited in luminaire and
dispose of those materials as indicated above. Provide documentation verifying disposal of PCB contaminated ballasts. 3.9 REMOVAL OF LAMPS IN EXISTING LUMINAIRES A. The Contractor
shall employ the service of a certified disposal/recycling service company to dispose of all removed fluorescent and/or HID lamps. All disposal procedures shall be performed in accordance
with EPA Requirements and Subtitle C for the disposal of mercury contaminated lamps. END OF SECTION 265000 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 1 SECTION 265500 - LIGHTING CONTROL PART 1 - GENERAL 1.1 DESCRIPTION A. Provide a complete
lighting control system as indicated on the Contract Documents and as specified herein. 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.3 QUALITY ASSURANCE A. Equipment and materials shall be of the quality and manufacture indicated
in their respective sections of the specifications. The equipment specified is based upon the acceptable manufacturers listed. Equipment types, device ratings, dimensions, etc. correspond
to the nomenclature dictated by those manufacturers. B. Installation shall be accordance with NFPA 70 (National Electrical Code), energy conservation codes, state codes, local codes,
and requirements of authority having jurisdiction. C. Equipment shall be designed, manufactured, assembled, and tested in accordance with the latest revisions of applicable published
ANSI, NEMA and IEEE Standards. D. All equipment shall NRTL tested. E. All components and assemblies are to be factory pretested. F. The controls provider must: 1. Provide equipment
from manufacturers for which they maintain a contract, distributorship, are an agent, or other formal arrangement for which documentation can be produced showing authority to sell and
service the equipment in this territory. 2. Demonstrate that they have successfully installed similar systems, utilizing their standard products, for a minimum period of five (5) years.
3. Employ service technicians who are trained in accordance with the systems manufacturer's recommendations. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue,
Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 2 4. Own and demonstrate proficiency in the use of the required test equipment, tools,
etc. for the proper installation, set-up, testing and maintenance of the system. If requested, must provide a listing of tools and/or equipment and where appropriate, certifications
in the proper training and use of the tools and/or equipment. 1.4 SUBMITTALS A. Submit the following equipment, materials, and products including all components and accessories: 1.
General Equipment 2. Vacancy/occupancy Sensors 3. Digital Lighting Control System 4. Wiring diagrams 5. Commissioning Plan B. Submit the shop drawings and the product data specified
below at the same time as a single submittal package. C. Product Data: Provide equipment data sheets, specifications, wiring diagrams and installation instructions for all required
system components. D. Shop drawings shall include the following at a minimum: 1. Composite custom wiring and/or schematic diagram of each control circuit as proposed to be installed
(standard diagrams will not be accepted). Wiring diagrams shall include all system components, including but not limited to: room controllers, digital switches, vacancy/occupancy sensors,
photocells, isolated relays, digital I/O interfaces to conference room A/V systems, network interfaces, lighting control panels and associated components. 2. All system devices shall
be located per the system manufacturers recommendations. All devices shall be suitable for the building configuration and intended operation. 1.5 SYSTEM DESCRIPTION A. The lighting
control system and/or components, as specified and indicated on the drawings to provide the intended and required control of the lighting systems. TENANT FIT-OUT FOR ITHACA BEER
COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 3 PART 2 - PRODUCTS 2.1 GENERAL EQUIPMENT A.
Switches 1. Toggle/Snap a. Unit shall be quiet operation, quick make/quick break, rated for 20A/120-277V/1hp at 120/277V, side/back wired or with 90° rear plug in termination with pig
tail, with nylon/polycarbonate toggle, self grounding mounting screw clip plate (not staple), ground terminal and silver alloy contacts. Units shall meet latest Federal Specification
WS896, NEMA WD-1 and UL Test 20. b. Acceptable Manufacturers (for single pole units, provide two pole, three way, four way, illuminated handle, keyed, etc. type of the same quality
and model). 1) Hubbell HBL1221 2) P&S 20AC1 3) Leviton 1221-2 2. Low Voltage a. Unit shall be button type switch that is configurable from one button to eight buttons using point-to-point
low voltage wiring for control of single or multiple loads. Each button shall provide a momentary contact and all share a common return. The switch shall be totally passive and contain
no active electronics or power supply. Operation is dependent upon a Class 2 connection to a compatible relay panel or other device that can react to a momentary contact signal. b.
Each button shall have an LED indicator light that can serve as a status indicator or as a locator light. The LED indicators shall be powered by a 24VDC source originating from the
lighting control panel or other device. The button quantities shall be as indicated on the plan views. c. Acceptable Manufacturer 1) Wattstopper LVSW series (Design Make) 2) Acuity
Brands 3) Hubbell 4) Approved Equal. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING
CONTROL 265500 - 4 3. All device colors shall match the surrounding devices and shall be selected by the Architect. B. Lighting Dimmers 1. Provide lighting dimmer where indicated
suitable for the type of luminaire for even continuous control. Unit shall be rated for the indicated connected load plus 25% minimum (even when ganged). Review luminaire schedule
and plans for type and loading. Provide for three-way control as indicated. 2. Low voltage dimming shall be as recommended by the luminaire manufacturer for magnetic or solid state.
3. LED dimmers shall be as recommended by the luminaire manufacturer and be listed for use with the associated driver. 4. Device color shall match the other project devices. 5. Acceptable
Manufacturers: a. Lutron (Design Make) b. Crestron c. Acuity Brands d. Leviton e. Approved equal 2.2 VACANCY/OCCUPANCY SENSORS A. Vacancy/occupancy Sensors: 1. Vacancy/occupancy sensors
shall comply with the following as a minimum: a. Zero crossing switching operation (switch on/off only where sine wave is at zero volts) suitable for linear, non-linear and electronic/magnetic
fluorescent ballasts for the loads indicated. Where the load to be controlled exceeds the sensor load rating provide a separate relay of adequate rating. b. Failure of the unit shall
be to the on/closed position or manual operation. c. Motion sensitivity adjustment (dip switch or dial) and time delay adjustment (5 to 30 minutes minimum, dip switch or dial). d. Line
voltage input and switching. Field selectable for 120 or 277 VAC, 60 Hz. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 LIGHTING CONTROL 265500 - 5 e. UL listed and have a five (5) year manufacturer full replacement warranty. f. Test mode feature to override the set time
delay to allow adjusting of the sensitivity. g. Sensor locations shall be adjusted during construction and at occupancy as recommended by the manufacturer for optimal sensing and operation.
h. Operation shall be field selectable with vacancy sensor being manual "on" with close switch/contact upon motion sensing and open after the set amount of time delay without motion
or occupancy sensor being automatic on upon motion sensing. i. Adjustable controls/settings shall only be accessible when the front cover is removed or from the back of the unit. j.
Unit color shall match the project devices except for the ceiling-mounted units which shall match the ceiling color. All color selections shall be by the Architect. k. Ultrasonic sensing
shall not be affected by air movement and shall operate at 32 kHz minimum (shall not interfere with hearing aids or other equipment). l. Provide components as needed for the indicated
control. m. A factory-authorized representative shall coordinate and instruct the startup services of the sensors providing placement recommendations, connection guidance and startup
supervision and adjustment. 2. Ceiling Mounted - Dual Technology: a. Unit shall mount to standard octagonal box, have auxiliary contact (Form C, 0.5A at 24 VDC), and utilize PIR and
ultrasonic technology motion sensing. Both types of sensing are needed for contact closure but only one (1) is needed to keep it closed. b. Shall have self-contained rated contacts
or control a separate switch pack. If a self-contained unit, then the ratings and function shall meet or exceed the switch pack specifications. c. Sensing shall be 360 degrees with
a minimum operating area of: 1) Major Motion (Walking/Arm Wave): 50 ft. x 30 ft. 2) Minor Motion (Small Motion at Desk): 40 ft. x 20 ft. TENANT FIT-OUT FOR ITHACA BEER COMPANY -
SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 6 d. Units shall be suitable for overlap of motion detection
areas without reduction in spacing and false operation. e. Sensing shall be suitable for a ceiling/mounting height of up to 12 ft. minimum. f. Ambient light level sensing (adjustable
20-300 fc) to prevent "On" operation when the ambient light level is greater than the setpoint level. g. The maximum depth shall be 1.5 in. below the ceiling/box. h. Acceptable Manufacturers:
1) Wattstopper DT-300 (Design Make) 2) Hubbell 3) Eaton 4) Acuity Brands B. Switch Pack: a. Provide a minimum of one (1) switch pack for each ceiling-mounted vacancy/occupancy sensor.
Provide additional units for multiple circuits (quantity to match the quantity of circuits). b. Unit shall be plenum rated with line voltage side into a metallic box. c. Low voltage
power shall be suitable for a minimum of three (3) sensors. Multiple sensors shall be able to control a single switch pack. d. Minimum switching capacity shall be 20A (all types of
loads) at 120/277 VAC. 2.3 DIGITAL LIGHTING CONTROL SYSTEM A. General: 1. All associated system components shall be supplied from a single manufacturer and shall be compatible for communication
as part of the digital lighting control network. Combining multiple manufactures system components to achieve the required system operation is not acceptable. B. Vacancy/Occupancy
Sensors: 1. Wall or ceiling mounted (to suit installation) dual technology digital (passive infrared and ultrasonic) occupancy sensor. Provide unit to accommodate the square-foot coverage
requirements for each area controlled. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING
CONTROL 265500 - 7 2. Sensors shall have adjustable settings and features as noted below. Sensor shall be adjusted through one of the following: graphic LCD display, push button
or via software from handheld device. a. Sensitivity: 0-100% in 10% increments. b. Time Delay: 1-30 minutes in 1 minute increment. Time delay shall be set to 20 minutes. c. Detection
Technology: Dual technology activation and or re-activation. The sensor shall be capable of being set to either PIR & Ultrasonic, PIR Only or Ultrasonic Only as required by the space
being controlled as recommended by the manufacturer. d. Test mode – Five second time delay e. Walk-through mode f. Selectable operating parameters shall include as a minimum Auto (Occupancy)
/ Manual (Vacancy) - ON, blink warning, and daylight enable/disable when photosenors/day-light sensors are included in the digital network. 3. Sensing shall be 360 degrees with a minimum
operating area of: 1) Ultrasonic: 25 ft. x 25 ft. 2) Passive Infrared: 32 ft radial. 4. RJ-45 port(s) for connection to digital lighting control network. 5. Two-way infrared (IR)
transceiver to allow remote programming through handheld configuration device and control by remote personal controls. 6. Assignment of occupancy/vacancy sensor to a specific load within
the room without wiring or special tools. 7. Manual override of controlled loads. 8. Multiple occupancy sensors shall be installed in a room if required by the size/configuration by
connecting them to the open topology digital lighting control network. No additional configuration shall be required. 9. Provide wall or ceiling mounted sensors as indicated on the
drawings. Final locations of all sensors shall be in accordance with the manufacturer's recommendations. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 8 C. Digital Lighting Wall Control Station 1. General - Digital controllers may consist of
multiple configurations and devices including but not limited to digital switches, dimmers and scene controllers. The digital controllers shall provide the control intent indicated
on the drawings and connected to the digital lighting control network. Individual device operation shall meet the features indicated below. 2. Digital Switch - low voltage momentary
pushbutton switches to have 1, 2, 3, 4, 5 and 8 button configurations; colors to be white, light almond, ivory, grey and black; compatible with wall plates with decorator opening.
The color shall match the other devices and be coordinated with the Architect. Wall switches shall include the following features at a minimum: a. Fully configurable and adjustable
using a handheld configuration device. b. Label each button and/or controller with custom silk screen labeling. Labeling identification shall be coordinated with the Owner for identification
once the system has been configured. c. Button covers shall be field replaceable. Button replacement may be completed without removing the switch from the wall. d. Indicating LED on
each switch that blinks to indicate data transmission. e. Scene Status LED on each switch button with the following characteristics: 1) Bi-level LED that is field configurable. 2) LED
status indicates power to switch 3) Bright status level indicates that load or scene is active f. RJ-45 port(s) for connection to digital lighting control network. g. Multiple digital
wall switches shall be installed in a room by connecting them to the open lighting control network. No additional configuration shall be required to achieve multi-way switching. h.
The following switch attributes shall be changed or selected using a handheld configuration device: 1) Load and Scene button function reconfigured for individual buttons (from Load
to Scene, and vice versa). 2) Individual button function may be configured to Toggle, On only or Off only. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 9 3) Individual scenes may be locked to prevent unauthorized change. 4) Switch buttons may
be assigned to any load on any room controller and are not load type dependent; each button may be assigned to multiple loads. 3. Digital Dimming Switch - shall have the same features
as the digital switches. Dimming switches shall have a raise/lower buttons that include LEDs to indicate the load dimming level. Buttons shall be labeled "UP" and "DOWN". The dimmer
shall provide full function dimming control in multi-way applications, such as 3-way, 4-way and beyond. a. The following dimmer switch attributes shall be changed or selected using
a handheld configuration device: 1) Fade Up and Fade Down times for individual scenes and loads adjustable from 0 seconds to 18 hours. 2) Ramp rate adjustable for each dimmer switch
from 0 to 10 minutes. 4. Digital Scene Selector - shall have the same features as the digital switches. Scene selector switches shall have four programmable preset scene buttons and
a separate master button to allow dimming raise/lower and all-on/all-off control of the individual scenes. The buttons shall have suitable labels. D. Room Controllers 1. Room Controllers
automatically assign the room loads to the connected devices in the space without the use of any tools. Room Controllers shall be provided to match the room lighting load and control
requirements. The controllers shall not have, dip switches, potentiometers or require special configuration. The Room Controllers shall provide on/off/dimming control and shall include
the following features as a minimum: a. Replacement: Using the default automatic configuration capabilities, a room controller may be replaced with an off-the-shelf unit without requiring
any configuration or setup. b. Device status LEDs to indicate: 1) Data transmission 2) Device has power 3) Status for each load TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 10 c. Installation features: 1) Standard junction box mounting 2)
Low voltage connections using standard RJ-45 patch cable d. UL 2043 plenum rated system. e. Manual override and LED indication for each load f. Dual voltage input (120/277VAC, 60 Hz).
g. Maximum of 20A combined load per Room Controller. Each relay rated for the following at 120/277VAC, 60 Hz: 1) 20A magnetic ballast or incandescent. 2) 16A electronic ballast or
LED driver (meet NEMA 410 ratings). 3) 1/2 HP motor load. h. Zero cross circuitry switching for each load. i. One, two or three relay configuration. Provide additional room controllers
networked together to accommodate the quantity of zones indicated on the drawings and as indicated in the room sequence of operation. j. Equipment shall be suitable for the operating
conditions within the intended locations. k. RJ-45 digital lighting control network ports with the ability to connect all required room control devices for communication to the digital
lighting control network. l. Class 2 output to digital lighting network room devices suitably sized to power the devices within the room. m. One (1) 0-10VDC analog class 2 dimming control
signal per channel for control of compatible dimming ballasts and LED drivers. n. Capability to provide line voltage/forward phase dimming control. Shall be suitable for controlling
incandescent lighting loads, magnetic low voltage lighting loads and electronic low voltage lighting loads. Manual switching or dimming control shall be done using the digital lighting
control system digital switches or dimmers. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
LIGHTING CONTROL 265500 - 11 o. The following dimming attributes shall be capable of being changed or selected using a handheld configuration device: 1) Establish preset level
for each load from 0-100% 2) Set high and low trim for each load 3) Fade time from 0 seconds to 18 hours. 4) Set controller for switched or dimmed applications E. Auxiliary Relay Interface:
1. The auxiliary relay interface shall allow the digital lighting control system to interface with third party devices, equipment or controls using an isolated relay interface. 2.
RJ-45 ports for connection to digital lighting control network. 3. Isolated relay ratings: a. 24VDC/VAC, 1A, SPDT b. Normally open, normally closed and common outputs. 4. Mountable
within a 4"x4" junction box. 5. When used as an auxiliary relay for connection to the Building Management System (BMS) system, it shall connect directly to the local room controller
to provide a relay interface for connection to the BMS for occupied/unoccupied control using the status of the room vacancy/occupancy sensors based on the isolated relay status. All
programming and setup shall be coordinated with the Division 23 BMS controls trade. F. Digital Lighting Control Network 1. The system network is to be an open topology lighting control
physical connection and communication protocol designed to control the lighting in a area of a building. Digital room devices shall connect to the network using CAT 5e cables with
RJ-45 connectors to provide both data and power to room devices. Features shall include: a. Plug n’ Go automatic configuration, communication and assigning of occupancy/vacancy sensors,
switches and lighting loads connected together within a room or space. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 LIGHTING CONTROL 265500 - 12 b. Replacement of any device in the digital lighting control network with a standard off the shelf unit shall be capable of
automatically configuring and operating using the factory default settings without custom configuration or setup. G. Acceptable Manufacturers: 1. Wattstopper: Digital Lighting Management
- DLM, (Design make). 2. Acuity Controls: nLight 3. Crestron Controls: GLPAC 4. Hubbell NX PART 3 - EXECUTION 3.1 INSTALLATION A. Provide all required system components, interconnection
wiring and branch circuit power connections as required by the lighting control system manufacturer to meet the intended sequence of operation and system performance requirements.
All system wiring shall be in accordance with the system manufacturer's requirements at a minimum. B. When using wire for connections other than the digital lighting control network
(Category 5e with RJ-45 connectors), provide detailed point to point wiring diagrams for every termination. Provide wire specifications and wire colors to simplify contractor termination
requirements. All Category 5e cabling and connectors shall be terminated and tested to meet the system manufacturer’s requirements. Category 5e cabling shall have a [green] thermoplastic
jacket to easily identify from other building network cabling, building management system, or other low voltage systems cabling. C. All line voltage wiring shall be installed in conduit.
Terminations shall be done above accessible ceilings or within utility rooms and within a 4"x4" back box and have a suitable cover provided. Digital network devices (room controllers,
isolated relays, plug load controllers, etc.) shall be mounted to a junction box and connected as recommended by the system manufacturer. D. All low voltage control cabling shall be
plenum rated. Cabling shall be installed in minimum 3/4" conduit in vertical runs in walls/partitions and inside mechanical/utility rooms. Provide suitable back box as required by
the system manufacturer for the device being installed. Above accessible ceilings and within utility rooms all control cabling shall be installed within separate J-hook supports located
at 3' on center with the cabling neatly bundled. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021
LIGHTING CONTROL 265500 - 13 3.2 SYSTEM PROGRAMMING A. Upon completion of the installation, the system shall be programmed by the manufacturer's factory authorized representative
who shall verify a complete fully functional system. B. The system manufacturer shall include separate individual site visits scheduled to complete the system programming and perform
the following functions: 1. Initial system startup/programming (time shall be suitable to setup all system devices). A minimum of two days shall be accounted for the system initial
setup. 2. Coordination with the owner to develop preferred lighting control scenes, scene illumination levels, button operation and coordinate day lighting requirements prior to final
system programming. Once verified with the owner all system components shall be fully programmed and setup. 3. Verification of the system operation (time shall be suitable to test
and verify day lighting functions are operating properly). The manufacturer shall provide light meters for verification; time shall be as required for proper testing of the system.
4. The lighting control system manufacturer shall coordinate all room names and scheduling with the owner prior to final setup. 5. The presence of the system manufacturer's service
technicians to assist the installing electrician in all of the above is a requirement of this project and proof of time expended shall be provided to the Owner's Representative. 3.3
SYSTEM COMMISSIONING A. The electrical contractor shall provide both the Owner and the electrical engineer with a minimum of ten working days written notice of the system startup and
configuration date. B. Refer to the lighting control details that are part of the Construction Drawings for sequence of operation and commissioning requirements of the project lighting
control scenarios. C. All lighting control systems and components shall be commissioned to verify sensor location, time delay/sensitivity is properly set, auto-on/manual-on, override
times, controls, day-lighting control, communications between control panels, and timeclock controls are operating as intended. D. Calibrate all sensor time delays, sensitivity settings
and properly aim to guarantee proper detection of occupants and energy savings. 1. Adjust time delay so that controlled area remains lighted for 15 minutes after occupant leaves area.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 LIGHTING CONTROL 265500 - 14 E. Exterior
photocells shall be aimed per the manufacturer's installation instructions. Locate and aim to be facing to the north and avoid being blocked by the building architectural features.
F. Provide written or computer-generated documentation on the commissioning of the system including room by room description including: 1. Sensor parameters, time delays, sensitivities,
and daylighting set points. 2. Sequence of operation, (e.g. manual ON, Auto OFF. etc.) 3. Load Parameters (e.g. blink warning, etc.) 3.4 SYSTEM TRAINING A. The Contractor shall provide
instruction to the Owner's Representative with regard to use and operation of the system. Obtain signed receipt from Owner's Representative that instruction has been given. B. The
lighting control system's manufacturer shall supply at least one (1) service technician after all systems have been tested and in full operation as described above to assist the installing
electrician to demonstrate and instruct the Owner's Representative on the operation, programming and any uniqueness of the control system. Minimum time required for Owner instruction
of the system is one (1) four (4) hour session. Provide additional instruction and training to the owner to as required to verify the owner is comfortable with the system operation.
Time of demonstration and instruction to be at Owner's convenience during normal working hours and shall be scheduled a minimum of ten working days prior. 3.5 WARRANTY A. Provide a
five year complete manufacturer’s warranty on all products to be free of manufacturers’ defects. END OF SECTION 265500 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 1 SECTION 283102 - ANALOG ADDRESSABLE FIRE ALARM SYSTEM
PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation of a fully operational analog addressable
fire alarm system and related Work as described in the Contract Documents. B. Provide system as approved by local Fire Marshal and the Authority Having Jurisdiction (AHJ). System
materials and installation shall be in accordance with the manufacturer's recommendations. 1.2 QUALITY ASSURANCE A. All methods of construction, details of workmanship that are not
specifically described or indicated in the contract documents, shall be subject to the control and approval of the Owner's Representative. Equipment and materials shall be of the quality
and manufacture indicated in their respective sections of the specifications. The equipment specified is based upon the acceptable manufacturers listed. Equipment types, device ratings,
dimensions, etc. correspond to the nomenclature dictated by those manufacturers. All equipment shall be tested at the factory. Unless specified elsewhere, standard factory inspection
and operational tests will be acceptable. B. Installation shall be in accordance with NFPA-70 (National Electrical Code), NFPA-72 (National Fire Alarm Code), AHJ, state codes, local
codes, requirements of authority having jurisdiction and the contract documents. Installer shall be certified in the State of New York for fire alarm installation. C. Equipment shall
be designed, manufactured, assembled, and tested in accordance with the latest revisions of applicable published UL, NFPA, ANSI, NEMA and IEEE Standards. All system equipment shall
be compatible and of the same manufacturer. D. Each item of the fire alarm system shall be listed as a product of a single fire alarm system manufacturer and shall bear the UL Label.
E. System installation shall be under the supervision of an accredited factory representative. Final connections to the FACP, annunciator panel and any other panels shall be by the
factory representative. F. The system provider must: 1. Provide equipment from a single manufacturer for which they maintain a contract, distributorship, are an agent, or other formal
arrangement for which documentation can be produced showing authority to sell and service the equipment in this territory. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 2 2. Demonstrate that they have successfully installed
these systems, utilizing their standard products, for a period of five (5) years minimum. 3. Maintain a service organization to provide both normal and emergency service. Emergency
service must be available 24 hours per day, 365 days per year and staff must be adequate to respond within 2 hours of an emergency call. 4. Have a service location not more than 50
miles from the project location. 5. Maintain adequate spare parts inventory to provide both normal and emergency service. 6. Employ service technicians who are trained in accordance
with the systems manufacturer's recommendations. 7. Own and demonstrate proficiency in the use of the required test equipment, tools, etc. for the proper installation, set-up, testing
and maintenance of the system. If requested, provide a listing of tools and/or equipment and where appropriate, certifications in the proper training and use of the tools and/or equipment.
