HomeMy WebLinkAboutAddendum No 1_Rhodes Hall 5th Floor Renov_1-20-2021 CORNELL UNIVERSITY RHODES HALL 5TH FLOOR RENOVATION FACILITIES CONTRACTS 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 January 20, 2021 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Section 080671 Door Hardware Schedule
DELETE in its entirety.
REPLACE with Section 080671 Door Hardware Schedule, attached.
Item 2. ADD Section 108211 Architectural Coiled Wire Grilles and Screens, attached
Item 3. Section 237513 Air Handling Units (Custom)
DELETE in its entirety.
REPLACE with Section 237513 Air Handling Units, attached.
Item 4. Drawing T-002
DELETE in its entirety.
REPLACE with Drawing T-002, attached.
Item 5. Drawing A-101
DELETE in its entirety.
REPLACE with Drawing A-101, attached.
Item 6. Drawing A-111
DELETE in its entirety.
REPLACE with Drawing A-111, attached.
Rhodes Hall 5th Floor Renovation Addendum No. 1 January 20, 2021 Page 2
Item 7. Drawing A-141
DELETE in its entirety.
REPLACE with Drawing A-141, attached.
Item 8. Drawing A-301
DELETE in its entirety.
REPLACE with Drawing A-301, attached.
Item 9. Drawing A-302
DELETE in its entirety.
REPLACE with Drawing A-302, attached.
Item 10. Drawing A-503
DELETE in its entirety.
REPLACE with Drawing A-503, attached.
Item 11. Drawing A-601
DELETE in its entirety.
REPLACE with Drawing A-601, attached.
Item 12. Drawing A-603
DELETE in its entirety.
REPLACE with Drawing A-603, attached.
Item 13. Drawing E-200
DELETE in its entirety.
REPLACE with Drawing E-200, attached.
Item 14. Drawing E-202
DELETE in its entirety.
REPLACE with Drawing E-202, attached.
Rhodes Hall 5th Floor Renovation Addendum No. 1 January 20, 2021 Page 3
Item 15. Drawing H-501
DELETE in its entirety.
REPLACE with Drawing H-501, attached.
Item 16. Drawing H-700
DELETE in its entirety.
REPLACE with Drawing H-700, attached.
Item 17. Drawing H-800
DELETE in its entirety.
REPLACE with Drawing H-800, attached.
Item 18. Drawing P-100
DELETE in its entirety.
REPLACE with Drawing P-100, attached.
Item 19. RFI Questions and Clarifications
See attached RFI Log (Items 1-13)
Attachments: Section 080671 Section 108211 Section 237513 Drawing T-002 Drawing A-101 Drawing A-111 Drawing A-141 Drawing A-301 Drawing A-302 Drawing A-503 Drawing A-601 Drawing A-603 Drawing E-200 Drawing E-202 Drawing H-501 Drawing H-700 Drawing H-800 Drawing P-100 RFI Log (Items 1-13)
****END OF ADDENDUM****
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 1
SECTION 080671
DOOR HARDWARE SCHEDULE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section references specification sections relating to commercial door hardware for the
following:
1. Swinging doors.
2. Sliding Doors.
3. Other doors to the extent indicated.
B. Commercial door hardware includes, but is not necessarily limited to, the following:
1. Mechanical door hardware.
2. Electromechanical and access control door hardware.
3. Electromechanical and access control door hardware power supplies, back-ups and surge
protection.
4. Automatic operators.
5. Cylinders specified for doors in other sections.
C. Related Sections:
1. Division 08 Section “Door Hardware”.
2. Division 28 Section “Access Control Hardware Devices”.
D. Codes and References: Comply with the version year adopted by the Authority Having
Jurisdiction.
1. ANSI A117.1 - Accessible and Usable Buildings and Facilities.
2. ICC/IBC - International Building Code.
3. NFPA 70 - National Electrical Code.
4. NFPA 80 - Fire Doors and Windows.
5. NFPA 101 - Life Safety Code.
6. NFPA 105 - Installation of Smoke Door Assemblies.
7. State Building Codes, Local Amendments.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 2
E. Standards: Reference Related Sections for requirements regarding compliance with applicable
industry standards.
1.3 SUBMITTALS
A. Product Data: Manufacturer's product data sheets including installation details, material
descriptions, dimensions of individual components and profiles, operational descriptions and
finishes.
B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication
and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door
Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand,
function, and finish of door hardware.
1. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and
Format for the Hardware Schedule."
2. Organization: Organize the Door Hardware Schedule into door hardware sets indicating
complete designations of every item required for each door or opening. Organize door
hardware sets in same order as in the Door Hardware Sets at the end of Part 3. Submittals
that do not follow the same format and order as the Door Hardware Sets will be rejected
and subject to resubmission.
3. Content: Include the following information:
a. Type, style, function, size, label, hand, and finish of each door hardware item.
b. Manufacturer of each item.
c. Fastenings and other pertinent information.
d. Location of door hardware set, cross-referenced to Drawings, both on floor plans
and in door and frame schedule.
e. Explanation of abbreviations, symbols, and codes contained in schedule.
f. Mounting locations for door hardware.
g. Door and frame sizes and materials.
4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date,
particularly where approval of the Door Hardware Schedule must precede fabrication of
other work that is critical in the Project construction schedule. Include Product Data,
Samples, Shop Drawings of other work affected by door hardware, and other information
essential to the coordinated review of the Door Hardware Schedule.
C. Keying Schedule: Prepared under the supervision of the Owner, separate schedule detailing
final keying instructions for locksets and cylinders in writing. Include keying system
explanation, door numbers, key set symbols, hardware set numbers and special instructions.
Owner to approve submitted keying schedule prior to the ordering of permanent cylinders.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 3
D. Product Test Reports: Indicating compliance with cycle testing requirements, based on
evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified
independent testing agency.
E. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance
manuals for each item comprising the complete door hardware installation in quantity as
required in Division 01, Closeout Submittals. The manual to include the name, address, and
contact information of the manufacturers providing the hardware and their nearest service
representatives. The final copies delivered after completion of the installation test to include "as
built" modifications made during installation, checkout, and acceptance.
F. Warranties and Maintenance: Special warranties and maintenance agreements specified in the
Related Sections.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Inventory door hardware on receipt and provide secure lock-up and shelving for door hardware
delivered to Project site. Do not store electronic access control hardware, software or
accessories at Project site without prior authorization.
B. Tag each item or package separately with identification related to the final Door Hardware
Schedule, and include basic installation instructions with each item or package.
C. Deliver, as applicable, permanent keys, cylinders, cores, access control credentials, software
and related accessories directly to Owner via registered mail or overnight package service.
Instructions for delivery to the Owner shall be established at the "Keying Conference".
1.5 WARRANTY
A. General Warranty: Reference Division 01, General Requirements. Special warranties specified
in this Article shall not deprive Owner of other rights Owner may have under other provisions
of the Contract Documents and shall be in addition to, and run concurrent with, other warranties
made by Contractor under requirements of the Contract Documents.
1.6 MAINTENANCE SERVICE
A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and
maintenance instructions as needed for Owner's continued adjustment, maintenance, and
removal and replacement of door hardware.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 4
PART 2 - PRODUCTS
2.1 SCHEDULED DOOR HARDWARE
A. Refer to “PART 3 – EXECUTION” for required specification sections.
PART 3 - EXECUTION
3.1 DOOR HARDWARE SETS
A. The door hardware sets represent the design intent and direction of the owner and architect.
They are a guideline only and should not be considered a detailed hardware schedule.
Discrepancies, conflicting hardware and missing items should be brought to the attention of the
architect with corrections made prior to the bidding process. Omitted items not included in a
hardware set should be scheduled with the appropriate additional hardware required for proper
application and functionality.
1. Quantities listed are for each pair of doors, or for each single door.
2. The supplier is responsible for handing and sizing all products.
3. Where multiple options for a piece of hardware are given in a single line item, the
supplier shall provide the appropriate application for the opening.
4. At existing openings with new hardware the supplier shall field inspect existing
conditions prior to the submittal stage to verify the specified hardware will work as
required. Provide alternate solutions and proposals as needed.
B. Products listed in the hardware sets shall be supplied by and in accordance with the
requirements described in the specification section as noted for each item.
1. Section 08 71 00 – Door Hardware.
2. Section 28 15 00 – Access Control Hardware Devices.
C. Manufacturer’s Abbreviations:
1. MK - McKinney
2. MR - Markar
3. SA - SARGENT
4. OT - Other
5. RO - Rockwood
6. PE - Pemko
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 5
Hardware Sets
Set: 1.0
Doors: 551/1, 551/1-Alt 1
4 Hinge (heavy weight) T4A3786 US26D MK 087100
1 Access Control Rim Exit 12 43 55 56 70 M1-8844-24V-BIPS-
B-OE LNJ US32D SA 281500 ⚡
1 Cylinder To Suit Existing Key System OT
1 Surface Closer 351 O EN SA 087100
1 Wall Stop 403 (or) 441CU (As Required) US26D RO 087100
1 Threshold to architect detail PE 087100
1 Gasketing S773BL PE 087100
1 ElectroLynx Harness - Frame QC-C1500P MK 087100 ⚡
1 ElectroLynx Harness - Door QC-CXXX (Size as required) MK 087100 ⚡
1 Electric Power Transfer EL-CEPT SU 087100 ⚡
1 Power Distribution Board AQL4-R8E1 SU 087100 ⚡
1 Wiring Diagram Elevation and Point to Point as
Specified OT
Notes: Operation:
*Door normally closed and secured.
*Upon use of mechanical key or presentation of authorized credentials door to unlock allowing authorized
entry.
*Built in request to exit switch to allow authorized egress, integrated door position switch to be tied into
security system to monitor status of door.
*Upon loss of power door to remain locked.
*Always free egress.
Set: 2.0
Doors: 551/2, 551/2-Alt 1, 551/3
8 Hinge (heavy weight) T4A3786 630 MR 087100
1 Removable Mullion L980S / L980A (As Required) x
Length Required PC SA 087100
1 Access Control Rim Exit 43 55 56 70 M1-8844-24V-BIPS-B-
OE LNJ US32D SA 281500 ⚡
1 Rim Exit Device, Exit Only 43 55 56 8810 EO US32D SA 087100 ⚡
2 Cylinder To Suit Existing Key System OT
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 6
2 Surface Closer 351 P9 EN SA 087100
1 Threshold to architect detail PE 087100
1 Gasketing S773BL PE 087100
2 Door Contacts 1078 X color SO
2 ElectroLynx Harness - Frame QC-C1500P MK 087100 ⚡
2 ElectroLynx Harness - Door QC-CXXX (Size as required) MK 087100 ⚡
2 Electric Power Transfer EL-CEPT SU 087100 ⚡
1 Power Distribution Board AQL4-R8E1 SU 087100 ⚡
1 Wiring Diagram Elevation and Point to Point as
Specified OT
Notes: Operation:
*Door normally closed and secured.
*Upon use of mechanical key or presentation of authorized credentials door to unlock allowing authorized
entry.
*Built in request to exit switch to allow authorized egress, integrated door position switch to be tied into
security system to monitor status of door.
*Upon loss of power door to remain locked.
*Always free egress.
Set: 3.0
Doors: 500/1
1 Cylinder To Suit Existing Key System OT
Notes: Existing hardware to remain. New cylinder as required.
Remove existing door, hardware, & frame (including hold open devices tied into the fire alarm system)
and reinstall in new location.
Set: 4.0
Doors: 551A/1, 551B/1
3 Hinge (heavy weight) T4A3786 US26D MK 087100
1 Storeroom/Closet Lock 70 8204 LNJ US26D SA 087100
1 Cylinder To Suit Existing Key System OT
1 Surface Closer 351 O EN SA 087100
1 Kick Plate K1050 10" high BEV CSK US32D RO 087100
1 Wall Stop 403 (or) 441CU (As Required) US26D RO 087100
3 Silencer 608-RKW RO 087100
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
DOOR HARDWARE SCHEDULE 080671 - 7
Set: 5.0
Doors: 50021/1, 50022/1
To follow
1 Automatic Opener 6341 689 NO 087100
1 Electric Strike 1500/1600 US26D HS 087100
1 Actuator 671 NO
1 Gasketing S77SBL PE 087100
1 Power Supply AQD2-4F1 Series SU 087100
Theory of Operation: Depressing either button will retract the latch and activate the power operator.
Door can be mechanically opened from either side.
Balance of hardware to remain.
END OF SECTION
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS 108211 - 1
SECTION 108211
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Architectural coiled wire grilles and screens.
1.02 RELATED REQUIREMENTS
1.03 DEFINITIONS
A. Coiled Wire Fabric: Building material created by interlocking strands of coiled wire to
form a larger flexible sheet; coiled wire fabric is made from various metals and gauges of
wire, and in a wide variety of sizes, weaves, finishes, and levels of fullness.
B. Attachment Systems: Components and materials required to provide coiled wire fabric in
designated shape and form (i.e., flat under tension in two directions, under tension in two
directions with a percentage of fullness, flat under tension in four directions, hanging in one
direction, or wrapping a form, etc.). Attachment systems are used to connect coiled wire
fabric to built environment and maintaining designated performance capability. Engineered
attachments may allow coiled wire fabric systems to remain in fixed position or to move,
either manually or mechanically.
1.04 REFERENCE STANDARDS
A. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60
000 PSI Tensile Strength 2014, with Editorial Revision (2017).
B. ASTM A380/A380M - Standard Practice for Cleaning, Descaling, and Passivation of
Stainless Steel Parts, Equipment, and Systems 2017.
C. ASTM D3451 - Standard Guide for Testing Coating Powders and Powder Coatings 2006
(Reapproved 2017).
D. ASTM F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs
2017.
1.05 ADMINISTRATIVE REQUIREMENTS
A. Coordination: Coordinate field measurements and fabrication schedule with progress of
construction to avoid construction delays.
B. Preinstallation Meetings: Conduct meetings including Contractor, Architect, fabricator,
installer and other subcontractors whose work involves coiled wire fabric to confirm project
requirements, framing and support conditions, mounting surfaces and manufacturer's
installation requirements.
C. Sequencing: Ensure that utility connections are achieved in an orderly and expeditious
manner.
1.06 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
B. Product Data: Submit manufacturer's data sheets on each product used, including
preparation instructions, storage and handling requirements, and installation methods.
C. Shop Drawings: Submit detailed shop drawings for fabrication and installation, including
plans and elevations, detailed sections, materials, finishes, fittings, hardware, anchorages,
fastening details, and manufacturer's technical and descriptive data.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS 108211 - 2
D. Samples: Submit samples for color verification of each specified finish, at least 6 inch (254
mm) wide by 10 inch (254 mm) long. Submit samples fullness % confirmation.
E. Certificates: Submit certificates signed by manufacturers of coiled wire products certifying
that products furnished comply with requirements.
F. Delegated Design Submittals: Submit comprehensive structural analysis of overall design
for specified loads prepared by qualified professional engineer.
G. Designer's Qualification Statement.
H. Manufacturer's Qualification Statement.
I. Installer's Qualification Statement.
J. Warranty Documentation: Submit manufacturer warranty and ensure that forms have been
completed in Owner's name and registered with manufacturer.
1. Submit "Final Installation Contractor Checklist" to ensure warranty requirements have
been met; see CCD website for copy of checklist.
1.07 QUALITY ASSURANCE
A. Designer Qualifications: Perform structural design under direct supervision of a
Professional Engineer experienced in design of this type of work and licensed in the State in
which the Project is located.
B. Manufacturer Qualifications: Company specializing in manufacturing products specified in
this section, with not less than ten years of documented experience.
C. Installer Qualifications: Company specializing in performing work of the type specified
and with at least five years of documented experience.
1.08 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to project site in manufacturer's original, unopened packaging, with labels
clearly identifying manufacturer and material.
B. Exercise care not to scratch, mark, dent, or bend metal components during delivery, storage,
and installation.
C. Store materials indoors, protected from moisture, humidity, and extreme temperature
fluctuations until ready for installation.
1.09 FIELD CONDITIONS
A. Verify dimensions of actual openings by field measurements before fabrication; provide
recorded measurements on shop drawings.
1.10 WARRANTY
A. See Section 017800 - Closeout Submittals, for additional warranty requirements.
B. Correct defective work within a two year period after Date of Substantial Completion.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Architectural Coiled Wire Grilles and Screens Manufacturers:
1. Cascade Coil Drapery, Inc, dba Cascade Architectural; www.cascade-
architectural.com
a. Address: PO Box 3707, 19505 SW 90th Court, Tualatin, OR 97062.
b. Phone - Toll Free: (800) 999-2645.
c. Phone: (971) 224-2188.
d. Email: info@cascadecoil.com.
e. Web: www.cascade-architectural.com.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS 108211 - 3
2.02 ARCHITECTURAL COILED WIRE GRILLES AND SCREENS SYSTEMS
A. Provide architectural coiled wire grilles and screens system with attachment method,
materials, weaves, and finish as indicated; manufacturer and contractor to engineer and
fabricate components and assemblies as required for installation in accordance with
manufacturer's Custom Architectural System.
B. Attachment Method: Aluminum Secura Track with Threaded Rod Brackets.
C. Fabricoil Architectural Coiled Wire Fabric Weaves:
1. Interior Application:
a. Aluminum: 5/16 inch (8 mm) thick, 14 gage wire.
D. Factory Finishes: Powder Coated. Color selected by Architect.
E. Fullness: 50%.
F. Provide batons for assistance with operating the screens.
2.03 PERFORMANCE REQUIREMENTS
A. Structural Requirements: Architectural coiled wire fabric systems capable of withstanding
applied loads and stresses within designated limits and under conditions as indicated on
drawings.
1. Provide coiled wire fabric and attachment system components in accordance with
applicable building code to withstand dead and live loads resulting from
environmental conditions including, but not limited to, wind, seismic events,
vegetation, rain, snow, and ice.
2. Provide coiled wire fabric systems capable of accommodating expansion and
contraction of metal components without causing undue stress, buckling, opening of
joints, and distortion.
3. Provide structural framing and hardware of coiled wire fabric systems capable of
withstanding loads and maintain deflection limitations in accordance with applicable
building codes when systems are fully installed.
2.04 FABRICATION
A. Tolerances: Verify field dimensions prior to start of shop fabrication.
B. Fabricate steel and stainless steel components in accordance with manufacturer's
requirements and the following:
1. Comply with requirements indicated for metal materials, thickness, design, and details
of construction; fabricate metal accurately and without any burrs.
2. Provide welded connections in compliance with American Welding Society (AWS)
standards for recommended practice in shop welding.
3. Provide welds located behind finished surfaces that are without distortion or
discoloration of exposed side.
4. Provide components that are accurately cut, drilled and/or tapped to receive coiled
wire fabric, hardware, fasteners, and accessories.
C. Shop fabricate components in accordance with requirements indicated on drawings and
specified performance requirements.
D. Shop fabricate hardware, interconnected parts, and assemblies to eliminate necessity for any
field cutting adjustments.
