HomeMy WebLinkAbout10-E2-22ATYPICAL
APARTMENT 22.2
TYPICAL
APARTMENT 22.3
TYPICAL
APARTMENT 22.1
TYPICAL
APARTMENT 22.4
OPEN TO
BELOW
UP DN
DNUP
PANEL
T22D1
PANEL
T22D2
PANEL
T22D3
PANEL
T22D4
E1
E1
E1
RANGE
DISPOSAL
DISHWASHER
RANGE
DISPOSAL
DISHWASHER
RANGE
DISPOSAL
DISHWASHER
RANGE
DISPOSAL
DISHWASHER
TYPE A
TYPE A
TYPE D1TYPE D1
A A
A
A
A
CA
A
C
A
A
C
C
A
AA
AA
A A C
A
A
C
A
A
A
C
WASHER/
DRYER 17:19
WASHER/
DRYER 17:19
WASHER/
DRYER 17:19
WASHER/
DRYER 17:19
1 1
1
1
6
5
4
2
2
2
7
7
7
7
1
1
9
9
7
7
7
7
1
9
9
5
5
55
5
5
5
55
5
55
5
5
9
9
11
9
9
11 11
11
3
1
3
1
5
5
7
7
7
7
7
8
8 8
8
9
9
9
DNUP
UP
OPEN TO
ABOVE
PANEL
T22C1
PANEL
T22C2
PANEL
T22C3
PANEL
T22C4
RA
E1
REFER TO TYPICAL
APARTMENT 22.1
REFER TO TYPICAL
APARTMENT 22.2
REFER TO TYPICAL
APARTMENT 22.4
REFER TO TYPICAL
APARTMENT 22.3
TYPE D1 TYPE D1
TYPE A
TYPE A
GFCI
WP
1
5
6
3
MS 13
9
9
9
1/4"=1'0"
BUILDING 2.2 - LEVEL D2 1/4"=1'0"
BUILDING 2.2 - LEVEL C1
DRAWING NO.:
DRAWN BY:
DATE:
SHEET TITLE:
PROJECT TITLE:
COLLEGETOWN
TERRACE APARTMENTS
ITHACA, NY
NOVARR MACKESEY
DEVELOPMENTPROFESSIONAL LICENSE
NUMBER:
NEW YORK STATE SEAL:
a r c h i t e c t s
ikon.5 PROJECT NO.:P58.00
VERSIONS
NO. DATE DESCRIPTION
CIVIL ENGINEER:STRUCTURAL ENGINEER:MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL
ENGINEER:
LANDSCAPE ARCHITECT:HAZARDOUS MATERIAL ENGINEER:
12923
NORTH
PROJECTJULY 1, 2011
1 07.01.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS
KEY PLAN
2 08.10.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS
ADDENDUM - 1
BUILDING 2.2 FLOOR PLAN - LEVEL C, LEVEL D
KSO
E2.22A
KEYED NOTES (CONTINUATION):
CORE DRILL FLOOR AND PROVIDE TWO 4" SLEEVES FOR FUTURE
VERIZON SERVICES.
PROVIDE DUPLEX RECEPTACLE TO SERVE CONDENSATE PUMP ON
C-LEVEL. RECEPTACLE SHALL BE ACCESSIBLE. COORDINATE
LOCATION WITH PLUMPING CONTRACTOR. D AND E LEVELS DO
NOT REQUIRE CONDENSATE PUMP RECEPTACLES.
PROVIDE NEMA 10-30R RECEPTACLE FOR COMBINATION
WASHER/DRYER.
THE CORRIDOR IS CONSIDERED PART OF THE STAIRWAY
ENCLOSURE. ONLY DEVICES AND ASSOCIATED CONDUIT AND
CABLING SERVING THE STAIRWAY ENCLOSURE ARE PERMITTED
TO BE IN THE STAIRWAY. NON-STAIRWAY CONDUITS AND CABLING
SHALL CROSS THE STAIRWAY CORRIDOR IN RATED ENCLOSURES
INDICATED ON THE ARCHITECTURAL DOCUMENTS.
6
2
2
2
2
2
2 2
7
2
2
2
2
2
2
2
22
8
GENERAL NOTES:
A. CIRCUIT EXIT SIGNS ON LEVELS C, D, AND E TOGETHER WITH #10
AWG CONDUCTORS FROM A 20A-1P CIRCUIT BREAKER IN PANEL
H22. PROVIDE CIRCUIT BREAKER HANDLE LOCK.
B. CIRCUIT DESIGNATION ON THIS PLAN REFER TO PANEL H22,
UNLESS NOTED OTHERWISE.
C. CIRCUIT EXTERIOR LIGHTING FIXTURES THROUGH TIME SWITCH
AND ROOF MOUNTED PHOTOCELL FOR PHOTOCELL 'ON' AND TIME
SWITCH 'OFF'. COORDINATE TIME SWITCH SCHEDULE WITH
OWNER.
1
KEYED NOTES:
REFER TO FLOOR PLANS FOR EACH APARTMENT PTAC
DESIGNATION.
PROVIDE CONNECTION TO KITCHEN EXHAUST HOOD.
TIME WARNER EQUIPMENT CABINETS PROVIDED BY TIME
WARNER. PROVIDE PLYWOOD BACKBOARD COVERING THE
SOUTH WALL.
CLOSET RESERVED FOR FUTURE VERIZON SERVICE EQUIPMENT.
PROVIDE PLYWOOD BACKBOARD COVERING THE SOUTH WALL.
CORE DRILL FLOOR AND PROVIDE TWO 4" SLEEVES FOR TIME
WARNER CABLING.
2
3
4
5
9
2
2
2
2
2
2
2
2
2
2
2
2
2