Loading...
HomeMy WebLinkAbout20210510_AD-1_Drawings101 ROOM NAME A101 1 1 A101 1 DETAIL ENLARGEMENT WALL SECTION BUILDING SECTION DETAIL SECTION INTERIOR ELEVATION DOOR TAG WALL TAG ROOM IDENTIFICATION EXISTING DOOR DOOR FULL HEIGHT PARTITION PARTIAL HEIGHT PARTITION KEYED NOTE FLOOR ELEVATION 1001 1 REVISION CLOUD & TAG A101 SIM A1 A2 A3 A4 DIMENSION TO THE FACE OF FRAMING AT NEW CONSTRUCTION, TYP. DIMENSION TO THE FACE OF FINISH AT EXISTING CONSTRUCTION DIMENSION TO THE FACE OF FINISH 1 EXISTING PARTITION 1 A101 1 A101 NAME ELEVATION AAP AREA ALARM PANEL ACP ACOUSTICAL CEILING PANEL AFF ABOVE FINISH FLOOR CL CENTERLINE CLL CONTRACT LIMIT LINE CLR CLEAR ETR EXISTING TO REMAIN FEC FIRE EXTINGUISHER CABINET HR HOUR MAX MAXIMUM MIN MINIMUM MO MASONRY OPENING NIC NOT IN CONTRACT NPS NOMINAL PIPE SIZE NR NOT REQUIRED OC ON CENTER OD OUTSIDE DIAMETER OFCI OWNER FURNISHED CONTRACTOR INSTALLED OFOI OWNER FURNISHED OWNER INSTALLED OPP OPPOSITE RD ROOF DRAIN SF SQUARE FOOT SIM SIMILAR SQ IN SQUARE INCHES TYP TYPICAL UON UNLESS OTHERWISE NOTED ZVB ZONE VALVE BOX CONTRACT LIMIT LINE AREA NOT IN CONTRACT (NIC) HOLT Architects, P.C. Architects, Planners, and Interior Designers 619 West State Street, Ithaca, New York 14850 132 E. Jefferson Street, Syracuse, New York 13202 Tel 607.273.7600 www.holt.com PROJECT INFORMATION DATE: JOB NUMBER: CONSTRUCTION CLASSIFICATION: SPRINKLER PROTECTION: BUILDING USE CLASSIFICATION: TOTAL EXISTING BUILDING AREA (SF): TOTAL AREA OF PROJECT (SF): AREA OF RENOVATION (SF): AREA OF ADDITION (SF): ITHACA BEER COMPANY AT SAI 411-415 College Ave, Ithaca, New York 14850 ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR 04.23.2021 20108 1A NFPA 13 A-2 59,311 3,935 3,935 G001 DRAWING LIST GENERAL G001 COVER SHEET G131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT STRUCTURAL S100 TYPICAL STRUCTURAL DETAILS ARCHITECTURAL A001 GENERAL NOTES, KEY PLANS AND WALL TYPES A101 FIRST FLOOR PLAN A152 FIRST FLOOR REFLECTED CEILING PLAN A162 FIRST FLOOR FINISH PLAN A200 ELEVATIONS A250 TYPICAL MOUNTING HEIGHTS AND ELEVATIONS FIRE PROTECTION GENERAL FP001 GEN NOTES, SYMBOLS LIST AND DETAILS - FIRE PROTECTION FIRE PROTECTION DEMOLITION FP101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS - FIRE PROTECTION FIRE PROTECTION FP101 BASEMENT AND FIRST FLOOR PLANS - FIRE PROTECTION PLUMBING GENERAL P001 GEN NOTES, SYMBOLS LIST, DETAILS AND SCHEDULE - PLUMBING PLUMBING DEMOLITION P101D BASEMENT AND FIRST FLOOR DEMOLITION PLANS - PLUMBING PLUMBING P101 BASEMENT AND FIRST FLOOR PLANS - PLUMBING P201 KITCHEN EQUIPMENT SCHEDULE AND DETAILS - PLUMBING MECHANICAL GENERAL M000 GENERAL NOTES AND SYMBOLS LIST - HVAC MECHANICAL DEMOLITION MD-101 FIRST AND SECOND FLOOR PLAN - HVAC DEMOLITION MECHANICAL M101 FIRST FLOOR PLAN - HVAC M102 ROOF PLAN - HVAC M400 DETAILS - HVAC M401 DETAILS - HVAC M402 DETAILS - HVAC M403 DETAILS - HVAC M404 DETAILS - HVAC M405 DETAILS - HVAC M500 RISER DIAGRAMS - HVAC M600 SCHEDULES AND CONTROLS - HVAC ELECTRICAL GENERAL E000 GENERAL NOTES & SYMBOL LIST - ELECTRICAL ELECTRICAL DEMOLITION ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION ELECTRICAL E100 BASEMENT FLOOR PLAN - POWER AND SYSTEMS/LIGHTING E101 FIRST FLOOR PLANS - POWER AND SYSTEMS/LIGHTING E102 ROOF PLAN - POWER AND SYSTEMS E500 DETAILS - ELECTRICAL E600 SCHEDULES - ELECTRICAL E601 SCHEDULES - ELECTRICAL DRYDEN RD COLLEGE AVEOAK AVE E BUFFALO ST EDDY STDRYDEN RD WILLIAMS ST HOLLISTER DR LINDEN AVEBRYANT AVEELMWOOD AVESUMMIT AVEO AK AVE PROJECT LOCATION PLAN LEGEND AND ABBREVIATIONS Elwyn & Palmer Consulting Engineers Structural Engineers 213 East Seneca Street, Ithaca, New York 14850 Tel 607.272.5060 M/E Engineering, P.C. Mechanical, Electrical, Plumbing and Fire Protection Engineers 300 Trolley Boulevard, Rochester, New York 14606 Tel 585.288.5590 Fax 585.288.0233 THIS SET OF DRAWINGS WAS DEVELOPED FOR THE PURPOSES OF DEFINING THE DESIGN INTENT OF THE PROJECT, AND DEFINING THE SCOPE OF THE PROJECT FOR THE BUILDING CODE OFFICAL FOR THE PURPOSES OF ISSUING A BUILDING PERMIT. WE HAVE PROVIDED SOME CONSIDERATIONS FOR BASIS OF DESIGN PRODUCTS; THESE PRODUCTS ARE NOT REQUIRED TO BE USED AND SHOULD BE THOUGHTFULLY CONSIDERED BETWEEN THE OWNER AND BUILDER. AD-1 05/10/2021 DN UP UP DN FD FD FD FD FD FS FS FS FS UP UP LOADING ZONE WATER METER DINING LEASING OFFICE ELEV ELEV CORRIDOR TRASH/ RECYCLE FB-3HR-E FB-3HR-E SE-2HR-E FB-3HR-E SE-2HR-E FB-3HR-E FB-3HR-E FB-3HR-E FW-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E SE-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR FB-2HR-E ED EA EA ED ED ED E STAIR NAME STAIR # STAIR WIDTH STAIR CAPACITY STAIR RATING DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING STAIR 3 ST3 44" CLR 146 2 HOUR ST2 34" CLR 170 1-1/2 HOUR STAIR 3 DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING ST3 38" CLR 190 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104A 69" CLR 345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104 69" CLR 345 N/A DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING N104B 69" CLR 345 N/A EXIT DISCHARGE THROUGH LOBBYD1 = 117'-4"D2 = 73'REMOTENESS OF EXITS 71'/107' = .663 X 100 = 66.3% PER 2020BCNYS SECTION 1007.1.1 EXCEPTION 2 -NO LESS THAN 33% OF DIAGONAL ALLOWED EATD = 47'-6"ASSEMBLY - UNCONCENTRATED (TABLES AND CHAIRS) 1,978 SF FB-3HR-ESE-2HR-E SE-2HR-E SE-2HR-E SE-2HR-E FB-2HR-E FB-2HR-E SE-2HR-E FB-3HR-E FB-1HR-EFB-1HR-E FB-1HR-E FB-1HR-E FEC ED DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING EXISTING 69" CLR 345 N/A FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FB-2HR-E FW-2HR-E FW-2HR-E FW-2HR-E FEC FB-3HR-E FB-3HR-E SE-1HR-E SE-1HR-E SE-1HR-E KITCHEN RETAIL WAIT BAR 1,978 sf KITCHENS -COMMERCIAL 1,497SF ASSEMBLY - UNCONCENTRATED (TABLES AND CHAIRS) 1716 SF EATD = 81'EATD = 79'-6"EXIT ACCESS TRAVEL DISTANCE (EATD) = 131' (SHOW THE LONGER OF THE TWO DISTANCES) PER 2020 BCNYS TABLE 1017.2, 250' ALLOWED IN SPRINKLERED BUILDING CPET = 57' CPET= 73' 6" EXISTING EXISTING FEC CLASS K FE AD-1 05/10/2021 AD-1 05/10/2021 GENERAL CODE NOTES 1. EXISTING WALL RATINGS SHOWN ON CODE DRAWINGS REFLECT THE RATINGS AS SHOWN ON EXISTING DOCUMENTS PROVIDED BY THE OWNER. NOT VERIFIED BY ARCHITECT. COORDINATE EXISTING AND NEW PARTITIONS WITH DEMOLITION AND CONSTRUCTION PLANS. 2. FLOOR IN THE AREA TO BE 2 HOUR RATED AS PART OF EXIT LOBBY. NOTE: NOT ALL MAY APPLY LOCATION OF EXITS EXIT ACCESS TRAVEL DISTANCE (EATD): DISTANCE TO EXITS FROM THE MOST REMOTE POINT IN THE MOST REMOTE ROOM ON THE FLOOR COMMON PATH OF EGRESS TRAVEL (CPET) CONTRACT LIMIT LINE E ENCLOSED EXIT/ EXIT TO EXTERIOR HE HORIZONTAL EXIT EA EXIT ACCESS REMOTENESS OF EXITS D2 = xxx FEET D1 = xxx FEET DEAD END CORRIDOR (DE) ED EXIT DISCHARGE EXIT TO EXIT (D2) BUILDING DIAGONAL (D1) EATD = xxx FEET CPET = xxx FEET DE = xxx FEET FIRE EXTINGUISHER FEC FEBRACKET CABINET 1 HOUR FIRE BARRIER - EXISTING 1/2 HOUR FIRE PARTITION - EXISTING 0 HOUR SMOKE PARTITION - EXISTING FB-1HR-E SP-0HR 1 HOUR FIRE BARRIER FB-1HR 1/2 HOUR FIRE PARTITION FP-1/2HR-E SP-0HR-E 0 HOUR SMOKE PARTITION 1 HOUR SHAFT/STAIR ENCLOSURE - EXISTING 1 HOUR SHAFT/STAIR ENCLOSURE SE-1HR-E SE-1HR 2 HOUR FIRE WALL - EXISTING FW-2HR-E 2 HOUR FIRE WALL FW-2HR 1 HOUR FIRE PARTITION - EXISTING 1 HOUR FIRE PARTITION FP-1HR-E FP-1HR 2 HOUR FIRE BARRIER - EXISTING FB-2HR-E 2 HOUR FIRE BARRIER FB-2HR 1 HOUR SMOKE BARRIER - EXISTING 1 HOUR SMOKE BARRIER SB-1HR-E SB-1HR FP-1/2HR 3 HOUR FIRE WALL - EXISTING 3 HOUR FIRE WALL FW-3HR-E FW-3HR SE-2HR-E SE-2HR 2 HOUR SHAFT/STAIR ENCLOSURE - EXISTING 2 HOUR SHAFT/STAIR ENCLOSURE HORIZONTAL ASSEMBLY (HA) (SHOWN IN PLAN) 3 HOUR FIRE BARRIER FB-3HR OCCUPANCY DIFFERENCE FEC FEC FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-E FB-3HR-EEATD = 52 FTE SE-1HR-E SE-1HR-E E FB-1HR-E FB-1HR-E ITHACA BEER TENANT SPACE, ONLY BEING PROVIDED WITH LIFE SAFETY REQUIREMENTS AT THIS TIME FUTURE STORAGE FUTURE ASSEMBLY UNCONCENTRATED 308 2020 BCNYS 2020 BC 8 239 </=67% =2 URINALS 3 WC REQUIRED=66% 6 3 3 3 3 PROVIDE DIAPER CHANGING STATIONS AS REQUIRED BY BCNYS P104.1 AD-1 05/10/2021 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 