ELECTRICAL UTILITY PLAN
KSO
E2.02
1
GENERAL NOTES:
A. UNLESS NOTED OTHERWISE, COMMUNICATION DUCTBANK
CONSTRUCTION SHALL BE DIRECT BURIED IN SAND BED.
B. ELECTRIC SERVICE DUCTBANKS FROM TRANSFORMER
SECONDARIES TO SERVICE ENTRANCE EQUIPMENT SHALL BE
REINFORCED CONCRETE ENCASED.
C. FOR COMMUNICATION DUCTBANKS, PROVIDE REINFORCED
CONCRETE DUCTBANK UNDER ROADS, DRIVE LANES, PAVED
SURFACES AND CONCRETE WALKS.
D. EXISTING SITE UTILITIES ARE NOT SHOWN ON THIS PLAN. REFER
TO CIVIL PLANS FOR ALL SITE UTILITIES. OTHER UTILITIES MAY BE
PRESENT OR PLACED IN DIFFERENT LOCATIONS. VERIFY EXACT
LOCATIONS OF EXISTING UTILITIES BY TEST HOLES OR SITE
INVESTIGATION BEFORE EXCAVATING. NOTIFY THE
UNDERGROUND FACILITIES PROTECTION ORGANIZATION (UFPO)
TO LOCATE UTILITIES BEFORE WORK COMMENCES. COORDINATE
WITH CIVIL DRAWINGS.
E. HAND EXCAVATE WHERE CROSSING EXISTING UTILITIES.
F. PROVIDE GALVANIZED RIGID STEEL CONDUIT STUB-UPS FROM ALL
PVC CONDUIT.
G. CONDUIT AND DUCTBANK ROUTING IS DIAGRAMMATIC. ACTUAL
ROUTING SHALL BE DETERMINED IN THE FIELD. PITCH
DUCTBANKS AND CONDUIT AWAY FROM BUILDINGS, TOWARD PULL
BOXES AND HAND HOLES.
H. LOCATIONS OF PULLBOXES AND HAND HOLES ARE APPROXIMATE,
FIELD VERIFY WITH CONSTRUCTION MANAGER BEFORE WORK
COMMENCES. COORDINATE WITH SITE LANDSCAPE WORK AND
OTHER UTILITY WORK.
KEYED NOTES:
EXTEND 4" CONDUIT DIRECT BURIED IN SAND BED FROM SPARE
VERIZON CONDUIT TO COMMUNICATION MANHOLE. COORDINATE
LOCATION OF SPARE CONDUIT WITH VERIZON.
E2.01
1
SP
NO SCALE
DUCTBANK SECTION
P
E2.01
2
SP
NO SCALE
DUCTBANK SECTION
E2.01
3
PP P = 4" ACTIVE POWER CONDUIT
S = 4" SPARE CONDUIT
NO SCALE
DUCTBANK SECTION
SP
P = 4" ACTIVE POWER CONDUIT
S = 4" SPARE CONDUIT
P = 4" ACTIVE POWER CONDUIT
S = 4" SPARE CONDUIT
E2.01
4
NO SCALE
DUCTBANK SECTION
E2.01
5
NO SCALE
DUCTBANK SECTION
SCC
SC C = 4" ACTIVE COMMUNICATION CONDUIT
S = 4" SPARE CONDUIT
C = 4" ACTIVE COMMUNICATION CONDUIT
S = 4" SPARE CONDUIT
NOTE:
A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR
DUCTBANK CONSTRUCTION REQUIREMENTS.
NOTE:
A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR
DUCTBANK CONSTRUCTION REQUIREMENTS.
NOTE:
A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR
DUCTBANK CONSTRUCTION REQUIREMENTS.
NOTE:
A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR
DUCTBANK CONSTRUCTION REQUIREMENTS.
NOTE:
A. REFER TO DUCTBANK NOTES ON THIS PLAN AND DETAILS FOR
DUCTBANK CONSTRUCTION REQUIREMENTS.
SCALE: 1" = 40'
ELECTRICAL SITE PLAN
DRAWING NO.:
DRAWN BY:
DATE:
SHEET TITLE:
PROJECT TITLE:
COLLEGETOWN
TERRACE APARTMENTS
ITHACA, NY
NOVARR MACKESEY
DEVELOPMENTPROFESSIONAL LICENSE
NUMBER:
NEW YORK STATE SEAL:
a r c h i t e c t s
ikon.5 PROJECT NO.:P58.00
VERSIONS
NO. DATE DESCRIPTION
CIVIL ENGINEER:STRUCTURAL ENGINEER:MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL
ENGINEER:
LANDSCAPE ARCHITECT:HAZARDOUS MATERIAL ENGINEER:
12923
NORTH
PROJECT0 8' 16' 32'
KEY PLAN
2 08.10.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS
ADDENDUM - 1
August 10, 2011