Loading...
HomeMy WebLinkAboutsigned mech comcheckCOMcheck Software Version 4.1.5.1 Mechanical Compliance Certificate Project Title: 90.1 (2016) Standard Project Type:Alteration Location:Ithaca, New York Climate Zone:5a Construction Site: 744 South Meadow Street Suite 400 Ithaca, NY Owner/Agent: RGLA 5100 River Road Suite 125 Schiller Park, IL 60176 Designer/Contractor: HNY Consulting Engineers New York, NY 10018 212-413-8770 Project Information Energy Code: ULTA #1503 Mechanical Systems List Quantity System Type & Description Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 199 kBtu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et SWH COMPLIANCE REQUIRED. 1 Water Heater 1 Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 71 ofPage Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.5.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2016) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2, 7.7.1, 10.4.2 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2, 8.4.1.1, 8.4.1.2, 8.7 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 72 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions 7.4.4.1 [PL2]3 Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use). Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 73 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions 6.4.3.4.5 [ME39]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.3.2.1 [ME40]2 DX cooling systems >= 75 kBtu/h (>= 65 kBtu/h effective 1/2016) and chilled-water and evaporative cooling fan motor hp >= ¼ designed to vary supply fan airflow as a function of load and comply with operational requirements. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. See the Mechanical Systems list for values. 7.5.3 [ME78]2 Gas-fired water-heating equipment installed in new buildings: where a singular piece of water-heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency must be >= 90 Et. Where multiple pieces of water-heating equipment serve the building with combined rating is >= 1,000 kBtu/h, the combined input-capacity-weighted- average thermal efficiency , thermal efficiency must be >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.2.4 [ME49]3 Approved field test used to evaluate design air flow rates and demonstrate proper capture and containment of kitchen exhaust systems. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 7.4.2 [ME36]2 Service water heating equipment meets efficiency requirements. Complies Does Not Not Observable Not Applicable 6.4.3.9 [ME63]2 Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.10 [ME73]3 Doors separating conditioned space from the outdoors have controls that disable/reset heating and cooling system when open. Complies Does Not Not Observable Not Applicable Exception: Alteration project to existing building. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 74 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 8.4.2 [EL10]2 At least 50% of all 125 volt 15- and 20-Amp receptacles are controlled by an automatic control device. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.4.3 [EL11]2 New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. In buildings with a digital control system the energy use is transmitted to to control system and displayed graphically. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 75 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 7.4.4.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.4 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. Complies Does Not Not Observable Not Applicable Requirement will be met. 10.4.3 [FI24]2 Elevators are designed with the proper lighting, ventilation power, and standby mode. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 76 ofPage Project Title: Data filename: ULTA #1503 J:\Lenexa\Programs\U-Z\ULTA\2050004606 1503 Ithaca, NY\000\Energy\(ASHRAE 2016) COMCheck.cck 04/27/21Report date: 77 ofPage