HomeMy WebLinkAbout10-E2-40UP
UPUP
PANEL
H43
X1
METER
CENTER
MC42
METER
CENTER
MC41
PANEL H42
PANEL
H411
X1
GFCI
GFCI
1
TYPICAL
BOLLARD
TYPICAL
BOLLARD
DATA RACK
MDF-4.3
4'W X 8'H
VERIZON
BACKBOARD
4'W X 8'H TIME
WARNER
BACKBOARD
X1
DATA RACK
MDF-4.1
4'W X 8'H
VERIZON
BACKBOARD
4'W X 8'H TIME
WARNER
BACKBOARD
GFCI
WP
1
GFCI
WP
1
GFCI
WP
1
GFCI
WP
9
GFCI
WP
1
GFCI
WP
9
GFCI
WP
1
GFCI
WP
1
TYPICAL
BOLLARD
DATA RACK
MDF-4.2
4'W X 8'H
TELEPHONE
BACKBOARD
4' W X 8'H TIME
WARNER
BACKBOARD
X1X1 GFCI
1
GFCI
1
TYPICAL
TYPICALTYPICAL
TYPICALTYPICAL
TYPICAL
METER
CENTER
MC43
GFCI
1
GFCI
11
GFCI
GFCI
1
PANEL
H412
PANEL
H421
PANEL
H422
PANEL H431
PANEL H432 GFCI
1
26
H411
26
H42126
H431
2 2
2
33
11
35
11
2
35
11
2
33
11
33
11
33
11
33
11
33
11
33
11
33
11
33
11
33
11
33
11
2
2
2
2
2
2
2
2
2
35
11
2
18
12
12
18
12
20
12
20
2
2
2
2
2
20
12
2
20
12
2
2
20
12 2
18
12
20
12
2
18
12
20
12
18
12
2
2
20
12
33
13
13
33
13
35
13
35
2
2
2
2
2
35
13
2
35
13
2
2
35
13 2
33
13
35
13
2
33
13
35
13
33
13
2
35
13
33
13
1
GFCI
PANEL H421
PANEL H422
18
12
TS14
2
TS14
2
TS14
2
TS14
2
TS14
2
TS14
2
2
1/8"=1'0"
BUILDING 4.0 - LEVEL A1
DRAWING NO.:
DRAWN BY:
DATE:
SHEET TITLE:
PROJECT TITLE:
COLLEGETOWN
TERRACE APARTMENTS
ITHACA, NY
NOVARR MACKESEY
DEVELOPMENTPROFESSIONAL LICENSE
NUMBER:
NEW YORK STATE SEAL:
a r c h i t e c t s
ikon.5 PROJECT NO.:P58.00
VERSIONS
NO. DATE DESCRIPTION
CIVIL ENGINEER:STRUCTURAL ENGINEER:MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL
ENGINEER:
LANDSCAPE ARCHITECT:HAZARDOUS MATERIAL ENGINEER:
12923
NORTH
PROJECTJULY 1, 2011
1 07.01.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS
KEY PLAN
2 08.10.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS
ADDENDUM - 1
1
KEYED NOTES:
REFER TO ARCHITECTURAL DOCUMENTS FOR RECEPTACLE
ELEVATIONS.
APPROXIMATE LOCATION OF TENANT PANELBOARD FEEDERS
ABOVE (LEVELS B, C, AND D). CORE DRILL HOLLOW CORE
PRECAST FLOOR SLABS AND ROUTE TENANT PANELBOARD
FEEDERS WITHIN STUD WALLS TO ASSOCIATED PANELBOARDS.
MAINTAIN PROPER SPACING BETWEEN FEEDER CABLES PER NEC.
NOT USED.
TIME WARNER CABLE EQUIPMENT CABINET(S) PROVIDED BY TIME
WARNER.
PROVIDE POWER CONNECTION TO MECHANICAL TEMPERATURE
CONTROL PANEL USING 2#12, #12G, 1/2"C FROM 20A-1P CIRCUIT
BREAKER.
PROVIDE CONCRETE PAD UNDER METER CENTER.
PROVIDE PANELBOARD FEEDERS IN CONDUIT FROM METER
CENTER TO ABOVE CEILING.
PROVIDE 2#10, #10G, 1/2"C FROM 30A-1P CIRCUIT BREAKER IN
PANEL H411 TO FIRE PROTECTION HEAT TRACE CONTROL PANEL.
PROVIDE SUPERVISORY FIRE ALARM CONNECTION TO CONTROL
PANEL.
PROVIDE 2#10, #10G, 1/2"C FROM 30A-1P CIRCUIT BREAKER IN
PANEL H421 TO FIRE PROTECTION HEAT TRACE CONTROL PANEL.