E. Coordinate system requirements, dimensions and spacing of attachment components to
ensure required factory drilled holes in supporting framework are properly located.
F. Provide exposed joints that are butt, flush, and hairline.
G. Fabricate exterior connections that will be exposed to weather in a manner that prevents
water from entering interior portions of structure, in accordance with Architect.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS 108211 - 4
H. Upon completion of fabrication, clean and prepare applicable coiled wire fabric system in
accordance with ASTM A380/A380M.
2.05 ACCESSORIES
A. Fasteners: Comply with ASTM F593 for stainless steel or ASTM A307 for carbon steel,
sizes to suit installation conditions.
B. Anchors and Inserts: Corrosion resistant; type, size, and material required for loading and
installation as indicated.
PART 3 EXECUTION
3.01 EXAMINATION
A. Prior to start of installation, verify that existing conditions are acceptable for installation of
coiled wire fabric and attachment systems in accordance with manufacturer's installation
instructions.
B. Coordinate with setting diagrams, plans, templates, and drawings to ensure that proper
installation of necessary anchors and supporting devices has been completed.
C. Ensure that supporting system for coiled wire fabric has been properly prepared for
attachment of framework, hardware, anchors, wire rope, and transfer of calculated loading.
D. Where existing conditions are responsibility of another installer, notify Architect of
unsatisfactory conditions prior to proceeding.
E. Coordinate with appropriate entity to correct any unsatisfactory conditions.
F. Start of this work indicates acceptance of areas and conditions as satisfactory by installer.
3.02 PREPARATION
A. Verify inventory of system components to ensure required components are available for
installation; inspect components for damage, and replace damaged components as
necessary.
B. Verify that alignment, support dimensions, and tolerances are correct.
C. Verify that necessary structural framing is installed prior to mounting coiled wire fabric
attachment system components.
D. Verify that support framing and other surfaces to receive coiled wire fabric and attachment
systems are clean and free of obstructions.
3.03 INSTALLATION
A. Install in accordance with manufacturer's written installation instructions.
B. Attach coiled wire fabric to structural framing using applicable hardware provided by
manufacturer as indicated on approved shop drawings.
C. Provide necessary anchorage devices and fittings to securely fasten to on-site construction;
including additional knife plates, embeds, framework, blocking, threaded rods, and anchors.
D. Provide for separation of dissimilar materials using bushings, grommets, or washers to
prevent electrolytic corrosion.
E. Upon completion of final adjustments, provide tamper-resistant lock-tight material at
mechanical fittings.
F. Provide for tension in coiled wire fabric as indicated on drawings, or as necessary to
remove slack.
G. Coiled Wire Fabric Attachment System:
1. Install coiled wire fabric attachment system components in accordance with approved
shop drawings.
Rhodes Hall 5th Floor Renovation January 20, 2021
Addendum No 1
ARCHITECTURAL COILED WIRE GRILLES AND SCREENS 108211 - 5
2. Install attachment system assemblies based on manufacturer's dimensions.
3. Install joints that accommodate for expansion and contraction of metal components
without causing undue stress, buckling, joint fatigue and/or distortion.
4. Install structural blocking at wall locations used for mounting of attachment system.
5. Install coiled fabric mounting hardware onto attachment systems as indicated on
approved shop drawings for specified attachment system; attach with approved
fasteners and techniques to ensure that framing members are horizontal and parallel to
grade or slab, and straight to within 1/16 inch (1.6 mm) in 4 feet (1.2 m).
6. Install attachment system plumb, level, square, and rigid without having any kinks or
sags in coiled wire fabric.
H. Coiled Wire Fabric:
1. Install coiled wire fabric in accordance with approved shop drawings.
2. Install coiled wire fabric based on manufacturer's dimensions.
3. Install joints that accommodate for expansion and contraction of metal components
without causing undue stress, buckling, joint fatigue and/or distortion.
4. Install coiled wire fabric mounting hardware onto coiled wire fabric as indicated on
approved shop drawings for specified attachment system; attach with approved
fasteners and techniques to ensure that sections are horizontal and parallel to grade or
slab, and straight to within 1/16 inch (1.6 mm) in 4 feet (1.2 m).
5. Install coiled wire fabric infill with attachment system plumb, level, square, and rigid
without having any kinks or sags.
3.04 CLEANING
A. Remove temporary protective coverings of adjacent work areas, and clean installed
materials prior to Date of Substantial Completion.
B. In heavy traffic areas, establish cleaning program to pressure wash or hand-wash coiled
wire fabric and attachment system on a monthly basis prior to Date of Substantial
Completion.
C. Clean coiled wire fabric system components with mild detergent and water applied with wet
wrap and wiped with clean dry rag; abrasive cleaners are not permitted.
D. Remove from project site and legally dispose of construction debris associated with this
work.
E. See Section 017419 - Construction Waste Management and Disposal, for additional
requirements.
3.05 PROTECTION
A. Provide protection of installed coiled wire grilles and screens and finished surfaces to
ensure they are without damage until Date of Substantial Completion.
B. Touch-up, repair or replace damaged products before Date of Substantial Completion.
C. Replace defective or damaged components as directed by Architect.
END OF SECTION
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 1
SECTION 237513
AIR HANDLING UNITS (CUSTOM)
PART 1 - GENERAL
1.1 WORK INCLUDED
A. Provide all labor, miscellaneous materials, and services to perform all operations required
for the complete unit assembly as shown on the Contract Documents.
B. Installation by Mechanical Contractor: Provide all labor, miscellaneous materials, and
services to perform all operations required for the complete installation as shown on the
Contract Documents.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Section 234100 - Air Filters and Accessories
1.3 SUBMITTALS
A. Mechanical Contractor will be actively involved in the submittal approval process in
order to coordinate units with project requirements. Submittal shall be provided by Unit
Manufacturer.
B. Equipment performance data sheets and schedules.
C. Submit shop drawings on air handling units showing dimensions, weights,
configurations, major component locations, access door locations, duct connection sizes
and locations, and shipping split locations.
D. Materials of construction for housing and major components.
E. Fan manufacturer and performance curves with operating points clearly indicated. Motor
sizes and types.
F. Coil sections with sizes, rows, fin spacing, face velocity, air & fluid temperatures, flow
rates, air& fluid pressure drops, and connection sizes.
G. Filters indicating size, efficiency, and pressure drop.
H. Electrical data, wiring diagrams, and accessories.
I. Octave band sound power levels for intake, supply and return connections, and octave
band sound power levels for radiated noise from the unit enclosure.
J. Factory testing procedures.
K. Operation and maintenance manuals.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 2
1.4 MANUFACTURER’S (EQUIPMENT SUPPLIER’S) AND GENERAL BIDDING
REQUIREMENTS
A. It is the intent of these specifications and referenced specification sections to provide the
minimum design and performance parameters without being proprietary toward a specific
equipment supplier. It is the responsibility of the listed acceptable equipment suppliers to
meet the basic intent of the specifications and drawings. The overall “box” size of Air
Handling Units and Return Air Units shall not be deviated from. It is not the option of
the equipment supplier to increase or decrease the physical size of the equipment. In
addition, the configuration or layout of the individual components within the equipment
cannot be modified or changed.
B. Pressure drop across each filter bank shall be minimum 1.5 in. w.g. and shall be included
into the internal static pressure losses of the equipment.
C. Design Equipment: Buffalo Air Handling.
D. Acceptable Makes: Air Enterprises, Buffalo Air Handling Units, Environmental Air
Systems.
1.5 PERFORMANCE TESTING
A. The Contractor shall retain Air Systems Balancing and Testing Service, Inc. to test and
document selected performance parameters, including leakage of each air handling unit.
The unit design cfm and static pressure shall be delivered as a brake horsepower within
5% of design conditions. Multiple point temperature readings shall be taken down stream
of the mixing section to certify that temperatures do not vary by more than 10°F across
the face of the preheat coil.
B. Air handling unit on site Leakage Test:
1. The casing leakage test shall verify the unit casing leakage is less than .5%of
design airflow when tested at 1-1/2 times the design static pressure. The unit
shall be sealed, and subject to both positive and negative pressure. The leakage
shall be measured using a calibrated orifice plate. Leakage shall not exceed 0.5%
of design airflow when tested at 150% of design static pressure.
2. In the event that the actual performance of the air handling unit does not fall
within the acceptable window, the unit manufacturer shall make all necessary
corrections without additional cost to the Owner, and also reimburse the Owner
for the cost of any additional testing needed to document performance.
3. In the event the manufacturer cannot achieve the submitted performance
parameters and leakage, the Owner reserves the right to seek an adjustment from
the manufacturer commensurate with the Owner's anticipated increased operating
costs.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 3
4. The Testing and Balancing Contractor shall submit the documented test results
directly to the Engineer. The report format and the parameters to be tested shall
be as per the requirements of Specification Section 230593 – Adjusting and
Balancing. This requirement for performance testing is in addition to the
adjusting and balancing requirements associated with the HVAC Contract.
1.6 FACTORY AUTHORIZED START-UP AND FACTORY JOINING SERVICE
A. The AHU Manufacturer shall provide 16 hours of factory start-up and joining service.
1.7 TRAINING
A. The AHU Manufacturer shall provide 2 hours of training.
1.8 WARRANTY
A. Except as otherwise specified, the Contractor shall warrant and guarantee all work
against defects in materials, equipment, and workmanship for a period of one (1) year
from the date of acceptance of the work as evidenced by a resolution to that effect by the
Owner and for that period of time noted in special or extended warranties.
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS
A. Provide air handling units to fit intended use and in locations called for. Capacity, size
arrangement, static pressure, brake horsepower, component parts and accessories as
called for and as necessary to obtain required results and allow for proper maintenance.
Guaranteed full capacity delivery through duct systems finally installed and under
conditions listed. Guaranteed sound power level ratings not exceeding those of design
equipment, or as scheduled.
B. All equipment shall be statically and dynamically balanced to acceptable tolerances with
weights permanently fastened to fan blades, and components including the motor,
installed on unit.
C. Classification as designated by Unit Manufacturer or minimum requirement list below:
Total S.P.Class
Up to 3 3/4 in. WG-STD I
Up to 6-3/4 in. WG-STD II
Up to 12-3/4 in. WG-STD III
D. Vibration levels shall be factory tested and field verified. Special balancing and
structural components shall be provided to minimize harmonic vibrations.
E. More than one manufacturer is listed as Make. Contractor must be certain that equipment
submitted fits properly into indicated space conditions the same as the Design
Equipment.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 4
F. Motors: Furnished by equipment manufacturer. See Specification Section 230513 -
Motors. Horsepower and type as called for from acceptable manufacturers listed. When
VAV drives are used, the motors provided shall be matched to the variable speed drive
selected for use. Motor to be suitable for use as direct drive application and be matched
to fan to meet performance requirements.
G. Vibration Isolation:
1. Provide vibration isolation equipment for each fan supplied inside the air
handling unit enclosure.
2. Fan and Motor mounted on a vibration isolated steel frame which is itself then
fastened to the unit base.
H. Fans:
1. Fans shall be AMCA 210 certified for performance and rated in accordance with
AMCA 300 for sound.
I. Unit to be completely pre-wired and pre-piped per drawing and specifications.
J. Each AHU shipping section to incorporate an exterior 4x4 junction box with sealed
conduit into airstream section to allow control subcontractor into air handling unit
without any field drilling through panel system in the field to compromise panel leakage
integrity.
K. All equipment materials and workmanship shall be warranted for (12) months from date
of acceptance. During the warranty period, the manufacturer shall repair or replace, at no
additional cost to the owner, any equipment, material, or workmanship in which defects
mat develop. Unit casing and structural base shall be warranted against corrosion or
failure under normal operating conditions.
2.2 AIR HANDLING UNITS
A. General:
1. Provide fan sections, filter sections, mixing box, plenums, coil sections and other
sections as called for and shown on the Contract Drawings.
2. Gauges of metal and construction to be heavy enough to prevent vibration, undue
noise or breathing.
3. Each coil shall be independently supported so that any one coil can be removed
without removing another coil. Coil racks to be stainless steel or aluminum.
4. Weight limitation of unit is 50 lbs./sq. ft. including all equipment shown to be
supplied by Division 15 and 16.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 5
B. Fan Sections:
1. The equipment supplier shall provide a means to fully remove all fans for
maintenance. Provide hoist and trolley assembly to allow full removal of the
fans from the unit enclosure. The mounting of the fan within the air handling
unit shall be designed to allow ease of decoupling of the fan for removal.
2. All fans shall be constructed to AMCA Standards and capacity shall be AMCA
Standards 210-74 rated.
3. Arrangement 4, direct drive, aluminum wheel, airfoil centrifugal unhoused type,
plenum fan, SWSI fans as called for, complete with motors, and fan guards. Fan
shaft shall be solid 1040 or 1045 hot rolled steel that is turned, ground and
polished.
4. Provide flexible discharge connection between fan inlet and intake wall.
5. Provide full screen cage on unhoused fans.
6. Provide mean to facilitate (lift points, etc.) fan motor removal/replacement which
do not interfere with airflow.
7. Fan Inlet Airflow System: Provide airflow measuring devices factory mounted
in fan inlets complete with flow transducer. The fan supplier shall provide an
airflow measuring system on the face to the inlet cone of the fan.
a. Design Equipment: Accutrol Vortek.
8. Fan Inlet Airflow Transducer:
a. The transducer shall be a combination differential pressure transmitter,
square root extractor, scaling multiplier, and output filter with process
indication, complete in a single package.
b. The measured air volume shall be locally indicated on a external
mounted magnehelic display meter scaled in CFM.
c. The transducer package shall be a factory calibrated for the flow
measuring element being served.
d. A transducer with magnehelic display meter shall be provided for each
individual airflow station.
e. Accuracy shall be plus or minus 0.5%.
f. An output signal of 01-10 VDC or 4-20 mA shall be generated for
monitoring the DDC system.
g. Design Equipment: Accutrol.
h. Make: Accutrol Vortek.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 6
9. Fans shall be selected to meet the overall acoustical performance (octave band
sound power levels at unit connections) as scheduled in the construction
documents.
10. Manufacturers: Twin City, Greenheck or Cook.
C. Hot Water / Glycol Heating Coil Sections:
1. Hot water heating coils, serpentine type, number rows and arrangement as
scheduled or as required to meet performance specifications, non-ferrous
headers, same end connections with vent chamber on return end and completely
drainable. Coils shall be designed for 125 psi working pressure, and shall be
designed to relieve expansion and contractions strains.
2. Coils shall be selected with a maximum face velocity of 550 FPM.
3. Vent and drain connections shall be provided at the top of bottom of each header
and shall be no less than 1/2 inch NPT.
4. 5/8 in. O.D. copper tubes not less than .035 in. wall thickness with .035 in. thick
"U" bends and .0075 in. thick aluminum fins. Fin spacing shall not exceed 10
FPI. All tubes shall be seamless construction with 304 stainless steel casings;
grooved connections NOT acceptable.
5. Head pressure loss through coil shall not exceed that scheduled in the documents.
6. Coils to be individually supported by an aluminum or stainless rack system. The
rack shall allow any one (1) coil to be removed through the unit casing without
disturbing any other coil.
7. Removable panels shall be located on both sides of the air handler unit, not just
on the coil removal side.
8. Manufacturers: Heatcraft or Aerofin
D. Chilled Water Cooling Coil Section:
1. Chilled water coils, serpentine type, number rows and arrangement as scheduled
or as required to meet performance specifications, same end connections with
vent chamber on return end and completely drainable.
2. Coils shall be selected with a maximum face velocity of 450 fpm. Unit
manufacturer shall assure no moisture carryover from coils at design conditions.
3. Head pressure loss through coil shall not exceed that schedule in the documents.
4. 5/8 in. O.D. copper tubes not less than .035 in. wall thickness with .035 in. thick
"U" bends and .0075 in. thick aluminum fins. Fin Spacing shall not exceed 10
FPI. All tubes shall be seamless construction with 304 stainless steel coil casing;
grooved connections NOT acceptable.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 7
5. Coils to be individually supported by an aluminum or stainless steel rack system.
The rack shall allow any one (1) coil to be removed through the unit casing
without disturbing any other coil.
6. Units to be provided with removable panel to allow for coil removal. These
panels shall be gasketed, effectively sealed without other sealants or caulks, and
shall be secured with stainless steel machine screws or other reusable fasters.
Self-tapping screws are not acceptable.
7. Positively pitched type 304 stainless steel drip pan(s), minimum of 18 gauge,
shall extend continuously under each coil with a minimum 3 in. overhang
upstream and 12 in. of overhang downstream. Each pan shall have its condensate
piped to common exterior connection. Each coil shall be caulked and flashed in
place to prevent carryover of condensate.
8. Cooling coils to be "desaturation" type with integral row of reheat to provide
separation of DB & WB temperature at all temperatures. Reheat shall not use
any additional energy and be circuited integral to the coil casing.
9. Active cooling coil condensate drain connections to be a minimum 12 inches
above the bottom of the air handling unit base for trapping.
10. Removable panels shall be located on both sides of the air handler unit, not just
on the coil removal side.
11. Manufacturers: Heatcraft or Aerofin.
E. Air Handling Unit Casing:
1. Double walled, insulated, air pressure tight, casing assemblies fabricated from
insulated aluminum panels with aluminum framing members. Wall panels shall
be continuously sealed (gasketed) between interior and exterior skin with 1/2"
epoxy bride. No through metal shall be allowed. Where dissimilar metals are
used, they shall be dielectrically isolated from one another to prevent galvanic
action. Adhesive tapes or gaskets are not acceptable as an acceptable thermal
brake or for dielectric isolation.
2. Panels shall be constructed with unpainted aluminum skins and injected foam.
Panel thickness shall be no less than 2 inches, but shall also be sufficient to:
a. Limit maximum deflection to 1/200th of the panel span at the full rated
unit static pressure.
b. Fully withstand positive and negative pressure of 150% of rated pressure
for testing, without any failure or deterioration of performance.
c. Prevent any condensation on the outside of the unit at 75°F wet bulb
temperature.
3. Aluminum panel skin thickness shall be a minimum of 0.050 in. thick for exterior
sheet and 0.040 in thick for the interior sheet. Interior sheet shall be solid.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 8
4. Interior space packed with blown foam. Panel U-value shall not exceed .0588
BTU/HR-SQ.FT. deg. F for 2 inch panels. Insulation shall meet or exceed 3.0
pounds per cubic foot (PCF) density rating and meet erosion requirements of UL
181 facing the airstream. The panel system shall meet the requirements of NFPA
90A and 90B and a certificate stating such shall be submitted to the Engineer.
5. All sections shall have a solid liner.
6. All casing walls shall be of panel construction, including but not limited to
discharge walls, mixing section walls.
7. Access doors for serviced access between each section and as shown on Contract
Drawings.