5:00:12 PMG131 CODE CONFORMANCE PLAN - FIRST FLOOR AND BASEMENT 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/8" = 1'-0"D5 ITHACA BEER SAI - FIRST FLOOR CODE CONFORMANCE PLAN 1/8" = 1'-0"D1 ITHACA BEER SAI - BASEMENT FLOOR CODE PLAN KEY PLAN 0'2'4'8'16'0'2'4'8'16' REVISION SCHEDULE NAME DATE AD-1 05/10/2021 FD FD FD FD FD FS FS FS FS FD FS FS 1A 2A 32 3.5 4 5 5.8 5.9 B C D E F G H J K L N O M 1.9 TABLE 18" x 30" SAUTEE 60" x 40"W/ SALIMANDER ABOVE GRILL TOP W/ LOWBOY UNDERNEATH, SALIMANDER ABOVE 36" x 36" FLAT TOP 60" x 36"(3) FRYERS 48" x 30" TABLE 24" x 30"HW SINK 17" x 15" FRIDGE 24" x 30" COOLER 60" x 30" STAGING TABLE 60" x 30" SALAD STATION 60" x 30" TABLE 30" x 48"ICE MAKER 30" x 30"PIZZA PREP TABLE 80"X 31" MUGNANI 69.5" x 74.5" DISH WASHER31.8" x 24.6" (3) BAY SINK 57"x57" CLEAR 5' - 0" 24" DISH WASHER BEER AND MERCHANDISE24" x 24" HW SINK 25" DISH WASHER4'-0" UC COOLERWATER SPIGGIT ABOVE COUNTER, NEED DRAIN 4'-0" (2) BAY SINK104 WOMEN'S TOILET 103 MEN'S TOILET 105 KITCHEN CLEAR3' - 8"COOLER 6' -0" 17' - 5 3/8"11' - 3"PREP TABLE 30" DEPTH CLEAR 5' - 0" CROWLER MACHINE ON TOP OF COUNTER 18" DUMP SINK HOT FOOD TO GO/OR DISPLAY 8' OF TAPS (15+/- LINES) COOLER6' -0" TWO-SIDED COOLER DISPLAYWINDOW OPENING W/ HEAT LAMPS CLEAR 4'-7"3'-7" 9'-7"CLEAR5' - 0"10' - 0"TABLE 24" x 60" 3' - 8 1/8"5' - 3 3/8" TABLE 24" x 48"RACK6'-3"BUILT-IN COUNTERS 25.25" x 29.8"" DISH WASHER3' - 0"8"101 WAIT 106 BAR102 DINING 107 RETAIL 100 VESTIBULE TAKEOUT SERVING STATION PIZZA OVEN JC COOLER 1 1 1A 1A 1A 1A 1A 1A 2B 1A1A 1A 1A 1A 1A1A 2B 1A 1A 1A 1A 1B 2A2A2A 2A2A 2A 2A 2A2A 2A2A 2A2A 2A 2A 2A 2A 2A2A 2A2A 2A 2A2A 2A 2A2A 2A2A 1'-4 7/8" 9'-0 5/8"6'-8 5/8"5'-0 1/4"6'-5 1/4"9'-0 5/8" 2B 6'-9 1/4"10'-4 7/8"5'-3 7/8"1'-4 1/8"6'-8 1/8"5'-11 1/4"9'-7 1/2"21'-2 3/4" 4 2 3 2'-6"5'-0"3'-0"COOLER A101 H8 SINK UNDER BAR 6 3'-9"6'-0" 5'-5 5/8" 8'-9 7/8"9'-0 1/4"5 6 2 2'-1 5/8"8'-3 5/8"3'-1 7/8"3'-1"7'-1 3/4"6'-1 1/2" 4'-11"2'-4"HOST 1'-3"2'-11"6'-5 3/4"10'-5"8'-10"1 1 2 °143° 1 1 2 ° 1 1 2 °5'-9 3/4"2'-6 3/4"1'-11 7/8"6'-3" 4'-10"11'-2 7/8"7'-6 5/8" 4'-11 1/2"15'-6 1/8"AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/20213'-0 1/2"1"1" PIZZA OVEN AND MOP SINK HAVE MOVED, PLEASE COORDINATE WITH MEP. MEP DRAWINGS DO NOT REFLECT THIS CHANGE. 3'-7 5/8" 15'-3 5/8"1'-9"8"AD-1 05/10/2021 1"1"AD-1 05/10/2021 9' - 5" 1"1"2'-7 1/2"6'-4 3/4"45'-0 3/4"6'-4 1/2"12'-5 1/2"AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 PROVIDE A 6" WIDE BY 3/8" THICK PLATE UNDER THE OVEN LEGS, COORDINATE SIZE AND LOCATION OF PLATE, CONNECTIONS WITH OVEN PROVIDED BY OWNER OVEN LEGS DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/11/2021 8:21:11 AMA101 FIRST FLOOR PLAN 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/4" = 1'-0"A1 FIRST FLOOR PLAN GENERAL ARCHITECTURAL NOTES KEY PLAN KEYED CONSTRUCTION NOTES GENERAL NOTES 1 ALL WORK IS NEW UNLESS NOTED AS EXISTING. 2 ANY DISCREPANCY CONTAINED WITHIN ANY OF THE DOCUMENTS SHALL BE UNDERSTOOD TO MEAN THAT THE GREATER QUANTITY AND OR THE BETTER QUALITY SHALL BE PROVIDED IN THE FAVOR OF THE OWNER. 3 REFER TO CODE CONFORMANCE DRAWINGS FOR REQUIRED FIRE RATED CONSTRUCTION. 4 PROTECT/MAINTAIN ALL EXISTING FIRE PROTECTION AND FIRE RESISTANCE RATED CONSTRUCTION. WHERE SCHEDULED WORK DISTURBS FIRE PROTECTION, THE CONTRACTOR SHALL MAKE REPAIRS NECESSARY TO MAINTAIN REQUIRED RATING. WHERE ANY CONSTRUCTION ACTIVITY DISRUPTS ANY ACTIVE LIFE SAFETY SYSTEMS, THESE MUST BE COORDINATED AT A TIME OF MINIMUM DISRUPTION TO THE OWNER AND WITH AT LEAST FOURTEEN (14) DAYS NOTICE. 5 CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD (EXISTING AND SCHEDULED CONSTRUCTION) AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 6 DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. 7 NOTES ON ONE DETAIL OR DRAWING APPLY TO ALL SIMILAR DETAILS AND DRAWINGS. 8 DIMENSIONS NOTED "EQ" ARE EQUAL TO EACH OTHER ONLY IF THEY ARE ON THE SAME DIMENSION STRING AND IN THE SAME ROW. 9 ROOM NUMBERING IS FOR CONSTRUCTION PURPOSES ONLY, ACTUAL ROOM NUMBERING TO BE COORDINATED WITH THE OWNER PRIOR TO ANY SCHEDULING OR LABELING. ALL EQUIPMENT LABELING AND SCHEDULING SHALL BE FORMATTED AS DIRECTED BY OWNER. 10 ANY PORTION OF THE PROJECT WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY SHALL BE REPAIRED. 11 MAINTAIN MEANS OF EGRESS, KEEPING IT FULLY SEPARATED FROM CONSTRUCTION AREA AT ALL TIMES WITH A 1-HOUR FIRE RESISTANT RATED BARRIER (U L DESIGN 309) 12 PROVIDE A FRAMED, DUST PROOF BARRIER TO SEPARATE CONSTRUCTION AREA FROM THE REST OF THE FACILITY AT ALL TIMES. PROVIDE TEMPORARY FILTERS, AND/OR NEGATIVE AIR, AS REQUIRED TO PREVENT THE SPREAD OF DUST, FUMES, AND ODORS THROUGHOUT THE BUILDING. UPON COMPLETION OF THE WORK, REMOVE AND REPAIR ANY DAMAGE CAUSED BY THE UNSTALLATION/PRESENCE OF THE TEMPORARY BARRIER TO A NEW-LIKE CONDITION. # SWINGING DOORS, NO LATCH. WHERE SEATING OR STANDING SPACE AT FIXED OR BUILT-IN TABLES, COUNTERS OR WORKSURFACES IS PROVIDED IN ACCESSIBLE SPACES, AT LEAST 5 PERCENT OF THE SEATING AND STANDING SPACES, BUT NOT LESS THAN ONE, SHALL BE ACCESSIBLE. NYS 2020 BUILDING CODE BC1109.11. POINT OF SALE AND SERVICE COUNTER: WHERE COUNTERS ARE PROVIDED FOR SALES OR DISTRIBUTION OF GOODS OR SERVICES, AT LEAST ONE OF EACH TYPE PROVIDED SHALL BE ACCESSIBLE. NYS BUILDING CODE 2020 BC1109.12.3. PROVIDED PAINTED METAL ENDCAP. GYPSUM BOARD SURROUND STEEL CROSSBRACING, AS TIGHT AS POSSIBLE TO STEEL, CREATE OPENINGS WHERE THEY EXIST IN CROSSBRACING. PARTIAL HEIGHT WALL AT 42" AFF. GLASS VESTIBULE, WITH CAP AT 9'-6" AFF. LOW WALL AT BANQUETTE SIDE, HEIGHT TO BE COORDINATED WITH BANQUETTE DETAIL. 0'1'2'4'8' CONTRACTOR SHALL PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL FLOOR, WALL, AND CEILING MOUNTED EQUIPMENT, MILLWORK, AND ACCESSORIES PROVIDED UNDER THIS CONTRACT AND EQUIPMENT TO BE PROVIDED BY THE OWNER. CONTRACTOR SHALL PROVIDE BRACING WHERE REQUIRED TO SUPPORT OR STABILIZE ALL NON-STRUCTURAL FRAMING. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS AS REQUIRED TO OBTAIN CONVENIENT MAINTENANCE ACCESS TO ALL VALVES, DAMPERS, CONCEALED JUNCTION BOXES, AND OTHER EQUIPMENT REQUIRING ADJUSTMENT, SERVICE, OR MAINTENANCE. PROVIDE PROPOSED LOCATION AND SIZE OF ALL ACCESS PANELS FOR REVIEW AND APPROVAL BY ARCHITECT PRIOR TO INSTALLATION. PROVIDE FIRE RATED ACCESSORIES AT ALL FIRE RATED PARTITIONS. REFER TO CODE CONFORMANCE DRAWING FOR FIRE EXTINGUISHER CABINET LOCATIONS. COMPLY WITH BC1109.2 NYS BUILDING CODE FOR TOILET FACILITIES ACCESSIBILITY REQUIREMENTS. REPAIR ANY FIRE RATED CONSTRUCTION DAMAGED DURING CONSTRUCTION; MAINTAIN EXISTING FIRE RATING AS PER BUILDING CODE REQUIREMENTS. PATCH EXISTING WALLS AND PREPARE FOR SCHEDULED FINISH, TYPICAL ALL EXISTING WALLS WITHIN CONTRACT LIMIT LINES AND NOTED ELSEWHERE. CLEAN ALL WINDOW GLASS, INTERIOR AND EXTERIOR. ALL SLAB OPENINGS FOR FLOOR SINKS, DRAINS, TROUGHS, TO BE FIRESTOPPED WITH REQUIRED RATING, AND FLASHED. PAINT ALL WALLS AND CEILINGS UON. 1 2 3 4 5 6 7 8 9 10 11 1/2" = 1'-0"H8 STRUCTURAL PLATE UNDER PIZZA OVEN 1 2 3 4 5 6 7 COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE INSTALLED. 13 REVISION SCHEDULE NAME DATE AD-1 05/10/2021 GC RESPONSIBILITY TO COORDINATE ARCHITECTURAL WORK SCOPE WITH ROOFTOP MECHANICAL WORK SHOWN ON DRAWINGS M102 & M400. CONFIRM THAT THIS WORK WILL NOT AFFECT EXISTING ROOFING WARRANTY. 14 IT IS THE RESPONSIBILITY OF THE GC TO ENSURE THAT THE KITCHEN HOOD CLEARANCE FROM LIMITED-COMBUSTIBLE MATERIALS IS IN COMPLIANCE WITH LOCAL CODE REQUIREMENTS. 15 AN ADDITIONAL LAYER OF ROOFING MEMBRANE TO BE APPLIED AT THE LOCATION OF THE KITCHEN AND PIZZA HOOD EXHAUST FANS. KITCHEN AND PIZZA HOOD EXHAUST DUCTS SHOULD BE PAINTED TO MATCH THE EXTERIOR OF THE BUILDING. 