8. Provide all system programming to deliver a customized system to the Owner ready for use. 9. All system programming is to be completed to the satisfaction of the Owner. If after
preliminary use of the system, and/or training, the increased understanding of the system's features and capabilities necessitates reprogramming to any extent, it is to be performed
at no additional cost. 10. Provide a minimum of two system inspections/tests each year during the warranty period as described in NFPA 72. Needed and requested system programming changes
shall be provided at these times. 11. Warranty period shall be as described elsewhere with [two] years being minimum. Provide a service contract for the Owner review for [two] years
beyond the warranty period. Warranty shall include all parts, materials, labor, transportation, etc. 12. Any system being extended or connected to an existing system shall be tested
for full functionality prior to beginning work. System shall be signed off by Owner/Engineer as fully functional prior to any new work. 1.3 SYSTEM DESCRIPTION A. The system shall constantly
monitor all initiation devices and notification circuits for any abnormalities or alarm conditions. System shall sample/poll each addressable device no less than every 10 seconds.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM
283102 - 3 B. The system operation subsequent to the alarm activation by any initiating device (manual station, automatic detector, sensor, sprinkler flow switch, etc.) shall be
as follows: 1. All audible alarm notification appliances within corresponding building or designated area shall provide a common audible fire alarm signal until the System Reset Key
or the Signal Silence Key is depressed. 2. All visual alarm notification appliances shall flash continuously and synchronized until the system is reset or silenced. 3. The remote central
monitoring station shall be notified automatically until the System Reset Key or the Signal Silence Key is depressed. 4. Shutdown of the corresponding HVAC system equipment shall occur
with a supervisory alarm until the system is reset. All fans over 2000 cfm shall be shut down. 5. Activation of all programmed outputs assigned to the initiating device shall occur
until the system is reset or the silence key is depressed. 6. The alarm shall be displayed at the local Fire Alarm Control Panel (FACP) and the fire alarm annunciator panel. 7. The
system alarm LED shall flash on the control panel and the fire alarm annunciator panel until the alarm has been acknowledged/reset. Once acknowledged, this same LED shall latch on.
A subsequent alarm received shall flash the system alarm LED on the control panel and annunciator. The LCD display shall show the new alarm information. 8. A pulsing audible alarm
tone shall occur within the local building control panel and, where applicable, the fire alarm annunciator panel until the event has been acknowledged. 9. Alarms shall be entered into
the system event log history. 10. Refer to Appendix A for operational/sequence matrix. C. Any subsequent alarm shall follow the operation described above. D. The activation by any
system smoke detector or sensor shall initiate an alarm verification operation whereby the panel will reset the activated detector and wait for a second alarm activation. If, within
a preset time after resetting, a second alarm is reported from the same or any other smoke detector, the system shall process the alarm as described previously. If no second alarm
occurs within the prescribed time, the system shall resume normal operation. The alarm verification shall operate only on smoke detector alarms. Other activated initiating devices
shall be processed immediately. The alarm verification operation shall be selectable by device. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 4 E. A manual evacuation (drill) switch shall be provided to operate the alarm
notification appliances without causing other control circuits to be activated. However, should an actual alarm occur, all alarm functions shall occur as described previously. F. The
system shall have a password(s) to allow the operator to display all alarms, troubles, and supervisory service conditions log history including the time of each occurrence. This shall
be able to be viewed from the front of the control panel, annunciator panel or from a computer connected to the FACP. G. The actuation of the " walk test" program at the control panel
shall activate the "Walk Test" mode of the system which shall cause the following to occur: 1. The remote central monitoring station connection shall be bypassed. 2. Only audible and
visual appliances shall be operated. Other alarm functions (elevator recall, HVAC shutdown, etc.) shall not be affected. 3. Walk test shall be selectable by circuit or circuits.
4. Actual alarms received during a "Walk Test" shall cause the control panel to go into alarm and override the walk test mode. 5. The control panel shall show trouble conditions.
6. The walk test activation of any initiation device shall cause the audible signals to activate for two seconds or a distinguishable audible. 7. The panel shall automatically reset
itself after signaling is complete. 8. The control panel shall automatically return to normal condition if there is no activity on a walk test circuit for a period of 30 minutes. H.
Any momentary opening of an initiating or notification appliance circuit wiring shall cause an audible signal to sound at the Fire Alarm Control Panel and, where applicable, the annunciator
panel for four seconds indicating a trouble condition. I. Elevator Operation: 1. Provide the following equipment as a minimum and as indicated on the drawings: a. Smoke detection in
the elevator equipment room. b. Smoke detection at each elevator lobby. c. Smoke detection in the elevator shaft if a smoke hatch. d. Heat detection in the equipment room and shaft
(high and low) if a sprinkler system is in the area. Detectors shall be within 2 ft. of the individual sprinkler heads. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 5 e. Detection devices located in elevator lobbies, elevator
hoistways and elevator machine rooms shall be used for elevator recall. Hoistway and equipment room heat detection shall initiate power shut down prior to water flow. Operation shall
be in accordance with ASME A17.1, Safety Code for Elevators and Escalators. Signals shall be provided to the elevator controls for main level lobby alarm, any lobby alarm, elevator
equipment room alarm and elevator hoistway alarm as a minimum. Provide addressable control modules for the signals to the elevator controls. 1.4 SUPERVISION A. The system shall utilize
independently supervised initiation device circuits. The alarm activation of any initiation device shall not prevent the subsequent alarm operation of any other initiation device.
B. Notification appliance circuits shall be supervised to indicate an open or short circuit condition. C. The incoming power to the system shall be supervised so that any power
failure must be audible and visually indicated at the control panel and the remote annunciator. A green "power on" LED shall be displayed continuously while incoming power is present.
This shall be a trouble alarm. D. The system batteries shall be supervised so that a low battery condition or disconnection of the battery shall be audibly and visually indicated
at the control panel and the remote annunciator. This shall be a trouble alarm. E. The system shall have provisions for disabling and enabling all circuits individually for maintenance
or testing purposes. 1.5 SUBMITTALS A. Provide a complete system submittal prior to ordering of equipment and installation including but not limited to: 1. Complete equipment list.
2. Catalog descriptive literature for all equipment. This shall include a description of the unit, ratings, functions, capability, materials and compatibility with other components.
3. Riser Wiring Diagram showing all equipment, devices, device addresses, connections, control connections, remote notification connection(s), wire quantities and sizes. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 -
6 4. Floor plan indicating equipment and device locations, addresses, power circuit information with power panel location, notification circuiting, initiation circuiting, control circuiting
and any system applicable building characteristics (ceiling heights, structural members impeding detection, etc.). Contact the Engineer for an electronic copy of the project floor
plans. Engineer logo shall be included in final drawing. 5. Typical Terminal Wiring Diagram for each type of device. 6. Terminal wiring Diagram for all Fire Alarm equipment. 7. Calculations
including: a. Battery sizing calculations indicating total number of power devices, load associated with each type device, backup period and recommended battery capacity (AH). b. Voltage
drop calculations with actual equipment loads used to derive battery back-up ampere-hour rating and individual circuit voltage drop (indicate the wire size to be used and the associated
voltage drop with the allowed voltage drop) for each circuit. 8. Complete console enclosure and equipment configuration. B. Submittal package, calculations and system wiring shall be
performed/collected/signed by a NICET Level III technician. C. If required by the Authority Having Jurisdiction (AHJ) provide a submission of all requested information for review
and comment by the AHJ. All AHJ comments shall be incorporated and resubmitted until approved. D. Test reports at the completion of the project. Testing shall be of all system devices,
equipment, circuits, features and functions. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. The project fire alarm system shall comply with and be in accordance with the drawings
and specifications. All system equipment and materials shall be of the same manufacturer unless otherwise indicated. System and component acceptable manufacturers include the following
unless otherwise indicated: 1. Existing Edwards EST-3X control panel TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 7 2.2 FIRE ALARM SYSTEM A. The fire alarm system shall be comprised of the components specified as a minimum
and also include components not indicated but required for a complete and operable system as described herein. B. The system and all its components shall be UL listed and in accordance
with NFPA 72, local and state codes. C. The system shall have 25% spare capacity. This shall include all individual notification circuits, initiation circuits, initiating modules,
alarm modules, power supplies, batteries, central processing unit memory and printed circuit card space. System initiation device and control device capacity shall be a minimum of
the indicated percentage over the shown quantity or 250 whichever is greater. D. Each initiating device shall have an individual address for system communication. The system addresses
shall not exceed seven digits. Each address, initiation circuit, notification circuit and control point shall have an individual identification description. 2.3 FIRE ALARM CONTROL
PANEL (FACP) A. The existing Edwards EST-3X control panel for the building shall be used. 2.4 VENTILATION FAN SHUTDOWN CONTROL A. Provide supervised normally closed relays and contactors
for connection into the fan motor control circuits ahead of all automatic devices. B. Sequence fan shutdown for every air distribution system. Provide duct detectors in return of systems
over 2,000 cfm and in return at each floor of systems over 15,000 cfm. C. Provide drill bypass feature, locate switch on Fire Alarm Control Panel and label "DRILL-FAN SHUTDOWN BYPASS".
Buzzer shall sound continuously while in bypass mode. D. Provide fan reset feature, locate switch on Fire Alarm Control Panel and label "FAN RESET". 2.5 INITIATION DEVICES A. General:
1. Provide analog addressable smoke and thermal sensors as shown. All detectors, control modules, monitor modules and all other initiation devices shall communicate with twisted pair
cable and have an individual address. Peripheral devices shall be of the some manufacturer as the FACP. 2. Spot type detectors shall utilize the same interchangeable bases. TENANT
FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 -
8 3. If a device is removed or taken out of service a trouble signal shall be initiated. B. Photo-Obscuration Type Smoke Detector: 1. The photo-obscuration detector shall operate
on the photo electronic principle and provide an analog signal to the system indicating the amount of smoke. Detector shall be an analog addressable type. 2. The detector shall incorporate
a built in type identification so the system can identify the type of detector. The sensor shall be continually monitored to measure any change in their sensitivity because of the
environment (dirt, smoke, temperature, humidity, etc.). Unit shall not be affected by exterior light or EMF. 3. The detector shall be designed and arranged to prevent interference
from exterior electromagnetic fields and light. 4. The detector shall provide advance indication of the analog value of the products of combustion to the FACP indicating that maintenance
is required in order to insure normal operation. The detector sensitivity shall be adjustable per device (within UL limits) and be set at the FACP for continuous or variable based
on time of day. There shall be a minimum of six (6) selectable sensitivity levels. The individual detector sensitivity setting shall be adjusted to meet the building/space characteristics
and operation. The detector shall monitor the obscuration continuously and raise the obscuration level to compensate for a dirty sensor to maintain the set sensitivity. 5. Detectors
shall be designed for twistlock mounting to a separate base assembly. Provide manufacturer's recommended back box suitable for surface mounting where required. 6. The detector base
shall have terminals for making all connections; no soldering shall be required. It shall be possible to secure the detector to the base with a concealed socket headscrew to prevent
unauthorized tampering. 7. Smoke detectors shall be UL 268 listed and FM approved. 8. All smoke detectors shall be field checked and set to meet the prevailing conditions of the premise
and any Owner requests. All such work shall be performed by an authorized representative of the manufacturer trained in such procedures. 9. Photo-obscuration type smoke detection shall
be used for smoke detection unless indicated otherwise indicated. C. Heat Detector: 1. The heat detector shall be a thermal sensor and shall constantly monitor the space temperature
and constantly report this to the system. The unit shall be analog addressable. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project
No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 9 2. The sensor shall use dual solid state thermistors and shall monitor the ambient temperature
from 32 degrees F, to 155 degrees F and provide a fast response to rapid increase in temperature. The sensor shall send data to the FACP representing the analog value of the ambient
temperature. The FACP shall be suitable to monitor for set temperature (selectable by detector for 135 or 155 degrees F) and rate of rise (selectable by detector for 15 or 20 degrees
F per minute). Individual detector thermal settings shall be adjusted for the building/space characteristics and operation but shall initially be set to 135 degrees F set temperature
and 15 degrees F per minute rate of rise. 3. Detectors shall be designed for twistlock mounting to a separate base assembly. Provide back box suitable for surface mounting where
required. 4. The detector base shall have terminals for making all connections; no soldering shall be required. It shall be possible to secure the detector in the base with a concealed
socket headscrew to prevent unauthorized tampering. 5. Smoke detectors shall be UL 268 listed and FM approved. 6. All thermal sensors shall be field checked and set to meet the prevailing
conditions of the premise. All such work shall be performed by an authorized representative of the manufacturer trained in such procedures. D. Addressable Initiation Module: 1. The
addressable initiation module shall be used to connect supervised conventional initiating device or zone of supervised conventional initiating devices (water flow switches, tamper switches,
manual pull stations, (4) wire smoke detectors, conventional (4) wire duct detectors, fire pump alarms, dry chemical fire extinguisher control panels, etc.) to one of the system's addressable
circuits. 2. The module shall provide address setting means using rotary decimal switches and also store an internal identifying code which the control panel shall use to identify the
type of device. 3. The module shall contain an integral LED that flashes each time the unit is polled. E. Manual Pull Stations: 1. Noncoded pull-down type, double action (push then
pull down) manual addressable units with front keyed test/reset. Units shall be semi-flush where installed in construction with hollow or block walls. Where construction does not
allow semi-flush mounting then unit shall be surface mounted utilizing the manufacturers back box. Each unit shall have a distinct address. Units shall be key reset. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 10 2. Units
installed outdoors or in potentially wet locations shall be rated for such conditions. 3. Bright red finish with white lettering "FIRE ALARM". F. Duct-Type Smoke Detector: 1. Detector
shall be a photoelectric type that shall be activated by the presence of combustion products. 2. The detector head shall be a plug-in unit. The unit shall contain no moving parts.
One chamber shall be for fire detection and the second chamber shall function as a reference, to stabilize the detector for changes in environmental temperature, humidity and pressure.
It shall be possible to electrically check detectors sensitivity, using a sensitivity test set, or equivalent, and readjust the detectors sensitivity as required. 3. The detector base
shall have terminals for making all connections; no soldering shall be required. It shall be possible to secure the detector in the base with a concealed socket-head screw to prevent
unauthorized tampering. 4. Smoke detectors shall be listed by Underwriter's Laboratories, Inc. and approved by Factory Mutual Insurance Company. 5. Provide complete with sampling tubes.
Size sampling tubes for 80% of the width of the duct. Locate in ductwork for the indicated system and in accordance with the manufacturer's recommendations. Unit shall be rated for
air velocities of 300 to 4000 fpm as a minimum. 6. Provide addressable control module and 120V power for smoke damper operation. 7. Provide a remote indicating light/key test switch
for each duct detector and mount directly below each duct detector on the underside of the ceiling where the detector is concealed. Provide addressable base. G. Carbon Monoxide (CO)
Detector: 1. Detector shall sense the level of CO concentration within a space and provide analog addressable signal to the system and be UL 2075 listed. Unit shall have a minimum
life span of 10 years without replacement/recalibration. 2. Provide with audible notification base unit for local unique notification. Alarm and notification initiation shall be
from the control panel. 3. Detector shall connect to the system addressable circuiting. 4. Alarm level shall be adjusted at the control panel. Upon an alarm the local notification
shall sound and a trouble alarm initiated. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG
ADDRESSABLE FIRE ALARM SYSTEM 283102 - 11 2.6 NOTIFICATION APPLIANCES A. Horns: 1. 24 volts DC. 2. Basic grille type with powder coated red finish paint. 3. Horn shall be rated
94 dBA (anechoic chamber) at 10 feet. Output shall be selectable steady tone or coded. Provide dampening devices to reduce unit output by 5dBA for a minimum of 40% of the system horn
units and install as needed to meet the Owner's needs. 4. Units shall be semi-flush where installed in construction with hollow or block walls. Where construction does not allow
semi-flush mounting then unit shall be surface mounted utilizing the manufacturers back box. 5. Units installed outdoors or in potentially wet locations shall be rated for such conditions.
6. Provide directional projector where noted on the Drawings. 7. Provide backbox and grille for fully recessed installations; 4 in. deep box maximum. 8. Horn for carbon monoxide alarm
notification shall meet the requirements above but have a white finish color, have the word "ALERT" imprinted on the device and have a temporal Code 4 alarm. B. Strobe Unit: 1. 24 volts
DC with built-in Xenon Flasher; two watts maximum. Pulse duration shall be 0.2 seconds with maximum duty cycle of 40%. Illumination intensity shall be field selectable for 15/30/75/110
candela or 135/177/185 candela as applicable for the location. Output setting shall be 15 candela in corridors, 75 candela in general areas, 177 candela in sleeping areas or as indicated.
Flash rate minimum 1 Hz, maximum 2 Hz. Units within building shall flash in synchronization. 2. Protruding pyramid shaped lexan lens with reflector and the word "FIRE" imprinted
on the lens. 3. Rated life shall be a minimum of 500 hours of continuous operation. 4. Units installed outdoors or in potentially wet locations shall be rated for such conditions.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM
283102 - 12 5. Units shall be semi-flush where installed in construction with hollow or block walls. Where construction does not allow semi-flush mounting then unit shall be surface
mounted utilizing the manufacturers back box. Wall or ceiling mounted as noted on the Drawings. 6. Provide surface backbox for surface installation; 4 in. deep maximum. 7. Strobe for
carbon monoxide alarm notification shall meet the requirements above but have a white finish color and have the word "ALERT" imprinted on the device. C. Combination Horn-Strobe Units:
1. Unit shall be a combination of the horn and strobe units specified above in a single manufactured unit. 2.7 ADDRESSABLE CONTROL MODULE A. The addressable control module shall have
an individual system address, be supervised and control an output dry contact from indication from the FACP. This can be used to control or have an input to elevator controls, notification
appliances, door holder circuits, fans systems, etc. as indicated. Modules shall be connected to the addressable loop(s). B. The unit shall control an output relay (dry contact form
C). The module shall mount in a 4 in. square, 2-1/8 in. deep electrical box. C. The module shall contain an integral LED that shall flash each time the module is polled. D. The module
shall provide address setting means using rotary decimal switches and also store an internal identifying code which the control panel shall use to identify the type of device. Each
unit shall have a separate address and be connected to the system addressable signaling circuit. 2.8 DIGITAL COMMUNICATOR A. Existing system communicator shall be used. 2.9 NOTIFICATION
APPLIANCE CIRCUIT EXTENDER (NAC) A. Unit shall provide additional notification appliance circuit capability for new or existing system and be utilized for horns and strobe units.
B. Connections to the unit shall include power, notification appliance circuit output circuits and addressable control input or notification circuit input. The power circuit shall
be from an emergency source if available in the building. C. Notification appliance circuit capability shall be four Class B or Class A, 2A, 24VDC minimum. Selectable for synchronized
or not. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM
283102 - 13 D. Power supply shall be rated for 8A minimum at 24VDC for circuit power use and battery charging. Battery and charger shall be as specified within this section.
E. Unit shall provide output circuit/operation/battery/power/status monitoring and trouble signal to FACP as needed. F. Provide with battery and charger. Battery to be sized for
backup as indicated for FACP. G. Operation: upon a signal through the addressable control input or the notification appliance circuit indicating a system alarm. H. Use: Units can
be utilized where indicated [or where building is greater than 60,000square feet or over six stories in height]. There shall be a minimum of one unit for each floor. 2.10 CENTRAL
STATION MONITORING A. Existing system central monitoring station shall be used. 2.11 BATTERY AND CHARGER A. Standby power shall be provided through 24 volt DC battery and automatic
charger. B. Provide sealed lead-calcium batteries suitable for a minimum of 24 hours of battery standby. When the system is operating on the battery supply, a trouble condition shall
be generated. When utility power is restored, the system shall revert back to 120 VAC supply without any operator action. C. Provide cell reversal protection. D. Battery life expectancy
shall be ten (10) years minimum. E. Charger shall be self-regulating, solid state, type, automatic with capability to fully charge the discharged battery within 48 hours. F. Existing
batteries shall be revised as required if the additional devices added as part of this project require an increase in battery size. Provide calculations in the submittal. PART 3 - EXECUTION
3.1 INSTALLATION, EQUIPMENT A. All installations shall be accomplished in a professional manner by qualified personnel regularly engaged in and experienced in this type of Work. Fire
alarm installation shall be directed by a person who possesses a state license for installation of fire alarm systems. All equipment and components shall be installed in accordance
with the manufacturer's recommendations. B. System junction boxes and surface mounted device boxes shall be painted red. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College
Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 14 C. Provide all wiring to sprinkler flow switches, pressure
switches, and alarm check valves, installed by others. Maintain supervisory circuitry to the switches. Use liquidtight conduit for the last 2 ft. - 0 in. of raceway at the switch.
D. Provide all wiring to the smoke dampers installed by others. Provide an addressable control module for each. Wire to the damper junction box with flexible conduit and wire; provide
box or boxes as required. Install according to NEC. Smoke dampers shall close when its associated smoke duct detector is in alarm, upon direction from the FACP or if the associated
fan unit is not operating. E. Provide all wiring to duct smoke detectors. Duct smoke detectors shall be mounted on the ventilating ductwork by others. All mounting arrangements, holes
cut into ductwork, sealing of openings along with ceiling and access doors for the duct type detectors shall be provided by others. Provide duct detectors along with sampling tubes
with end caps. F. Provide all wiring required for fan shutdown. Wire from the addressable control module for each fan to be shut down and provide wiring from the module to the fan
control unit (starter, adjustable speed drive, etc.) Dry contact shall be wired ahead of all control functions for starters. Provide intermediate relay for control circuits beyond
the rating of the control module. G. Detection and initiating equipment shall be listed by NRTL and approved by FM. H. All surface mounted devices shall be mounted on a special box
furnished by fire alarm equipment manufacturer. Total assembly shall be secure, smooth contour and have no protrusions. I. Where detectors are installed on wood or masonry surfaces,
attach brackets directly to the surface with tamperproof fasteners. Where detectors are installed on suspended ceilings, provide additional supports in the ceiling, such as channel
support system, angle iron or additional runner bars. Fasten the additional supports rigidly to the ceiling runner bar system. Attach bracket to the supports with tamperproof fasteners.
Install metal spacers between the bracket and supports so that the ceiling tiles will not be a part of the support system. J. Install wall mounted audio/visual signal devices at 80
in. AFF to center line. Where ceiling types are called for, verify ceiling type and mounting height in the field. Provide pendant-mounted devices as required for specified mounting
height. K. An auxiliary fire alarm relay used to control an emergency control device that provides control functions described in this specification shall be located within 3 ft. of
the emergency control device and all wiring shall be supervised. L. All smoke detectors shall be field checked and set to meet the prevailing conditions of the premise. All such Work
shall be performed by an authorized representative of the manufacturer trained in such procedures. M. Provide circuiting from all indicated motor controls for indication if not operational
and close any associated smoke dampers. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG
ADDRESSABLE FIRE ALARM SYSTEM 283102 - 15 3.2 SYSTEM CIRCUITING A. All wiring shall conform to the NEC and to NFPA-72, National Fire Alarm Code. B. Install all wiring in accordance
with manufacturer's recommendations taking into account loading, intended location, circuit length, spare capacity and voltage drop. C. All wiring shall be copper, plenum rated where
not installed in conduit, and installed in a dedicated/segregated EMT conduit system in walls, above non-accessible ceilings and in exposed structure areas. Wiring above accessible
ceilings shall be run utilizing J-hooks. D. Power circuits: 1. Circuit breakers serving fire alarm system equipment shall have a red handle lock to prevent from manual off operation.
Directory shall be marked for the specific equipment served. E. Provide minimum #18 AWG twisted shielded pair for addressable signal line circuits. Notification appliance circuits
shall be#14AWG minimum. F. Addressable signal line circuits shall be NFPA 72 - 2010 Class B. G. Notification appliance circuits shall be NFPA 72 - 2010 Class B. H. Notification circuits
shall be segregated as indicated on the drawings and by individual floors as a minimum. 3.3 PROGRAMMING A. Include in bid the cost to cover all system programming, including items
particular to this project (such as custom zone descriptions, time delay settings, sensitivity settings, etc.) such that entire system is 100% complete and operating to the Owner's
satisfaction. Coordinate all system programming with the Owner. Also, provide programming of the system a minimum of once during the warranty period to provide changes requested by
the Owner. 3.4 TESTING AND INSTRUCTION A. The complete fire alarm system shall be fully tested after the installation is complete. Testing shall include all devices, FACP, annunciator
panel, other panels, features and functions. Testing shall be witnessed by the owners representative and be in accordance with the NFPA and herein. Provide a testing report to the
authority having jurisdiction and the Engineer as a submittal. B. Instruction shall be for the building owner for the overall building Fire Alarm System per specifications for that
project. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM
283102 - 16 C. Provide to the Owner system Operation Manuals as specified, that shall include as a minimum: 1. Bill of Material. 2. Catalog descriptive literature for all equipment.
This shall include a description of the unit, ratings, functions, capability, materials and compatibility with other components. 3. Riser Wiring Diagram showing all equipment, devices,
device addresses, connections, control connections, remote notification connection(s), wire quantities and sizes. 4. Floor plan indicating equipment and device locations, addresses,
power circuit information with power panel location, notification circuiting, initiation circuiting and control circuiting. Contact the Engineer for a copy of the project floor plans.