8. Unit floor in air handling sections shall be 3/16” aluminum or type 304 stainless
steel safety tread plate fully welded watertight, and designed for a min. of 100 lb.
per square foot throughout the unit. Provide a floor drain in each section.
Provide a 1-1/2 in. condensate drain from outside air plenum, mixing section
upstream of filters and from cooling coil. Provide a 1-1/4 in. capped drain from
all other sections for cleaning. . Base of unit shall be lined with .040" aluminum
skin which shall be recessed to allow for rigging the sections in place without
damage to the insulation projection. The insulation shall be a minimum 4 in. base
insulation.
9. The unit shall be constructed on an all-aluminum minimum 8 in. channel base
structure member sized to support all major components and the housing during
rigging, handling and operation of the unit. The base shall be designed to
distribute loads properly to a suitable mounting surface and be braced to support
internal components without sagging, pulsing or oil canning.
10. The unit base shall be provided with sumps in outside air sections or as indicated
in the documents. Sumps shall be welded and guaranteed watertight to serve as a
drain pan to prevent water damage from the unit.
11. All equipment within the air handling unit shall be provided with a minimum 2”
high base rail to raise the equipment off the unit floor for housekeeping.
Equipment mounted directly to the floor with fastener or drilled holes penetrating
the water seal of the base is unacceptable.
12. Door panels constructed of same material and gauges as panels; door sized as
called for, 3 in. thick of the overlapping seal type. Doors shall be supplied with
continuous non-pitching gaskets. Doors to be supplied with piano hinges full
height of door. Minimum of two latches with an inside release handle. Doors
shall be assembled with hinge hardware attached and adjusted in the field. The
door gaskets shall incorporate two continuous separate gasket seals around the
periphery of the door. Gasket materials shall be UV resistant, closed cell
neoprene: gaskets shall be attached by adhesive and not mechanically held in
place. Door latches wedge lever type with handles inside and outside.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 9
Hinges designed for door size and weight. Doors installed to open against the air
pressure. Interior doors shall have 10 in. (min.) square thermal pane windows at
5 ft.-0 in. center line height. Doors to be minimum of 24”wide to all internal
components. Provide 1” diameter test ports with screwed caps on casing
upstream and downstream of filters and coils for pressure and temperature
measurement.
13. Air and watertight sleeves, caulked and insulated where pipes and conduits
penetrate unit casings.
14. Provide framed openings with curved bell mouthed fittings for duct connections
with exit velocities exceeding 2000fpm. Bellmouth fittings shall have a
minimum smooth radius equal to 20% of the diameter (round or oval) or shortest
side (rectangular) to provide optimum performance. Bellmouths to be mounted
flush with the interior edge to minimize exit loss. Where openings are in floor,
provide a removable safety grating fastened to opening framing. Supply opening
safety grating to be aluminum. All floor openings shall have a 3 in. high frame
welded to the pan to prevent water from entering the building.
15. The structure shall be fully self-supporting. Where roof spans and wall loadings
require additional structural strength, it shall be furnished either by heavier roof
and wall joiners, or, additional structural members capable of withstanding a
differential pressure of 10 in. w.g. Unit built on unpainted aluminum base
channel. The unit base shall be insulated with 2 in. of 3 lb./cu. in. density
insulation with an aluminum liner for additional sound attenuation.
16. Provide plug panels for removal of coils.
17. Interior aluminum surfaces are not required to be painted.
18. Any equipment flashing, internal partitions or other attachments to the casing
shall be made in such a way as to ensure a permanent leak tight connection.
Attachments that are bolted, screwed, or welded to or through the casing creating
air bypass, air leakage or rust propagation areas are not acceptable.
19. Multiple section units shall be bolted together in the field using stainless steel
bolts, nuts and washers.
20.The wall and roof panels to be built to meet the requirements of NFPA 90A &
90B fire and smoke spread of National Fire Protection Standards.
Manufacturer shall include with submittals copy of test results for ASTM E84-
17 test standard "Surface Burning Characteristics of Building Materials". No
substitutions on type of test results will be acceptable for approval. Failure to
provide certified ASTM test results assumes noncompliance with NFPA 90A &
90B.
F. Filter Sections:
1. Refer to Specification Section 234100 for further requirements.
2. Provide one extra full set of all final filters and pre filters.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 10
3. Provide access doors for replacing filters and access to dampers.
4. Provide a filter magnehelic gauge for each filterbank. Gauge to be 3-7/8 in.
diameter white dial diaphragm actuated. Guaranteed accurate to + 2% of full
scale. Pointer zero adjustment. Provide all accessories including adapters,
mounting panel, pressure tips, fittings, tubing, vent valves.
5. Filter racks to include internal vertical stiffeners.
G. Dampers:
1. Return, Exhaust and Outside Air Dampers:
a. Dampers shall be opposed blade, unless otherwise noted on drawings,
aluminum, airfoil, and low leakage type design.
b. Blade and frame seals shall be of extruded silicone. Seals are to be
secured in an integral slot with the aluminum extrusions.
c. Bearings shall be composed of a Celcon inner bearing fixed to an
aluminum hexagon blade pin, rotating within a polycarbonate outer
bearing inserted in the frame, resulting in no metal-to-metal or metal-to-
plastic contact.
d. Linkage hardware shall be installed in the frame side and constructed of
aluminum and corrosion-resistant, zinc-plated steel, complete with cup-
point trunnion screws for a slip-proof grip.
e. Dampers are to be designed for operation in temperatures ranging
between -40°F and 212°F.
f. All dampers shall be arranged within the air-handling unit to allow the
actuators to be installed within the enclosure of the units and not
mounted at the unit exterior unless otherwise noted on drawings.
g. Design Equipment: Tamco 1500 series, except dampers exposed to
unmixed outside air shall be Tamco Series 9000.
h. Make: Tamco.
2. Outside Air Flow Station:
a. Material: Element 6063-T5 anodized aluminum and casing 16 gauge
G90 galvanized steel.
b. Accuracy: Within ± 0.5% of actual flow through the velocity range of
200 to 1,000 fpm when installed in accordance with published
recommendation and within ±5% at a velocity of 100 fpm. Operating
velocity range 200 to 1,000 fpm.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 11
c. Temperature: Provide temperature compensation sensor to adjust for air
density.
d. Temperature: -40 deg F to 120 deg F.
e. Humidity: 0 to 100%.
f. Design Equipment: Accutrol Vortex IAQ.
g. Make: Paragon, Ruskin, Accutrol Vortex.
3. Air Volume/Velocity Transducers for Minimum Outside Air and Fan Inlet
Airflow Stations with NEMA 4 enclosure:
a. The transducer shall be a combination differential pressure transmitter,
square rood extractor, scaling multiplier, and output filter with process
indication, complete in a single package.
b. The measured air volume shall be locally indicated on a door mounted
LED display meter scaled in CFM.
c. The transducer package shall be a factory calibrated for the flow-
measuring element being served.
d. A transducer shall be provided for each individual airflow station.
e. Accuracy shall be plus or minus 0.25%.
f. An output signal of 0-10 VDC or 4-20 mA shall be generated for
monitoring by the DDC system.
g. Design Equipment: Accutrol Vortex.
h. Make: Paragon, Cambridge, Accutrol Vortex.
H. Accessories: As called for.
1. Provide outside air plenum and discharge plenum section with outlets as shown
on the Contract Drawings.
2. Provide floor drains in outside air plenum, access ahead of filter section and coil
sections.
3. Unit shall be prewired for lighting. Pre-wiring shall include but not limited to:
a. Single point connections - lighting. Each connection point shall have
conduit through the side of the unit for extension by others. Lighting
connection shall be suitable for 120V single phase, 20A. Unit power
requirements shall not exceed the scheduled and as indicated herein.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 12
b. Lighting connection shall be for the interior lighting. This lighting shall
be vapor tight receptacle for compact fluorescent or LED type lights and
provide a minimum of 40 foot candles throughout. All the lighting
within the unit shall be controlled by a single centrally located electronic
timer switch equal to Woods Model #59013.
1) Receptacles: Provide a minimum of two 120 volt duplex
receptacles on the exterior. All receptacles shall be ground fault
interrupting type and have a weatherproof cast aluminum cover.
c. All electrical work and entire installation shall be in accordance with the
NEC and Division 26 of these specifications. Provide thermal and
moisture barrier in all conduits penetrating to air handling areas.
4. All fans shall be wired to a junction box mounted to enclosure exterior.
Installation of wiring and conduit shall be in conformance with NEC. Variable
frequency drives will be provided and installed by others.
5. All access doors at unhoused (plug) fan sections shall be provided with OSHA
approved "kill" switches. The switches shall be capable of interrupting the fan
motor control circuit whenever a door is open.
6. Motor removal rails for all fan sections.
7. Service corridor to have integral structural members to hang piping from ceiling
of corridor with no sagging or deflection of ceiling.
8. Provide LED exterior light with switch.
PART 3 - EXECUTION
3.1 INSTALLATION
A. All tubing for filter gauges, airflow station, etc. shall be hard copper type with soldered
joints. Provide maximum of 1’-0” of polyethylene tubing at connections to fans which
are supported by vibration isolators.
B. Provide proper weatherization for protection of multi-section units during any periods of
outdoor storage/staging, and during unit transport.
C. Pipe coil drip pans, humidifier and outside air sections independently to nearest floor
drain, minimum pipe size shall be 1-1/2 in. Provide deep seal "P" trap and unions on
both side of trap. The trap depth shall be greater than the static pressure of the section
being drained. All other drain connection shall be piped with 1 in. piping manifolded
together to the nearest floor drain. Provide each drain connection with ball valve and
union.
D. The Contractor is responsible for cleaning of unit and repainting of any floor pans,
interior walls, exterior walls, etc. that are damaged during rigging, assembly and final
piping connections.
Rhodes Hall 5th Floor Renovation
M/E REF 200157
January 20, 2021
Addendum No 1
AIR HANDLING UNITS (CUSTOM)237513 - 13
E. Air handlers shall be properly protected during shipment. Units shipped on unprotected
flat-bed trailers shall be made all-weather-tight.
F. If air handlers need to be stored on site before installation within an enclosed building,
all-weather-tight protection shall be maintained until the units are within an enclosed
space.
END OF SECTION
CB
CB
CB
CB
