Loading...
HomeMy WebLinkAbout09-M4-40UP UPUP PIPING ABOVE SUSPENDED CEILING (TYP.) 114" 112" 114" HWS & HWR UP 114" 114" HWS & HWR UP 114" HWS & HWR UP 114" HWS & HWR UP 2" 114" 114" HWS & HWR UP 114" 114" 112" 114" HWS & HWR UP PIPING ABOVE SUSPENDED CEILING (TYP.) 2" 114" HWS & HWR UP 114" HWS & HWR UP REFER TO DRAWING M4-40/8 FOR WORK IN THIS AREA REFER TO DRAWING M4-40/5 FOR WORK IN THIS AREA REFER TO DRAWING M4-40/2 FOR WORK IN THIS AREA 1" HWS & HWR UP 112" __" 1" HWS & HWR UP 2" HWS & HWR 114" 114" HWS & HWR UP 114" PIPING ABOVE SUSPENDED CEILING (TYP.) 2" 114" HWS & HWR UP 114" HWS & HWR UP 114" HWS & HWR UP BOILER ROOMBIKE STORAGE BOILER ROOM BOILER ROOM IT CLOSET IT CLOSET IT CLOSET BIKE STORAGE BIKE STORAGE 1-1/2"1-1/2" 2" HWS & HWR 2" HWS & HWR 1-1/2" 4"Ø BOILER INTAKE & 4"Ø BOILER EXHAUST 6"Ø CONCENTRIC TERMINATION KIT 4"Ø BOILER INTAKE & 4"Ø BOILER EXHAUST 6"Ø CONCENTRIC TERMINATION KIT 4"Ø BOILER INTAKE & 4"Ø BOILER EXHAUST 6"Ø CONCENTRIC TERMINATION KIT 114" 112" TS1TS2 TS1TS2TS1TS2 2 22 2 2 1" HWS & HWR UP 2 AS 2" B-4.1-1 HWH R 8 4 EXT 5 F-4.0-1 AAD 16"x16" LOUVER 13x12 GRILLE 7 3 2 3 7 7 1 5 6 VSD 4.1-1 & VSD 4.1-2 FD P 4.1-3 P-4.1-4 16"x16" LOUVERFD P-4.1-1 P-4.1-2 7 16x16 FILTER HOUSING & FILTER HWHB-4.1-1 FP SERVICE ACID NUETRALIZING/TRAP P 4.1-3 P-4.1-4 2" 2" 2" 2" AS-12" P-4.1-1P-4.1-2 EXT GLYCOL FULL SIZE 2"2" 3/4" 16 x 16 TRANSFER DUCT WITH AND FILTER RACK 3/4" VSD 4.1-1 VSD 4.1-2 2" 2" AS-12" P-4.2-1P-4.2-2 EXT GLYCOL FULL SIZE 2"2" 3/4" 16 x 16 TRANSFER DUCT WITH AD & FILTER RACK 3/4" VSD 4.2-1 VSD 4.2-2 HWHB-4.2-1 FP SERVICE ACID NUETRALIZING/TRAP P 4.2-3 P-4.2-4 2" 2" AS 2" B-4.1-1 HWH R 7 8 4 EXT 5 F-4.0-2 AAD 16"x16" LOUVER 13x12 GRILLE 73 2 3 7 7 1 5 6 VSD 4.2-1 & VSD 4.2-2 FD P 4.2-3 P-4.2-416"x16" LOUVER FDP-4.2-1 P-4.2-2 16x16 FILTER HOUSING & FILTER AS 2" B-4.3-1 HWH R 7 8 4 EXT 5 F-4.0-3 AAD 16"x16" LOUVER 13x12 GRILLE 73 2 3 7 7 1 5 6 VSD 4.3-1 VSD 4.3-2 FD P 4.3-3 P-4.3-416"x16" LOUVER FDP-4.3-1 P-4.3-2 16x16 FILTER HOUSING & FILTER 2" 2" AS-1" P-4.3-1P-4.3-2 EXT GLYCOL FULL SIZE 2"2" 3/4" 16 x 16 TRANSFER DUCT WITH AD & FILTER RACK 3/4" VSD 4.3-1 VSD 4.3-2 HWHB-4.3-1 FP SERVICE ACID P 4.3-3 P-4.3-4 2" 2" 1/8"=1'0" BUILDING 4.0 - LEVEL A1 DRAWING NO.: DRAWN BY: DATE: SHEET TITLE: PROJECT TITLE: COLLEGETOWN TERRACE APARTMENTS ITHACA, NY NOVARR MACKESEY DEVELOPMENTPROFESSIONAL LICENSE NUMBER: NEW YORK STATE SEAL: a r c h i t e c t s ikon.5 PROJECT NO.:P58.00 VERSIONS NO. DATE DESCRIPTION CIVIL ENGINEER:STRUCTURAL ENGINEER:MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL ENGINEER: LANDSCAPE ARCHITECT:HAZARDOUS MATERIAL ENGINEER: 12923 NORTH PROJECTJULY 1, 2011 1 07.01.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS KEY PLAN 2 08.10.2011 SEQUENCE 1 - CONSTRUCTION DOCUMENTS ADDENDUM - 1 BUILDING 4.0 FLOOR PLAN - LEVEL A PR M2.40 1/4"=1'0" BUILDING 4.1 MECHANICAL ROOM PLAN2 1/4"=1'0" BUILDING 4.1 MECHANICAL ROOM ELEVATION3 1/4"=1'0" BUILDING 4.1 - MECHANICAL ROOM ELEVATION4 1 2 KEYED NOTES: 2" HWS & HWR. CONDENSING BOILER. 3 4 BOILER LOOP PUMPS PIPED IN PARALLEL. HEATING SYSTEM LOOP PUMP, TYPICAL OF 2. 5 6 EXTEND 4" VENT AND COMBUSTION AIR TO EXTERIOR WALL. TERMINATE WITH 4" TERMINATION KIT. EXTEND PIPING FROM ACID NEUTRALIZING TRAP TO FLOOR DRAIN. COORDINATE FLOOR DRAIN LOCATION WITH BOILER DRAIN AND PLUMBING INSTALLER. 7 8 PLUMBING AND FIRE PROTECTION EQUIPMENT SHOWN FOR REFERENCE ONLY. MECHANICAL ROOM EXHAUST FAN. GENERAL NOTES: A SEE M7-01 FOR PIPING SCHEMATIC DIAGRAM. ALL ISOLATION VALVES IN BOILER LOOP SHALL BE FULL PORT. PAINT PUMP SUPPORT STEEL ONE COAT CHEROKEE RED OVER PRIMER. PROVIDE PVC JACKETING FOR PIPING INSULATION IN MECHANICAL ROOM BELOW 7' AFF. B C D 1/4"=1'0" BUILDING 4.2 MECHANICAL ROOM PLAN5 1/4"=1'0" BUILDING 4.2 MECHANICAL ROOM ELEVATION6 1 2 KEYED NOTES: 2" HWS & HWR. CONDENSING BOILER. 3 4 BOILER LOOP PUMPS PIPED IN PARALLEL. HEATING SYSTEM LOOP PUMP, TYPICAL OF 2. 5 6 EXTEND 4" VENT AND COMBUSTION AIR TO EXTERIOR WALL. TERMINATE WITH 4" TERMINATION KIT. EXTEND PIPING FROM ACID NEUTRALIZING TRAP TO FLOOR DRAIN. COORDINATE FLOOR DRAIN LOCATION WITH BOILER DRAIN AND PLUMBING INSTALLER. 7 8 PLUMBING AND FIRE PROTECTION EQUIPMENT SHOWN FOR REFERENCE ONLY. MECHANICAL ROOM EXHAUST FAN. GENERAL NOTES: A SEE M7-01 FOR PIPING SCHEMATIC DIAGRAM. ALL ISOLATION VALVES IN BOILER LOOP SHALL BE FULL PORT. PAINT PUMP SUPPORT STEEL ONE COAT CHEROKEE RED OVER PRIMER. PROVIDE PVC JACKETING FOR PIPING INSULATION IN MECHANICAL ROOM BELOW 7' AFF. B C D 1/4"=1'0" BUILDING 4.2 - MECHANICAL ROOM ELEVATION7 1/4"=1'0" BUILDING 4.3 MECHANICAL ROOM PLAN8 1 2 KEYED NOTES: 2" HWS & HWR. CONDENSING BOILER. 3 4 BOILER LOOP PUMPS PIPED IN PARALLEL. HEATING SYSTEM LOOP PUMP, TYPICAL OF 2. 5 6 EXTEND 4" VENT AND COMBUSTION AIR TO EXTERIOR WALL. TERMINATE WITH 4" TERMINATION KIT. EXTEND PIPING FROM ACID NEUTRALIZING TRAP TO FLOOR DRAIN. COORDINATE FLOOR DRAIN LOCATION WITH BOILER DRAIN AND PLUMBING INSTALLER. 7 8 PLUMBING AND FIRE PROTECTION EQUIPMENT SHOWN FOR REFERENCE ONLY. MECHANICAL ROOM EXHAUST FAN. GENERAL NOTES: A SEE M7-01 FOR PIPING SCHEMATIC DIAGRAM. ALL ISOLATION VALVES IN BOILER LOOP SHALL BE FULL PORT. PAINT PUMP SUPPORT STEEL ONE COAT CHEROKEE RED OVER PRIMER. PROVIDE PVC JACKETING FOR PIPING INSULATION IN MECHANICAL ROOM BELOW 7' AFF. B C D 1/4"=1'0" BUILDING 4.3 MECHANICAL ROOM ELEVATION9 1/4"=1'0" BUILDING 4.3 - MECHANICAL ROOM ELEVATION10 2 2 2 GENERAL NOTES: ALL PIPING IN GARAGE SPACE IS ABOVE SUSPENDED CEILING. SEE STRUCTURAL PLAN SHOWING BEAM PENETRATIONS FOR THE PASSAGE OF PIPING AND CONDUIT. COORDINATE MECHANICAL PIPING WITH PLUMBING, ELECTRICAL AND FIRE PROTECTION INSTALLERS. IN GENERAL, STRUCTURAL BEAM SIZES IN THE GARAGE LEVEL PROHIBIT PASSING CONDUITS, CONDUCTORS, PIPING, ETC., BETWEEN THE BOTTOM OF BEAM AND CEILING/CEILING INSULATION SYSTEM. DO NOT RUN CONDUITS, CONDUCTORS, PIPING, ETC. WITHIN THE INSULATION SYSTEM. THERE ARE SPACES WHERE BEAMS HAVE OPENINGS TO PASS UTILITIES THROUGH THE BEAM; REFER TO STRUCTURAL DOCUMENTS. COORDINATE ALL UTILITY PENETRATIONS THROUGH BEAMS WITH OTHER TRADES PRIOR TO COMMENCEMENT OF ANY WORK. A 2 B 22 2 2 2 2222 KEYED NOTES 1 CEILING PLENUM TEMPERATURE SENSOR NETWORK. SUSPEND SENSOR VERTICALLY IN CENTER OF PLENUM SPACE. NETWORK SENSORS TOGETHER AND CONNECT TO FIRE ALARM PANEL C