Loading...
HomeMy WebLinkAboutOlin Hall 2024 Room B40 Minor Lab-top Epoxy Abatement SOWCornell University – Asbestos Abatement Type 1 Project Scope of Work Page 1 of 5 Project Location/Information: Date Prepared: September 11, 2020 Building Name / Code / Address: Olin Hall / 2024 / 113 Ho Plaza, Ithaca, NY Cornell Space ID#(s): Basement Room B40 Cornell Project Representative: Mike Swartwout (Office: 607-255-4920 / Cell: 607-327-0128) Cornell Building Coordinator: Thom Quinn (Office: 607-255-3540, Room B-14A in Olin Hall) Quantity and description of materials being removed: Abatement operations shall include the removal of non-asbestos Lab-tops / Sink-top / Backsplashes and their associated non-friable organically bound (NOB) asbestos containing joint/seam epoxy present along the west wall in Room B40. All Lab-top/sink utilities shall be disconnected prior to abatement operations. The ACM epoxy is applied at the various joints/seams on the lab-top/sink-top sections and backsplashes to be removed. The total quantity of asbestos containing joint/seam epoxy to be removed is less than 1 square foot (23 linear feet at an average 1/8” width). Reference the attached drawing for the lab-top sections and their associated backsplashes to be removed. All lab-top bases shall be cleaned and are to remain. Method of Abatement: Non-Asbestos Lab-tops and associated ACM joint/seam epoxy removal shall be performed as per the requirements of 12 NYCRR Part 56-11.1 for In-Plant operations and Part 56-11.3 for Minor Asbestos Projects. Abatement Project Schedule/Dates/Manpower: Anticipated Crew Size: 1 Supervisor 2 Worker Project Schedule: Abatement operations including work area preparation, abatement, and final cleaning shall be performed during a worst-case single shift on Wednesday, September 16th, 2020 starting at 7:30 am. Contact Building Coordinator Tom Quin upon arrival for Room Access. Special Project Conditions: Project Power: Existing Building Power to be utilized Project Water: Source to be provided by the Owner Negative Air Exhaust Location: Localized via HEPA-Vacuum. Project Documentation / Requirements: Work Order No. Reference Task Authorization for Work Order No. Prevailing Wage Rate Project: Yes No X Cornell University – Asbestos Abatement Type 1 Project Scope of Work Page 2 of 5 Building Permits: State Permit Required: Yes No X ; Contractor to Procure: Yes No Local City Permit Required: Yes X No ; Contractor to Procure: Yes X No Project Notifications: NYS DOL 10-Day Notification Required: Yes No X EPA 10-Day Notification Required: Yes No X Building Occupant Posting, Date of Posting: As necessary for 9/16/2020 project date Prepared By: DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, DPC Stephen Prislupsky Director of Environmental Services NYS DOL Asbestos Project Designer Certificate No. 90-10891 Cornell University – Asbestos Abatement Type 1 Project Scope of Work Page 3 of 5 Attachment A Drawings Cornell University – Asbestos Abatement Type 1 Project Scope of Work Page 4 of 5 Attachment B Photos Cornell University – Asbestos Abatement Type 1 Project Scope of Work Page 5 of 5 Non-Asbestos Lab-top / Sink-top / Backsplash with ACM Joint/Seam Epoxy to be removed (sections present on blue base cabinets in photos)