5. Typical Terminal Wiring Diagram for each type of device. 6. Terminal wiring Diagram for all Fire Alarm equipment. 7. Calculations including: a. Battery sizing calculations indicating
total number of power devices, load associated with each type device and recommended battery capacity (AH). b. Voltage drop calculations with actual equipment loads used to derive battery
back-up ampere-hour rating and individual circuit voltage drop (indicate the wire size to be used and the associated voltage drop with the allowed voltage drop) for each circuit. 8.
Instruction report starting when instruction was given and who was in attendance, signed by Owner's Representative. 9. A written test report from an authorized representative of the
equipment manufacturer that each device and overall system operation has been 100% tested and approved. 10. Certificate of Completion as described in NFPA-72. 11. A two (2) year warranty
in accordance with the Basic Requirements of these Specifications shall be provided for this system. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 283102 - 17 3.5 CO DETECTOR SIGNAGE A. Coordinate with the Owner, install a permanent
8-1/2 in. and 11 in., two (2) color lamicoid sign at eye level in the vicinity of every CO alarm notification device indicating specific instructions to be followed, ex. "Do not enter
room if an alarm is sounding". END OF SECTION 283102 THIS PAGE INTENTIONALLY LEFT BLANK
Addendum #1/20210510_AD-1_Drawings.pdf
101 ROOM NAME A101 1 1 A101 1 DETAIL ENLARGEMENT WALL SECTION BUILDING SECTION DETAIL SECTION INTERIOR ELEVATION DOOR TAG WALL TAG ROOM IDENTIFICATION EXISTING DOOR DOOR FULL HEIGHT
PARTITION PARTIAL HEIGHT PARTITION KEYED NOTE FLOOR ELEVATION 1001 1 REVISION CLOUD & TAG A101 SIM A1 A2 A3 A4 DIMENSION TO THE FACE OF FRAMING AT NEW CONSTRUCTION, TYP. DIMENSION
TO THE FACE OF FINISH AT EXISTING CONSTRUCTION DIMENSION TO THE FACE OF FINISH 1 EXISTING PARTITION 1 A101 1 A101 NAME ELEVATION AAP AREA ALARM PANEL ACP ACOUSTICAL CEILING PANEL AFF
ABOVE FINISH FLOOR CL CENTERLINE CLL CONTRACT LIMIT LINE CLR CLEAR ETR EXISTING TO REMAIN FEC FIRE EXTINGUISHER CABINET HR HOUR MAX MAXIMUM MIN MINIMUM MO MASONRY OPENING NIC NOT IN
CONTRACT NPS NOMINAL PIPE SIZE NR NOT REQUIRED OC ON CENTER OD OUTSIDE DIAMETER OFCI OWNER FURNISHED CONTRACTOR INSTALLED OFOI OWNER FURNISHED OWNER INSTALLED OPP OPPOSITE RD ROOF
DRAIN SF SQUARE FOOT SIM SIMILAR SQ IN SQUARE INCHES TYP TYPICAL UON UNLESS OTHERWISE NOTED ZVB ZONE VALVE BOX CONTRACT LIMIT LINE AREA NOT IN CONTRACT (NIC) HOLT Architects, P.C. Architects,
Planners, and Interior Designers 619 West State Street, Ithaca, New York 14850 132 E. Jefferson Street, Syracuse, New York 13202 Tel 607.273.7600 www.holt.com PROJECT INFORMATION
DATE: JOB NUMBER: CONSTRUCTION CLASSIFICATION: SPRINKLER PROTECTION: BUILDING USE CLASSIFICATION: TOTAL EXISTING BUILDING AREA (SF): TOTAL AREA OF PROJECT (SF): AREA OF RENOVATION (SF):
AREA OF ADDITION (SF): ITHACA BEER COMPANY AT SAI 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 04.23.2021 20108 1A NFPA 13 A-2 59,311 3,935
3,935 G001 DRAWING LIST GENERAL G001 COVER SHEET G131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT STRUCTURAL S100 TYPICAL STRUCTURAL DETAILS ARCHITECTURAL A001 GENERAL NOTES, KEY
PLANS AND WALL TYPES A101 FIRST FLOOR PLAN A152 FIRST FLOOR REFLECTED CEILING PLAN A162 FIRST FLOOR FINISH PLAN A200 ELEVATIONS A250 TYPICAL MOUNTING HEIGHTS AND ELEVATIONS FIRE PROTECTION
GENERAL FP001 GEN NOTES, SYMBOLS LIST AND DETAILS - FIRE PROTECTION FIRE PROTECTION DEMOLITION FP101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS - FIRE PROTECTION FIRE PROTECTION FP101
BASEMENT AND FIRST FLOOR PLANS - FIRE PROTECTION PLUMBING GENERAL P001 GEN NOTES, SYMBOLS LIST, DETAILS AND SCHEDULE - PLUMBING PLUMBING DEMOLITION P101D BASEMENT AND FIRST FLOOR DEMOLITION
PLANS - PLUMBING PLUMBING P101 BASEMENT AND FIRST FLOOR PLANS - PLUMBING P201 KITCHEN EQUIPMENT SCHEDULE AND DETAILS - PLUMBING MECHANICAL GENERAL M000 GENERAL NOTES AND SYMBOLS LIST
- HVAC MECHANICAL DEMOLITION MD-101 FIRST AND SECOND FLOOR PLAN - HVAC DEMOLITION MECHANICAL M101 FIRST FLOOR PLAN - HVAC M102 ROOF PLAN - HVAC M400 DETAILS - HVAC M401 DETAILS - HVAC
M402 DETAILS - HVAC M403 DETAILS - HVAC M404 DETAILS - HVAC M405 DETAILS - HVAC M500 RISER DIAGRAMS - HVAC M600 SCHEDULES AND CONTROLS - HVAC ELECTRICAL GENERAL E000 GENERAL NOTES &
SYMBOL LIST - ELECTRICAL ELECTRICAL DEMOLITION ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION ELECTRICAL E100 BASEMENT FLOOR PLAN - POWER AND SYSTEMS/LIGHTING E101 FIRST FLOOR PLANS
- POWER AND SYSTEMS/LIGHTING E102 ROOF PLAN - POWER AND SYSTEMS E500 DETAILS - ELECTRICAL E600 SCHEDULES - ELECTRICAL E601 SCHEDULES - ELECTRICAL DRYDEN RD COLLEGE AVE OAK AVE E BUFFALO
ST EDDY ST DRYDEN RD WILLIAMS ST HOLLISTER DR LINDEN AVE BRYANT AVE ELMWOOD AVE SUMMIT AVE OAK AVE PROJECT LOCATION PLAN LEGEND AND ABBREVIATIONS Elwyn & Palmer Consulting Engineers
Structural Engineers 213 East Seneca Street, Ithaca, New York 14850 Tel 607.272.5060 M/E Engineering, P.C. Mechanical, Electrical, Plumbing and Fire Protection Engineers 300 Trolley
Boulevard, Rochester, New York 14606 Tel 585.288.5590 Fax 585.288.0233 THIS SET OF DRAWINGS WAS DEVELOPED FOR THE PURPOSES OF DEFINING THE DESIGN INTENT OF THE PROJECT, AND DEFINING
THE SCOPE OF THE PROJECT FOR THE BUILDING CODE OFFICAL FOR THE PURPOSES OF ISSUING A BUILDING PERMIT. WE HAVE PROVIDED SOME CONSIDERATIONS FOR BASIS OF DESIGN PRODUCTS; THESE PRODUCTS
ARE NOT REQUIRED TO BE USED AND SHOULD BE THOUGHTFULLY CONSIDERED BETWEEN THE OWNER AND BUILDER. AD-1 05/10/2021 DN UP UP DN FD FD FD FD FD FS FS FS FS UP UP LOADING ZONE WATER METER
DINING LEASING OFFICE ELEV ELEV CORRIDOR TRASH/ RECYCLE FB-3HR-E FB-3HR-E SE-2HR-E FB-3HR-E SE-2HR-E FB-3HR-E FB-3HR-E FB-3HR-E FW-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E
SE-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR FB-2HR-E ED EA EA ED ED ED E STAIR NAME STAIR # STAIR WIDTH STAIR CAPACITY STAIR RATING DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING STAIR
3 ST3 44" CLR 146 2 HOUR ST2 34" CLR 170 1-1/2 HOUR STAIR 3 DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING ST3 38" CLR 190 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104A 69" CLR
345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104 69" CLR 345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104B 69" CLR 345 N/A EXIT DISCHARGE THROUGH LOBBY D1 = 117'-4"
D2 = 73' REMOTENESS OF EXITS 71'/107' = .663 X 100 = 66.3% PER 2020BCNYS SECTION 1007.1.1 EXCEPTION 2 - NO LESS THAN 33% OF DIAGONAL ALLOWED EATD = 47'-6" ASSEMBLY UNCONCENTRATED (TABLES
AND CHAIRS) 1,978 SF FB-3HR-ESE -2HR-E SE-2HR-E SE-2HR-E SE-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E FB-3HR-E FB-1HR-EFB -1HR-E FB-1HR-E FB-1HR-E FEC ED DOOR # DOOR WIDTH DOOR CAPACITY DOOR
RATING EXISTING 69" CLR 345 N/A FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FW-2HR-E FW-2HR-E FW-2HR-E FEC FB-3HR-E FB-3HR-E SE-1HR-E SE-1HR-E SE-1HR-E KITCHEN RETAIL
WAIT BAR 1,978 sf KITCHENS - COMMERCIAL 1,497SF ASSEMBLY UNCONCENTRATED (TABLES AND CHAIRS) 1716 SF EATD = 81' EATD = 79'-6" EXIT ACCESS TRAVEL DISTANCE (EATD) = 131' (SHOW THE LONGER
OF THE TWO DISTANCES) PER 2020 BCNYS TABLE 1017.2, 250' ALLOWED IN SPRINKLERED BUILDING CPET = 57' CPET= 73' 6" EXISTING EXISTING FEC CLASS K FE AD-1 05/10/2021 AD-1 05/10/2021 GENERAL
CODE NOTES 1. EXISTING WALL RATINGS SHOWN ON CODE DRAWINGS REFLECT THE RATINGS AS SHOWN ON EXISTING DOCUMENTS PROVIDED BY THE OWNER. NOT VERIFIED BY ARCHITECT. COORDINATE EXISTING AND
NEW PARTITIONS WITH DEMOLITION AND CONSTRUCTION PLANS. 2. FLOOR IN THE AREA TO BE 2 HOUR RATED AS PART OF EXIT LOBBY. NOTE: NOT ALL MAY APPLY LOCATION OF EXITS EXIT ACCESS TRAVEL DISTANCE
(EATD): DISTANCE TO EXITS FROM THE MOST REMOTE POINT IN THE MOST REMOTE ROOM ON THE FLOOR COMMON PATH OF EGRESS TRAVEL (CPET) CONTRACT LIMIT LINE E ENCLOSED EXIT/ EXIT TO EXTERIOR HE
HORIZONTAL EXIT EA EXIT ACCESS REMOTENESS OF EXITS D2 = xxx FEET D1 = xxx FEET DEAD END CORRIDOR (DE) ED EXIT DISCHARGE EXIT TO EXIT (D2) BUILDING DIAGONAL (D1) EATD = xxx FEET CPET
= xxx FEET DE = xxx FEET FIRE EXTINGUISHER FEC FEBRACKET CABINET 1 HOUR FIRE BARRIER - EXISTING 1/2 HOUR FIRE PARTITION - EXISTING 0 HOUR SMOKE PARTITION - EXISTING FB-1HR-E SP-0HR
1 HOUR FIRE BARRIER FB-1HR 1/2 HOUR FIRE PARTITION FP-1/2HR-E SP-0HR-E 0 HOUR SMOKE PARTITION 1 HOUR SHAFT/STAIR ENCLOSURE - EXISTING 1 HOUR SHAFT/STAIR ENCLOSURE SE-1HR-E SE-1HR 2
HOUR FIRE WALL - EXISTING FW-2HR-E 2 HOUR FIRE WALL FW-2HR 1 HOUR FIRE PARTITION - EXISTING 1 HOUR FIRE PARTITION FP-1HR-E FP-1HR 2 HOUR FIRE BARRIER - EXISTING FB-2HR-E 2 HOUR FIRE
BARRIER FB-2HR 1 HOUR SMOKE BARRIER - EXISTING 1 HOUR SMOKE BARRIER SB-1HR-E SB-1HR FP-1/2HR 3 HOUR FIRE WALL - EXISTING 3 HOUR FIRE WALL FW-3HR-E FW-3HR SE-2HR-E SE-2HR 2 HOUR SHAFT/STAIR
ENCLOSURE - EXISTING 2 HOUR SHAFT/STAIR ENCLOSURE HORIZONTAL ASSEMBLY (HA) (SHOWN IN PLAN) 3 HOUR FIRE BARRIER FB-3HR OCCUPANCY DIFFERENCE FEC FEC FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E
FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E EATD = 52 FT E SE-1HR-E SE-1HR-E E FB-1HR-E FB-1HR-E ITHACA BEER TENANT SPACE, ONLY BEING PROVIDED WITH LIFE SAFETY REQUIREMENTS AT THIS TIME FUTURE
STORAGE FUTURE ASSEMBLY UNCONCENTRATED 308 2020 BCNYS 2020 BC 8 239 </=67% =2 URINALS 3 WC REQUIRED=66% 6 3 3 3 3 PROVIDE DIAPER CHANGING STATIONS AS REQUIRED BY BCNYS P104.1
AD-1 05/10/2021 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619
West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person,
unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall
affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 5:00:12
PM G131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0"
D5 ITHACA BEER SAI - FIRST FLOOR CODE CONFORMANCE PLAN 1/8" = 1'-0" D1 ITHACA BEER SAI - BASEMENT FLOOR CODE PLAN KEY PLAN 0' 2' 4' 8' 16'0' 2' 4' 8' 16' REVISION SCHEDULE NAME DATE
AD-1 05/10/2021 FD FD FD FD FD FS FS FS FS FD FS FS 1A 2A 32 3.5 4 5 5.8 5.9 B C D E F G H J K L N O M 1.9 TABLE 18" x 30" SAUTEE 60" x 40"W/ SALIMANDER ABOVE GRILL TOP W/ LOWBOY UNDERNEATH,
SALIMANDER ABOVE 36" x 36" FLAT TOP 60" x 36" (3) FRYERS 48" x 30" TABLE 24" x 30" HW SINK 17" x 15" FRIDGE 24" x 30" COOLER 60" x 30" STAGING TABLE 60" x 30" SALAD STATION 60" x 30"
TABLE 30" x 48" ICE MAKER 30" x 30" PIZZA PREP TABLE 80"X 31" MUGNANI 69.5" x 74.5" DISH WASHER 31.8" x 24.6" (3) BAY SINK 57"x57" CLEAR 5' - 0" 24" DISH WASHER BEER AND MERCHANDISE
24" x 24" HW SINK 25" DISH WASHER 4'-0" UC COOLER WATER SPIGGIT ABOVE COUNTER, NEED DRAIN 4'-0" (2) BAY SINK 104 WOMEN'S TOILET 103 MEN'S TOILET 105 KITCHEN CLEAR 3' - 8" COOLER 6'
- 0" 17' - 5 3/8" 11' - 3" PREP TABLE 30" DEPTH CLEAR 5' - 0" CROWLER MACHINE ON TOP OF COUNTER 18" DUMP SINK HOT FOOD TO GO/ OR DISPLAY 8' OF TAPS (15+/- LINES) COOLER 6' - 0" TWO-SIDED
COOLER DISPLAY WINDOW OPENING W/ HEAT LAMPS CLEAR 4'-7" 3'-7" 9'-7" CLEAR 5' - 0" 10' - 0" TABLE 24" x 60" 3' - 8 1/8" 5' - 3 3/8" TABLE 24" x 48" RACK 6'-3" BUILT-IN COUNTERS 25.25"
x 29.8" " DISH WASHER 3' - 0" 8" 101 WAIT 106 BAR 102 DINING 107 RETAIL 100 VESTIBULE TAKEOUT SERVING STATION PIZZA OVEN JC COOLER 1 1 1A 1A 1A 1A 1A 1A 2B 1A 1A 1A 1A 1A 1A 1A 2B
1A 1A 1A 1A 1B 2A 2A2A 2A2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 1'-4 7/8" 9'-0 5/8" 6'-8 5/8" 5'-0 1/4" 6'-5 1/4" 9'-0 5/8" 2B 6'-9 1/4" 10'-4 7/8"5'-3
7/8"1'-4 1/8" 6'-8 1/8" 5'-11 1/4" 9'-7 1/2" 21'-2 3/4" 4 2 3 2'-6" 5'-0" 3'-0" COOLER A101 H8 SINK UNDER BAR 6 3'-9" 6'-0" 5'-5 5/8" 8'-9 7/8" 9'-0 1/4" 5 6 2 2'-1 5/8" 8'-3 5/8" 3'-1
7/8"3'-1" 7'-1 3/4" 6'-1 1/2" 4'-11" 2'-4" HOST 1'-3" 2'-11" 6'-5 3/4" 10'-5" 8'-10" 112° 143° 112° 112° 5'-9 3/4" 2'-6 3/4" 1'-11 7/8" 6'-3" 4'-10" 11'-2 7/8" 7'-6 5/8" 4'-11 1/2"
15'-6 1/8" AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 3'-0 1/2"1" 1" PIZZA OVEN AND MOP SINK HAVE MOVED, PLEASE COORDINATE WITH MEP. MEP DRAWINGS
DO NOT REFLECT THIS CHANGE. 3'-7 5/8" 15'-3 5/8" 1'-9" 8" AD-1 05/10/2021 1" 1" AD-1 05/10/2021 9' - 5" 1" 1" 2'-7 1/2"6'-4 3/4"45'-0 3/4"6'-4 1/2"12'-5 1/2" AD-1 05/10/2021 AD-1 05/10/2021
AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 PROVIDE A 6" WIDE BY 3/8" THICK PLATE UNDER THE OVEN LEGS, COORDINATE SIZE AND LOCATION OF PLATE, CONNECTIONS WITH OVEN PROVIDED BY OWNER
OVEN LEGS DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State
Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless
acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix
to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/11/2021 8:21:11 AM A101
FIRST FLOOR PLAN 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/4" = 1'-0" A1 FIRST FLOOR PLAN GENERAL ARCHITECTURAL
NOTES KEY PLAN KEYED CONSTRUCTION NOTES GENERAL NOTES 1 ALL WORK IS NEW UNLESS NOTED AS EXISTING. 2 ANY DISCREPANCY CONTAINED WITHIN ANY OF THE DOCUMENTS SHALL BE UNDERSTOOD TO MEAN
THAT THE GREATER QUANTITY AND OR THE BETTER QUALITY SHALL BE PROVIDED IN THE FAVOR OF THE OWNER. 3 REFER TO CODE CONFORMANCE DRAWINGS FOR REQUIRED FIRE RATED CONSTRUCTION. 4 PROTECT/MAINTAIN
ALL EXISTING FIRE PROTECTION AND FIRE RESISTANCE RATED CONSTRUCTION. WHERE SCHEDULED WORK DISTURBS FIRE PROTECTION, THE CONTRACTOR SHALL MAKE REPAIRS NECESSARY TO MAINTAIN REQUIRED
RATING. WHERE ANY CONSTRUCTION ACTIVITY DISRUPTS ANY ACTIVE LIFE SAFETY SYSTEMS, THESE MUST BE COORDINATED AT A TIME OF MINIMUM DISRUPTION TO THE OWNER AND WITH AT LEAST FOURTEEN (14)
DAYS NOTICE. 5 CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD (EXISTING AND SCHEDULED CONSTRUCTION) AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 6 DO NOT SCALE DRAWINGS
TO OBTAIN DIMENSIONS. 7 NOTES ON ONE DETAIL OR DRAWING APPLY TO ALL SIMILAR DETAILS AND DRAWINGS. 8 DIMENSIONS NOTED "EQ" ARE EQUAL TO EACH OTHER ONLY IF THEY ARE ON THE SAME DIMENSION
STRING AND IN THE SAME ROW. 9 ROOM NUMBERING IS FOR CONSTRUCTION PURPOSES ONLY, ACTUAL ROOM NUMBERING TO BE COORDINATED WITH THE OWNER PRIOR TO ANY SCHEDULING OR LABELING. ALL EQUIPMENT
LABELING AND SCHEDULING SHALL BE FORMATTED AS DIRECTED BY OWNER. 10 ANY PORTION OF THE PROJECT WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY SHALL BE REPAIRED. 11 MAINTAIN MEANS
OF EGRESS, KEEPING IT FULLY SEPARATED FROM CONSTRUCTION AREA AT ALL TIMES WITH A 1-HOUR FIRE RESISTANT RATED BARRIER (U L DESIGN 309) 12 PROVIDE A FRAMED, DUST PROOF BARRIER TO SEPARATE
CONSTRUCTION AREA FROM THE REST OF THE FACILITY AT ALL TIMES. PROVIDE TEMPORARY FILTERS, AND/OR NEGATIVE AIR, AS REQUIRED TO PREVENT THE SPREAD OF DUST, FUMES, AND ODORS THROUGHOUT
THE BUILDING. UPON COMPLETION OF THE WORK, REMOVE AND REPAIR ANY DAMAGE CAUSED BY THE UNSTALLATION/PRESENCE OF THE TEMPORARY BARRIER TO A NEW-LIKE CONDITION. # SWINGING DOORS, NO LATCH.
WHERE SEATING OR STANDING SPACE AT FIXED OR BUILT-IN TABLES, COUNTERS OR WORKSURFACES IS PROVIDED IN ACCESSIBLE SPACES, AT LEAST 5 PERCENT OF THE SEATING AND STANDING SPACES, BUT NOT
LESS THAN ONE, SHALL BE ACCESSIBLE. NYS 2020 BUILDING CODE BC1109.11. POINT OF SALE AND SERVICE COUNTER: WHERE COUNTERS ARE PROVIDED FOR SALES OR DISTRIBUTION OF GOODS OR SERVICES,
AT LEAST ONE OF EACH TYPE PROVIDED SHALL BE ACCESSIBLE. NYS BUILDING CODE 2020 BC1109.12.3. PROVIDED PAINTED METAL ENDCAP. GYPSUM BOARD SURROUND STEEL CROSSBRACING, AS TIGHT AS POSSIBLE
TO STEEL, CREATE OPENINGS WHERE THEY EXIST IN CROSSBRACING. PARTIAL HEIGHT WALL AT 42" AFF. GLASS VESTIBULE, WITH CAP AT 9'-6" AFF. LOW WALL AT BANQUETTE SIDE, HEIGHT TO BE COORDINATED
WITH BANQUETTE DETAIL. 0' 1' 2' 4' 8' CONTRACTOR SHALL PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL FLOOR, WALL, AND CEILING MOUNTED EQUIPMENT, MILLWORK, AND ACCESSORIES PROVIDED UNDER
THIS CONTRACT AND EQUIPMENT TO BE PROVIDED BY THE OWNER. CONTRACTOR SHALL PROVIDE BRACING WHERE REQUIRED TO SUPPORT OR STABILIZE ALL NON-STRUCTURAL FRAMING. PROVIDE ACCESS PANELS IN
WALLS AND CEILINGS AS REQUIRED TO OBTAIN CONVENIENT MAINTENANCE ACCESS TO ALL VALVES, DAMPERS, CONCEALED JUNCTION BOXES, AND OTHER EQUIPMENT REQUIRING ADJUSTMENT, SERVICE, OR MAINTENANCE.