PROVIDE SUPERVISORY FIRE ALARM CONNECTION TO CONTROL
PANEL.
PROVIDE 2#10, #10G, 1/2"C FROM 30A-1P CIRCUIT BREAKER IN
PANEL H431 TO FIRE PROTECTION HEAT TRACE CONTROL PANEL.
PROVIDE SUPERVISORY FIRE ALARM CONNECTION TO CONTROL
PANEL.
PROVIDE 2 #10,#10G,1/2C FROM 20A-1P GFCI CIRCUIT BREAKER IN
PANEL H411 TO JUNCTION BOX FOR HEAT TAPE. MOUNT
JUNCTION BOX ABOVE ACCESSIBLE CEILING. PROVIDE
DISCONNECT SWITCH AT JUNCTION BOX. VERIFY EXACT
LOCATION WITH PLUMBING CONTRACT.
PROVIDE 2 #10,#10G,1/2C FROM 20A-1P GFCI CIRCUIT BREAKER IN
PANEL H421 TO JUNCTION BOX FOR HEAT TAPE. MOUNT
JUNCTION BOX ABOVE ACCESSIBLE CEILING. PROVIDE
DISCONNECT SWITCH AT JUNCTION BOX. VERIFY EXACT
LOCATION WITH PLUMBING CONTRACT.
PROVIDE 2 #10,#10G,1/2C FROM 20A-1P GFCI CIRCUIT BREAKER IN
PANEL H431 TO JUNCTION BOX FOR HEAT TAPE. MOUNT
JUNCTION BOX ABOVE ACCESSIBLE CEILING. PROVIDE
DISCONNECT SWITCH AT JUNCTION BOX. VERIFY EXACT
LOCATION WITH PLUMBING CONTRACT.
PROVIDE FIRE ALARM SYSTEM SUPERVISORY CONNECTION TO
TEMPERATURE SENSOR LOCATED IN GARAGE LEVEL CEILING
SPACE. SENSOR PROVIDED BY MECHANICAL CONTRACTOR.
COORDINATE LOCATION WITH MECHANICAL CONTRACTOR.
GENERAL NOTES:
A. FEEDER ROUTING IS DIAGRAMMATIC. COORDINATE ROUTING
WITH OTHER TRADES AND ACTUAL FIELD CONDITIONS.
B. CIRCUIT EXIT SIGNS TOGETHER IN EACH BUILDING WITH #10 AWG
CONDUCTORS FROM A 20A-1P CIRCUIT BREAKER IN PANEL THE
BUILDING HOUSE PANEL (PANEL H412 FOR BUILDING 4.1, PANEL
H422 FOR BUILDING 4.2, PANEL H432 FOR BUILDING 4.3). PROVIDE
CIRCUIT BREAKER HANDLE LOCKS.
C. UNLESS NOTED OTHERWISE, CIRCUIT DESIGNATION ON THIS PLAN
REFER TO THE BUILDING HOUSE PANEL (PANEL H412 FOR
BUILDING 4.1, PANEL H422 FOR BUILDING 4.2, PANEL H422 FOR
BUILDING 4.3).
D. IN GENERAL, STRUCTURAL BEAM SIZES IN THE GARAGE LEVEL
PROHIBIT PASSING CONDUITS, CONDUCTORS, PIPING, ETC.,
BETWEEN THE BOTTOM OF BEAM AND CEILING/CEILING
INSULATION SYSTEM. DO NOT RUN CONDUITS, CONDUCTORS,
PIPING, ETC. WITHIN THE INSULATION SYSTEM. THERE ARE
SPACES WHERE BEAMS HAVE OPENINGS TO PASS UTILITIES
THROUGH THE BEAM; REFER TO STRUCTURAL DOCUMENTS.
COORDINATE ALL UTILITY PENETRATIONS THROUGH BEAMS WITH
OTHER TRADES PRIOR TO COMMENCEMENT OF ANY WORK.
E. BOLLARDS LOCATED IN GARAGE LEVEL ARE SHOWN FOR
REFERENCE ONLY AND ARE PROVIDED BY THE GENERAL
CONTRACTOR.
F. CIRCUIT GARAGE LIGHTING AN EXTERIOR LIGHTING THROUGH
MULTIPOLE LIGHTING CONTACTORS AND TIME SWITCH. PROVIDE
SEPARATE SCHEDULES FOR GARAGE LIGHTING AND EXTERIOR
LIGHTING. PROVIDE PHOTOCELL CONNECTION TO ROOF
MOUNTED PHOTOCELL.
BUILDING 4.0 FLOOR PLAN - LEVEL A
KSO
E2.40
2
3
4
5
6
7
8
9
10
2
11
2
12
13
14