SYMBOLS:KEYNOTEDETAILSECTIONELEVATIONSVERTICAL ELEVATIONPARTITION TYPE (SEE A-602 FOR DETAILS)ACCESSORY TYPEDOOR NUMBERREVISION NUMBERROOM NUMBERALIGNING SURFACES???01A-000000.00'FINISH FL.A1012431A1?1011001T-1ALIGNLEGENDEXISTING WALL TO REMAINNEW INTERIOR PARTITIONNEW 1-HR RATED PARTITIONNEW 2-HR RATED PARTITIONNEW FIXED FURNITURE/ CASEWORKEXISTING WALL PARTITION TO BE DEMOLISHEDABBREVIATIONS:&AND@ATAASSOCIATEACALTERNATING CURRENT/ACOUSTICALA/CAIR CONDITIONINGACMASBESTOS CONTAINING MATERIALACTACOUSTICAL CEILING TILEADAREA DRAINADJADJUSTABLE/ADJACENTAFACCESS FLOORAFFABOVE FINISH FLOORALTALTERNATEALUM ALUMINUMAMPAMPEREANOD ANODIZEDAPACCESS PANELAPPD APPROVEDARCH ARCHITECT/ARCHITECTURALASPH ASPHALTASYM ASYMMETRICALAVBAIR & VAPOR BARRIERAVGAVERAGEBBBUILDING BOARDBDBOARDBLDG BUILDINGBLKG BLOCKINGBMBEAM/BENCH MARKB.O.BY OTHERSBRKBRICKBSMT BASEMENTBTMBOTTOMBTWBETWEENBURBUILT UP ROOFINGBVLBEVELCABCABINETC.C.CENTER TO CENTERCERCERAMICCFMCUBIC FEET PER MINUTECJCONTROL JOINTCLCLOSERCLGCEILINGCLRCLEARCMUCONCRETE MASONRY UNITC.O.CASED OPENINGCOL(S) COLUMN(S)COMM COMMUNICATIONCONC CONCRETECOND CONDUITCONF CONFERENCECONN CONNECTION(S)CONSTR CONSTRUCTIONCONT CONTINUOUSCOORD COORDINATECORR CORRIDORCPCIRCUIT PANELCPTCARPETCRCOLD ROLLEDCRSCOURSE(S)CSOCASED OPENINGCTCERAMIC TILECTAICOOLING TOWER AIR INTAKECTRCENTERCUCUBICCWCOLD WATERCYCOPYDDEEP/DEPTHDBLDOUBLEDCDIRECT CURRENTDEMO DEMOLITIONDETDETAILDFDRINKING FOUNTAINDIADIAMETER/DIAGONALDIMDIMENSIONDISPDISPENSERDLDEAD LOADDNDOWNDODOOR OPENINGDRDOORDWGDRAWINGEEAST(E)EXISTING TO REMAINEAEACHECEMPTY CONDUITEECEXISTING EXPOSED CONSTRUCTIONEFEXHAUST FANEIFSEXTERIOR INSULATION FINISH SYSTEMELELEVATION(S)ELEC ELECTRICALELEV ELEVATOREMEMERGENCYEMTELECTRICAL METALLIC TUBINGENCL ENCLOSUREEQEQUAL(ER)EXIST. TO BE REMOVED(ERR) EXIST. TO BE REMOVED & RELOCATEDEWCELECTRICAL WATER COOLEREXHEXHAUSTEXIST,EX EXISTINGEXP BT EXPANSION BOLTEXP JT EXPANSION JOINTEXTEXTERIORFFILEFAFIRE ALARMFDFLOOR DRAINFEFIRE EXTINGUISHERFECFIRE EXTINGUISHER CABINETFHCFIRE HOSE CABINETFINFINISHFIXTFIXTUREFLRFLOORFLUOR FLUORESCENTF.O.FACE OFFPFIRE PROOFFPSC FIRE PROOF SELF CLOSINGFPBFIRE PULL BOXFRFRAMEFSPFIRE STANDPIPEFTFOOTFTGFOOTINGFWCFABRIC WALL COVERINGGAGAUGEGALV GALVANIZEDGBLK GYPSUM BLOCKGCGENERAL CONTRACTORGFIGROUND FAULT INTERRUPTERGLGLASSGR,GD GRADEGWBGYPSUM WALLBOARDGYPGYPSUMHBHOSE BIBBHCHANDICAPPEDHMHOLLOW METALHDWHARDWAREHDWD HARDWOODHORIZ HORIZONTALHPHIGH POINTHPLHIGH PRESSURE LAMINATEHRHOURHTHEIGHTHTGHEATINGHVAC HEATING, VENTILATION, AIR CONDITIONINGHVPHIGH VOLTAGE PANELHWHOT WATERIBCINSTALL BY CONTRACTORIBOINSTALL BY OWNERIDINSIDE DIAMETERINCLINCLUDE/INCLUDINGINSUL INSULATIONINTINTERIORJBOX JUNCTION BOXJSJAMB SWITCHJTJOINTKWKILOWATTLACLACQUERLAMLAMINATELAVLAVATORYLBSPOUNDSLFLINEAR FEETLHLEFT HANDLHRB LEFT HAND RETURN BEVELLLLIVE LOADLSCLOCKSET CYLINDRICALLSMLOCKSET MORTISEDLDLINEAR DIFFUSERLTLIGHTLVLOUVERLVPLOW VOLTAGE PANELMAGMAGNETICMARB MARBLEMASMASONRYMAXMAXIMUMMCMAIL CHUTEMEZZ MEZZANINEMFRMANUFACTURERMINMINIMUMMISCMISCELLANEOUSMLDG MOLDINGM.O.MASONRY OPENINGMOD-BIT MODIFIED BITUMINOUS ROOFINGMPMEASURE POINT / MASONRY PAINTMTDMOUNTEDMTLMETALMULMULLIONNNORTH/NEWNATNATURALNECNEW EXPOSED CONSTRUCTIONNICNOT IN CONTRACTNONUMBERNOMNOMINALNRNOISE REDUCTIONNRCNOISE REDUCTION COEFFICIENTNTSNOT TO SCALEOCON CENTERODOUTSIDE DIAMETEROHOPPOSITE HANDOPPOPPOSITEPART PARTITIONPCPL PORTLAND CEMENT PLASTERPGLPLATE GLASSPBOPROVIDED BY OWNERPLFPOUNDS PER LINEAR FOOTPLAM PLASTIC LAMINATEPLAS PLASTERPSIPOUNDS PER SQUARE INCHPTPAINTPTDPAINTEDPTGPAINTINGPTDR PAPER TOWEL DISPENSERPTRPAPER TOWEL RECEPTACLEPVCPOLYVINYL CHLORIDEPWDPLYWOODR/ARETURN AIRRADRADIUSRBRUBBER BASERDROOF DRAIN(RE)RELOCATED EXISTINGRCPREFLECTED CEILING PLANREFREFRIGERATORREINREINFORCING/REINFORCEDREQD REQUIREDRHRIGHT HANDRHRB RIGHT HAND REVERSE BEVELRMROOMROROUGH OPENINGRUBRUBBERSSOUTH/SUPPLYSAFB SOUND ATTENUATION FIRE BATTSBSTRAIGHT BASESCSEPARATE CIRCUIT/SELF CLOSINGSCHSCHEDULESEAL SEALANTSIMSIMILARSLCSOLID CORESNDSANITARY NAPKIN DISPOSALSNVSANITARY NAPKIN VENDORSPEC SPECIFICATIONSQSQUARESSSTAINLESS STEELSTDSTANDARDSTLSTEELSTNSTAINSTRUCT STRUCTURESUBSUBSTITUTESUSP SUSPENDEDSVCSERVICESYMSYMMETRICALSYSSYSTEMTBTOWEL BARTBDTO BE DETERMINEDTDTRENCH DRAINTELTELEPHONETGLTEMPERED GLASST>ONGUE & GROOVETHTHRESHOLDTHRU THROUGHTHKTHICK/THICKNESSTLTILET.O.TOP OFT.O.S. TOP OF SLABTPDTOILET PAPER DISPENSERTSTILE STARTTYPTYPICALU.O.N. UNLESS OTHERWISE NOTEDVVOLTVBVINYL BASEVCTVINYL COMPOSITE TILEVERT VERTICALVIFVERIFY IN FIELDVNRVENEERV. PLASVENEER PLASTERVTVINYL TILEWWEST/WATTW/WITHWCWATER CLOSETWDWOODWFWIDE FLANGEWPWATER PROOFWRWASTE RECEPTACLEWSWET STACKWWF WELDED WIRE FABRICWWM WELDED WIRE MESHYDYARDDUMPSTER LOCATIONSGRUMMAN HALL2043UPSON AUTO SHOP2045ARHODES DRIVEWARD CENTER2061UPSON HALL 2045AVOID EXISTING INGROUND TANK WITH FENCE.PATH THROUGH LOADING DOCK OR DOOR TO BUILDING FRIEGHT ELEVATOREXISTING FREIGHT ELEVATOR, PROVIDE PROTECTION FOR CAB WALLS AND FLOOR. WEIGHT LIMIT 4,500LBS. DIMENSIONS 8'-0"X5'-6". CEILING HEIGHT 7'-6". DOOR OPENING WIDTH 4'-7". Revisions:Issue for BidRichard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 TRyan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1December 15, 2020 January 20, 2021As indicatedSYMBOLS, NOTES &ABBREVIATIONST-002N.T.S1SITE PLAN1/32" = 1'-0"3STAGING PLAN1
UPUPUPGF8FEDCBA1234567G5H5X1K111098121314HX18' - 6 3/16"22' - 8"22' - 8"22' - 8"22' - 8"14' - 4 5/16"4' - 1 7/8"18' - 6 3/16"22' - 8"22' - 8"22' - 8"22' - 8"18' - 6 5/8"1' - 7 5/8"1' - 7 5/8"1' - 7 5/8"EQEQTERRACEGRAD.STUDENTS596GRAD.STUDENTS594STAFF592STAFF590ASSOC.DIRECTOR588LIBRARY586CLERICAL584DIRECTOR582GRAD.STUDENTS58057857657457250044LOUNGE568DATACLOSET552ELEC.CLOSET50075MEN50022WOMEN500215007350076512514508504A504502500503501517519521521A523520518516514B571503 SF505 SF1A-4102A-41042460 SF505 SF31503 SF51 1 1 11 11 11 11 3 4 4 11 11 11 11 44 SFSTORAGE551B551B15001LABORATORY551A1E14 6 7 7 A-30119 TYP.A-3013546A-5411A-5413A-5414A1551112 A-5011C113 13 13 B1A1D29 9 9 13 13 STORAGE551A551A1E15513B16A-502TYP.12 TYP.12 TYP.D1A-3021A-5013E1A-3017A-3018A-30122A-5022A-5022A-50210 10 A-5012A-5012SIM.TYP.2 50046STAIR# 3500035004050042STAIR# 250002500635006250061571AA-501455121' - 4"11' - 0"3' - 1"6' - 9"3' - 0"50021150022114 14 14 14 14 A11' - 4"A1EQEQTYP.TYP.TYP.1' - 1"ALIGNOF WALL AND COLUMN0' - 4"4' - 5"8' - 1"ALIGNA-3022115 16 1KEY NOTES:FIXED WOOD LABORATORY CASEWORK, WOOD WITH EPOXY COUNTERTOP.PREPARE EXISTING CONCRETE FLOOR TO RECEIVE NEW FINISH, SEE ALSO A-131. WALL MOUNTED OPEN SHELVING BY LABORATORY CASEWORK MFR. SINK WITH COUNTERTOP MOUNTED EYEWASH.NOT USED.RELOCATED CORRIDOR DOOR, FRAME AND HARDWARE. NOT USED.INCLUDE PAINTED FLOOR MARKINGS, APPROXIMATELY 4" WIDE AND LOCATED ALONG THE COLUMN LINES IN THE PROJECT AREA.WIRE MESH DIVIDER CURTAIN. SUSPENDED FROM C CHANNEL TRACK WITH TROLLEY ACCESSORY. RECESSED FIRE EXTINGUISHER CABINET. 2-HOUR RATED INTUMESCENT COATING ON COLUMNS. PREPAREEXISTING STEEL TO RECEIVE COATINGREPLACE EXISTING RADIATOR COVERS. ADD END CAPS.NEW ROOM SIGNAGE. SEE .SURFACE MOUNTED STAINLESS STEEL CORNER GUARD, 8' TALLCUT VINYL LETTERING, COLOR TO BE SELECTED BY ARCHITECT. ½”DEEP AND 3”HIGH MINIMUM. PROJECT WALL BOX.1 2 3 4 5 6 7 8 9 10 11 12 /1A-60313 14 15 16 1LEGENDEXISTING WALL TO REMAINNEW INTERIOR PARTITIONNEW 1-HR RATED PARTITIONNEW 2-HR RATED PARTITIONNEW FIXED FURNITURE/ CASEWORKEXISTING WALL PARTITION TO BE DEMOLISHEDRevisions:Issue for BidRichard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 TRyan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Scale:January 20, 2021Rhodes HallFifth Floor Renovation Cornell UniversityIthaca, NY 14850 1 Addendum #1December 15, 2020 January 20, 2021As indicatedFIFTH FLOOR PLANA-1011/8" = 1'-0"1LEVEL 5GENERAL NOTE:1.GRIND EXISTING CONCRETE SLAB, FILL ALL CRACKS WITH EPOXYSEALANT, AND PREPARE TO RECEIVE SPECIFIED FINISH.2.PAINT ALL WALLS AND EXPOSED CEILING ELEMENTS IN THEPROJECT AREA. PAINT ALL WALLS IN EXISTING CORRIDOR 50044.3.REFER TO SHEET A-141 FOR LOOSE FURNITURE PLAN
GF8FEDCBA1234567G5H5X1K111098121314HX1A-4102A-410B.O. BEAM10' - 1 1/2"TYP.A2A-11121 TYP.A33 3 1A-5029A-5034 10' - 8"4 2 A4A1A1A56 6 A2A21 TYP.1 TYP.8' - 8"8' - 8"8' - 8"11' - 7"B.O. BEAM10' - 1 1/2"11' - 7"10' - 1 1/2"B.O. BEAMB.O. BEAMB.O. BEAM11' - 10 1/2"B.O. BEAM9' - 1"8' - 0"9A-503SIM.11' - 4 1/2"B.O. BEAMA-1113A-1114A7A711A-503TYP.8' - 2"4 LINE OF NEW TO EX. CEILINGLINE OF EX. TO NEW CEILING4 A8A87 TYP.ALIGNEQEQTYP.EQTYP.EQEQEQTYP.EQTYP.EQOF GRIDOF GRID2 1/4"3' - 7"3' - 3"EQEQEQEQ2' - 10"2' - 10"EQEQEQEQALIGNALIGNALIGN7A-503A-30221KEY NOTES:1DUAL ROLLER WINDOW SHADES WITH FASCIA, ONE SOLAR AND ONE BLACK OUT SHADE. BASIS OF DESIGN URBANSHADE BY MECHOSHADEFLUSH MOUNTED CEILING ACCESS PANEL, 2'X2'SUSPENDED STUD AND GYPSUM BOARD ENCLOSURE AROUND EXISTING MECHANICAL EQUIPMENT (ABOVE CEILING) FOR ACOUSTICAL PURPOSES. NEW GYPSUM BOARD CEILING FLUSH WITH ADJACENT EXISTING CEILING TO REMAIN.PATCH AND PAINT CEILING.TRANSFER DUCTS. SEE MECHANICAL.GYPSUM ENCLOSURE AROUND EXISTING BEAM. FIREPROOFING TO REMAIN. SEE DETAILS ON A-502.234567LIGHT LEGEND:A1LINEAR PENDANT, 8'-0" LONGA2LINEAR PENDANT, 4'-0" LONGA3LINEAR PENDANT, 6'-0" LONGA42X2 RECESSED DIRECT/INDIRECTA5RECESSED CAN LIGHTA6 FLAT RECESSED LET LIGHT, 8'-0" LONGA7 FLAT RECESSED LET LIGHT, 3'-0" LONGA8LINEAR PENDANT, 7'-0" LONGCEILING FINISH LEGEND:FOAM ACOUSTICAL CEILING TREATMENT ADHERED TO CEILING. PROVIDE SONEX, TECH WEDGE ACOUSTICAL FOAM BY ACOUSTICAL SOLUTIONS INC. 2" THICK, 2'X4' PANEL SIZE. PROVIDE FULL RANGE OF MFR. COLOR SAMPLES FOR SELECTIONEXISTING ACOUSTICAL CEILING TILE AND SUSPENSION SYSTEMNEW ACOUSTICAL CEILING TILE AND SUSPENSION SYSTEMNEW SUSPENDED GYPSUM BOARD CEILINGACOUSTICAL WALL TREATMENT, GROOVED AND PERFORATED ACOUSTICAL WOOD PANELLIGHT SUSPENDED ABOVE C CHANNEL SYSTEM.CEILING MOUNTED RETRACTABLE POWER RECEPTACLEUNISTRUT OR KINDORF C-CHANNEL SUSPENDED FROM THREADED ROD FASTENERS TO SLAB ABOVE. HUNG AT 8'-8" AFF.EQEQEQNOTES:1. PROVIDE 10% ADDITIONAL ATTIC STOCK OF ALL C-CHANNEL SUSPENDED SYSTEM2. ALL SYSTEM COMPONENTS TO BE PAINTED.3. DIMENSIONS ARE TYPICAL UNLESS NOTED OTHERWISE.8' - 6"8' - 6"EQEQTYP.EQTYP.EQLEGEND:SUPPLY DIFFUSERRETURN GRILLEWIRELESS WALL MOUNTED ACCESS POINTRETRACTABLE POWER CHORDWAPF2UNISTRUT OR KINDORF C-CHANNEL SUSPENDED FROM THREADED ROD FASTENERS TO SLAB ABOVE. HUNG AT 8'-8" AFF.8' - 6"ALIGNALIGN9' - 0"B.O SOFFIT9' - 6"B.O CURTAIN ROD3 8 °10A-503INDICATES BLACKOUT CURTAIN AND TRACK (BY OWNER)ALIGNALIGNDEQEQEQ8' - 6"4' - 3"UNISTRUT OR KINDORF C-CHANNEL SUSPENDED FROM THREADED ROD FASTENERS TO SLAB ABOVE. HUNG AT 8'-8" AFF.ALIGNTYP.EQTYP.EQRevisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 2021As indicatedFIFTH FLOOR REFLECTEDCEILING PLANA-1111/8" = 1'-0"1LEVEL 5 REFLECTED CEILING PLAN1/4" = 1'-0"2TYPICAL SLOTTED METAL FRAMING CEILING LAYOUT1/4" = 1'-0"3SLOTTED METAL FRAMING CEILING LAYOUT1/4" = 1'-0"4SLOTTED METAL FRAMINGCEILING LAYOUTGENERAL NOTES:1. ONLY DOWNTURNED SPRINKLER HEADS ARE SHOWN. SEE PLUMBING DRAWINGS FOR UPTURNED AND DOWNTURNED SPRINKLER HEADS.2. LIGHTS ARE SHOWN FOR REFERENCE ONLY. REFER TO MEP FOR CEILING MOUNTED FIXTURES.
KEY NOTES:MOVABLE STORAGE CABINET WITH WOOD TOP (N.I.C.)INDUSTRIAL WORKBENCH WITH BUTCHER BLOCK TOP, ON CASTERS. SIZE 60"X30". (N.I.C.) STORAGE RACK ON CASTERS, APPROX. 7' HIGH. (N.I.C.)BLACK OUT CURTAIN BOOTH, SUSPENDED FROM CEILING GRID (N.I.C.)FULL HEIGHT WIRE MESH CURTAIN. TRACK SUSPENDED FROM SLAB ABOVE.FLOOR MOUNTED SCREEN WITH METAL GRID PANEL. SEE . EXPERIMENT AREA, WOOD BOX, ROBOTIC ARM, ETC. (N.I.C.)STOOL ON WHEELS, ADJUSTABLE HEIGHT. (N.I.C.)8'-8" HIGH OPEN SHELVING. (N.I.C.)1 2 3 4 5 6 7 8 /2A-1419 14' - 0"6' - 0"1' - 0"1 1/2" X 1 1/2" STEEL TUBE FRAME, PAINTED. FULLY WELD ALL JOINTSWIRE MESH INFILLBASIS OF DESIGN: CHAOS BY CAMBRIDGE ARCHITECTURAL MESH1/4" DEEP STABILIZING LEG (STEEL)1" = 1'-0"PROVIDE WEIGHT IN BASE FOR STABILITYGF8FEDCB1234G59H500442122312233888855558882123213312122331221222322688858123882186686668685555588LABORATORY551STORAGE551ASTORAGE551B999999666Revisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 2021As indicatedFURNITURE & EQUIPTMENT PLAN-FIFTH FLOORA-1412DEMOUNTABLE TYPE PANEL3/16" = 1'-0"1FURNITURE & EQUIPTMENT - LEVEL 5