PROVIDE PROPOSED LOCATION AND SIZE OF ALL ACCESS PANELS FOR REVIEW AND APPROVAL BY ARCHITECT PRIOR TO INSTALLATION. PROVIDE FIRE RATED ACCESSORIES AT ALL FIRE RATED PARTITIONS. REFER
TO CODE CONFORMANCE DRAWING FOR FIRE EXTINGUISHER CABINET LOCATIONS. COMPLY WITH BC1109.2 NYS BUILDING CODE FOR TOILET FACILITIES ACCESSIBILITY REQUIREMENTS. REPAIR ANY FIRE RATED CONSTRUCTION
DAMAGED DURING CONSTRUCTION; MAINTAIN EXISTING FIRE RATING AS PER BUILDING CODE REQUIREMENTS. PATCH EXISTING WALLS AND PREPARE FOR SCHEDULED FINISH, TYPICAL ALL EXISTING WALLS WITHIN
CONTRACT LIMIT LINES AND NOTED ELSEWHERE. CLEAN ALL WINDOW GLASS, INTERIOR AND EXTERIOR. ALL SLAB OPENINGS FOR FLOOR SINKS, DRAINS, TROUGHS, TO BE FIRESTOPPED WITH REQUIRED RATING,
AND FLASHED. PAINT ALL WALLS AND CEILINGS UON. 1 2 3 4 5 6 7 8 9 10 11 1/2" = 1'-0" H8 STRUCTURAL PLATE UNDER PIZZA OVEN 1 2 3 4 5 6 7 COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE
INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE INSTALLED. 13 REVISION SCHEDULE NAME DATE AD-1 05/10/2021 GC RESPONSIBILITY TO COORDINATE ARCHITECTURAL
WORK SCOPE WITH ROOFTOP MECHANICAL WORK SHOWN ON DRAWINGS M102 & M400. CONFIRM THAT THIS WORK WILL NOT AFFECT EXISTING ROOFING WARRANTY. 14 IT IS THE RESPONSIBILITY OF THE GC TO ENSURE
THAT THE KITCHEN HOOD CLEARANCE FROM LIMITED-COMBUSTIBLE MATERIALS IS IN COMPLIANCE WITH LOCAL CODE REQUIREMENTS. 15 AN ADDITIONAL LAYER OF ROOFING MEMBRANE TO BE APPLIED AT THE LOCATION
OF THE KITCHEN AND PIZZA HOOD EXHAUST FANS. KITCHEN AND PIZZA HOOD EXHAUST DUCTS SHOULD BE PAINTED TO MATCH THE EXTERIOR OF THE BUILDING. 16 17 DN FD FD FD FD FD FS FS FS FS FD FS FS
FD FS ELEV ELEV DINING P SC 102 RETAIL P SC 107 WOMEN'S TOILET RB EP SC 104 MEN'S TOILET RB EP SC 103 EP SS KITCHEN RS FRP RS 105 BAR COOLER COOLER AD-1 05/10/2021 AD-1 05/10/2021 AD-1
05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT P2 ACCENT WALL PAINT COLOR ROOM FINISH KEY: NOTE:
REFER TO FINISH SCHEDULE FOR MATERIALS. FLOOR FINISHES SCOPE OF WORK AREA FLOOR DRAIN COORDINATE WITH PLUMBING DRAWINGS FLOOR SINK COORDINATE WITH PLUMBING DRAWINGS * REFER TO ELEVATIONS
DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street
Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting
under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such
document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/11/2021 8:23:14 AM A162 FIRST
FLOOR FINISH PLAN 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/4" = 1'-0" A1 ITHACA BEER SAI - FIRST FLOOR FINISH
PLAN 1 ALL WALLS TO BE PAINTED X UNLESS OTHERWISE NOTED. 2 ALL GYPSUM BOARD CEILINGS TO BE PAINTED. 3 ALL DOORS / FRAMES AND PAINTED WINDOW TRIM / FRAMES SHALL BE PAINTED. 4 SEE REFLECTED
CEILING PLAN FOR ADDITIONAL FINISH INFORMATION, TYPICAL. 5 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 6 EXTEND
ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 7 MISCELLANEOUS ELECTRICAL PANEL COVERS, GRILLES, ETC. TO BE PAINTED TO MATCH ADJACENT WALL SURFACES. 8 ALL
GYPSUM BOARD AT TOILET ROOMS TO BE MOISTURE RESISTANT GYSPUM BOARD UNLESS OTHERWISE NOTED. 9 ADHESIVES AND FINISHES TO BE LOW VOC. 10 IN KITCHEN, OUTSIDE CORNERS TO RECEIVE STAINLESS
STEEL CORNER GUARDS (U.O.N.). 11 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. GENERAL FINISH
NOTES FINISH LEGEND KEYED FINISH NOTES KEY PLAN FINISH SCHEDULE: FLOORS: SC: SEALED CONCRETE RS: RESILIENT SHEET FLOORING WITH SLIP RESISTANCE, WELDED SEAMS, 6" FLASH COVE BASE, 2.5mm
THICKNESS -BASIS OF DESIGN: ALTRO CLASSIC 25 WALLS: P: LATEX PAINT; EGGSHELL OR SATIN ON WALLS AND GYPSUM BOARD CEILINGS, SEMI- GLOSS AT DOOR FRAMES, TRIM EP: (TOILET ROOMS AND SELECT
AREAS IN KITCHEN) WATER BASED EPOXY PAINT FRP: (THROUGHOUT KITCHEN, UON) FIBERGLASS REINFORCED POLYESTER PANEL ON CEMENT BOARD SHEATHING, JOINTS, SEAMS, AND EDGES SHOULD HAVE MOULDING/JOINT
STRIPS, AND ALSO BE SEALED. SS: (COOKING AREA) FLASHED WITH 20 GAUGE (1MM) STAINLESS STEEL, WITH LOCK SEAMS, FROM FLOOR TO CEILING AND EXHAUST HOOD BOTTOM; APPLY TO CEMENT BOARD SHEATHING
RB: RUBBER BASE AT 6" HIGH IN TOILET ROOMS CEILINGS: DF: (GENERAL EXPOSED FIREPROOFED DECK AND BEAMS) DRYFOG ACRYLIC LATEX PAINT WITH FLAME SPREAD INDEX < 200 INCLUDE ALL EXPOSED UTILITIES
UON ACP1: (KITCHEN) WASHABLE, SOIL RESISTANT, MOLD AND MILDEW RESISTANT, RESISTANT TO SAGGING -BASIS OF DESIGN ARMSTRONG CERAMAGUARD UNPERFORATED NOTE: SLATS AND OTHER MATERIALS SHOWN
ON RCP TO BE DETERMINED BY OWNER. # 1 2 3 0' 2' 4' 8' 16' COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE
INSTALLED. 12 REVISION SCHEDULE NAME DATE AD-1 05/10/2021 FIRST FLOOR 358' - 6" SECOND FLOOR 372' - 6" ROOF 427' - 6" THIRD FLOOR 383' - 6" FOURTH FLOOR 394' - 6" FIFTH FLOOR 405' -
6" SIXTH FLOOR 416' - 6" 14'-0"11'-0"11'-0"11'-0"11'-0"11'-0" DUCTS TO BE PAINTED TO MATCH EIFS WALL, PAINT COLOR TO MATCH DRYVIT 614 "SMOKE SIGNAL" DATE: PROJECT: OTHER: DRAWN BY:
A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson
Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect,
to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered
by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 5:07:16 PM A200 ELEVATIONS 04.23.2021 20108 CAK/HRT 411-415 College
Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR REVISION SCHEDULE NAME DATE AD-1 05/10/2021 1/8" = 1'-0" A1 EXTERIOR ELEVATION - EAST AD-1 05/10/2021 ROOF
DRAIN WALL HYDRANT (WH) / HOSE BIBB (HB) VENT PIPING TRAP PRIMER (TP)T PRESSURE GAUGE THERMOMETER RECIRCULATION PUMP SHOCK ABSORBER (SA) SHOWER HEAD BACKFLOW PREVENTER (BFP) UNION PIPE
GUIDE PIPE ANCHOR S SHUT-OFF SWITCH RELIEF VALVE PRESSURE REDUCING VALVE SOLENOID VALVE CHECK VALVE BALANCING VALVE SHUT OFF VALVE WATER METERM INDIRECT WASTE PIPING (IW)IW FLOOR DRAIN
(FD) / FLOOR SINK (FS) CLEANOUT (CO) WALL PLATE CLEANOUT (WPCO) DECK PLATE CLEANOUT (DPCO) CAP OR PLUG PIPE CONTINUATION "P" TRAP TOP TEE CONNECTION BOTTOM/TEE CONNECTION ELBOW UP 45°OFFSET
ELBOW DOWN DESCRIPTION PLUMBING SYMBOL LIST SYMBOL NATURAL GAS PIPING (G)G ST STORM WATER SEWER PIPING (ST) STRAINER SANITARY SEWER PIPINGSAN 140 140° HOT WATER RECIRCULATING PIPING
(HWR) 140 140° HOT WATER PIPING (HW) HOT WATER RECIRCULATING PIPING (HWR) HOT WATER PIPING (HW) COLD WATER PIPING (CW) NEW PIPING LOCATED BELOW FLOOR/SLAB NEW PIPING LOCATED ABOVE FLOOR/SLAB
(E) EXISTING PIPING EC ELECTRICAL CONTRACTOR PC PLUMBING CONTRACTOR MC MECHANICAL CONTRACTOR GC GENERAL CONTRACTOR VTR VENT THRU ROOF BFF BELOW FINISHED FLOOR AFF ABOVE FINISHED FLOOR
(ETR) EXISTING TO REMAIN (E) EXISTING NTS NOT TO SCALE POINT OF DISCONNECTION POINT OF CONNECTION WORK TO BE REMOVED DRAWING KEYNOTE DEMOLITION/REMOVAL KEYNOTE X X PUMP DISCHARGE (PD)PD
FPC FIRE PROTECTION CONTRACTOR PUMP SCHEDULE NO. LOCATION SERVICE GPM HEAD FT WATER MOTOR TYPE DESIGN MAKE HP VOLTAGE PHASE RPM FIXTURE AND EQUIPMENT CONNECTION SCHEDULE DESIGNATION
DESCRIPTION COLD WATER HOT WATER WASTE OR SANITARY VENT REMARKS SHOCK ABSORBER SCHEDULE NO. FIXTURE UNIT RATING SIZE IN INCHES PDI SYMBOL SA-A 1 - 11 1/2" A SA-B 12 - 32 3/4" B SA-C
33 - 60 1" C SA-D 61 - 113 1 1/4" D SA-E 114 - 154 1 1/2" E SA-F 155 - 330 2" F WATER HEATER SCHEDULE NO. SERVICE TYPE BTUH INPUT GALLONS/ HOUR RECOVERY TEMP RISE DEG F FUEL TYPE DESIGN
MAKE WC LAV HB WATER CLOSET LAVATORY HOSE BIBB 1 1/2" 1/2" 1/2" 1/2" 4" 1 1/2" 2" 1 1/2" NOTES UR URINAL 1" 2" 2" MB MOP BASIN 3/4" 3/4" 3" 2" FD FLOOR DRAIN 4" 2" -FS 4" 2" --FLOOR
SINK RP-1 MECHANICAL ROOM DOM. HWR-115 5 25 INLINE GRUNDFOS MAGNA3-32-100FN WH-1 DOM. WATER SEMI-INST./TANK 199,000 232 100 NAT. GAS LOCHINVAR "SHIELD" SWA200N - 115 1 VARIABLE 9.7
W TO 178 W, 0.29 A-1.61 A G G 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES WH-1 24" DEEP HEAT TRAP (TYP.) STRAINER WITH VALVED BLOW-DOWN AND THREADED CAP (TYP.) THERMOMETER (TYP.) 3"
CPVC INTAKE AND 3" CPVC EXHAUST OUT TO BUILDING EXTERIOR. ROUTE AS INDICATED ON PLANS 12" DIRT LEG AND CAP FACTORY SIZED T&P RELIEF VALVE 1/2" TO CONDENSATE DRAIN CONDENSATE NEUTRALIZER
1/2" TO FLOOR DRAIN 8 GALLON THERMAL EXPANSION TANK (TX-1) CHARGE TO SYSTEM STATIC PRESSURE IN FIELD. REFER TO DETAIL ON THIS DRAWING. TO DRAIN (SEE DETAIL 2 ON THIS DRAWING) FIN. FLOOR
UNION (TYP.) MANUAL MASTER MIXING VALVE STATION. MOUNT ON WALL AT 48" ABOVE FIN. FLOOR. ALL COMPONENTS SHALL BE LEAD-FREE HWR PUMP RP-1 AQUASTAT CONTROLLER. SET TO 110 DEG. F TIME CLOCK
CONTROLLER 1" TO FLOOR DRAIN 1 1/2" CW FROM TENANT'S METERED DOMESTIC WATER CONNECTION 3/4" HWR FROM TENANT'S DOM. HOT WATER SYSTEM 115 140 11/2" 11/2" 140 11/2" 1 1/2" 140 1" A T 1151
1/2" 3/4" 1" 1" CHECK VALVE (TYP.) BALANCE VALVE SET TO 2 GPM 3/4" 1" HW(115) TO TENANT'S FIXTURES AND EQUIPMENT 11/2" 11/2" 1" HW (140) TO HOODS IN TENANT'S KITCHEN ON FLOOR ABOVE1"
140 1" INTEGRAL BASE FOR FLOOR MOUNTING CW PIPING FROM WATER HEATING PLANT 1/2" CALIBRATED PRESSURE RELIEF VALVE SET AT 120 PSI 3/4" DRAIN VALVE WITH VACUUM BREAKER. PIPE TO FLOOR SINK
IN ROOM N002 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES FINISHED FLOOR HARD COPPER RELIEF VALVE DISCHARGE LINE TO END 6" OVER FLOOR DRAIN ASME TANK WITH DIAPHRAGM AIR CHARGING VALVE.
CHARGE TANK WITH AIR PRESSURE TO MATCH BUILDING STATIC WATER PRESSURE, THEN OPEN VALVE NORMALLY OPEN SHUT-OFF VALVE 3/4" UNION DIRECTION OF FLOW SIZE OF HWR PIPING AS NOTED ON FLOOR
PLANS BALANCE VALVE - SET AT GPM REQUIRED TO BALANCE ENTIRE TENANT SPACE CHECK VALVE BALL VALVE 1. PROVIDE THIS ARRANGEMENT ON ALL HOT WATER RE-CIRCULATION BRANCHES AND WHERE
NOTED ON PLANS. SIZES NOTED ON PLANS. NOTES: SEE PLANS FOR PIPE SIZE CHECK VALVE DETAIL NOTES: A. B. C. D. COMPOUND GAUGE GAUGE COCK (TYPICAL) FLANGE CONNECTION (TYPICAL) SHUTOFF
VALVE (TYPICAL) STRAINER WITH VALVED BLOW DOWN. PRESSURE GAUGE INLINE PUMP - SEE SCHEDULE FOR CAPACITY PROVIDE REDUCER AT PUMP IF REQUIRED (TYPICAL) PRESSURE GAUGES - SELECT GAUGE RANGE
TO PLACE MAXIMUM SYSTEM OPERATING PRESSURE IN MIDDLE THIRD OF RANGE. PROVIDE UNION ON PUMP INLET AND OUTLET IF PUMP IS NOT FLANGED. INSTALL PUMP WITH SHAFT HORIZONTAL. PIPING MAY BE
INSTALLED VERTICAL, AS SHOWN, OR HORIZONTAL DEPENDING ON SITE CONDITIONS. INSTALL CHECK VALVE HORIZONTALLY OR VERTICALLY WITH FLOW UPWARD. BALANCING VALVESET FLOW TO MATCH PUMP DESIGN/SYSTEM
REQUIREMENTS 1 0 30 20 0 1 0 0 70 80 60 40 50 9 0 1 0 30 20 0 1 0 0 70 80 60 40 50 9 0 FINISHED FLOOR UNION STRUCTURAL STEEL MEMBER 5'-0" MAX. GAS FIRED EQUIPMENT WTR. HTR., MAKE UP
AIR UNIT, BOILER, ETC. SEE PLANS FOR PIPE SIZES GAS SHUT-OFF VALVE GENERAL NOTES: PROVIDE SHUT-OFF VALVE, DIRT LEG AND UNION AT EACH GAS CONNECTION ON EACH PIECE OF EQUIPMENT. VERIFY
CONNECTION SIZES, QUANTITIES AND LOCATIONS WITH HVAC TRADE. P.C. IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. A. B. C. FULL SIZE 6" LONG DIRT LEG WITH CAP DETAIL NOTES: FLOW DIRECTION
LABEL. PROVIDE 360° WRAP OVERLAPPING BOTH ENDS OF THE PIPE FUNCTION LABEL AND MATCHING THE FLOW DIRECTION OF THE PIPE CONTENTS. PIPE FUNCTION LABEL PROVIDE A PIPE LABEL FOR EACH PIPE
FUNCTION. PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE PIPE PASSES THROUGH. PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20'-0" CENTERS FOR EVERY PIPE UNLESS OTHERWISE NOTED
IN THE SPECIFICATIONS. LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM 1/2 OF PIPES IN THE AIR AND ON THE TOP 1/2 OR SIDES OF PIPES
MOUNTED LOW. LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS. A. B. C. D. E. F. DOMESTIC COLD WATER
DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street
Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting
under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such
document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 12:53:10 PM P001 GEN.
NOTES, SYMBOLS LIST, DETAILS AND SCHEDULES PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR GENERAL NOTES: A. B. C.
D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. THESE NOTES ARE APPLICABLE TO ALL PLUMBING CONTRACT DRAWINGS. DISPOSE OF ALL DEMOLITION AND/OR OTHER WASTE MATERIALS CAUSED BY WORK OF
THIS CONTRACT. LEGALLY DISPOSE OF ALL MATERIALS TO A LOCATION OFF SITE. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OWNER AND OTHER TRADES PRIOR TO DEMOLITION. PATCH HOLES IN
EXISTING CONSTRUCTION LEFT BY THE REMOVAL OF PIPING AND EQUIPMENT. MAINTAIN THE FIRE/SMOKE RATING OF EXISTING CONSTRUCTION. DEMOLITION SHALL INCLUDE, BUT NOT BE LIMITED TO: PIPING,
VALVES, FIXTURES, EQUIPMENT, HANGERS, SUPPORTS, AND INSULATION EXCEPT ASBESTOS. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE FIRESTOPPING FOR ALL PENETRATIONS. ALL PENETRATIONS
THROUGH FIRE WALLS AND FLOORS SHALL BE SLEEVED AND FIRE/SMOKE STOPPED. REFER TO CONTRACT DOCUMENTS FOR FIRE WALL AND FLOOR LOCATIONS. ALL PENETRATIONS THROUGH NON RATED WALLS SHALL
BE SLEEVED AND SEALED. SEAL WITH A NONHARDENING SEALANT ON BOTH SIDES OF WALL PENETRATION TO REDUCE NOISE TRANSMISSION. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. ADVISE OTHER TRADES
OF ALL REQUIRED SERVICE CLEARANCES. PITCH 4" AND LARGER SANITARY, STORM, AND WASTE PIPING AT 1/8" PER FOOT UNLESS OTHERWISE NOTED. FOR SANITARY, STORM, AND WASTE PIPING 3" AND SMALLER
PITCH AT 1/4" PER FOOT UNLESS OTHERWISE NOTED. COORDINATE LOCATION AND ELEVATION OF ALL STORM SEWER, SANITARY AND DOMESTIC WATER PIPING. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS
DUE TO THE CONTRACTORS FAILURE TO COORDINATE TERMINATION POINTS. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. THE PLANS ARE DIAGRAMMATIC AND INDICATE THE GENERAL
PIPING AND EQUIPMENT ARRANGEMENT. ALL PIPING MAINS, EQUIPMENT, BRANCH LINES, AND SYSTEM COMPONENTS SHALL BE PROVIDED. THE PLANS ARE NOT INTENDED TO SHOW EVERY ITEM OF WORK OR EQUIPMENT.
THE CONTRACTOR SHALL PROVIDE ALL COMPONENTS NECESSARY TO COMPLETE THE SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE WITHOUT ADDITIONAL COST. ITEMS OF WORK OR EQUIPMENT SHOWN
ON THE DRAWINGS ONLY, OR CALLED FOR IN THE SPECIFICATIONS ONLY, SHALL BE PROVIDED IN THE SAME MATTER AS IF THEY APPEARED ON BOTH THE DRAWINGS AND THE SPECIFICATIONS. DRAWINGS DO NOT
INDICATE ALL OFFSETS, CHANGES IN ELEVATION, ETC. WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL MAKE ALL SUCH CHANGES IN PIPING AND LOCATIONS OF EQUIPMENT, ETC. TO ACCOMODATE WORK, OBSTACLES,
AND WORK OF OTHER CONTRACTORS. INSTALL EQUIPMENT AND PIPING TO AVOID INTERFERENCE WITH THE OPERATION, SERVICE AND MAINTENANCE OF EQUIPMENT. ADVISE OTHER TRADES OF REQUIRED SERVICE CLEARANCES.
THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING OF EXISTING OR NEW FIREPROOFING WHICH IS DISTURBED OR REMOVED DURING THE COURSE OF ANY DEMOLITION OR NEW WORK THAT IS PART OF THIS
CONTRACT. FIELD VERIFY ALL FLOOR ELEVATIONS INDICATED ON THE PLANS. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTING HEIGHTS OF ALL PLUMBING FIXTURES, LOCATIONS OF GRAB
BARS AND CONTROLS, ETC. PROVIDE SHUTOFF VALVES ON ALL CW AND HW BRANCHES SERVING INDIVIDUAL PLUMBING FIXTURES. UNLESS OTHERWISE INDICATED, PLUMBING CONTRACTOR SHALL PROVIDE CUTTING
AND PATCHING AND ALL CORING OF SLABS, WALLS AND OTHER ITEMS REQUIRED FOR PLUMBING WORK. PROVIDE TRAP GUARD INSERTS IN ALL FLOOR DRAINS. ALL FLOOR DRAINS AND FLOOR SINKS WILL BE INSTALLED
IN EXISTING FLOOR SLABS. REFER TO PROJECT'S STRUCTURAL DRAWINGS FOR INSTALLATION DETAILS. PROVIDE ALL REQUIRED FLOOR CUTTING, FLASHING, SEALING, AND PATCHING, PROVIDE ALL REQUIRED STRUCTURAL
WORK. LOCATE ALL FLOOR SINKS AND FLOOR DRAINS WITH THEIR GRATES SLIGHTLY BELOW THE SURROUNDING FINISHED FLOOR, AND UNDER EQUIPMENT AND/OR COUNTERTOPS. DO NOT INSTALL SUCH THAT EQUIPMENT
DRAINS TO FLOOR SINKS AND FLOOR DRAINS WILL CAUSE A TRIPPING HAZARD. PROVIDE ALL FLOOR PENETRATIONS FOR PIPING IN ACCORDANCE WITH PROJECT'S STRUCTURAL DRAWINGS. ALL TENANT DOMESTIC
WATER USE SHALL BE METERED FROM NEW 1 1/2" METER PROVIDED IN ROOM N002. DO NOT PROVIDE ANY DOMESTIC WATER CONNECTIONS FOR TENANT'S FIXTURES AND EQUIPMENT OFF ANY PIPING NOT ON THE DOWNSTREAM
SIDE OF THE NEW 1 1/2" METER. NOT TO SCALE 1 TENANT DOMESTIC WATER HEATING PLAN DETAIL NOT TO SCALE 2 THERMAL EXPANSION TANK DETAIL NOT TO SCALE 3 BALANCE VALVE ARRANGEMENT DETAIL NOT
TO SCALE 4 INLINE PUMP DETAIL NOT TO SCALE 5 GAS EQUIPMENT CONNECTION DETAIL NOT TO SCALE 6 PIPING IDENTIFICATION LABEL DETAIL REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 e1
e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 ELEV 1968 MECHANICAL ROOM N002 FUTURE WORK N001 ELECTRICAL ROOM N003 STAIR
3 ST3 4" 2" (E)SAN (E)3/4" CW UP TO WH 2"● 3" 4" 6" (E)SAN (E)SAN 4" 4" 4" 22 16 23 26 9 ● ●● ●●● 16 29 2" 23 27 19 3/4" 3/4" 23 3/4" 1" (E)ST 3/4" ● 3/4" 17 ●● ● 3/4" 25 ● 231" ●
●● ●●● 1 1/2" (E)4" SAN 15 1" 3/4" 1 1/2" 20 ●● ● 1" 11/2" 3/4" 7●● ● 7 5 3 ● 2" 14 6 4" 9 19 3" 16 9 3/4" 24 4 1 1/2" 9 13 28 24 21 12 11 4" 2 4" 1 8 10 140 ●● 32 (E)2" IW 30 31
56 9 1 23 1 1 1" 58 4" 59 1 18 1 1 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 (E)FD (E)WH (E)HB (E)INV. 360.00'
6" 3" 1 1/2" 4" 4"3" 4" 2" 2" 4" 4" 4" 1 1/2" 3" 3" 3" 1 1/2" 1 1/2" 1 1/2" 4" 4" 4" 3" 2" 1 1/2" 1 1/2" 3" 2" 2" 4"(E)ST JAN. CLOS. 590 SERVICE 591 ELEV 473 TRASH/ RECYCLE N106 DINING
102 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 (E)FD (E)SAN (E)●● (E)SAN (E)IW (E) ●● (E)SAN (E)IW (E)ST (E)ST (E)SAN (E)SAN (E)IW (E)ST (E)ST (E) ● (E)●● (E)● A
B Z D E (3) F AD I V AA O N MP Q Q K V R Q P S T (E)WH 4" FD 4" FD 4"FD 4" FD 4" FS 4" FS 4" FD 4" FS 4" FS WC-B WC-A WC-A LAV-A 4" FD UR(2) WC-B G 34 33 3" LAV-A 36 37 3" 35 35 G 34
G 3" G G 2" 2" G 38 (TYP.10) 2" ●● ● 45 2" 33 39 40 2" 45 ●● ● 49 53 53 53 53 532" 50 38 38 55 40 40 38 (TYP.2) 38 IW 51 54 52 43 4" FS 46 46 MB IW 44 56 48 3" 1 1/2" 41 4257 1 57 41
41 1 41 1 4" FS 1 1 47 1 1 1 4" FIN. FLOOR EXIST. SANITARY SUMP PUMP SYSTEM CO 4" 2" EXIST. 2" VENT GREASE TRAP ON FIN. FLOOR, WITH REMOVABLE COVER FOR ACCESS 4" FROM TENANT FLOOR
SINKS, POT SINK, ETC. REWORK PIPING AND SUMP COVER AS REQUIRED TO ACCOMMODATE NEW 4" SANITARY INTO SUMP GREASE TRAP DESIGN: WATTS GP-50 1 2" 2" BALL VALVE (TYP.) UNION (TYP.)1 1/2"
TENANT METER ON WALL AT 3'-0" AFF 2" 2" FROM BUILDING CW SYSTEM 2" TO TENANT FIXTURES AND EQUIPMENT DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273
7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way.