16 17 DN FD FD FD FD FD FS FS FS FS FD FS FS FD FS ELEV ELEV DINING P SC 102 RETAIL P SC 107 WOMEN'S TOILET RB EP SC 104 MEN'S TOILET RB EP SC 103 EP SS KITCHEN RS FRP RS 105 BAR COOLER COOLER AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 AD-1 05/10/2021 3101 P1 CP1 RB1 ROOM NUMBER WALL TREATMENT FLOOR TREATMENT BASE TREATMENT P2 ACCENT WALL PAINT COLOR ROOM FINISH KEY: NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS. FLOOR FINISHES SCOPE OF WORK AREA FLOOR DRAIN COORDINATE WITH PLUMBING DRAWINGS FLOOR SINK COORDINATE WITH PLUMBING DRAWINGS * REFER TO ELEVATIONS DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/11/2021 8:23:14 AMA162 FIRST FLOOR FINISH PLAN 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/4" = 1'-0"A1 ITHACA BEER SAI - FIRST FLOOR FINISH PLAN 1 ALL WALLS TO BE PAINTED X UNLESS OTHERWISE NOTED. 2 ALL GYPSUM BOARD CEILINGS TO BE PAINTED. 3 ALL DOORS / FRAMES AND PAINTED WINDOW TRIM / FRAMES SHALL BE PAINTED. 4 SEE REFLECTED CEILING PLAN FOR ADDITIONAL FINISH INFORMATION, TYPICAL. 5 ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. 6 EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. 7 MISCELLANEOUS ELECTRICAL PANEL COVERS, GRILLES, ETC. TO BE PAINTED TO MATCH ADJACENT WALL SURFACES. 8 ALL GYPSUM BOARD AT TOILET ROOMS TO BE MOISTURE RESISTANT GYSPUM BOARD UNLESS OTHERWISE NOTED. 9 ADHESIVES AND FINISHES TO BE LOW VOC. 10 IN KITCHEN, OUTSIDE CORNERS TO RECEIVE STAINLESS STEEL CORNER GUARDS (U.O.N.). 11 PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. GENERAL FINISH NOTES FINISH LEGEND KEYED FINISH NOTES KEY PLAN FINISH SCHEDULE: FLOORS: SC: SEALED CONCRETE RS: RESILIENT SHEET FLOORING WITH SLIP RESISTANCE, WELDED SEAMS, 6" FLASH COVE BASE, 2.5mm THICKNESS -BASIS OF DESIGN: ALTRO CLASSIC 25 WALLS: P: LATEX PAINT; EGGSHELL OR SATIN ON WALLS AND GYPSUM BOARD CEILINGS, SEMI-GLOSS AT DOOR FRAMES, TRIM EP: (TOILET ROOMS AND SELECT AREAS IN KITCHEN) WATER BASED EPOXY PAINT FRP: (THROUGHOUT KITCHEN, UON) FIBERGLASS REINFORCED POLYESTER PANEL ON CEMENT BOARD SHEATHING, JOINTS, SEAMS, AND EDGES SHOULD HAVE MOULDING/JOINT STRIPS, AND ALSO BE SEALED. SS: (COOKING AREA) FLASHED WITH 20 GAUGE (1MM) STAINLESS STEEL, WITH LOCK SEAMS, FROM FLOOR TO CEILING AND EXHAUST HOOD BOTTOM; APPLY TO CEMENT BOARD SHEATHING RB: RUBBER BASE AT 6" HIGH IN TOILET ROOMS CEILINGS: DF: (GENERAL EXPOSED FIREPROOFED DECK AND BEAMS) DRYFOG ACRYLIC LATEX PAINT WITH FLAME SPREAD INDEX < 200 INCLUDE ALL EXPOSED UTILITIES UON ACP1: (KITCHEN) WASHABLE, SOIL RESISTANT, MOLD AND MILDEW RESISTANT, RESISTANT TO SAGGING -BASIS OF DESIGN ARMSTRONG CERAMAGUARD UNPERFORATED NOTE: SLATS AND OTHER MATERIALS SHOWN ON RCP TO BE DETERMINED BY OWNER. # 1 2 3 0'2'4'8'16' COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR THE INSTALLATION AND MAINTENANCE FOR ANY PRODUCTS, MATERIALS, AND FINISHES TO BE INSTALLED. 12 REVISION SCHEDULE NAME DATE AD-1 05/10/2021 FIRST FLOOR 358' -6" SECOND FLOOR 372' -6" ROOF 427' -6" THIRD FLOOR 383' -6" FOURTH FLOOR 394' -6" FIFTH FLOOR 405' -6" SIXTH FLOOR 416' -6"14'-0"11'-0"11'-0"11'-0"11'-0"11'-0"DUCTS TO BE PAINTED TO MATCH EIFS WALL, PAINT COLOR TO MATCH DRYVIT 614 "SMOKE SIGNAL" DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 5:07:16 PMA200 ELEVATIONS 04.23.2021 20108 CAK/HRT 411-415 College Ave, Ithaca, New York 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FORREVISION SCHEDULE NAME DATE AD-1 05/10/2021 1/8" = 1'-0"A1 EXTERIOR ELEVATION - EAST AD-1 05/10/2021 ROOF DRAIN WALL HYDRANT (WH) / HOSE BIBB (HB) VENT PIPING TRAP PRIMER (TP)T PRESSURE GAUGE THERMOMETER RECIRCULATION PUMP SHOCK ABSORBER (SA) SHOWER HEAD BACKFLOW PREVENTER (BFP) UNION PIPE GUIDE PIPE ANCHOR S SHUT-OFF SWITCH RELIEF VALVE PRESSURE REDUCING VALVE SOLENOID VALVE CHECK VALVE BALANCING VALVE SHUT OFF VALVE WATER METERM INDIRECT WASTE PIPING (IW)IW FLOOR DRAIN (FD) / FLOOR SINK (FS) CLEANOUT (CO) WALL PLATE CLEANOUT (WPCO) DECK PLATE CLEANOUT (DPCO) CAP OR PLUG PIPE CONTINUATION "P" TRAP TOP TEE CONNECTION BOTTOM/TEE CONNECTION ELBOW UP 45°OFFSET ELBOW DOWN DESCRIPTION PLUMBING SYMBOL LIST SYMBOL NATURAL GAS PIPING (G)G ST STORM WATER SEWER PIPING (ST) STRAINER SANITARY SEWER PIPINGSAN 140 140° HOT WATER RECIRCULATING PIPING (HWR) 140 140° HOT WATER PIPING (HW) HOT WATER RECIRCULATING PIPING (HWR) HOT WATER PIPING (HW) COLD WATER PIPING (CW) NEW PIPING LOCATED BELOW FLOOR/SLAB NEW PIPING LOCATED ABOVE FLOOR/SLAB (E)EXISTING PIPING EC ELECTRICAL CONTRACTOR PC PLUMBING CONTRACTOR MC MECHANICAL CONTRACTOR GC GENERAL CONTRACTOR VTR VENT THRU ROOF BFF BELOW FINISHED FLOOR AFF ABOVE FINISHED FLOOR (ETR) EXISTING TO REMAIN (E)EXISTING NTS NOT TO SCALE POINT OF DISCONNECTION POINT OF CONNECTION WORK TO BE REMOVED DRAWING KEYNOTE DEMOLITION/REMOVAL KEYNOTE X X PUMP DISCHARGE (PD)PD FPC FIRE PROTECTION CONTRACTOR PUMP SCHEDULE NO.LOCATION SERVICE GPM HEAD FT WATER MOTOR TYPE DESIGN MAKEHPVOLTAGEPHASERPM FIXTURE AND EQUIPMENT CONNECTION SCHEDULE DESIGNATION DESCRIPTION COLD WATER HOT WATER WASTE OR SANITARY VENT REMARKS SHOCK ABSORBER SCHEDULE NO.FIXTURE UNIT RATING SIZE IN INCHES PDI SYMBOL SA-A 1 -11 1/2"A SA-B 12 -32 3/4"B SA-C 33 -60 1"C SA-D 61 -113 1 1/4"D SA-E 114 -154 1 1/2"E SA-F 155 -330 2"F WATER HEATER SCHEDULE NO.SERVICE TYPE BTUH INPUT GALLONS/ HOUR RECOVERY TEMP RISE DEG F FUEL TYPE DESIGN MAKE WC LAV HB WATER CLOSET LAVATORY HOSE BIBB 1 1/2" 1/2" 1/2" - 1/2" - 4" 1 1/2" - 2" 1 1/2" - NOTES UR URINAL 1" 2" 2" - MB MOP BASIN 3/4" 3/4" 3" 2" FD FLOOR DRAIN 4" 2" -- FS 4" 2" --FLOOR SINK RP-1 MECHANICAL ROOM DOM. HWR-115 5 25 INLINE GRUNDFOS MAGNA3-32-100FN WH-1 DOM. WATER SEMI-INST./TANK 199,000 232 100 NAT. GAS LOCHINVAR "SHIELD" SWA200N -115 1 VARIABLE 9.7 W TO 178 W, 0.29 A-1.61 A GG 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES WH-1 24" DEEP HEAT TRAP (TYP.) STRAINER WITH VALVED BLOW-DOWN AND THREADED CAP (TYP.) THERMOMETER (TYP.) 3" CPVC INTAKE AND 3" CPVC EXHAUST OUT TO BUILDING EXTERIOR. ROUTE AS INDICATED ON PLANS 12" DIRT LEG AND CAP FACTORY SIZED T&P RELIEF VALVE 1/2" TO CONDENSATE DRAIN CONDENSATE NEUTRALIZER 1/2" TO FLOOR DRAIN 8 GALLON THERMAL EXPANSION TANK (TX-1) CHARGE TO SYSTEM STATIC PRESSURE IN FIELD. REFER TO DETAIL ON THIS DRAWING. TO DRAIN (SEE DETAIL 2 ON THIS DRAWING) FIN. FLOOR UNION (TYP.) MANUAL MASTER MIXING VALVE STATION. MOUNT ON WALL AT 48" ABOVE FIN. FLOOR. ALL COMPONENTS SHALL BE LEAD-FREE HWR PUMP RP-1 AQUASTAT CONTROLLER. SET TO 110 DEG. F TIME CLOCK CONTROLLER 1" TO FLOOR DRAIN 1 1/2" CW FROM TENANT'S METERED DOMESTIC WATER CONNECTION 3/4" HWR FROM TENANT'S DOM. HOT WATER SYSTEM 11514011/2" 11/2"14011/2" 1 1/2" 140 1" A T 1151 1/2" 3/4" 1" 1" CHECK VALVE (TYP.) BALANCE VALVE SET TO 2 GPM 3/4" 1" HW(115) TO TENANT'S FIXTURES AND EQUIPMENT 11/2" 11/2" 1" HW (140) TO HOODS IN TENANT'S KITCHEN ON FLOOR ABOVE1" 140 1" INTEGRAL BASE FOR FLOOR MOUNTING CW PIPING FROM WATER HEATING PLANT 1/2" CALIBRATED PRESSURE RELIEF VALVE SET AT 120 PSI 3/4" DRAIN VALVE WITH VACUUM BREAKER. PIPE TO FLOOR SINK IN ROOM N002 4" HIGH CONCRETE PAD WITH CHAMFERED EDGES FINISHED FLOOR HARD COPPER RELIEF VALVE DISCHARGE LINE TO END 6" OVER FLOOR DRAIN ASME TANK WITH DIAPHRAGM AIR CHARGING VALVE. CHARGE TANK WITH AIR PRESSURE TO MATCH BUILDING STATIC WATER PRESSURE, THEN OPEN VALVE NORMALLY OPEN SHUT-OFF VALVE 3/4" UNION DIRECTION OF FLOW SIZE OF HWR PIPING AS NOTED ON FLOOR PLANS BALANCE VALVE -SET AT GPM REQUIRED TO BALANCE ENTIRE TENANT SPACE CHECK VALVE BALL VALVE 1. PROVIDE THIS ARRANGEMENT ON ALL HOT WATER RE-CIRCULATION BRANCHES AND WHERE NOTED ON PLANS. SIZES NOTED ON PLANS. NOTES: SEE PLANS FOR PIPE SIZE CHECK VALVE DETAIL NOTES: A. B. C. D. COMPOUND GAUGE GAUGE COCK (TYPICAL) FLANGE CONNECTION (TYPICAL) SHUTOFF VALVE (TYPICAL) STRAINER WITH VALVED BLOW DOWN. PRESSURE GAUGE INLINE PUMP -SEE SCHEDULE FOR CAPACITY PROVIDE REDUCER AT PUMP IF REQUIRED (TYPICAL) PRESSURE GAUGES -SELECT GAUGE RANGE TO PLACE MAXIMUM SYSTEM OPERATING PRESSURE IN MIDDLE THIRD OF RANGE. PROVIDE UNION ON PUMP INLET AND OUTLET IF PUMP IS NOT FLANGED. INSTALL PUMP WITH SHAFT HORIZONTAL. PIPING MAY BE INSTALLED VERTICAL, AS SHOWN, OR HORIZONTAL DEPENDING ON SITE CONDITIONS. INSTALL CHECK VALVE HORIZONTALLY OR VERTICALLY WITH FLOW UPWARD. BALANCING VALVE- SET FLOW TO MATCH PUMP DESIGN/SYSTEM REQUIREMENTS 1030 20010070 80604050 901030 20010070 80 604050 90FINISHED FLOOR UNION STRUCTURAL STEEL MEMBER 5'-0" MAX.GAS FIRED EQUIPMENT - WTR. HTR., MAKE UP AIR UNIT, BOILER, ETC. SEE PLANS FOR PIPE SIZES GAS SHUT-OFF VALVE