LEVEL 5867' -4"LEVEL 6880' -8"GF8FED1 1 1A-5027A 7A PT-3PT-3PT-35511NEW WALL CONSTRUCTIONEXISTING WALL8 8 14 NEW WALLEXISTING WALLRB, TYP.EXISTING WALLEQEQ6' - 0"EQEQ24 1KEY NOTES:NEW FRAME AND GLAZING. SEE A-601.WIRELESS WALL MOUNTED ACCESS POINT (SEE ELECTRICAL DRAWINGS)SUSPENDED LIGHT FIXTURE (SEE RCP)UNISTRUT OR KINDORF C-CHANNEL SUSPENDED FROM THREADED ROD FASTENERS TO SLAB ABOVE. HUNG AT 8'-8" AFF.CEILING MOUNTED RETRACTABLE POWER RECEPTACLE(S)DUAL ROLLER WINDOW SHADES WITH FASCIA, ONE SOLAR AND ONE BLACK OUT SHADE. BASIS OF DESIGN URBANSHADE BY MECHOSHADE. PROVIDE AT EACH EXTERIOR WINDOW.NEW ROOM SIGNAGE. SEE .NEW ROOM SIGNAGE. PROVIDE 8.5" X 11" INSERT.WIRE MESH CURTAINS ON UNISTRUT TRACK ASSEMBLY.GLASS MARKERBOARD PANEL ON STAINLESS STEEL SLIDING TRACK HARDWARE SYSTEM.FOAM ACOUSTICAL PANELS ADHERED TO CEILING. WIREMOLD WITH POWER RECEPTACLES.TRANSFER DUCTS. SEE MECHANICAL. COORDINATE FINAL LOCATION IN FIELD WITH ARCHITECT. RECESSED FIRE CABINET.DOOR HOLDER CONNECTION.CABLE TRAY. SEE ELECTRICAL.SMOKE DETECTOR. FIN TUBE RADIATOR COVER.INDICATES NEW SHAFT WALL PARTITION, EXTEND 6" ABOVE FINISHED CEILING, DO NOT DISTURB EXISTING WALL FIRE DAMPERS.RELOCATED CONTROLSWALL STOPPIPING TO SERVICE SINK BELOW, INSTALL TIGHT TO COLUMN, PAINT.ACOUSTICAL WALL TREATMENT, GROOVED AND PERFORATED ACOUSTICAL WOOD PANELEMERGENCY PHONE.RECESSED PROJECT WALL BOX (FUTURE DISPLAY BY OWNER)CUT VINYL LETTERING, COLOR TO BE SELECTED BY ARCHITECT. ½”DEEP AND 3”HIGH MINIMUM. 1 2 3 4 5 6 /1A-6037 8 9 10 11 12 13 14 15 16 17 18 19 20 21 7A 22 23 24 25 1LEVEL 5867' -4"LEVEL 6880' -8"234CORRIDOR50044A-54126 TYP.6"2 10 PT-1PT-213 16 RB, TYP.20 WAP11 PT-4A-5026SIM.PT-611LEVEL 5867' -4"LEVEL 6880' -8"GF8FEDCCORRIDOR500443 4 TYP.TYP.A-50255 TYP.8 TYP.PT-1PT-215 NEW WALLEXISTING WALLEXISTING WALLNEW WALL5"3' - 10" TYP.EQEQ10 9A-5035511551210 TYP.23 S11111LEVEL 5867' -4"LEVEL 6880' -8"234CORRIDOR500443 4 TYP.TYP.7 6 2 10 13 551316 1/2"RB, TYP.EQEQ2 WAPWAPA-5031111 16 A-5037SSPT-6155131LEVEL 5867' -4"LEVEL 6880' -8"FEDCCORRIDOR500443 4 TYP.TYP.5 TYP.6 TYP.A-5416A-5415A-5022A-5022A-50228 TYP.22 TYP.6A-502PT-415 17 TYP.22 15 21 22 TYP.22 TYP.22 TYP.22 TYP.6 TYP.6 TYP.6 TYP.6 TYP.10 TYP.1111GENERAL NOTES:1. FOR POWER / DATA OUTLET LOCATIONS, SEE2. WHERE EXISTING WALL HATCH IS NOTED ON ELEVATIONS IT IS TO DELINEATE NEW VS EXISTING WALL LOCATIONS/ EXISTING WALLS ON OTHER ELEVATIONS ARE NOT ALL INDICATED BY THIS HATCH. 3. ALL ABOVE CEILING ITEMS, INCLUDING PIPING, DUCTS, CONDUITS, ETC. TO BE PAINTED. /1A-121LEVEL 5867' -4"LEVEL 6880' -8"FEPT-3PT-33A-50116 16 18 18 14 RB, TYP.EXISTING WALL19 3' - 10"NEW WALL CONSTRUCTIONEXISTING WALLLEVEL 5867' -4"LEVEL 6880' -8"3PT-3PT-3NEW WALL CONSTRUCTIONEXISTING WALL5513RB, TYP.1 7A LEVEL 5867' -4"LEVEL 6880' -8"GF87 PT-1PT-2A-541916 LEGENDWALL MOUNTED DUPLEX RECEPTACLE (SEE ELECTRICAL PLANS)WALL MOUNTED QUADRUPLEX RECEPTACLE (SEE ELECTRICAL PLANS)GROUND FAULT INTERRUPTER DUPLEX RECEPTACLE (SEE ELECTRICAL PLANS)DATA RECEPTACLE (O.F.C.I.)STROBE LIGHT (SEE ELECTRICAL PLANS)LIGHT SWITCHCARD READERWIRELESS ACCESS POINTSPACE SENSORCRWAPSRevisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 20211/4" = 1'-0"INTERIOR ELEVATIONSA-3011/4" = 1'-0"1WEST ELEVATION @ CORRIDOR1/4" = 1'-0"3INTERIOR ELEVATION IN ROOM 551 LOOKING NORTH1/4" = 1'-0"5INTERIOR ELEVATION IN ROOM 551 LOOKING EAST1/4" = 1'-0"4INTERIOR ELEVATION IN ROOM 551 LOOKING SOUTH1/4" = 1'-0"6INTERIOR ELEVATION IN ROOM 551 LOOKING WEST1/4" = 1'-0"7INTERIOR ELEVATION IN CORRIDOR 50044 LOOKING EAST1/4" = 1'-0"2INTERIOR ELEVATION IN CORRIDOR 50044 LOOKING NORTH1/4" = 1'-0"8INTERIOR ELEVATION IN ROOM 551LOOKING WEST
LEVEL 5867' -4"LEVEL 6880' -8"45EQEQEQEQ12 12 KEY NOTES:NEW FRAME AND GLAZING. SEE A-601.WIRELESS WALL MOUNTED ACCESS POINT (SEE ELECTRICAL DRAWINGS)SUSPENDED LIGHT FIXTURE (SEE RCP)UNISTRUT OR KINDORF C-CHANNEL SUSPENDED FROM THREADED ROD FASTENERS TO SLAB ABOVE. HUNG AT 8'-8" AFF.CEILING MOUNTED RETRACTABLE POWER RECEPTACLE(S)DUAL ROLLER WINDOW SHADES WITH FASCIA, ONE SOLAR AND ONE BLACK OUT SHADE. BASIS OF DESIGN URBANSHADE BY MECHOSHADE. PROVIDE AT EACH EXTERIOR WINDOW.NEW ROOM SIGNAGE. SEE .NEW ROOM SIGNAGE. PROVIDE 8.5" X 11" INSERT.WIRE MESH CURTAINS ON UNISTRUT TRACK ASSEMBLY.GLASS MARKERBOARD PANEL ON STAINLESS STEEL SLIDING TRACK HARDWARE SYSTEM.FOAM ACOUSTICAL PANELS ADHERED TO CEILING. WIREMOLD WITH POWER RECEPTACLES.TRANSFER DUCTS. SEE MECHANICAL. COORDINATE FINAL LOCATION IN FIELD WITH ARCHITECT. RECESSED FIRE CABINET.DOOR HOLDER CONNECTION.CABLE TRAY. SEE ELECTRICAL.SMOKE DETECTOR. FIN TUBE RADIATOR COVER.INDICATES NEW SHAFT WALL PARTITION, EXTEND 6" ABOVE FINISHED CEILING, DO NOT DISTURB EXISTING WALL FIRE DAMPERS.RELOCATED CONTROLSWALL STOPPIPING TO SERVICE SINK BELOW, INSTALL TIGHT TO COLUMN, PAINT.ACOUSTICAL WALL TREATMENT, GROOVED AND PERFORATED ACOUSTICAL WOOD PANELEMERGENCY PHONE.RECESSED PROJECT WALL BOX (FUTURE DISPLAY BY OWNER)CUT VINYL LETTERING, COLOR TO BE SELECTED BY ARCHITECT. ½”DEEP AND 3”HIGH MINIMUM. 1 2 3 4 5 6 /1A-6037 8 9 10 11 12 13 14 15 16 17 18 19 20 21 7A 22 23 24 25 1LEVEL 5867' -4"LEVEL 6880' -8"238' - 0"9 PT-1PT-2LEVEL 5867' -4"LEVEL 6880' -8"GF8FED1 1 1 1 7A 7A PT-3PT-3PT-3551114 RB, TYP.5512EQEQ6' - 0"24 1LEVEL 5867' -4"LEVEL 6880' -8"40' - 2"7' - 0"25 1NOTE:OWNER TO VERIFY FINAL LETTERING0' - 5" TYP.Revisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 20211/4" = 1'-0"INTERIOR ELEVATIONSA-3021/4" = 1'-0"1INTERIOR ELEVATION IN ROOM 571 LOOKING SOUTH1/4" = 1'-0"3INTERIOR ELEVATION AT WHITE BOARD PARTITION - ALTERNATE 21/4" = 1'-0"4WEST ELEVATION @ CORRIDOR - ALTERNATE 11/4" = 1'-0"2SOUTH ELEVATION @ CORRIDOR
PAINTED UNISTRUT C CHANNEL SYSTEMSUSPENDED LED LIGHTSACOUSTIC CEILING PANELSFLOOR CONSTRUCTION ABOVECORNER FITTING SEE /2A-503T-INTERSECTION FITTING SEE /3A-503INTERSECTION FITTING SEE /4A-503NOTE:PROVIDE ALL REQUIRED ACCESSORIES FOR THE METAL GRID SYSTEM, INCLUDING HANGARS, RODS, ATTACHMENT TO DECK ABOVE, NUTS, BOLTS, SLOTTED C CHANNEL, CONNECTION PIECES, BRACING, ETC. PROVIDE MOCKUP GRID AT FULL SIZE IN SINGLE LOCATION TO SERVE AS MODEL FOR THE BALANCE OF THE INSTALLATIONALL COMMENTS OF HANGING METAL GRID SYSTEM SHALL BE PAINTED.ETRACK ATTACHED TO C PANEL, BASIS OF DESIGN CASCADEALUMINUM MESH CURTAIN1/4" DIA. THREADED HANGER ROD. , PROVING BRACING BETWEEN HANGERSWASHER AND BOLT8' - 8"EXISTING STRUCTURAL BEAMEXISTING STRUCTURAL COLUMN BEYONDCENTER MOUNT BEAM CLAMPSREMOVE EXISTING SPRAY-ON FIREPROOFING TO INSTALL BEAM CLIP. INSTALL NEW SPRAY ON FIREPROOFING WHERE DISTURBED. INSTALL GYPSUM BOARD TIGHT TO UNDERSIDE OF SPRAY-ON FIREPROOFING. CARRIER 6" O.C. TYP.1TRACK BRACING 4' O.C.A-5038HANGING WIRE (TYP.)MAIN BEAM (TYP.)ACOUSTIC LAY-IN CEILING PANELS (REFER TO R.C.P. FOR TYPE)EXISTING FLOOR CONSTRUCTION ABOVEREFER TO R.C.P. CEILING HEIGHTCROSS TEE (TYP.)CONTINUOUS 1/2" SHADOW MOULDING PERIMETER (TYP)PARTITION - SEE PLANCEILING HEIGHTREFER TO R.C.P. ANGLE MOLDING REVEAL WIDTH TO MATCH WIDTH OF TEE GRID.ACOUSTIC LAY-IN CEILING PANEL (REFER TO R.C.P. FOR TYPE)FACE OF PARTITION OR FASCIALEVEL 6880' -8"571SEALANTTAPE & SPACKLE, TYP.1 LAYER 5/8" GWB1 LAYER 1" GWB LINER PANELSTEEL J-RUNNER2 LAYER 5/8" GWBCORNER BEADSEALANTEXISTING WALLEXISTING STRUCTURAL BEAMEXISTING FLOOR CONSTRUCTION3 1/8"2 1/2"EXISTING HVAC UNIT9' - 1"A-5028ATTACH SUSPENSION ROD TO THE SOFFITLEVEL 6880' -8"FC-CHANNEL9' - 0"9' - 6"DUCTEXISTING STRUCTURAL BEAMS WITH FIREPROOFINGMETAL STUD AND GYPSUM BOARD BEAM ENCLOSURE. FIREPROOFING TO REMAIN. INSTALL GYPSUM BOARD TIGHT TO UNDERSIDE OF FIREPROOFINGBLACKOUT CURTAIN TRACK (N.I.C.)METAL STUD AND GYPSUM BOARD SOFFIT HUNG FROM CEILING FOR FUTURE BLACKOUT CURTAIN (BLACKOUT CURTAINS AND TRACK BY OWNER)PAINTED C CHANNELTHREADED HANGER RODBRACINGPAINTED C CHANNELPAINTED C CHANNELLEVEL 6880' -8"2EXISTING WINDOWNEW ROLLER SHADESFUR OUT WALL USING 1 5/8" STUD AND 5/8" GWBACOUSTICAL PANELSA-50312A-50313± 11' - 0 1/2"EXISTING STRUCTURAL BEAM WITH FIRE PROOFING1 5/8" STUD2 1/2" STUDALIGNCONTINUOUS WALL TRACKSHIM AS REQUIREDALUMINUM "Z" CLIPALIGNDRIVE CHAINROLLER TUBE AND SHADE ASSEMBLY WITH DOUBLE SHADE1"EDGE BANDALUMINUM "Z" CLIPSHIM AS REQUIREDCONTINUOUS WALL TRACKEXISTING WALL CONSTRUCTIONMATCHING VENEER SPLINERAW SAW-CUT EDGESHIM AS REQUIREDALUMINUM "Z" CLIPCONTINUOUS TRACK1/16"1/8"LEVEL 6880' -8"4EXISTING STRUCTURAL BEAM WITH FIREPROOFINGNEW OR EXISTING CORRIDOR WALL± 10' - 9 1/2"METAL STUD AND GYPSUM BOARD BEAM ENCLOSURE. FIREPROOFING TO REMAIN. Revisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 2021As indicatedDETAILS IIIA-50313D VIEW LOOKING AT THE GRID SYSTEM3" = 1'-0"5SECTION DETAIL AT CURTAIN ROD1 1/2" = 1'-0"6A.C.T. CEILING DETAIL (TYP.)12" = 1'-0"8CEILING EDGE DETAIL1 1/2" = 1'-0"9SOFFIT DETAIL1 1/2" = 1'-0"10SECTION DETAIL AT BLACKOUT BOOTH3" = 1'-0"2CORNER FITTING3" = 1'-0"3T-INTERSECTION FITTING3" = 1'-0"4INTERSECTION FITTING1 1/2" = 1'-0"11SECTION DETAIL AT ACCOUSTICAL PANELS6" = 1'-0"12ACCOUSTIC PANEL ATTACHMENT DETAIL AT BASE6" = 1'-0"13ACCOUSTIC PANEL ATTACHMENT DETAIL AT TOP6" = 1'-0"14ACCOUSTIC PANEL BUTT ATTACHMENT AND CORNER DETAIL1 1/2" = 1'-0"7BEAM ENCLOSURE AT CORRIDOR WALL
-D1-INSULATED - HOLLOW METAL DOORSEE SCHEDULESEE SCHEDULEDOOR TYPESSCALE: 1/2"=1'-0"-D2-FIRE RATED METAL DOOR WITH VISION LITENOTE:GL-11 HOUR RATED GLAZING INCLUDES GLASS PRIVACY FILM, BASIS OF DESIGN: SOLYX SXJ-0561 MATTE FINE DOT GRADIENT 72". GL-2NON RATED DOUBLE GLAZED UNIT INCLUDES GLASS PRIVACY FILM, BASIS OF DESIGN: SOLYX SXJ-0561 MATTE FINE DOT GRADIENT 72". -D3-METAL DOOR WITH VISION LITESEE DOOR SCHEDULEJ4H3S4GL-1H2S1J5GRADIENT FILM6' - 2"3' - 7"2 3/4"2 3/4"2"2"2 3/4"2 3/4"SEE DOOR SCHEDULESEE DOOR SCHEDULEJ4H3S4GL-2J2H2S1PANIC BARJ4H3S3SEE DOOR SCHEDULEGL-1J5H2S12' - 4"GRADIENT FILM6' - 2"3' - 6"2 3/4"2 3/4"2 3/4"2"2"2 3/4"J4H3S3M1EQEQEQEQEQEQEQSEE DOOR SCHEDULESEE DOOR SCHEDULEGL-2GL-2J2H2S12' - 4"GRADIENT FILM6' - 2"2 3/4"2 3/4"PANIC BARSIM.2 3/4"2 3/4"2 3/4"22' - 3"9' - 10 1/2"2"2 3/4"15' - 8"-F1-FIRE RATED STEEL FRAMED ENTRANCE AND STOREFRONT SYSTEM-F2-STEEL FRAMED ENTRANCE AND STOREFRONT SYSTEMFRAME TYPESSCALE: 1/2"=1'-0"-F6-ALTERNATE BID 1 ONLYFIRE RATED STEEL FRAMED ENTRANCE AND STOREFRONT SYSTEM-F5-ALTERNATE BID 1 ONLYSTEEL FRAMED ENTRANCE AND STOREFRONT SYSTEM0' - 2"DOOR SIZESEE SCHEDULE-F4-FIRE RATED METAL FRAME SYSTEM0' - 2"DOOR SIZESEE SCHEDULE-F3-FULLY WELDED INSULATED HOLLOW METALJ3H1J2H2S10' - 2"0' - 2"SIM.GL-2GL-2REMOVABLE MULLION WHERE SPECIFIEDPANIC BARSEE SCHEDULESEE SCHEDULE10"GL-1Revisions:Issue for BidRichard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 TRyan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Scale:January 20, 2021Rhodes HallFifth Floor Renovation Cornell UniversityIthaca, NY 14850 1 Addendum #1December 15, 2020 January 20, 20211/2" = 1'-0"DOOR AND GLAZING SCHEDULEA-601500/1 CORRIDOR 1 HR EXISTING EXISTING 26' - 0"8' - 8"0' - 2"EXISTING HMPNT SET 3 H1J1-EXISTING DOOR AND FRAME - SALAVAGE AND REINSTALL551/1 LABORATORY 1 HR D2HM / GLASS 13' - 0"8' - 6"0' - 2"F1STL PNT SET 1 H2J5S1PROVIDE ACCESS CONTROL. RATED DOORS INSTALLATION AND GAP MEASUREMENT MUST COMPLY WITH NFPA 80 STANDARD.551/2 LABORATORY NONE D3HM / GLASS 26' - 0"8' - 6"0' - 2"F2STL PNT SET 2 H2J2S1PROVIDE ACCESS CONTROL. 3/4" UNDERCUT551/3 LABORATORY NONE D3HM / GLASS 26' - 0"8' - 6"0' - 2"F4STL PNT SET 2 H2J2 SIM. S1PROVIDE ACCESS CONTROL. 3/4" UNDERCUT551A/1 STORAGE NONE D1HM12' - 6"7' - 0"0' - 2"F1HM PNT SET 4 H1J3-3/4" UNDERCUT551B/1 STORAGE NONE D1HM13' - 0"7' - 0"0' - 2"F1HM PNT SET 4 H1J3-3/4" UNDERCUT551/1 LABORATORY 1 HR D2HM / GLASS 13' - 0"8' - 6"0' - 2"F6STL PNT SET 1 H2J5S1ALTERNATE BID 1 ONLY. PROVIDE ACCESS CONTROL. RATED DOORS INSTALLATION AND GAP MEASUREMENT MUST COMPLY WITH NFPA 80STANDARD.551/2 LABORATORY NONE D3HM / GLASS 26' - 0"8' - 6"0' - 2"F5STL PNT SET 2 H2J2S1ALTERNATE BID 1 ONLY. PROVIDE ACCESS CONTROL. 3/4" UNDERCUTGENERAL NOTES:1. ALL INTERIOR DOOR HARDWARE LOCK SETS ARE SARGENT "STANDARD LEVER, STYLE J" MORTISE LOCKS/EXIT DEVICES OR APPROVEDEQUAL.2. REFER TO FLOOR PLAN FOR DOOR SWING.3. A SOLID WALL FROM TOP OF FRAME TO UNDERSIDE OF STRUCTURE ABOVE SHALL BE CONSTRUCTED ABOVE ALL FRAMES, INCLUDEBRACING AT DOOR OPENINGS. PROVIDE HEADER AND/OR LINTEL AS REQUIRED TO SUPPORT WALL CONSTRUCTION AT HEAD OF ALLFRAMES. SEE WALL PARTITIONS A-603.4. ALL CYLINDERS/KEYING TO BE ‘BEST’.5.SEE SPECIFICATIONS FOR GLAZING TYPES.6. PROVIDE ALL ACCESS CONTROL COMPONENTS AND ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION AND FUNCTIONINGSYSTEM. INSTALLATION AND COMMISSIONING TO BE COORDINATED WITH THE OWNER.7. OPENING FORCE ON ALL DOORS SHALL NOT EXCEED 5 POUNDS.8. HARDWARE SHALL COME FROM A SINGLE SOURCE. SUBSTITUTIONS TO THE SETS BELOW IS SUBJECT TO APPROVAL BY ARCHITECT ANDUNIVERSITY.9.SEE THE POWER AND COMMUNICATIONS PLAN AND ELECTRICAL DRAWINGS FOR ADDITIONAL ACCESS CONTROL REQUIREMENTS ANDDIAGRAMS.10.DOOR CLOSERS, WHERE SCHEDULED, SHALL BE LOCATED ON THE INTERIOR (NON-CORRIDOR) SIDE.11.POWER SUPPLY BPS-24-1 SHALL BE INCLUDED FOR EACH ELECTRIFIED MORTISE LOCKSET. READER INTERFACE MODULES TO BE FIELDLOCATED ON THE INTERIOR SIDE OF THE DOOR.12.INSTALL ALL FIRE RATED GLAZING PER MFR. INSTRUCTIONS TO MAINTAIN REQ'D RATING.13.POWER TRANSFER (WHERE SCHEDULED) SHALL BE LOCATED BETWEEN MIDDLE AND TOP HINGE.14.SEE SPECIFICATIONS FOR DOOR HARDWARE SETS.-ALT 1-ALT 1DOOR AND FRAME SYSTEM SCHEDULEDOOR NO. ROOM NAMEFIRERATINGDOOR TYPEDOORMATERIAL# OFLEAFSDOORFRAME TYPEFRAMEMATERIALFINISHHARDWARESETHEADDETAILJAMBDETAILSILL DETAILCOMMENTSWIDTH HEIGHT THICKNESS50021/1 WOMEN 1 HR EXISTING EXISTING 13' - 0"7' - 0"0' - 2"EXISTING HM PNT SET 5 H1J3-50022/1 MEN1 HR EXISTING EXISTING 13' - 0"7' - 0"0' - 2"EXISTING HM PNT SET 5 H1J3-1