If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the
date of such alteration, and a specific description of the alteration. 5/10/2021 12:54:58 PM P101 BASEMENT AND FIRST FLOOR PLANS PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca,
NY 14850 Ithaca Beer Company AT SAI TENANT FIT-OUT FOR 0' 2' 4' 8' 16' 1/8" = 1'-0" 1 BASEMENT FLOOR PLAN - PLUMBING 1/8" = 1'-0" 2 FIRST FLOOR PLAN - PLUMBING 0' 2' 4' 8' 16' P101
DRAWING NOTES 42 DROP 2" GAS TO EQUIPMENT UNDER HOOD. REFER TO DETAIL 3 ON DRAWING P201. 43 CONNECT EACH SANITARY BRANCH TO NEW 4" DROP, RUN TO BASEMENT. 44 RUN 1 1/2" IW TO MOP SINK.
45 CONNECT 1 1/2" HW AND 1 1/2" CW TO EXISTING PIPING. ROUTE NEW PIPING TO AVOID WORK IN KITCHEN. 46 PROVIDE TWO(2) 3/4" HW(140) AND TWO(2) 1" CW CONNECTIONS TO PIZZA HOOD. PROVIDE
VALVE AND UNION AT EACH CONNECTION. PROVIDE 1 1/2" IW DRAINS FROM PIZZA HOOD TO FS. 47 PROVIDE 1" IW FROM BEER COOLER EVAPORATIVE EQUIPMENT TO FS. RUN PIPING ALONG WALL BEHIND PIZZA
OVEN. 48 3/4" CW, 3/4" HW(115) AND 1" HW(140) UP FROM BASEMENT. CONNECT HW(115) AND CW TO MOP BASIN. RUN 1" HW(140) AND 1" CW AS INDICATED TO PIZZA HOOD. 49 CONNECT 2" CW AND 2" HW
TO EXISTING PIPING. 50 DROP 1 1/2" VENT, 1 1/2" WASTE DOWN. 1/2" HW AND CW FOR WATER STATION/SINK AND COFFEE MAKER. 51 CONNECT 1 1/2" IW TO EXISTING IW. 1 1/2" IW DOWN. 52 CONNECT 4"
STORM TO EXISTING, CONNECT 3" AND 4" SAN TO EXISTING. DROP 4" STORM AND 4" SAN TO BASEMENT. 53 3/4" HW, 3/4" CW UP FROM BASEMENT. CONNECT TO ALL FOOD SERVICE EQUIPMENT REQUIRING THESE
SERVICES. 54 CONNECT 1 1/2" IW, 4" STORM AND 4" SAN TO EXISTING PIPING. DROP EACH SERVICE DOWN TO BASEMENT. 55 1 1/2" VENT UP, 1 1/2" SAN DN. 56 1/2" CW, 1/2" HW AND 1 1/2" SAN UP TO
HAND SK. PROVIDE BALL VALVES ON CW AND HW PIPING. 57 PROVIDE TWO(2) 1 1/2" IW DRAINS FOR HOOD TO NEAREST FLOOR SINK. 58 4" SANITARY WITH TRAP UP TO FS. 1/2" CW AND HW UP TO SINK. 59
PROVIDE BALL VALVES ON CW AND HW PIPING. P101 DRAWING NOTES 21 CONNECT 4" STORM AND 4" SANITARY FROM RELOCATED RISERS TO EXISTING STORM AND SANITARY. 4" ST, 4" SAN UP. 22 CONNECT 1
1/2" IW FROM RELOCATED RISER TO EXIST 1 1/2". 1 1/2" IW UP. 23 4" SANITARY WITH TRAP UP TO FLOOR SINK. 3/4" HW AND CW UP. 24 2" VENT UP. 25 3/4" HW AND CW UP, 3" SANITARY UP FOR COMPARTMENT
SINK. 26 3/4" HW AND CW UP. 27 CONNECT 2" VENT TO EXISTING 2". 28 CONNECT 4" STORM FOR RELOCATED RISER TO EXISTING 4". 4" STORM, 2" VENT UP. 29 4" STORM, 4" SANITARY AND 1 1/2" IW UP.
CONNECT TO EXISTING STORM, SANITARY AND IW. 30 CONNECT 1 1/2" SANITARY TO EXISTING 6" SANITARY. 31 1 1/2" SANITARY, 1/2" HW AND CW UP TO SINK/WATER STATION. 32 1" HW(140) UP. 33 DROP
3" GAS AT EXTERIOR OF BLDG. AND CONNECT TO TENANT GAS METER. PROVIDE 3" VALVE. 34 SLEEVE AND SEAL 3" PIPE AT WALL PENETRATION SO THAT PIPING IS ISOLATED FROM BLDG. CONSTRUCTION. PROVIDE
LINK SEAL. 35 DOMESTIC WATER PIPING FOR ALL FIXTURES IN THIS TOILET ROOM FROM BASEMENT AS REQUIRED. 36 TERMINATE 3" INTAKE AND 3" EXHAUST (FOR BASEMENT WATER HEATER) IN ACCORDANCE WITH
ALL MANUFACTURER'S RECOMMENDATIONS. 37 3" INTAKE, 3" EXHAUST FOR WATER HEATER DOWN TO BASEMENT. 38 2" VENT DOWN. 39 DROP 2" GAS AND CONNECT TO MAU BY HVAC TRADE. PROVIDE VALVE, UNION
AND DIRT LEG. REFER TO DETAIL 5 ON DRAWING P001. 40 CONNECT 2" VENT TO EXISTING 2". 41 DROP 2" GAS TO EQUIPMENT UNDER HOOD. REFER TO DETAIL 3 ON DRAWING P201. P101 DRAWING NOTES 1 1"
CW, 2" SAN UP FOR URINAL. 2 1 1/2" CW, 4" SAN, 2" VENT UP FOR WC. 3 CONNECT 2" CW TO EXISTING 3". 4 DROP 2" CW AT WALL. PROVIDE 1 1/2" DOM. COLD WATER METER WITH DIGITAL INTERACE AT
3'-0" AFF. PROVIDE VALVE ON EACH SIDE OF METER. RISE UP AND RUN 2" CW TO TENANT'S SYSTEM AS INDICATED. METER MAKE: NEPTUNE T-10 WITH WIRELESS AND DIGITAL INTERFACE. REFER TO DETAIL
4 ON THIS DRAWING. 5 GREASE TRAP ON FLOOR. REFER TO DETAIL 3 ON THIS DRAWING. 6 3" INTAKE, 3" EXHAUST FOR WATER HEATER, RUN UP IN WALL ABOVE. PIPING SHALL BE SCH. 40, CPVC. 7 1/2" HW
AND CW, 1 1/2" SANITARY UP FOR TROUGH LAV FIXTURE. 8 CONNECT 2" VENT FROM GREASE TRAP TO EXISTING 2" VENT UP. 9 4" SANITARY WITH TRAP UP TO FLOOR DRAIN. 10 1 1/2" CW, 4" SAN, 2" VENT
UP FOR WC IN WOMEN'S TOILET ROOM ABOVE (TYP.3). 11 4" RELOCATED SANITARY RISER UP. CONNECT TO SANITARY ON THIS LEVEL. 12 CONNECT 1 1/2" SAN, 4" SAN, 4" SAN (NEW BRANCHES) TO EXISTING
4" SANITARY. 13 DROP 3/4" CW WITH VALVE. PROVIDE HB AT 48" AFF ON SOUTH FACE OF COLUMN D-4. 14 TENANT'S DOMESTIC WATER HEATER. REFER TO DETAIL 1 ON DRAWING P001. 15 CW, HW AND HWR FOR
TENANT'S DOM. WATER HEATING PLANT. PUMP RP-1. REFER TO DETAIL 1 ON DRAWING P001. 16 CONNECT 4" SANITARY TO EXISTING 4" SANITARY. 17 CONNECT 3/4" CW TO EXISTING 3/4" STUBBED DOWN INTO
SPACE (SERVES WH IN TENANT OUTDOOR SPACE). 18 4" SANITARY WITH TRAP, 2" VENT UP TO FLOOR SINK. 19 TWO(2) - 2" VENTS UP. 20 1" HW AND CW UP. 3" SANITARY WITH TRAP UP TO MOP BASIN. 4"
SANITARY WITH TRAP UP TO FLOOR SINK. GENERAL NOTES: 1. 2. 3. FIELD VERIFY AND COORDINATE WITH ALL EXISTING PIPING. AVOID EXISTING PIPING AS REQUIRED. COORDINATE ALL FLOOR DRAIN AND
FLOOR SINK LOCATIONS WITH ALL FOOD SERVICE EQUIPMENT. LOCATE AS REQUIRED FOR PROPER DRAINAGE OF ALL EQUIPMENT. DO NOT LOCATE UNDER EQUIPMENT LEGS/SUPPORTS OR AT INACCESSIBLE LOCATIONS.
COORDINAE WITH NYSEG AS REQUIRED TO OBTAIN AND INSTALL GAS METER FOR THIS TENANT. PROVIDE ALL REQUIRED WORK TO ESTABLISH TENANT'S GAS SERVICE. REVISION SCHEDULE NAME DATE Addendum #1
05/10/21 NOT TO SCALE 3 GREASE TRAP DETAIL NOT TO SCALE 4 TENANT WATER METER DETAIL 1 1 1 1 KITCHEN/FOOD SERVICE EQUIPMENT NOTED ON PLAN BY SYMBOL. REFER TO PROJECTS FOOD SERVICE DOCUMENTS
FOR ADDITIONAL REQUIREMENTS. 1 QTY EQUIPMENT CATEGORYITEM CODE FOOD SERVICE PLUMBING SCHEDULE HOT WATER SIZE COLD WATER SIZE DIRECT DRAIN SIZE INDIRECT DRAIN SIZE GAS SIZE CFH PLUMBING
REMARKS - PROVIDE ALL WORK GAS RANGE 1 GAS SALAMANDER 1 3 11 HAND SINK 1/2" 1/2" 1" 406 43 3/4" 87GAS CHARBROILER GAS GRIDDLE1 3/4" 135 GAS FRYER 1 1 1 1 3 1 1 A Z 1/2" B D E 1/2"
& 3/4" 90 F 1 1/2" I COFFEE MAKER 1/2" PROVIDE IN-LINE WATER FILTER K ICE MAKER 3/8" 1 1/2" IW TO FLOOR SINK; PROVIDE WATER FILTER M THREE COMPARTMENT CORNER SINK 1/2" 1/2" 2" N 1
1/2" 3/4" 180 DEG. F HW FROM BOOSTER HEATER TO WASHER DISHWASHER 1 SOILED DISHTABLE 1/2" 1/2" 2"O 1 WALL MOUNTED UNDER BAR HAND SINK 1/2" 1/2" 1 1/2"P GLASS WASHER 1/2" 1 1/2" IW
TO FLOOR SINK Q R BAR REFRIGERATOR 1" UNDERBAR HAND SINKS 1/2" 1/2" 1 1/2" 1 UNDERBAR 2 BAY HAND SINK 1/2" 1/2" 1 1/2"T 2 DROP-IN WATER STATION V 1/2" 1 EVAPORATOR AA/AD 3/4" IW
TO FLOOR DRAIN OR FLOOR SINK IW TO FLOOR SINK GAS PRESSURE REQUIRED: 4.5" W.C. GAS PRESSURE REQUIRED: 5.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C.
GAS PRESSURE REQUIRED: 4.0" W.C. VENT SIZE 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" NOTES: 1. OBTAIN MANUFACTURERS DETAILS, CUT SHEETS AND INFORMATION ON ALL KITCHEN EQUIPMENT AND PROVIDE
ALL REQUIRED ROUGH-INS, CONNECTIONS AND DRAINS. PROVIDE ISOLATION SHUT-OFF VALVES FOR EACH PIECE OF EQUIPMENT. RUN DOMESTIC WATER PIPING ALONG WALL, ABOVE FLOOR TO SERVICE MULTIPLE
PIECES OF EQUIPMENT FROM SUPPLIES PIPED UP FROM BASEMENT. 2. 3. 4. IW TO FLOOR DRAIN OR FLOOR SINK 1 11/2" 11/2" 11/2" 3" 3" FIN. FLR CO CONN. 2" WASTE TO EACH SINK COMPARTMENT (TYP.
3) 2" P-TRAP (TYP. 3) 4" FLOOR SINK (FS) CONNECT 1/2" H&C TO FAUCET 1/2" H&C TO FAUCET OR FLEX HOSE (TYP. 3) INSTALL STOPPER (FURNISHED BY KEC) AT EACH COMPARTMENT ALL PIPING, TRAPS,
ETC. BY P.C. TERMINATE 2" ABOVE RIM OF FS QUANTITY OF SINK COMPARTMENTS AS NOTED ON PLANS. NOTES: 1. IF SINK IS UTILIZED FOR FOOD PREPARATION, INDIRECT WASTE CONN. IS REQUIRED. IF SINK
IS ONLY USED FOR POT WASHING, DIRECT CONN. IS ACCEPTABLE. 2. FLOOR DRAIN/SINK CONDENSER WATER SUPPLY CONNECTION FILTER - MOUNT AT ACCESSIBLE HEIGHT AND LOCATION. 1/2" INLINE DOUBLE
CHECK VALVE SIMILAR TO WATTS #9BD CONDENSER WATER WASTE CONNECTION 1" DRAIN WITH VENTING TEE PITCH INDIRECT WASTE PIPING TO DRAIN FINISHED FLOOR PROVIDE DRAINS TO NEAREST FLOOR DRAIN
OR FLOOR SINK FROM ICE MAKER SUMP, ICE BIN AND BACKFLOW PREVENTER. TERMINATE PIPING AT 1" ABOVE DRAIN AS SHOWN. PITCH INDIRECT WASTE PIPING 1/4" PER FOOT MINIMUM. CONNECTIONS ARE DIAGRAMATIC
AND SHOWN ON SIDES OF ICE MACHINE FOR CLARITY. THEY WILL NORMALLY BE ON THE BACK OF THE MACHINE. COORDINATE FINAL POINTS OF CONNECTION WITH THE MANUFACTURER. INSULATE WATER SUPPLY PIPING
AS SPECIFIED. COVER INSULATION WITH PVC JACKET. FILTER SHALL BE INSURICE NO. 2000, TWIN. 1" MINIMUM BIN DRAIN 1 1/2" 1/2" 1/2" 1/2" COLD WATER ICE MAKER SUPPLY DETAIL NOTES: A. B. C.
D. E. ICE MACHINE ICE BIN UNION (TYPICAL) A G 2" CAP GAS VALVE CSA, UL LISTED STAINLESS STEEL GAS FLEX CONNECTION PROVIDE FINAL CONNECTION TO EQUIPMENT PROVIDE THIS ARRANGEMENT FOR
ALL EQUIPMENT NOTE: SIZE OF EACH VALVE AND FLEX CONNECTION AS NOTED. EQUIPMENT DESIGNATIONS PER SCHEDULE ON THIS DRAWING FLOOR SUPPORT (TYP.) 14" CAP, INSTALL TO MAINTAIN ACCESS FOR
REMOVAL FINISHED FLOOR 8" DIRT LEG EMERGENCY SHUTOFF VALVE FURNISHED BY OTHERS, INSTALLED BY P.C. UNION, TYP. MANUAL SHUTOFF VALVE 2" 1" Z 3/4" E (TYP.3) ALL 3/4" D 3/4" B 3/4" 2" 2"
2" HEADER TIGHT TO WALL BEHIND APPLIANCES 2" G FROM 3" MAIN OFF TENANT'S METER DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing
the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration,
and a specific description of the alteration. 5/10/2021 12:56:07 PM P201 KITCHEN EQUIPMENT SCHEDULE AND DETAILS PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850 Ithaca
Beer Company AT SAI TENANT FIT-OUT FOR NOT TO SCALE 1 KITCHEN EQUIPMENT SCHEDULE NOT TO SCALE 2 THREE COMPARTMENT SINK PLUMBING DETAIL NOT TO SCALE 4 ICE MACHINE CONNECTION DETAIL NOT
TO SCALE 3 HOOD GAS PIPING SCHEMATIC DETAIL REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 PIZZA OVEN HOOD REQUIREMENTS AND NOTES: 1. 2. PIZZA OVEN HOOD: A. PROVIDE TWO(2) - 3/4"
HOT WATER (140 DEG.F) CONNECTIONS FOR HOOD. B. PROVIDE TWO(2) - 1" COLD WATER CONNECTIONS FOR HOOD. C. PROVIDE VALVE AND UNION ON ALL CONNECTIONS. D. PROVIDE TWO(2) - 1 1/2" IW DRAINS
FROM HOOD TO FLOOR SINK. FOR ALL HOODS ON PROJECT OBTAIN MANUFACTURER'S TECHNICAL DRAWINGS AND SPECIFICATIONS AND COORDINATE LOCATIONS. PROVIDE ALL REQUIRED PLUMBING TO EACH HOOD. 1
UP UP e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 102 DINING 762 ELEV N106 TRASH/ RECYCLEST3 STAIR 3 N103 LEASING
OFFICE FD/SD (E)HP-104A (E)HP-104B (E)HP-104C (E)EUH-3 (E)EUH-4 (E)HP-102 (E)16x12 (E)20x12 N107 LOADING ZONE (E)EF-2 8" N108 WATER METER N105 CORRIDOR 20x12 x 8 8 (E) 150 8" N100 VESTIBULE
(E)EUH-5 (E)EWH-5 EWH-1 (E)CUH-2(E)CUH-1 FD (E)14x10 (E)14x6 FD FD (E)EUH-6 (E)EUH-7 N323 COOLER 104 WOMEN'S TOILET 103 MEN'S TOILET HOOD H-1 HOOD H-1A 14x8 106 BAR 430 SF RETAIL 105
KITCHEN EUH-8 EUH-9 14" "8 4 160 "8 4 160 x12 6 2 240 TYP=2 8" 8" "8 4 160 "8 4 160 "8 4 160 "8 4 160 "8 4 160 8" 16x10 HP-104D x12 6 3 100 TYP=4 1 2 2 2 3 4 4 5 5 9 (E)10" 8x8 HOOD
H-2 14x10 14x8 36x14 MAU-1 9'-6"Lx38"Wx36"H APPROX. 815 LBS 1112 7 x 6 6 A 50 EF-8 x 8 8 2 110 TYP=2 10x6 x10 10 A 210 TYP=2 12x6 " 1 8 290 " 1 8 290 14x10 14x8 6" 6" 26x12 26x12 36x14
10x6 x22 22 A 800 14x10 8 14" 10x8 12x8 10x8 10x8 8x6 6" 14" 14" " 1 6 100 x14 6 3 150 x14 6 3 150 12" 8x8 VAV-2 10" 16x12 6 10 10 10 10 10 10 10 10 13 15 15 x22 10 3 625 VAV-1 14 10"
16 16 16 16 14x10 AREA NOT IN SCOPE OF WORK 42x14 48"x48" O.A. LOUVER IL-1 17 14x6 6" 12x6 (BELOW) 8" 2-WAY 24x24 AREA NOT IN SCOPE OF WORK 18 1919 1919 20 10x10 6" 21 10x6 (E)EF-1
12x8 22 23 16x10 12x12 16x10 x14 6 3 150 8" 24 8 12x10 16x12 12x10x22 10 3 625 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O
1 M 1.9 6.5 473 ELEV N106 TRASH/ RECYCLE (E)HP-104C (E)HP-104B (E)HP-104A (E)EUH-3 (E)EUH-4 (E)HP-102 N103 LEASING OFFICE N105 CORRIDOR N107 LOADING ZONE N108 WATER METER ST3 STAIR
3 (E)1" HPWS&R 1" HPWS&R 1" HPWS&R 11/2" HPWS&R (E)EF-2 T T S S S S N100 VESTIBULE N101 RECEPTION N102 LOBBY (E)HP-103 11/2" HPWS&R EWH-1 T (E)EUH-5 (E)1" HPWS&R (E)1 1/4" HPWS&R (E)3/4"
HPWS&R S HP-104D 107 RETAIL 102 DINING 106 BAR 105 KITCHEN 103 MEN'S TOILET 104 WOMEN'S TOILET N323 COOLER HOOD H-1 HOOD H-1A HOOD H-2 S (E) (E) (E) (E) (E) 1 1 1 1" HPWS&R 2 2 2 2
3 4 4 4 4 4 4 AREA NOT IN SCOPE OF WORK EF-8 VAV-1 VAV-2 EUH-8 EUH-9 5 AREA NOT IN SCOPE OF WORK MAU-1 6 7 DRAWING NOTES: 1. EXISTING 26x12 VENTILATION SUPPLY AND RETURN DUCTWORK UP
IN CHASE, 20x12 DOWN. 2. PROVIDE LINED RETURN AIR PLENUM THE SAME SIZE AS UNIT CONNECTION. RETURN DUCTWORK TO BE OPEN ENDED WITH WELDED WIRE MESH. 3. PROVIDE WALL CAP WITH BACKDRAFT
DAMPER. 4. MOUNT UNIT HEATER AT 9'-0" AFF. 5. EXISTING HEAT PUMP HP-104C TO BE REPOSITIONED TO LOCATION SHOWN. 6. EXISTING HEAT PUMP HP-104BA TO BE REPOSITIONED TO LOCATION SHOWN. 7.
CONNECT NEW 16x12 VENTILATION AIR DUCT TO EXISTING 16x12 AT POINT OF CONNECTION SHOWN. 8. PROVIDE NEW DUCT STATIC PRESSURE SENSOR AND INSTALL AT THIS LOCATION. REFER TO RISER DIAGRAM
FOR MORE INFORMATION. 9. TERMINATE 16x12 VENTILATION RETURN AIR WITH WELDED WIRE MESH. 10. DUCTWORK TO BE EXPOSED IN DINING/BAR/RETAIL AREA. DUCTWORK SHALL BE GAVANEAL AND PAINTED.
COLOR SELECTION BY ARCHITECT. 11. 36x14 EXHAUST DUCT UP SIDE OF BUILDING TO EF-6 ON ROOF. REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING S100 FOR MOUNTING AND
SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL LOCATION OF DUCTWORK AND SUPPORTS WITH EXISTING WINDOWS. 12. 16x10 EXHAUST DUCT UP SIDE OF BUILDING TO EF-7 ON ROOF.
REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING S100 FOR MOUNTING AND SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL LOCATION OF DUCTWORK
AND SUPPORTS WITH EXISTING WINDOWS. 13. OUTLINE OF LOWER CEILING/SOFFIT AREA. REFER TO RCP PLAN FOR MORE INFORMATION. 14. CONNECT NEW 16x12 VENTILATION AIR DUCT TO EXISTING AT POINT
OF CONNECTION SHOWN. 15. HEAT PUMP TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE LOCATION OF HEAT PUMP WITH SLAT CEILING SO THAT HEAT PUMP REMAINS ACCESSIBLE FOR SERVICING. REFER
TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 16. PROVIDE REMOTE VOLUME DAMPERS ABOVE GYP BOARD CEILING. 17. VAV TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE LOCATION OF VAV
WITH SLAT CEILING SO THAT VAV REMAINS ACCESSIBLE FOR SERVICING. REFER TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 18. MOUNT BOTTOM OF INTAKE LOUVER AT 12" AFF. PROVIDE 1'-0" DEEP
PLENUM WITH ACCESS DOOR. 19. EXHAUST DUCTWORK AT EXTERIOR OF BUILDING SHALL BE INSULATED WITH KITCHEN HOOD EXHAUST DUCT WRAP AND COVERED WITH ALUMAGUARD JACKETING PER MANUFACTURER'S
RECOMMENDATIONS. DUCTWORK IS TO ROUTE UP 6 STORIES TO ROOF. APPROX. 70 FT. 20. UNIT TO SIT ON 6" CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL FOR MORE INFORMATION. 21. ACCESS PANEL FOR
EXHAUST FAN. REFER TO ARCHITECTURAL PLANS FOR MORE INFORMATION. 22. EXISTING EXHAUST FAN EF-1 TO BE RELOCATED AT LOCATION SHOWN. 23. EXISTING WALL CAP WITH BACKDRAFT TO BE MOVED TO
LOCATION SHOWN. 24. CONNECT NEW 8" DUCT TO EXISTING AT POINT OF CONNECTION SHOWN. X DRAWING NOTES: 1. RELOCATE EXISTING SENSOR TO NEW LOCATION SHOWN. EXTENDED/MODIFY CONTROL WIRING
AS REQUIRED. 2. EXTEND MODIFY HPWS&R PIPING TO RELOCATED EXISTING HEAT PUMP. 3. CONNECT NEW 1" HPWS&R PIPING TO EXISTING 2" TAP AND CONNECT TO RELOCATED HEAT PUMP AS SHOWN. 4. PIPING
IN OPEN CEILING AREAS TO BE PAINTED. COLOR SELECTION BY ARCHITECT. 5. PROVIDE REMOTE MOUNTED LCD CONTROL PANEL FOR HOOD OPERATION. 6. PROVIDE ANSUL PULL STATION AT LOCATION SHOWN. 7.
WALL MOUNTED UTILITY CABINET FOR HOOD H-2. X GENERAL NOTES: A. REFER TO DRAWINGS M401-M405 FOR COMPLETE HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING ERV TO
BE RE-BALANCED FOR NEW 1250 CFM OF VENTILATION AIR FOR FIRST FLOOR LEVEL. REFER TO RISER DIAGRAM ON M500 FOR MORE INFORMATION. GENERAL NOTES: A. REFER TO DRAWINGS M401-M405 FOR COMPLETE
HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING HEAT PUMP WATER PUMPS AND SYSTEM TO BE REBALANCED TO NEW GPM QUANITITY. REFER TO RISER DIAGRAM ON M500 FOR MORE
INFORMATION. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West
State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person,
unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall
affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 12:17:17
PM M101 FIRST FLOOR PLANS - HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 FIRST FLOOR PLAN - HVAC DUCTWORK
0' 2' 4' 8' 16' 1/8" = 1'-0" 2 FIRST FLOOR PLAN - HVAC PIPING 0' 2' 4' 8' 16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 3 2 3.5 3.9 4
4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 EXISTING EVAPORATIVE COOLER EVC-1 15'-0"Lx4'-0"Wx10'-6"H APPROX. 7,970 LBS (E)ERV-1 6'-5"Wx15'-2"Lx5'-6'-0"H APPROX. 4,328
LBS ST3 STAIR 3 10'-0" MIN. (E)EF-3 (E)EWH-4 26" EF-6 EF-7 12 3 4 4 14" 3 14" 26" 5 55 5 5 5 10'-0" MIN. DRAWING NOTES: 1. 36x14 EXHAUST DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTURAL
DRAWINGS FOR MOUNTING AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING.REFER TO M101 FOR CONTINUATION. 2. 16x10 EXHAUST DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTUAL DRAWINGS FOR MOUNTING
AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING. REFER TO M101 FOR CONTINUATION. 3. DUCTWORK EQUIPMENT SUPPORT RAILS, TYPICAL. REFER TO STRUCTURAL DRAWING S100 FOR COMPLETE DETAILS.
4. ROOF EXHAUST FAN. REFER TO DETAIL ON DRAWING M400 FOR MORE INFORMATION. 5. EXTERIOR EXHAUST DUCTWORK TO BE INSULATED WITH KITCHEN HOOD EXHAUST DUCT WRAP AND COVERED WITH ALUMAGUARD
JACKETING PER MANUFACTURER'S RECOMMENDATIONS. X DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior
Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of
New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered,
the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the
alteration. 5/10/2021 12:17:18 PM M102 ROOF PLAN HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 2 ROOF PLAN
- HVAC 0' 2' 4' 8' 16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 S F F F F S S F F S S S F M M H H H H S S S CO CO CO F F M M M M M M CO F F F F F HD HD WAP WAP M OS OS J J
J a-k D J J J J a-k D J J PC PC e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV ST1 EXISTING STAIR 1 589
ELECT. PANELS 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE 102 DINING N108 WATER METER N101 RECEPTION N100 VESTIBULE N102 LOBBY N103 LEASING OFFICE ST3
STAIR 3 591 SERVICE A C G H H I N AA2 AD1 J Q Q R K Q W X UC UC EUH-8 EUH-9 UC UC AB UC UC AA1 AC AC 1 J1 2 AD2 MAU-1 EF-8 (ER) (ER) (ER) (ER) HP-B HP-B HP-104D HP-B (ER) (30/2) 53,55
TP-1 TP-1 57,59 (30/2) TP-1 58,60 (30/2) (ER) (ER) 5 7 (ER) 6 CM IM IM 7 6 9 9 UC UC UC UC UC 10 10 2#10, 1#10, 3/4"C 2#10, 1#10, 3/4"C 8 8 8 (E) (E) 8 8 8 6 6 6 6 6 6 6 2#10, 1#10,
3/4"C 4 4 4 2 2 2 2 2 11 11 11 11 11 11 11 68 7 7 66 64 62 70 72 AA3 AD3 10 10 12 12 13 9 9 9 8 8 8 8 AC 14 14 EF-1 (ER) 15 16 16 1 1 1 1 1 GENERAL ELECTRICAL NOTES: A. UNLESS NOTED
OTHERWISE PROVIDE 2#12, 1#12G, 1/2"C AND CONNECT ALL ELECTRICAL DEVICES, EQUIPMENT AND LIGHTING FIXTURES TO CIRCUITS IN PANEL TP-1 IN BASEMENT, CIRCUIT NUMBERS AS INDICATED ON PLAN.
B. PROVIDE 2#12, 1#12, 1/2"C AND CONNECT EMERGENCY BATTERY LUMINAIRES AND EXIT SIGNS TO AREA LIGHTING CIRCUIT AHEAD OF ALL SWITCHING AND CONTROLS. C. PROVIDE 0-10V WIRING FOR DIMMING
OF ALL LIGHT FIXTURES INDICATED AS BEING DIMMED UTILIZING 0-10V DIMMING. D. PROVIDE FORWARD PHASE DIMMING DIGITAL LIGHTING ROOM CONTROLLERS FOR ALL LIGHTING REQUIRING LINE VOLTAGE DIMMING.
E. ALL LIGHTING WITHIN THE DAYLIGHTING ZONE SHALL BE ABLE TO BE DIMMED BY PHOTOCELL. F. PROVIDE SOUNDER BASE FOR ALL CO DETECTORS. G. UNLESS OTHERWISE NOTED ALL RECEPTACLES IN KITCHEN
AND BAR AREA SHALL BE GFCI PROTECTED. RECEPTACLES SHALL BE NORMAL RECEPTACLES CONNECTED TO GFCI CIRCUIT BREAKERS. H. ALL TRACK LIGHTING SHALL HAVE TIME OF DAY CONTROL TO MEET ENERGY
CODE SPECIFIC APPLICATION CONTROL REQUIREMENTS. THE DIGITAL LIGHTING CONTROLLERS FOR THESE ZONES SHALL BE PROGRAMMED FOR TIME OF DAY CONTROL WITH LOCAL SWITCH OVERRIDE. COORDINATE WITH
TENANT FOR ANY ADDITIONAL LIGHTING OR SIGN CIRCUITS TO HAVE TIME OF DAY CONTROL. PROVIDE ZONE CONTROLLER AS REQUIRED FOR TIME OF DAY FEATURE FOR THE DIGITAL CONTROLLERS. I. LOCATE DIGITAL
LIGHTING CONTROLLERS ABOVE ACCESSIBLE CEILING OR IN TENANT'S AREA IN BASEMENT BELOW SO NOT VISIBLE IN EXPOSED CEILING AREAS. J. NORTH AND WEST DAYLIGHT ZONES ARE INDICATED ON PLAN.
IF THE INSTALLED LIGHTING IS OVER 150W IN A ZONE THEN THAT ZONE WILL REQUIRE A DAYLIGHT SENSOR AND THE LIGHTING WITHIN THE ZONE SHALL DIM UP AND DOWN BASED ON THE DAYLIGHT. SWITCHES
SHALL PROVIDE OVERRIDE CONTROL OF THE DAYLIGHTING ZONE. K. ALL EXIT SIGNS AND SENSORS SHALL BE PENDANT MOUNTED WHERE NO CEILINGEXISTS. e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 3 2 3.5
3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV ST1 EXISTING STAIR 1 589 ELECT. PANELS 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE
102 DINING N105 CORRIDOR N103 LEASING OFFICE ST3 STAIR 3 N108 WATER METER N100 VESTIBULE N101 RECEPTION c c c 67 2 2 2 1 3 3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 d d d d d d d d d d L4 L4
L4 L4 L4 L4 L4 L4 f f f f f f f fL1 L1 L1 L1 e e e e L2 L2 L2 h L5 L5 L5 L5 L5 L5 L5 L5 L2 L2 g g L2 h L2 L1 8 8 17 4 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 10 10 65 65 65 65 65 65 65
65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 63 6363 6363 63 63 63 63 63 63 63 63 63 6363636363 63 69 69 69 65 71 73 75 75 DAYLIGHTING ZONE DAYLIGHTING ZONE 67 67 11 L3 L3
a a L3 L3 b b i j j k 3 3 1 1 1 1 1 1 1 DRAWING NOTES: 1. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR CURVED SIGNAGE. COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE
FIELD WITH SIGNAGE. 2. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR ORGANIC PENDANT LIGHTING. REFER TO ARCHITECTURAL RCP FOR EXACT QUANTITIES OF LIGHTS. APPROXIMATELY 1/3
OF PENDANTS TO BE FED PER JUNCTION BOX. 3. PROVIDE UNISTRUT AT 9'-0" AFF TO PROVIDE PATHWAY FOR PENDANT LIGHTS. COORDINATE EXACT LOCATION OF LIGHTS WITH ARCHITECT PRIOR TO ROUGH-IN.
MC CABLE SHALL RUN IN UNISTRUT. PROVIDE ELECTRICAL BOX FOR EACH LIGHT FIXTURE MOUNTED TO UNISTRUT. 4. DIMMING CONTROL STATION FOR LIGHTING ZONES 'a' THROUGH 'k'. PROVIDE CONTROL STATIONS
SO THAT EACH ZONE HAS ON/OFF CONTROL AND SHALL BE ABLE TO BE DIMMED UP/DOWN. PROVIDE QUANTITY OF CONTROL STATIONS REQUIRED. PROVIDE ONE CONTROL STATION WITH FOUR (4) SCENE SETTINGS
AND PROGRAM SCENES AS DETERMINED BY OWNER. ALL BUTTONS SHALL BE ENGRAVED INDICATING FUNCTION. 5. PROVIDE NEMA SIZE 1, 120V, 60HZ CONTACTOR WITH (3) N.O. CONTACTS IN NEMA 1 ENCLOSURE
FOR USE AS KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. MOUNT ABOVE CEILING IN CONVENIENT LOCATION ABOVE ACCESSIBLE CEILING. CONNECT TO 120V, 20A HOOD CIRCUIT AND CONNECT SUCH THAT ACTIVATION
OF HOOD FIRE SUPPRESSION SYSTEM DEACTIVATES CONTACTOR WHICH IN TURN DEACTIVATES ALL EQUIPMENT CONNECTED TO IT. 6. PROVIDE SAME 120V, 20A CIRCUIT AS THE KITCHEN HOOD TO GAS VALVE CONNECT
TO HOOD FIRE SUPPRESSION SYSTEM SUCH THAT ACTIVATION OF THE FIRE SUPPRESSION SYSTEM DEACTIVATES GAS VALVE WHICH SHUTS OFF GAS TO COOKING EQUIPMENT. COORDINATE EXACT LOCATION IN THE
FIELD. 7. PROVIDE FIRE ALARM INITIATION MODULE AT HOOD FIRE SUPPRESSION SYSTEM CONTROL PANEL AND CONNECT TO MICROSWITCH SUCH THAT FIRE ALARM GOES INTO ALARM UPON ACTIVATION OF HOOD
FIRE SUPPRESSION SYSTEM. 8. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT #63 FROM PANEL TP-1 FOR CONNECTING TO BATHROOM LIGHT FIXTURE(S). CONNECT SO CONTROLLED BY SWITCHES AND SENSORS
AS INDICATED. 9. PROVIDE DUPLEX RECEPTACLE UNDERNEATH BANQUET SEATING. COORDINATE EXACT LOCATION WITH ARCHITECT PRIOR TO ROUGH-IN. 10. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED
FOR SIGNAGE AT THIS LOCATION. COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE FIELD WITH SIGNAGE. 11. PROVIDE ONE LIGHT SWITCH TO CONTROL SIGNAGE CIRCUIT #67 FROM PANEL TP-1. PROVIDE
ANOTHER LIGHT SWITCH TO CONTROL L1 FIXTURE IN VESTIBULE. 12. PROVIDE GFCI RECEPTACLE UNDER SINK FOR PLUG IN TRANSFORMER FURNISHED BY PLUMBING TRADE. 13. DISCONNECT LOCATION FOR DISHWASHER.
RUN CONDUIT DOWN TO DISCONNECT AND BACK UP TO ABOVE CEILING. 14. PROVIDE PATHWAY FROM WIRELESS ACCESS POINT LOCATION TO DATA RACK. 15. EXTEND BRANCH CIRCUITING OF EXHAUST FAN SAVED
OFF DURING DEMOLITION TO THIS LOCATION AND CONNECT TO RELOCATED EXHAUST FAN. 16. PROVIDE XLERATOR XL SERIES 120V HAND DRYER. FINISH TO BE CHOSEN BY ARCHITECT. 17. ON/OFF CONTROL FOR
ALL LIGHTING ZONES A-K. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H
I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for
any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect
shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 1:33:59
PM E101 FIRST FLOOR PLANS POWER AND SYSTEMS / LIGHTING 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR 1/8" = 1'-0" 1 FIRST
FLOOR PLAN - POWER & SYSTEMS 1/8" = 1'-0" 2 FIRST FLOOR PLAN - LIGHTING 0' 2' 4' 8' 16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 1 1 1 1 REFERENCE NOTES: A. EXHAUST FAN IS
FOR PIZZA HOOD 1/1a. HOOD IS FURNISHED WITH ADJUSTABLE SPEED DRIVE IN CONTROL PANEL FOR FAN. PROVIDE CIRCUIT INDICATED TO DRIVE IN-HOOD CONTROL PANEL AND PROVIDE CONDUIT AND WIRING
FROM DRIVE TO EXHAUST FAN. FAN TO BE INTERLOCKED WITH MAU-1. B. PROVIDE 2#12 IN CONDUIT HOOD CONTROL PANEL TO MAU-1. PROVIDE 2#16 IN 1/2"C FOR 24VAC WIRING FROM HOOD CONTROL PANEL TO
MAU-1 BOARD FOR START/STOP. C. EXHAUST FAN IS FOR MAIN KITCHEN HOOD . PROVIDE POWER WIRING TO FAN FROM PANEL TP-1. PROVIDE #12 OUTDOOR RATED STP IN 1/2" CONDUIT FROM HOOD CONTROL PANEL
TO EXHAUST FAN. D. PROVIDE CAT5 CABLE FROM HOOD CONTROL PANEL TO UNIT. REFER TO WIRIING DIAGRAMS ON MECHANICAL DRAWINGS. REFERENCE NOTES: A. SEPARATE PIECE OF EQUIPMENT THAT WILL SHARE
NEMA 5-15R RECEPTACLE OF EQUIPMENT SHOWN ABOVE. B. EQUIPMENT IS LOCATED BENEATH HOOD AND SHALL BE CONNECTED THROUGH THE KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. REFER TO DRAWING NOTES
ON FLOOR PLAN. C. DRIVE FOR EF-7 LOCATED IN HOOD CONTROL CABINET. D. CIRCUIT INDICATED IS FOR WALK-IN COOLER LIGHTING AND CONTROLS. PROVIDE CIRCUIT INDICATED AND PROVIDE INTERCONNECTING
WIRING BETWEEN SWITCHES AND LIGHT FIXTURES FURNISHED WITH UNIT. SEAL CONDUITS AT WALL PENETRATIONS. E. PROVIDE WIRING FROM HOOD CONTROL PANEL TO ACCESSORY COMPONENTS FURNISHED WITH
HOOD AS FOLLOWS: MICROSWITCH 1 AND 2, HOOD LIGHTS, TEMP SENSOR, HOOD 1 CAPTURE VOLUME SENSOR, HOOD 1A CAPTURE VOLUME SENSOR, HOOD 3 VOLUME CAPTURE SENSOR, HOOD 1A PSP SENSOR. COORDINATE
ALL REQUIREMENTS WITH CAPITVAIRE IN THE FIELD. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS. F. PROVIDE OCTAGON BOX FOR FIRE SUPPRESSION SYSTEM REMOTE MANUAL PULL STATION, COORDINATE
EXACT LOCATION IN THE FIELD. PROVIDE 1/2" CONDUIT FROM BOX TO 6" ABOVE CEILING FOR USE BY FIRE SUPPRESSION SYSTEM INSTALLER. G. THIS HOOD DOES NOT HAVE A CONTROL PANEL. PROVIDE WIRING
FROM MAIN HOOD CONTROL PANEL TO LIGHT FIXTURES FURNISHED WITH THIS HOOD. H. COORDINATE LOCATION OF CONDENSING UNIT WITH INSTALLER PRIOR TO ROUGH-IN. I. CONTROL PANEL REQUIRES ETHERNET
CONNECTION. PROVIDE CONDUIT TO ABOVE ACCESSIBLE CEILING FOR WIRING BY TENANT'S IT VENDOR. GENERAL NOTES: A. COORDINATE ALL KITCHEN EQUIPMENT RECEPTACLE LOCATIONS AND EQUIPMENT CONNECTIONS
WITH FINAL LAYOUT OF EQUIPMENT. INSTALL ALL LUMINAIRES, SWITCHES, CONTROL PANELS, PUSH BUTTONS, FURNISHED LOOSE WITH THE EQUIPMENT. PROVIDE ALL REQUIRED INTERCONNECTING POWER AND CONTROL
CONDUIT AND WIRING. B. UNLESS NOTED OTHERWISE, ALL NEMA 5-20R RECEPTACLES SHALL BE GFCI PROTECTED. FOR ACCESSIBILITY REQUIREMENTS GFCI PROTECTION SHALL BE AT THE CIRCUIT BREAKER. C.
COORDINATE ELEVATIONS OF RECEPTACLES IN THE FIELD WITH EQUIPMENT VENDOR. D. REFER TO ELECTRIC EQUIPMENT AND CONTROL SCHEDULE FOR HOOD EXHAUST FAN ELECTRICAL REQUIREMENTS. E. RECEPTACLES
FOR SPECIFIC EQUIPMENT INDICATED IN THIS SCHEDULE ARE NOT SHOWN ON THE FLOOR PLANS. ALL RECEPTACLES SHOWN ON THE FLOOR PLANS ARE ADDITIONAL RECEPTACLES FOR USE AS CONVENIENCE OUTLETS.
F. ALL EQUIPMENT BELOW EACH KITCHEN HOOD SHALL HAVE POWER RUN THROUGH A KITCHEN EQUIPMENT SHUTDOWN CONTACTOR FOR THAT HOOD WHICH SHALL BE CONNECTED TO THE HOOD CONTROL PANEL SUCH THAT
ALL EQUIPMENT BELOW THE HOOD IS SHUT DOWN UPON ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM. CONNECT ELECTRONIC GAS VALVE TO HOOD CONTROL PANEL SUCH THAT ACTIVATION OF THE SYSTEM TURNS
OFF THE GAS VALVE. G. NF = NON FUSED. H. DISCONNECTS INDICATED AS 20A NON FUSED SHALL BE MOTOR RATED TOGGLE SWITCHES. I. PROVIDE DISCONNECT SWITCH FOR EACH HARD WIRED PIECE OF EQUIPMENT.
INSTALL ALL DISCONNECTS IN CONVENIENT LOCATION SO THAT THEY ARE VISIBLE FROM EQUIPMENT AND ACCESSIBLE. J. FOR EQUIPMENT WITH A QUANTITY OF MORE THAN ONE, MULTIPLE CIRCUIT NUMBERS INDICATE
THE CIRCUITS TO BE USED. EACH PIECE OF EQUIPMENT SHALL BE ON A DEDICATED CIRCUIT UNLESS NOTED OTHERWISE. IF ONLY ONE CIRCUIT IS INDICATED UTILIZE CIRCUIT FOR MULTIPLE PIECES OF EQUIPMENT.
K. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS FOR ALL WIRING REQUIRED TO BE DONE BY ELECTRICAL CONTRACTOR RELATIING THE HOODS, EXHAUST FANS AND MAKEUP AIR UNIT. DATE: PROJECT:
OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York
14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction
of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and
the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 5/10/2021 1:34:00 PM E600 SCHEDULES ELECTRICAL 04.23.21
2017054 WJD 411-415 College Ave, Ithaca, NY 14850 ITHACA BEER COMPANY AT SAI TENANT FIT-OUT FOR RCP RECIRCULATON PUMP BASEMENT 1/4 1 120 5.8 TP-1 #61 20/1 2#12 1#12 1/2"C 2#12 1#12
1/2"C X RCP WH WATER HEATER BASEMENT 1 120 6.0 TP-1 #44 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X 20 NF AU N WH EF-8 EXHAUST FAN WOMENS TOILET 0.152 1 120 1.3 TP-1 #49 20/1 2#12 1#12 1/2"C
2#12 1#12 1/2"C X IU EF-8 EF-7 EXHAUST FAN ROOF 1 1/2 3 208 6.6 TP-1 #77,79,81 20/3 3#12 1#12 EG 1/2"C 3#12 1#12 EG 1/2"C IU IU A EF-7 EF-6 EXHAUST FAN ROOF 7 1/2 3 208 24.2 TP-1 #41,43,45
70/3 3#8 1#10 3/4"C 3#8 1#10 3/4"C IU IU C, D EF-6 MAU-1 MAKE UP AIR UNIT ROOF 7 1/2 3 208 26.4 TP-1 #35,37,39 70/3 3#8 1#10 3/4"C 3#8 1#10 3/4"C IU X X B, D MAU-1 HP-104D HEAT PUMP
1ST FLOOR 1 208 19.9 TP-1 #46,48 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X 30 NF AU N HP-104D EUH-9 ELECTRIC UNIT HEATER VESTIBULE 5 1 208 24.0 TP-1 #54,56 30/2 2#10 1#10 3/4"C 2#10 1#10
3/4"C X IU EUH-9 EUH-8 ELECTRIC UNIT HEATER VESTIBULE 5 1 208 24.0 TP-1 #50,52 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X IU EUH-8 PHASE GROUND CONDUIT PHASE GROUND CONDUIT SWITCH AMPS
FUSE SIZE LOC. WEATHER PROOF REF. NOTES ITEM ID NAME ROOM LOCATION HP KW PHASE SYSTEM VOLTS MCA or SYSTEM AMPS PANEL AND CIRCUIT(S) CIRCUIT BREAKER or "FU" FOR FUSE POWER WIRING FROM
PANEL TO CONTROL UNIT POWER WIRING FROM CONTROL UNIT TO EQUIPMENT NEMA SIZE STARTER NEMA TYPE MANUAL MOTOR STARTER MANUAL MOTOR STARTER WITH RELAY MAGNETIC STARTER COMBINATION MAGNETIC
STARTER COMBINATION REDUCED VOLTAGE STARTER COMBINATION STARTER MP/FUSE (F) SIZE ADJUSTABLE SPEED DRIVE ADJUSTABLE SPEED DRIVE WITH BYPASS ADJUSTABLE SPEED DRIVE WITH REDUNDANT ASD
PACKAGED CONTROL UNIT FURNISHED BY OTHERS DUPLEX PUMP CONTROLLER BY OTHERS FIRE ALARM FAN SHUTDOWN REQUIRED SUPPLY DUCT SMOKE DETECTOR W/ REMOTE TEST STATION RETURN DUCT SMOKE DETECTOR
W/ REMOTE TEST STATION EXHAUST DUCT SMOKE DETECTOR W/ REMOTE TEST STATION THERMOSTAT CONNECTION AQUASTAT CONNECTION MOTORIZED DAMPER CONNECTION START/STOP PUSHBUTTONS HAND/OFF/AUTO
SELECTOR SWITCH CONTROL DEVICE LOCATION SAFETY SWITCH ITEM ID EQUIPMENT POWER SOURCE, PROTECTION & WIRING CONTROL DEVICES AS SHOWN ON THE PLANS BY ITEM DESIGNATION G. "IU" INDICATES
INTEGRAL WITH UNIT. F. "NF" INDICATES NON-FUSED. E. "AU" INDICATES CONTROL DEVICES IS LOCATED AT THE UNIT. D. PROVIDE OVERLOADS, SIZE AS REQUIRED, BY THE DIVISION 15 CONTRACTOR. C.