GENERAL NOTES: PROVIDE SHUT-OFF VALVE, DIRT LEG AND UNION AT EACH GAS CONNECTION ON EACH PIECE OF EQUIPMENT. VERIFY CONNECTION SIZES, QUANTITIES AND LOCATIONS WITH HVAC TRADE. P.C. IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. A. B. C. FULL SIZE 6" LONG DIRT LEG WITH CAP DETAIL NOTES: FLOW DIRECTION LABEL. PROVIDE 360° WRAP OVERLAPPING BOTH ENDS OF THE PIPE FUNCTION LABEL AND MATCHING THE FLOW DIRECTION OF THE PIPE CONTENTS. PIPE FUNCTION LABEL PROVIDE A PIPE LABEL FOR EACH PIPE FUNCTION. PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE PIPE PASSES THROUGH. PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20'-0" CENTERS FOR EVERY PIPE UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS. LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM 1/2 OF PIPES IN THE AIR AND ON THE TOP 1/2 OR SIDES OF PIPES MOUNTED LOW. LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS. A. B. C. D. E. F. DOMESTIC COLD WATER DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 12:53:10 PMP001 GEN. NOTES, SYMBOLS LIST, DETAILS AND SCHEDULES - PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850Ithaca Beer Company AT SAITENANT FIT-OUT FORGENERAL NOTES: A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. THESE NOTES ARE APPLICABLE TO ALL PLUMBING CONTRACT DRAWINGS. DISPOSE OF ALL DEMOLITION AND/OR OTHER WASTE MATERIALS CAUSED BY WORK OF THIS CONTRACT. LEGALLY DISPOSE OF ALL MATERIALS TO A LOCATION OFF SITE. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OWNER AND OTHER TRADES PRIOR TO DEMOLITION. PATCH HOLES IN EXISTING CONSTRUCTION LEFT BY THE REMOVAL OF PIPING AND EQUIPMENT. MAINTAIN THE FIRE/SMOKE RATING OF EXISTING CONSTRUCTION. DEMOLITION SHALL INCLUDE, BUT NOT BE LIMITED TO: PIPING, VALVES, FIXTURES, EQUIPMENT, HANGERS, SUPPORTS, AND INSULATION EXCEPT ASBESTOS. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE FIRESTOPPING FOR ALL PENETRATIONS. ALL PENETRATIONS THROUGH FIRE WALLS AND FLOORS SHALL BE SLEEVED AND FIRE/SMOKE STOPPED. REFER TO CONTRACT DOCUMENTS FOR FIRE WALL AND FLOOR LOCATIONS. ALL PENETRATIONS THROUGH NON RATED WALLS SHALL BE SLEEVED AND SEALED. SEAL WITH A NON- HARDENING SEALANT ON BOTH SIDES OF WALL PENETRATION TO REDUCE NOISE TRANSMISSION. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. ADVISE OTHER TRADES OF ALL REQUIRED SERVICE CLEARANCES. PITCH 4" AND LARGER SANITARY, STORM, AND WASTE PIPING AT 1/8" PER FOOT UNLESS OTHERWISE NOTED. FOR SANITARY, STORM, AND WASTE PIPING 3" AND SMALLER PITCH AT 1/4" PER FOOT UNLESS OTHERWISE NOTED. COORDINATE LOCATION AND ELEVATION OF ALL STORM SEWER, SANITARY AND DOMESTIC WATER PIPING. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO THE CONTRACTORS FAILURE TO COORDINATE TERMINATION POINTS. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL FINAL CONNECTIONS. THE PLANS ARE DIAGRAMMATIC AND INDICATE THE GENERAL PIPING AND EQUIPMENT ARRANGEMENT. ALL PIPING MAINS, EQUIPMENT, BRANCH LINES, AND SYSTEM COMPONENTS SHALL BE PROVIDED. THE PLANS ARE NOT INTENDED TO SHOW EVERY ITEM OF WORK OR EQUIPMENT. THE CONTRACTOR SHALL PROVIDE ALL COMPONENTS NECESSARY TO COMPLETE THE SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE WITHOUT ADDITIONAL COST. ITEMS OF WORK OR EQUIPMENT SHOWN ON THE DRAWINGS ONLY, OR CALLED FOR IN THE SPECIFICATIONS ONLY, SHALL BE PROVIDED IN THE SAME MATTER AS IF THEY APPEARED ON BOTH THE DRAWINGS AND THE SPECIFICATIONS. DRAWINGS DO NOT INDICATE ALL OFFSETS, CHANGES IN ELEVATION, ETC. WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL MAKE ALL SUCH CHANGES IN PIPING AND LOCATIONS OF EQUIPMENT, ETC. TO ACCOMODATE WORK, OBSTACLES, AND WORK OF OTHER CONTRACTORS. INSTALL EQUIPMENT AND PIPING TO AVOID INTERFERENCE WITH THE OPERATION, SERVICE AND MAINTENANCE OF EQUIPMENT. ADVISE OTHER TRADES OF REQUIRED SERVICE CLEARANCES. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING OF EXISTING OR NEW FIREPROOFING WHICH IS DISTURBED OR REMOVED DURING THE COURSE OF ANY DEMOLITION OR NEW WORK THAT IS PART OF THIS CONTRACT. FIELD VERIFY ALL FLOOR ELEVATIONS INDICATED ON THE PLANS. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTING HEIGHTS OF ALL PLUMBING FIXTURES, LOCATIONS OF GRAB BARS AND CONTROLS, ETC. PROVIDE SHUTOFF VALVES ON ALL CW AND HW BRANCHES SERVING INDIVIDUAL PLUMBING FIXTURES. UNLESS OTHERWISE INDICATED, PLUMBING CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING AND ALL CORING OF SLABS, WALLS AND OTHER ITEMS REQUIRED FOR PLUMBING WORK. PROVIDE TRAP GUARD INSERTS IN ALL FLOOR DRAINS. ALL FLOOR DRAINS AND FLOOR SINKS WILL BE INSTALLED IN EXISTING FLOOR SLABS. REFER TO PROJECT'S STRUCTURAL DRAWINGS FOR INSTALLATION DETAILS. PROVIDE ALL REQUIRED FLOOR CUTTING, FLASHING, SEALING, AND PATCHING, PROVIDE ALL REQUIRED STRUCTURAL WORK. LOCATE ALL FLOOR SINKS AND FLOOR DRAINS WITH THEIR GRATES SLIGHTLY BELOW THE SURROUNDING FINISHED FLOOR, AND UNDER EQUIPMENT AND/OR COUNTERTOPS. DO NOT INSTALL SUCH THAT EQUIPMENT DRAINS TO FLOOR SINKS AND FLOOR DRAINS WILL CAUSE A TRIPPING HAZARD. PROVIDE ALL FLOOR PENETRATIONS FOR PIPING IN ACCORDANCE WITH PROJECT'S STRUCTURAL DRAWINGS. ALL TENANT DOMESTIC WATER USE SHALL BE METERED FROM NEW 1 1/2" METER PROVIDED IN ROOM N002. DO NOT PROVIDE ANY DOMESTIC WATER CONNECTIONS FOR TENANT'S FIXTURES AND EQUIPMENT OFF ANY PIPING NOT ON THE DOWNSTREAM SIDE OF THE NEW 1 1/2" METER. NOT TO SCALE1TENANT DOMESTIC WATER HEATING PLAN DETAIL NOT TO SCALE2THERMAL EXPANSION TANK DETAIL NOT TO SCALE3BALANCE VALVE ARRANGEMENT DETAIL NOT TO SCALE4INLINE PUMP DETAIL NOT TO SCALE5GAS EQUIPMENT CONNECTION DETAIL NOT TO SCALE6PIPING IDENTIFICATION LABEL DETAIL REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 ELEV 1968 MECHANICAL ROOM N002 FUTURE WORK N001 ELECTRICAL ROOM N003 STAIR 3 ST3 4" 2" (E)SAN (E)3/4" CW UP TO WH 2"● 3" 4" 6"(E)SAN(E)SAN 4" 4"4" 22 16 23 26 9 ●●● ●●● 16 29 2"23 2719 3/4" 3/4" 23 3/4"1" (E)ST 3/4" ● 3/4" 17 ●●●3/4" 25●231"●●● ●●● 1 1/2" (E)4" SAN 15 1" 3/4" 1 1/2" 20 ●●● 1" 11/2"3/4" 7●●● 7 5 3 ● 2" 14 6 4" 9 19 3" 16 9 3/4" 24 4 1 1/2" 9 13 28 24 21 12 11 4" 2 4" 1 8 10 140 ●● 32 (E)2" IW 30 31 56 9 1 23 1 1 1" 58 4" 59 1 18 1 1 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 (E)FD (E)WH (E)HB (E)INV. 360.00'6" 3" 1 1/2" 4"4"3" 4" 2" 2" 4"4" 4" 1 1/2" 3"3" 3" 1 1/2" 1 1/2" 1 1/2" 4" 4" 4" 3" 2" 1 1/2" 1 1/2" 3"2" 2" 4"(E)ST JAN. CLOS. 590 SERVICE 591 ELEV 473 TRASH/ RECYCLE N106 DINING 102 CORRIDOR N105 LEASING OFFICE N103 STAIR 3 ST3 WATER METER N108 (E)FD (E)SAN (E)●●(E)SAN(E)IW(E)●● (E)SAN(E)IW(E)ST (E)ST (E)SAN (E)SAN (E)IW (E)ST(E)ST(E)●(E)●●(E)●A B Z D E (3) F AD I V AAO N MP Q Q K V R Q P S T (E)WH 4" FD 4" FD 4"FD 4" FD 4" FS 4" FS 4" FD 4" FS 4" FS WC-B WC-A WC-A LAV-A 4" FD UR(2) WC-B G 34 33 3" LAV-A 36 37 3" 35 35 G 34 G 3" G G 2" 2"G38 (TYP.10)2" ●●● 45 2" 33 39 402" 45 ●●● 49 53 53 53 53 532" 50 38 38 55 40 40 38 (TYP.2)38 IW 51 54 52 43 4" FS 46 46 MB I W44 56 48 3" 1 1/2" 41 4257 1 57 41 41 1 41 1 4" FS 1 1 47 1 1 1 4" FIN. FLOOR EXIST. SANITARY SUMP PUMP SYSTEM CO 4" 2" EXIST. 2" VENT GREASE TRAP ON FIN. FLOOR, WITH REMOVABLE COVER FOR ACCESS 4" FROM TENANT FLOOR SINKS, POT SINK, ETC. REWORK PIPING AND SUMP COVER AS REQUIRED TO ACCOMMODATE NEW 4" SANITARY INTO SUMP GREASE TRAP DESIGN: WATTS GP-50 1 2" 2" BALL VALVE (TYP.) UNION (TYP.)1 1/2" TENANT METER ON WALL AT 3'-0" AFF 2" 2" FROM BUILDING CW SYSTEM 2" TO TENANT FIXTURES AND EQUIPMENT DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 12:54:58 PMP101 BASEMENT AND FIRST FLOOR PLANS - PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850Ithaca Beer Company AT SAITENANT FIT-OUT FOR0'2'4'8'16' 1/8" = 1'-0"1 BASEMENT FLOOR PLAN - PLUMBING 1/8" = 1'-0"2 FIRST FLOOR PLAN - PLUMBING 0'2'4'8'16' P101 DRAWING NOTES 42 DROP 2" GAS TO EQUIPMENT UNDER HOOD. REFER TO DETAIL 3 ON DRAWING P201. 43 CONNECT EACH SANITARY BRANCH TO NEW 4" DROP, RUN TO BASEMENT. 44 RUN 1 1/2" IW TO MOP SINK. 45 CONNECT 1 1/2" HW AND 1 1/2" CW TO EXISTING PIPING. ROUTE NEW PIPING TO AVOID WORK IN KITCHEN. 