GWBGYPSUM WALL BOARD*SECTION 092900 - GYPSUM WALL BOARD*SEE PARTITION TYPES FOR GWB TYPESGWB-IRIMPACT RESISTANT GWBSECTION 092900 - GYPSUM WALL BOARDCEILINGGWBPAINTED GYPSUM BOARDSECTION 092900 - GYPSUM DRYWALLACT-1CEILING PANEL SECTION 095113 - ACOUSTIC PANEL CEILINGSEE SPECIFICATIONSSEE SPECIFICATIONSSEE SPECIFICATIONSULTIMA TILE WITH REGULAR EDGE AND PRELUDE XL SUSPENSION SYSTEM BY ARMSTRONGCODEDEFINITIONSPECIFICATIONFLOOREXPOSED CONC. EXISTING CONCRETESECTION 096726 - RESINOUS FLOORINGCPT-1CARPET TILESECTION 096813 - TILE CARPETINGBASERB-1 THERMOSET RUBBER BASE - COLOR 1SECTION 096512 - RESILIENT BASE AND ACCESSORIESWALLSPRODUCTSIKAFLOOR 160 (PRIMER), SIKAFLOOR 217 (CLEAR EPOXY COAT), SIKAFLOOR 315N (CHEMICAL RESISTANT CLEAR URETHANE), AND SIKAFLOOR 2870 (LINE STRIPING)HONOR ROLL COLLECTION, STYLE "CUBIC," BY INTERFACEJOHNSONITE 6" RUBBER BASEAPT - 1 ACOUSTICAL WALL TREATMENTSECTION 098414 - ACOUSTICAL WALL TREATMENTDECOUSTICS SOLO GROOVED WOOD PANELPAINTPT - 1 PAINT - WALL GENERALSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONSAFP - 1ACOUSTICAL CEILING TREATMENTSECTION 098400 - ACOUSTICAL CEILING TREATMENTSONEX TEC WEDGE FOAM BY ACOUSTICAL SOLUTIONSPT - 2 PAINT - UPPER WALLSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONSPT - 3 PAINT - WALL GENERAL, CORRIDORSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONSPT - 4PAINT - BLACKOUT BOOTHSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONSPT - 5 PAINT - CEILINGSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONSWINDOW TREATMENTSWT-1MANUAL OPERATED WINDOW SHADE WITH SINGLE ROLLERSECTION 122413 - WINDOW SHADESDUAL ROLLER URBANSHADE BY MECHOSHADEPLASTIC LAMINATEPL-1PLASTIC LAMINATE WINDOW SILL SECTION 062000 WILSONART HPL (HIGH PRESSURE LAMINATE) PT - 6 PAINT - ACCENT PAINTSECTION 099000 - PAINTING AND FINISHESSEE SPECIFICATIONS11UNDERSIDE OF FLOOR CONSTRUCTIONSTEEL STUD(1) LAYER 5/8" WALLBOARDEACH SIDE.SCHEDULED FLOOR FINISH AND BASECONTINUOUS FIRERATED SEALANT TYPICAL BOTH SIDES AND AT VERTICAL INTERFACE AT FIRE RATED PARTITIONS. CONTINUOUS ACOUSTIC SEALANT TYPICAL BOTH SIDES AND VERTICAL INTERFACE AT NON-RATED PARTITIONS.CONTINUOUS STEEL RUNNERA: NON RATEDALL NOTES REFER TO BOTH SIDES OF PARTITION, U.O.N. GAUGE AND SPACING AS REQUIRED TO MEET SPAN AND DEFLECTION REQUIREMENTSCONTINUOUS FIRERATED SEALANT TYPICAL BOTH SIDES AND VERTICAL INTERFACE AT FIRE RATED PARTITIONS.CONTINUOUS ACOUSTIC SEALANT TYPICAL BOTH SIDES AND VERTICAL INTERFACE AT NON-RATED PARTITIONS.CONTIN. STL RUNNER DEFLECTION TRACK TYPICAL. PROVIDE MOVEMENT GAPPARTITION: NON RATED A14 7/8"(3 5/8" STUD)ASTUD DEPTHS BASED ON THE FOLLOWING: 2 1/2" STUDS MAX HEIGHT 11'-3" 3 5/8" STUDS MAX HEIGHT 16'-5" 4" STUDS MAX HEIGHT 18'-4" TOP OF EXIST. FLOOR CONSTRUCTION, U.O.N.SEE FINISH SCHEDULEFOR WALL FINISH.PLANNOTESHEADBASEBPARTITION-1 HOUR RATEDASSEMBLY TO COMPLY WITH UL U419B1B: 1 HOUR-RATEDWIDTH TO MATCH ADJACENT EXISTINGPLANNOTESHEADC: 2 HOUR RATEDSHAFT WALL -2 HOUR RATEDASSEMBLY TO COMPLY WITH UL U415C15"2 1/2" STUDC(2) LAYER 1/2" FIRECODE C GWBUNDERSIDE OF FLOOR CONSTRUCTIONCONTINUOUS FIRE RATED SEALANT BOTH SIDES AND VERTICAL INTERFACE TYPICALCONTIN. STL RUNNER DEFLECTION TRACK TYPICAL. PROVIDE MOVEMENT GAP STEEL STUDSCHEDULED FLOOR FINISH AND BASECONTINUOUS FIRE RATED SEALANT BOTH SIDES AND VERTICAL INTERFACE TYPICALCONTINUOUS STEEL RUNNERTOP OF EXIST. FLOOR CONSTRUCTION, U.O.N.1 1/2" THERMAFIBER SOUND ATTENUATION FIRE BLANKET1" SHAFT WALL LINERBASEPLANNOTESHEADSCHEDULED FLOOR FINISH AND BASEACOUSTICAL CAULKINGUNDERSIDE OF FLOOR CONSTRUCTIONCONTINUOUS ACOUSTICAL SEALANTWALL FURRING -NON RATEDNO ACOUSTIC BATTETOP OF EXIST. FLOOR CONSTRUCTION, U.O.N.RESILIENT CHANNELBASEE: INSULATEDE14 1/8"1/2" RESILIENT CHANNELSCHEDULED WALL FINISH5/8" WALLBOARD3/4" PLYWOODMINERAL WOOL AS PER FIRE RATED MASTIC MANUFACTURER'S RECOMMENDATION1/2" AIR SPACEPLANNOTESHEADFULL HEIGHT SOUND ATTENUATIONBLANKET AT PARTITION TYPE P U.O.N.D: NON-INSULATEDTYPICAL:1. WIDTH VARIES, SEE PLAN2. ANCHOR STUD TO EXISTING WALL CONSTRUCTION, SPACE CLIPS EQUALLY AS REQUIRED PER MANUFACTURERS SPECIFICATION FOR HEIGHT OF FURRED WALLUNDERSIDE OF FLOOR CONSTRUCTIONNOTE: STUD DEPTHS BASED ON BRACING BACK TO STRUCTURE AS REQUIRED CONTIN. STL RUNNER DEFLECTIONTRACK TYPICAL. PROVIDEMOVEMENT GAP AS REQUIRED BYSTRUCTURALCONTINUOUS ACOUSTICAL SEALANTWALL FURRING -NON RATEDWITH INSULATIOND15 1/4"3 5/8" STUD WITH 1/2"SPACESTUD DEPTHS BASED ON THE FOLLOWING: 1 5/8" STUDS MAX HEIGHT 11'-0" 2 1/2" STUDS MAX HEIGHT 12'-6" 3 5/8" STUDS MAX HEIGHT 18'-7" D23 5/8"2 1/2" STUD WITH 1/2"SPACEBASESCHEDULED WALL FINISH.SCHEDULED FLOOR FINISH AND BASEACOUSTICAL CAULKINGSTEEL RUNNERTOP OF EXIST. FLOOR CONSTRUCTION, U.O.N.D000RAISED CHARACTERS AND BRAILLEPLASTIC SIGN FIELD1/8" SLIDING ACRYLIC LENS INSERTED INTO C-CHANNEL SHAPE FOR PAPER INSERT INSTALLATIONSPACE FOR PAPER INSERT0.06" CLEAR ACRYLIC UNDERSIZED BACKERPROVIDE BACK PLATE (SAME SIZE AND COLOR AS SIGN) WHEN MOUNTING ON GLASSRAISED CHARACTERS AND BRAILLEPLASTIC SIGN FIELD1/8" SLIDING ACRYLIC LENS INSERTED INTO C-CHANNEL SHAPE FOR PAPER INSERT INSTALLATIONSPACE FOR PAPER INSERTPROVIDE BACK PLATE (SAME SIZE AND COLOR AS SIGN) WHEN MOUNTING ON GLASSINTERIOR ROOM IDENTIFICATION SIGNAGE:1. A ROOM SIGN, AS DETAILED HERE, SHALL BE PROVIDED AND INSTALLED FOR EACH NEW DOOR IN THE PROJECT AREA.2. WHEN MOUNTING ON GLASS, PROVIDE BACKING (SAME SIZE AS SIGN) ON OPPOSITE SIDE OF THE GLASS.3. SUBMIT SHOP DRAWINGS SHOWING SCHEDULE LAYOUT, PROFILES AND PRODUCT COMPONENTS, INCLUDING MATERIAL DETAILS, DIMENSIONS, ANCHORAGE, AND ACCESSORIES FOR ARCHITECT'S REVIEW AND APPROVAL BEFORE STARTING FABRICATION.4. ALL SIGNAGE SYSTEMS SHALL MEET REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) AND LOCAL AMENDMENTS AND MODIFICATIONS.5. RAISED LETTERING AND/OR NUMERALS: COMPUTER-CUT CHARACTERS WITH MATTE FINISH, COLOR AS SPECIFIED FROM MANUFACTURER'S STANDARD COLOR CHART. SHALL EXTEND A MINIMUM OF 1/32" FROM THE SIGN SURFACE. PHOTOPOLYMER TAGS SHALL NOT BE ACCEPTABLE.6. GRADE 2 BRAILLE: CLEAR RASTER BALLS COMPUTER DRILLED AND PRESSURE INSERTED INTO SIGN FACE, SHALL BE HALF-HEMISPHERE IN SHAPE AND SHALL EXTEND A MINIMUM OF 0.025" FROM THE SIGN SURFACE. OTHER METHODS OF MANUFACTURE, INCLUDING SURFACE APPLIED PHOTOPOLYMER BRAILLE TAGS SHALL NOT BE ACCEPTABLE.7. FASTENER: VERY HIGH BOND (VHB) .030 INCH THICK DOUBLE-FACE TAPE.FINISHES:1. COLORS AS SELECTED FROM THE MANUFACTURER'S STANDARD CHART.2. PATTERNS: AS SELECTED FROM THE MANUFACTURER'S STANDARD CHART.1' - 0"0' - 9 1/2"7/8" THUMBSLOT0' - 8 3/8"0' - 10 7/8"0' - 11"1/8" ACRYLIC BACKERINSERT SLOTVINYL TAPEFILLER1/16" NON-GLARE ACRYLICFILLER1/16" NON-GLARE ACRYLICRevisions:Issue for Bid December 15, 2020Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20 Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper Road Endwell, NY 13760607-231-6674 TTrophy Point4588 South Park AvenueBlasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850January 20, 2021Scale:Fifth Floor Renovation 1 Addendum #1 January 20, 2021As indicatedFINISH SCHEDULE & PARTITIONTYPESA-6036" = 1'-0"1ROOM SIGNAGE DETAIL6" = 1'-0"2ROOM SIGNAGE DETAILFINISH SCHEDULEROOMNUMBERROOM NAME FLOOR FINISHBASEFINISHWALL FINISHCEILING FINISH COMMENTSNORTH EAST SOUTH WEST50044 CORRIDOR CP-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACT551 LABORATORY EXPOSED CONC. RB-1 PT-1 PT-1 PT-1 PT-1 EXPOSED, PNT-5 INCLUDE FLOOR PAINT MARKING ON EXPOSED CONCRETE551B STORAGE EXPOSED CONC. RB-1 PT-1 PT-1 PT-1 PT-1 EXPOSED, PNT-5551A STORAGE EXPOSED CONC. RB-1 PT-1 PT-1 PT-1 PT-1 EXPOSED, PNT-5
CR CR CR
CR CR CR CR
CRCRCRCR
CR CR CR CR
CRCRCRCR
CRCR
CRCR
J
J
J
J
J
M
M
G
F8
F
E
D
C
B
A
1 2 4 5 6 7
G5
H5
X1 K
11
10
9
8
12
13
14
X
Room
571
GRAD.
STUDENTS
596
GRAD.
STUDENTS
594
STAFF
592
STAFF
590
ASSOC.
DIRECTOR
588
LIBRARY
586
CLERICAL
584
DIRECTOR
582
GRAD.
STUDENTS
580
Room
578
Room
576
Room
574
Room
572
LABORATORY
551
STAIR# 3
50003
LABORATORY
551
Room
50073
WOMEN
50021
Room
50063
Room
50062
Room
50061
DATA CLOSET
552
LOUNGE
568
ELEC. CLOSET
50075
MEN
50022
Room
50076
CORRIDOR
50044
CORRIDOR
50044
Room
523
Room
521A
Room
520
Room
521
Room
519
Room
517
Room
518
Room
516
Room
512
Room
514
Room
514B
Room
504A
Room
508
STAIR# 2
50002
Room
500
SHOP
501
Room
503
Room
502
Room
504
(E)LP-5(1)
(E)LP-5(2)
(E)DP-5AC1
(E)DP-CC1
(E)UP-5A
(E)UP-5B
(E)UP-5ET TT(E)
(E)
(E)
(E)(E)
(E)
1
1
1
(E)
GFI
OC
GFI
1
351
2
3
3
3
4
4 4
28
5
50 47 6
7
8
910
11
12
35
12
12
39
14
16 17
15 30
18 19 32 34
20 21 36 38
22 23 40 42
24 25 44 46
27 26 48
VAV
VAV
29
29
GFI12
2 TUP-5LAB
NTX-45-5
GFIGFI
5
5
3133 41
43
45
49
54
3
37
41
45
47
67
54
51
3
4
4
4
4
4
4
4
4
(E)
VAV
55
57
5
5
12
OC
GFI
69
67
65
63
71 71
OC
GFI
OC
GFI
DOOR OPERATOR
DOOR OPERATOR
6
6
UP-5LAB
66
UP-5LAB
66
13
53
7
1
41
E-200 GENERAL NOTES:
A. ALL CIRCUITING SHOWN IN THIS LAB SPACE SHALL BE FED FROM PANEL UP-5LAB.
B. CORD REEL SHALL BE FED FROM A JUNCTION BOX BY 15' OF SO CABLE. POWER CONNECTION TO JUNCTION BOX
SHALL BE FED BY EMT FROM SOURCE PANEL.
C. ALL GFI RECEPTACLES NEAR SINKS SHALL BE GASKETED GFI RATED FOR WASHDOWN APPLICATIONS.
D. CONTRACTOR SHALL COORDINATE WITH END USER FOR CEILING HOOK LOCATIONS TO MOUNT CORD REEL.
E. CONTRACTOR SHALL PROVIDE KINDORF WITH RACK FOR CORD REEL PERMANENT LOCATION WHEN NOT IN USE
ABOVE CEILING. THIS LOCATION SHALL BE COORDINATED IN FIELD AROUND OTHER CONTRACTORS SCOPE AND BE
COORDINATED WITH END USER AND ARCHITECT SO THAT IT IS IN AN EASILY ACCESSIBLE LOCATION.
F. DISCONNECT AND RECONNECT VAV AS NECESSARY. CONFIRM WITH MECHANICAL CONTRACTOR FOR EXACT
LOCATIONS.
Revisions:
Richard McElhiney Architects LLC
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Jacobs
303 South Broadway, Suite G20
Tarrytown NY 10591
914-841-1069 T
M/E Engineering, P.C.
300 Trolley Boulevard
Rochester, NY 14606
585-288-5590 T
Ryan Biggs Clark Davis
257 Ushers Rd
Clifton Park, NY 12065
518-406-5506 T
Delta
860 Hooper Road
Endwell, NY 12065
518-406-5506
Trophy Point
4588 South Park Avenue
Blasdell, New York 14219
716-823-0006 T
Key Plan:
Notes:
Rhodes Hall
Cornell University
Ithaca, NY 14850
December 15, 2020
Scale:
Fifth Floor Renovation
As Indicated
Issue for Bid December 15, 2020
PARTIAL FIFTH FLOOR PLAN -
POWER NEW WORK
E-200
1/8" = 1'-0"
1 PARTIAL FIFTH FLOOR PLAN - POWER NEW WORK
E-200 DRAWING NOTES
1 DEDICATED RECEPTACLE SHALL BE MOUNTED UNDERCOUNTER ON A DEDICATED CIRCUIT TO SERVE THE DRAIN
PUMP THAT WILL BE INSTALLED UNDERNEATH SINK.
2 RECEPTACLE SHALL BE MOUNTED IN ABOVE COUNTER CABINETS THAT WILL FEED UNDERCABINET LIGHTING.
RECEPTACLE SHALL BE TIED INTO RECEPTACLE CIRCUIT #12.
3 WIREMOLD THAT SHALL FEED THESE (2) RECEPTACLES SHALL RUN ALONG WALL INTO AND BEHIND THE CABINET.
RECEPTACLES SHALL BE FLUSH MOUNTED TO SIDE OF CABINET.
4 RECEPTACLES SHALL BE FED FROM 2 CHANNEL ANODIZED CLEAR FINISH WIREMOLD. RECEPTACLES SHALL BE
MOUNTED AT 36" AFF.
5 JUNCTION BOX SHALL FEED (3) LAB VALVE BOXES. 20A-1P CIRCUIT SHALL FEED THEM, CIRCUIT NUMBER AS
INDICATED. FINAL JUNCTION BOX LOCATION SHALL BE DETERMINED IN FIELD. FIELD COORDINATE WITH
MECHANICAL CONTRACTOR.
6 PROVIDE WIRING IN 3/4" CONDUIT PER MANUFACTURER REQUIREMENTS.
7 CONTRACTOR SHALL CONFIRM WITH ARCHITECT DRAWINGS FOR FINAL LOCATION AND MOUNTING HEIGHT FOR
PWB-270 CRESTRON WALL BOX, THAT CONTRACTOR SHALL PROVIDE. CONTRACTOR SHALL PROVIDE 120V
POWER CONNECTION TIED INTO NEAREST RECEPTACLE AVAILABLE.1
1 Addendum #1 January 20, 2021
TGBCPABCDEWAP
WAP
WAP
CR CRCRDC
DC
DC
G
F8
F
E
D
C
B
A
1 2 4 5 6 7
G5
H5
X1
K
11
10
9
8
12
13
14
X
Room
571
GRAD.
STUDENTS
596
GRAD.
STUDENTS
594
STAFF
592
STAFF
590
ASSOC.
DIRECTOR
588
LIBRARY
586
CLERICAL
584
DIRECTOR
582
GRAD.
STUDENTS
580
Room
578
Room
576
Room
574
Room
572
LABORATORY
551
STAIR# 3
50003
LABORATORY
551
Room
50073
WOMEN
50021
Room
50063
Room
50062
Room
50061
DATA CLOSET
552
LOUNGE
568
ELEC. CLOSET
50075
MEN
50022
Room
50076
CORRIDOR
50044
CORRIDOR
50044
Room
523
Room
521A
Room
520
Room
521
Room
519
Room
517
Room
518
Room
516
Room
512
Room
514
Room
514B
Room
504A
Room
508
STAIR# 2
50002
Room
500
SHOP
501
Room
503
Room
502
Room
504
(E)
(E)
(E)
1
1 1
1
1
1
1
1
2
3
1
E-202 GENERAL NOTES:
A. TIE CARD READER INTO NEAREST EXISTING RECEPTACLE CIRCUIT.
B. NEW CABLE TRAY SHALL BE 12" WIDE.
C. PROVIDE (3)20A-1P CIRCUIT FOR DOOR HARDWARE CONTROLS FROM PANEL UP-5LAB.
D. EXISTING CABLE TRAY IN LABORATORY MAY NEED TO BE REMOVED AND RELOCATED DEPENDING ON EXISTING
HEIGHT. CABLE TRAY SHALL BE LOCATED BETWEEN 9'-0" & 9'6".
Revisions:
Richard McElhiney Architects LLC
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Jacobs
303 South Broadway, Suite G20
Tarrytown NY 10591
914-841-1069 T
M/E Engineering, P.C.