ALL DEVICES SHALL BE SURFACE MOUNTED UNLESS OTHERWISE NOTED. B. ITEM NUMBER INDICATES EQUIPMENT NUMBER A. ALL DEVICES PROVIDED BY THE DIVISION 16 CONTRACTOR. ELECTRIC EQUIPMENT
AND CONTROL SCHEDULE GENERAL NOTES: REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 2 PIZZA HOOD LIGHTS, ANSUL 1 120 1 TP-1 20A 42 2#12 1#12 1/2"C X 20 NF F,G 1 MAIN HOOD LIGHTS, CONTROLS,...
1 120 1 TP-1 20A 42 2#12 1#12 1/2"C X 20 NF C,E,F, I AD3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 25,27 3#12 1#12 1/2"C X 30 NF AD2 COOLER EVAPORATOR 1 120 1 TP-1 20A 23 2#12 1#12 1/2"C
X 20 NF AD1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D AC STRIP WARMERS 36" 2 7 120 1 TP-1 20A 14, 16 2#12 1#12 1/2"C X 20 NF AB GLYCOL CHILLER (ON TOP OF AD1)
1 120 1 TP-1 20A 12 2#12 1#12 1/2"C X 20 NF AA3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 17,19 3#12 1#12 1/2"C X 30 NF AA2 COOLER EVAPORATOR 1 120 1 TP-1 20A 15 2#12 1#12 1/2"C X 20
NF AA1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D Y MERCHANDISER 7.3 120 1 TP-1 20A 40 2#12 1#12 1/2"C NEMA 5-20R X MERCHANDISER 1 8.3 120 1 TP-1 20A 38 2#12 1#12
1/2"C NEMA 5-20R W CROWLER SEAMER 1 6 120 1 TP-1 20A 36 2#12 1#12 1/2"C X 20A NF R BACK BAR REFRIGERATOR 1 1/5 2.5 120 1 TP-1 20A 34 2#12 1#12 1/2"C NEMA 5-20R Q GLASSWASHER 3 7.5 120
1 TP-1 20A 29,31,33 2#12 1#12 1/2"C X 20 NF N DISHWASHER 1 28.5 208 3 TP-1 40A 28,30,32 3#8 1#10 3/4"C X 60 NF K ICE MAKER 1 10.2 120 1 TP-1 20a 9 2#12 1#12 1/2"C NEMA 5-20R J1 PIZZA
TOPPING RAILS 1 1.3 120 1 -- -- -- -- -- -- NEMA 5-20R A. J PIZZA PREP TABLE 1 4.3 120 1 TP-1 20A 26 2#12 1#12 1/2"C NEMA 5-20R I COFFEE MAKER 1 11.4 120 1 TP-1 20A 24 2#12 1#12 1/2"C
NEMA 5-20R H FOOD PREP TABLE 2 6.5 120 1 TP-1 20A 22 2#12 1#12 1/2"C NEMA 5-20R G REACH IN REFRIGERATOR 1 7.4 120 1 TP-1 20A 20 2#12 1#12 1/2"C NEMA 5-20R C CHEFS TABLE 1 3.5 120 1
TP-1 20A 18 2#12 1#12 1/2"C NEMA 5-20R B A GAS RANGE W/ CONVECTION... 2 4.3 120 TBD TP-1 20A 21 2#12 1#12 1/2"C NEMA 5-20R B PHASE GND CONDUIT HP KW AMPS NEMA PLUG AND RECEPT HARD WIRED
SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE KITCHEN EQUIPMENT DESIGNATION DESCRIPTION QTY. LOAD VOLTAGE PHASE PANEL CIRCUIT BREAKER CIRCUIT NUMBER BRANCH CIRCUIT
WIRING CONNECTION TYPE NEMA 1 DISC. SWITCH NEMA 3R DISC. SWITCH NEMA 4SS DISC. SWITCH NOTES KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE
Addendum #1/20210510_AD-1_Specs.pdf
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND
DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 1 SECTION 233100 - SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials,
equipment and services required for the complete installation designed in Contract Documents. 1.2 QUALITY ASSURANCE A. Ductwork shall be fabricated and installed in compliance with
latest edition of the following standards. 1. SMACNA Duct Construction Standards - Metal and Flexible Ductwork. 2. SMACNA Duct Liner Application Standard. 3. SMACNA HVAC Air Duct Leakage
Test Manual. 4. 2020 Energy Conservation Construction Code of New York State. 5. SMACNA Kitchen Ventilation and Food Service Equipment Fabrication and Installation Guidelines. 6. NFPA
Standard 96. 7. Plans and Specifications which exceed the requirements in any of the referenced standards. 8. 2020 Mechanical Code of New York State. B. All sheet metal shall be fabricated
and installed by an experienced Contractor specializing in this type of work. C. All ductwork and fittings shall have a computer generated label affixed to the exterior surface of each
section, detailing all applicable information including the duct dimensions, gauge, reinforcement type/class and connection type by systems manufacturer. Galvanizing thickness shall
be clearly stenciled on each duct section. D. All ductwork on the project shall meet the SMACNA Duct Cleanliness For New Construction Guidelines, "Advanced Level" of duct cleanliness
for production, delivery, storage and installation of ductwork. 1.3 SUBMITTALS A. Ductwork Shop Drawings. B. Duct Access Doors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 2 C.
Flexible Duct. D. Submit a complete shop standard manual including miscellaneous materials, and construction details for all shop fabricated materials including, but not limited to,
volume dampers, turning vanes, duct sealant, equipment flexible connections, access doors, flexible duct, acoustical duct lining, etc. 1.4 GENERAL A. All adhesives, sealants, primers
and paint used for ductwork in the interior of the building shall comply with the maximum Volatile Organic Compound (VOC) limits called for in the current version of U.S. Green Building
Council LEED Credits EQ 4.1 and EQ 4.2. 1.5 DUCTWORK CLASSIFICATION A. Duct systems are to be classified and constructed per the SMACNA Velocity-Pressure classification system as follows:
1. All ductwork shall be constructed for a minimum pressure class of 2 in. w.g. (unless stated otherwise) for the following systems, as applicable: a. Supply duct downstream of terminal
units. b. Typical low pressure supply ductwork. c. Typical return ductwork. d. Typical low pressure exhaust ductwork. 2. Supply duct upstream of terminal units shall be constructed
for a minimum pressure class of 3 in. w.g. unless otherwise stated or required as per below. 3. Pressure classes above 3 in. w.g. shall be provided as follows, based upon the external
static pressure as scheduled for each specific fan. Scheduled External Static Pressure Pressure Class Over 3 in. up to 4 in. w.g. 4 in. w.g. Over 4 in. up to 6 in. w.g. 6 in. w.g. Over
6 in. up to 10 in. w.g. 10 in. w.g. 1.6 DUCTWORK SHOP DRAWINGS A. Prepare minimum 1/4 in. scale drawings: 1. Detailed ductwork shop drawings shall include size, layouts and pressure
classifications. Any ductwork installed without benefit of review by the Engineer of Record may be subject to replacement at the expense of the Contractor. TENANT FIT-OUT FOR ITHACA
BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION
233100 - 3 2. Constructed from actual field inspections and measurements so as to assure a complete job. 3. Incorporate dimensions of actual equipment proposed for use on the
project. 4. Showing adequate sections, elevations, and plan views and indicating the bottom of ductwork elevations from the finished floor. 5. Indicating all volume dampers, fire dampers,
smoke dampers, damper access doors and other accessories required for a completed project. B. Call to the attention of the Engineers immediately, any major deviations from the Contract
Drawings, which must be made. All deviations shall be documented in writing. C. Indicate roof, wall and floor opening dimensions and locations shown on shop drawings. D. Submit prints
to each Contractor of the other trades for review for interference's and coordination with their work. PART 2 - PRODUCTS 2.1 DUCTWORK MATERIALS A. Unless otherwise called for, provide
materials in accordance with Exhibit I at the end of this section. 2.2 SQUARE AND RECTANGULAR DUCTWORK A. Galvanized Sheetmetal: Comply with ASTM A653 and A924, with G90/Z275 coating.
Stainless-steel Sheets: Comply with ASTM A 480/A 480M, Type 304 or 316, as indicated in Exhibit "I"; cold rolled, annealed, sheet. Exposed surface finish shall be No. 2B, No. 2D or
No. 3 as indicated in Exhibit "I". Aluminum sheets: Comply with ASTM B 209 (ASTM B 209M) Alloy 3003, H14 temper; with mill finish for concealed ducts, and standard, one-side bright
finish for duct surfaces exposed to view. Gauges per SMACNA HVAC Duct Construction Standards, Metal and Flexible. B. Transverse and longitudinal duct seams reinforcement shall conform
to appropriate tables and figures per SMACNA Velocity-Pressure Classification for duct construction. 1. Transverse joints shall be sealed with duct joint sealant. "Ductmate" or "Nexus"
4-bolt connection systems may be used in lieu of standard construction. 2. Field assembled longitudinal seams shall be sealed with duct sealant. Factory or shop fabricated rolled or
machine pressed longitudinal seams does not require sealant. C. Corner closures shall be required as described and illustrated by SMACNA Duct Construction Standards. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES
CONSTRUCTION 233100 - 4 D. Throat radius on all elbows shall not be less than the dimension of the duct plane of radius. Where this cannot be maintained, use shorter radius with
internal guide vanes, or square elbow with turning vanes. E. Bracing and hanging of ductwork shall be per SMACNA Standards for size and system class of ductwork being used. F. Any transformations
shall not reduce the ductwork cross-sectional area. Maximum angle in straight duct, 20 for diverging flow and 30 for contraction flow. Transformation from square to round or flat
to oval seams welded or brazed. 2.3 ROUND DUCTWORK A. Standard Round Ductwork: 1. Galvanized Sheet metal: Comply with ASTM A653 and A924, with G90/Z275 coating. Stainless-steel Sheets:
Comply with ASTM A 480/A 480M, Type 304 or 316, as indicated in Exhibit "I"; cold rolled, annealed, sheet. Exposed surface finish shall be No. 2B, No. 2D or No. 3 as indicated in Exhibit
"I". Aluminum sheets: Comply with ASTM B 209 (ASTM B 209M) Alloy 3003, H14 temper; with mill finish for concealed ducts, and standard, one-side bright finish for duct surfaces exposed
to view. Gauges per SMACNA Duct Construction Standards. Spiral lock-seam or longitudinal fusion-welded. 2. All spiral ducts shall have locked seams so made as to eliminate leakage
under pressure for which this system has been designed. Longitudinal seams duct shall have fusion-welded butt seams. 3. Round Ductwork Fittings: a. All fittings fabricated per SMACNA
Standards for round and flat-oval ductwork, material to match straight pieces of ductwork. b. Fittings shall have continuous, welded seams. c. 90 tees shall be conical type. 90 tees
and 45 laterals up to and including 12 in. diameter tap size shall have a radiused entrance into the tap, produced by machine or press forming. The entrance shall be free of any restrictions.
d. Round taps off the bottom of rectangular ducts down to diffusers shall be made with a 45 square to round shoe-tap. 4. Elbows: a. Diameters 3 in. through 8 in.: Two-section stamped
and continuously welded elbows, material to match straight pieces of ductwork. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No.
20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 5 b. Over 8 in.: Gored construction with standing seam
construction and internally sealed or continuously welded. Less than 35 - two gores, 36 to 71 - three gores, over 71 - five gores. c. Fabricated to a centerline radius of 1.5 times
the cross-section diameter. 5. Joints: a. For duct construction pressure 3 in. w.g. or greater: 1) Round Joints: a) Unexposed Duct 3 in. - 30 in. Diameter: Connect round duct with
a one piece interior slip coupling, at least two gauges heavier than duct wall, beaded at center and fastener to duct with screws. Seal joint with an approved sealant applied continuously
around both end of coupler prior to assembling and after fastening. b) All Exposed Duct and Unexposed Duct 30 in. - 72 in. Diameter: Install using a three piece, gasket flangedjoint
consisting of two internal flanges, with integral mastic sealant, and one external closure band, which compress the gasket between the internal flanges. (1) Acceptable Manufacturer:
Ductmate Industries "Spiralmate" system or approved equal. c) Above 72 in. Diameter: Install using companion angle flanged joints as defined in Figure 3-1 of the 2005 SMACNA Manual,
"HVAC Duct Construction Standards, Metal and Flexible" Third Edition. Refer to manual for proper sizing and construction details. d) Dust collection systems and exposed duct 3 in.
- 14 in. use a one piece, polyethylene lined gasket connector with integrated bolt for the closure system. (1) Acceptable Manufacturer: Ductmate Industries "Quicksleeve" or approved
equal. b. Pipe-to-pipe joints in diameters up to 60 in. shall be by the use of sleeve couplings, reinforced by rolled beads. c. Pipe-to-fitting joints in diameters up to 60 in. shall
be by slip-fit of projecting collar of the fitting into the pipe. d. Insertion length of sleeve coupling and fitting collar shall be 2 in. up to 36 in. diameter and 4 in. above 36 in.
diameter. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET
METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 6 e. Pipe-to-pipe and pipe-to-fitting connections in ductwork above 60 in. in diameter shall be made by angle ring flanges.
The flange on the pipe shall be a 2 in. x 2 in. x 3/16 in. angle attached to the pipe with a continuous weld. The fittings shall have a loose ring "Van Stone" flange. A 5/8 in. flange
shall be provided to act as a gasketing surface for sealing with the angle ring being a rolled, welded ring 2 in. x 2 in. x 3/16 in. Bolt hole spacing for angle rings shall be 6 in.
centers. f. If longitudinal seam duct greater than 60 in. in diameter is supplied in lengths greater than 4 ft., one angle ring must be welded to the duct on 4 ft. centers for support.
2.4 DUCTWORK SEALING A. SMACNA Duct Sealing Classification shall be used for duct systems using the following criteria: 1. Ductwork and all plenums with pressure class ratings shall
be constructed to Seal Class A, as required to meet the requirements of SMACNA Duct Construction Standards and with standard industry practice, including transverse joints, longitudinal
seams, fitting connections, and all penetrations of the duct wall. 2. Openings for rotating shafts shall be sealed with bushings or other devices that seal off air leakage. Pressure
sensitive tape shall not be used. 3. All connections shall be sealed, including but not limited to spin-ins, taps, other branch connections, access doors, access panels and duct connections
to equipment. 4. Sealing that would void product listings is not required. 5. Spiral lock seams need not be sealed. B. Duct sealant for indoor applications shall be non-fibrated, water
based, Hardcast IronGrip IG-601, Ductmate PRO Seal, Foster 32-17 or Childers CP146. C. Duct sealant for outdoor applications shall be fibrated, water based, Hardcast Versa-Grip VG-102,
Ductmate Fiberseal, Foster 32-17 or Childers CP148. D. Sealants and tapes shall be listed and labeled in accordance with UL 181A or UL181B and marked according to type. 2.5 TURNING
VANES A. Provide in mitered elbows as shown on contract drawings. Vanes 36 in. or longer shall be double wall air foil type. All turning vanes shall be installed as per the latest
SMACNA Standards. Turning vane size and spacing shall be as per SMACNA. Turning vane spacing greater than SMACNA Standards is not acceptable. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100
- 7 B. Turning vanes shall be Harper or equivalent double wall turning vanes fabricated from the same material as the duct. C. Turning vane front and back panels shall be securely
locked together with adequate crimping to prevent twisting of vane. Vane shall be capable of withstanding 250 pounds of tensile load when secured according to the manufacturer's instructions.
D. Rails for mounting turning vanes shall have self locking, friction fit tabs designed to facilitate proper alignment of vanes. Tab spacing shall be as specified in Figure 4-3 of
the 2005 SMACNA Manual, "HVAC Duct Construction Standards, Metal and Flexible". Rail systems with non-compliant tab spacing shall not be accepted. E. Acoustical Turning Vane: Shall
be used in applications that require quiet operating systems. Mounting rails shall have friction insert tabs that align the vanes automatically. F. Acceptable Manufacturer: Ductmate
Industries PRO-Rail Turning Vane or approved equal. 2.6 DAMPERS IN DUCTWORK A. Blade Type Volume Dampers: Constructed per SMACNA, one gauge heavier than duct material, securely fastened
to 3/8 in. sq., cold rolled steel operator rod. Provide Ventlock 639 elevated dial regulator for 2 in. insulated ductwork. B. Multiple Blade Type Volume Dampers: Provide multiple
blade volume dampers in ductwork above 12 in. in height. 1. Heavy duty, manual balancing dampers suitable for application in HVAC systems with velocities to 1,500 ft. per minute, open
position and max. pressure of 3 in. w.g. close position. Ruskin MD 35 or equivalent. 2. Fabrication: a. Frame: 5 in. x minimum 16 gauge roll formed, galvanized steel hatshaped channel,
reinforced at corners. Structurally equivalent to 13 gauge U-channel. 3. Blades: a. Style: Single skin with 3 longitudinal grooves. b. Action: Opposed. c. Orientation: Horizontal.
d. Material: Minimum 16 gauge equivalent thickness, galvanized steel. e. Width: Nominal 6 in. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 8 4. Bearings: Molded synthetic sleeve,
turning in extruded hole in frame. 5. Linkage: Concealed in frame. 6. Axles: Minimum 1/2 in. diameter, plated steel, hex-shaped, mechanically attached to blade. 7. Control Shaft:
3/8 in. square plated steel. 8. Finish: Mill galvanized. a. Actuator: Hand quadrant for 3/8 in. square extended shaft. b. Hand Quadrant Standoff Bracket: 2 in. standoff for insulated
ductwork. c. Oillite bearings. d. Factory Sleeve: Minimum 20 gauge thickness, minimum 12 in. length. C. Fire and Smoke Dampers: See "Fire and Smoke Dampers" Section. D. Automatic
Air Dampers: Furnished as part of "Building Management System" Section 230923, and installed by this Contractor. E. Remote Balancing Dampers: For round ducts 4 inches to 24 inches
in diameter, Greenheck RBDR-50, or equivalent. 1. Ratings: 1 in. wg. pressure differential, 2000 fpm, 180 deg. F. 2. Construction: Reinforced 20 ga. galvanized steel frame, 20 ga.
galvanized steel blade, 3/8 in. sq. plated steel axle, synthetic (acetal) sleeve type bearings, 9 volt actuator. 3. Options: (Edit as required): a. "EZ Balance" remote control device
with 9 volt battery and 5 ft. RJ11 cable. b. Diffuser body connectors. c. Single gang wall plates with RJ11 ports (1, 2, 3, 4, or 6 port). Colors: white, ivory or stainless steel.
d. Round wall/ceiling mounting plate with one port. e. 14, 25 or 50 ft. plenum rated RJ11 cable, as required. f. RJ11 cable connectors. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI
411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100
- 9 2.7 FLEXIBLE AIR DUCTS AND CONNECTORS A. Flexible air ducts and connectors shall be constructed in compliance with NFPA Bulletin 90A, 90B and UL Standard 181 and shall be listed
and labeled as Class I Air Duct. B. Flexible air ducts and connectors shall be tri-laminate: 1. Consisting of corrosion resistant galvanized steel helix encapsulated by a double lamination
of polyethylene or spun bond nylon. 2. Factory applied (R 6.0 or R 8.0) fiberglass exterior insulation, sheathed in a seamless, tri-directionally reinforced, metalized polyester, exterior
vapor barrier. 3. R-value shall be classified by Underwriters Laboratories, and certified by the Air Diffusion Council, in accordance with ADC Flexible Duct Performance and Installation
Standard (1991), using ASTM C-518, at installed wall thickness, on flat insulation only. Comply with ASHRAE/IESNA 90.1. 4. Recommended operating pressure for flexible ductwork shall
be three times maximum system press but not less than 6 in. w.g. positive pressure for 4 in. - 20 in. dia., 5 in. wg. negative pressure through 16 in. dia., 1 in. negative pressure
for 18 in. and 20 in. dia. Maximum velocity of 5500 fpm. 5. Operating temperature range - 20°F to 250°F, intermittent @1/2 in. pos. w.g. max., -20°F to 140°F, continuous at maximum
pressure. 6. Flame Spread: 25 max. smoke developed rating: 50 max. 7. Porous inner core flexible duct shall not be used. C. Static pressure and thermal performance shall be tested
and certified in accordance with Air Diffusion Council (ADC) Test Code FD-72-R1 under conditions of 140°F for 164 hours and 180°F for 4 hours. D. Acoustical performance shall be certified
in accordance with ASTM E 477 and/or Air Diffusion Council Test Code FD-72-R1. 1. Minimum Acoustic Performance: a. The insertion loss (dB) of a 6 foot length of duct when tested in
accordance with ASTM E477 at a velocity of 1000 feet per minute shall be at least: 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8 inch dia. 26 27 27 31 32 27 12 inch dia 22 26 24 31
31 20 TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL
AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 10 E. Friction loss and leakage for flexible duct only shall be certified in accordance with Air Diffusion Council Test Code FD-72-R1.
Leakage for connections shall be accordance with UL 181 requirements. F. Basis-of-Design: Flexmaster 6B (R-6.0). G. Acceptable Manufacturers: 1. Dundas-Jafine Type SPC R6.0/ Type
SPC R8.0. 2. Hart & Cooley Type F216 (R-6.0)/ Type F218 (R-8.0) 3. Flexible Technologies, Inc. Thermaflex Type M-KE (R-6.0)/ Type M-KE (R8.0) 4. Atco Rubber Products, Inc. Type 036
(R-6.0)/Type 031 (R-8.0). 5. Superior Air Ducts Type SF 082 (R-8.0) 2.8 FLEXIBLE CONNECTIONS TO FANS AND EQUIPMENT A. Basis of Deign: Ventfabrics, Inc. B. Acceptable Manufacturers:
Ductmate Industries, Inc., Duro Dyne Inc., Elgen Manufacturing, Ward Industries, Inc.; a division of Hart & Cooley, Inc. C. Materials: Flame-retardant or noncombustible fabrics, water
and mildew resistant UL Standard 214. D. Coatings and Adhesives: Comply with UL 181, Class 1. E. Metal-Edged Connectors: Factory fabricated with a fabric strip wide attached to two
(2) strips of 2-3/4-in. wide, 0.028-in. thick, galvanized sheet steel or 0.032 in. thick aluminum sheets. Provide metal compatible with connected ducts. F. Indoor System, Flexible
Connector Fabric: Glass fabric double coated with neoprene. 1. Minimum Weight: 26 oz./sq. yd. 2. Tensile Strength: 480 lbf/in. in the warp and 360 lbf/in. in the filling. 3. Service
Temperature: Minus 40 to plus 200°F. G. Outdoor System, Flexible Connector Fabric: Glass fabric double coated with weatherproof, synthetic rubber resistant to UV rays and ozone. 1.