46 PROVIDE TWO(2) 3/4" HW(140) AND TWO(2) 1" CW CONNECTIONS TO PIZZA HOOD. PROVIDE VALVE AND UNION AT EACH CONNECTION. PROVIDE 1 1/2" IW DRAINS FROM PIZZA HOOD TO FS. 47 PROVIDE 1" IW FROM BEER COOLER EVAPORATIVE EQUIPMENT TO FS. RUN PIPING ALONG WALL BEHIND PIZZA OVEN. 48 3/4" CW, 3/4" HW(115) AND 1" HW(140) UP FROM BASEMENT. CONNECT HW(115) AND CW TO MOP BASIN. RUN 1" HW(140) AND 1" CW AS INDICATED TO PIZZA HOOD. 49 CONNECT 2" CW AND 2" HW TO EXISTING PIPING. 50 DROP 1 1/2" VENT, 1 1/2" WASTE DOWN. 1/2" HW AND CW FOR WATER STATION/SINK AND COFFEE MAKER. 51 CONNECT 1 1/2" IW TO EXISTING IW. 1 1/2" IW DOWN. 52 CONNECT 4" STORM TO EXISTING, CONNECT 3" AND 4" SAN TO EXISTING. DROP 4" STORM AND 4" SAN TO BASEMENT. 53 3/4" HW, 3/4" CW UP FROM BASEMENT. CONNECT TO ALL FOOD SERVICE EQUIPMENT REQUIRING THESE SERVICES. 54 CONNECT 1 1/2" IW, 4" STORM AND 4" SAN TO EXISTING PIPING. DROP EACH SERVICE DOWN TO BASEMENT. 55 1 1/2" VENT UP, 1 1/2" SAN DN. 56 1/2" CW, 1/2" HW AND 1 1/2" SAN UP TO HAND SK. PROVIDE BALL VALVES ON CW AND HW PIPING. 57 PROVIDE TWO(2) 1 1/2" IW DRAINS FOR HOOD TO NEAREST FLOOR SINK. 58 4" SANITARY WITH TRAP UP TO FS. 1/2" CW AND HW UP TO SINK. 59 PROVIDE BALL VALVES ON CW AND HW PIPING. P101 DRAWING NOTES 21 CONNECT 4" STORM AND 4" SANITARY FROM RELOCATED RISERS TO EXISTING STORM AND SANITARY. 4" ST, 4" SAN UP. 22 CONNECT 1 1/2" IW FROM RELOCATED RISER TO EXIST 1 1/2". 1 1/2" IW UP. 23 4" SANITARY WITH TRAP UP TO FLOOR SINK. 3/4" HW AND CW UP. 24 2" VENT UP. 25 3/4" HW AND CW UP, 3" SANITARY UP FOR COMPARTMENT SINK. 26 3/4" HW AND CW UP. 27 CONNECT 2" VENT TO EXISTING 2". 28 CONNECT 4" STORM FOR RELOCATED RISER TO EXISTING 4". 4" STORM, 2" VENT UP. 29 4" STORM, 4" SANITARY AND 1 1/2" IW UP. CONNECT TO EXISTING STORM, SANITARY AND IW. 30 CONNECT 1 1/2" SANITARY TO EXISTING 6" SANITARY. 31 1 1/2" SANITARY, 1/2" HW AND CW UP TO SINK/WATER STATION. 32 1" HW(140) UP. 33 DROP 3" GAS AT EXTERIOR OF BLDG. AND CONNECT TO TENANT GAS METER. PROVIDE 3" VALVE. 34 SLEEVE AND SEAL 3" PIPE AT WALL PENETRATION SO THAT PIPING IS ISOLATED FROM BLDG. CONSTRUCTION. PROVIDE LINK SEAL. 35 DOMESTIC WATER PIPING FOR ALL FIXTURES IN THIS TOILET ROOM FROM BASEMENT AS REQUIRED. 36 TERMINATE 3" INTAKE AND 3" EXHAUST (FOR BASEMENT WATER HEATER) IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS. 37 3" INTAKE, 3" EXHAUST FOR WATER HEATER DOWN TO BASEMENT. 38 2" VENT DOWN. 39 DROP 2" GAS AND CONNECT TO MAU BY HVAC TRADE. PROVIDE VALVE, UNION AND DIRT LEG. REFER TO DETAIL 5 ON DRAWING P001. 40 CONNECT 2" VENT TO EXISTING 2". 41 DROP 2" GAS TO EQUIPMENT UNDER HOOD. REFER TO DETAIL 3 ON DRAWING P201. P101 DRAWING NOTES 1 1" CW, 2" SAN UP FOR URINAL. 2 1 1/2" CW, 4" SAN, 2" VENT UP FOR WC. 3 CONNECT 2" CW TO EXISTING 3". 4 DROP 2" CW AT WALL. PROVIDE 1 1/2" DOM. COLD WATER METER WITH DIGITAL INTERACE AT 3'-0" AFF. PROVIDE VALVE ON EACH SIDE OF METER. RISE UP AND RUN 2" CW TO TENANT'S SYSTEM AS INDICATED. METER MAKE: NEPTUNE T-10 WITH WIRELESS AND DIGITAL INTERFACE. REFER TO DETAIL 4 ON THIS DRAWING. 5 GREASE TRAP ON FLOOR. REFER TO DETAIL 3 ON THIS DRAWING. 6 3" INTAKE, 3" EXHAUST FOR WATER HEATER, RUN UP IN WALL ABOVE. PIPING SHALL BE SCH. 40, CPVC. 7 1/2" HW AND CW, 1 1/2" SANITARY UP FOR TROUGH LAV FIXTURE. 8 CONNECT 2" VENT FROM GREASE TRAP TO EXISTING 2" VENT UP. 9 4" SANITARY WITH TRAP UP TO FLOOR DRAIN. 10 1 1/2" CW, 4" SAN, 2" VENT UP FOR WC IN WOMEN'S TOILET ROOM ABOVE (TYP.3). 11 4" RELOCATED SANITARY RISER UP. CONNECT TO SANITARY ON THIS LEVEL. 12 CONNECT 1 1/2" SAN, 4" SAN, 4" SAN (NEW BRANCHES) TO EXISTING 4" SANITARY. 13 DROP 3/4" CW WITH VALVE. PROVIDE HB AT 48" AFF ON SOUTH FACE OF COLUMN D-4. 14 TENANT'S DOMESTIC WATER HEATER. REFER TO DETAIL 1 ON DRAWING P001. 15 CW, HW AND HWR FOR TENANT'S DOM. WATER HEATING PLANT. PUMP RP-1. REFER TO DETAIL 1 ON DRAWING P001. 16 CONNECT 4" SANITARY TO EXISTING 4" SANITARY. 17 CONNECT 3/4" CW TO EXISTING 3/4" STUBBED DOWN INTO SPACE (SERVES WH IN TENANT OUTDOOR SPACE). 18 4" SANITARY WITH TRAP, 2" VENT UP TO FLOOR SINK. 19 TWO(2) - 2" VENTS UP. 20 1" HW AND CW UP. 3" SANITARY WITH TRAP UP TO MOP BASIN. 4" SANITARY WITH TRAP UP TO FLOOR SINK. GENERAL NOTES: 1. 2. 3. FIELD VERIFY AND COORDINATE WITH ALL EXISTING PIPING. AVOID EXISTING PIPING AS REQUIRED. COORDINATE ALL FLOOR DRAIN AND FLOOR SINK LOCATIONS WITH ALL FOOD SERVICE EQUIPMENT. LOCATE AS REQUIRED FOR PROPER DRAINAGE OF ALL EQUIPMENT. DO NOT LOCATE UNDER EQUIPMENT LEGS/SUPPORTS OR AT INACCESSIBLE LOCATIONS. COORDINAE WITH NYSEG AS REQUIRED TO OBTAIN AND INSTALL GAS METER FOR THIS TENANT. PROVIDE ALL REQUIRED WORK TO ESTABLISH TENANT'S GAS SERVICE. REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 NOT TO SCALE3GREASE TRAP DETAIL NOT TO SCALE4TENANT WATER METER DETAIL 1 1 1 1 KITCHEN/FOOD SERVICE EQUIPMENT NOTED ON PLAN BY SYMBOL. REFER TO PROJECTS FOOD SERVICE DOCUMENTS FOR ADDITIONAL REQUIREMENTS. 1 QTY EQUIPMENT CATEGORYITEM CODE FOOD SERVICE PLUMBING SCHEDULE HOT WATER SIZECOLD WATER SIZEDIRECT DRAIN SIZEINDIRECT DRAIN SIZEGAS SIZECFHPLUMBING REMARKS - PROVIDE ALL WORK GAS RANGE 1 GAS SALAMANDER 1 3 11 HAND SINK 1/2" 1/2" 1"406 43 3/4" 87GAS CHARBROILER GAS GRIDDLE1 3/4" 135 GAS FRYER 1 1 1 1 3 1 1 A Z 1/2" B D E 1/2" & 3/4" 90 F 1 1/2" I COFFEE MAKER 1/2"PROVIDE IN-LINE WATER FILTER K ICE MAKER 3/8" 1 1/2"IW TO FLOOR SINK; PROVIDE WATER FILTER M THREE COMPARTMENT CORNER SINK 1/2" 1/2" 2" N 1 1/2"3/4"180 DEG. F HW FROM BOOSTER HEATER TO WASHER DISHWASHER 1 SOILED DISHTABLE 1/2" 1/2"2"O 1 WALL MOUNTED UNDER BAR HAND SINK 1/2" 1/2" 1 1/2"P GLASS WASHER 1/2" 1 1/2"IW TO FLOOR SINK Q R BAR REFRIGERATOR 1" UNDERBAR HAND SINKS 1/2" 1/2" 1 1/2" 1 UNDERBAR 2 BAY HAND SINK 1/2" 1/2" 1 1/2"T 2 DROP-IN WATER STATION V 1/2" 1 EVAPORATOR AA/AD 3/4"IW TO FLOOR DRAIN OR FLOOR SINK IW TO FLOOR SINK GAS PRESSURE REQUIRED: 4.5" W.C. GAS PRESSURE REQUIRED: 5.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. GAS PRESSURE REQUIRED: 4.0" W.C. VENT SIZE1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" NOTES: 1. OBTAIN MANUFACTURERS DETAILS, CUT SHEETS AND INFORMATION ON ALL KITCHEN EQUIPMENT AND PROVIDE ALL REQUIRED ROUGH-INS, CONNECTIONS AND DRAINS. PROVIDE ISOLATION SHUT-OFF VALVES FOR EACH PIECE OF EQUIPMENT. RUN DOMESTIC WATER PIPING ALONG WALL, ABOVE FLOOR TO SERVICE MULTIPLE PIECES OF EQUIPMENT FROM SUPPLIES PIPED UP FROM BASEMENT. 2. 3. 4. IW TO FLOOR DRAIN OR FLOOR SINK 1 11/2" 11/2" 11/2" 3" 3" FIN. FLR CO CONN. 2" WASTE TO EACH SINK COMPARTMENT (TYP. 3) 2" P-TRAP (TYP. 3) 4" FLOOR SINK (FS) CONNECT 1/2" H&C TO FAUCET 1/2" H&C TO FAUCET OR FLEX HOSE (TYP. 3) INSTALL STOPPER (FURNISHED BY KEC) AT EACH COMPARTMENT ALL PIPING, TRAPS, ETC. BY P.C. TERMINATE 2" ABOVE RIM OF FS QUANTITY OF SINK COMPARTMENTS AS NOTED ON PLANS. NOTES: 1. IF SINK IS UTILIZED FOR FOOD PREPARATION, INDIRECT WASTE CONN. IS REQUIRED. IF SINK IS ONLY USED FOR POT WASHING, DIRECT CONN. IS ACCEPTABLE. 2. FLOOR DRAIN/SINK CONDENSER WATER SUPPLY CONNECTION FILTER -MOUNT AT ACCESSIBLE HEIGHT AND LOCATION. 1/2" INLINE DOUBLE CHECK VALVE SIMILAR TO WATTS #9BD CONDENSER WATER WASTE CONNECTION 1" DRAIN WITH VENTING TEE PITCH INDIRECT WASTE PIPING TO DRAIN FINISHED FLOOR PROVIDE DRAINS TO NEAREST FLOOR DRAIN OR FLOOR SINK FROM ICE MAKER SUMP, ICE BIN AND BACKFLOW PREVENTER. TERMINATE PIPING AT 1" ABOVE DRAIN AS SHOWN. PITCH INDIRECT WASTE PIPING 1/4" PER FOOT MINIMUM. CONNECTIONS ARE DIAGRAMATIC AND SHOWN ON SIDES OF ICE MACHINE FOR CLARITY. THEY WILL NORMALLY BE ON THE BACK OF THE MACHINE. COORDINATE FINAL POINTS OF CONNECTION WITH THE MANUFACTURER. INSULATE WATER SUPPLY PIPING AS SPECIFIED. COVER INSULATION WITH PVC JACKET. FILTER SHALL BE INSURICE NO. 2000, TWIN. 1" MINIMUM BIN DRAIN 1 1/2" 1/2" 1/2" 1/2" COLD WATER ICE MAKER SUPPLY DETAIL NOTES: A. B. C. D. E. ICE MACHINE ICE BIN UNION (TYPICAL) A G 2" CAP GAS VALVE CSA, UL LISTED STAINLESS STEEL GAS FLEX CONNECTION PROVIDE FINAL CONNECTION TO EQUIPMENT PROVIDE THIS ARRANGEMENT FOR ALL EQUIPMENT NOTE: SIZE OF EACH VALVE AND FLEX CONNECTION AS NOTED. EQUIPMENT DESIGNATIONS PER SCHEDULE ON THIS DRAWING FLOOR SUPPORT (TYP.)14"CAP, INSTALL TO MAINTAIN ACCESS FOR REMOVAL FINISHED FLOOR 8" DIRT LEG EMERGENCY SHUTOFF VALVE FURNISHED BY OTHERS, INSTALLED BY P.C. UNION, TYP. MANUAL SHUTOFF VALVE 2" 1" Z 3/4" E (TYP.3) ALL 3/4" D 3/4" B 3/4" 2"2" 2" HEADER TIGHT TO WALL BEHIND APPLIANCES 2" G FROM 3" MAIN OFF TENANT'S METER DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 12:56:07 PMP201 KITCHEN EQUIPMENT SCHEDULE AND DETAILS - PLUMBING 04.23.21 2017054 AMB 411-415 College Ave, Ithaca, NY 14850Ithaca Beer Company AT SAITENANT FIT-OUT FORNOT TO SCALE1KITCHEN EQUIPMENT SCHEDULE NOT TO SCALE2THREE COMPARTMENT SINK PLUMBING DETAIL NOT TO SCALE4ICE MACHINE CONNECTION DETAIL NOT TO SCALE3HOOD GAS PIPING SCHEMATIC DETAIL REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 PIZZA OVEN HOOD REQUIREMENTS AND NOTES: 1. 