300 Trolley Boulevard
Rochester, NY 14606
585-288-5590 T
Ryan Biggs Clark Davis
257 Ushers Rd
Clifton Park, NY 12065
518-406-5506 T
Delta
860 Hooper Road
Endwell, NY 12065
518-406-5506
Trophy Point
4588 South Park Avenue
Blasdell, New York 14219
716-823-0006 T
Key Plan:
Notes:
Rhodes Hall
Cornell University
Ithaca, NY 14850
December 15, 2020
Scale:
Fifth Floor Renovation
As Indicated
Issue for Bid December 15, 2020
PARTIAL FIFTH FLOOR PLAN -
SPECIAL SYSTEMS NEW WORK
E-202
1/8" = 1'-0"
1 PARTIAL 5TH FLOOR PLAN - SPECIAL SYSTEMS
E-202 DRAWING NOTES
1 THE 2 CHANNEL WIREMOLD SHALL HAVE 6 DATA PORTS ABOVE THE RECEPTACLES.
2 (1) TELEPHONE CONNECTION FOR AN EMERGENCY PHONE. REFER TO ARCHITECT
DRAWINGS FOR FINAL EM PHONE LOCATION.
3 (1) NETWORK CONNECTION FOR PWB-270 CRESTRON WALL BOX. REFER TO ARCHITECT
DRAWINGS FOR FINAL LOCATION AND MOUNTING HEIGHT.
1 Addendum #1 January 20, 2021
1
H-501
1
NOT TO SCALE
STEAM LOAD SHED MATRIX
CONTROL POINT LOAD SHED-1 STEAM LOAD SHED-2 STEAM LOAD SHED-3 STEAM LOAD SHED-4 STEAM LOAD SHED-5 STEAM LOAD SHED-6 STEAM
ZONE CONTROL
NON-RESEARCH SPACES INDEX SPACE TO UNOCCUPIED MODE INDEX TEMPERATURE SET POINT TO 60 DEG F
RESEARCH SPACES INDEX SPACE TO UNOCCUPIED MODE, RESETTABLE TO OCCUPIED MODE SPACE TEMPERATURE SET POINT TO 60 DEG F
INDEX SPACE AIR CHANGE RATE TO MIN UNPCCUPIED AC/PH AND
CRITICAL SPACES (2)UNDER CONTROL
AIR HANDLING SYSTEM CONTROL
100% OUTSIDE AIR SYSTEMS - NON CRITICAL UNDER CONTROL TEMPERATURE TO 55 DEG F
INDEX DISCHARGE AIR INDEX UNIT "OFF"
100% OUTSIDE AIR SYSTEMS - CRITICAL (2)UNDER CONTROL INDEX DISCHARGE AIR TEMPERATURE TO 55 DEG F (1)
LABORATORY MAKE-UP AIR SYSTEMS UNDER CONTROL INDEX DISCHARGE AIR TEMPERATURE TO 55 DEG F (1)
LABORATORY EXHAUST SYSTEMS UNDER CONTROL
HYDRONIC SYSTEM CONTROL
REHEAT LOOP SYSTEM - NON CRITICAL UNDER CONTROL
SCHEDULE, WHICHEVER IS LOWER
DEG F OR MAINTAIN RESET
INDEX LOOP TEMPERATURE TO 140
CLOSE STEAM VALVE, PUMPS "ON"
REHEAT LOOP SYSTEMS - CRITICAL (2)UNDER CONTROL
GLYCOL HEATING LOOP SYSTEM UNDER CONTROL
NOTES:
(1)RETAIN ORIGINAL SET POINT IF LOWER THAN 55 DEG F.
(2)THE DETERMINATION OF WHETHER A SYSTEM OR ZONE IS CONSIDERED "CRITICAL" SHALL BE DETERMINED ON A CASE-BY-CASE BASIS.
GENERALLY ANIMAL ROOMS, SERVER ROOMS AND LIBRARIES ARE THE ONLY SPACES THAT ARE PREQUALIFIED AS "CRITICAL"
EACH PROJECT SHALL CONDUCT AN INDEPENDENT MEETING WITH THE PRIMARY PURPOSE OF MAKING LOAD SHED DECISIONS
CHILLED WATER LOAD SHED MATRIX
NOT TO SCALE
STEAM LOAD SHED MATRIX
CONTROL SCHEMATICS
AND SYSTEM SUMMARIES
GS
GR
AI
P
BO
M
VFDS
S
SCAO
COM
R BI
- AV: SPEED (RPM)
- AV: POWER (KW)
TYPICAL VFD CONTROL/MONITORING POINTS
T
AI
T
AI
SETPOINT
AV
SETPOINT
AV
M
VFD
M
VFD
P BI
BACnet
REFER TO PLANS FOR LOCATION
PRESSURE TRANSDUCER.
REMOTE DIFFERENTIAL STATIC
NOT TO SCALE
REHEAT HOT WATER SYSTEM CONTROL SCHEMATIC AND SYSTEM SUMMARY3
P-18
P-19
SYSTEM DESCRIPTION
REHEAT HOT WATER LOOP HEAT EXCHANGER (CV-7A & CV-7B)
REHEAT HOT WATER LOOP PUMPS (P-19, P-20)
GENERAL
CONTROL SYSTEM (BACS).
SYSTEM SHALL BE CONTROLLED THROUGH THE BUILDING AUTOMATION AND
ALL SETPOINTS SHALL BE ADJUSTABLE.
SETTING DURING A LOSS OF POWER FOR AT LEAST TEN HOURS.
THE BACS SHALL BE CAPABLE OF RETAINING ITS PROGRAMMING AND TIME
SETPOINTS
REHEAT HOT WATER LOOP SUPPLY TEMPERATURE: 13
DIFFERENTIAL PRESSURE: XX PSI (ADJ)
START/STOP
WITH THE SYSTEM ARE OPEN AND CALLING FOR DEMAND.
SYSTEM SHALL BE ENABLED WHEN 10% OF THE CONTROL VALVES ASSOCIATED
AND THE LEAD PUMP SHALL INDEX TO STANDBY AND BE OFF.
HOURS OF OPERATION THE STANDBY PUMP SHALL INDEX TO LEAD AND RUN,
THE LEAD PUMP SHALL START, STANDBY PUMP SHALL BE OFF. AFTER 1000
AND RUN.
ON FAILURE OF THE LEAD PUMP, THE STANDBY PUMP SHALL INDEX TO LEAD
SPEED CONTROL
CRITICAL ZONE CONTROL VALVE POSITION AT 95% OPEN.
LOOP DIFFERENTIAL SETPOINT SHALL BE RESET AS NEEDED TO MAINTAIN THE
REQUIRED TO MAINTAIN THE LOOP DIFFERENTIAL PRESSURE SETPOINT. THE
WHEN ENABLED, PUMP SHALL MODULATE VIA VARIABLE FREQUENCY DRIVE AS
REHEAT HOT WATER LOOP CONTROL
TO LEAD AND THE LEAD HEAT EXCHANGER SHALL INDEX TO LAG.
BE CLOSED. AFTER 1000 HOURS (ADJ) THE LAG HEAT EXCHANGER SHALL INDEX
EXCHANGER ISOLATION CONTROL VALVE AND STEAM CONTROL VALVE SHALL
WATER REHEAT LOOP SUPPLY WATER TEMPERATURE SETPOINT. THE LAG HEAT
STEAM CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN THE HOT
THE LEAD HEAT EXCHANGER ISOLATION CONTROL VALVE SHALL OPEN AND THE
EXCHANGER SHALL INDEX TO LEAD.
ON FAILURE OF THE LEAD EXCHANGER CONTROL VALVE(S), THE LAG HEAT
CHILLED WATER LOAD SHED MATRIX
CONTROL POINT DAYTIME (DEFCON 3)
LOAD SHED 1 - CHILLED WATER
(DEFCON 2)
LOAD SHED 2 - CHILLED WATER NIGHT
EMERGENCY (DEFCON 1)
LOAD SHED 3 - CHILLED WATER
EMERGENCY (DEFCON)
LOAD SHED 4 - CHILLED WATER LCS
ZONE CONTROL
NON-RESEARCH SPACES
INDEX SPACE TO UNOCCUPIED MODE
UNDER CONTROL
CHILLED WATER COIL CONTROL VALVE INDEX CHILLED WATER COIL CONTROL VALVE CLOSED
RESEARCH SPACES INDEX SPACE TO UNOCCUPIED MODE, RESTTABLE TO OCCUPIED MODE VALVE CLOSED
INDEX CHILLED WATER CONTROL
CRITICAL SPACES (2)UNDER CONTROL
AIR HANDLING SYSTEM CONTROL
100% OUTSIDE AIR SYSTEMS - NON CRITICAL SET POINT TO 65 DEG F (1)
INDEX DISCHARGE AIR TEMPERATURE
SET POINT TO 70 DEG F (1)
INDEX DISCHARGE AIR TEMPERATURE
SET POINT TO 75 DEG F (1)
INDEX DISCHARGE AIR TEMPERATURE
VALVE CLOSED
INDEX CHILLED WATER CONTROL
100% OUTSIDE AIR SYSTEMS - CRITICAL (2)UNDER CONTROL
LABORATORY MAKE-UP AIR SYSTEMS UNDER CONTROL SET POINT TO 65 DEG F (1)
INDEX DISCHARGE AIR TEMPERATURE
LABORATORY EXHAUST SYSTEMS UNDER CONTROL
HYDRONIC SYSTEM CONTROL
BUILDING RECIRCULATION LOOP - NON CRITICAL INDEX CHILLED WATER TEMPERATURE TO 53 DEG F INDEX PUMPS "OFF" AND OPEN RECICULATING LOOP VALVE TO 100%
BUILDING RECIRCULATION LOOP - CRITICAL (2)UNDER CONTROL
NOTES:
(1)RETAIN FREE COOLING IF REQUIRED AND AVAILABLE
(2)THE DETERMINATION OF WHETHER A SYSTEM OR ZONE IS CONSIDERED "CRITICAL" SHALL BE DETERMINED ON A CASE-BY-CASE BASIS.
GENERALLY ANIMAL ROOMS, SERVER ROOMS AND LIBRARIES ARE THE ONLY SPACES THAT ARE PREQUALIFIED AS "CRITICAL"
EACH PROJECT SHALL CONDUCT AN INDEPENDENT MEETING WITH THE PRIMARY PURPOSE OF MAKING LOAD SHED DECISIONS
SEQUENCE OF OPERATION
T
AI
T
AI
CV-7
AOE
GHWS
GHWR
2
POINT SCHEDULE
REHEAT HOT WATER LOOP HEAT EXCHANGER CV-7
HARDWARE POINTS SOFTWARE POINTS
GRAPHIC
SHOWN ON NOTES
BI BO AI AO AV BV SCH TREND
ALARM
BACS EMCS DESCRIPTION
STEAM LOAD SHED X (6)BINARY NETWORK INPUTS FROM EMCS
OUTSIDE AIR TEMPERATURE X X X IF NOT PROVIDED GLOBALLY
GLYCOL LOOP SUPPLY WATER TEMPERATURE X X X X X
GLYCOL LOOP RETURN WATER TEMPERATURE X X X X X
REHEAT HOT WATER LOOP SUPPLY WATER TEMPERATURE X X X X + / - 4 DEG F FROM SETPOINT X
REHEAT HOT WATER LOOP SUPPLY WATER TEMP SETPOINT X X X
REHEAT HOT WATER LOOP RETURN WATER TEMPERATURE X X X X X
REHEAT HOT WATER LOOP DIFFERENTIAL PRESSURE X X X X 10% DEVIATION FROM SETPOINT X REFER TO PLANS
REHEAT HOT WATER LOOP DIFFERENTIAL PRESSURE SETPOINT X X X
REHEAT HOT WATER LOOP SYSTEM PRESSURE X X X X LOW PRESSURE X REFER TO PLANS
REHEAT HOT WATER PUMP START/STOP X X X TYPICAL OF 2
REHEAT HOT WATER PUMP STATUS X X X X FAILURE X VIA CONTACT ON DRIVE - TYPICAL OF 2
REHEAT HOT WATER PUMP SPEED COMMAND X X X TYPICAL OF 2
REHEAT HOT WATER PUMP POWER (KW)X X X BACnet MSTP NETWORK POINT - TYPICAL OF 2
REHEAT HOT WATER PUMP SPEED (RPM)X X X BACnet MSTP NETWORK POINT - TYPICAL OF 2
NOT TO SCALE
4
INDICATES EXISTING
M
SETPOINT
AV
T
AI
N.C.
T
AI
AIR TEMPERATURE
(E)OUTSIDE
AO
(E)P-16
(E)GHWS
(E)GHWR
EP
S
S CS BIBO
SEQUENCE OF OPERATION
SYSTEM DESCRIPTION
GLYCOL PREHEAT LOOP CONTROL VALVE
GLYCOL PREHEAT LOOP PUMP (P-16)
SHOWN SOLID ON THE CONTROL DIAGRAM)
(EXISTING CONTROL POINTS ARE SHOWN DASHED AND NEW CONTROL POINTS ARE
GENERAL
ALL SETPOINTS SHALL BE ADJUSTABLE.
CONTROL POINTS SHALL BE REMOVED AND REPLACED.
EXISTING SYSTEM SHALL BE PROVIDED WITH NEW CONTROL POINTS. ALL EXISTING
SETPOINTS
GLYCOL PREHEAT LOOP SUPPLY TEMPERATURE: SEE RESET SCHEDULE
SYSTEM (BACS).
SYSTEM SHALL BE CONTROLLED THROUGH THE BUILDING AUTOMATION AND CONTROL
DURING A LOSS OF POWER FOR AT LEAST TEN HOURS.
THE BACS SHALL BE CAPABLE OF RETAINING ITS PROGRAMMING AND TIME SETTING
HEAT EXCHANGER (E)CV-5
HOT WATER LOOP
(E)ACS-3&4 PREHEAT
MODIFIED CONTROL SEQUENCE OF OPERATION SHALL BE AS FOLLOWS:
ACS-3&4 GLYCOL PREHEAT LOOP HEAT EXCHANGER (CV-5)
START/STOP
FOR DEMAND.
WHEN THE CONTROL VALVE ON HEAT EXCHANGER CV-7 IS OPEN AND CALLING
SYSTEM SHALL BE WHEN THE OUTSIDE AIR TEMPERATURE IS BELOW 55î€
GLYCOL PREHEAT HOT WATER LOOP CONTROL
TEMPERATURE SETPOINT.
REQUIRED TO MAINTAIN THE GLYCOL PREHEAT LOOP SUPPLY WATER
THE HEAT EXCHANGER STEAM CONTROL VALVE SHALL MODULATE AS
SCHEDULE:
THE SUPPLY WATER TEMPERATURE SHALL BE RESET ON THE FOLLOWING
SWT = 18 ---OAT = 10F &
SWT = 14 ---OAT = 5
1
January 14, 20211 Addendum #1
EXISTING GLYCOL PREHEAT LOOP CONTROL SCHEMATIC AND SYSTEM SUMMARY
Revisions:
Richard McElhiney Architects LLC
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Jacobs
303 South Broadway, Suite G20
Tarrytown NY 10591
914-841-1069 T
M/E Engineering, P.C.
300 Trolley Boulevard
Rochester, NY 14606
585-288-5590 T
Ryan Biggs Clark Davis
257 Ushers Rd
Clifton Park, NY 12065
518-406-5506 T
Delta
860 Hooper Road
Endwell, NY 13760
607-231-6674 T
Trophy Point
4588 South Park Avenue
Blasdell, New York 14219
716-823-0006 T
Key Plan:
Notes:
Rhodes Hall
Cornell University
Ithaca, NY 14850
Scale:
Fifth Floor Renovation
As Indicated
December 4, 2020
December 15, 2020Issued for Bid
S
GFCI
S
GFCI
S
GFCI
S
GFCI
S
GFCI
S
GFCI
S
GFCI
PLAN VIEW
ELEVATION VIEW
3'-6"4'-1"4'-0"4'-6"5'-1"3'-10.5"23'-3.5"
1
2 2
2
3 4 567 8
94'-2"3
MAKE-UP AIR SUPPLY AIR
1 8
10910910
2'-1"
2 2
4 567
Revisions:
Richard McElhiney Architects LLC
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Jacobs
303 South Broadway, Suite G20
Tarrytown NY 10591
914-841-1069 T
M/E Engineering, P.C.
300 Trolley Boulevard
Rochester, NY 14606
585-288-5590 T
Ryan Biggs Clark Davis
257 Ushers Rd
Clifton Park, NY 12065
518-406-5506 T
Delta
860 Hooper Road
Endwell, NY 12065
518-406-5506
Trophy Point
4588 South Park Avenue
Blasdell, New York 14219
716-823-0006 T
Key Plan:
Notes:
Scale: As Indicated
January 20, 2021
Rhodes Hall
Fifth Floor Renovation
Cornell University
Ithaca, NY 14850
Issue for Bid
AIR HANDLING UNIT
DIMENSIONS & DETAILS -HVAC
H-700
DRAWING NOTES
1 35x14 MAKE UP AIR CONNECTION.
2 ACCESS DOOR.
3 PRE-FILTER AND FINAL FILTERS.
4 40% ETHLYENE GLYCOL HEAT RECOVERY COIL.
5 SUPPLY AIR FAN.
6 40% PROPLYENE GLYCOL PRE-HEAT COIL.
7 CHILLED WATER COOLING COIL.
8 26x16 SUPPLY AIR CONNECTION.
9 8" BASE FRAME.
10 6" CONCRETE PAD, REFER TO STRUCTURAL PLANS.
NOT TO SCALE1AIR HANDLING UNIT ACS-8 DETAIL
1 Addendum #1
December 15, 2020
January 20 , 2021
1
1
1
1 1 1 1 1 1
1
Revisions:
Richard McElhiney Architects LLC
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Jacobs
303 South Broadway, Suite G20
Tarrytown NY 10591
914-841-1069 T
M/E Engineering, P.C.
300 Trolley Boulevard
Rochester, NY 14606
585-288-5590 T
Ryan Biggs Clark Davis
257 Ushers Rd
Clifton Park, NY 12065
518-406-5506 T
Delta
860 Hooper Road
Endwell, NY 12065
518-406-5506
Trophy Point
4588 South Park Avenue
Blasdell, New York 14219
716-823-0006 T
Key Plan:
Notes:
Scale: As Indicated
January 20, 2021
Rhodes Hall
Fifth Floor Renovation
Cornell University
Ithaca, NY 14850
Issue for Bid December 15, 2020
SCHEDULES -HVAC
H-800
2. PROVIDE FILTER WITH 36"x36" CLARK AIR SYSTEM SIDE-LOCK FILTER HOUSING.
1. PROVIDE FILTER WITH INTEGRAL 1" RECESS FOR USE WITH PRE-FILTER.
REMARKS:
PRE-FILTER 2 24 12 4 14 Tri-Dim Tri-Pleat UltraF-3 DUCT MOUNTED (E)LEF-1 SIDE SERVICE 4400 0.18 1.0 1 24 24 4 VARIES PLEATED PANEL MERV 9 40-45 29 Tri-Dim Tri-Pleat Ultra 2
1 24 12 12 58 VILEDON MV85F-1 ACS-8 ACS-8 FINAL
FILTER FRONT ACCESS 3700 0.23 1.0 1 24 24 12 VARIES V BANK MERV 13A 80-90 131 VILEDON MV85 1
2 24 12 2 8F-1 ACS-8 ACS-8
PRE-FILTER FRONT ACCESS 3700 0.31 0.75 1 24 24 2 VARIES PLEATED PANEL MERV 8 25-30 17 CAMFILL FARR 30/30 -
(In.) (In.) (In.)