Minimum Weight: 24 oz./sq. yd. 2. Tensile Strength: 530 lbf/in. in the warp and 440 lbf/in. in the filling. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca,
NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 11 3. Service Temperature:
Minus 50 to plus 250°F. H. Thrust Limits: Combination coil spring and elastomeric insert with spring and insert in compression, and with a load stop. Include rod and angle-iron brackets
for attaching to fan discharge and duct. 1. Frame: Steel, fabricated for connection to threaded rods and to allow for a maximum of 30 degrees of angular rod misalignment without binding
or reducing isolation efficiency. 2. Outdoor Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load. 3. Minimum Additional Travel: 50 percent
of the required deflection at rated load. 4. Lateral Stiffness: More than 80 percent of rated vertical stiffness. 5. Overload Capacity: Support 200 percent of rated load, fully compressed,
without deformation or failure. 6. Elastomeric Element: Molded, oil-resistant rubber or neoprene. 7. Coil Spring: Factory set and field adjustable for a maximum of 1/4-in. movement
at start and stop. 2.9 ACCESS DOORS A. General: 1. Provide access doors of adequate size to allow easy access to the equipment that will require maintenance. Provide insulated or acoustically
lined doors to prevent condensation where applicable. 2. Manufacturer to provide an installed neoprene gasket around perimeter of access door for airtight seal. 3. Systems 3 in. w.g.
or less shall utilize a hinged, cam, or hinged and cam square framed access door. 4. Systems 4 in. w.g. and above shall utilize a sandwich type access door. Construct doors in accordance
with Figure 7-3 of the 2005 SMACNA Manual, "HVAC Duct Construction Standards, Metal & Flexible" Third Edition. 5. Approved Manufacturer: Ductmate Industries "Sandwich" style door or
approved equal. 6. All access doors shall be continuous piano hinged type, unless noted otherwise. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 12 7. Non-hinged only allowed where clearance
to ceiling does not allow a full 90 swing. 8. Double panel insulated type when used in insulated duct. 9. Single panel uninsulated type allowed in un-insulated duct. 10. Pressure rated
according to system in which being installed. Door-to-frame and frame-to-duct gasketing. 11. Provide specified Seal Class A or B ductwork sealing around frame, and hand adjust the
latch tension for proper seal, on all access doors other than sandwich panel (Ductmate) style. 12. MINIMUM access door size for ducts 12 in. or less in depth is 12 in. x 8 in. 13. MINIMUM
access door size for ducts 12 in. to 18 in. in depth is 18 in. x 14 in. 14. MINIMUM access door size for ducts more than 18 in. in depth is 24 in. x 18 in. 15. In ducts which require
multiple section fire dampers due to duct size, provide one access door for each fire damper section. 16. Access doors for fire and smoke dampers shall be permanently labeled with 1/2
in. high lettering reading "SMOKE DAMPER" or "FIRE DAMPER". 17. Grease exhaust duct doors shall be grease and air tight, UL 1978 listed, meet NFPA 96 standards and all mechanical codes.
Grease duct access doors can be sandwich type or with a weld on frame, with/without hinge. Approved Manufacturer: Ductmate Industries "Ultimate" style door or approved equal. 18.
All grease duct access doors used must be accompanied by independent testing in conjunction with each manufacturer's respective wrap system for high temperature applications. B. Door
Types: 1. Low Pressure Systems (2 in. w.g. pressure class): National Controlled Air ADH1, Ruskin ADH22, Vent Products 9701, Air Balance FSA-100, Safe Air SAH, Nailor. 2. Medium and
High Pressure Systems (3 in. w.g. pressure class and higher): a. Rectangular Duct: Ductmate Industries "Ultimate" Style Door, or equal. b. Round Duct: Ductmate Industries Round Sandwich
type, or equal. 8 in. x 4 in. for ducts 14 in. and less in diameter. Ductmate Industries Round Sandwich type 16 in. x 12 in. for ducts more than 14 in. in diameter. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES
CONSTRUCTION 233100 - 13 c. Furnish and install factory supplied protector molding on cut medal edge for all Ductmate access doors. 3. Kitchen Hood Exhaust Systems: In accordance
with the latest requirements of NFPA 96, grease-tight, flanged and bolted. Approved Manufacturer: Ductmate Industries "Ultimate" style door or approved equal. 2.10 EXHAUST HOODS AND
HOOD CONNECTIONS A. General Requirements: 1. Provide hoods and/or duct connections to hoods/fans where furnished by others. 2. Duct material, thickness and joints as required for gases
and vapors involved and per SMACNA. 3. Clearance between bottom of hood and floor shall be 80 in. 4. Provide continuous internal channel brackets for supporting lighting fixtures, coordinate
with and install to suit Division 26 "Electrical". B. Kitchen Hood Duct Connections: 1. Exposed duct shall be 304 stainless steel, #3 polish finish, welded construction. 2. Concealed
duct shall be black steel, welded, flanged and gasketed. 3. Metal gauges comparable to similar duct sizes with adequate stiffening, 16 gauge minimum thickness. 4. Support from building
structural members. 2.11 ACOUSTIC-THERMAL DUCT LINING IN DUCTWORK A. General: Comply with NFPA Standard 90 and NAIMA Standard AHC-101. B. Materials: ASTM C 1071, Type I. Glass mineral
wool insulation coated with an antimicrobial EPA registered coating that seals the airstream surface fibers into a smooth, low-friction surface acoustic ductliner shall be of thickness
shown in the table. Density at 1.5 PCF. Maximum "K" value to be 0.24 btu/in. /sq. ft. /degrees F. /hr. when tested in accordance to ASTM C177. Acoustic duct liner to be suitable
for use up to 6000 feet per minute air velocity and temperatures up to 250°F. The acoustic duct liner shall not accelerate the corrosion of steel, copper or aluminum. The liner shall
not absorb greater than 3% by weight when tested per ASTM C1104. Acoustic duct liner shall provide the minimum sound absorption coefficients shown below when tested per ASTM C423 and
ASTM E795, Mounting Type A. OCTAVE BAND FREQUENCIES HZ Thickness 125 250 500 1000 2000 4000 NRC TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850
HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 14 1-1/2 in. .23 .50 .87 .92 .93 .93
.80 2 in. .37 .76 1.02 1.00 .98 .92 .95 C. Thickness: Unless otherwise noted, all supply air ductwork indicated to be acoustically lined, shall have 1-1/2 in. thick liner with a minimum
R value of 6. Return or exhaust ductwork, if acoustically lined, shall be of a thickness specifically noted. Note that per the symbol list (L) equals 1-1/2 in. thick. If called for
on the plans, (2L) equals 2 in. thick. D. Fire Hazard Classification: Flame spread rating of not more than 25 and a smoke developed rating of no higher than 50, when tested in accordance
with ASTM E84, UL 723, UL/ULC S102-M88 and NFPA 255. E. Liner Adhesive: Comply with NFPA Standard 90A, ASTM C919, and maximum VOC requirements of LEED EQ 4.1 and EQ 4.2. F. Mechanical
Fasteners: Galvanized steel, suitable for adhesive attachment, mechanical attachment, or welding attachment to duct. Provide fasteners that do not damage the liner when applied as
recommended by the manufacturer, that do not cause leakage in the duct, and will indefinitely sustain a 50 pound tensile dead load test perpendicular to the duct wall. 1. Fastener Pin
Length: As required for thickness of insulation, and without projecting more than 1/8 inch into the airstream. 2. Adhesive for Attachment of Mechanical Fasteners: Comply with the
"Fire Hazard Classification" of duct liner system. G. Design Equipment: Knauf Atmosphere. H. Acceptable Makes: Knauf Atmosphere, Certainteed ToughGard R. OCTAVE BAND FREQUENCIES HZ
Thickness 125 250 500 1000 2000 4000 NRC 1-1/2 in. .10 .47 .85 1.01 1.02 .99 .85 2 in. .25 .66 1.00 1.05 1.02 1.01 .95 I. For duct velocities above 4000 fpm, provide metal "build-outs"
of proper height, welded to the ductwork for turning vanes and dampers. 2.12 CABLE SUSPENSION SYSTEM A. Ductwork not required to be exterior insulated in exposed installations may be
installed using a cable suspension system. B. Ductwork shall be installed using load rated, stainless steel cable suspension systems. Cables shall be pre-cut lengths, type 316 stainless
steel with fused ends, and pre-made end attachments. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 15 C. Cable grips shall be of 316 stainless steel and have an internal tamperproof
cable release mechanism. D. Stress distribution saddles shall be prescribed in addition for the support of rectangular duct on corners as necessary. E. Hangers shall have a manufacturer's
published safe working load and have a 5 to 1 safety factor. F. Hang and support ductwork as defined in the latest edition of SMACNA Manual, "HVAC Duct Construction Standards, Metal
& Flexible". G. Adjustable steel cable hanging system consisting of spring loaded, serrated clamping mechanism shall be tested and certified in compliance with all applicable SMACNA
standards for upper and lower attachment methods. 1. All approved systems must be installed using matching components including steel cable, clamping mechanism and hardware approved
by the manufacturer for its corresponding load rating. No Substitution of manufacturer's components is permitted. 2. Approved systems must be installed per the manufacturer's specific
instructions and must not exceed the stated working load rating at any point throughout the system. H. Supports, bar/angle reinforcements, and other products that are not part of the
duct that are manufactured of uncoated mild steel shall either be painted with two (2) coats of primer or shall be manufactured of a galvanized equivalent material. I. Approved Manufacturer:
Ductmate Industries "Clutcher" Cable Hanging System or Gripple Inc. 2.13 DUCT ACCESSORY HARDWARE A. Instrument Test Holes: Cast iron or cast aluminum to suit duct material, including
screw cap and gasket. Size to allow insertion of pitot tube and other testing instruments and of length to suit duct-insulation thickness. B. Ventlock 699 or 699-2 based upon insulation
thickness. C. Install duct test holes where required for duct traverse testing and balancing purposes. PART 3 - EXECUTION 3.1 REQUIREMENTS A. Equipment and systems shall be installed
in accordance with local and state codes and regulations having jurisdiction. Bracing and hanging of ductwork shall be per SMACNA - HVAC Duct Construction Standard. TENANT FIT-OUT
FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES
CONSTRUCTION 233100 - 16 B. Install all ductwork concealed and tight to the structure above unless noted otherwise on shop drawings. Fabricate only after the approval of shop
drawings, and in locations to avoid interferences. Ductwork installed without approved shop drawings, which requires removal/modification and/or reinstallation due to conflicts or
improper installation shall be repaired at no cost to the Owner. C. Sizes given on contract drawings are inside dimensions. D. Keep openings continuously closed and sealed with protective
plastic wrapping during construction to prevent entrance of dirt and debris. E. Extend access openings, damper rods and levers, to outside of external insulation make systems airtight.
F. No piping, conduit or other obstruction to airflow is permitted in ductwork. G. Provide necessary openings, hanger inserts, framing, chases, and recesses, not provided by other trades.
H. Exposed exhaust or return registers and grilles shall be flush with face of duct; exposed supply registers and grilles shall be mounted outside airstream with 45 shoe-tap extension
collars. I. Provide 14 gauge sleeves for ducts passing through Mechanical Room floors. Set sleeves 4 in. above finished floor in Mechanical Rooms, seal watertight to floor. J. Where
a return or exhaust duct is shown to be left open ended, provide hardware mesh screen at opening. K. Do not utilize flexible ductwork or connection in any way to connect variable or
constant volume boxes to ductwork. L. For duct penetrations of non-rated walls, provide sheet metal angle framing or sheet metal closure panels around the entire perimeter of each duct
wall penetration on both sides of the wall, where the gap exceeds 1/4 inch. Where the gap is less than 1/4 inch, the gap may be caulked on both sides of the wall. Non-rated wall penetrations
SHALL NOT be fire caulked under any circumstances. M. For duct penetrations of rated walls, see Specification Section 230500 - Basic Mechanical and Electrical Requirements. N. Ductwork
that is called for to be welded shall be fully welded, continuous around the entire perimeter at all joints/seams, and shall be fully airtight and watertight. 3.2 FLEXIBLE CONNECTIONS
A. Provide flexible connections for the intake and discharge connections of duct connected to fans and air handling equipment. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415
College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 17 B.
Round connections are to be made with adhesive and metal drawbands with ends tightly bolted. C. Rectangular connections shall be made with material securely held in grooved seam between
flanges. Attach with adhesive and mechanical fasteners on 6 in. centers. D. Connections shall be made with a minimum of 2 in. space between duct and equipment collars, installed in
line, and with 1 in. excess material folded so as not to interfere with airflow through connection. E. Mechanically fastened and sealed, with specified duct sealant, at duct and equipment
connections. 3.3 FLEXIBLE AIR DUCTS AND CONNECTORS A. "Air duct" applies to conduit or passageway for conveying air to or from heating, cooling, air conditioning or ventilating equipment
but not including the plenum as defined in NFPA 90A. "Air connector" applies to conduit for transferring air between an air duct or plenum and an air terminal device or an air inlet
or an air outlet as defined by the NFPA 90A. B. For round to oval connections, provide round-oval flexible adapter. C. Flexible air ducts and connectors shall be provided in fully extended
condition, free from kinks. D. Flexible air ducts and connectors shall not be used in systems with entering air temperatures in excess of 250°F. E. Flexible air ducts and connectors
shall use only the minimum length required to make the connection and shall be installed in the horizontal or vertical position. Flexible elbows are not acceptable. Do not exceed
a maximum length of 48 in., fully extended. F. Flexible air ducts and connectors shall use minimum 1/2 in. wide positive locking, steel worm drive clamp, or nylon plenum rated straps
for joints and connections. One clamp or strap for the inside core liner and one clamp or strap for the outer jacketing. When non-metallic (nylon) straps are used, they should be
listed and labeled to standard UL 181B. Fastener package should be marked UL 181 B-C. G. Collars to which flexible duct is attached shall be beaded and a minimum of 2 in. in length.
Wrap twice with UL 181 tape and secure with clamp or strap. Sleeves used for joining two sections of flexible duct shall be beaded and a minimum of 4 in. in length. The draw band
shall be positioned behind the bead on the metal collar. H. Outer vapor barrier and insulation shall be slid over inner core and collar, wrapped twice with UL 151 tape and secured with
a clamp or strap. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No.
1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 18 I. Connections shall be per SMACNA "HVAC Duct Construction Standards - Metal and Flexible", Air Diffusion Council
"Flexible Duct Performance and Installation Standards" and NAIMA Installation Standards. J. Flexible duct shall be supported at manufacturer's recommended intervals, but no greater
distance than 2'-6" on center and prior to all 90 degree bends. Maximum permissible sag shall be 1/2 in. per foot of support spacing. Provide a minimum of one hanger on each run of
flexible duct. K. A connection to rigid duct or equipment shall be considered a support joint. Long horizontal duct runs with sharp bends shall have additional supports before and
after the bend approximately one duct diameter from the centerline of the bend. L. Hanger or saddle material in contact with the flexible duct shall be of sufficient width to prevent
any restriction of the internal diameter of the duct when the weight of the supported section rests on the hanger or saddle material. In no case shall the material contacting the flexible
duct be less than 1-1/2 in. wide. Factory installed suspension systems integral to the flexible duct are an acceptable alternative hanging method when the manufacturer's recommended
procedures are followed. M. The hanger shall be strapped around the flexible duct and secured to the structure above. Hangers shall not be attached to other mechanical or electrical
objects. Hangers may be attached to an approved trapeze. Ceiling grid shall not be used to fabricate a trapeze. Support hangers shall be installed horizontal. Screws shall not be
used to penetrate the flexible duct to attach to the hanger. N. Provide flexible duct connections and splices in accordance with manufacturer's recommended installation instructions.
O. Seal flexible duct connections with sealing materials listed and labeled in accordance with UL 181B. Mechanically secure connections with approved clamping materials. 3.4 TURNING
VANES A. Install only in square elbows of equal dimensions. B. Install as per latest SMACNA Standards. C. Secure vane runners to duct with spot welding, riveting or sheet metal screws.
D. When installing in ductwork with internal insulation. 1. Install runners in ductwork inside insulation and bolt through insulation and duct sides, welding bolts to insure rigid installation.
Provide build-outs for duct Velocity-Pressure classes above 2 in. w.g. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402
/ M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 19 3.5 DUCT CLEANLINESS AND CLEANING AFTER INSTALLATION A. Duct
Cleanliness: 1. All ductwork on the project shall meet the SMACNA Duct Cleanliness For New Construction Guidelines, "Advanced Level" of duct cleanliness for production, delivery, storage
and installation of ductwork. 2. Prior to shipment to the jobsite, all duct ends and openings must be covered with a heavy duty, dual-ply, clear polyethylene protective film. Open
ends are to be kept covered during transport, storage, and installation. As ductwork is installed at the job site, open ends are to be covered to maintain cleanliness. 3. The film
must be securely affixed to protect against dirt and debris, and must be translucent to facilitate inspection of interior surfaces without removing the film. The film is have a elongation
rating of 600% and a break strength of 13.1 lbs./in. The film shall contain no VOC's, and shall leave no residue on duct after removal. 4. Manufacturer: Ductmate Industries ProGuard
(heavy duty grade clear). B. Cleaning After Installation: 1. Interior surfaces shall be free of dust and debris prior to initial start up. Protect equipment which may be harmed by
excessive dirt with filters, or bypass during cleaning. Provide adequate access into ductwork for cleaning purposes. Any cleaning of duct systems shall comply with recommendations
of NAIMA and NADCA. 2. Clean external surfaces of foreign substances that might cause corrosion, deterioration of the metal, or where ductwork is to be painted. 3. Clean debris from
system before fans are turned on. 4. Keep openings continuously closed during the construction period. 5. Pay damages resulting from dirt blown on painted or other finished surfaces.
6. Repair or replace damaged fan wheels, dampers, or other system parts damaged as a result of debris. 7. Clean system as many times as required until the entire system is dirt free.
3.6 INSTALLATION OF ROUND DUCTWORK A. Use factory-fabricated couplings for joints. B. After the joint is slipped together, sheet metal screws are placed 1/2 in. from the joint bead
for mechanical strength. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum
No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 20 C. Sealer is applied to the outside of the joint and covering the screw heads. D. Flanged joints shall be made
with neoprene rubber gaskets. 3.7 TEST OF DUCTWORK A. Conduct duct leakage tests per SMACNA "HVAC Air Duct Leakage Test Manual" and per the requirements of the 2015 International Energy
Conservation Code, for all ductwork systems designed to operate at static pressures of 3.0 in. w.g. or greater. Representative sections totaling no less than 25% of the total duct
area, per system, for the designated pressure class shall be tested as well as all associated ductwork located out-of-doors. All areas shall be as selected by the Engineer. Positive
pressure leakage testing is acceptable for negative pressure ductwork. The rate of air leakage (CL) must be less than or equal to 4.0, as determined by equation 4 - 8 in 2015 IECC,
which reads: CL=F/P0.65 where F = measured leakage rate in CFM per 100 sq. ft. of duct surface, and P = static pressure of the test. When leakage above stated limits occurs, ascertain
location of leaks and repair as required. Repeat tests as required to obtain allowable leakage rates. Prepare a report similar to that suggested by SMACNA and submit for review.
Duct testing shall be conducted in the presence of the Owner's Representative. B. Provide test reports indicating pressure tests performed. Include date, section tested, test pressure
and leakage rate. C. Ductwork not required to be tested for leakage, shall be checked and guaranteed to meet the standards of the specified SMACNA Duct Seal Class A. Air balancing
and testing shall be used to determine satisfactory operation of duct systems. Balancing reports indicating excessive leakage amounts shall be required to rebuild, repair or seal ductwork
having excessive leakage. C.D. Provide Grease Duct Testing as required by 2020 Mechanical Code of New York State Section 506.3.2.5. 3.8 DAMPERS AND AIR CONTROL DEVICES A. Provide volume
dampers at all air outlets, diffusers, grilles and as noted on plans. Provide volume dampers at all low pressure supply, return and exhaust, branch ducts and as noted on the plans.
B. Provide dampers necessary to permit proper balancing of air quantities. Comply with code requirements for smoke and fire control. Prevent introduction of uncontrolled outside air
into building through roof and wall openings. C. When dampers are installed in acoustically lined ductwork, install with insulated "buildouts" per SMACNA. D. Install fire dampers in
accordance with "Fire Dampers" Section and applicable codes. E. Install all dampers furnished as part of "Building Management System" Section. TENANT FIT-OUT FOR ITHACA BEER COMPANY
- SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100
- 21 3.9 ACCESS DOORS A. Provide for access to upstream side of duct mounted reheat coils, dampers, damper motors, fire dampers, smoke dampers, smoke detectors, control devices, fan
bearings, and equipment requiring periodic inspection or service. Provide labels for fire and smoke dampers as called for in Part 2 - Products. B. For ducts that are too small to install
an access door of the minimum specified size, provide a 12 in. long section of removable ductwork for maintenance and inspection access. Removable ductwork shall be fastened between
device requiring access and next duct section with duct flanges or Donaldson Torit clamp with PVC foam seal. For ducts that are required to be insulated, provisions shall be made to
allow insulation to be easily removed and re-installed. C. Provide access service openings as required by NFPA 96 and 2020 Mechanical Code of New York State Section 506.3.8 and 506.3.9
at 20 ft. intervals along horizontal ducts and at each vertical riser for kitchen hood exhaust. 3.10 DUCT SUPPORTS A. Provide per SMACNA, same material as duct. Hanger bands to extend
down sides and turn under bottom 2 in. Minimum two metal screws per hanger. Angle iron on larger duct spaced per building structural system but not greater that 8 ft. Provide extra
support angles as required. 3.11 AIR AND WATERTIGHT DUCTWORK A. Where water and snow may accumulate on ductwork or where odors or corrosive gasses may collect, ductwork and plenums
shall be made watertight by soldering, brazing or welding of joints. Grade ducts down toward waste points and/or toward louvers. Provide valve and drain piping from low point to waste
point. 1. Kitchen hood exhaust ductwork. B. Grease Duct to be installed as required by 2020 Mechanical Code of New York State Section 506.3.7. 3.12 ACOUSTIC-THERMAL DUCT LINING A. Increase
metal duct dimensions to accommodate lining. Adhere lining to interior side of duct; minimum 90% coverage of Benjamin Foster 85-20 fire retardant adhesive, UL approved. Stapling method
of attaching will not be permitted. Mechanical fasteners shall not pierce the sheet metal. Installing fasteners with spacing as per SMACNA Standards. Multiple layers of liner to
achieve indicated thickness is prohibited. B. Abutting edges of acoustic linings shall be sealed with a fire resistant neoprene coating, and exposed edges of acoustic linings shall
be installed with sheet metal nosing to prevent erosion. TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference
210021 Revised per Addendum No. 1 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 22 C. Lining shall not impart odor to the air, delaminate or be loosened by the
airstream under normal operating conditions. Lining which is damaged during fabrication or shipment shall not be installed. D. Supply ductwork downstream of terminal units shall have
1-1/2 in. thick acoustical lining for a minimum of 10 feet. All air outlets shall be installed downstream of this minimum distance. 3.13 SMOKE DETECTION A. Smoke detectors shall
be furnished by Division 26 "Electrical". This Contractor shall install detectors located in ductwork. Clearly indicate locations of smoke detectors on the sheet metal shop drawings.
B. Increase duct size at smoke detectors, where required for proper installation, per smoke detector manufacturer's recommendations. Coordinate minimum duct size required with Division
26 "Electrical". 3.14 DUCT SEALING A. Preparation: 1. Clean surfaces of dirt, oil, grease and loose of foreign matter that could impair adhesion, using soap and water or solvent. 2.
Allow surfaces to dry completely before proceeding. B. Installation of Sealant System: 1. Apply sealant system to duct joints, fasteners, and seams in accordance with manufacturer's
instructions. 2. Apply sealant by brush, putty knife or caulk gun, to full coverage. Remove excess adhesive immediately. 3. Completely seal duct joint, fasteners and seams without
voids, to a minimum 20 mil thick wet film. 4. Apply and store at ambient temperature of 40F to 100F; and protect from freezing until dry. C. Field Quality Control: 1. Allow duct sealant
system to cure a minimum of 72 hours before operating the system. 2. Do not apply external duct insulation or coatings until the joints have been inspected by the Owner's Representative.
TENANT FIT-OUT FOR ITHACA BEER COMPANY - SAI 411-415 College Avenue, Ithaca, NY 14850 HOLT Project No. 20210402 / M/E Reference 210021 Revised per Addendum No. 1 SHEET METAL AND
DUCTWORK ACCESSORIES CONSTRUCTION 233100 - 23 EXHIBIT I - DUCTWORK MATERIALS SERVICE MATERIAL SPECIAL REQUIREMENTS Supply, return, vent, relief, outside and exhaust Lock forming
quality, galvanized steel ASTM A653 and A924, galvaneal/paint grip if not insulated and exposed Joints and features as called for Accessories, dampers and air turns Same material and
gauge as parent duct --------------- Exposed Kitchen hood Type 304 stainless steel, with #3 polished finish where exposed Braze or weld airtight/watertight Concealed kitchen hood exhaust
16 gauge black steel Joints welded airtight/watertight, flanged and gasketed at connections to hood END OF SECTION 233100