HomeMy WebLinkAboutadd-1 3-16-2020CORNELL UNIVERSITY JOHNSON MUSEUM OF ART FACILITIES CONTRACTS ROOM 2B07 RENOVATION 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 March 16, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. W herever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. GENERAL REQUIREMENTS Item 1. Specification 01 14 00 W ORK RESTRICTIONS, Section 1.2 ADD M. Dumpster will not be allowed in loading dock area. Debris truck may be parked in loading dock area for a limited time and is not to interfere with deliveries. New material may be staged in limited space in loading area. Loading dock use to be coordinated with Cornell. DRAW INGS Item 2. Drawing E1.0 Demo, Power, and Lighting Plans DELETE in its entirety. REPLACE with revised Drawing E.10, attached. Item 3. RFI Questions and Clarification See attached RFI Log (Items 1 – 9) Attachments: RFI Log (Items 1 – 9) Drawing E1.0 ****END OF ADDENDUM**** PROJECT: Johnson Museum of Art Room 2B07 Renovation 3/16/2020 RFI Form RFI/ Page/ Response Dwg./Spec./Rep. Section/ Design Team Index Number Paragraph/Topic RFI Response 1 Drawing A1.0 Please provide a spec for the alternate panel ceiling, and the alternate carpet. See Drawing A1.0 which identifies the acceptable manufacturers and models for the acoustical panel alternate and the carpet alternate. 2 Drawing A0.2 Will the replacement of damaged wood flooring be addressed as a change order, or will you establish an allowance to address this concern? The scope of wood floor repair or replacement will not be known until the existing carpet is removed. 3 Details 8/A3.0 and 9/A3.0 Please provide the quantity of removable hanging frame top anchor (8/A3.0), and removable hanging frame lower anchors(9/A3.0) Provide 10 pairs of each. 4 Details 6/A2.0 and 6/A3.0 Please clarify what the "Removable Medex Display Panel " is (6/A2.0, 6/A3.0). Is this something provided by the Owner? If not, how many are there and what size? Contractor to provide removable Medex Display Panels, 8 total. Width of each panel is to match the width of each of the 8 storage cabinets underneath the countertop. Refer to 3/A2.0. For height, thickness and slope of the panels, Contractor to refer to 6/A2.0, 5/A3.0 and 6/A3.0 and coordinate exact dimensions with the rest of the millwork along the south wall. 5 Detail 2/A3.0 Please provide the quantities for the removable hanging top anchors and removable hanging frame lower anchors in detail 2 on A3.0. Is there a spec that could be provided for these items? Provide 10 pairs each. Systematic Art Museum (Anti- Theft) Rod Hook. https://www.systematicart.com/anti-theft- museum-hook-with-lock.html. 6 Detail 2/A3.0 Please provide specification for the aluminum extrusion in Detail 2 on A3.0. Provide Fry Reglet" Contemporary Reveal 3/4" high x 1/2" depth, #CDRM-50-75, standard powder paint finish, color to be selected by Architect from the full range of manufacturer’s standard colors. 7 Drawing A1.0 Please provide a detail showing the intent for the hanging ceiling panels called for in Alternate 1. Perimeter detail at the wall/ceiling interface, joint layout, hanging detail. Please provide the manufacturer’s standard recommendation for perimeter and hanging details. Align and center all joints with ceiling light tracks, typ. Contractor to provide layout for review during submittal review process. 8 Detail 8/A3.0 and Detail 2/A3.0 Please provide a manufacturer/part number and quantity for the hanging frame brackets shown on Detail 8/A3.0. Is there a basis of design for the powder coated aluminum extrusion shown on Detail 2/A3.0? See response to questions 3, 5 and 6 above. 9 Detail 3/A1.0 and Details 4 & 5/A4.0 Please clarify if the gwb substrate for the acoustical plaster is the existing ceiling or new ceiling. The new acoustic plaster ceiling is to be installed at the same elevation as the current GWB ceiling. Refer to 3/A1.0, 4 & 5/A4.0. Contractor to determine if any part of the existing ceiling construction can be reused as substrate for the new acoustic plaster ceiling.