(CFM)HEIGHT WIDTH LENGTH RATING (%) (Sq. Ft.)
BANK NO.AIR FLOW (In. WC) (In. WC) NO. SIZE ARRANGEMENT FRAME MERV EFFICIENCIES AREA
FILTER LOCATION SERVICE TYPE SYSTEM INITIAL P.D. FINAL P.D. CARTRIDGES HOLDING EFFICIENCY MEDIA MANUFACTURER & MODEL NO. REMARKS
AIR FILTER SCHEDULE
LP-1 ROOF ACS-8 INTAKE ALUMINUM 7.1 5 46 19 3/4" 46 3700 525 0.055 GREENHECK WIH - 32x32 -
(CFM) (FPM)
(Sq. Ft.)(In.) (In.) (In.) FLOW VEL. (In. WC)
AREA TIERS WIDTH HEIGHT DEPTH AIR THROAT MAX P.D.
UNIT NO. LOCATION SERVICE TYPE MATERIAL THROAT NO. OF DIMENSIONS (APPROX.) AIR PERFORMANCE MANUFACTURER & MODEL NO. REMARKS
LOUVERED PENTHOUSE SCHEDULE
RHC-3 LABORATORY 551 EQUIPMENT 551 FLANGED 30.2 700 55 95 0.15 414.8 2.0 130 100 0.4 WATER 6 5 13.5 18 AEROFIN W-5.0CF-13.5X18.0-6-0.333 -
RHC-2 LABORATORY 551 EQUIPMENT 551 FLANGED 56.2 1300 55 95 0.22 436.4 4.0 130 100 0.2 WATER 8 5 16.5 26 AEROFIN W-5.0CF-16.5X26.0-8-0.666 -
RHC-1 LABORATORY 551 EQUIPMENT 551 FLANGED 59.6 1380 55 95 0.18 463.2 4.0 130 100 0.9 WATER 6 5 16.5 26 AEROFIN W-5.0CF-16.5X26.0-6-0.333 -
(CFM) (DEG. F) (DEG. F) (In. W.C.) (FPM) (GPM) (DEG. F) (DEG. F) (Ft. HD)(In.) (In.)
FLOW TEMP. TEMP. P.D. VELOCITY FLOW TEMP.TEMP.P.D.INCH LENGTH WIDTH
(MBH) AIR ENT. AIR LVG. AIR AIR MAX. FACE WATER ENT. WATER LVG. WATER WATER FLUID DEEP PER
UNIT NO. LOCATION SERVICE MOUNTING CAPACITY AIR SIDE WATER SIDE ROWS FINS COIL FACE
DIMENSIONS
MANUFACTURER & MODEL No. REMARKS
HEATING COIL SCHEDULE - HOT WATER
CV-7 PENTHOUSE MER REHEAT LOOP PLATE EXCHANGER 9.5 140 105 150 0.63 40% EG 10 100 130 150 0.55 5 14 WATER 61.03 BELL AND GOSSETT GPX-AP20
(GPM) (DEG. F) (DEG. F)(GPM) (DEG. F) (DEG. F)(FPS)
RATE ENT. LVG. (MBH) (Ft. HD)RATE ENT. LVG. (MBH) (Ft. HD) TUBE VEL. PASSES (Sq. Ft.)
FLOW WATER TEMP.CAPACITY PRESS. DROP FLUID FLOW WATER TEMP.CAPACITY PRESS. DROP MAXIMUM NO. OF FLUID SURFACE AREA
UNIT NO. LOCATION SERVICE TYPE HIGH TEMP. SIDE LOW TEMP. SIDE HEAT TRANSFER MANUFACTURER & MODEL NO. REMARKS
HEAT EXCHANGER SCHEDULE - WATER TO GLYCOL
A RETURN STEEL WHITE TITUS MODEL 355-RL -
2 SUPPLY STEEL WHITE TITUS MODEL 272-RL -
1 SUPPLY STEEL WHITE TITUS MODEL TMS -
TYPE APPLICATION MATERIAL FINISH MANUFACTURER & MODEL NO. REMARKS
REGISTER GRILLE AND DIFFUSER SCHEDULE
2. INTEGRAL SOUND ATTENUATOR.
1. FIBER FREE LINER.
REMARKS:
VAV-2 LOUNGE 568 520 270 0.01 8 22 27 TITUS DESV 1,2
VAV-1 CORRIDOR 50044 450 300 0.01 8 19 25 TITUS DESV 1,2
(CFM) (CFM) (In. WC)
FLOW FLOW MAX CFM (In.)
AIR AIR PRESS AT SIZE AT 1" S.P. AT 1" S.P.
UNIT NO. SERVICE MAX MIN MIN INLET INLET RAD N.C. DISCH N.C. MANUFACTURER & MODEL NO. REMARKS
VAV - SINGLE DUCT - AIR TERMINAL UNIT SCHEDULE
1. COIL PERFORMANCE BASED ON TURBULATORS INSIDE OF THE TUBES.
REMARKS:
HRC-2 PENTHOUSE MER EXHAUST AIR STANDARD FLANGED 150 4400 70 45 0.55 489 12 45.76 70 38.6 40% PG 8 12 36 36 AEROFIN W 1, 2
HRC-1 PENTHOUSE MER OUTSIDE AIR STANDARD FLANGED 150 3700 -5 25 0.74 431
P-20
12 42.43 -5 32.8 40% PG 8 10 37.5 33 AEROFIN W 1
(CFM) (DEG. F) (DEG. F) (In. W.C.) (FPM)(GPM) (Ft. HD) (DEG. F) (DEG. F)(In.) (In.)
FLOW TEMP. TEMP. P.D. VELOCITY NO. FLOW P.D.TEMP.TEMP.INCH LENGTH WIDTH
(MBH) AIR ENT. AIR LVG. AIR AIR MAX. FACE PUMP WATER WATER ENT. WATER LVG. WATER FLUID DEEP PER
UNIT NO. LOCATION SERVICE TYPE MOUNTING CAPACITY AIR SIDE WATER SIDE ROWS FINS COIL FACE
DIMENSIONS
MANUFACTURER & MODEL No. REMARKS
ENERGY RECOVERY "RUN-AROUND" COIL SCHEDULE
6. PROVIDE WITH TIGHT SHUT-OFF
5. PROVIDE WITH FACTORY DRAW BAND CLAMPS IF VENTURI STYLE VALVE IS PROVIDED.
4. PROVIDE WITH FAN STATIC RESET IF VENTURI STYLE VALVE IS PROVIDED.
3. PROVIDE WITH FACTORY SOUND NEUTRALIZER IF VENTURI STYLE VALVE IS PROVIDED.
2. THE MAX / MIN POSITIONS ON THE VALVE WILL BE SET AT THE FACTORY TO THE FULL RANGE WITH ACTUAL AIRFLOW SETPOINTS IN SOFTWARE.
1. REFER TO THE LAB AIRFLOW SCHEDULES FOR FURTHER REQUIREMENTS.
REMARKS:
GEV-3 LABORATORY 551 ZONE 3 12" 1790 180 800 400 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
GEV-2 LABORATORY 551 ZONE 2 14" 2750 250 1500 750 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
GEV-1 LABORATORY 551 ZONE 1 14" 2750 250 1380 680 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
SAV-3 LABORATORY 551 ZONE 3 12" 1790 180 700 300 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
SAV-2 LABORATORY 551 ZONE 2 14" 2750 250 1400 140 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
SAV-1 LABORATORY 551 ZONE 1 14" 2750 250 1380 680 HORIZONTAL 0.2 ACCUTROL ACCUVALVE AVC6000 1,2,3,4,5,6
(CFM) (CFM) (CFM) (CFM)(In. WC)
FLOW FLOW FLOW FLOW PRESSURE
(In.) MAX AIR MIN AIR MAX AIR MIN AIR POSITION OPERATING
UNIT NO. LOCATION SERVICE SIZE FACTORY RANGE OPERATIONAL RANGE MOUNTING MINIMUM MANUFACTURER & MODEL NO. REMARKS
LAB AIR VALVE SCHEDULE
1 Addendum #1 January 20, 2021
STD. 279 -5 65 431 0.2 21.1 130 100 4.13 40% EG 408 3 8.76 BUFFALO AIR HANDLING 1
(DEG. F)(DEG. F) VEL. (FPM) (In. WC) FLOW (GPM) TEMP. (DEG. F) TEMP. (DEG. F) (Ft. HD)
(MBH) ENT. AIR TEMP. LVG. AIR TEMP. MAX. FACE AIR P.D. WATER ENT. WATER LVG. WATER WATER P.D. FLUID VOLTS PHASE FLA
TYPE CAPACITY AIR SIDE WATER SIDE
PREHEATING COIL (HOT WATER)UNIT ELECTRICAL
CHARACTERISTICS
MANUFACTURER & MODEL No. REMARKS
AIR HANDLING UNIT SCHEDULE - CHILLED WATER /HOT WATER, CONT'D
1. BOTTOM OF DRAIN CONNECTION SHALL BE A MINIMUM OF 3" ABOVE THE BOTTOM OF THE EQUIPMENT RAIL.
REMARKS:
ACS-8 PENTHOUSE MER 5TH FLR LAB 3700 3700 2.5 7.25 PLENUM 1 - 15" 7.7 3485 DIRECT 7.5 ASD 151.9 21.3 1.45 91 74 53 53 449 26 14.7 47 67 12 9
(CFM) (CFM) (In. WC) (In. WC)& MIN DIA. BHP RPM (MBH) (TONS) (In. WC) DB WB DB WB VEL. (FPM) FLOW (GPM) (Ft. HD) TEMP. (DEG. F) TEMP. (DEG. F)INCH
FLOW O.A. STATIC STATIC TYPE FAN NO. MAX FAN DRIVE HP STARTER SENSIBLE TOTAL AIR P.D. EAT (DEG. F) LAT (DEG. F) MAX. FACE WATER WATER P.D. ENT. WATER LVG. WATER PER
AIR MIN EXT. TOTAL FAN CHARACTERISTICS MOTOR CAPACITY AIR SIDE WATER SIDE ROWS FINS
UNIT NO. LOCATION SERVICE SUPPLY FAN COOLING COIL (CHILLED WATER)
AIR HANDLING UNIT SCHEDULE - CHILLED WATER /HOT WATER
1
3. STAND-BY
2. GLYCOL - PROPYLENE, 40%.
1. GLYCOL - ETHLYLENE, 40%.
REMARKS:
P-21 PENTHOUSE MER ACS-8 PREHEAT COIL INLINE 21 30 175 3995 1/2 208 1 INTEGRAL ASD -180 46.7 0.92 1-1/4 BELL & GOSSETT ECOCIRC XL 55-45 1
P-20 PENTHOUSE MER HEAT RECOVERY INLINE 12 70 95 3450 3 208 3 ASD 4.875 60 28 0.998 1 BELL & GOSSETT E-90 1AAB 2
P-19 PENTHOUSE MER REHEAT LOOP INLINE 10 40 175 3995 1/2 208 1 INTEGRAL ASD -180 28.9 0.45 1-1/4 BELL & GOSSETT ECOCIRC XL 55-45 3
P-18 PENTHOUSE MER REHEAT LOOP INLINE 10 40 175 3995 1/2 208 1 INTEGRAL ASD -180 28.9 0.45 1-1/4 BELL & GOSSETT ECOCIRC XL 55-45 -
(%)(In.)
(GPM) IN FEET (DIA. In.) (DEG. F) EFF.SIZES
& DESCRIPTION FLOW TOTAL HEAD WWP RPM HP VOLTS PHASE STARTER SIZE TEMP. PUMP BHP DISCHARGE
PUMP NO. LOCATION SERVICE UNIT TYPE PUMP CAPACITY MAX MOTOR CHARACTERISTICS IMPELLER FLUID MIN. MAX. SUCTION & MANUFACTURER & MODEL NO. REMARKS
PUMP SCHEDULE
1
LOUNGE568DATA CLOSET552ELEC. CLOSET50075CORRIDOR50044Room571Room572Room574Room576Room578STAIR# 350003GRAD.STUDENTS596GRAD.STUDENTS594STAFF592STAFF590ASSOC.DIRECTOR588LIBRARY586CLERICAL584DIRECTOR582GRAD.STUDENTS580STAIR# 250002SHOP501Room503Room500Room502Room504Room504ARoom50073WOMEN50021Room50063Room50062Room50061MEN50022Room50076Room508Room512Room514Room514BRoom516Room518Room520Room517Room519Room521Room521ARoom523CORRIDOR50044GF8FEDCBA1234567G5H5X1K111098121314X3"(E)IW3"(E)IW(E)IW3"(R) 3" IW & 3/4" DOWN TO SERVICE SINK W/ AIR GAP3"(E) 4" SAN, (E) 3" V, (E) 2" CW, (E) 1" HW UP AND DN(E) 4" S.P.O., (E) 3" V.P.O, (E)CW C.O., (E)HW C.O. REMOVE HW BACK INTO CHASE I.E. = 107" 1111111(E)IW(E)IW3"3"3/4"3/4"111(E) 3" IW UP(E) 3" IW UP(E) 3" IW UPRevisions:Richard McElhiney Architects LLC347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FJacobs303 South Broadway, Suite G20Tarrytown NY 10591914-841-1069 TM/E Engineering, P.C.300 Trolley BoulevardRochester, NY 14606585-288-5590 T Ryan Biggs Clark Davis257 Ushers Rd Clifton Park, NY 12065518-406-5506 TDelta860 Hooper RoadEndwell, NY 12065518-406-5506Trophy Point4588 South Park Avenue Blasdell, New York 14219716-823-0006 TKey Plan:Notes:Rhodes HallCornell UniversityIthaca, NY 14850December 15, 2020Scale:Fifth Floor RenovationAs IndicatedIssue for Bid December 15, 2020PARTIAL FIFTH FLOORDEMOLITION PLAN -PLUMBINGP-1001/8" = 1'-0"1PARTIAL FIFTH FLOOR DEMOLITION PLANDEMOLITION NOTES1 DISCONNECT AND REMOVE CONDENSATE ASSOCIATED WITH HVAC EQUIPMENT BACK TOMOP BASIN. VERIFY EXTENT OF REMOVALS IN FIELD.11 Addendum #1 January 20, 2021
PROJECT: RHODES HALL 5TH FLOOR RENOVATION Date: January 20, 2021
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1 42200 Full section
Spec 042200: Is this section applicable? I did not notice masonry looking through drawings and just want to confirm.There is only minor penetration work at the existing block wall in the mechanical shaft. See plumbing Drawings.
2 A-141 Note 5 - wire mesh curtain and
track
Drawing A-141: Is there a spec for note #5, wire mesh curtain
& track?
Please see Addendum No 1, Item 2 for added
specification 018211.
3 A-141 Note 9 - open shelving
Drawing A-141: Is there a spec for note #9, Open Shelving?Please see Addendum No 1, Item 7. The shelving is N.I.C.
4 Temporary Walls, T-004 Keynote 1
Are there locations you would like temporary walls installed? It
looks like portions of work area may be exposed to occupied areas.
Yes, see drawing T-004, Keynote 1.
5 Air Handling Unit
It appears as though the intent is to bring the sections of the air
handling unit to the penthouse via the elevator. Can you please
provide the maximum dimensions and weights that the elevator will accommodate? If that is not the intended method to get
the air handler to the penthouse can you please tell me the
anticipate method to get the unit there.
That is the intended method. Please see Addendum
No 1, Item 4 for additional elevator weight and
dimension information.
6
Steel Frame Entrances &
Storefront, Section
084123, Drawing A-601
1. Door & Frame System Schedule, Sht. A-601: Dr. 551-1 (base bid & alt 1), 551-2 (base bid & alt 1), & 551-3 are
showing as steel framed entrance and storefront system type
openings per Section 084123 Steel Frame Entrances & Storefront. Para. 2.3, A. Steel Framing System, is calling for
VDS Framing fire rated steel frame system..also noted as E119 Framing from Assa Abloy, Ceco Door. The rating is shown to be as indicated on the drawings and as 60 minutes. The Door &
Frame System Schedule, Sht. A-601, shows only Dr. 551-1 (base bid & alt 1) to be 60 minute rated. Are Dr. 551-2 (base
bid & alt 1) & 551-3 to be provided as E119 fire rated framing
regardless of the lack of a fire rating requirement (none) according to the Door & Frame System Schedule? The head &
jamb details referenced on both these openings show 60 minute
fire rated door frame. Clarification is requested.
Yes, E119 shall be provided even when no rating is required on the drawings. This is for consistency in
appearance (to match adjacent existing framing in the
corridor). Please note the glazing varies and is not rated where no wall rating is required.
7 Door Hardware Schedule.
Section 080671 3.1
Door Hardware Schedule Section 080671: Hardware Set 5.0
(Dr. 50021-1 & 50022-1) is showing simply as "to follow". Please provide.
Please see Addendum No 1, Item 1 for updated set in
the specifications.
8 Resinous Flooring Is Stonhard an acceptable resinous flooring?No. Stonhard does not appear to meet the design
intent.
9 Wire Mesh Divider
Curtain
Please provide Specifications for the Wire Mesh Divider Curtains as indicated per Key Note 9/A-101.Please see Addendum No 1, Item 2 for added specification.
10 Barn-Door Style White
Boards
Please provide Specifications for the Moveable Barn-Door
Style White Boards to be provided in Alternate #2.
Please see section 101116 Glass Markerboards and
Section 087100, 2.17 Sliding Track Hardware.
11 Wire Mesh Curtains
Can a manufacture/Specification be provided for the Wire
Mesh Divider Curtains and Track? There are many different
mesh wire sizes and materials.
Please see Addendum No 1, Item 2 for added
specification.
12 Wall Reveal Detail A-502 8/A-502
Does Wall Reveal Detail ( 8/A-502) need to be maintained at
the Acoustic Panels along the windows? ( Ref. 6/A-502, 11/A-
503)
No, it does not need to be maintained in the acoustical
panels. Please see detail 6/502.
13 Carpet Tile
Finish Schedule A-603 at CPT-1 Carpet tile specifies Interface
Honor Roll Collection; This is a collection of Four Different
Styles Exposed, Cubic, Verticals and Profiles; all Four styles have different price points. Please specify a style name for
clarification and accurate pricing.
Link to Carpet brochure:
https://interfaceinc.scene7.com/s7viewers/html5/eCatalogViewer.html?asset=InterfaceInc/ec_am-honorrollviewbook2018&config=InterfaceInc/Universal_HTM
L5_eCatalog_Adv_2
Please see Addendum No 1, Item 12 for style
clarification.