Loading...
HomeMy WebLinkAbout10-E2-02120 113 115 531' 533' 531' 1 T1 T3T2 T7 T8 CPB-2 HH-1 HH-2 HH-3 FRONT FRONT FRONT FRONT FRONT TRANSFORMER PAD, TYPICAL CPB-3 COMMINICATION PULLBOX, TYPICAL COMMUNICATION HAND HOLE, TYPICAL CPB-1 CPB-2 HH-3 HH-4 CPB-3 CPB-5 HH-5 HH-6 HH-7CPB-4 ELECTRICAL UTILITY PLAN KSO E2.02 1 GENERAL NOTES: A. UNLESS NOTED OTHERWISE, COMMUNICATION DUCTBANK CONSTRUCTION SHALL BE DIRECT BURIED IN SAND BED. B. ELECTRIC SERVICE DUCTBANKS FROM TRANSFORMER SECONDARIES TO SERVICE ENTRANCE EQUIPMENT SHALL BE REINFORCED CONCRETE ENCASED. C. FOR COMMUNICATION DUCTBANKS, PROVIDE REINFORCED CONCRETE DUCTBANK UNDER ROADS, DRIVE LANES, PAVED SURFACES AND CONCRETE WALKS. D. EXISTING SITE UTILITIES ARE NOT SHOWN ON THIS PLAN. REFER TO CIVIL PLANS FOR ALL SITE UTILITIES. OTHER UTILITIES MAY BE PRESENT OR PLACED IN DIFFERENT LOCATIONS. VERIFY EXACT LOCATIONS OF EXISTING UTILITIES BY TEST HOLES OR SITE INVESTIGATION BEFORE EXCAVATING. NOTIFY THE UNDERGROUND FACILITIES PROTECTION ORGANIZATION (UFPO) TO LOCATE UTILITIES BEFORE WORK COMMENCES. COORDINATE WITH CIVIL DRAWINGS. E. HAND EXCAVATE WHERE CROSSING EXISTING UTILITIES. F. PROVIDE GALVANIZED RIGID STEEL CONDUIT STUB-UPS FROM ALL PVC CONDUIT. G. CONDUIT AND DUCTBANK ROUTING IS DIAGRAMMATIC. ACTUAL ROUTING SHALL BE DETERMINED IN THE FIELD. PITCH DUCTBANKS AND CONDUIT AWAY FROM BUILDINGS, TOWARD PULL BOXES AND HAND HOLES. H. LOCATIONS OF PULLBOXES AND HAND HOLES ARE APPROXIMATE, FIELD VERIFY WITH CONSTRUCTION MANAGER BEFORE WORK COMMENCES. COORDINATE WITH SITE LANDSCAPE WORK AND OTHER UTILITY WORK. KEYED NOTES: EXTEND 4" CONDUIT DIRECT BURIED IN SAND BED FROM SPARE VERIZON CONDUIT TO COMMUNICATION MANHOLE. COORDINATE LOCATION OF SPARE CONDUIT WITH VERIZON. E2.01 1 SP NO SCALE DUCTBANK SECTION P E2.01 2 SP NO SCALE DUCTBANK SECTION E2.01 3 PP P = 4" ACTIVE POWER CONDUIT S = 4" SPARE CONDUIT NO SCALE DUCTBANK SECTION SP P = 4" ACTIVE POWER CONDUIT S = 4" SPARE CONDUIT P = 4" ACTIVE POWER CONDUIT S = 4" SPARE CONDUIT E2.01 4 NO SCALE DUCTBANK SECTION E2.01 5 NO SCALE DUCTBANK SECTION SCC SC C = 4" ACTIVE COMMUNICATION CONDUIT S = 4" SPARE CONDUIT C = 4" ACTIVE COMMUNICATION CONDUIT S = 4" SPARE CONDUIT NOTE: A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR DUCTBANK CONSTRUCTION REQUIREMENTS. NOTE: A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR DUCTBANK CONSTRUCTION REQUIREMENTS. NOTE: A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR DUCTBANK CONSTRUCTION REQUIREMENTS. NOTE: A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR DUCTBANK CONSTRUCTION REQUIREMENTS. NOTE: A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR DUCTBANK CONSTRUCTION REQUIREMENTS. SCALE: 1" = 40' ELECTRICAL SITE PLAN DRAWING NO.: DRAWN BY: DATE: SHEET TITLE: PROJECT TITLE: COLLEGETOWN TERRACE APARTMENTS ITHACA, NY NOVARR MACKESEY DEVELOPMENTPROFESSIONAL LICENSE NUMBER: NEW YORK STATE SEAL: a r c h i t e c t s ikon.5 PROJECT NO.:P58.00 VERSIONS NO. DATE DESCRIPTION CIVIL ENGINEER:STRUCTURAL ENGINEER:MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL ENGINEER: LANDSCAPE ARCHITECT:HAZARDOUS MATERIAL ENGINEER: 12923 NORTH PROJECT0 8' 16' 32' KEY PLAN 2 08.10.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS ADDENDUM - 1 August 10, 2011