2. PIZZA OVEN HOOD: A. PROVIDE TWO(2) -3/4" HOT WATER (140 DEG.F) CONNECTIONS FOR HOOD. B.PROVIDE TWO(2) -1" COLD WATER CONNECTIONS FOR HOOD. C.PROVIDE VALVE AND UNION ON ALL CONNECTIONS. D.PROVIDE TWO(2) -1 1/2" IW DRAINS FROM HOOD TO FLOOR SINK. FOR ALL HOODS ON PROJECT OBTAIN MANUFACTURER'S TECHNICAL DRAWINGS AND SPECIFICATIONS AND COORDINATE LOCATIONS. PROVIDE ALL REQUIRED PLUMBING TO EACH HOOD. 1 UPUP e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 102 DINING 762 ELEV N106 TRASH/ RECYCLEST3 STAIR 3 N103 LEASING OFFICE FD/SD (E)HP-104A (E)HP-104B (E)HP-104C (E)EUH-3 (E)EUH-4 (E)HP-102 (E)16x12 (E)20x12 N107 LOADING ZONE (E)EF-2 8" N108 WATER METER N105 CORRIDOR 20x12 x8 8 (E) 150 8" N100 VESTIBULE (E)EUH-5 (E)EWH-5 EWH-1 (E)CUH-2(E)CUH-1 FD (E)14x10 (E)14x6 FD FD (E)EUH-6 (E)EUH-7 N323 COOLER 104 WOMEN'S TOILET 103 MEN'S TOILET HOOD H-1 HOOD H-1A14x8 106 BAR 430 SF RETAIL 105 KITCHEN EUH-8 EUH-9 14" "8 4 160 "8 4 160 x126 2 240 TYP=2 8"8" "8 4 160 "8 4 160 "8 4 160 "8 4 160 "8 4 160 8" 16x10 HP-104D x126 3 100 TYP=4 1 2 2 2 3 4 4 5 5 9 (E)10" 8x8 HOOD H-2 14x10 14x8 36x14MAU-1 9'-6"Lx38"Wx36"H APPROX. 815 LBS 1112 7 x6 6 A 50 EF-8 x8 8 2 110 TYP=2 10x6 x1010 A 210 TYP=2 12x6 " 1 8 290 " 1 8 290 14x10 14x86" 6" 26x12 26x12 36x14 10x6 x22 22 A 800 14x10 8 14"10x8 12x8 10x8 10x8 8x6 6" 14" 14" " 1 6 100 x146 3 150 x146 3 150 12" 8x8 VAV-2 10" 16x12 6 10 10 10 10 10 10 10 10 13 15 15 x2210 3 625 VAV-1 14 10" 16 16 16 16 14x10 AREA NOT IN SCOPE OF WORK 42x14 48"x48" O.A. LOUVER IL-1 17 14x6 6" 12x6 (BELOW) 8" 2-WAY 24x24 AREA NOT IN SCOPE OF WORK 18 1919 1919 20 10x10 6" 21 10x6 (E)EF-112x822 23 16x1012x12 16x10x146 3 150 8" 24 8 12x10 16x12 12x10x2210 3 625 e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV N106 TRASH/ RECYCLE (E)HP-104C (E)HP-104B (E)HP-104A (E)EUH-3 (E)EUH-4 (E)HP-102 N103 LEASING OFFICE N105 CORRIDOR N107 LOADING ZONE N108 WATER METER ST3 STAIR 3 (E)1" HPWS&R 1" HPWS&R 1" HPWS&R 11/2" HPWS&R (E)EF-2 T T S S S S N100 VESTIBULE N101 RECEPTION N102 LOBBY (E)HP-103 11/2" HPWS&R EWH-1 T (E)EUH-5 (E)1" HPWS&R(E)1 1/4" HPWS&R (E)3/4" HPWS&R S HP-104D 107 RETAIL 102 DINING 106 BAR 105 KITCHEN 103 MEN'S TOILET 104 WOMEN'S TOILET N323 COOLER HOOD H-1 HOOD H-1A HOOD H-2 S (E) (E) (E) (E) (E) 1 1 1 1" HPWS&R 2 2 2 2 3 4 4 4 4 4 4 AREA NOT IN SCOPE OF WORK EF-8 VAV-1 VAV-2 EUH-8 EUH-9 5 AREA NOT IN SCOPE OF WORK MAU-1 6 7 DRAWING NOTES: 1. EXISTING 26x12 VENTILATION SUPPLY AND RETURN DUCTWORK UP IN CHASE, 20x12 DOWN. 2. PROVIDE LINED RETURN AIR PLENUM THE SAME SIZE AS UNIT CONNECTION. RETURN DUCTWORK TO BE OPEN ENDED WITH WELDED WIRE MESH. 3. PROVIDE WALL CAP WITH BACKDRAFT DAMPER. 4. MOUNT UNIT HEATER AT 9'-0" AFF. 5. EXISTING HEAT PUMP HP-104C TO BE REPOSITIONED TO LOCATION SHOWN. 6. EXISTING HEAT PUMP HP-104BA TO BE REPOSITIONED TO LOCATION SHOWN. 7. CONNECT NEW 16x12 VENTILATION AIR DUCT TO EXISTING 16x12 AT POINT OF CONNECTION SHOWN. 8. PROVIDE NEW DUCT STATIC PRESSURE SENSOR AND INSTALL AT THIS LOCATION. REFER TO RISER DIAGRAM FOR MORE INFORMATION. 9. TERMINATE 16x12 VENTILATION RETURN AIR WITH WELDED WIRE MESH. 10. DUCTWORK TO BE EXPOSED IN DINING/BAR/RETAIL AREA. DUCTWORK SHALL BE GAVANEAL AND PAINTED. COLOR SELECTION BY ARCHITECT. 11. 36x14 EXHAUST DUCT UP SIDE OF BUILDING TO EF-6 ON ROOF. REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING S100 FOR MOUNTING AND SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL LOCATION OF DUCTWORK AND SUPPORTS WITH EXISTING WINDOWS. 12. 16x10 EXHAUST DUCT UP SIDE OF BUILDING TO EF-7 ON ROOF. REFER TO M102 FOR DUCTWORK CONTINUATION. REFER TO STRUCTURAL DRAWING S100 FOR MOUNTING AND SUPPORTING OF DUCTWORK UP THE SIDE OF THE BUILDING. COORDINATE FINAL LOCATION OF DUCTWORK AND SUPPORTS WITH EXISTING WINDOWS. 13. OUTLINE OF LOWER CEILING/SOFFIT AREA. REFER TO RCP PLAN FOR MORE INFORMATION. 14. CONNECT NEW 16x12 VENTILATION AIR DUCT TO EXISTING AT POINT OF CONNECTION SHOWN. 15. HEAT PUMP TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE LOCATION OF HEAT PUMP WITH SLAT CEILING SO THAT HEAT PUMP REMAINS ACCESSIBLE FOR SERVICING. REFER TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 16. PROVIDE REMOTE VOLUME DAMPERS ABOVE GYP BOARD CEILING. 17. VAV TO BE PLACED ABOVE SLAT CEILING AREA. COORDINATE LOCATION OF VAV WITH SLAT CEILING SO THAT VAV REMAINS ACCESSIBLE FOR SERVICING. REFER TO REFLECTED CEILING PLANS FOR MORE INFORMATION. 18. MOUNT BOTTOM OF INTAKE LOUVER AT 12" AFF. PROVIDE 1'-0" DEEP PLENUM WITH ACCESS DOOR. 19. EXHAUST DUCTWORK AT EXTERIOR OF BUILDING SHALL BE INSULATED WITH KITCHEN HOOD EXHAUST DUCT WRAP AND COVERED WITH ALUMAGUARD JACKETING PER MANUFACTURER'S RECOMMENDATIONS. DUCTWORK IS TO ROUTE UP 6 STORIES TO ROOF. APPROX. 70 FT. 20. UNIT TO SIT ON 6" CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL FOR MORE INFORMATION. 21. ACCESS PANEL FOR EXHAUST FAN. REFER TO ARCHITECTURAL PLANS FOR MORE INFORMATION. 22. EXISTING EXHAUST FAN EF-1 TO BE RELOCATED AT LOCATION SHOWN. 23. EXISTING WALL CAP WITH BACKDRAFT TO BE MOVED TO LOCATION SHOWN. 24. CONNECT NEW 8" DUCT TO EXISTING AT POINT OF CONNECTION SHOWN. X DRAWING NOTES: 1. RELOCATE EXISTING SENSOR TO NEW LOCATION SHOWN. EXTENDED/MODIFY CONTROL WIRING AS REQUIRED. 2. EXTEND MODIFY HPWS&R PIPING TO RELOCATED EXISTING HEAT PUMP. 3. CONNECT NEW 1" HPWS&R PIPING TO EXISTING 2" TAP AND CONNECT TO RELOCATED HEAT PUMP AS SHOWN. 4. PIPING IN OPEN CEILING AREAS TO BE PAINTED. COLOR SELECTION BY ARCHITECT. 5. PROVIDE REMOTE MOUNTED LCD CONTROL PANEL FOR HOOD OPERATION. 6. PROVIDE ANSUL PULL STATION AT LOCATION SHOWN. 7. WALL MOUNTED UTILITY CABINET FOR HOOD H-2. X GENERAL NOTES: A. REFER TO DRAWINGS M401-M405 FOR COMPLETE HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING ERV TO BE RE-BALANCED FOR NEW 1250 CFM OF VENTILATION AIR FOR FIRST FLOOR LEVEL. REFER TO RISER DIAGRAM ON M500 FOR MORE INFORMATION. GENERAL NOTES: A. REFER TO DRAWINGS M401-M405 FOR COMPLETE HOOD, ASSOCIATED EXHAUST FAN, ANSUL AND CONTROLS DETAILS. B. EXISTING HEAT PUMP WATER PUMPS AND SYSTEM TO BE REBALANCED TO NEW GPM QUANITITY. REFER TO RISER DIAGRAM ON M500 FOR MORE INFORMATION. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 12:17:17 PMM101 FIRST FLOOR PLANS - HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/8" = 1'-0"1 FIRST FLOOR PLAN - HVAC DUCTWORK 0'2'4'8'16' 1/8" = 1'-0"2 FIRST FLOOR PLAN - HVAC PIPING 0'2'4'8'16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 e1 e2 e3 e4 e5 e6 e7 eA eB e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.85.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 EXISTING EVAPORATIVE COOLER EVC-1 15'-0"Lx4'-0"Wx10'-6"H APPROX. 7,970 LBS (E)ERV-1 6'-5"Wx15'-2"Lx5'-6'-0"H APPROX. 4,328 LBS ST3 STAIR 3 10'-0" MIN.(E)EF-3 (E)EWH-426"EF-6 EF-7 12 34 4 14" 3 14"26" 5 55 5 5 510'-0" MIN.DRAWING NOTES: 1. 36x14 EXHAUST DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTURAL DRAWINGS FOR MOUNTING AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING.REFER TO M101 FOR CONTINUATION. 2. 16x10 EXHAUST DUCT DOWN TO FIRST FLOOR. REFER TO STRUCTUAL DRAWINGS FOR MOUNTING AND SUPPORTING OF DUCTWORK DOWN SIDE OF BUILDING. REFER TO M101 FOR CONTINUATION. 3. DUCTWORK EQUIPMENT SUPPORT RAILS, TYPICAL. REFER TO STRUCTURAL DRAWING S100 FOR COMPLETE DETAILS. 4. ROOF EXHAUST FAN. REFER TO DETAIL ON DRAWING M400 FOR MORE INFORMATION. 5. EXTERIOR EXHAUST DUCTWORK TO BE INSULATED WITH KITCHEN HOOD EXHAUST DUCT WRAP AND COVERED WITH ALUMAGUARD JACKETING PER MANUFACTURER'S RECOMMENDATIONS. X DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 12:17:18 PMM102 ROOF PLAN - HVAC 04.23.21 2017054 NED 411-415 College Ave, Ithaca, NY 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/8" = 1'-0"2 ROOF PLAN - HVAC 0'2'4'8'16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 S F F F F S S F F S S S F M M H H H H S S S CO CO CO F F M M M M M M CO F F F F FHDHD WAP WAP M OS OS J J J a-kD J J J J a-kDJ J PC PC e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV ST1 EXISTING STAIR 1 589 ELECT. PANELS 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE 102 DINING N108 WATER METER N101 RECEPTION N100 VESTIBULE N102 LOBBY N103 LEASING OFFICE ST3 STAIR 3 591 SERVICE A C G H H I N AA2 AD1 J Q Q R K Q W X UC UC EUH-8 EUH-9 UC UC AB UC UC AA1 AC AC 1 J1 2 AD2 MAU-1 EF-8 (ER) (ER) (ER) (ER) HP-B HP-B HP-104D HP-B (ER) (30/2)53,55 TP-1 TP-1 57,59 (30/2) TP-1 58,60 (30/2)(ER) (ER) 5 7 (ER) 6 CM IM IM7 6 9 9 UC UC UC UC UC 10 10 2#10, 1#10, 3/4"C 2#10, 1#10, 3/4"C 8 8 8 (E) (E) 8 8 8 6 6 6 6 6 6 6 2#10, 1#10, 3/4"C 4 4 4 2 2 2 2 2 11 11 11 11 11 11 11 68 7 7 66 64 62 70 72 AA3 AD3 10 10 12 12 13 9 9 9 8 8 8 8 AC 14 14 EF-1 (ER) 15 16 16 1 1 1 1 1 GENERAL ELECTRICAL NOTES: A.UNLESS NOTED OTHERWISE PROVIDE 2#12, 1#12G, 1/2"C AND CONNECT ALL ELECTRICAL DEVICES, EQUIPMENT AND LIGHTING FIXTURES TO CIRCUITS IN PANEL TP-1 IN BASEMENT, CIRCUIT NUMBERS AS INDICATED ON PLAN. B.PROVIDE 2#12, 1#12, 1/2"C AND CONNECT EMERGENCY BATTERY LUMINAIRES AND EXIT SIGNS TO AREA LIGHTING CIRCUIT AHEAD OF ALL SWITCHING AND CONTROLS. C.PROVIDE 0-10V WIRING FOR DIMMING OF ALL LIGHT FIXTURES INDICATED AS BEING DIMMED UTILIZING 0-10V DIMMING. D.PROVIDE FORWARD PHASE DIMMING DIGITAL LIGHTING ROOM CONTROLLERS FOR ALL LIGHTING REQUIRING LINE VOLTAGE DIMMING. E.ALL LIGHTING WITHIN THE DAYLIGHTING ZONE SHALL BE ABLE TO BE DIMMED BY PHOTOCELL. F.PROVIDE SOUNDER BASE FOR ALL CO DETECTORS. G.UNLESS OTHERWISE NOTED ALL RECEPTACLES IN KITCHEN AND BAR AREA SHALL BE GFCI PROTECTED. RECEPTACLES SHALL BE NORMAL RECEPTACLES CONNECTED TO GFCI CIRCUIT BREAKERS. H.ALL TRACK LIGHTING SHALL HAVE TIME OF DAY CONTROL TO MEET ENERGY CODE SPECIFIC APPLICATION CONTROL REQUIREMENTS. THE DIGITAL LIGHTING CONTROLLERS FOR THESE ZONES SHALL BE PROGRAMMED FOR TIME OF DAY CONTROL WITH LOCAL SWITCH OVERRIDE. COORDINATE WITH TENANT FOR ANY ADDITIONAL LIGHTING OR SIGN CIRCUITS TO HAVE TIME OF DAY CONTROL. PROVIDE ZONE CONTROLLER AS REQUIRED FOR TIME OF DAY FEATURE FOR THE DIGITAL CONTROLLERS. I.LOCATE DIGITAL LIGHTING CONTROLLERS ABOVE ACCESSIBLE CEILING OR IN TENANT'S AREA IN BASEMENT BELOW SO NOT VISIBLE IN EXPOSED CEILING AREAS. J.NORTH AND WEST DAYLIGHT ZONES ARE INDICATED ON PLAN. IF THE INSTALLED LIGHTING IS OVER 150W IN A ZONE THEN THAT ZONE WILL REQUIRE A DAYLIGHT SENSOR AND THE LIGHTING WITHIN THE ZONE SHALL DIM UP AND DOWN BASED ON THE DAYLIGHT. SWITCHES SHALL PROVIDE OVERRIDE CONTROL OF THE DAYLIGHTING ZONE. K.ALL EXIT SIGNS AND SENSORS SHALL BE PENDANT MOUNTED WHERE NO CEILINGEXISTS. e1 e2 e3 e4 e5 e6 e7 eA eB eC e5.5 1A 2A 32 3.5 3.9 4 4.7 5 5.4 5.8 5.9 6 7 A B C D E F G H J K L N O 1 M 1.9 6.5 473 ELEV ST1 EXISTING STAIR 1 589 ELECT. PANELS 590 JAN. CLOS. 591 SERVICE N107 LOADING ZONE 762 ELEV N106 TRASH/ RECYCLE 102 DINING N105 CORRIDOR N103 LEASING OFFICE ST3 STAIR 3 N108 WATER METER N100 VESTIBULE N101 RECEPTION c c c 67 2 2 2 1 3 3 L3L3 L3 L3 L3 L3 L3 L3 L3 L3 dd d d d d d d d d L4 L4 L4 L4 L4 L4 L4 L4 f f f f f f f fL1 L1 L1 L1 e e e e L2 L2 L2 h L5L5 L5 L5 L5 L5 L5 L5 L2 L2 g g L2 h L2 L1 8 8 17 4 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 L7 10 10 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 63 6363 6363 63 63 63 63 63 63 63 63 63 6363636363 63 69 69 69 65 71 73 75 75 DAYLIGHTING ZONE DAYLIGHTING ZONE 67 67 11 L3 L3 a a L3 L3 b b i j j k3 31 1 1 1 1 1 1 DRAWING NOTES: 1. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR CURVED SIGNAGE. COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE FIELD WITH SIGNAGE. 2. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR ORGANIC PENDANT LIGHTING. REFER TO ARCHITECTURAL RCP FOR EXACT QUANTITIES OF LIGHTS. APPROXIMATELY 1/3 OF PENDANTS TO BE FED PER JUNCTION BOX. 3. PROVIDE UNISTRUT AT 9'-0" AFF TO PROVIDE PATHWAY FOR PENDANT LIGHTS. COORDINATE EXACT LOCATION OF LIGHTS WITH ARCHITECT PRIOR TO ROUGH-IN. MC CABLE SHALL RUN IN UNISTRUT. PROVIDE ELECTRICAL BOX FOR EACH LIGHT FIXTURE MOUNTED TO UNISTRUT. 4. DIMMING CONTROL STATION FOR LIGHTING ZONES 'a' THROUGH 'k'. PROVIDE CONTROL STATIONS SO THAT EACH ZONE HAS ON/OFF CONTROL AND SHALL BE ABLE TO BE DIMMED UP/DOWN. PROVIDE QUANTITY OF CONTROL STATIONS REQUIRED. PROVIDE ONE CONTROL STATION WITH FOUR (4) SCENE SETTINGS AND PROGRAM SCENES AS DETERMINED BY OWNER. ALL BUTTONS SHALL BE ENGRAVED INDICATING FUNCTION. 5. PROVIDE NEMA SIZE 1, 120V, 60HZ CONTACTOR WITH (3) N.O. CONTACTS IN NEMA 1 ENCLOSURE FOR USE AS KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. MOUNT ABOVE CEILING IN CONVENIENT LOCATION ABOVE ACCESSIBLE CEILING. CONNECT TO 120V, 20A HOOD CIRCUIT AND CONNECT SUCH THAT ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM DEACTIVATES CONTACTOR WHICH IN TURN DEACTIVATES ALL EQUIPMENT CONNECTED TO IT. 6. PROVIDE SAME 120V, 20A CIRCUIT AS THE KITCHEN HOOD TO GAS VALVE CONNECT TO HOOD FIRE SUPPRESSION SYSTEM SUCH THAT ACTIVATION OF THE FIRE SUPPRESSION SYSTEM DEACTIVATES GAS VALVE WHICH SHUTS OFF GAS TO COOKING EQUIPMENT. COORDINATE EXACT LOCATION IN THE FIELD. 7. PROVIDE FIRE ALARM INITIATION MODULE AT HOOD FIRE SUPPRESSION SYSTEM CONTROL PANEL AND CONNECT TO MICROSWITCH SUCH THAT FIRE ALARM GOES INTO ALARM UPON ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM. 8. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT #63 FROM PANEL TP-1 FOR CONNECTING TO BATHROOM LIGHT FIXTURE(S). CONNECT SO CONTROLLED BY SWITCHES AND SENSORS AS INDICATED. 9. PROVIDE DUPLEX RECEPTACLE UNDERNEATH BANQUET SEATING. COORDINATE EXACT LOCATION WITH ARCHITECT PRIOR TO ROUGH-IN. 10. PROVIDE JUNCTION BOX WITH 120V, 20A CIRCUIT INDICATED FOR SIGNAGE AT THIS LOCATION. COORDINATE EXACT LOCATION OF JUNCTION BOX IN THE FIELD WITH SIGNAGE. 11. PROVIDE ONE LIGHT SWITCH TO CONTROL SIGNAGE CIRCUIT #67 FROM PANEL TP-1. PROVIDE ANOTHER LIGHT SWITCH TO CONTROL L1 FIXTURE IN VESTIBULE. 12. PROVIDE GFCI RECEPTACLE UNDER SINK FOR PLUG IN TRANSFORMER FURNISHED BY PLUMBING TRADE. 13.DISCONNECT LOCATION FOR DISHWASHER. RUN CONDUIT DOWN TO DISCONNECT AND BACK UP TO ABOVE CEILING. 14.PROVIDE PATHWAY FROM WIRELESS ACCESS POINT LOCATION TO DATA RACK. 15. EXTEND BRANCH CIRCUITING OF EXHAUST FAN SAVED OFF DURING DEMOLITION TO THIS LOCATION AND CONNECT TO RELOCATED EXHAUST FAN. 16. PROVIDE XLERATOR XL SERIES 120V HAND DRYER. FINISH TO BE CHOSEN BY ARCHITECT. 17. ON/OFF CONTROL FOR ALL LIGHTING ZONES A-K. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 1:33:59 PME101 FIRST FLOOR PLANS - POWER AND SYSTEMS / LIGHTING 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FOR1/8" = 1'-0"1 FIRST FLOOR PLAN - POWER & SYSTEMS 1/8" = 1'-0"2 FIRST FLOOR PLAN - LIGHTING 0'2'4'8'16' REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 1 1 1 1 1 REFERENCE NOTES: A. EXHAUST FAN IS FOR PIZZA HOOD 1/1a. HOOD IS FURNISHED WITH ADJUSTABLE SPEED DRIVE IN CONTROL PANEL FOR FAN. PROVIDE CIRCUIT INDICATED TO DRIVE IN-HOOD CONTROL PANEL AND PROVIDE CONDUIT AND WIRING FROM DRIVE TO EXHAUST FAN. FAN TO BE INTERLOCKED WITH MAU-1. B. PROVIDE 2#12 IN CONDUIT HOOD CONTROL PANEL TO MAU-1. PROVIDE 2#16 IN 1/2"C FOR 24VAC WIRING FROM HOOD CONTROL PANEL TO MAU-1 BOARD FOR START/STOP. C. EXHAUST FAN IS FOR MAIN KITCHEN HOOD . PROVIDE POWER WIRING TO FAN FROM PANEL TP-1. PROVIDE #12 OUTDOOR RATED STP IN 1/2" CONDUIT FROM HOOD CONTROL PANEL TO EXHAUST FAN. D. PROVIDE CAT5 CABLE FROM HOOD CONTROL PANEL TO UNIT. REFER TO WIRIING DIAGRAMS ON MECHANICAL DRAWINGS. REFERENCE NOTES: A. SEPARATE PIECE OF EQUIPMENT THAT WILL SHARE NEMA 5-15R RECEPTACLE OF EQUIPMENT SHOWN ABOVE. B. EQUIPMENT IS LOCATED BENEATH HOOD AND SHALL BE CONNECTED THROUGH THE KITCHEN EQUIPMENT SHUTDOWN CONTACTOR. REFER TO DRAWING NOTES ON FLOOR PLAN. C. DRIVE FOR EF-7 LOCATED IN HOOD CONTROL CABINET. D. CIRCUIT INDICATED IS FOR WALK-IN COOLER LIGHTING AND CONTROLS. PROVIDE CIRCUIT INDICATED AND PROVIDE INTERCONNECTING WIRING BETWEEN SWITCHES AND LIGHT FIXTURES FURNISHED WITH UNIT. SEAL CONDUITS AT WALL PENETRATIONS. E. PROVIDE WIRING FROM HOOD CONTROL PANEL TO ACCESSORY COMPONENTS FURNISHED WITH HOOD AS FOLLOWS: MICROSWITCH 1 AND 2, HOOD LIGHTS, TEMP SENSOR, HOOD 1 CAPTURE VOLUME SENSOR, HOOD 1A CAPTURE VOLUME SENSOR, HOOD 3 VOLUME CAPTURE SENSOR, HOOD 1A PSP SENSOR. COORDINATE ALL REQUIREMENTS WITH CAPITVAIRE IN THE FIELD. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS. F. PROVIDE OCTAGON BOX FOR FIRE SUPPRESSION SYSTEM REMOTE MANUAL PULL STATION, COORDINATE EXACT LOCATION IN THE FIELD. PROVIDE 1/2" CONDUIT FROM BOX TO 6" ABOVE CEILING FOR USE BY FIRE SUPPRESSION SYSTEM INSTALLER. G. THIS HOOD DOES NOT HAVE A CONTROL PANEL. PROVIDE WIRING FROM MAIN HOOD CONTROL PANEL TO LIGHT FIXTURES FURNISHED WITH THIS HOOD. H. COORDINATE LOCATION OF CONDENSING UNIT WITH INSTALLER PRIOR TO ROUGH-IN. I. CONTROL PANEL REQUIRES ETHERNET CONNECTION. PROVIDE CONDUIT TO ABOVE ACCESSIBLE CEILING FOR WIRING BY TENANT'S IT VENDOR. GENERAL NOTES: A. COORDINATE ALL KITCHEN EQUIPMENT RECEPTACLE LOCATIONS AND EQUIPMENT CONNECTIONS WITH FINAL LAYOUT OF EQUIPMENT. INSTALL ALL LUMINAIRES, SWITCHES, CONTROL PANELS, PUSH BUTTONS, FURNISHED LOOSE WITH THE EQUIPMENT. PROVIDE ALL REQUIRED INTERCONNECTING POWER AND CONTROL CONDUIT AND WIRING. B. UNLESS NOTED OTHERWISE, ALL NEMA 5-20R RECEPTACLES SHALL BE GFCI PROTECTED. FOR ACCESSIBILITY REQUIREMENTS GFCI PROTECTION SHALL BE AT THE CIRCUIT BREAKER. C. COORDINATE ELEVATIONS OF RECEPTACLES IN THE FIELD WITH EQUIPMENT VENDOR. D. REFER TO ELECTRIC EQUIPMENT AND CONTROL SCHEDULE FOR HOOD EXHAUST FAN ELECTRICAL REQUIREMENTS. E. RECEPTACLES FOR SPECIFIC EQUIPMENT INDICATED IN THIS SCHEDULE ARE NOT SHOWN ON THE FLOOR PLANS. ALL RECEPTACLES SHOWN ON THE FLOOR PLANS ARE ADDITIONAL RECEPTACLES FOR USE AS CONVENIENCE OUTLETS. F. ALL EQUIPMENT BELOW EACH KITCHEN HOOD SHALL HAVE POWER RUN THROUGH A KITCHEN EQUIPMENT SHUTDOWN CONTACTOR FOR THAT HOOD WHICH SHALL BE CONNECTED TO THE HOOD CONTROL PANEL SUCH THAT ALL EQUIPMENT BELOW THE HOOD IS SHUT DOWN UPON ACTIVATION OF HOOD FIRE SUPPRESSION SYSTEM. CONNECT ELECTRONIC GAS VALVE TO HOOD CONTROL PANEL SUCH THAT ACTIVATION OF THE SYSTEM TURNS OFF THE GAS VALVE. G. NF = NON FUSED. H. DISCONNECTS INDICATED AS 20A NON FUSED SHALL BE MOTOR RATED TOGGLE SWITCHES. I. PROVIDE DISCONNECT SWITCH FOR EACH HARD WIRED PIECE OF EQUIPMENT. INSTALL ALL DISCONNECTS IN CONVENIENT LOCATION SO THAT THEY ARE VISIBLE FROM EQUIPMENT AND ACCESSIBLE. J. FOR EQUIPMENT WITH A QUANTITY OF MORE THAN ONE, MULTIPLE CIRCUIT NUMBERS INDICATE THE CIRCUITS TO BE USED. EACH PIECE OF EQUIPMENT SHALL BE ON A DEDICATED CIRCUIT UNLESS NOTED OTHERWISE. IF ONLY ONE CIRCUIT IS INDICATED UTILIZE CIRCUIT FOR MULTIPLE PIECES OF EQUIPMENT. K. REFER TO WIRING DIAGRAMS ON MECHANICAL DRAWINGS FOR ALL WIRING REQUIRED TO BE DONE BY ELECTRICAL CONTRACTOR RELATIING THE HOODS, EXHAUST FANS AND MAKEUP AIR UNIT. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600 www.holt.com WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.5/10/2021 1:34:00 PME600 SCHEDULES - ELECTRICAL 04.23.21 2017054 WJD 411-415 College Ave, Ithaca, NY 14850ITHACA BEER COMPANY AT SAITENANT FIT-OUT FORRCP RECIRCULATON PUMP BASEMENT 1/4 1 120 5.8 TP-1 #61 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X RCP WH WATER HEATER BASEMENT 1 120 6.0 TP-1 #44 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X 20 NF AU N WH EF-8 EXHAUST FAN WOMENS TOILET 0.152 1 120 1.3 TP-1 #49 20/1 2#12 1#12 1/2"C 2#12 1#12 1/2"C X IU EF-8 EF-7 EXHAUST FAN ROOF 1 1/2 3 208 6.6 TP-1 #77,79,81 20/3 3#12 1#12 EG 1/2"C 3#12 1#12 EG 1/2"C IU IU A EF-7 EF-6 EXHAUST FAN ROOF 7 1/2 3 208 24.2 TP-1 #41,43,45 70/3 3#8 1#10 3/4"C 3#8 1#10 3/4"C IU IU C, D EF-6 MAU-1 MAKE UP AIR UNIT ROOF 7 1/2 3 208 26.4 TP-1 #35,37,39 70/3 3#8 1#10 3/4"C 3#8 1#10 3/4"C IU X X B, D MAU-1 HP-104D HEAT PUMP 1ST FLOOR 1 208 19.9 TP-1 #46,48 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X 30 NF AU N HP-104D EUH-9 ELECTRIC UNIT HEATER VESTIBULE 5 1 208 24.0 TP-1 #54,56 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X IU EUH-9 EUH-8 ELECTRIC UNIT HEATER VESTIBULE 5 1 208 24.0 TP-1 #50,52 30/2 2#10 1#10 3/4"C 2#10 1#10 3/4"C X IU EUH-8 PHASE GROUND CONDUIT PHASE GROUND CONDUIT SWITCH AMPS FUSE SIZE LOC.WEATHER PROOF REF. NOTES ITEM ID NAME ROOM LOCATION HP KW PHASE SYSTEM VOLTS MCA or SYSTEM AMPS PANEL AND CIRCUIT(S) CIRCUIT BREAKER or "FU" FOR FUSE POWER WIRING FROM PANEL TO CONTROL UNIT POWER WIRING FROM CONTROL UNIT TO EQUIPMENT NEMA SIZE STARTERNEMA TYPEMANUAL MOTOR STARTERMANUAL MOTOR STARTER WITHRELAYMAGNETIC STARTERCOMBINATION MAGNETIC STARTERCOMBINATION REDUCED VOLTAGESTARTERCOMBINATION STARTER MP/FUSE (F)SIZEADJUSTABLE SPEED DRIVEADJUSTABLE SPEED DRIVEWITH BYPASSADJUSTABLE SPEED DRIVEWITH REDUNDANT ASDPACKAGED CONTROL UNITFURNISHED BY OTHERSDUPLEX PUMP CONTROLLER BYOTHERSFIRE ALARM FAN SHUTDOWNREQUIREDSUPPLY DUCT SMOKE DETECTOR W/REMOTE TEST STATIONRETURN DUCT SMOKE DETECTOR W/REMOTE TEST STATIONEXHAUST DUCT SMOKE DETECTORW/ REMOTE TEST STATIONTHERMOSTAT CONNECTIONAQUASTAT CONNECTIONMOTORIZED DAMPER CONNECTIONSTART/STOP PUSHBUTTONSHAND/OFF/AUTO SELECTOR SWITCHCONTROL DEVICE LOCATIONSAFETY SWITCH ITEM ID EQUIPMENT POWER SOURCE, PROTECTION & WIRING CONTROL DEVICES AS SHOWN ON THE PLANS BY ITEM DESIGNATION G. "IU" INDICATES INTEGRAL WITH UNIT. F. "NF" INDICATES NON-FUSED. E. "AU" INDICATES CONTROL DEVICES IS LOCATED AT THE UNIT. D. PROVIDE OVERLOADS, SIZE AS REQUIRED, BY THE DIVISION 15 CONTRACTOR. C. ALL DEVICES SHALL BE SURFACE MOUNTED UNLESS OTHERWISE NOTED. B. ITEM NUMBER INDICATES EQUIPMENT NUMBER A. ALL DEVICES PROVIDED BY THE DIVISION 16 CONTRACTOR. ELECTRIC EQUIPMENT AND CONTROL SCHEDULE GENERAL NOTES: REVISION SCHEDULE NAME DATE Addendum #1 05/10/21 2 PIZZA HOOD LIGHTS, ANSUL 1 120 1 TP-1 20A 42 2#12 1#12 1/2"C X 20 NF F,G 1 MAIN HOOD LIGHTS, CONTROLS,... 1 120 1 TP-1 20A 42 2#12 1#12 1/2"C X 20 NF C,E,F, I AD3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 25,27 3#12 1#12 1/2"C X 30 NF AD2 COOLER EVAPORATOR 1 120 1 TP-1 20A 23 2#12 1#12 1/2"C X 20 NF AD1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D AC STRIP WARMERS 36" 2 7 120 1 TP-1 20A 14, 16 2#12 1#12 1/2"C X 20 NF AB GLYCOL CHILLER (ON TOP OF AD1) 1 120 1 TP-1 20A 12 2#12 1#12 1/2"C X 20 NF AA3 COOLER CONDENSING UNIT 1 208 3 TP-1 15A 17,19 3#12 1#12 1/2"C X 30 NF AA2 COOLER EVAPORATOR 1 120 1 TP-1 20A 15 2#12 1#12 1/2"C X 20 NF AA1 BAR WALK IN COOLER 1 120 1 TP-1 20A 13 2#12 1#12 1/2"C X 20 NF D Y MERCHANDISER 7.3 120 1 TP-1 20A 40 2#12 1#12 1/2"C NEMA 5-20R X MERCHANDISER 1 8.3 120 1 TP-1 20A 38 2#12 1#12 1/2"C NEMA 5-20R W CROWLER SEAMER 1 6 120 1 TP-1 20A 36 2#12 1#12 1/2"C X 20A NF R BACK BAR REFRIGERATOR 1 1/5 2.5 120 1 TP-1 20A 34 2#12 1#12 1/2"C NEMA 5-20R Q GLASSWASHER 3 7.5 120 1 TP-1 20A 29,31,33 2#12 1#12 1/2"C X 20 NF N DISHWASHER 1 28.5 208 3 TP-1 40A 28,30,32 3#8 1#10 3/4"C X 60 NF K ICE MAKER 1 10.2 120 1 TP-1 20a 9 2#12 1#12 1/2"C NEMA 5-20R J1 PIZZA TOPPING RAILS 1 1.3 120 1 -- -- -- -- -- -- NEMA 5-20R A. J PIZZA PREP TABLE 1 4.3 120 1 TP-1 20A 26 2#12 1#12 1/2"C NEMA 5-20R I COFFEE MAKER 1 11.4 120 1 TP-1 20A 24 2#12 1#12 1/2"C NEMA 5-20R H FOOD PREP TABLE 2 6.5 120 1 TP-1 20A 22 2#12 1#12 1/2"C NEMA 5-20R G REACH IN REFRIGERATOR 1 7.4 120 1 TP-1 20A 20 2#12 1#12 1/2"C NEMA 5-20R C CHEFS TABLE 1 3.5 120 1 TP-1 20A 18 2#12 1#12 1/2"C NEMA 5-20R B A GAS RANGE W/ CONVECTION... 2 4.3 120 TBD TP-1 20A 21 2#12 1#12 1/2"C NEMA 5-20R B PHASE GND CONDUIT HP KW AMPS NEMA PLUG AND RECEPT HARD WIRED SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE SWITCH AMPS FUSE SIZE KITCHEN EQUIPMENT DESIGNATION DESCRIPTION QTY. LOAD VOLTAGE PHASE PANEL CIRCUIT BREAKER CIRCUIT NUMBER BRANCH CIRCUIT WIRING CONNECTION TYPE NEMA 1 DISC. SWITCH NEMA 3R DISC. SWITCH NEMA 4SS DISC. SWITCH NOTES KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE